Investing in 50% share of company
Amadint Ltd CazinMala Lisa bbCazin 77 220Bosnia and Herzegovina
+ Possibilities for other investments
![Page 2: Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014](https://reader035.fdocuments.in/reader035/viewer/2022081505/568165cb550346895dd8d65d/html5/thumbnails/2.jpg)
Comparative advantages of project location:
Investing in Renewable Energy Sources,
Geostrategic position of the location,
Wood raw material availability,
All necessary permits and infrastructure secured,
Distance to nearest harbour is less than 250 km (Rijeka - Croatia),
Distance to major Central - European cities is less than 500 km.
Our project location
![Page 3: Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014](https://reader035.fdocuments.in/reader035/viewer/2022081505/568165cb550346895dd8d65d/html5/thumbnails/3.jpg)
Project locationBosnia and HerzegovinaBosanski Petrovac
Lot 1 Lot 2
Lot 3
Lot 4
Lot 5Lot 6
Lot 8Lot 9
Lot 10
Lot 11Lot 12
Lot 13
Lot 7
![Page 4: Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014](https://reader035.fdocuments.in/reader035/viewer/2022081505/568165cb550346895dd8d65d/html5/thumbnails/4.jpg)
Investment: INCREASE OF PRODUCTION CAPACITY
Wood Pellets Factory Yearly capacity: 15.000 T
Yearly capacity after investment:30.000 T
![Page 5: Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014](https://reader035.fdocuments.in/reader035/viewer/2022081505/568165cb550346895dd8d65d/html5/thumbnails/5.jpg)
Why should You invest with us?
• Income Tax 10 %• Capital Gain Tax 0,0 %• Income Tax is 0% (if more than 30% of income is made by export of the goods)
Investment possibilities:
•Creation of production capacities for further development of wood processing production,
•Start up Cogeneration plant,
•Start up Solar power plant.
1. New Shareholder buy-in for the 50% of shares,
2. Investment in the increase of production capacity to 4t/h.
Investment objectives:
![Page 6: Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014](https://reader035.fdocuments.in/reader035/viewer/2022081505/568165cb550346895dd8d65d/html5/thumbnails/6.jpg)
Amadint Ltd Cazin101. MUKBR bb77 220 CazinBosnia and Herzegovina
+387 37 511 531+387 61 195 252+387 61 201 275
Contact information:
Investment Value<Wood Pellet Factory>
CAPEX: 3.206.534 €OPEX: 777.173 €Total Investment: 3.983.707 €
Funds neccessary for the projectimplementation: 3.983.707 €
Investment Payback period: 5 years and 5 months
ROI: 25,23 %