Otm 2013 c13_e-18a-sabharwal-naval-covert-waste-to-value-with-otm
description
Transcript of Otm 2013 c13_e-18a-sabharwal-naval-covert-waste-to-value-with-otm
Convert Waste into Value using OTM
Value IN Waste OUT
Get More form your OTM
Boxing Bout Mr. TIMWOOD Mr. OTM
Motion
Transportation
Waiting
Over Processing
Over Production
Defects
Inventory
7 Deadly Wastes
Who is Mr TIMWOOD?
STRATEGY :- Distracts you and attacks with • SHORT JABS • BACK HAND PUNCH • TWIST PUNCH
Mr TIMWOOD is all prevalent
Waste What is it? Examples
Transportation • Unnecessary transportation moves
• Moving over longer distances than required.
Inventory • Excess resources deployed than required
• Under-utilised Vehicle / Equipment
Motion • Actions of people or equipment that do not add value to the process
• Manual Data Entry • Misalignment of Dock scheduling
with staging point
Waiting • Materials not moving • People waiting for work
• Order stuck in a queue • Staging of packages • Vehicle waiting to be handled
Waste What is it? Examples
Over-Production • Producing more than is actually required
• Moving packages through express when normal mode can meet delivery date
Over-processing • Working beyond what is needed to satisfy the customer
• Any unnecessary steps in processing
• Adjustments of shipment units in a container
• Re-checks in process • Duplication of Data Entry
Defects • To work over again, to revise, to repeat a process usually to correct an error
• Rework • Rejects
Mr TIMWOOD is all prevalent
OTM provides the Capability to Continuously Improve & Sustain Operations
Mr OTM = Mr DEPENDABLE
STRATEGY :- CONSISTENT ATTACK TO TIRE OUT THE OPPONENT
• STRAIGHT RIGHT AND LEFT HOOK • HOOK PUNCH • UPPER CUT
SUSTAINABLE OPERATIONS
ENDURING WASTE
REMOVER
BEST PRACTICE; THEORY
Plan before the Bout : Value Stream map : Logistics Operations
Daily
Goods Receipt
CT: 5 mins
People: 1/2
Batch size -SKU
Binning
CT: 12 mins
People: 1/6
Batch size-SKU
Load :- 40000 Mtrs per day
Sorting and Merging
CT : 16 mins:
People: : 1/20
Batch :-86 mtrs
Weighing
CT: 2 mins
People 2/4
Batch – Ship Unit Load – 1000 Bales pd
Consolidation
CT: 2 mins
People
Shifts 2,
Planning
Customers
Outlets / Dist
Consignment
Freq: daily 25/30
Total qty items:
Discrepancy report
ERP
ERP
NVA VA 5 mins 12 mins 2 mins 16 mins 6 mins 8 mins 2 mins 2 mins
45 mins 24 mins .45-60 days 60 mins 25 mins .20 mins 45 mins .32 mins
Zone wise Staging
CT: 2 mins
People:: 2/2
Batch – Pick list
Load : 200 pd
Non availability
ERP
Scanning
CT: 6 mins
People 1/4
Batch – 86 mts
Packing
CT: 8 mins
People 3/12
Batch – Ship Unit
Load – 1000 Bales pd
Orders to suppliers
Load :- 40000 Mtrs per day
ERP
NA
Parts Kitting
CT: 18 mins
People 13
Shifts : 2
Load : 5000 Mtrs ps
ERP
TMS
Load40000 Mtrs pd
Load4 0000 mtrs pd : :
ERP
TMS
Special dixs
CT: xxxxx
People xxxx
Shifts : 2
Load : xxxxx
TMS
Invoice + LR
Manual
Verbal
ADC
TIM WOOD had created 82% waste in the operations
TIMWOOD had attacked multiple areas
Waste Waste Identified
Transportation • Multiple vehicles routed to same region on same day • Last minute changes in plans necessitated by business was
leading to excess transportation moves
Inventory • Vehicle capacity was not effectively utilised
Motion • Repetitive Manual planning entry was slow , errors and unproductive
Waiting • Manual Dock scheduling resulted in wait time & demurrage
Over Production
• Ordering excess capacity due to lack of visibility
Over Process • Manual Invoicing by carriers led delayed payments & leakages • Ship Unit re-loading, adjustments after loading a container to
optimise space utilisation
Defect • Transhipments of critical items led to product damages • Fitment Parts were left out while the main assembly was shipped
Let the match begin
Mr. TIMWOOD Mr. OTM
BOX
Removing the “Inventory” Waste by using container space optimally
• In “ Load Configuration” Configure “custom”
logic configuration with type “Container optimization”
– Parameter Value “ TRUE” for the Parameter USE 3D BASED LOAD CONFIGURATION
• Install Cortona 3D viewer
• Configure new parameter set – Set the Parameter Value
“CONTAINER_OPTIMIZATION” for the Parameter CONTAINER OPT CONFIG ID
– Priority Setting was selected as “Yes” to enable critical items to be dispatched first
– Stackability Norms were build at the Ship Unit specification level
Removing the “Inventory” Waste by using container space optimally : 3D Output
Removing the “Inventory” Waste by using container space optimally : Handlers Output
To arrive at the ideal loading pattern multiple “waste identification exercises were undertaken” and best loading pattern was determined based on which • Load Configuration was configured and
Loading pattern* was set up at ship unit • Maximum Number of Stacking Layers
were set up • Maximum Number of Loading Rows were
set up Notes If the Maximum Number of Stacking Layers or Maximum Number of Loading Rows is left blank, then no restrictions apply. Loading Patterns* specify the orientation and layout for when ship units are loaded in equipment.
Pinwheel
Removing the “Inventory” Waste by using container space optimally : Loading Pattern
Crosswise
Lengthwise Standing Nested
Standing Straight
Canon Rolling
Removing the “Inventory” Waste by using container space optimally : Tim Wood has a Black Eye
Removing the “Inventory” Waste by using container space optimally : Future Proofing
• Due to changing Business needs we understood that Loading Configuration and Loading Patterns may not provide optimized results for the future too
• A What if Option was created to review outputs with different loading patterns wherein the weight / volume utilization was less than 95%
• Operations staff can re-set the Loading Patterns for Group of ship unit based on trends established through the What If scenario
Removing the “Defect” Waste of Fitment Parts left out while the main assembly was shipped using BOM Structure Fitment parts and Main Assembly are identified • In “ Item” Configure new BOM Structure
– Enter details of fitment parts – Establish link to Parent ( Main Assembly) – Create new planning group “SHIP
TOGETHER”. – Planning group for all the parent and child
item is managed through an agent which automates the check as an mandatory option.
– Plan orders with the agent Planning group. Notes : This can be done at item level and need not be repeated again and again. The BOM data can be pulled in from BOM data maintained in your ERP
• Any attempt to ship the parent without the
child throws up an error for the parent to be dispatched
Left Hook : TIMWOOD is Wobbling
Removing the “Transportation” Waste to cater to last minute changes in plans : Using the Re-Sequence Option
Load is planned for multi stops and load is tendered to the carrier and needs re-sequence of stops • In “ Buy Shipment / Action” select option Re-
sequence stops • Change the sequence numbers and save. Lane
based option was used • Carrier will also be apprised of the sequence
change • Cost and service level impact due to the
sequence is also visible before a decision is taken
• Incase carrier has been secured the re-sequencing option can still be used.
• Carrier apprised of the sequence change and the resource secured is marked as “un-scheduled” till the carrier accepts the change
Notes • Incase carrier has executed the load the re-
sequencing option can still be used. • Carrier and Driver apprised of the sequence
change through mail and VTS
TIMWOOD rises after a 3 count
Removing “Transportation” Waste of Multiple vehicles routed to same region on same day by using pooling Option Multiple Points are clubbed into a region and transit hubs are also entered in the master data • In “Iternary” configure source the
deconsolidation pool point and destination. • When you plan an order it consolidates orders
together for the region for the consolidation pool point.
• The consolidated load is used to identify the best equipment
• LTL shipments are created from the deconsolidation hub to the respective destinations
• Cost for direct and pooled delivery are visible before the final option is exercised
Here comes the Upper cut TIMWOOD being treated for Cuts
Removing “Over Process” Waste of Data Entry of Manual Invoices by using conversion and loading tools
• High Manpower Cost • Inaccuracy • Training
Manual / PDF / Scanned Invoices
Received
Excel format Invoices received
XML format Invoices received
Invoice Registration
Invoice and POD Data Entry
Verification
Process
Manual
Manual
OTM OTM
Manual ( Excel )
Data Upload
• Data Upload Errors • Mapping Errors • Infrastructure Cost
OTM
Upload
Manual / PDF / Scanned Invoices
Received
Excel format Invoices received
XML format Invoices received
Invoice Registration
Invoice and POD Data Entry
Verification
Process
Scan
Digitize, Map & Load
Excel to XML converter
OTM OTM OTM
Map & Load Map & Load
Removing “Over Process” Waste of Data Entry of Manual Invoices by using conversion and loading tools
Web-service
XML
Map
Load
Fetch
Digitize
iFetch • FTP based fetch • OCR convert
iCap • Digitize correct If required • Inbuilt intelligence
LoadX • Mapping Accuracy • Loading accuracy • Error window
OTM • Freight Settlement
TIMWOOD send back to the Corner before round ends
Removing “Over Process” Waste of Data Entry of Manual Invoices by using conversion and loading tools
Removing “Defect” and “Wait” Waste leading to damages and demurrage charges by using Mobile sols Equipment# / LR# and Vehicle# on departure from the plant are transmitted to a Mobile App at the receiving site
– On receipt of vehicle the gate selects the Equipment # / LR #
– The App pops up a list of Vehicle # and selects “Vehicle does not exists”
– Receiving person selects the vehicle number or “Vehicle does not exists” option.
– Incase “Vehicle does not exists” is selected the App requests the receiving person to take an image
• The receiving date and time are also used for settlement of the bills and monitor service levels
– Shortages and Damages if any are also captured with images in the Mobile App at the point of unloading
• The time difference between the receiving date and time and the actual unloading is used to calculate the demurrage charges.
Hook Punch TIMWOOD is on Count of 10
Web-service
Map
Load
Web Service
OTM • Despatch Data
Transfer
POD App • Transshipment
Integrity • Shortage / damage
Integrity • Arrival times • Demurrage
Management
LoadX • Mapping Accuracy • Loading accuracy • Error window
OTM • Freight Settlement
TIMWOOD is on Count of 10
App Technology Elements Hardware Android/iOS Device with a device camera for scanning barcodes Software RedLaser SDK (licensed) Or ZXing SDK for Android Devices 2.2+ required to provide Bar Code scan functionality
Process Flow The data and business logic present in the OTM server is exposed to the mobile client using OTM web services. The mobile App accesses these web services over http/https to acquire/update data
Removing “Defect” and “Wait” Waste leading to damages and demurrage charges by using Mobile sols
KNOCK OUT Waste Out Value In
Mr. TIMWOOD Mr. OTM
NEED HELP TO KOCK OUT
MR. TIMWOOD
CONTACT US AT
[email protected] contact no +44 7799644535
[email protected] contact +49 1721617774
[email protected] contact no +91 9004014283
Visit us at Our OTM Lab at
Chennai, India