1 Project Quality Management Chapter 8

Transcript of Pmp quality chapter 8

Page 1: Pmp quality chapter 8

1

Project Quality ManagementChapter 8

Page 2: Pmp quality chapter 8

2

Quality Theories

Evolution of Quality Management

8.1 Plan Quality Management

8.2 Perform Quality Assurance

8.3 Control Quality

KEY TERMS

Page 3: Pmp quality chapter 8

Project Quality Management

Knowledge

Area

Process

Initiating Planning ExecutingMonitoring &

ControlClosing

Cost8.1 Plan

Quality

Management

8.2 Perform

Quality Assurance

8.3 Control

Quality

Enter phase/

Start project

Exit phase/

End project

Initiating

Processes

Closing

Processes

Planning

Processes

Executing

Processes

Monitoring &

Controlling Processes

Quality is the degree to which the project fulfills

requirements.

3

Page 4: Pmp quality chapter 8

4

8.1 Plan Quality Management

The process of identifying quality requirements and/or

standards for the project and its deliverables and

documenting how the project will demonstrate compliance

with quality requirements.

8.2 Perform Quality Assurance

The process of auditing the quality requirements and the

results from quality control measurements to ensure that

appropriate quality standards and operational definitions are

used.

8.3 Control Quality

The process of monitoring and recording results of

executing the quality activities to assess performance and

recommend necessary changes.

Page 5: Pmp quality chapter 8

5

Joseph

Juran

• 80/20 principle, top management

involvement. Quality is fitness for use.

• Advocated top management involvement

Quality Theorists

Philip

Crosby

• Cost of poor quality, prevention over

inspection and zero defects.

• Quality = Conformance To Requirements

Edwards

Deming

• 14 steps of Total Quality Management,

Plan-Do-Check-Act cycle.

• Basis for quality improvement.

Page 6: Pmp quality chapter 8

Quality Concepts

Quality vs. Grade

Quality: the degree to which a set of inherent characteristics fulfill requirements

Quality level that fails to meet quality requirements is always a PROBLEM

Grade: a category assigned to product or service having the same functional use but different technical characteristics

Low grade may not be a problem

6

Page 7: Pmp quality chapter 8

• Customer satisfaction

• Conformance to requirement

• Fitness for use: product/service produced must satisfy real needs

• Prevention over inspection

• Cost of preventing mistakes < cost of correcting

• Continuous improvement (Kaizen) Japanese concept

• Based on PDCA cycle

• Using quality improvement initiatives e.g. TQM, 6 sigma

• Management responsibility

• To provide the resource needed to succeed

7

Page 8: Pmp quality chapter 8

8

Gold Plating: giving the customer extras not recommended

Marginal Analysis: looking for the point where..benefits/revenue to be received from improving quality EQUALS the incremental cost to achieve that quality

Just in Time (JIT): just when they are needed or just before they are needed. It forces attention on quality practices.

decreasing inventory to close to zero.

Total Quality Management (TQM) Company & their employees focus on finding ways to continuous

improve the quality of their business practices & products.

Page 9: Pmp quality chapter 8

9

• ISO to help ensure that organizations have quality

procedures and that they follow them.

• Six Sigma a methodology for organizational

process improvement and achieving high levels of

correctness with extremely reduced variances.)

• 1 sigma = 68.26 %

• 2 sigma = 95.44 %

• 3 sigma = 99.73 %

• 6 sigma = 99.99 %

Page 10: Pmp quality chapter 8

10

8.1- Plan Quality Management

Page 11: Pmp quality chapter 8

11

8.1- Plan Quality Management.

The process of identifying quality requirements and/or

standards for the project and its deliverables and

documenting how the project will demonstrate compliance

with quality requirements.

Page 12: Pmp quality chapter 8

12

Page 13: Pmp quality chapter 8

8.1- Plan Quality Management INPUTS

13

1. Project

Management Plan

• Scope baseline

• Work Breakdown Structure

• WBS Dictionary

• Schedule baseline

• Cost baseline

• Other management Plans

2. Stakeholder Register

3. Risk register

4. Requirements Documentation

5. OPA

Page 14: Pmp quality chapter 8

8.1- Plan Quality Management T & T

14

• Cost-benefit Analysis The primary benefit of meeting

quality requirements is less rework, i.e., higher

productivity, lower costs and increased stakeholder

satisfaction.

• Benchmarking This technique involves looking at other

projects to get ideas for improvement on the current

project and to provide a basis (or benchmark) to use in

measuring quality performance.

• Meetings

Page 15: Pmp quality chapter 8

15

• Cost Of Quality

Refers to the total cost of the conformance work and the

nonconformance work

8.1- Plan Quality Management T & T

Page 16: Pmp quality chapter 8

16

• Design of Experiment DOE statistical method

• Helps identify which factors might influence specific variables.

• DOE can help shorten the time and effort required to discover the best

conditions to produce a quality deliverable

Which parts are

best integrated to

give best result

8.1- Plan Quality Management T & T

Page 17: Pmp quality chapter 8

17

• Seven Basic Quality Tools 7QC Tools

used within the context of the PDCA Cycle to solve quality-

related problems.

1. Cause-and-effect (fishbone diagrams / Ishikawa diagrams) Trace

the problem’s source back to its “actionable root cause”

Page 18: Pmp quality chapter 8

18

• Seven Basic Quality Tools 7QC Tools

2. Flowcharting (Process Map) a graphical representation of a

process showing the relationships among process steps and display the

sequence of steps

Page 19: Pmp quality chapter 8

19

• Seven Basic Quality Tools 7QC Tools

3. Check sheet (Tally Sheet) a type of checklist that can be used to

keep track of data such as quality problems uncovered during inspections.

Page 20: Pmp quality chapter 8

20

• Seven Basic Quality Tools 7QC Tools

4. Pareto Diagram (Pareto Chart)

Identify the vital few sources that are responsible for causing most of a

problem’s effects.

• Focus attention to most

critical issues

• Pareto Principle :

80/20 principle states that

80 percent of problems

are due to 20 percent of

the root causes

Page 21: Pmp quality chapter 8

21

• Seven Basic Quality Tools 7QC Tools

5. Histograms

A bar chart and are used to describe the central tendency, distraction.

Does not consider the influence of time on the variation exists within a

distribution.

Helps identify which Problems are worth dealing with.

Page 22: Pmp quality chapter 8

22

• Seven Basic Quality Tools 7QC Tools

6. Control Charts

Graphic displays of the results, over time, of a process; used to assess

whether the process is “in control”.

Control Limits : represent the performing organization's standards

Mean (Average) : It shows the middle of the range of acceptable variation.

Specification Limits : represent the customer's expectations or contractual

requirements

Page 23: Pmp quality chapter 8

23

• Seven Basic Quality Tools 7QC Tools

6. Control Charts

• Rule of Seven : seven points toward upper or lower control limit may indicate

that process is out of control

Assignable causes – Variations may be caused by differences in

machines, workers overtime, etc. Identify the root cause.

A process is considered out of control when :

1. a data point exceeds a control limit.

2. seven consecutive plot points are above the mean

3. seven consecutive plot points are below the mean.

Page 24: Pmp quality chapter 8

24

Upper

control limit

Mean Line

(center )

Out of control

Assignable/special

cause

Specification limit:

is point determines by

customer, not calculated

based on control chart

Normal and expected

variation Usually 3 or 6

sigma

Rule of seven (non random

data points) Out of control

Assignable/special cause

Normal

distribution

curve

Lower

control limit

Page 25: Pmp quality chapter 8

25

• Seven Basic Quality Tools 7QC Tools

7. Scatter diagrams ( correlation charts )

• Tracks two variables to determine their relationship.

• Determines the relationship of independent variables such as paint

quantity, dryer fan speed, and door weight to the dependent variable of

drying time.

Door Paint Spray

Quantity (mL/sqm)Dryer Fan Speed

(rpm)Door weight

Do

or

Dry

ing

Tim

e(m

inu

tes)

Page 26: Pmp quality chapter 8

26

• Statistical Sampling

8.1- Plan Quality Management T & T

Involves choosing part of a population of interest for inspection

(e.g., selecting 10 samples of 75 electronic components).

Appropriate sampling can often reduce the cost of quality

control.

Brainstorming. This technique is used to generate ideas.

Nominal group technique. This technique is used to allow

ideas to be brainstormed in small groups and then reviewed by

a larger group.

• Additional Quality Planning Tools

Page 27: Pmp quality chapter 8

8.1- Plan Quality Management Outputs

27

Quality

Management

Plan

• What processes will be followed to help ensure

quality

• Review of earlier decisions to make sure those

decisions are correct

• The meetings to be held addressing quality

• The reports that will address quality

• What metrics will be used to measure quality

• What parts of the project or deliverables will be

measured and when

Process

Improvement

Plan

• Process boundaries. purpose of the process, the start

and end of the process, its inputs

and outputs, the process owner, and the stakeholders of

the process.

• Process configuration. Provides a graphic depiction of

processes, How to improve quality processes.

• Process metrics.

• Targets for improved performance.

Page 28: Pmp quality chapter 8

8.1- Plan Quality Management Outputs

28

Quality Metrics

• How the control quality process will measure the

deliverables / product.

• What is the measures for each part including

time / cost tolerance / quality accepted level.

Quality

Checklists

a structured tool, used to verify that a set of required

steps has been performed.

Project

Documents

Updates

• Stakeholder register assign new people for tasks.

• Responsibility assignment matrix (change

responsibilities.

• WBS and WBS Dictionary.

Page 29: Pmp quality chapter 8

29

8.2- Perform Quality Assurance

Page 30: Pmp quality chapter 8

30

8.2- Perform Quality Assurance.

The process of auditing the quality requirements and the

results from quality control measurements to ensure that

appropriate quality standards and operational definitions

are used.

Are we using the standard?

Can we improve the standard?

Page 31: Pmp quality chapter 8

31

Page 32: Pmp quality chapter 8

8.2- Perform Quality Assurance Inputs

32

1. Quality Management Plan

2. Process Improvement Plan

3. Quality Metrics

4. Project Documents

5.

Quality Control

Measurements

• Are the results of control quality activities.

• Analyze and evaluate the quality of the

processes of the project against the standards

of the performing organization or the requirements

specified

.

• Compare the processes used to create the

measurements, and validate actual

measurements to determine their level of

correctness.

Page 33: Pmp quality chapter 8

8.2- Perform Quality Assurance T & T

33

• Quality Audits

• To see if you are complying to company policies,

standards & procedures.

• Determine whether they are used efficiently & effectively

• Identify all the good practices being implemented

• Identify all the gaps/shortcomings

• Look for new lesson learned & good practices

• Process Analysis

• Includes root cause analysis

• How is the processes going to

find out the defect.

Page 34: Pmp quality chapter 8

• Quality Management and Control Tools

34

1. Affinity Diagram: A technique that allows large numbers of ideas to be

classified into groups for review and analysis.

8.2- Perform Quality Assurance T & T

Page 35: Pmp quality chapter 8

35

2. Process Decision Program Charts Used to understand a

goal in relation to the steps for getting to the goal. The PDPC is useful as

a method for contingency planning.

8.2- Perform Quality Assurance T & T

• Quality Management and Control Tools

Page 36: Pmp quality chapter 8

36

3. Interrelationship Digraphs analyze the relationships among

numerous different issues to find the root cause of the problem.

8.2- Perform Quality Assurance T & T

• Quality Management and Control Tools

Page 37: Pmp quality chapter 8

37

4. Tree Diagrams (systematic diagrams )

• Used to represent decomposition hierarchies such as the WBS, RBS

(risk breakdown structure), and OBS (organizational breakdown

structure), RBS (resource breakdown structure)

• Decompose processes to find a solution to a problem, and arrive at

corrective or preventive action.

8.2- Perform Quality Assurance T & T

• Quality Management and Control Tools

Arrive at school

on time

Arrive at school

late

Miss school

Catch 1st train

Catch 2nd train

Miss trains

Catch 1st bus

Catch 2nd bus

Miss buses

Leave

home

Page 38: Pmp quality chapter 8

38

4. Prioritization MatricesIdentify the key issues and the suitable alternatives to be prioritized as

a set of decisions for implementation

8.2- Perform Quality Assurance T & T

• Quality Management and Control Tools

5. Activity Network Diagram if you're looking to improve time

management processes.

6. Matrix Diagrams• Used to perform data analysis within the organizational structure.

• Seeks to show the strength of relationships between factors,

causes, and objectives

Page 39: Pmp quality chapter 8

39

Page 40: Pmp quality chapter 8

8.2- Perform Quality Assurance Outputs

40

1. Change Requests

2. Project Management Plan Updates

3. Project Documents Updates

4. OPA

Page 41: Pmp quality chapter 8

41

8.3- Control Quality

Page 42: Pmp quality chapter 8

42

8.3- Control Quality.

• The process of monitoring and recording results of

executing the quality activities to assess performance

• The key benefits of this process include

Identifying the causes of poor quality

Validating that project deliverables and work meet

the requirements

Page 43: Pmp quality chapter 8

43

8.3- Control Quality.

Prevention (Keeping errors out of the process).

Inspection (Keeping errors out of the hands of the

customer).

Attribute sampling ( either conform or not )

Variables sampling (degree of conformity)

Tolerance (range of acceptable results) and

Control limits (thresholds which may indicate out of

control)

Page 44: Pmp quality chapter 8

44

Page 45: Pmp quality chapter 8

8.3- Control Quality Inputs

45

Project Management Plan

Quality Metrics

Quality checklists

Work Performance Data

Approved Change Requests

Deliverables

Project

Documents

• Agreements,

• Quality audit reports

• Training plans and assessments of effectiveness.

• Process documentation

OPA

Page 46: Pmp quality chapter 8

8.3- Control Quality T & T

46

Seven Basic Quality Tools

Statistical Sampling

Inspection

Approved Change Request Reviews

Page 47: Pmp quality chapter 8

8.3- Control Quality Outputs

47

Quality Control Measurements

Validated Changes

Verified Deliverables

Work Performance Information

Change Requests

Project Management Plan Updates

Project Document Updates

OPA

Page 48: Pmp quality chapter 8

Questions

48

1. When a product or service completely meets a customer's

requirements:

A. Quality is achieved.

B. The cost of quality is high.

C. The cost of quality is low.

D. The customer pays the minimum price.

Page 49: Pmp quality chapter 8

Questions

49

1. When a product or service completely meets a customer's

requirements:

A. Quality is achieved.

B. The cost of quality is high.

C. The cost of quality is low.

D. The customer pays the minimum price.

Answer : A

Page 50: Pmp quality chapter 8

Questions

50

2. To what does the following definition refer? "The point

where the benefits or revenue to be received from improving

quality equals the incremental cost to achieve that quality ?

A. Quality control analysis

B. Marginal analysis

C. Standard quality analysis

D. Conformance analysis

Page 51: Pmp quality chapter 8

Questions

51

2. To what does the following definition refer? "The point

where the benefits or revenue to be received from improving

quality equals the incremental cost to achieve that quality ?

A. Quality control analysis

B. Marginal analysis

C. Standard quality analysis

D. Conformance analysis

Answer : B

Page 52: Pmp quality chapter 8

Questions

52

3. Who is ultimately responsible for quality management on

the project?

A. The project engineer

B. The project manager

C. The quality manager

D. The team member

Page 53: Pmp quality chapter 8

Questions

53

3. Who is ultimately responsible for quality management on

the project?

A. The project engineer

B. The project manager

C. The quality manager

D. The team member

Answer : B

Page 54: Pmp quality chapter 8

Questions

54

4. All the following are tools of Control Quality EXCEPT:

A. Inspection.

B. Cost of quality.

C. Pareto diagram.

D. Fishbone diagram.

Page 55: Pmp quality chapter 8

Questions

55

4. All the following are tools of Control Quality EXCEPT:

A. Inspection.

B. Cost of quality.

C. Pareto diagram.

D. Fishbone diagram.

Answer : B

Page 56: Pmp quality chapter 8

Questions

56

5. Pareto diagrams help the project manager:

A. Focus on the most critical issues to improve quality.

B. Focus on stimulating thinking.

C. Explore a desired future outcome.

D. Determine if a process is out of control.

Page 57: Pmp quality chapter 8

Questions

57

5. Pareto diagrams help the project manager:

A. Focus on the most critical issues to improve quality.

B. Focus on stimulating thinking.

C. Explore a desired future outcome.

D. Determine if a process is out of control.

Answer : A

Page 58: Pmp quality chapter 8

Questions

58

6. A control chart helps the project manager:

A. Focus on the most critical issues to improve quality.

B. Focus on stimulating thinking.

C. Explore a desired future outcome.

D. Determine if a process is functioning within set limits.

Page 59: Pmp quality chapter 8

Questions

59

6. A control chart helps the project manager:

A. Focus on the most critical issues to improve quality.

B. Focus on stimulating thinking.

C. Explore a desired future outcome.

D. Determine if a process is functioning within set limits.

Answer : D

Page 60: Pmp quality chapter 8

Questions

60

7. Testing the entire population would:

A. Take too long.

B. Provide more information than wanted.

C. Be mutually exclusive.

D. Show many defects.

Page 61: Pmp quality chapter 8

Questions

61

7. Testing the entire population would:

A. Take too long.

B. Provide more information than wanted.

C. Be mutually exclusive.

D. Show many defects.

Answer : A

Page 62: Pmp quality chapter 8

Questions

62

8. All of the following are examples of the cost of

nonconformance EXCEPT:

A. Rework.

B. Quality training.

C. Scrap.

D. Warranty costs.

Page 63: Pmp quality chapter 8

Questions

63

8. All of the following are examples of the cost of

nonconformance EXCEPT:

A. Rework.

B. Quality training.

C. Scrap.

D. Warranty costs.

Answer : B

Page 64: Pmp quality chapter 8

Questions

64

9. You are asked to select tools and techniques to implement

a quality assurance program to supplement existing quality

control activities. Which of the following would NOT be

appropriate for this purpose?

A. Quality audits

B. Statistical sampling

C. Pareto diagrams

D. Focus groups

Page 65: Pmp quality chapter 8

Questions

65

9. You are asked to select tools and techniques to implement

a quality assurance program to supplement existing quality

control activities. Which of the following would NOT be

appropriate for this purpose?

A. Quality audits

B. Statistical sampling

C. Pareto diagrams

D. Focus groups

Answer : DFocus groups are a tool of the Collect Requirements process, and

would not be useful in the Perform Quality Assurance process.

Page 66: Pmp quality chapter 8

Questions

66

10. As the project manager, you are preparing your quality

management plan. You are looking for a tool that can

demonstrate the relationship between events and their

resulting effects. You want to use this tool to depict the events

that cause a negative effect on quality. Which of the following is

the BEST choice for accomplishing your objective?

A. Histogram

B. Pareto diagram

C. Ishikawa diagram

D. Control chart

Page 67: Pmp quality chapter 8

Questions

67

10. As the project manager, you are preparing your quality

management plan. You are looking for a tool that can

demonstrate the relationship between events and their

resulting effects. You want to use this tool to depict the events

that cause a negative effect on quality. Which of the following is

the BEST choice for accomplishing your objective?

A. Histogram

B. Pareto diagram

C. Ishikawa diagram

D. Control chart