    PE08 - ReducingDeployment Time for

    Substation IED Integration

    and Control

    Ken Roslan

    Marketing Manager

    661-716-5260

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    2/23

    ProSoft Technology Company Overview

    Privately Held Company Founded by Doug Sharratt

    First products in 1988

    HQ in Bakersfield, CA

    Global Organization Over 110 employees worldwide

    Strong application experience

    Industrial communication

    DNP-Org.

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    3/23

    Our Solutions

    Dec 12, 2006

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    4/23

    Serial Protocols Modbus DF1, ASCII, DH485 DNP3.0

    IEC 60870-5-101 & 103

    Siemens 3964R Emerson FC

    Foxboro Systronic

    Ethernet Protocols EtherNet/IP Modbus TCP/IP IEC 60870-5-104

    DNP3 Ethernet

    ASCII Ethernet CC-Link

    GE Global Data

    Over +60 Protocols

    o nson on ro e asys York Chiller

    Specialty Modules C Programmable Gas Flow Computing InChassis PC

    SCANport modules Profibus Modbus, Modbus Plus

    Metasys N2

    - e Open Ethernet Port C

    Fieldbus Protocols HART Multidrop HART Analog Honeywell DE

    Profibus DPV1

    Modbus Plus Interbus

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    5/23

    Agenda

    Brief on IEC 61850IEDs

    Data formats

    Applications

    Wind PowerHydro Electric Power

    Future solutions

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    6/23

    ModbusDNP

    60870-5-101/104

    60870-5-103

    Profibus

    Protocols used in power delivery today

    LON

    MVB

    Proprietary

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    7/23

    IEC 61850 vs...

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    8/23

    IEC 61850 in other domains

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    9/23

    What is IEC 61850 ?

    As an international standard for substation automationsystems

    IEC 61850 defines the communication between devicesin the substation and related system requirements it usesa publisher-subscriber concept

    It describes a structure for addressing interoperability of

    Common configuration language

    Standardized object models and naming conventions

    Self-describing devices

    Standardized meaning of data

    Standardized services and device behavior models Profiles for Control/SCADA, Protection messaging, Transducers

    and I/O

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    10/23

    Parts of IEC 61850

    SCL Substation

    Configuration

    DefinedProtocols

    Data Model

    Language

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    11/23

    IEC 61850 Protocol Suite

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    12/23

    Intelligent Electric Device (IED)

    Reference USA and 61850 For Dummies - Siemens Power Transmission &

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    13/23

    Object-Oriented

    IEC 61850 uses an object-oriented approach with Logical Nodes (LN)Describes the physical IED

    Multiple logical Devices per IED

    Multiple objects logical Nodes per Device

    Data oint er lo ical NodeMultiple Attributes per Data point

    Examples are all data of a circuit breaker contained in the Logical Node XCBR. Therefore, thesubstation or protection engineer identifies those objects. Logical Nodes have data, and all thedata have attributes

    Attributes are related to the data called Pos, one attribute for diagnostic stVal, which indicatesthe position of a valve (off, on, intermediate-state, bad-state) and another attribute ctlVal for theopening and closing command (values: off, on).

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    14/23

    Accessing Data

    The Pos folder is of type Controllable Double Point (CDP) data

    class. The CDP data class consists of 14 data fields (some aremandatory and must always be present, others are optional). TheStVal field contains the value of the CB

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    15/23

    Where will IEC 61850 be used?

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    16/23

    How will 61850 be used?

    IEC 61850 will not replace ALL protocols in use now

    As in industrial automation different applications require different types ofnetworks

    IEC61850 was developed to create an open communicationenvironment in substations on the station and process level

    Not to solve EVERY communication problem in the energy distributionindustry

    More IEDs support the network protocol

    Many utilities are in the process of migrating from proprietaryprotocols to the serial IEC-101/IEC-103 or the IEC-104.

    The application of the new IEC61850 highly depends on customerspresent situation, and the suppliers migration strategy

    What equipment is installed (network support??)Obsolescence issues to consider

    Time/Cost involvement for upgrades

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    17/23

    Substation Data

    In a typical substation, all data attributes

    (approximately 100) from each of the 50 IEDs aredesired at the PLC

    Data is desired at the Station PLC (for decisionmaking) and at the SCADA system

    Examples of data needs:Data gathered for Condition Based Monitoring purposes, todetect point of degradation of an aging mechanism

    Checking SF6 gas insulation temperature

    Alarm data with high precision of accuracy needed, todetermine which IED alarmed (GOOSEd) first

    Control of bay-level switchgear -- interlocking &maintenance purposes

    17

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    18/23

    IEC 61400-25: Wind Power

    61400-25 data objects are 61850 compatible

    61400-25 services are nearly the same

    - .than being based upon a DATA-SET, with 61400-25you have to subscribe to data for reporting.

    61850 being used for some Wind Power installationsrather than 61400-25

    18

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    19/23

    IEC 61850-7-410: Hydro-electric Power

    Extension of 61850 Part 7-4

    63 additional Logical Nodes

    3 additional Common Data Classes definedspecifically for Hydro

    19

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    20/23

    EtherNet/IP to IEC 61850 Gateway

    IEC 61850 Pass-

    throughconfiguration

    Station or Bay Controller w/distributedgateway integrated controller

    IEC 61850 NetworkConfiguration

    IEC 61850 MMS/GOOSE

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    21/23

    ProSoft 61850 Gateway Service Conformance

    ProSofts 61850 Clientgateway supports theyellow-highlightedservices.

    Blue rows are future

    61850-7-2 ACSI Class desc.

    Clause 6 Server Model

    Clause 7 Association Model

    Clause 8 Logical Device Model

    Clause 9 Logical Node Model

    Clause 10 Data Model

    Clause 11 Data-Set Model

    21

    tems.

    See ProSofts PICSstatement for details.

    Clause 12 Substitution Model

    Clause 13 Setting-Group-Control-Block

    Clause 14 BRCB, URCB, Log

    Clause 14 Log

    Clause 15 GSE

    Clause 16 Sampled ValuesClause 17 Control Model

    Clause 18 Time & Time Synch

    Clause 19 Naming Conventions

    Clause 20 File Transfer Model

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    22/23

    ProSofts 61850 Client gateway

    61850 Client Gateway will connect to 60IEDs

    Easy to configure

    Information gathered from IEDconfiguration files (CID file), so userdoes not have to re-type information

    . . ,Drag & Drop selection of IEDs dataattributes

    Tag names automatically generated foryou

    ODVA-compliant hardware with specificEtherNet/IP LEDs

    22

  • 8/6/2019 PE08 - Reducing Deployment Time for Substation IED Integration and Control

    23/23

    Questions