    Performing Skip Lot Inspections

    Trigger:

    Concept

    Skip Lot inspections are generally used with suppliers that have achieved a specified level of

    conformity and reliability in their relationship with you. To model this process, you can set up

    qualification controls for your skip lot procedure. These controls can specify how many good

    receipts must be processed before skip lot is initiated and/or a specific time limit within which the

    good receipts must be received.

    To perform skip lot inspections, you must first enable skip lot inspections, then set them up bydefining their parameters.

    In this topic, you will perform skip lot inspections.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/19/2010 12:24:00 PM Page 1

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    2/31

    System Process DocumentPerforming Skip Lot Inspections

    Procedure

    Step Action

    1. Begin by navigating to the Skip Lot Process Setup page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    3/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/19/2010 12:24:00 PM Page 3

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    4/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Skip Lot Process Setup link.

    Page 4 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    5/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    5. Use the Organizations page to select the appropriate organization.

    Last changed on: 1/19/2010 12:24:00 PM Page 5

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    6/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    6. Click the M1 list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    7/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    8. Use the Skip Lot Process Setuppage to enter a name in the Skip Lot Process

    Code field.

    Enter a number in the Number of consecutive lots accepted for qualification

    field to indicate the number of good lots received before skip lot inspection begins.

    Optionally, enter a number in the Maximum days span for qualification lots fieldto indicate the number of days which consecutive lots accepted for qualification

    needs to be within, before skip lot inspection can begin.

    Last changed on: 1/19/2010 12:24:00 PM Page 7

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    8/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    9. Click in the Skip Lot Process Code field.

    Page 8 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    9/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    10. Enter the desired information into the Skip Lot Process Code field. Enter "IC

    SKIPLOT1".

    Step Action

    11. Click in the Description field.

    Last changed on: 1/19/2010 12:24:00 PM Page 9

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    10/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    12. Enter the desired information into the Description field. Enter "IC Skipping Plan

    1".

    Page 10 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    11/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    13. Click in the Number of consecutive lots accepted for qualification field.

    Step Action

    14. Enter the desired information into the Number of consecutive lots accepted for

    qualification field. Enter "1".

    Last changed on: 1/19/2010 12:24:00 PM Page 11

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    12/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    15. Click in the Maximum days span for qualification lots to be received field.

    Page 12 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    13/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    16. Enter the desired information into the Maximum days span for qualification lots

    to be received field. Enter "45".

    Step Action

    17. Click the Skipping Parameters tab.

    Last changed on: 1/19/2010 12:24:00 PM Page 13

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    14/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    18. Use the Skipping Parameters tab to define how skip lot inspections will be

    conducted for a specific Skip Lot Process Code.

    Select a collection plan and skipping frequency values. The frequency values

    specify how

    many inspections will be performed for a given number of receipts.

    The Time Span value specifies that the rounds must be completed within a certain

    time

    frame or the next set of values are not used.

    Optionally, you can define an alternate plan to be used on the skipped receipt.

    Page 14 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    15/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    19. Click in the Collection Plan field.

    Last changed on: 1/19/2010 12:24:00 PM Page 15

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    16/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    20. Enter the desired information into the Collection Plan field. Enter "IC SKIPLOT

    I PLAN".

    Step Action

    21. Click in the Plan Type field.

    Page 16 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    17/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    22. Click the Yes button.

    orPress [Alt+Y].

    Last changed on: 1/19/2010 12:24:00 PM Page 17

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    18/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    23. Click in the Sequence field.

    Step Action

    24. Enter the desired information into the Sequence field. Enter "10".

    Page 18 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    19/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    25. Click in the Skipping Frequency: Numerator field.

    Last changed on: 1/19/2010 12:24:00 PM Page 19

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    20/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    26. Enter the desired information into the Skipping Frequency: Numerator field.

    Enter "1".

    Step Action

    27. Click in the Skipping Frequency: Denominator field.

    Page 20 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    21/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    28. Enter the desired information into the Skipping Frequency: Denominator field.

    Enter "2".

    Last changed on: 1/19/2010 12:24:00 PM Page 21

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    22/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    29. Click in the Number of Rounds field.

    Step Action

    30. Enter the desired information into the Number of Rounds field. Enter "2".

    Page 22 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    23/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    31. Click in the Sequence field.

    Last changed on: 1/19/2010 12:24:00 PM Page 23

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    24/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    32. Enter the desired information into the Sequence field. Enter "20".

    Step Action

    33. Click in the Skipping Frequency: Numerator field.

    Page 24 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    25/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    34. Enter the desired information into the Skipping Frequency: Numerator field.

    Enter "1".

    Last changed on: 1/19/2010 12:24:00 PM Page 25

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    26/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    35. Click in the Skipping Frequency: Denominator field.

    Step Action

    36. Enter the desired information into the Skipping Frequency: Denominator field.

    Enter "5".

    Page 26 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    27/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    37. Click the Interruption Parameters tab.

    Last changed on: 1/19/2010 12:24:00 PM Page 27

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    28/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    38. Use the Interruption Parameters tab to enter values that define when that

    schedule is no longer predictable.

    If the interruption values are exceeded, the skip lot process reverts to the

    qualification stage.

    Step Action

    39. Click in the Maximum days between lots received field.

    Page 28 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    29/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    40. Enter the desired information into the Maximum days between lots received field.

    Enter "60".

    Last changed on: 1/19/2010 12:24:00 PM Page 29

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    30/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    41. Click the Save button.

    Step Action

    42. Click the Close button.

    Page 30 Last changed on: 1/19/2010 12:24:00 PM

  • 8/14/2019 Performing Skip Lot Inspections_SPD

    31/31

    System Process DocumentPerforming Skip Lot Inspections

    Step Action

    43. You have completed the Performing Skip Lot Inspections procedure.

    End of Procedure.