Phase 1 FPIX module assembly status

37
Phase 1 FPIX module assembly status Phase 1 Pixel Upgrade Workshop - Aug2012 Pixel Modules Parallel Session 1 Kirk Arndt Purdue University for CMS FPIX Mechanical Group S. Kwan, C.M. Lei, S. Los, G. Derylo (Fermilab) G. Bolla, D. Bortoletto, I. Shipsey, Y. Ding, V. Noe-Kim, D. Snyder (Purdue)

description

Phase 1 FPIX module assembly status. Kirk Arndt Purdue University for CMS FPIX Mechanical Group S. Kwan, C.M. Lei, S. Los, G . Derylo (Fermilab ) G. Bolla, D. Bortoletto, I. Shipsey, Y . Ding, V. Noe-Kim, D. Snyder ( Purdue). Phase 1 FPIX module. Flex cable strain relief - PowerPoint PPT Presentation

Transcript of Phase 1 FPIX module assembly status

Page 1: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 1

Phase 1 FPIX module assembly status

Phase 1 Pixel Upgrade Workshop - Aug2012

Kirk ArndtPurdue University

for CMS FPIX Mechanical GroupS. Kwan, C.M. Lei, S. Los, G. Derylo (Fermilab)

G. Bolla, D. Bortoletto, I. Shipsey, Y. Ding, V. Noe-Kim, D. Snyder (Purdue)

Page 2: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 2Phase 1 Pixel Upgrade Workshop - Aug2012

TBM

Module end holder(with thru hole for #00 or M1.2 screw)

2x8 ROCs

HDI

Flexible Printed Circuit SMT connector

(SMK CFP8730-0101F)

Flex cable strain relief (built into module end holder)

FPIX sensor

Phase 1 FPIX module

Flat flex cable75cm length

(short “connector saver” pigtail flex will be used for testing during assembly)

Page 3: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 3Phase 1 Pixel Upgrade Workshop - Aug2012

Flex cable and strain relief insertion sequence

Threaded insert in module end holder (for engagement with screw

thru hole in blade)

Connector cover flips and locks easily withonly a small force to

connect flex cable

Page 4: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 4

Flex cable strain relief trial

It works!

Phase 1 Pixel Upgrade Workshop - Aug2012

Page 5: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 5

HDI flex and TBM

2x8 Bump-Bond Module

Status• For HDI-to-sensor gluing, beginning

trials using a stamp on the ‘pick-and-place’ machine to improve the uniformity of epoxy dispensing (similar to the process used by BPIX).

• Early results on stamping Araldite 2011 epoxy on glass slides look promising…

Semi-automated module assembly

Phase 1 Pixel Upgrade Workshop - Aug2012

Page 6: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 6

• Completed reverse engineering of custom front-end tools on loan from UCSB. Designs sent to Nebraska for machining of the tools for Nebraska and Purdue gantry systems.

• Aerotech software upgrades in progress to make Purdue and Nebraska gantry controls identical.

• Completed LabVIEW program at Purdue with all functionality required for pixel module assembly as baseline code for commissioning Nebraska system (see video at http://www.youtube.com/watch?v=qMs_w89dnXc)

• Plan to adopt the PSI cooling box for FPIX module testing…received drawings and parts list from Andrei Starodumov (…need to follow-up with Philipp Eller for the changes that ETHZ made to the design)

• Parts for two boxes will be purchased by Kansas University and machined and assembled at Nebraska…one will go to Purdue.

Update: module assembly and testing at Purdue/Nebraska

Phase 1 Pixel Upgrade Workshop - Aug2012

Page 7: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 7

Wirebond encapsulationpast and future

Phase 1 Pixel Upgrade Workshop - Aug2012

Page 8: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 8

Vibrations

• Vibrations are detected all the way down to 3x8 pixels pulsed in all ROCs that correspond to a current of ~8 mA in the single Bond being investigated.

• More pixels implies more current and so larger amplitude.• The frequency detected is ~14 KHz and obviously the wire oscillates

also when pulsed at 7Khz and 3.5KHz, but the amplitude goes down

click here for the movie

From CMSFPIX Tech Board Meeting – Dec 1, 2006 (full report in backup slides)

Phase 1 Pixel Upgrade Workshop - Aug2012

Page 9: Phase 1 FPIX module assembly status

Pixel Modules Parallel Session 9Phase 1 Pixel Upgrade Workshop - Aug2012

Page 10: Phase 1 FPIX module assembly status

FPIX Plaquette Encapsulation• The encapsulant (Dow Corning Sylgard 186) is

removable. Wirebonding can be done again in case of failures

• The 2-part encapsulant is mixed, poured into a syringe and degassed in a vacuum or centrifuge

• The syringe is connected to an air powered fluid dispenser and inserted into a holder on a 3-axis stage (motion along rows of bond feet is motor-controlled).

• Shape of encapsulant beads is determined by the rate of volume dispensed and the rate of motion of the syringe

• Mixed encapsulant should be used between ~0.5 and ~1.5 hours after mixing. Fixture cure at room temp. is ~8 hours, full cure in 48 hours.

• Estimate ~3 hours to encapsulate 6 plaquettes (including mixing and clean-up time).

• See section 3.3 “Wirebonding and encapsulation” in Assembly and qualification procedures of CMS forward pixel detector modules, Nucl. Instrum. Meth. A638, Issue 1, 11 May 2011, Pages 55–62, doi:10.1016/j.nima.2011.02.106

Phase 1 Pixel Upgrade Workshop - Aug2012 Pixel Modules Parallel Session 10

Camera

Plaquette

Video Monitor

Syringe

VHDI

Encapsulant beads

Wirebonds

Sensor ROCs

Page 11: Phase 1 FPIX module assembly status

FPIX Encapsulation result

ROC and VHDI wire bond feet were potted in separate encapsulant beads for each ROC

Phase 1 Pixel Upgrade Workshop - Aug2012 Pixel Modules Parallel Session 11

Page 12: Phase 1 FPIX module assembly status

Bead dimensions

Phase 1 Pixel Upgrade Workshop - Aug2012 Pixel Modules Parallel Session 12

width VHDI bead ~900 um

height ~150 um width ROC bead

~600 um

height ~100 um

Page 13: Phase 1 FPIX module assembly status

Phase 1 FPIX encapsulation

Phase 1 Pixel Upgrade Workshop - Aug2012 Pixel Modules Parallel Session 13

• Use 3-axis motion-controlled “robot” and programmable dispenser controller for increased accuracy and repeatability

• Would be nice to add camera to robot for pattern recognition alignment of dispensing pattern-to-module wirebonds

• Will try conical dispensing nozzle (shown above) with 50 micron ID orifice (used 100 micron ID syringe needle in the past)

Page 14: Phase 1 FPIX module assembly status

Backup slides

14

Page 15: Phase 1 FPIX module assembly status

Gold plated area12.8 mm X 2.5 mm,Non-bendable region

flex cable strain relief design

15

Page 16: Phase 1 FPIX module assembly status

9.6o angle up from plane of connector

16

Page 17: Phase 1 FPIX module assembly status

Step 1:Place Flex cable in front of connector;Bend at ~5 mm from end.

Step 2:Insert Flex cable into connector;Bend at 7.5 mm from end.

Step 3:Snap in the cap (handle not shown)Flex cable strain-relieved.

17

Page 18: Phase 1 FPIX module assembly status

18

Page 19: Phase 1 FPIX module assembly status

• The insertion direction is reversed so that friction locks the plug when the cable is pull accidentally from the free end.

• Locking feature = deflection tip at the front end of the plug.• Need experience with prototype.

19

Page 20: Phase 1 FPIX module assembly status

• Having trouble finding a manufacturer of a “textured” stamp similar to the stamp used by BPIX (on the left).

• Closest I’ve found is shown on the right.

20

Page 21: Phase 1 FPIX module assembly status

Purdue status Report

• The main topic is encapsulation or not, and if so how

21

G. Bolla, P. Merkel, I. Shipsey, K. Arndt, G. Arndt, D. Graves, D. Bortoletto, C. McKinney, I. Childres

and more ….

CMSFPIX Tech Board Meeting – Dec 1, 2006

Page 22: Phase 1 FPIX module assembly status

Encapsulation or not

• Approach– Understand what is going on with measurements

• Can be very time consuming, but fun as well– Make an educated decision – Develop the tools and procedures to get the job

done

22

Page 23: Phase 1 FPIX module assembly status

Magnetic field• How do we get it at Purdue?

– Cheap– Handy and easy to use– Safe– Compatible with

• installing a Plaquette in the field with the ~right orientation• Watching the bonds with high-mag optic• Close to the DAQ (cosmo based thx Rutgers people)

• Investigated various options:– Multiple magnets available in the Phys. Bldg. up to 2 T

• Similar to what Atac-et-al used• What a pain

» it might trip on anything» Schedule with other users» Not really my style

• Make a SHOPPING LIST– Bought some nice permanent magnets ($150 for the whole thing)

• Neodymium Iron Boron (NdFeB) Magnets• 2 inches diameter and 2 inches thick (a beauty but I had to spend 2 hours on the phone with the vendor for

safety reasons; He thought I could not handle them properly and I was going to be killed by them)– Safety first so Kirk (the wise guy) helped and set up a safe frame for the new toys

– Bought some first surface mirror to get the bond image out to the stereoscope • 6$ a piece (I bought 10 of them)• Handy 9mmx9mm I can put them anywhere and they are compatible with a small gap between the magnets

9/SQRT(2)=~6.4 mm between the magnets (~ 0.4 inches for the Yankees)– Coupled our lab digital camera to the stereoscope and take movies and pictures

23

Page 24: Phase 1 FPIX module assembly status

Mapping the field with a GAUSSmeter

24

1 2 3 4 5 6S1

S2

S3

S4

S5

S6 0.92-0.93

0.91-0.92

0.9-0.91

0.89-0.9

0.88-0.89

0.87-0.88

0.86-0.87

0.85-0.86

0.84-0.85

0.83-0.84

0.82-0.83

0.81-0.82

0.8-0.81

0.79-0.8

0.78-0.79

0.77-0.78

0.76-0.77

0.75-0.76

0.74-0.75

0.73-0.74

Mapping of the B-field. The field is above 0.9 T within a radius of 2 cm. The grid of the map in in 5mm steps.This matches pretty well the predictions done when we made the shopping list.

Page 25: Phase 1 FPIX module assembly status

Magnitude of the current spikes Per BOND: 8mA/2bonds= 4 mA in a single ROC (inside a Plaquette)From VHDI-to-HDI 8mA*N_ROC/8 (8mA*N_ROC/4) in a 2xN(1xN) Plaquette:2x5 and 1x5 is 10 mA, 2x4 is 8 mA2x3 is 6 mA1x2 is 4 mA

Source: http://sl.web.cern.ch/SL/sli/new_filling.gif

Width of the spikes: 3 ms (t5), ~1 ms (t3 and t4), ~0.2-0.3 ms (t1 and t2)

Current variations (Source: Roland H. at the upgrade workshop)

Frequencies of interest are the ones associated with the beam cycle/s

1. f(88.924ms) is 11.24 KHz2. And many others (higher

than….)

25

Page 26: Phase 1 FPIX module assembly status

Idig versus time• Borrowed a current probe

from EE.• Replaced the Vdig

connection between the Plaquette and the FANOUT module with a wire (bypass the connector)

• This allows for monitoring of the current to the Plaquette with extreme precision in time and about 1mA resolution

26

Tektronix TCP202 AC/DC Current Probe

• The current I measure is the one flowing on the VHDI to HDI (fanout board) bonds.

• I cannot find a way to measure directly the current in the ROC bonds

Page 27: Phase 1 FPIX module assembly status

• This is hard to get in house– Get smart (Gino You should call for help)

27

Cal inj

Trigger

READOUT of 6 ROCsI have chosen to set the ROCsWith the wrong WBC in order NOT to have a long, long READOUT

Page 28: Phase 1 FPIX module assembly status

Precision of the method

• Clearly capable to detect the <1mA during readout (0.75 mA from the PSI46V2 Manual)

28

Page 29: Phase 1 FPIX module assembly status

Using the ROC as a pulse tuner

• Depending on the pattern and number of pixel you inject you can get different shape pulses on the digital current

29

Page 30: Phase 1 FPIX module assembly status

Vibrations

30

• Vibrations are detected all the way down to 3x8 pixels pulsed in all ROCs that correspond to a current of ~8 mA in the single Bond being investigated.

• More pixels implies more current and so larger amplitude.• The frequency detected is ~14 KHz and obviously the wire oscillates

also when pulsed at 7Khz and 3.5KHz, but the amplitude goes down

click here for the movie

Page 31: Phase 1 FPIX module assembly status

Remarks• The expected current variation induced by the abort gaps (inactivity) of the

LHC on the digital power supply of the ROC are reproducible (Inverted) by injecting charge in multiple pixels in a Plaquette with a good tuning capability

• With a 0.9 T magnetic field wirebonds can be seen to oscillate with current pulses as small as 8mA (we cannot exclude that at lower current the wire vibrates with an amplitude lower than our detection threshold)– This translate to <2mA for a 4T field

• Should we worry also about the AOUT bonds and maybe some others?• The per BOND current swing expected in LHC are up to 10mA for FPIX• Encapsulation (or something else) is mandatory!• We started a process of learning how to encapsulate the bonds in the

plaquettes (next 4 transparencies)– Great help from the expertize and equipment left over by the CLEO detector

construction

31

Page 32: Phase 1 FPIX module assembly status

32

Page 33: Phase 1 FPIX module assembly status

Encapsulation• The encapsulant (Sylgard 186) is

removable. Wirebonding can be done again in case of failures.

• The 2-part encapsulant is mixed, poured into a syringe and degassed in a vacuum.

• The syringe is connected to an air powered fluid dispenser and inserted into a holder on a 3-axis stage (motion along rows of bond feet is motor-controlled).

• Shape of the encapsulant bead is determined by the rate of volume dispensed and the rate of motion of the syringe.

• Mixed encapsulant should be used between ~0.5 and ~1.5 hours after mixing. Fixture cure at room temp. is ~8 hours, full cure in 48 hours.

• Estimate ~3 hours to encapsulate 6 plaquettes (including mixing and clean-up time).

33

Page 34: Phase 1 FPIX module assembly status

Encapsulation trial result

ROC and VHDI wire bond feet are potted in separate encapsulant beads for each ROC.

34

Page 35: Phase 1 FPIX module assembly status

Bead dimensions

35

width VHDI bead ~900 um

height ~150 um width ROC bead

~600 um

height ~100 um

Page 36: Phase 1 FPIX module assembly status

Checking the outcome

36

• Does it still work? YES• Any effect on the Analog OUT

(different capacitance due to the different dielectric on the bonds) NO

• Yet to be done:• Thermal cycling

• I cannot see a problem with it (with the geometry of the BEAD that Kirk achieved).

• Will do this w-e• Vibration tests

• Will get done after CERN

Page 37: Phase 1 FPIX module assembly status

Conclusions (encapsulation)

• As a group we believe there is no question left and the encapsulation is mandatory

• We have a way to encapsulate the bonds on plaquettes that is reliable and fast enough– A few crosschecks to be done

• If a decision is taken, we will start encapsulating the bonds before the next shipment.

37