Ong-Art CV 170208

27
Curriculum Vitae (CV) Mr. Ong-Art Sanpinit

Transcript of Ong-Art CV 170208

Page 1: Ong-Art CV 170208

Curriculum Vitae (CV) Mr. Ong-Art Sanpinit

Page 2: Ong-Art CV 170208

2/27

Table of Content

Page

Curriculum Vitae (CV) ...................................................................................................... 3

Professional Licenses .................................................................................................... 14

EHS Training Certificated .............................................................................................. 15

Quality and Project Management Training ................................................................... 17

Experience References Certificated ............................................................................. 19

Education Certificated ................................................................................................... 24

Page 3: Ong-Art CV 170208

3/27

Mr. ONG-ART SANPINIT

Place of Birth Present Mobile Email Address

SISAKET, THAILAND 244/38 Moo1, Khumsub land Village, Rat-u-thid Road Soi 34, Sansab, Minburi, Bangkok 10510 +66 81 9000 773 [email protected] [email protected] [email protected]

Birthday 23-May-1964 Age 52 Years Height 169 cm Weight 70 Kg. Nationality THAI Religion Buddhism Marital Status Married 2

Executive Profile Children

Visionary Operations Executive with hand on managing all levels of multiple projects including budgeting and administration.

Skill Highlights

Project Management Project Planning Quality Management, Team Leadership Claim Management

Staff Development Staff Training Team Building Cost Controls Contract Negotiations

Core Accomplishments

Project Management:

� Initiated project started from estimate, engineering, Procurement and construction (EPC) with success more than 7 IPP/SPP power plant.

� Created a systematic to control all process of EPC by using MS Access 2013, mainly to control working time of each activity.

Operations Management:

� Hand on and management a power plant construction team and outage management for power plant as Field Services Department Manager.

� Managed product fabrications for pressure vessels (drum/columns/Heat exchanger etc.), module structure offshore.

� Handled all functions related to shop floor pressure vessels fabrication and handle more than 700 persons included engineer, supervisor and skilled workers.

Staff Development:

� Launched well-received program of professional development courses for all staff such as S-curve by using MS Project 2013, Claim management, Primavera P3, KKS System, P&ID and NEBOSH EHS Program.

Page 4: Ong-Art CV 170208

4/27

Professional Experiences

ALSTOM Grid Solution From May-2016 to Oct-2016

Industrial type/Company business

Power Grid Solution and Substation

Role Function/Responsibility

Multi-Project planning and control for overall multi-site construction starting from Site establishment

Job Tile Construction Manager

Project/Job Achieved Start site activities for NABONG 500/230KV Substation at LAO PDR and start to mobilize for SI KHIU 3 230/115KV Substation

Achievements/Highlights N/A

UNIMIT Engineering Public company limited

From Nov-2009 to Apr-2015

Industrial type/Company business

Shop fabrication and field construction for major chemical plant, petrochemical plant, oil refinery, etc. The main business consists of 5 areas consist of: -

� Pressure Vessel in 3 shapes (Drum, Column, and Sphere) and in 8 categories (Unfired Pressure Vessels, Fired Pressure Vessels, Heat Exchangers, Distillation Tower, Jacketed Vessels, Reactors, Transportable Vessels, and Cryogenic Tanks)

� Machinery Parts: - Furnace, Wind tunnel, Stack and Diverters

� Steel Structure /piping: - �Structures, Pipe Spools, Pipe Racks, Pipe Support

� Chemical Tank: - Oil tank, Water tank, Silo

� Mechanical Installation:- Tank installation, Equipment installations, Repair and modification work

Role Function/Responsibility

Control product operation to ensure for delivery of product life cycle and quality need of customer satisfaction included weekly & monthly report of production and cost control in term of labor cost (Man-hour) and follow up of payment.

Job Title Assistant Vice President

Project/Job Achieved � Clean Fuel project for EXXON Mobil under Foster Wheeler International Corporation, completed of 2 Tower and 7 Drums in Jul 2010.

� Clean Fuel project for Star Petroleum Refinery Co., Ltd. (SPRC), under Bechtel international, completed of 5 Tower and 25 Drums in Mar 2011.

Page 5: Ong-Art CV 170208

5/27

� Clean Fuel Project for The Bangchak Petroleum Public co., Ltd. Under DEAWOO Engineering, Completed of 2 Tower and 15 drums in Apr 2011.

� IRPC CHP Project by supply 6 Deaerator to Jurong Engineering, completed in Jul 2010.

� Various Deaerator Project for STORK TERMAG Holland total 29 Unit

� Waste Gas Preheat Project for SIPCHEM at Saudi Arabia (with supervision at KSA)

� Tower for TPX under Thai Oil Group.

� R&D for CRYOGENICS Storage tank (4 items of 12,500litre for pilot’s project)

� Module Project for AIBEL, structure, piping and vessels. (Vessel for MODEX)

� TPX Linear Alkyl Benzene (LAB) Project under Hyundai Eng. 6 unit for Columns and 16 Unit for Drums for Thai Para xylene (Thai Oil Group)

� Emission Improvement and PSA-3 Project (Thai Oil), 3 unit Columns under Foster Wheeler

Achievements/Highlights � Successful to establish ISO 140001 and ISO 18001 with certificated on Jan 2011.

� Establish and successful to make the standardized for Production Man-hours with statistics analysis tools.

� Establishing and developing the cost of poor quality by lessons learned method.

� Achieved pilot R&D for 12,500 liter Cryogenics Storage tank Two Success of BOI application.

ALSTOM (Thailand) Ltd. From Jun-1998 To Apr-2009

Industrial type/Company business

ALSTOM OEM Power Plant, Power Plant EPC and Outage Services of CCPP (Combined Cycle Power Plant)

Role Function/Responsibility

EPC Project Management, Field Services management included tendering preparation, Planning, Inspection & test plan, Environment, Health and Safety system.

Designate Chronology 1998 - Site Manager

2001 - Construction Department Manager

2003 - Filed Services Department Manager

2005 - Operational Department Manager (Resp. two Div. Project Management and Field Services)

Page 6: Ong-Art CV 170208

6/27

2008 - Filed Services Department Manager (One Div. for Field Services)

Project/Job Achieved � Completed two-40 MW Biomass power plant (Dan Chang & Phu Khiew Bio Energy) included 115kV outdoor type switchyard within target schedule and less budgeted than plan.

� Completed one 40 MW Combined cycle power plant (NPC) included indoor type switchyard (115kV GIS) within target schedule and less budgeted than plan.

� Completed two 120 MW Combined cycle power plant (Bang boo & Nhongkhea Cogen.) Included indoor type switchyard (115kV GIS) within target schedule and less budgeted than plan.

� Completed one 350 MW Combined cycle power plant (Bangbo) included 230kV outdoor type switchyard within target schedule and less budgeted than plan.

� Completed one 741 MW Combined cycle power plant (Bowin) included 230kV outdoor type switchyard within target schedule and less budgeted than plan.

� Completed one 1500MW Combined cycle power plant (Kaeng Khoi 2) included 230kV outdoor type switchyard with some delay and out of budgeted.

� One re-vamping Pumping station at Turkmenistan country, this project turnkey and join venture with ALSTOM France, eleven of 1.6MW pump and two of 0.8MW pump. This project has been delay by government of Turkmenistan but less 40% of budgeted.

� Completed one raceway in tunnel for Bangkok Metropolitan Electricity Authority (MEA), this project was successful with schedule and less budget.

Achievements/Highlights � As a pioneer electrical EPC leading for ALSTOM (Thailand), the successful of first project with 70 staff peak period for 120MW and last stage of 1500MW with 423 staff peak period.

� A strong team building by mentor and coaching group staff with four-site manager and one commissioning manager with in department. The success of project describe above was part of their management.

� Manage a Field service processes, including the

Page 7: Ong-Art CV 170208

7/27

continuous improvement achieve “best in class” performance.

� Successful to manage the optimal utilization of permanent and temporary labor within the Department to support business improvement activities within ALSTOM Thailand.

� Successful to manage the Operations Team, including the development of Individual Performance Objectives, MDOP (Management Development & Organizational Planning), salary review and individual development/improvement plans with satisfaction of a team.

� Leading and successfully of the overall control of projects, including the financial, commercial, legal and life cycle of the project and all describe are under control within schedule and budgeted.

� Ownership of the Project Management and Field service processes, including the continuous improvement of these processes to achieve “best in class” performance.

� Successful training for EHS Champion from Newcastle UK with collaborated certificated from National Examination Board in Occupational Safety and Health (NEBOSH).

� Leading and Implemented the Environment, Health and Safety standard with successful obtain Certificated of ISO 18001:2007 and ISO 14001:2004

Energy Services International Ltd.

From May-1997 To Apr-1998

Industrial type/Company business

Oil & Gas O&M (Operation and Maintenance) and Outage services

Role Function/Responsibility

A daily plan for deep well site & crude oil plant activity with shutdown planning

Job Title Planning Engineer

Project/Job Achieved � Managing, organizing, planning and scheduling for Minor construction and shutdown activities, which is included tooling, equipment and manpower for Thai Shell Exploration SIRIKIT CRUDE OIL Plant Lankrabue, Kampeangpetch Thailand

Achievements/Highlights � Completed and successful for yearly shutdown with Shell International recognition on “Breakthrough Performance Success” by senior management of Solar Turbine as a major contributor.

B.K.K. (1985) PLC. From Apr-1996 To Apr-1997

Page 8: Ong-Art CV 170208

8/27

Industrial type/Company business

Construction Contractor/ Engineering, Procurement and Construction (EPC) for LPN Steel Plate mill

Role Function/Responsibility

Conceptual/Consequence criteria design, control for construction and prepare budget for sub-contractor tendering.

Job Title Senior Electrical Engineer

Project/Job Achieved � Developing the conceptual & basic design for extensions Hot Plate mill plant and new Cold Mill Plant. Establish the tendering process included specifications, Quality, Planning and budgeting

Achievements/Highlights � This project was not successful as expectation due to financial crisis (Tom Yam Kung).

NEW ELECTRICAL TECHNOLOGY LTD.

From Aug-1995 to Jan-1996

Industrial type/Company business

Electrical Contractor

Role Function/Responsibility

Business Development and seeking for new customer

Job Title Project Coordinator

Project/Job Achieved - Develop New Electrical Engineering and Construction Coordinate route surveys for upcoming Project Tendering and Estimate

Achievements/Highlights N/A

RONCELLI (Thailand) Co., Ltd.

From Feb-1991 to Jun-1995

Industrial type/Company business

Electrical Contractor:- Engineering, Procurement and Construction (EPC)

Role Function/Responsibility

Electrical design and Project Management in parallel with site management included control of subcontractor, procurement and construction.

Designate Chronology 1991 Project Coordinator/ Action as overall Project/Site Management

1994 Site Manager

Page 9: Ong-Art CV 170208

9/27

Project/Job Achieved � Completed Tank Farm Area E&I System erection for Rayong refinery Thailand. This project was not success; it’s in the plan schedule but is out of budgeted.

� Completed one Steel Plate Mill with Hot Mill process at LPN Plate Mill Thailand. This project was successfully within target schedule and less budgeted than plan.

� Completed one E&I contract for Gas transmission pipeline onshore facility at Khanhom, south of Thailand. This project was successfully within target schedule and less budgeted than plan 15%.

� Completed one Biggest Hot Strip Mill project (during that time) for Sahaviriya at Bangsaphan Thailand, with collaborated of ANSALDO Italy. This project was successfully both schedule and budgeted, at final stage we gain more additional work 100% more than initial contract agreement.

� Completed 12 building of Popular Condominiums as electrical EPC contract at Muang Thong Thani Thailand. This project was successfully within target schedule and less budgeted than plan 20%.

� Completed 2 building of Industrial Condominiums as electrical EPC contract at Muang Thong Thani Thailand. This project was successfully within target schedule and less budgeted than plan 25%.

� Completed 23 building of prime state mini-office as electrical EPC contract. This project was successfully within target schedule and less budgeted than plan.

� Others small industrials for Sanitary ware, department store and etc. with successful of target schedule and budgeted

Achievements/Highlights As a pioneer engineer with new establishment a branch company from Italy in Thailand, with a dedicated of working hard, a company can extent their business in Thailand and grab a potential client for large number of condominium and gain more than 40% profit.

A chance to work as a joint venture with an international company name ANSALDO for biggest Hot strip mill in Thailand, this is a starting point to learn how to plan the project, how to control the

Page 10: Ong-Art CV 170208

10/27

project as a professional. This is making support to current career as a leading in local power business.

SIAM SYNTECH GENESIS CO., LTD.

From Nov-1990 to Jan-1991

Industrial type/Company business

Construction Turnkey Contractor for High Raise Building

Role Function/Responsibility

M&E Coordinator

Job Title M&E Coordinator

Project/Job Achieved M & E Coordinate for Electrical, Sanitary, Air-conditioning and Civil for High raise building Sathorn Tower Thailand. This was not a challenge to the career in term of electrical field.

Achievements/Highlights N/A

TA&T System Co., Ltd. From Jun-1989 to Oct-1990

Industrial type/Company business

Electrical Contractor for Engineering, Procurement and Construction (EPC)

Role Function/Responsibility

Electrical system Erection and erection drawing design

Designate Chronology 1989 Site Engineer

1990 Project Engineer

Project/Job Achieved Fresh graduate and start with Petrochemical plant with extension of existing plant and individual plant with in business boundary of Thai Petrochemical Industry Rayong Thailand, and 30th floor high raise building. This company is the starting for electrical engineer career and filled that building is not the right objective.

Achievements/Highlights Completed TPU Plant at TPI Rayong with under budget

Page 11: Ong-Art CV 170208

11/27

Educations

Year Qualifications

1981-1983 Vocational Certificate of Electrical Power at Sisaket Technical College Thailand GPA 3.58 number one of the class

1984-1985 Diploma Certificated of Electrical Power from Institute of Technology And Vocational Education [Rajamagala University], Khon Khean Campus (Thai-German) GPA 2.58

1987-1988 Bachelor Degree of Electrical Power from Institute of Technology And Vocational Education [Rajamagala University], Tawes Campus Bangkok GPA 2.76

2013-2016 Master of Business Administration Major Business Engineering Management “Thesis Six Sigma cycle time improvement” Rajamangala University of Technology Thanyaburi GPA 3.39

Professional Skilled

Skilled Level Year of Experiences

Last Used

Project Planning and Scheduling, Reporting, Project costing, Resources tracking

Expert >20 Current

Contractual Negotiations, Outsourcing, Bid Evaluation and Estimation

Expert >20 Current

Financial & Project Mgmt., Budgeting, Logistics, Utilities, Recruiting, HR Management

Expert >20 Current

Safety Management system (ISO 18001:2007) and Environment Management system (ISO14001:2004) Auditing, Supervising, Leadership, Team Building

Expert >10 Current

Communication & Interpersonal skills, Team Building, Leadership, Analytical Thinking & Creative Problem Solving

Expert >15 Current

Initiated and update the Inspection and Test Plan (ITP) for Power plant and Switchyard

Expert >20 Current

A Trainer for KKS system, P&I D, Primavera and NEBOSH EHS

Intermediate >10 <2 years

Page 12: Ong-Art CV 170208

12/27

Computer Skilled

Program Level Year of Experiences

Last Used

Planning & Scheduling program / Primavera P3

Advanced >20 <5

Planning & Scheduling program / MS Project 2013

Advanced >25 Current

Data Base, MS Access / Build own program used for Site/Project Management in all process, starting from Estimation, Work progress, Account, Purchase, Materials handling, Reporting, Cabling etc..

Advanced >25 Current

MS Office such as Excel, Word and Presentation program like Power point.

Advanced >25 Current

Others Graphic Viewer such as CAD, 3D etc. Intermediate >20 Current

Languages

Languages Level Year of Experiences

Last Used

English, Speaking, Reading, Writing Fluent >30 Current

Thai, Speaking, Reading, Writing Native >50 Current

Laos, Speaking Native >50 Current

Cambodia, Speaking Excellent >50 Current

Professional Licenses

Licenses Level Year of Experiences

Last Used

Associate Electrical Engineer (ภฟก.6064) [Level 1] >25 <10

Fellow Electrical Engineer (สฟก. 2536) [Level 2] >15 Current

Charter Electrical Engineer (วฟก. 1037) [Level 3] >3 Current

Professional Training

Year Course

1994 Crouse-Hinds Explosion Proof, with course details for: -

� Training for explosion proof system

1999 Safety Training Course Level Management, with course details for: -

� Local EHS as per local legislation

Page 13: Ong-Art CV 170208

13/27

2000 115kV Splicing Cable, with course details for: -

� Cable splicing 115kV for product Datwyler

2000 G.I.S., with course details for: -

� Maintenance and operating 115kV

2001 Quality Foundation Workshop, with course details for: -

� This course is fully support for Quality Management

2005 MANAGING PROJECTS TRAINING PROGRAMME, with course details for:

� Managing Risks on Tenders & Projects, Contract Standards & Key Contract Provisions, Operation & Maintenance Key Terms, Bonds & Guarantees, Contract Administration and Claim Management, Contract Planning and Scheduling etc.

2006 Environment Health and Safety, with course details for: -

� RRC and ALSTOM EHS Champion certificated

2006-2007

Bullet Proof Management, with course details for: -

� This course is the series training for Management and continue monthly

2007 Global Field Services Network EHS Management System, with course details for: -

� This course have been approved by NEBOSH from UK (The National Examination Board in Occupational Safety and Health)

References

Name Organize Company Email Telephone

Jean-Pierre Faure

Operations & Solutions Group Leader Asia Pacific

Grid Solutions GE and Alstom joint venture

[email protected] [email protected]

T+6567490777 M+6596474768

Benoit Gresillon

Chief Technology Officer Korea

Grid Solutions GE and Alstom joint venture

[email protected] [email protected]

T+827046526059 M+821092903847

Eric Lassurguere (Ex-ALSTOM)

Sales Director Asia Pacific

UCC Holdings Corporation

[email protected] +66840773047

Page 14: Ong-Art CV 170208

14/27

Professional License

Fellow Electrical Engineer (2536)

Charter Electrical Engineer (1037)

Page 15: Ong-Art CV 170208

15/27

EHS Training Certificate

Page 16: Ong-Art CV 170208

16/27

Page 17: Ong-Art CV 170208

17/27

Quality and Project Management Training

Page 18: Ong-Art CV 170208

18/27

Page 19: Ong-Art CV 170208

19/27

Experience References Certificated

Page 20: Ong-Art CV 170208

20/27

Page 21: Ong-Art CV 170208

21/27

Page 22: Ong-Art CV 170208

22/27

Page 23: Ong-Art CV 170208

23/27

Page 24: Ong-Art CV 170208

24/27

Education Certificated

Page 25: Ong-Art CV 170208

25/27

Diploma Certificated

Page 26: Ong-Art CV 170208

26/27

Bachelor Degree

Page 27: Ong-Art CV 170208

27/27

Master Degree of Administration