Part 3 Power plant Volume III.pdf

70
Khabat Thermal Power Plant Units 1&2 and Bazyan 400kV Substation EPC/TURNKEY BIDDING PACKAGE Bidding No. : PART 3 Volume III Appendices for Power Plant

description

d

Transcript of Part 3 Power plant Volume III.pdf

Page 1: Part 3 Power plant Volume III.pdf

Khabat Thermal Power Plant Units 1&2 and Bazyan 400kV Substation

EPC/TURNKEY BIDDING PACKAGE

Bidding No. :

PART 3

Volume III

Appendices for

Power Plant

Page 2: Part 3 Power plant Volume III.pdf

( i )

CONTENTS LIST OF ABBREVIATIONS VOLUME I TECHNICAL SPECIFICATION 1. PROJECT DESCRIPTION 2. PLANT DESIGN CRITERIA 3. SCOPE OF WORK 4. GENERAL REQUIREMENTS 5. SITE DETAILS AND SAFETY REQUIREMENTS 6. MECHANICAL PLANT AND SYSTEMS 7. ELECTRICAL 8. CONTROL, INSTRUMENTATION AND COMMUNICATIONS 9. CIVIL WORKS 10. QUALITY CONTROL, INSPECTION AND TESTING 11. COMMISSIONING, START-UP AND TESTING

VOLUME II SCHEDULES A. Site Particulars B. Dates of Despatch, Delivery to Site and Completion C1. Manufacturers Guarantee Particulars C2. Mechanical Schedules C3. Electrical Schedules C4. Control and Instrumentation Schedules D. Suppliers of Materials, Manufacturers, Places of Manufacture Testing and

Inspection E. Drawings and Documentation F. Variations from Specification G1. General Tests and Inspections G2. Tests in Manufacturer’s Works G3. Site Tests H. List of Spare Parts and Consumables J. List of Special Tools and Equipment

VOLUME III APPENDICES

1. PLOT PLAN 2. GENERAL ARRANGEMENT 3. SYSBOL & LEGEND 4. FLOW DIAGRAM 5. SINGLE LINE DIAGRAM 6. CONTROL SYSTEM CONFIGURATION DRAWING 7. BASIC PLANT OPERATION SCHEME ON PCS

Page 3: Part 3 Power plant Volume III.pdf

( ii )

LIST OF ABBREVIATIONS

% per cent

°C degrees Celsius

A ampere

ac alternating current

AFFF aqueous film forming foam

AGI above ground installation

AGMA American Gear Manufacturers Association

ANSI American National Standards Institute

API American Petroleum Institute

ASME American Society of Mechanical Engineers

ASTM American Society for Testing of Materials

AVR automatic voltage regulator

AWS American Welding Society

AWWA American Water Works Association

barg bar gauge

BCSA British Construction Steelwork Association

BMS Building Management System

BoP balance of plant

BS British Standards

C&I control and instrumentation

C/H (C/H ratio)

CCCW closed circuit cooling water

CCGT combined cycle gas turbine

CCR central control room

CCTV closed circuit television

CCW closed cooling water

CD compact disc

CD Rom compact disc read-only memory

CEMS continuous emissions monitoring system

CFD Computational Fluid Dynamics

CO carbon monoxide

CPU central processor unit

Cr chromium

CT current transformer

Page 4: Part 3 Power plant Volume III.pdf

( iii )

CV flow coefficient

CV curriculum vitae

CW circulating water

dB decibel

dB(A) decibel (A weighted)

dc direct current

DEH digital electro-hydraulic

demin demineralization

DFR design flow rate

DGP data gathering panels

DLT digital linear type

EHV extra high voltage

EMC electromagnetic compatibility

EN Euro Norme

EPA Environment Public Authority

EPC engineer, procure, construct

EPR ethylene propylene rubber

EWS engineer’s workstation

FAT Factory Acceptance Test

FCAW flux-cored arc welding

FD Fire Department

FGD flue gas desulphurization

FM

GMAW gas metal arc welding

GMT Greenwich mean time

GPS global positioning system

GRP glass reinforced plastic

GSC gland steam condenser

GT gas turbine

GTAW gas tungsten arc welding

H&S health and safety

HAZID hazard identification

HAZOP hazard and operability

HCFC single hydrochlorofluorocarbon compound

HEI Heat Exchange Institute

HMI human machine interface

Page 5: Part 3 Power plant Volume III.pdf

( iv )

HP high pressure

HRSG heat recovery steam generator

HV high voltage

HVAC heating ventilation and air-conditioning

Hz hertz

I/O input/output

I/P input

IBC intermediate bulk containers

IBM International Business Machines

IEC International Electrotechnical Commission

IEEE Institute of Electrical and Electronics Engineers

IP intermediate pressure

IP International Protection

IPB isolated phase busbar

ISDN integrated service digital network

ISO International Standards Organisation

kg kilogram

KKS Kraftwerk Kennzeichen System

km kilometre

kN kiloNewtons

kV kilovolt

kW kilowatt

LAeq equivalent steady sound level in dB (a) containing the same

acoustic energy as the actual fluctuating sound level over a

given period

LAN local area network

lb pound

LCV lower calorific value

LP low pressure

LSF low smoke and fume

lub lubrication

LV low voltage

m metre

m metre

m/s metres per second

m2 metres squared

Page 6: Part 3 Power plant Volume III.pdf

( v )

m3 metres cubed

mA milliampere

mb millibar

MCB miniature circuit breaker

MCC motor control centre

MCC motor control centre

MCR maximum continuous rating

MED multiple effect distillation

mg milligram

mg/l milligram per litre

MI mineral insulated

MIG metal inert gas

mm millimetre

mm2 millimetre squared

MMA manual metal arc

MOV Motor Operated Valve

MPI Magnetic Particle Inspection

MSS Manufacturers Standard Society

MTBF mean time between failure

MTTR mean time to repair

MV medium voltage

MVA megavolt ampere

MVAr megavolt-ampere reactive

MVArh megavolt-ampere hours

MW megawatt

MWe megawatts electrical

MWh megawatt-hour

NB nominal bore

NDE non-destructive examination

NDT non-destructive testing

NFPA National Fire Protection Agency

Nm3 normal metres cubed

NOx oxides of nitrogen

NPHR net plant heat rate

NPO net power output

NPSH net positive suction head

Page 7: Part 3 Power plant Volume III.pdf

( vi )

O&M operation and maintenance

O/P output

O2 oxygen

OCGT open cycle gas turbine

ONAF oil natural air forced

ONAN oil natural air natural

P&ID piping and instrumentation diagram

PA public address

PABX private automatic branch exchange

PCS plant control system

PD Pressure Directive

pH index of acid concentration

PLC programmable logic controller

PN nominal pressure

ppm parts per million

PSS power system stabilizer

PSTN public switched telephone network

PTFE polytetrafluoroethylene

PTZ pan-tilt-zoom

PVC polyvinyl chloride

QC Quality Control

QCC Quality Control Certificate

QCR Quality Control Record

RH relative humidity

rms root mean square

rpm revolutions per minute

RSO recurrent surge oscillogram

RTD resistance thermometer detector

SAW submerged arc welding

SCADA Supervisory Control and Data Acquisition

SF6 sulphur hexafluoride

SFC static frequency converter

SMACNA Sheet Metal and Air Conditioning Contractor National

Association

SMAW shielded metal arc welding

SO2 sulphur dioxide

Page 8: Part 3 Power plant Volume III.pdf

( vii )

SOE sequence of events

SPN single phase neutral

ST steam turbine

TEMA Tubular Exchanger Manufacturers Association

TEWAC totally enclosed water cooled

TIG tungsten inert gas

TPN three phase neutral

TV television

UHF ultra high frequency

ULSS stainless steel

UPS uninterruptible power supply

UV ultra violet

V volt

VCR video cassette recorder

VDE Verband Der Elektrotechnik Elektronik Informationstechnik

e.V

VDU visual display unit

VOC volatile organic compounds

VT voltage transformer

VWO valve wide open

WB World Bank

WHO World Health Organization

WTP water treatment plant

XLPE cross linked polyethylene

Page 9: Part 3 Power plant Volume III.pdf

( i )

VOLUME III APPENDICE

1. PLOT PLAN

2. GENERAL ARRANGEMENT

3. SYSBOL & LEGEND

4. FLOW DIAGRAM

5. SINGLE LINE DIAGRAM

6. CONTROL SYSTEM CONFIGURATION DRAWING

7. BASIC PLANT OPERATION SCHEME ON PCS

Page 10: Part 3 Power plant Volume III.pdf
Page 11: Part 3 Power plant Volume III.pdf
Page 12: Part 3 Power plant Volume III.pdf
Page 13: Part 3 Power plant Volume III.pdf
Page 14: Part 3 Power plant Volume III.pdf
Page 15: Part 3 Power plant Volume III.pdf
Page 16: Part 3 Power plant Volume III.pdf
Page 17: Part 3 Power plant Volume III.pdf
Page 18: Part 3 Power plant Volume III.pdf
Page 19: Part 3 Power plant Volume III.pdf
Page 20: Part 3 Power plant Volume III.pdf

FLOW DIAGRAM DRAWING LISTIRAQI KURDISTAN KHABAT THERMAL POWER PLANT

TY SUPPLIER-ID REV DATE TITLE REMARK

106 9-402-M106-001 00 09/10/29 FLOW DIAGRAM AIR & FLUE GAS SYSTEM

106 9-411-M106-001 00 09/10/29 FLOW DIAGRAM ASH HANDLING SYSTEM

106 9-441-M106-001 00 09/10/29 FLOW DIAGRAM MAIN AND REHEAT STEAM SYSTEM

106 9-451-M106-001 00 09/10/29 FLOW DIAGRAM FEED WATER SYSTEM

106 0-461-M106-001 00 09/10/29 FLOW DIAGRAM RAW WATER PRETREATMENT SYSTEM

106 0-461-M106-002 00 09/10/29 FLOW DIAGRAM RAW WATER SUPPLY SYSTEM

106 0-462-M106-001 00 09/10/29 FLOW DIAGRAM DEMINERALIZER MAKE-UP SYSTEM (1/2)

106 0-462-M106-002 00 09/10/29 FLOW DIAGRAM DEMINERALIZER MAKE-UP SYSTEM (2/2)

106 0-463-M106-001 00 09/10/29 FLOW DIAGRAM SERVICE WATER SYSTEM

106 0-463-M106-002 00 09/10/29 FLOW DIAGRAM POTABLE WATER SYSTEM

106 9-464-M106-001 00 09/10/29 FLOW DIAGRAM CHEMICAL FEED SYSTEM (1/2)

106 9-464-M106-002 00 09/10/29 FLOW DIAGRAM CHEMICAL FEED SYSTEM (2/2)

106 0-432-M106-002 00 09/10/29 FLOW DIAGRAM FUEL OIL SYSTEM

106 0-431-M106-001 00 09/10/29 FLOW DIAGRAM LIGHT OIL SYSTEM

106 9-470-H106-001 00 09/10/29 FLOW DIAGRAM ABSORBER & AUX. SYSTEM

106 9-471-H106-001 00 09/10/29 FLOW DIAGRAM FGD FLUE GAS SYSTEM(1/2)

106 9-471-H106-002 00 09/10/29 FLOW DIAGRAM FGD FLUE GAS SYSTEM(2/2)

106 0-475-H106-001 00 09/10/29 FLOW DIAGRAM FGD WASTE WATER TREATMENT SYSTEM(1/2)

106 0-475-H106-002 00 09/10/29 FLOW DIAGRAM FGD WASTE WATER TREATMENT SYSTEM(2/2)

106 0-476-H106-001 00 09/10/29 FLOW DIAGRAM GYPSUM DEWATERING SYSTEM(1/2)

106 0-476-H106-002 00 09/10/29 FLOW DIAGRAM GYPSUM DEWATERING SYSTEM(2/2)

106 0-477-H106-001 00 09/10/29 FLOW DIAGRAM LIMESTONE SLURRY PREPARATION SYSTEM

106 9-479-H106-001 00 09/10/29 FLOW DIAGRAM FGD MAKE UP WATER SYSTEM

106 0-602-M106-001 00 09/10/29 FLOW DIAGRAM FUEL OIL HEATING STEAM SYSTEM (1/2)

106 0-602-M106-002 00 09/10/29 FLOW DIAGRAM FUEL OIL HEATING STEAM SYSTEM (2/2)

106 9-506-M106-001 00 09/10/29FLOW DIAGRAM FEED WATER HEATER EXTRACTION STEAM & DRAINSSYSTEM

106 9-561-M106-001 00 09/10/29 FLOW DIAGRAM CONDENSATE SYSTEM

106 0-564-M106-001 00 09/10/29 FLOW DIAGRAM CONDENSER AIR REMOVAL SYSTEM

106 0-572-M106-001 00 09/10/29 FLOW DIAGREAM CIRCULATING WATER SYSTEM

106 0-544-M106-001 00 09/10/29 FLOW DIAGRAM CLOSED COOLING WATER SYSTEM

106 0-610-M106-001 00 09/10/29 FLOW DIAGRAM SERVICE & INSTRUMENT AIR SYSTEM

106 9-601-M106-001 00 09/10/29 FLOW DIAGRAM AUXILIARY STEAM SYSTEM

106 0-611-H106-001 00 09/10/29 FLOW DIAGRAM WASTE WATER TREATMENT SYSTEM(1/2)

106 0-611-H106-002 00 09/10/29 FLOW DIAGRAM WASTE WATER TREATMENT SYSTEM(2/2)

Page 21: Part 3 Power plant Volume III.pdf

FLOW DIAGRAM DRAWING LISTIRAQI KURDISTAN KHABAT THERMAL POWER PLANT

TY SUPPLIER-ID REV DATE TITLE REMARK

106 0-612-H106-001 00 09/10/29 FLOW DIAGRAM WASTE WATER TRANSFER SYSTEM

106 0-613-H106-001 00 09/10/29 FLOW DIAGRAM SEWAGE WATER TRANSFER SYSTEM

106 0-614-H106-001 00 09/10/29 FLOW DIAGRAM SEWAGE WATER TREATMENT SYSTEM

106 0-651-M106-001 00 09/10/29 FLOW DIAGRAM FIRE PROTECTION SYSTEM (1/2)

106 0-651-M106-002 00 09/10/29 FLOW DIAGRAM FIRE PROTECTION SYSTEM (2/2)

106 0-672-M106-001 00 09/10/29 FLOW DIAGRAM CONTROL BUILDING CHILLED WATER SYSTEM

106 0-691-M106-001 00 09/10/29 FLOW DIAGRAM SERVICE GAS SUPPLY SYSTEM

105 0-033-M105-001 00 09/10/29 INDEX, SYMBOL & LEGEND (1/4)

105 0-033-M105-002 00 09/10/29 INDEX, SYMBOL & LEGEND (2/4)

105 0-033-M105-003 00 09/10/29 INDEX, SYMBOL & LEGEND (3/4)

105 0-033-M105-004 00 09/10/29 INDEX, SYMBOL & LEGEND (4/4)

Page 22: Part 3 Power plant Volume III.pdf
Page 23: Part 3 Power plant Volume III.pdf
Page 24: Part 3 Power plant Volume III.pdf
Page 25: Part 3 Power plant Volume III.pdf
Page 26: Part 3 Power plant Volume III.pdf
Page 27: Part 3 Power plant Volume III.pdf
Page 28: Part 3 Power plant Volume III.pdf
Page 29: Part 3 Power plant Volume III.pdf
Page 30: Part 3 Power plant Volume III.pdf
Page 31: Part 3 Power plant Volume III.pdf
Page 32: Part 3 Power plant Volume III.pdf
Page 33: Part 3 Power plant Volume III.pdf
Page 34: Part 3 Power plant Volume III.pdf
Page 35: Part 3 Power plant Volume III.pdf
Page 36: Part 3 Power plant Volume III.pdf
Page 37: Part 3 Power plant Volume III.pdf
Page 38: Part 3 Power plant Volume III.pdf
Page 39: Part 3 Power plant Volume III.pdf
Page 40: Part 3 Power plant Volume III.pdf
Page 41: Part 3 Power plant Volume III.pdf
Page 42: Part 3 Power plant Volume III.pdf
Page 43: Part 3 Power plant Volume III.pdf
Page 44: Part 3 Power plant Volume III.pdf
Page 45: Part 3 Power plant Volume III.pdf
Page 46: Part 3 Power plant Volume III.pdf
Page 47: Part 3 Power plant Volume III.pdf
Page 48: Part 3 Power plant Volume III.pdf
Page 49: Part 3 Power plant Volume III.pdf
Page 50: Part 3 Power plant Volume III.pdf
Page 51: Part 3 Power plant Volume III.pdf
Page 52: Part 3 Power plant Volume III.pdf
Page 53: Part 3 Power plant Volume III.pdf
Page 54: Part 3 Power plant Volume III.pdf
Page 55: Part 3 Power plant Volume III.pdf
Page 56: Part 3 Power plant Volume III.pdf
Page 57: Part 3 Power plant Volume III.pdf
Page 58: Part 3 Power plant Volume III.pdf
Page 59: Part 3 Power plant Volume III.pdf
Page 60: Part 3 Power plant Volume III.pdf
Page 61: Part 3 Power plant Volume III.pdf
Page 62: Part 3 Power plant Volume III.pdf
Page 63: Part 3 Power plant Volume III.pdf
Page 64: Part 3 Power plant Volume III.pdf
Page 65: Part 3 Power plant Volume III.pdf
Page 66: Part 3 Power plant Volume III.pdf
Page 67: Part 3 Power plant Volume III.pdf
Page 68: Part 3 Power plant Volume III.pdf
Page 69: Part 3 Power plant Volume III.pdf
Page 70: Part 3 Power plant Volume III.pdf

NO PACKAGE NAME CONTROL SYSTEM PHYSICAL INTERFACEwith PCS OWS LOCATION REMARKS

1 BOILER AND ITS AUXILIES PCS M C - CCR

2 SOOTBLOWER SYSTEM PLC M SC Communication/HW(*) CCR (*) If necessary

3 BOP SYSTEMS PCS M C - CCR

4 STEAM TURBINE AND ITS AUXILIES TCS M SC Communication/HW CCR

5 ELECTRICAL CONTROL SYSTEM ECS - - HW (*) CCR (*) If necessary

6 ESP PLC M SC Communication/HW(*) EP/ASH CONTROL ROOM (*) If necessary

7 ASH HANDLING SYSTEM PLC M SC Communication/HW(*) EP/ASH CONTROL ROOM (*) If necessary

8 FGD SYSTEM PLC M SC Communication/HW(*) FGD CONTROL ROOM (*) If necessary

9 WATER SAMPLING SYSTEM PLC M - HW LOCAL

10 CPP SYSTEM PLC M - Communication W.T CONTROL ROOM

11 CHEMICAL FEED SYSTEM PLC M - Communication W.T CONTROL ROOM

12WATER TREATMENT SYSTEM(Raw water pretreatment and Makeupdemineralizer system )

PLC M - Communication W.T CONTROL ROOM W.T : WATER TREATMENT

13 WASTEWATER TREATMENT SYSTEM PLC M - Communication W.T CONTROL ROOM

14 CTCS PLC M - Communication LOCAL

15 AIR COMPRESSOR SYSTEM PLC M SC Communication/HW(*) LOCAL (*) If necessary

16 HVAC PLC - - N/A LOCAL

17 CEMS, Metering - M - HW -

18 WEATHER STATION - M - HW -

19 CONDITION MONITORING SYSTEM - M - Communication/HW COMPUTER ROOM

20 AUX. BOILER PLC M SC Communication AUX. BOILER CONTROLROOM

21 BOILER TUBE LEAK DETECTIONSYSTEM - M - HW COMPUTER ROOM

22 EMERGENCY DIESEL GENERATOR SYS PLC - - N/A LOCAL Interfaced with ECS

23 FIRE PROTECTION SYSTEM - M - HW LOCAL

Note : M : Monitoring, C : Control, SC : Supervisory Control, HW : HardwiredCommunication shall be dual redundant. Critical signals including protection interlock shall be interfaced to PCS with hardwired.

Basic Plant Operation Scheme on PCS

FUNCTION ONPCS(Note)