Phase-I Status

8
Plant consists of: • Direct Reduction Plant • Steel Making Plant (EAF, LF, CCM) • Rolling Mills (BM, WRM) RM3 (Wire Rod Coil) has started as planned in October and RM2 (Bar) has started in December 2007. Steel Making Plant has started in February and Direct Reduction Plant in August 2008 Phase-I Status

Transcript of Phase-I Status

Page 1: Phase-I Status

Plant consists of:

• Direct Reduction Plant

• Steel Making Plant (EAF, LF, CCM)

• Rolling Mills (BM, WRM)

RM3 (Wire Rod Coil) has started as planned in

October and RM2 (Bar) has started in December

2007.

Steel Making Plant has started in February and

Direct Reduction Plant in August 2008

Phase-I Status

Page 2: Phase-I Status

Steel Making Plant Production

0

100

200

300

400

500

600

700

800

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Num

ber of heat

0

20000

40000

60000

80000

100000

120000

Ton

Heat/month Ton/month

Page 3: Phase-I Status

Wire Rod Mill - 480,000 tpy

16 Strands + 1 high speed block (BGV)Production sizesPlain 5.5 - 8 mmDeformed 8 - 16 mm

Bar Mills - 1,100,000 tpy (+700,000 tpy from existing)16 Strands + 2 high speed blocks (BGV)Production sizes 8 - 32 mm

Steel Making Plant - 1,4000,000 tpy

EAF & LF of 150 T: TTT 46 min.CCM 6 - strands 130 mm, 150 mm & 200 mm Billets sizes

Direct Reduction Plant - 1,600,000 tpy

Pneumatic hot charging system @ 600° CHYL Technology

Phase I Products

Page 4: Phase-I Status

Phase II Project

Therefore, since it is ESI’s strategy to meet market expectation and customer satisfaction, it has been decided to go ahead with Phase II project. Whilst being an identical copy of Phase I DRP & SMP Phase II will incorporate a Combi Caster to produce billets, bloom & beam blanks.

The study of the current and potential future market indicates that a strong demand is in place and most likely will continue to grow.

This market is expected to be sufficiently large to absorb the current production capacity of rebar and wire rod.

There exists a demand for other products.

Page 5: Phase-I Status

Phase II Production Flow Chart

DIRECT REDUCTION PLANT1,600,000 tpy DRI

MELTSHOP PLANT1,410,000 tpy LIQUID STEEL

BILLET / BLOOM / BEAMBLANK CASTER

1,400,000 tpy

TO NEW SECTION MILL1,000,000 TPY

TOTAL OUTPUT1,400,000 TPY

TO EXISTING MILLS BARS / WIRE400,000 tpy

Page 6: Phase-I Status

Direct Reduction Plant1.6 M t of DRI using HYL technology, hot charging system @ 600°C.

Steel Making Plant

EAF, LF

1.4 M t of Refined Liquid steel using 150 t furnace.

Combi Caster

1.39 M t of billets, blooms and beam blanks.

Shape Size

� Bloom 220x350 mm (589.1 kg/m)

� Beam Blank 1 430x350x90 mm (649.2 kg/m)

� Beam Blank 2 480x250x90 mm (538.3 kg/m)

� Beam Blank 3 500x435x120 mm (961.5 kg/m)

� Beam Blank 4 670x350x90 mm (814.4 kg/m)

� Beam Blank 5 1,050x435x120 mm (1,562.8 kg/m)

Page 7: Phase-I Status

ES Heavy Sections Mill

� The Section Mill is designed to produce 1 million tons per year, comprising of

a wide range of products.

� The product mix below is an indicative example

400 to 755 mm

150 to 250 mm

200 to 430 mm

200x200 to 400x400 mm

200x100 to 1000x400 mm

~ 10 %

~ 7 %

~ 3 %

~ 40 %

~ 40 %

Sheet PilingU / Z

AnglesL

Channels ⊓⊓⊓⊓

Columns H

BeamsI

Page 8: Phase-I Status

DESCRIPTIONPHASES

Phase III

Phase IV

Future Expansions

•DRI plant of 1.6 M tpy capacity

• Steel Melting plant of 1.4 M tpy capacity for slab casting

• Rolling mill of 1.2 M tpy capacity for plate / coil production

•Two DRI units, each of 1.6 M tpy capacity

• Steel Melting plant of 2.8 M tpy for slab casting

• Hot strip mill of 2.4 M tpy of high quality HRC

• Cold Rolling, Galvanizing and Coloring production units can

be added at a later stage