THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY

Transcript of THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE...

Page 1: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

THE BOROUGH OFHIGHTSTOWN

ENVIRONMENTAL COMMISSION

STORM WATER MANAGEMENT DEMONSTRATION

AT

THE HIGHTSTOWN HOUSING AUTHORITY

Page 2: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

HURRICANE IRENE, THE AFTERMATH

Page 3: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

BOROUGH WATER PLANT

Page 4: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

STORM WATER VICTORY IN HIGHTSTOWN

Borough of Hightstown Adopts Storm water Management Ordinanceto Protect Clean Water and Alleviate Future Flooding

In response to Hurricane Irene and its severe flooding aftermath in August 2011, the Hightstown Environmental Commission with assistance from the Stony Brook Millstone Watershed drafted and garnered public and official support for ground-breaking changes to its Storm water Management Ordinance.  The changes are uniquely suited to highly urbanized areas with small lot sizes.    The State Model Ordinance does not address urbanized areas with very small lots. This ordinance creates a process for the Environmental Commission to review all zoning permit applications, including permits those for additions and alterations existing single-family residences. 

Page 5: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

OPPORTUNITY

THE ENVIRONMENTAL COMMISSION PARTNERED WITH THE HOUSING AUTHORITY TO SUBMIT AN APPLICATION FOR A $10,000 SUSTAINABLE JERSEY/PSE&G GRANT TO BUILD A DEMONSTRATION SITE TO SHOWCASE 3 SIMPLE STORM WATER SOLUTIONS THAT BUSINESSES AND HOMEOWNERS CAN USE TO HELP REDUCE THE RUNOFF FROM THEIR PROPERTY. THE PROJECT WAS SELECTED AND FUNDED IN THE FALL OF 2012.

Page 6: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

RAIN GARDENS

THE LARGEST AND MOST COMPLICATED PROJECT, THE RAIN GARDEN WAS CONCEIVED AND DESIGNED BY MEMBERS OF THE ENVIRONMENTAL COMMISSION TO HANDLE THE RUNOFF FROM ONE OF THE HOUSING AUTHORITY’S LARGEST BUILDINGS. THE GARDEN AND ASSOCIATED PIPING IS DESIGNED TO HANDLE 2 TIMES THE AVERAGE RAINFALL EVENT. IN THE COURSE OF AN AVERAGE YEAR IN NEW JERSEY, THIS RAIN GARDEN WILL RECHARGE OVER 169,000 GALLONS OF WATER BACK INTO THE SOIL, AND MORE IMPORTANTLY, KEEP IT FROM RUNNING DOWN THE STREET INTO OUR LAKES AND STREAMS.

Page 7: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

OUR COMPLETED RAIN GARDEN

Page 8: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

BUDGET VS. ACTUAL COST-RAIN GARDEN

Rain Garden Construction Budgeted: Actual:

Planning and Design $ - Donated by Architectural Firm

Excavation $ 5,500.00 $ 3,590.00 3/18/2013 13721

Rain Garden initial shaping and grading

Leader boxes $ 975.00

13 boxes and grates @62.58 from NDS Systems, Inc. installed by Growing Concern

Gutter modification $ - parts and volunteer labor

EZ flow piping installed $ 1,500.00 $ 3,270.00 3/18/2013 13721

9.24 per lineal foot from NDS Systems Inc. Installed by E.C

grading and seeding $ 1,500.00 Growing Concern

Labor-trenching and filling $ 3,000.00 $ 3,270.00 3/18/2013 13721

300 Lineal feet of trench for EZFLOW installation

Labor-finished grading and planting $ 750.00 $ 750.00

E.C will seek volunteers from Community

plant materials and mulch $ 1,000.00 $ 2,510.00 13763Growing Concern

Total Cost $ 14,225.00 $ 13,390.00

Page 9: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

RAIN BARRELS

OUR RAIN BARREL PROJECT WAS DESIGNED TO TAKE THE WATER FROM A PORTION OF THE ROOF OF THE OFFICE BUILDING AND STORE IT TO BE USED FOR IRRIGATION. THE EXCESS RAINFALL IS RECHARGED BACK INTO THE SOIL THROUGH LATERAL LINES OF EZFLOW PIPING. THIS PROJECT IS ONE OF THE SIMPLEST PROJECTS FOR HOMEOWNERS.

Page 10: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

OUR COMPLETED RAIN BARRELS

Page 11: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

COST BREAKDOWN- RAIN BARRELS

Rain Barrel Installations Expended Chk#

Rain Barrels $ 436.00 $ 590.24 13625Purchased from Gardener's Supply-Flat backed with hubs for attaching to wall.

Rain Barrel Stand $ 135.08 $ 109.29 137554@ $33.77 from the Home Depot

Gutter Modification $ - Donated E.C. Labor

Over flow piping $ 159.88 $ 50.57 11/21/2012 4@ $39.97 from the Home Depot

Trenching Labor $ 1,800.00 $ 1,800.00 11/21/2012 135390 lineal feet of 8"x18" deep trench including soil removal(Growing Concern)

EZ Flow piping installed $ 450.00 $ 450.00 11/21/2012 13539.24 per lineal foot from NDS Systems Inc. Installed by E.C and backfilled and graded by Growing Concern

Soaker hoses $ 95.76 8- 50 foot soaker hoses @ 11.97 from the Home Depot, installed by the E.C.

Total Cost $ 3,076.72 $ 3000.00

Page 12: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

DRYWELLS

ADDING DRYWELLS TO THE SITE IS AN IDEAL WAY OF RECHARGING STORM WATER DIRECTLY INTO THE SOIL IN AREAS WHERE OTHER SOLUTIONS ARE NOT PRACTICAL. DRYWELLS WORK THROUGH PERCOLATION, WHERE THE WATER FROM THE IMPERVIOUS SURFACE IS CHANNELED TO THE DRYWELL AND ALLOWED TO NATURALLY PERCOLATE INTO THE SURROUNDING SOILS. OUR DESIGN INCORPORATED EZFOW PIPING WHICH INCREASES THE OVERALL SURFACE AREA FOR PERCOLATION.

Page 13: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

DRYWELL DRAWING

Page 14: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

DRYWELL INSTALLATION

Page 15: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

DRYWELL COST BREAKDOWNDry Well installation Budgeted Expended

Planning and Design $ - Donated by

Architectural firm

3- 24 inch drywells$ 682.02

3 @ 227.34 from NDS Systems, Inc.

40 lineal feet of 4 inch ezflow pipe $ 200.00

9.24 per lineal foot from NDS Systems Inc. Installed by E.C and backfilled and graded by Growing Concern

Escavation and trenching $ 1,500.00 Escavation and excess

soil removal

Leader boxes $ 300.00

4 boxes and grates @62.58 from NDS Systems, Inc. installed by Growing Concern

3/4 clean Gravel $ 375.00 3 Cubic yards at $125

per yard from Trap Rock

Final grading and seeding $ 550.00 $ 2,850.00 11/21/2012 13515Growing Concern

Total Cost $ 3,607.02 $ 2,850.00

Page 16: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

WHAT HAVE WE LEARNED?

• CONSTRUCTION OF SIMPLE STORM WATER MANAGEMENT SOLUTIONS CAN BE INCORPORATED INTO MOST NEW AND EXISTING HOMES AND BUSINESSES.

• STORM WATER SOLUTIONS CAN BE HIDDEN OR QUITE ATTRACTIVE ADDITIONS TO YOUR LANDSCAPE.

• MOST PROJECTS ARE FAIRLY SIMPLE AND CAN BE ACCOMPLISHED BY AN AVERAGE HOMEOWNER.

Page 17: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

WHAT HAVE WE ACCOMPLISHED?• THIS PROJECT REDUCES THE RUNOFF FROM THE HIGHTSTOWN HOUSING

AUTHORITY SITE BY APPROXIMATELY 14%. THE AUTHORITY HAS ALREADY EXPANDED UPON THE PROJECT, ADDING DRAINAGE AND DRYWELLS IN TWO OTHER AREAS.

• 197,000 GALLONS OF WATER EACH YEAR WILL BE RECHARGED IN THE AQUIFER FROM THIS PROJECT INSTEAD OF RUNNING DOWN THE STREET INTO THE LAKE. JUST IN THE MONTH OF JUNE, 2013 WE HAVE COLLECTED OVER 40,740 GALLONS OF WATER. THAT IS THE EQUIVALENT OF FILLING 2 AVERAGE 20X40 FOOT IN GROUND POOLS. (OR FILLING THIS ROOM TO THE CEILING 1.5 TIMES)

• WE HAVE ADDED AN ATTRACTIVE LANDSCAPE FEATURE IN TOWN FOR ALL RESIDENTS TO ENJOY.

Page 18: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

PROJECT UPDATE

• AFTER 6 MONTHS OF EXPERIENCE WITH OUR STORM WATER PROJECTS AT THE HIGHTSTOWN HOUSING AUTHORITY, WE ARE VERY PLEASED WITH THE RESULTS. WE HAVE ALREADY INSTALLED A DRYWELL AND EZFLOW IN ONE OTHER AREA AND WILL BE DOING SIMILAR SOLUTIONS ON 2 OTHER BUILDINGS THIS FALL. WHEN COMPLETE THIS FALL, WE WILL HAVE DOUBLED THE SIZE OF THE ORIGINAL PROJECT, WITH PLANS TO INCORPORATE SIMILAR MEASURES ACROSS THE PROPERTY.

Page 19: THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.

SPECIAL THANKS

• THE SUSTAINABLE JERSEY/ PSEG SMALL GRANTS PROGRAM

• THE BOARD OF COMMISSIONERS OF THE HIGHTSTOWN HOUSING AUTHORITY

• STONY BROOK MILLSTONE WATERSHED

• MEMBERS OF THE ENVIRONMENTAL COMMISSION WHO MADE THIS PROJECT A SUCCESS.