1. The complete cycle of pole erection can be done by two labors only against the current manual practice of 12 to 14 labors.

2. it takes very little time to make a pit (Approx 05 to 07 Min) against the time taken by manual labor is 5 to 6 hour. This reduce the burden of labor management and Huge cost saving.

3. This is a tractor operated application ,designed especially for Rural Electrification work hence Pit designs and dimension can be customized as per pit design.

4. Most critical benefit is huge cost saving and very high speed of work.

5. It eliminates the prevailing labor problem completely thus leads to project on time execution.

6. Ultra low initial investment, under the reach of a tiny petty contractor also.

7. You can also use this machine for Transformer shifting on pole and VCB installation in sub station work as well as other material handling like wire drum loading un loading etc.

Page 3: Presentation 2003

1. Production capacity of machine is very high, with proper planning and execution per shift of 8 working hour it can complete the pole installation of 25 to 30 pole per shift by two labors only.

2. For Rest of the work like Stay, Earthing Pit making will be very high almost 05 to 07 min per pit.

3. Huge cost saving for contractor – Avg. a contractor pays 600-800Rs per Pole. With help of machine same pole can be erected only at the expenses 100 Rs which leads to the saving of Rs 12000/- (Twlve thousand per day per machine) in addition to that it also ensues timely execution of the project.

Page 4: Presentation 2003

1. Very high strength materials has been used to manufacture its components hence almost nil repairs and maintenance is needed.

2. In case of any failure we have developed a support system to provide service at site.

3. We have full back ups of parts inventory which will ensure the smooth operation of machine and lowest breakdown time.

Page 5: Presentation 2003

1 It can Make Pit for building pilling also.2 It can be used for making pit for mass

scale plantation to execute govt projects.3 It is also used in executing solar projects

for piling.4 Remain Useful for various other purpose

where Pit is required.

Page 6: Presentation 2003
Page 7: Presentation 2003

To Download Video Please paste the link on internet browser.

http://www.4shared.com/file/JvtgKL1u/Hole_-Pit_Machine_Demo_call-9.html

http://www.4shared.com/file/PXAU_MVR/Pole_Errection_Machine_call_me.html

Page 8: Presentation 2003

B K Singh.Surya Infrastructure.

2nd Lane, Gandhi Nagar, Berhampur, Orissa.

[email protected]@hotmail.com

Call us Mob – 9439525334 / 9692205054.OFF- 0680-2223685