PLDT TODO list

2
Things to Do: 1. Change the Color to the Proper Color Code a. The proper color code is in the “Summary” Sheet of OJT/Keys_Project/Keys Inventory.xlsx 2. Put the keys a. The Proper keys location is written in the “For Printing” Sheet of OJT/Keys_project/Keys Sorted New.xls (Basta un latest na Keys Sorted na excel file) 3. Edit the Total Keys and Brand a. Background: May nagkaduplicate lang sa listahan Proposed Procedure: 1. Pick a bundle from the Keys Cabinet 2. For each Key, Find its proper Hook Number from the Keys Sorted excel a. Note that in each Keys Location, there are many Equipment Id and Keys Brand 3. Now, Match the brand of the key-in-hand to the list a. Highlight its Brand and # of keys b. Take note of its quantity 4. Change the tie wrap to its proper color a. Note: The scissors, tape, and tie wrap is in the locker b. If the tie wrap is not enough, use the wires c. The wires are located in the adjacent drawer of Sir Sarge’s drawer. d. If naubos pa un wire, un reinforcements nandun sa middle bottom Big drawer sa may harapan ng office. Etong harapan ay kung nasaan un clock. 5. Put the key in the proper location 6. Do step 1-5 in all keys. 7. Afterwards, Check the un-highlighted part in the excel file. Remove it.

description

This is the TODO list I used for doing my OJT Final Project: Keys Arrangement.

Transcript of PLDT TODO list

Things to Do:1. Change the Color to the Proper Color Codea. The proper color code is in the Summary Sheet of OJT/Keys_Project/Keys Inventory.xlsx2. Put the keysa. The Proper keys location is written in the For Printing Sheet of OJT/Keys_project/Keys Sorted New.xls (Basta un latest na Keys Sorted na excel file)3. Edit the Total Keys and Branda. Background: May nagkaduplicate lang sa listahan

Proposed Procedure:

1. Pick a bundle from the Keys Cabinet

2. For each Key, Find its proper Hook Number from the Keys Sorted excela. Note that in each Keys Location, there are many Equipment Id and Keys Brand3. Now, Match the brand of the key-in-hand to the lista. Highlight its Brand and # of keysb. Take note of its quantity

4. Change the tie wrap to its proper colora. Note: The scissors, tape, and tie wrap is in the lockerb. If the tie wrap is not enough, use the wiresc. The wires are located in the adjacent drawer of Sir Sarges drawer.d. If naubos pa un wire, un reinforcements nandun sa middle bottom Big drawer sa may harapan ng office. Etong harapan ay kung nasaan un clock.

5. Put the key in the proper location

6. Do step 1-5 in all keys.

7. Afterwards, Check the un-highlighted part in the excel file. Remove it.

8. For each Hook, bundle all the hooks there in one wire.

9. Print the Final Directory List