PRE-FEASIBILITY REPORT
For
Proposed Expansion of Bulk Drugs & Chemical Manufacturing Unit (480 TPA)
At
Plot No. SP1-6B, RIICO Industrial Area,
Sotanala, Tehsil-Behror-301701 Distt- Alwar (Rajasthan).
Proposed By
Sharika Life Science Pvt. Ltd.
Prepared by
M/s. Mantras Green Resources Limited
25
INDEX
Sr. No. Content Page No.
1. Executive Summary 28
2. Introduction of Project / Background Information 30
2.1 Identification of project and Project proponent 30
2.2 Nature of the project 32
2.3 Need for the project 32
2.4 Demand and Supply Gap 33
2.5 Employment Generation (Direct or Indirect due to the project) 33
3. Project Description 34
3.1 Type of the Project 34
3.2 Location 34
3.3 Details of Alternate Sites considered and the basis of selecting the
proposed Site
37
3.4 Size & Magnitude of Operation 37
3.5 Project Description 37
3.5.1 Products 38
3.5.2 Process Details 38
3.6 Raw materials 41
3.7 Resource optimization/recycling and reuse 42
3.8 Water Requirement & Distribution 42
3.8.1 Water Requirement 42
3.8.2 Wastewater Generation 44
3.8.3 Power and Fuel Requirement 44
3.9 Waste Generation and its Management 45
3.9.1 Liquid waste Generation and its Management 45
3.9.2 Solid waste Generation and its Management 45
4. Site Analysis 46
4.1 Connectivity 46
4.2 Land Form / Land Use / Land Ownership 46
4.3 Topography 47
4.4 Existing Land Use Pattern 47
4.5 Existing Infrastructure 47
4.6 Soil Classification 48
4.7 Climate & Rainfall 48
4.8 Social Infrastructure Available 48
5. Planning Brief 48
5.1 Planning Concept 48
5.2 Population Projection 49
5.3 Land use Planning 49
26
5.4 Assessment of Infrastructure Demand (Physical and Social) 49
5.5 Amenities/ Facilities 49
6. Proposed Infrastructure 49
6.1 Industrial Area (Processing Area) 49
6.2 Residential Area (Non Processing Area) 49
6.3 Green Belt 50
6.4 Connectivity 50
6.5 Water Management (Source & Supply of water) 50
6.7 Sewerage System 50
7. Rehabilitation and Resettlement (R& R) Plan 50
8. Project Schedule and Cost Estimates 50
9. Analysis of Proposal 51
27
List of Tables
Table No. Content Page No.
1 Details of Project and its required infrastructure 29
2 List of products manufactured 32
3 Manpower Details 33
4 Area Statement 37
5 List of products along with proposed quantity per annum 38
6 List of Raw Material 42
7 Water Requirement 43
8 Waste Water Generation 44
9 Power Requirement 44
10 Details of Solid Waste 45
11 Site Analysis 46
12 Land Use 47
13 Budget for Environment protection measures 51
List of Figures
Figure No. Content Page No.
1 Structure of Manpower 34
2 Map of Rajasthan 35
3 Map of District- Alwar 35
4 Google Image of Site 36
5 Flow chart of Intermediate Production Process 40
6 Flow chart of API Production Process 41
7 Water Balance Diagram 43
28
1. EXECUTIVE SUMMARY:
Brief about Project:
Sharika Life Science Pvt. Ltd. (SLPL) is engaged in the business of Active Pharmaceutical
Ingredients and Finished Formulations. A premier company that is managed by qualified and
experienced Professionals and Technocrats, who pool in their collective expertise to bring out
the best. After having achieved recognition in the field of indenting and contract
manufacturing Sharika has ventured into manufacturing and is successfully running a
distillation plant.
SLPL has been contacted and assigned by some exporters and domestic buyers to synthesize
and develop Beta Lactam and non-sterile Cephalosporin for local and global markets. The
faith shown by these exporters and domestic buyers in our exceptional custom synthesis
capabilities has encouraged us to set up this facility in our premises.
SLPL has an exciting unit with production capacity of 740.00 TPA Solvent productions at
plot no. SP1-6 (B) RIICO Area Sotanala, Behror, District Alwar, Raj. Now they are
proposing to expand unit of Bulk Drugs & Chemical Manufacturing Unit with capacity of
480 TPA.
The activity falls under schedule 5 (f) B Synthetic organic chemicals industry in Notified
industrial area / estate which requires environmental clearance under notification SO 1533
dated 14th
September 2006.
29
Table 1- Details of project and its required infrastructure
S. No. Parameters Details
1 Site Plot No.- SP1-6(B), RICCO Industrial Area, Sotanala, Tehsil Behror, Alwar,
Rajasthan
2 Capacity Existing capacity: 740 TPA (Solvent).
Proposed product capacity: 480 TPA.
3 Water
requirement
Total
water
requireme
nt
Existing daily water requirement –7.08 KLD
Proposed additional water requirement: 6.42 KLD
Total Water Requirement : 13.5 KLD
Source RIICO, Behror.
No borewell water use is proposed at site.
Fresh water
requirement • Source: RIICO
Proposed Water Requirement
Fresh
(M3/d
ay)
Recycle
used
(M3/day
)
total
Require
d
(M3/day
)
Consump
tion / loss
(M3/day)
Efflue
nt
(M3/d
ay)
1 Process 6 0 6 0 7
Scrubber 0 0 0 0 0
6 0 6 0 7
2 Boiler 3 4.5 7.5 3 4.5
Cooling
Tower 0 2 2 2 0
3 6.5 9.5 5 4.5
3 Domesti
c 4.5 0 4.5 4.5 0
4 Green
belt 0 3 3 3 0
GRAND
TOTAL 13.5 9.5 23 12.5 11.5
S. No. Parameters Details
4 Power
Requirement
30
2. INTRODUCTION OF PROJECT /BACKGROUND INFORMATION
2.1 Identification of the Project and Project Proponent
Sharika has been contacted and assigned by some exporters and domestic buyers to
synthesize and develop Beta Lactam and non-sterile Cephalosporin for local and global
markets. The faith shown by these exporters and domestic buyers in our exceptional
custom synthesis capabilities has encouraged us to set up this facility in our premises.
Profile of the Directors:
Anil Bali, Director is a post graduate with 29 years of industrial experience related to
Active Pharmaceutical Ingredients, Chemicals and Formulations.
Power Requirement
Existing Additional
Proposed
3. Connected
Load
240 KVA 510 KVA
4. DG set 1 DG of 380 KVA 1DG of 500
KVA
5 Fuel
Requirement Sr. No
Fuel Existing Total
3. HSD 200 LPD 2000 LPD
4. Pet coke 100 kg/h
6 DG Set 1 DG sets already exist on site of capacity 380 KVA of stack height 6 mt.
1 New DG’s are proposed of capacity 500 KVA of stack height 7 mt.
7 Project Cost Total Investment (Lakhs)
Cost of Plot 400
Building & Structure 210
Plant & Machinery 497
Misc. Fixed Assets 15.65
Pre-liminary& Pre- operative
Expenses 6.62
Contingencies / Price Escalation
@ .75%
5.42
Working Capital 209.06
Total 1343.75
31
Poonam Bali, Director is a graduate from Delhi University with 28 yr. of work
experience in the field of advertising & pharma. She also has experience in managing
finance of the group.
R.P.S Chauhan, Technical Director is a Master of Science (Chemistry) and Post
Graduate in production. A scientist of repute with over 30 years of experience in R & D
relating to Semi Synthetic Penicillin with related intermediates (side chain) and has
successful stints with major pharmaceutical companies in India.
SLPL have a existing chemical factory at RIICO, Behror, measuring plot area 26014.44
sq. mts. To fulfill the increasing demand the expansion of product is planned in same
factory premises. The same factory building will be utilized for production of new
products along with expansion of processing area, Final storage area and office area.
The activity falls under schedule 5 (f) B Synthetic organic chemicals industry in
Notified industrial area / estate which requires environmental clearance under
notification SO1533 dated 14th September 2006.
SLPL has obtained consent to operate from RSPCB vide file no.-
F(SCMG)/Alwar(Alwar)/641(1)/2013-14/7727-7729 dated 13/10/2016.
The Ministry of Environment and Forests (MoEF) Government of India has issued an
EIA notification, S .O. 1533 dated 14 September 2006 notification amended in 1
December 2009 wide no. 3067. Under Environmental (Protection) Act (EPA) 1986,
Prior Environmental Clearance from the EIA Authorities is mandatory for the
establishment of projects/activities listed in the schedule of above notification. This
project is categorized under 5 (f) B Synthetic organic chemicals industry in Notified
industrial areas / estate of schedule of activities and therefore requires prior
environmental clearance from the Expert appraisal committee / authority.
32
2.2 Nature of the Project
Table 2 - List of products manufactured
Sr. No Product Name
proposed
capacity
T / Annum
Products
1. Cloxacillin Sodium Alternative
production
with maximum
capacity of 300
TPA
2. Flucloxacillin Sodium
3. Dicloxacillin Sodium
4. Oxacillin Sodium
5. AmoxycillinTrihydrate
6. Ampicillin Trihydrate
Intermediate Products
7. CMIC Chloride Alternative
production
with maximum
capacity of 180
TPA
8. FCMIC Chloride
9. DICMIC Chloride
10. PCMIC Chloride
11. Sodium Hexonate
2.3 Need for the project
India with its large talented manpower, cost effective chemical synthesis, legal &
financial framework is poised to become sourcing destination of bulk drugs to the
global markets.
The project is benefitted to fulfill domestic & exports requirements for the
manufacturing of various B-lactam without affecting environmental conditions of the
area.
The pharmaceutical industry in India ranks third in the world in terms of volume and
contributes 10% to the global pharmaceutical production. According to the Department
of Pharmaceuticals, the Indian pharmaceutical industry is pegged at Rs 810 bn, which
includes domestic sales and exports. The industry is the fourteenth-largest in the world
in terms of value and accounted for 1.5% of the global pharmaceutical market. The
industry has a lower share in the global market because Indian products are available at
a price that is 5-50% lower than that in the developed countries.
There will be very good opportunity of employment generation of additional qualified
staff & unqualified workers due to the proposed project
33
2.4 Demand and Supply Gap
Over the years, the production of bulk drug has made significant progress. The drug &
pharmaceutical industry in India meets around 70% of the country’s demand for bulk
drugs, drug intermediates, pharmaceutical formulations, chemicals, tablets, capsules,
orals & injectable. There are about 250 large pharmaceuticals manufacturers and
suppliers and about 8000 small scale pharmaceutical & drug units which form the core
of the pharmaceutical industry in India. These bulk drugs & pharmaceuticals
manufactures produce the complete range of pharmaceutical formulation i.e. medicines
ready for consumption by patients and about 350 bulk drugs i.e. chemicals having
therapeutic value and used for production of pharmaceutical formulation. Owing to a
significant in Pharmaceuticals exports, India’s USD 3.1 billion pharmaceutical industry
is growing at the rate of 14% per year. It is one of the largest and most advanced among
the developing countries. Even the number of pharmaceuticals exporters,
manufacturers and suppliers in increasing tremendously.
2.5 Employment Generation (Direct or Indirect due to the project)
Project will create direct & indirect employment opportunities within the surrounding
region. Unit will use good faith efforts to employ local people from the nearby villages
depending upon the availability of skilled & un-skilled man-power surrounding the
project site.
In operation phase, along with existing workers the proposed project would require
more workforces of non-technical and technical persons.
Table 3 - Manpower Details
S.No Designation Nos.
1. Manager 1
2. Asst. Manager 2
3. Supervisor/ Foreman 6
4. Skilled Operators 18
5. Semi-skilled Workers 65
6. Unskilled Labour 54
7. Accounts &
Administration
3
8. Sales & Marketing 5
9. Peon/ Watchman 6
10. Total 160
34
Figure 1- Structure of Manpower
3. PROJECT DESCRIPTION
3.1 Type of Project
The proposed project is a Bulk Drugs &Chemical manufacturing unit. The production is
mainly supporting bulk drugs & chemical manufacturing industry. It is an industrial
project which will be developed in notified industrial area i.e. RIICO, Behror.
3.2 Location
M/s. Sarika Lifescience Pvt. Ltd. proposes to expand their existing industrial unit on
same plot. SLPL plot no. SP1-6(B) in Industrial area Sotanala, and measuring 20614.44
sq.mt. at Tehsil- Behror, Dist. Alwar, Rajasthan. Latitude: 27°49’52.47"N to
27°49’58.81"N, Longitude:76°16’05.86 "E to 76°16’11.80"
35
Figure 2 - Map of Rajasthan
Figure 3 - Map of District Alwar
36
Figure 4 - Google Image of Site
The Project envisages location of the plant at RIICO Behror, Tehsil- Behror, Dist –
Alwar in Rajasthan. About 26014 sq. mts. of land has been allotted by RIICO and
developed since 2013. The SLPL factory complex will consist of main plant, utility
buildings, finished product storage, raw material storage, Office building, R & D centre,
fuel oil and methanol distillation tower, Effluent Treatment Plant, loading (finished
product) and unloading (raw material) and cooling tower and boiler.
Proposed industryM/s. SarikaLifescience Pvt. Ltd. falls under notified industrial
areaSotanala. Refer Annexure 1: RIICO lease agreement dated 17 Dec 2013.It is
well connected by roadways to Delhi and Jaipur (NH-8).
Harsoli is the Railway Station of Jaipur- Delhi is at 34.0 km distance from site. While
bus depot behror is almost 5.0 km away. The RIICO road which is approaching to the
site is 15 m wide. RIICO roads connected to National Highway 8which is 0.75 km away
from site.
37
3.3 Details of Alternate Sites considered and the basis of selecting the proposed Site:
The Sarika life science Pvt. Ltd. is operating since 2013 on this site. As the site is in
notified Industrial zone, the same is selected with a view of total infrastructure present
for the Industrial production.
The RIICO, Behrorhas following features which are taken into view for selection of site
and why other alternate site is not considered.
1. Well connected by Road network, Railway and waterway. This eases the
transportation of raw material and finished products.
2. Also RIICO, Behrorhas well supportive infrastructure.
3. Behror is surrounded by many small villages hence worker availability will be with
ease.
4. Fire station, Police station, Hospital and other life supportive facilities are available
at nearby town Behror at distance of 5.0 km.
5. RIICO, Behrorarea is perfect area for development of Industry.
3.4 Size/Magnitude of Operation
Following table clearly indicates all facets of proposed project to elaborate magnitude
of project:
Table 4 – Area Statement
S.No Area Statement Area (Sq. mts.)
1. Existing Covered Area 2650.02
2. Proposed Covered Area 5168.82
3. Green Area 7655.71
4. Road & Paved Area 5139.45
Total Plot Area 20614.44
3.5 Project Description:
The major products of SLPL i.e Cloxacillinsodium, Di-Cloxacillinsodium, Flu-
Cloxacillinsodium, Oxacillin Sodium, Amoxycillin trihydrate & with its
CMICChloride,DI-CMICChloride, FCMIC Chloride and cefixime.
38
3.5.1 Products
Table 5- List of Products along with proposed quantity per annum
Sr. No Product Name proposed capacity
T / Annum
Products
1. Cloxacillin Sodium
Alternative production
with maximum capacity of
300 TPA
2. Flucloxacillin Sodium
3. Dicloxacillin Sodium
4. Oxacillin Sodium
5. AmoxycillinTrihydrate
6. Ampicillin Trihydrate
Intermediate Products
7. CMIC Chloride Alternative production
with maximum capacity of
180 TPA
8. FCMIC Chloride
9. DICMIC Chloride
10. PCMIC Chloride
11. Sodium Hexonate
3.5.2 Process Details:
The basic unit processes involved in Bulk Drugs & Intermidaiates Manufacturing
process which are Reaction, Condensation, Centrifuging, Hydrolysis, and
Crystallization, washing and drying.
The production of different products are Reactions,condensations Filtration, Extraction,
Crystallization, Distillation, FBD Drying, Charcoal filtration, & purification etc. All
processes are carried out at normal atmospheric pressure. Reaction temperature
involved in all type of process vary from -150C to 750C. Negligible Exothermic
reaction is involved in any production process.
39
Schematic Manufacturing Route
N
S
CH3
CH3
O
NH2
COOH
H H
H ON
Cl
O
CH3
Cl
N
O
Cl
O
CH3
NH
N
H H
O
S
CH3
CH3
COOHH
6-APA CIMC Chloride
Extraction Separation
Filtration and Drying
N
O
Cl
O
CH3
NH
N
H H
O
S
CH3
CH3
COONaH
CLOXACILLIN SODIUM
H2O.
40
Fig 5 :- Flow chart of Intermediate Production Process
Dissolution Methanol and one this
[OCB,DCB,FCB,Benzeldehyde
One of these ]
HAS,SBC
Methyl Aceto
acetate→ Condensation
Chloroform → Phase Separation
→ Methanol Reused
and ML sent to ETP
plant
Panta chloride→ RXN Phase
Toluene → Rxn and extraction
↓To
recovery plant for
toluene recovery
OIL layerof
[cmic,Fcmic,dicmic,Pcmic
chloride] Go for Use in
cloxa,dicloxa,flucloxacillin &
oxacillin sodium
Ethy acetate add
INTERMEDIATES
41
Fig 6 :- Flow chart of API Production Process
3.6 Raw materials
Most of the raw materials required for the project are obtained from local resources &
exported from Rajasthan & china respectively.
Water ,6-APA
Catalyst
Intermidiates
M. Salt ← Condensation
Aqueous phase → Phase Separation
Sodium Hexanoate ←← Organic Phase
Mother liquor → Centrifuge
↓
To recovery plant
for EA recovery
Drying
Flu-
CLOXACILLIN,CLOXACILLIN,DICLOXACILL
IN ,OXACILIIN SODIUM
42
The Raw Material will be stored for maximum of Three months production capacity.
The same is stored in closed designated area.
Raw Material Consumption
Raw Material and Finished product will be transported by Roads or by Sea.
Table 6- List of Raw Material
3.7 Resource optimization/recycling and reuse:
Total water requirement for this project is 13.5 CMD after expansion. To reduce load
on municipal water supply water recycling is necessary. In this project water recycling
is proposed for Boiler water. ETP treated water will be used for gardening.
3.8 Water Requirement & Distribution
3.8.1 Water Requirement:
Presently the entire water requirement of M/s. Sharika life science Ltd.is met through
RICCO, Behror and same source will be utilized after proposed expansion.
List of Raw Material
1. 6-Aminopenicillanic Acid (6APA)
2. OCB,DCB,FCB
3. HAS
4. Methyl Aceto Acetate (MAA)
5. SBC
6. Toluene
7. Ethyl Acetate
8. Sodium Chloride
9. 2-EHA
10. MDC
11. GCLE
12. Chloroform
13. ACETONE
14. Phosphorus Penta
15. Chloride
16. Sodium
17. Carbonate
18. Methanol
19. Misc.Consumables
43
The total fresh water requirement for existing unit is 7.08 KL/day for domestic,
gardening and Industrial purpose. After proposed expansion, it will be increased up to
6.42 KL/day. Thus, the additional water requirement for proposed expansion will
be 13.5 KL/day.
Table 7- Water Requirement
Fig 7- Water Balance Diagram
Proposed Water Requirement
Fresh
(M3/da
y)
Recycle
used
(M3/day)
total
Required
(M3/day)
Consumpti
on / loss
(M3/day)
Effluen
t
(M3/da
y)
1 Process 6 0 6 0 7
Scrubber 0 0 0 0 0
6 0 6 0 7
2 Boiler 3 4.5 7.5 3 4.5
Cooling
Tower
0 2 2 2 0
3 6.5 9.5 5 4.5
3 Domestic 4.5 0 4.5 4.5 0
4 Green belt 0 3 3 3 0
GRAND
TOTAL
13.5 9.5 23 12.5 11.5
Boiler 4.5
Industrial [
Effluent Discharge
Soak Pit via Septic tank Domestic
[4.5]
44
3.8.2 Wastewater Generation
The wastewater generated from the project, as estimated, is given below with proposed
mitigation methods.
Table 8- Waste water generation
3.8.3 Power and Fuel Requirement:
At present the total connected load of power is about 240 KVA and which is
expected to be increased up to about 750 KVA after proposed expansion. Thus, the
additional power requirement for the proposed expansion will be 510 KVA, which
will be procured from Jaipur Vidyut Vitran Nigam Ltd. (JVVNL) subsidiary of
Rajasthan Electricity Board (REB).
The unit has also provided one stand by D.G.set (380KVA), the unit will install new
D.G. [500 KVA] set will be used in case of main power failure only.
Table 9 – Power Requirement
Waste water generated
(M3/day)
1 Process 6
Washing 1
7
2 Boiler 4.5
Cooling Tower 0
4.5
3 Domestic 0
4 Green belt 3
GRAND TOTAL 14.5
Power Requirement
Existing Additional Proposed
1 Connected
Load
240 KVA 510 KVA
2 DG set 1 DG of 380 KVA 1DG of 500 KVA
Sr.
No
Fuel Existing Additional Proposed
3 HSD 200 LPD 2000 LPD
4 Pet coke 100kg/h
45
3.9 Waste Generation and its Management
3.9.1 Liquid waste Generation and its Management:
The total Liquid Waste generation is of two types
1. Domestic Waste
2. Industrial Process waste
1. Domestic waste:
The Domestic Waste will be generated by the workers working in the factory round a
clock. The same will be disposed of through soak pit.
Total Domestic waste generated will be 4.5KLD.
2. Industrial Process waste
The effluent generated will be treated in Effluent Treatment Plant of capacity 20 m3/day.
The existing capacity of ETP is 6 m3/day& proposed capacity is 20 m
3/day. The
generated effluent will be treated in proposed zero discharge system and the treated
water will be utilized for utility such as in Boiler, cooling towerand gardening.
3.9.2 Solid waste (Hazardous waste) Generation and its Management:
The Industry will generate following amount and type of waste.
Table 10- Details of Solid Waste
S.No. Details of Waste Quantity
1. NaCl 1.5 T/M
2. Na2SO4 7 T/M
3 Used DG Oil 15 l/M
Disposal:
Generate hazardous waste will be hand over to authorized vendor for disposal as well as
incinerate. SLPL has approval for utilization of solvent from CPCB vide no B-29016(SC)/1
(55-233)/ 15/HWMD/ dated 22 Sept 2015.
46
And also an authorized member of Continental Petroleums Limited for incineration of
hazardous waste facilities vide letter no. - CPL/2013-14/Behror-Inc/0901 Dated: 09/01/2014.
4. SITE ANALYSIS:
4.1 Connectivity:
The Factory Site is located on RIICO Behror Road connecting to National Highway
No.8. The nearest railway station Harsoli railway station is at a distance of 34 Km from
factory site.
Table 11- Site Analysis
Sr.
No.
Particulars Details
1 Latitude 27°49’52.47 "N to 27°49’58.81"N,
2 Longitude 76°16’05.86 "E to 76°16’11.80"E.
3 Elevation above MRL 325 M
4 Seismic Zone Zone –III As per IS-1893
5 Nearest villages Jainpurwas at a distance about 1.0 km in
SE direction.
Shyampur at a distance about 2.0 km in
NE direction.
Guntiat a distance about 2.2 km in SW
direction.
6 Nearest city Behrorat a distance about 5.0.Km in NE
direction.
7 Nearest railway station Harsoli Railway Station (34 KM) on North
Eastern railway
8 Nearest airport Indira Gandhi International Airport Delhi
(113 kms)
Sanganer International Airport, Jaipur (120
kms)
9 Streams/Rivers SotaNalah is at a distance of 70 m.
SabiNadi at adistance of 3.50 km in South
direction
10 Nearest Bus Stop Behror Bus Depot ( 5.0 KM)
4.2 Land Form / Land Use / Land Ownership
Total area 20614Sq meter has been allotted ot SLPL by RIICO, Behror. The lease area
forms part of G.T. Sheet No. 54A/5. No forest land is involved in leased area.
47
4.3 Topography:
The District is a fairly regular quadrilateral in shape with its central northernPortion,
consisting of tehsil Mandawar on the north, tehsil Behror on the west, tehsilTijara on
the east and Laxmangarh tehsil on its south eastern corner. The district islocated
between the Yamuna, Satluj, divide and central part of the district is covered bythe
Aravali hills which run north south, ranging in height from 456 meters to 700 meters.
This part of the district is fairly well wooden. The alignment of Aravalis in the
districtspreads diagonally from south-west to north-western corners of the district
compriselargely of pains. Besides this, between the plain sectors of the district has
many hillswhere the average altitude is approximately 1600 feet. There is a marked
differencebetween the hills of north east and south, west. While the south-western
hillscomprosong the area of Rajgarh, Alwar&Thanagazi, have fairly dense vegetation.
Thenorth eastern part gives an appearance of barren and rocky.
4.4 Existing Land Use Pattern:
The existing factory unit is at RIICO, Behror. The Lease letter of plot is attached in
annexure 1. The expansion is proposed on existing Factory Building to increase
production capacity & storage area.
Classification of Land Use:
Table 12- Land use
Land Use Area (sq. mts.) Area in %
Proposed Covered Area 5168.82 25
Existing Covered Area 2650.02 12
Green Area 7655.71 37
Road & Paved Area 5139.45 24.9
Total 20614.44 100
4.5 Existing Infrastructure:
RIICO Behror is located at district Alwar, Rajsthan. In factory premises solvent
manufacturing plant, 6 KLD ETP, Office building and temporary rest house for workers
are excited.
48
All required services are very much near to the site. Fire station, Police Station, Banks,
hospital, school, collage, post office etc. are available at Behror at a distance of 5.0 km.
4.6 Soil Classification:
Soils are derived from alluvium and found mainly in western parts of the district.These
soils are non-calcareous, semi-consolidated to unconsolidated brown soils, Loamy sand
to sandy loam in texture. They are well drained and occupy gently slopingTerrains.
4.7 Climate & Rainfall:
The climate is semi-arid and mostly dry, with a hot summer period in April to July,
followed by a short monsoon in July to September, and a cool dry winter period
between October and March. Average daily temperatures peak at around 41°C in June
(when the minimum is 28°C at night), and in January the temperature falls to an average
of 23°C during the day and 8 °C at night. The long term average annual rainfall is 638
mm, of which around 85% falls during the monsoon. However rainfall is highly
variable, and has been generally low in most recent years. Relative humidity is around
70% during the monsoon, but is much lower throughout the rest of the year, falling to
20-25% in the summer. Winds are generally light and variable during the cool winter
period, and mainly from the north and north-west, and the strongest winds are the
south-western lies that bring the monsoon in June and July.
4.8 Social Infrastructure Available:
The factory area is about ~ 5.0 km in SW direction from Behror. Jaipur International
airport, is at a distance of ~120 km in SW direction from the site. Harsoli Railway
Station is around ~ 34 km in NE direction from site. The area is well connected through
roads. The site is well connected with communication facilities like telephone, fax, post
& telegraph, Tehsil- Behror is ~5.0 km in NE direction and district headquarter- Alwar
is ~45.0km, SE direction from the site.
5. PLANNING BRIEF:
5.1 Planning Concept:
The Sarika Life Science Pvt. Ltd. has proposed expansion in existing building to
increase production & storage area. SLPL is currently having unit at RIICO, Behror
49
5.2 Population Projection:
Manpower required will be engaged from nearby Villages. No significant influx of
people is anticipated in the area.
5.3 Land use Planning:
The expansion is proposed in existing building structure to increase production &
storage area.
5.4 Assessment of Infrastructure Demand (Physical and Social):
The Proposed Unit is coming in already Developed RIICO area of Behror. Hence many
industries are working full fledged. The reason of selection of the same area is because
of presence of all required Infrastructure required for Industrial running.
Also Manpower required for production is also available from nearby villages. So there
is no need of development of more infrastructures.
5.5 Amenities/ Facilities:
The basic amenities and facilities for industrial development are already present in
nearby area as per requirement of the local people under social development activities.
6. PROPOSED INFRASTRUCTURE:
6.1 Industrial Area (Processing Area)
The proposed Layout plan will utilize same existing building structure for expansion.
Total Plot area is 20614 sq.mt. The Existing Processing area is 2650.02sq.m & proposed
Expansion area for processing is 5168.82sq.m.
6.2 Residential Area (Non Processing Area):
Residential area is not proposed as any permanent housing or residing is allowed in
Factory Premises. Workers will come to premises as per their shift timings. Security
will also employ as per Shift. No permanent housing is proposed.
Non Processing area is basically Storage area of Raw Material and Finished Products,
office Staff sitting area.
50
6.3 Green Belt:
SLPL has devolved Green area more than 33% of total plot area. SLPL take care of the
existing Green area while expanding the building.No Tree cutting is proposed as
expansion is proposed in existing factory unit. Hence existing green area will remain
undisturbed.
6.4 Connectivity:
The factory area is about ~ 5.0 km in SW direction from Behror. NH-8 is about 0.75 km
from plant and well connected by RIICO roads. Jaipur International airport, is at a
distance of ~120 km in SW direction from the site. Harsoli Railway Station is around ~
34 km in NE direction from site. The area is well connected through roads. The site is
well connected with communication facilities like telephone, fax, post & telegraph,
Tehsil- Behror is ~5.0 km in NE direction and district headquarter- Alwar is ~45.0km,
SE direction from the site.
6.5 Water Management (Source & Supply of water)
Total fresh water requirement for the project is 13.5 KLD which sourced from RIICO,
Behror. Domestic wastewater are being generated from the restshelter, which are being
disposed in soak pit via septic tank. Industrial waste water will be reused after treatment
in ETP
6.6 Sewerage System:
Domestic sewage water generated from office toilet are being disposed in soak pits via
septic tank. Outside discharge is not envisaged.
7. REHABILITATION AND RESETTLEMENT (R& R) PLAN:
The Factory Building and Premises is already in use by factory owner i.e by Sarika Life
Science Pvt. Ltd.& now we are proposing expansion in same unit to increase production
& storage area. The same plot is allotted by RIICO. Hence there is no rehabilitation and
resettlement proposed.
8. PROJECT SCHEDULE AND COST ESTIMATES:
(i) Likely Date Of Start Of Construction And Likely Date Of Completion
(Time Schedule For The Project To Be Given)
51
The proposed expansion will be done after obtaining all clearances/consents
from the concerned authority.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic
Viability of the Project
Total capital coast for the project is 1343.75 Lakh.
Table 13- Budget for Environment protection measures
Sr. Particular PROPOSED
Capital
Cost
(RsLacs)
Recurring Cost
per annum
(RsLacs)
No.
1 Air Pollution Control 10 1
2 Water Pollution Control 18 1.5
3 Noise Pollution Control 6 0.2
4 Solid waste management 3.5 0.15
5 Environment Monitoring 2.5 0.5
6 Occupational Health 5.5 0.5
7 Green Belt 1.5 0.2
8 Rain Water Harvesting 20 0.7
Total 67 4.75
9. ANALYSIS OF PROPOSAL:
Project will create direct & indirect employment opportunities. Unit will use good faith
efforts to employ local people from the nearby villages depending upon the availability
of skilled & un-skilled man-power surrounding the project site. Around 160 Workers
will get direct employment and many others will get indirect. Also the increase in
production will increase the export and will in turn help Indian Economy.
An added benefit to the proposed project will result in considerable growth of
stimulating the industrial and commercial activities in the state. Small and medium
scale industries may be further developed as a consequence.