Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein, AIA, PP, LEED Managing Partner The Goldstein Partnership, Architects Outline of Presentation • Aerial Views of Site, showing alternatives • Plans of Existing and of 4 Potential Designs • Site Plan Diagrams, showing alternatives • Comparison of the Design Schemes • Design Recommendation • Additional Background Information Purpose of Presentation The primary purpose of this Presentation is to provide the Council with the information necessary to select a Design Scenario to advance. Aerial View of Site Borough Hall Fire House Police Building North Main Street Historical Society EXISTING MUNICIPAL BUILDING 1 2 3

Transcript of Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design...

Page 1: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Preliminary Design PresentationHIGHTSTOWN MUNICIPAL BUILDING

Hightstown, NJ

September 16, 2013

Eli Goldstein, AIA, PP, LEEDManaging Partner

The Goldstein Partnership, Architects

Outline of Presentation

• Aerial Views of Site, showing alternatives• Plans of Existing and of 4 Potential Designs• Site Plan Diagrams, showing alternatives• Comparison of the Design Schemes• Design Recommendation• Additional Background Information

Purpose of Presentation

The primary purpose of this Presentation is to provide the Council with the information necessary to select a Design Scenario to advance.

Aerial View of Site

Borough Hall

Fire House

Police Building

No

rth

Main

Str

ee

t

Historical Society

EXISTING MUNICIPAL BUILDING

1

2

3

Page 2: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Aerial View of Site

Borough Hall

Fire House

Police Building

No

rth

Main

Str

ee

t

Historical Society

EXISTING MUNICIPAL BUILDING, AFTER DEMOLITION OF POLICE BUILDING

Aerial View of Site

Existing Building

Fire House

Police Building

No

rth

Main

Str

ee

t

Historical Society

Addition

BOROUGH HALL WITH ADDITION (SCHEMES 2 & 3)

Aerial View of Site

Borough Hall

Fire House

Police Building

No

rth

Main

Str

ee

t

Historical Society

New Municipal

&Police

Building

NEW COMBINED MUNICIPAL & POLICE BUILDING (SCHEME 4)

4

5

6

Page 3: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Existing Floor Plans

The Goldstein PartnershipArchitects & Planners

ExistingFirst Floor

ExistingSecond Floor

7

8

9

Page 4: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Design Scenario #1Separate Police Building

The Goldstein PartnershipArchitects & Planners

NOTE: Plans are subject to revision to

accommodate Mechanical and Electrical Equipment Rooms and chases, once their

sizes and locations have been established.

Scheme #1First Floor

Scheme #1Second Floor

10

11

12

Page 5: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Design Scenario #2Police Addition

The Goldstein PartnershipArchitects & Planners

NOTE: Plans are subject to revision to

accommodate Mechanical and Electrical Equipment Rooms and chases, once their

sizes and locations have been established.

Scheme #2First Floor

Scheme #2Second Floor

13

14

15

Page 6: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Design Scenario #3Integrated Addition

The Goldstein PartnershipArchitects & Planners

NOTE: Plans are subject to revision to

accommodate Mechanical and Electrical Equipment Rooms and chases, once their

sizes and locations have been established.

Scheme #3First Floor

Scheme #3Second Floor

16

17

18

Page 7: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Design Scenario #4Entirely New Building

The Goldstein PartnershipArchitects & Planners

NOTE: Plans are subject to revision to

accommodate Mechanical and Electrical Equipment Rooms and chases, once their

sizes and locations have been established.

Scheme #4First Floor

Scheme #4Second Floor

19

20

21

Page 8: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Massing Study for Scheme 4

Interior Perspective Study of Council Room in Scheme 4

Shortcomings in Thermal Envelopeof existing Borough Hall

• Roofs are either poorly insulated or uninsulated

• Exterior walls are either poorly insulated or uninsulated

• These characteristics necessitate larger capacity mechanical equipment than for a new building

• This larger equipment results in higher operating costs, year after year.

A new building will be much more energy-efficient, resulting in significant operational economies over its service life.

22

23

24

Page 9: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Site Plan Comparison

The Goldstein PartnershipArchitects & Planners

NOTE: Plans are subject to revision to

accommodate Mechanical and Electrical Equipment Rooms and chases, once their

sizes and locations have been established.

Site Diagram: Existing

Site Diagram: Schemes 2 & 3

25

26

27

Page 10: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Site Diagram: Scheme 4

Comparison of Design Scenarios

The Goldstein PartnershipArchitects & Planners

Comparison of Design Schemes

BLDG. FOOT-PRINT

SCHEME 1 2 3 4BOROUGH HALL RENOVATED RENOVATED RENOVATED NEW/COMBINED

POLICE BUILDING

NEW ADDITION ADDITION NEW/COMBINED

SEPARATE BLDGS.

2 1 1 1

MEETS PROGRAM?

NO NO YES YES

OPERATING COST

HIGH MEDIUM MEDIUM LOW

PROJECT DURATION

INTERMEDIATE LONGEST LONGEST SHORTEST

BLDG. AREA (in nom. sq. ft.)

12,000 SF 12,000 SF 12,000 SF 12,000 SF

RELATIVERISK

INTERMEDIATE HIGHEST HIGHEST LOWEST

RECOMMENDEDSCHEME

28

29

30

Page 11: Preliminary Design Presentation HIGHTSTOWN MUNICIPAL … · 2013-09-17 · Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ September 16, 2013 Eli Goldstein,

Some aspects of Borough Hall not in conformance with current codes

• Egress Stairwells, which are not enclosed • Courtroom, which is not fully accessible• Lack of a secure route to walk detainees to Court• Toilet Rms, which are too small for occupant load• Mold and asbestos must be remediated.

Because making Borough Hall habitable again requires that the building be unoccupied during construction, this is a “reconstruction” project, which triggers these and other upgrades.

Questions & Answers