PROJECT : INDONESIA INTEGRATED STEEL MILL
BLAST FURNACE PROJECT
OWNER : KRAKATAU POSCO
LOCATION : CILEGON , INDONESIA
DOCUMENT NO. : BF810-EC222-0009
JOB. NO. 2713
A FOR APPROVAL 02-12-2011
VIVIT RRK WEN
REV.
DESCRIPTION DATE PREPARED
CHECKED APPROVED
APPROVED BY OWNER
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
SHEET : 2 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
REVISION HISTORICAL SHEET
REVISION DATE DESCRIPTION
A 02-12-2011 FOR APPROVAL
SHEET : 3 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
T A B L E O F C O N T E N T
1. BASIS OF CALCULATION..................................................................................................4
1.1 Standard..............................................................................................................................4
1.2 Material Specification..........................................................................................................4
2. LOADING..............................................................................................................................4
2.1 Live Load.............................................................................................................................4
2.2 Support Load.......................................................................................................................4
3. CALCULATION SHEET.......................................................................................................5
3.1 Calculation Unit...................................................................................................................5
3.2 Geometry............................................................................................................................5
3.3 Ultimate Pile Capacity.........................................................................................................5
3.4 Pile Capacity.......................................................................................................................5
3.5 Foundation Design for Type 1.............................................................................................8
3.5.1 Loading Data.............................................................................................................8
3.5.2 Checking for Pile Capacity.......................................................................................10
3.5.3 Pile Cap Design.......................................................................................................14
3.5.4 Pedestal Design.......................................................................................................17
3.5.5 Tie Beam Design.....................................................................................................18
3.5.6 Checking Pile Head due to Horizontal & Moment Load..........................................23
3.6 Foundation Design for Type 2...........................................................................................26
3.6.1 Loading Data...........................................................................................................26
3.6.2 Checking for Pile Capacity.......................................................................................28
3.6.3 Pile Cap Design.......................................................................................................31
3.6.4 Pedestal Design.......................................................................................................34
3.6.5 Tie Beam Design.....................................................................................................35
3.6.6 Checking Pile Head due to Horizontal & Moment Load..........................................37
SHEET : 4 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
1. BASIS OF CALCULATION
1.1 STANDARD
SNI T-03 -2847-2002
American Concrete Institute ACI 318 - 1998
Principles of Foundation Engineering – BRAJA M. DAS
Civil & Architectural Design Criteria PT. KRAKATAU POSCO
1.2 MATERIAL SPECIFICATION
CONCRETE
Pile Cap : K – 30210 Kg/cm2 (fc = 24.9 Mpa)
Concrete Density : γconcrete = 2400 kg /m3
REINFORCEMENT
Deform Bar : D > 13 mm, BJTD 40 ( Fy = 390 Mpa)
Plain Bar : Ø < 10 mm, BJTP 24 ( Fy = 240 Mpa)
2. LOADING
2.1 Dead Load
Self weight :
Concrete = 2400kg/m3
Soil = 1546kg/m3
2.2 Support Load
Support Load is taken from Output Reaction of Structure Calculation by SAP 2000
SHEET : 5 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
soil 7.92 fsy 240MPa SF2 2.5
Dpile.300 300mm wpile.300 113kg
m Apile.300 452cm
2 soil 1546
kg
m3
3.3 Ultimate Pile Capacity
A. Axial Load Spun Pile Diameter 300mm Class A2
Pult300 72.60ton
B. Momen Capacity Spun Pile Diameter 300mm Class A2
Mult.300 3.75tonm
3.4 Pile Capacity
Efficiency pile factor :
s1 3 Dpile distance pile to pile
Eg 1( ) s1 3 Dpileif
1 n2 1( ) m2 m2 1( ) n2[ ]
90 m2 n2
otherwise
Eg 1
3. CALCULATION SHEET
3.1. Calculation Unit
N 0.1kg kgpm 1kg
m ton 1000kg MPa 106Pa
kN 1000N kgm 1 kg m tonm 1 ton m MPa 1N
mm2
kN 100kg kgpcm2 1kg
cm2
tonm 1000 kg m
3.2 Geometry
concrete 24kN
m3
fc' 24.9MPa fy 390MPa SF1 3
0.85
SHEET : 6 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Ep 33167.4841MPa
(young's modulus of the pile)Ep 4700 fc'pile MPa
Ip 39760.782cm4
(moment inertia of the pile)Ip1
64
Dpile.300
4
(young's modulus of the soil type sandy clay) >>> Braja M.DAS S page 161Es 10.35103kN
m2
(poison ratio of the soil)s 0.3
(diameter of pile)Dpile.300 0.3m
fc'pile 49.8MPa
fc'pile 0.83 60 MPa
Pile's Concrete : K-600
Allowable Horizontal Load
Qpull 165.6kNQall 668.6667kN
QpullQpu
SF2Qall
Qu
SF1
Qpu 414kNQu 2006kN
Pull capacity :Compression capacity :
End Bearing value (eb) is taken minimum value of = 40 * NSPT * L / D and < 400 * NSPT * Area
Friction value (fr) is taken minimum value of = 2 * NSPT * Perimeter * L
For type of soil sandy clay :
local cumm cumm0.0 Sand - - 0 0 0 0 0 0 0-1.0 Sand - - 0 0 0 0 0 0 0-2.0 Sand - - 0 0 0 0 0 0 0-3.0 Sand - - 0 0 0 0 0 0 0-4.0 Sand - - 60 60 905 965 42 0 42-5.0 Sand - - 60 121 905 1025 84 0 84-6.0 Sand - - 94 215 1414 1629 150 0 150-7.0 Sand - - 94 309 1414 1723 216 0 216-8.0 Sand - - 94 403 1414 1817 282 0 282-9.0 Sand - - 94 498 1414 1911 348 0 348-10.0 Sand - - 94 592 1414 2006 414 0 41450 66
50 6650 66
Depth (m)
Soil Properties Compression Capacity (kN) Pull Capacity (kN)
Layer NSPT cu (kN/m2) αFriction
End QuFriction
Wp Qpulocal
0 00 00 00 032 4232 4250 6650 66
Lp' 11.5mQ allowable based on BH 102 (at Blast Furnace Area) : for deepth
For Pile Diameter 300mm :
SHEET : 7 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Qhor1all.300 3.99tonQpu1all.300 13.3tonQc1all.300 53.2ton
Qhor1all.300 1.33Qhorall.300Qpu1all.300 1.33Qpuall.300Qc1all.300 1.33Qcall.300
Lateral capacity :Pull capacity :Compression capacity :
For Temporary Load :
Qhorall.300 3tonQpuall.300 10tonQcall.300 40ton
Lateral capacity :Pull capacity :Compression capacity :
nh 9000kN
m3
Constand of modulus of horizontal subgrade reaction By soil type Submerged sand (dense)
xz 10 mm Allowable displacement at the top of the pile
T''
5Ep Ip
nh characteristic length of the soil - pile system
T'' 1.0794m
Lp'
T''10.654
Lp'
T''5 So this is a long pile
Given : xz = 10 mm, at z = 0.00, Ax = 2.435
Ax 2.435 (Table 8.12 Braja M.Das)
Qhorxz Ep Ip
Ax T''3
Qhor 43.0639kN
So Based we can take :
For Permanent Load :
SHEET : 8 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
length of pile Ltb1 1.38m length of tie beam 1
He 3.5m height of embankment btb2 0.3m width of tie beam 2
Lp' 11.5m lenght effective of pile htb2 0.45m height of tie beam 2
Pped 0.2m length of pedestal Ltb2 5.28m length of tie beam 2
Lped 0.2m width of pedestal X 3m distance pedestal to pedestal
3.5 Foundation Design For Type 1
3.5.1 Loading Data
T1 0.85m thickness of pile cap h1 0.3mheight of pedestal
P 0.72m length of pile cap h2 0.22m
L 0.72m width of pile cap btb1 0.25m width of tie beam 1
npile 1 number of pile (for 1 pile cap) htb1 0.4m height of tie beam 1
Lp 15m
SHEET : 9 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
My1 0kN m
Mx1 0kN mMoment :
Fy1 0.01 kN
Fx1 0.12 kN Horisontal load :
V1 23.50kNVertical load :
1. Permanent Load (COMB 1DL + 1LL)
Output Reaction of Structure from SAP 2000 (Not Factored) :
B. Support Reaction Loads
Vfound 45.1759kN
Vfound Vcap 1.5Vped 0.5Vtiebeam Vpile Vsoil
Vsoil 6.6922kN
Vsoil P L Pped Lped h1 soil btb1 h1 0.5 Ltb1 soil btb2 h1 0.5 Ltb2 soil
A.5 Soil Weight
A. Foundation Loads
A.1 Pile Cap Weight
Vcap P L T1 concrete
Vcap 10.5754kN
A.2 Pedestal Weight
Vped Pped Lped h1 h2 concrete
Vped 0.4992kN
A.3 Tie Beam Weight
Vtb1 btb1 htb1 Ltb1 concrete
Vtb1 3.312kN
Vtb2 btb2 htb2 Ltb2 concrete
Vtb2 17.1072kN
Vtiebeam Vtb1 Vtb2
Vtiebeam 20.4192kN
A.4 Pile Weight
Vpile Lp wpile.300 npile
Vpile 16.95kN
SHEET : 10 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Pile coordinate from centre of pile cap : npile 1
Pile Coordinat :
x1_ 0m y1_ 0m
x2 1 x1_2
x2 0m2
y2 1y1_2
y2 0m2
A. Axial Load Capacity
1. Analysis For Permanent Load (COMB 1DL + 1LL)
Vfound 45.1759kN
Vertical load : V1 23.5kN
Horisontal load : Fx1 0.12 kN
Fy1 0.01 kN
Moment : Mx1 0kN m
My1 0kN m
2. Temporary Load 1 (COMB 1DL + 1LL + 1QX + 0.3QY)
V2 25.26kNVertical load :Fx2 3.85 kN
Horisontal load :Fy2 1.02 kN
Mx2 0kN mMoment :
My2 0kN m
3. Temporary Load 2 (COMB 1DL + 1LL + 0.3QX + 1QY)
Vertical load : V3 28.87kN
Horisontal load : Fx3 1.46kN
Fy3 3.39 kN
Moment : Mx3 0 kN m
My3 0 kN m
Vtot Vfound V1
Vtot 68.6759kN
3.5.2 Checking for Pile Capacity
SHEET : 11 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Vtotal 8.3066ton
Vtotal Vfound 1.5 V2
My2 0kN m
Mx2 0kN mMoment :
Fy2 1.02 kN
Fx2 3.85 kNHorisontal load :
V2 25.26kNVertical load :
Vfound 45.1759kN
2. Analysis For Temporary Load 1 (COMB 1DL + 1LL + 1 QX + 0.3QY)
AxialFoundation1 "Ok"
AxialFoundation1 "Ok" Ppilemin1 0if
"Not Ok" otherwise
Ppilemin1 8.0426ton
Ppilemin1Vtotal
npile
My x1_
x2
Mx y1_
y2
AxialFoundation1 "Ok"
AxialFoundation1 "Ok" Qcall.300 Ppilemax1if
"Not Ok" otherwise
Ppilemax1 8.0426ton
Ppilemax1Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 0.1644 kN m
My My1 Fx1 T1 h1 h2
Mx 0.0137kN m
Mx Mx1 Fy1 T1 h1 h2
Moment :
SHEET : 12 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Vtotal 8.8481ton
Vtotal Vfound 1.5 V3
My3 0kN m
Mx3 0kN mMoment :
Fy3 3.39 kN
Fx3 1.46kNHorisontal load :
V3 28.87kNVertical load :
Vfound 45.1759kN
3. Analysis For Temporary Load 2 (COMB 1DL + 1LL + 0.3 QX + 1QY)
AxialFoundation2 "Ok"
AxialFoundation2 "Ok" Ppilemin2 0if
"Not Ok" otherwise
Ppilemin2 8.3066ton
Ppilemin2Vtotal
npile
My x1_
x2
Mx y1_
y2
AxialFoundation2 "Ok"
AxialFoundation2 "Ok" Qc1all.300 Ppilemax2if
"Not Ok" otherwise
Ppilemax2 8.3066ton
Ppilemax2Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 5.2745 kN m
My My2 Fx2 T1 h1 h2
Mx 1.3974kN m
Mx Mx2 Fy2 T1 h1 h2
Moment :
SHEET : 13 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Hpile 3.85kN
HpileHult
npile
Hult 3.85kN
Hult max Fx Fy
Fy 3.39kNFx 3.85kN
Fy max Fy1 Fy2 Fy3( )Fx max Fx1 Fx2 Fx3( )
Horizontal Load : (due to temporary load)
Qhor1all.300 39.9kN
Allowable Horizontal Load
B. Horizontal Load Capacity
AxialFoundation3 "Ok"
AxialFoundation3 "Ok" Ppilemin3 0if
"Not Ok" otherwise
Ppilemin3 8.8481ton
Ppilemin3Vtotal
npile
My x1_
x2
Mx y1_
y2
AxialFoundation3 "Ok"
AxialFoundation3 "Ok" Qc1all.300 Ppilemax3if
"Not Ok" otherwise
Ppilemax3 8.8481ton
Ppilemax3Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 2.0002kN m
My My3 Fx3 T1 h1 h2
Mx 4.6443kN m
Mx Mx3 Fy3 T1 h1 h2
Moment :
SHEET : 14 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Shear Diagram :
Modeling in STAAD PRO {COMB 1 x (1.2DL + 1.6LL)} :
Vdistributed 75.2932kN
m
Vdistributed 1.2Vfound
L
Vfound 45.1759kN
Vmax 32.46kN
Vmax V1'
Loading :
My1' 0kN m
Mx1' 0kN mMoment :
Fy1' 0.01 kN
Fx1' 0.17kN Horisontal load :
V1' 32.46kNVertical load :
Output Reaction of Structure from SAP 2000 (Factored) :
a 0.36m
a 0.5 L
Reinforcement for X and Y direction (Bottom) :
A. Pile Cap Reinforcement
3.5.3 Pile Cap Design
HorizontalFoundation "Ok"
HorizontalFoundation "Ok" Qhor1all.300 Hpileif
"Not Ok" otherwise
SHEET : 15 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Used As D13-200 (As=6.637cm2)Asused 5.912cm2
Asused ' 1m d
' 0.0008
Reinforcement for X and Y direction (Top) :
Used As D13-150 (As=8.849cm2)Asused 7.39cm2
Asused used 1m d
used min 0.025( )if
min minif
min 0.001 0
0.85 fc'
fy1 1
2 Rn
0.85 fc'
Rn 18.2474kN
m2
RnMn
0.8 L d2
Mn 5.74kN m
MnMu
0.85
L 0.72m
d 0.739m
d T1 100mm 11mm
Foundation actual height (for assumption use D22mm)
Mu 4.879kN m
Moment Diagram :
SHEET : 16 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
PunchingShear "Ok"
PunchingShear "Ok" Vu Vpcif
"Not Ok" otherwise
Vpc 238.4545ton
Vpc1
6
fc'
MPa MPa bo1 d
bo1 3.8877m
bo1 Dpile d
Allowable shear pile cap :
Vu 11.7975ton
VuPpilemax
0.75
Ppilemax 88.4809kN
Ppilemax max Ppilemax1 Ppilemax2 Ppilemax3
Maximum load by pile =
d 737.5mm
Dpile.300 0.3md T1 0.1m 0.0125mEffective height of pile cap =
T1 0.85m
Punching Shear Due to Pile Compress
B. Checking Pile Cap Shear Capacity
SHEET : 17 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Load supported by Reinforcement :
P''u Fzu P'u
P''u 471.51 kN
Concrete can accounts axial load, was not required again reinforcement but in execution in applies use minimum reinforcement.
So use reinforcement : Asped g Pped Lped dia 13 mm
Asped 4cm2
As_131
4 dia
2
As_13 1.3273cm2
nAsped
As_13
n 3.0136 Used As 4D13 (As=5.309m2)
Shear Reinforcement :
Shear Capacity of concrete :
Vxu 0.01kN
0.75
fsy 240N
mm2
3.5.4 Pedestal Design
Vxu Fy1' Vu 1.4 Vxu Fzu 1.4 V1'
Vxu 0.01kN Vu 0.014kN Fzu 45.444kN
Assumed : g 0.01 Ratio of reinforcement
0.65 Strenght reduction factor
Ag Pped Lped
Ag 40000mm2
Load supported by concrete area :
P'u 0.8 0.85 fc' Ag Ag g fy Ag g SK SNI T - 15 - 1991 03 ( 3.3-2 )
P'u 516.95kN
SHEET : 18 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
BW 1.38m
BW Ltb1
qult.tb1 4.9833kN
m
qult.tb1 1.4 qtb1
qtb1 3.5595kN
m
qtb1 btb1 htb1 concrete btb1 h1 soil
Dead Load (DL) :
Load of tie beam :
htb1 0.4m
Ltb1 1.38mbtb1 0.25m
Dimension of tie beam :
A.Tie Beam 1
3.5.5 Tie Beam Design
Used minimum shear reinforcement Ø10-150
ShearReinforcement "Used minimum shear reinforcement"
ShearReinforcement "Used minimum shear reinforcement" vc vnif
"Need shear reinforcement" otherwise
vn 0.0133kN
vnVxu
vc 22.2055kN
vc1
6fc' MPa b d
b 0.2m
b Lped
d 133.5mm
d Lped 50 mm 10 mm13 mm
2
fsy 240N
mm2
SHEET : 19 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Vu 3.4385kN
Vu 0.5 qult.tb1 Ltb1
Shear Reinforcement :
Used As 2D16 (As=4.021cm2)Asused 1.5457cm2
Asused used btb1 d
used min 0.025( )if
min minif
min 0.0018 0.0001
0.85 fc'
fy1 1
2 Rn
0.85 fc'
Rn 0.0335N
mm2
RnMu
0.8 btb1 d2
d 0.3435m
d htb1 40 mm 10 mm13 mm
2
Mu 0.7908kN m
Mu1
12
qult.tb1 BW2
22
SHEET : 20 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
qult.tb2 5.5577kN
m
qult.tb2 1.2 qtb2
qtb2 4.6314kN
m
qtb2 btb2 htb2 concrete btb2 h1 soil
Dead Load (DL) :
Load of tie beam :
htb2 0.45m
Ltb2 5.28mbtb2 0.3m
Dimension of tie beam :
B.Tie Beam 2
Used minimum shear reinforcement Ø10-150
ShearReinforcement "Used minimum shear reinforcement"
ShearReinforcement "Used minimum shear reinforcement" vc vnif
"Need shear reinforcement" otherwise
vn 0.0133kN
vnVxu
vc 71.1074kN
vc1
6fc' MPa b d
b 0.25m
b btb1
d 342mm
d htb1 40 mm 10 mm16 mm
2
fsy 240N
mm2
0.75
SHEET : 21 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Super Dead Load (SDL from support reaction) :
V1' 32.46kN
Modeling in STAAD PRO {COMB 1 x (1.2DL + 1.6LL)} :
Shear Diagram :
Moment Diagram :
Mu 34.335kN m
d htb2 40 mm 10 mm13 mm
2
d 0.3935m
RnMu
0.8 btb1 d2
Rn 1.1087N
mm2
0.85 fc'
fy1 1
2 Rn
0.85 fc'
0.0029 min 0.0018
SHEET : 22 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Used minimum shear reinforcement Ø10-150
ShearReinforcement "Used minimum shear reinforcement"
ShearReinforcement "Used minimum shear reinforcement" vc vnif
"Need shear reinforcement" otherwise
vn 0.0133kN
vnVxu
vc 97.8038kN
vc1
6fc' MPa b d
b 0.3m
b btb2
d 392mm
d htb2 40 mm 10 mm16 mm
2
fsy 240N
mm2
0.75
Vu 30.902kN
Shear Reinforcement :
Used As 3D16 (As=6.032cm2)Asused 2.874cm2
Asused used btb1 d
used min 0.025( )if
min minif
SHEET : 23 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Ddp = diametre of pile Dpile.300 0.3m
Pxn = maximum horizontal load
Mx = maximum pile momen capacity
1. Permanent Load (COMB 1DL + 1LL)
Vertical load : V1 23.5kN
Horisontal load : Fx1 0.12 kN
Fy1 0.01 kN
Moment : Mx1 0kN m
My1 0kN m
X direction : Y direction :
Hloadx Fx1 Hloady Fy1
Hloadx 0.12kN Hloady 0.01kN
3.5.6. Checking Pile Head due to Horizontal & Moment Load
Joint Pile to Pile Cap (L2)
Compressive concrete strength (K-300) : fc' 24.9MPa
Yield steel strength: fy 390MPa
Allowable bearing pressure: f_cb 0.33 fc'
f_cb 8.217MPa
Bearing Force:H
Apcf_cb
h 0.175m
hpc h 0.075m
hpc 0.25m
Where : Apc = bearing area Apc Dpile.300 hpc Apc 0.075m2
SHEET : 24 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Moment : Mx2 0kN m
My2 0kN m
X direction : Y direction :
Hloadx Fx2 Hloady Fy2
Hloadx 3.85kN Hloady 1.02kN
f_bx
Hloadx
Apc
6 Mx2
Dpile hpc2
npile f_by
Hloady
Apc
6 My2
Dpile hpc2
npile
f_bx 0.0513MPa f_by 0.0136MPa
Hloadx
Apc0.0513MPa
Hloady
Apc0.0136MPa
f_cb 8.217MPa f_cb 8.217MPa
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" Checky1 "Ok"
f_bx
Hloadx
Apc
6 Mx1
Dpile hpc2
npile f_by
Hloady
Apc
6 My1
Dpile hpc2
npile
f_bx 0.0016MPa f_by 0.0001MPa
Hloadx
Apc0.0016MPa
Hloady
Apc0.0001MPa
f_cb 8.217MPa f_cb 8.217MPa
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" Checky1 "Ok"
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok" Checky2 "Ok"
2. Temporary Load 1 (COMB 1DL + 1LL + 1 QX + 0.3QY)
Vertical load : V2 25.26kN
Horisontal load : Fx2 3.85 kN
Fy2 1.02 kN
SHEET : 25 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
f_bx
Hloadx
Apc
6 Mx3
Dpile hpc2
npile f_by
Hloady
Apc
6 My3
Dpile hpc2
npile
f_bx 0.0195MPa f_by 0.0452MPa
Hloadx
Apc0.0195MPa
Hloady
Apc0.0452MPa
f_cb 8.217MPa f_cb 8.217MPa
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" Checky1 "Ok"
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok" Checky2 "Ok"
So Distance Joint Pile to Pile Cap: L2 hpc
L2 0.25m
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok" Checky2 "Ok"
3. Temporary Load 2 (COMB 1DL + 1LL + 0.3 QX + 1QY)
Vertical load : V3 28.87kN
Horisontal load : Fx3 1.46kN
Fy3 3.39 kN
Moment : Mx3 0kN m
My3 0kN m
X direction : Y direction :
Hloadx Fx3 Hloady Fy3
Hloadx 1.46kN Hloady 3.39kN
SHEET : 26 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Ltb1 3.78m length of tie beam (the longest tie beam)
He 3.5m height of embankment
Lp' 11.5m lenght effective of pile
Pped 0.47m length of pedestal
Lped 0.24m width of pedestal
A. Foundation Loads
A.1 Pile Cap Weight
Vcap P L T1 concrete
Vcap 10.5754kN
A.2 Pedestal Weight
Vped Pped Lped h1 h2 concrete
Vped 1.4077kN
A.3 Tie Beam Weight
Vtiebeam btb1 htb1 Ltb1 concrete
Vtiebeam 9.072kN
3.6 Foundation Design For Type 2
3.6.1 Loading Data
T1 0.85m thickness of pile cap h1 0.3mheight of pedestal
P 0.72m length of pile cap h2 0.22m
L 0.72m width of pile cap btb1 0.25m width of tie beam
npile 1 number of pile (for 1 pile cap) htb1 0.4m height of tie beam
Lp 15m length of pile
SHEET : 27 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
V2 166.97kNVertical load :Fx2 0.23kN
Horisontal load :Fy2 19.24 kN
Mx2 0kN mMoment :
My2 0kN m
3. Temporary Load 2 (COMB 1DL + 1LL + 0.3QX + 1QY)
Vertical load : V3 202.01kN
Horisontal load : Fx3 0.09kN
Fy3 26.24 kN
Moment : Mx3 0 kN m
My3 0 kN m
Vtot Vfound V1
Vtot 185.2117kN
A.4 Pile Weight
Vpile Lp wpile.300 npile
Vpile 16.95kN
A.5 Soil Weight
Vsoil P L Pped Lped h1 soil btb1 h1 0.5 Ltb1 soil
Vsoil 4.0726kN
Vfound Vcap Vped 0.5Vtiebeam Vpile Vsoil
Vfound 37.5417kN
B. Support Reaction Loads
Output Reaction of Structure from SAP 2000 (Not Factored) :
1. Permanent Load (COMB 1DL + 1LL)
Vertical load : V1 147.67kN
Horisontal load : Fx1 0.01kN
Fy1 15.76 kN
Moment : Mx1 0kN m
My1 0kN m
2. Temporary Load 1 (COMB 1DL + 1LL + 1QX + 0.3QY)
SHEET : 28 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Ppilemax1 18.5212ton
Ppilemax1Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 0.0137kN m
My My1 Fx1 T1 h1 h2
Mx 21.5912kN m
Mx Mx1 Fy1 T1 h1 h2
Moment :
Vtotal 18.5212ton
Vtotal Vfound V1
My1 0kN m
Mx1 0kN mMoment :
Fy1 15.76 kN
Fx1 0.01kNHorisontal load :
V1 147.67kNVertical load :
Vfound 37.5417kN
1. Analysis For Permanent Load (COMB 1DL + 1LL)
A. Axial Load Capacity
y2 0m2
y2 1y1_2
x2 0m2
x2 1 x1_2
y1_ 0mx1_ 0m
Pile Coordinat :
npile 1Pile coordinate from centre of pile cap :
3.6.2 Checking for Pile Capacity
SHEET : 29 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
AxialFoundation2 "Ok"
AxialFoundation2 "Ok" Qc1all.300 Ppilemax2if
"Not Ok" otherwise
Ppilemax2 20.4512ton
Ppilemax2Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 0.3151kN m
My My2 Fx2 T1 h1 h2
Mx 26.3588kN m
Mx Mx2 Fy2 T1 h1 h2
Moment :
Vtotal 20.4512ton
Vtotal Vfound V2
My2 0kN m
Mx2 0kN mMoment :
Fy2 19.24 kN
Fx2 0.23kNHorisontal load :
V2 166.97kNVertical load :
Vfound 37.5417kN
2. Analysis For Temporary Load 1 (COMB 1DL + 1LL + 1 QX + 0.3QY)
AxialFoundation1 "Ok"
AxialFoundation1 "Ok" Ppilemin1 0if
"Not Ok" otherwise
Ppilemin1 18.5212ton
Ppilemin1Vtotal
npile
My x1_
x2
Mx y1_
y2
AxialFoundation1 "Ok"
AxialFoundation1 "Ok" Qcall.300 Ppilemax1if
"Not Ok" otherwise
SHEET : 30 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
AxialFoundation3 "Ok"
AxialFoundation3 "Ok" Ppilemin3 0if
"Not Ok" otherwise
Ppilemin3 23.9552ton
Ppilemin3Vtotal
npile
My x1_
x2
Mx y1_
y2
AxialFoundation3 "Ok"
AxialFoundation3 "Ok" Qc1all.300 Ppilemax3if
"Not Ok" otherwise
Ppilemax3 23.9552ton
Ppilemax3Vtotal
npile
My x1_
x2
Mx y1_
y2
Pile Reaction :
My 0.1233kN m
My My3 Fx3 T1 h1 h2
Mx 35.9488kN m
Mx Mx3 Fy3 T1 h1 h2
Moment :
Vtotal 23.9552ton
Vtotal Vfound V3
My3 0kN m
Mx3 0kN mMoment :
Fy3 26.24 kN
Fx3 0.09kNHorisontal load :
V3 202.01kNVertical load :
Vfound 37.5417kN
3. Analysis For Temporary Load 2 (COMB 1DL + 1LL + 0.3 QX + 1QY)
AxialFoundation2 "Ok"
AxialFoundation2 "Ok" Ppilemin2 0if
"Not Ok" otherwise
Ppilemin2 20.4512ton
Ppilemin2Vtotal
npile
My x1_
x2
Mx y1_
y2
SHEET : 31 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Vfound 37.5417kN
Vmax 204.66kN
Vmax V1'
Loading :
My1' 0kN m
Mx1' 0kN mMoment :
Fy1' 21.83 kN
Fx1' 0.02kN Horisontal load :
V1' 204.66kNVertical load :
Output Reaction of Structure from SAP 2000 (Factored) :
a 0.36m
a 0.5 L
B. Horizontal Load Capacity
Allowable Horizontal Load
Qhor1all.300 39.9kN
Horizontal Load : (due to temporary load)
Fx max Fx1 Fx2 Fx3( ) Fy max Fy1 Fy2 Fy3( )
Fx 0.23kN Fy 26.24kN
Hult max Fx Fy
Hult 26.24kN
HpileHult
npile
Hpile 26.24kN
HorizontalFoundation "Ok" Qhor1all.300 Hpileif
"Not Ok" otherwise
HorizontalFoundation "Ok"
3.6.3 Pile Cap Design
A. Pile Cap Reinforcement
Reinforcement for X and Y direction (Bottom) :
SHEET : 32 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Used As D13-150 (As=8.849cm2)Asused 7.39cm2
Asused used 1m d
used min 0.025( )if
min minif
min 0.001 0
0.85 fc'
fy1 1
2 Rn
0.85 fc'
Rn 15.1656kN
m2
RnMn
0.8 L d2
Mn 4.7706kN m
MnMu
0.85
L 0.72m
d 0.739m
d T1 100mm 11mm
Foundation actual height (for assumption use D22mm)
Mu 4.055kN m
Moment Diagram :
Shear Diagram :
Modeling in STAAD PRO {COMB 1 x (1.2DL + 1.6LL)} :
Vdistributed 62.5696kN
m
Vdistributed 1.2Vfound
L
SHEET : 33 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
PunchingShear "Ok"
PunchingShear "Ok" Vu Vpcif
"Not Ok" otherwise
Vpc 238.4545ton
Vpc1
6
fc'
MPa MPa bo1 d
bo1 3.8877m
bo1 Dpile d
Allowable shear pile cap :
Vu 31.9402ton
VuPpilemax
0.75
Ppilemax 239.5517kN
Ppilemax max Ppilemax1 Ppilemax2 Ppilemax3
Maximum load by pile =
d 737.5mm
Dpile.300 0.3md T1 0.1m 0.0125mEffective height of pile cap =
T1 0.85m
Punching Shear Due to Pile Compress
B. Checking Pile Cap Shear Capacity
Used As D13-200 (As=6.637cm2)Asused 5.912cm2
Asused ' 1m d
' 0.0008
Reinforcement for X and Y direction (Top) :
SHEET : 34 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
P''u Fzu P'u
P''u 1171.27 kN
Concrete can accounts axial load, was not required again reinforcement but in execution in applies use minimum reinforcement.
So use reinforcement : Asped g Pped Lped dia 16 mm
Asped 11.28cm2
As_161
4 dia
2
As_16 2.0106cm2
nAsped
As_16
n 5.6102 Used As 6D16 (As=12.064m2)
Shear Reinforcement :
Shear Capacity of concrete :
Vxu 21.83kN
0.75
fsy 240N
mm2
d Lped 50 mm 10 mm13 mm
2
d 173.5mm
3.6.4 Pedestal Design
Vxu Fy1' Vu 1.4 Vxu Fzu 1.4 V1'
Vxu 21.83kN Vu 30.562kN Fzu 286.524kN
Assumed : g 0.01 Ratio of reinforcement
0.65 Strenght reduction factor
Ag Pped Lped
Ag 112800mm2
Load supported by concrete area :
P'u 0.8 0.85 fc' Ag Ag g fy Ag g SK SNI T - 15 - 1991 03 ( 3.3-2 )
P'u 1457.8kN
Load supported by Reinforcement :
SHEET : 35 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
BW 3.78m
BW Ltb1
qult.tb1 4.9833kN
m
qult.tb1 1.4 qtb1
qtb1 3.5595kN
m
qtb1 btb1 htb1 concrete btb1 h1 soil
Dead Load (DL) :
Load of tie beam :
htb1 0.4m
Ltb1 3.78mbtb1 0.25m
Dimension of tie beam :
3.6.5 Tie Beam Design
Used minimum shear reinforcement Ø10-150
ShearReinforcement "Used minimum shear reinforcement"
ShearReinforcement "Used minimum shear reinforcement" vc vnif
"Need shear reinforcement" otherwise
vn 29.1067kN
vnVxu
vc 34.6305kN
vc1
6fc' MPa b d
b 0.24m
b Lped
SHEET : 36 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
fsy 240N
mm2
0.75
Vu 9.4184kN
Vu 0.5 qult.tb1 Ltb1
Shear Reinforcement :
Used As 2D16 (As=4.021cm2)Asused 1.5457cm2
Asused used btb1 d
used min 0.025( )if
min minif
min 0.0018 0.0006
0.85 fc'
fy1 1
2 Rn
0.85 fc'
Rn 0.2514N
mm2
RnMu
0.8 btb1 d2
d 0.3435m
d htb1 40 mm 10 mm13 mm
2
Mu 5.9336kN m
Mu1
12
qult.tb1 BW2
22
SHEET : 37 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATIONfsy 240
N
mm2
d htb1 40 mm 10 mm16 mm
2
d 342mm
b btb1
b 0.25m
vc1
6fc' MPa b d
vc 71.1074kN
vnVxu
vn 29.1067kN
ShearReinforcement "Used minimum shear reinforcement" vc vnif
"Need shear reinforcement" otherwise
ShearReinforcement "Used minimum shear reinforcement"
Used minimum shear reinforcement Ø10-150
3.6.6. Checking Pile Head due to Horizontal & Moment Load
Joint Pile to Pile Cap (L2)
SHEET : 38 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
Fx1 0.01kN
Fy1 15.76 kN
Moment : Mx1 0kN m
My1 0kN m
X direction : Y direction :
Hloadx Fx1 Hloady Fy1
Hloadx 0.01kN Hloady 15.76kN
f_bx
Hloadx
Apc
6 Mx1
Dpile hpc2
npile f_by
Hloady
Apc
6 My1
Dpile hpc2
npile
f_bx 0.0001MPa f_by 0.2101MPa
Hloadx
Apc0.0001MPa
Hloady
Apc0.2101MPa
f_cb 8.217MPa f_cb 8.217MPa
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" Checky1 "Ok"
Compressive concrete strength (K-300) : fc' 24.9MPa
Yield steel strength: fy 390MPa
Allowable bearing pressure: f_cb 0.33 fc'
f_cb 8.217MPa
Bearing Force:H
Apcf_cb
h 0.175m
hpc h 0.075m
hpc 0.25m
Where : Apc = bearing area Apc Dpile.300 hpc Apc 0.075m2
Ddp = diametre of pile Dpile.300 0.3m
Pxn = maximum horizontal load
Mx = maximum pile momen capacity
1. Permanent Load (COMB 1DL + 1LL)
Vertical load : V1 147.67kN
Horisontal load :
SHEET : 39 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
f_by 0.2565MPa
Hloadx
Apc0.0031MPa
Hloady
Apc0.2565MPa
f_cb 8.217MPa f_cb 8.217MPa
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" Checky1 "Ok"
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok" Checky2 "Ok"
3. Temporary Load 2 (COMB 1DL + 1LL + 0.3 QX + 1QY)
Vertical load : V3 202.01kN
Horisontal load : Fx3 0.09kN
Fy3 26.24 kN
Moment : Mx3 0kN m
My3 0kN m
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok" Checky2 "Ok"
2. Temporary Load 1 (COMB 1DL + 1LL + 1 QX + 0.3QY)
Vertical load : V2 166.97kN
Horisontal load : Fx2 0.23kN
Fy2 19.24 kN
Moment : Mx2 0kN m
My2 0kN m
X direction : Y direction :
Hloadx Fx2 Hloady Fy2
Hloadx 0.23kN Hloady 19.24kN
f_bx
Hloadx
Apc
6 Mx2
Dpile hpc2
npile f_by
Hloady
Apc
6 My2
Dpile hpc2
npile
f_bx 0.0031MPa
SHEET : 40 of 40
REV. : A
DATE : 02-12-2011
DOC NO. : BF810-EC222-0009
CALCULATION SHEET OF
CONVEYOR C-1 B/C FOUNDATION
L2 0.25m
L2 hpcSo Distance Joint Pile to Pile Cap:
Checky2 "Ok"Checkx2 "Ok"
Checky2 "Ok"Hloady
Apcf_cbif
"Not Ok" otherwise
Checkx2 "Ok"Hloadx
Apcf_cbif
"Not Ok" otherwise
Checky1 "Ok"Checkx1 "Ok"
Checky1 "Ok" f_by f_cbif
"Not Ok" otherwise
Checkx1 "Ok" f_bx f_cbif
"Not Ok" otherwise
f_cb 8.217MPaf_cb 8.217MPa
Hloady
Apc0.3499MPa
Hloadx
Apc0.0012MPa
f_by 0.3499MPaf_bx 0.0012MPa
f_by
Hloady
Apc
6 My3
Dpile hpc2
npilef_bx
Hloadx
Apc
6 Mx3
Dpile hpc2
npile
Hloady 26.24kNHloadx 0.09kN
Hloady Fy3Hloadx Fx3
Y direction :X direction :