Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE...
Transcript of Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE...
BELLVILLE VILLAGE WATEROH7000012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057645EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: BELLVILLE VILLAGE
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
BELLVILLE VILLAGE WATEROH7000012
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BELLVILLE VILLAGE WATEROH7000012
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BRIARWOOD ESTATES MHPOH7000112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057646EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: BRIARWOOD ESTATES MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
BRIARWOOD ESTATES MHPOH7000112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BRIARWOOD ESTATES MHP DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BRIARWOOD ESTATES MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COLONIAL HILLS MHPOH7000312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057647EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: COLONIAL HILLS MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
COLONIAL HILLS MHPOH7000312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: COLONIAL HILLS MHP DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: COLONIAL HILLS MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BUTLER VILLAGEOH7000412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7062134EP004 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: BUTLER VILLAGE TP 4
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
BUTLER VILLAGEOH7000412
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: BUTLER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: BUTLER, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
BUTLER VILLAGEOH7000412
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: BUTLER, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CEDAR CREEK MHPOH7000512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057649EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: CEDAR CREEK COURT MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CEDAR CREEK MHPOH7000512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CEDAR CREEK MHP DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CEDAR CREEK MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CLEARFORK MHP PWSOH7000612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057650EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: CLEARFORK MHP NO 1
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CLEARFORK MHP PWSOH7000612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CLEARFORK MHP/WELL 1 DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CLEARFORK MHP/WELL 1 DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COUNTRYSIDE WATER ASSOCIATIONOH7000712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057652EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: COUNTRYSIDE WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
COUNTRYSIDE WATER ASSOCIATIONOH7000712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: COUNTRYSIDE WATER ASSOC. DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: COUNTRYSIDE WATER ASSOC. DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057653EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: CRESTWOOD HILLS C & R ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EASTVIEW COMMUNITY WATER ASSOCIATIONOH7000912
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057654EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: EASTVIEW COMMUNITY WATER ASSN
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
EASTVIEW COMMUNITY WATER ASSOCIATIONOH7000912
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EASTVIEW COMM WATER ASSN DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
EXPRESSVIEW COMM WATER ASSOCIATIONOH7001012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057655EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: EXPRESSVIEW COMM WATER
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
EXPRESSVIEW COMM WATER ASSOCIATIONOH7001012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EXPRESSVIEW COMM WTR ASSOC DISTRIBU Facility Class: CLASS 1
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: EXPRESSVIEW COMM WTR ASSOC DISTRIBUADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
FAIRVIEW ESTATES MHPOH7001112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057656EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: FAIRVIEW ESTATES MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
FAIRVIEW ESTATES MHPOH7001112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: FAIRVIEW ESTATES MHP DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: FAIRVIEW ESTATES MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
FOREST HILLS MHPOH7001212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057657EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: FOREST HILLS MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013
Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
FOREST HILLS MHPOH7001212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: FOREST HILLS MHP DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: FOREST HILLS MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 4OH7001412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057659EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
AQUA OHIO - MANSFIELD SYSTEM 4OH7001412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4 DIST
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4 DISTADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HANLEY ACRES WATER ASSOCIATIONOH7001512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057660EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: HANLEY ACRES WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HANLEY ACRES WATER ASSOCIATIONOH7001512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HANLEY ACRES WATER ASSOC DISTRIBUTIO
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HANLEY ACRES WATER ASSOC DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057661EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 1
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7060585EP002 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 2
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7060586EP003 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 3
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013
Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7060587EP005 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 5
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 7OH7001612
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HEATHERWOOD COMMUNITY WATER PWSOH7001712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057662EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: HEATHERWOOD COMM
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HEATHERWOOD COMMUNITY WATER PWSOH7001712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HEATHERWOOD COMM WATER DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HEATHERWOOD COMM WATER DISTRIBUTIO757 WOODCREST DRIVE
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HILLSDALE COMMUNITY WATER ASSOCIATION PWOH7001912
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057664EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: HILLSDALE COMMUNITY WATER ASSN
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HILLSDALE COMMUNITY WATER ASSOCIATION PWOH7001912
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HILLSDALE COMM WATER ASN DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HILLSDALE COMM WATER ASN DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HILLSIDE MHPOH7002012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057665EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: HILLSIDE MHP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013
HILLSIDE MHPOH7002012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HILLSIDE MHP DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HILLSIDE MHP DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WATERFALL ESTATESOH7002112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057666EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: WATERFALL ESTATES
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
WATERFALL ESTATESOH7002112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WATERFALL ESTATES DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WATERFALL ESTATES DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LEXINGTON VILLAGEOH7002212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057667EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: LEXINGTON VILLAGE
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
LEXINGTON VILLAGEOH7002212
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
20 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
5 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013
5 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LEXINGTON VILLAGEOH7002212
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LEXVIEW ALLOTMENTOH7002312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057668EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: LEXVIEW PARK AND WATER BOARD
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
LEXVIEW ALLOTMENTOH7002312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LEXVIEW ALLOTMENT DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LEXVIEW ALLOTMENT DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 9OH7002512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057670EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 9
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 3/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 9OH7002512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD 9 DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD 9 DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LUCAS VILLAGEOH7002612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057671EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: LUCAS VILLAGE
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
LUCAS VILLAGEOH7002612
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LUCAS, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LUCAS, VILLAGE OF DISTRIBUTION47 LUCAS-PERRYSVILLE ROAD
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LUCAS VILLAGEOH7002612
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: LUCAS, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 1OH7002812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057673EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 1
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
AQUA OHIO - MANSFIELD SYSTEM 1OH7002812
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 1OH7002812
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MANSFIELD CITY PWSOH7002914
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057674EP001 Facility Source: Surface Water Facility Class: CLASS 4
Facility Name: MANSFIELD WTP
Sample(s) Required betweenINORGANICS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and7/1/2013 9/30/2013
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013
A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.
MANSFIELD CITY PWSOH7002914
Page 1 of 3
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MANSFIELD, CITY OF DISTRIBUTION Facility Class: CLASS 2
30 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
60 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201360 Sample(s) Required between 2/1/2013 and 2/28/201360 Sample(s) Required between 3/1/2013 and 3/31/201360 Sample(s) Required between 4/1/2013 and 4/30/201360 Sample(s) Required between 5/1/2013 and 5/31/201360 Sample(s) Required between 6/1/2013 and 6/30/201360 Sample(s) Required between 7/1/2013 and 7/31/201360 Sample(s) Required between 8/1/2013 and 8/31/201360 Sample(s) Required between 9/1/2013 and 9/30/201360 Sample(s) Required between 10/1/2013 and 10/31/201360 Sample(s) Required between 11/1/2013 and 11/30/201360 Sample(s) Required between 12/1/2013 and 12/31/2013
60 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201360 Sample(s) Required between 2/1/2013 and 2/28/201360 Sample(s) Required between 3/1/2013 and 3/31/201360 Sample(s) Required between 4/1/2013 and 4/30/201360 Sample(s) Required between 5/1/2013 and 5/31/201360 Sample(s) Required between 6/1/2013 and 6/30/201360 Sample(s) Required between 7/1/2013 and 7/31/201360 Sample(s) Required between 8/1/2013 and 8/31/201360 Sample(s) Required between 9/1/2013 and 9/30/201360 Sample(s) Required between 10/1/2013 and 10/31/201360 Sample(s) Required between 11/1/2013 and 11/30/201360 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MANSFIELD, CITY OF DISTRIBUTION506 SOUTH AIRPORT ROAD
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MANSFIELD CITY PWSOH7002914
Page 2 of 3
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: MANSFIELD, CITY OF DISTRIBUTION751 ASHLAND RD.
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS203
Facility Name: MANSFIELD, CITY OF DISTRIBUTION495 WOODVILLE RD.
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS204
Facility Name: MANSFIELD, CITY OF DISTRIBUTION385 SOUTH ILLINOIS AVENUE
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS205
Facility Name: MANSFIELD, CITY OF DISTRIBUTION1405 AUER BLVD.
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MANSFIELD CITY PWSOH7002914
Page 3 of 3
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS206
Facility Name: MANSFIELD, CITY OF DISTRIBUTION68 SOUTH HOME ROAD
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS207
Facility Name: MANSFIELD, CITY OF DISTRIBUTION345 MARION AVE.
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS208
Facility Name: MANSFIELD, CITY OF DISTRIBUTION2255 S. MAIN ST.
Facility Class: CLASS 2
1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MAXWALTON GLENS WATER ASSOCIATION PWSOH7003012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057675EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: MAXWALTON GLENS WATER ASSOCIATION
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MAXWALTON GLENS WATER ASSOCIATION PWSOH7003012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MAXWALTON GLENS WTR DISTRIBUTION
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MAXWALTON GLENS WTR DISTRIBUTION1020 MORITZ LANE
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MEADOWOOD WATER ASSOCIATION PWSOH7003112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057676EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: MEADOWOOD WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and4/1/2013 6/30/2013
MEADOWOOD WATER ASSOCIATION PWSOH7003112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MEADOWOOD WATER ASSOC. DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MEADOWOOD WATER ASSOC. DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 8OH7003212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057677EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 8
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and10/1/2013 12/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and10/1/2013 12/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 8OH7003212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYS 8 DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYS 8 DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - SITES LAKEOH7003312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE09/13/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057678EP001 Facility Source: Ground Water
Facility Name: AQUA OHIO - SITES LAKE STU 1
Not RequiredINORGANICS
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
AQUA OHIO - SITES LAKEOH7003312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE09/13/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7061546EP003 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - SITES LAKE STU 3
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - SITES LAKEOH7003312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - SITES LAKE DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - SITES LAKE DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ONTARIO CITY PWSOH7003512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057679EP001 Facility Source: Ground Water Facility Class: CLASS 2
Facility Name: ONTARIO VILLAGE WTP STU 1
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
ONTARIO CITY PWSOH7003512
Page 1 of 2
2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ONTARIO, CITY OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
7 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013
7 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: ONTARIO, CITY OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ONTARIO CITY PWSOH7003512
Page 2 of 2
2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: ONTARIO, CITY OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
COUNTRY MEADOW CARE CENTEROH7003612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057680EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: COUNTRY MEADOWS CARE
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
COUNTRY MEADOW CARE CENTEROH7003612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: COUNTRY MEADOW CARE CENT DISTRIBUTI
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: COUNTRY MEADOW CARE CENT DISTRIBUTIADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
PEYTON COMMUNITY WELLOH7003712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057681EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: PEYTON COMMUNITY WELL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
PEYTON COMMUNITY WELLOH7003712
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: PEYTON COMMUNITY WELL DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: PEYTON COMMUNITY WELL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
PIN OAK ESTATESOH7003812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057682EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: PIN OAK ESTATES
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
PIN OAK ESTATESOH7003812
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: PIN OAK ESTATES DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: PIN OAK ESTATES DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
PLYMOUTH VILLAGEOH7004003
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION30 MILLS ST
Facility Class: CLASS 1
1 Sample(s) Required between 1/1/2013DISINFECTION BYPRODUCTS and 1/7/20131 Sample(s) Required between 4/1/2013 and 4/7/20131 Sample(s) Required between 7/1/2013 and 7/7/20131 Sample(s) Required between 10/1/2013 and 10/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
PLYMOUTH VILLAGEOH7004003
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION28 BROOKS COURT
Facility Class: CLASS 1
1 Sample(s) Required between 1/1/2013DISINFECTION BYPRODUCTS and 1/7/20131 Sample(s) Required between 4/1/2013 and 4/7/20131 Sample(s) Required between 7/1/2013 and 7/7/20131 Sample(s) Required between 10/1/2013 and 10/7/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
DAYSPRING ASSISTED LIVING AND CAREOH7004112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057685EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: DAYSPRING ASSISTED LIVING AND CARE
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
DAYSPRING ASSISTED LIVING AND CAREOH7004112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: DAYSPRING ASSIST LIVING AND CARE DIST
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: DAYSPRING ASSIST LIVING AND CARE DISTADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
EDGEWOOD AND EDGEWATER, LLCOH7004412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057687EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: EDGEWOOD ESTATES
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
EDGEWOOD AND EDGEWATER, LLCOH7004412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: EDGEWOOD ESTATES DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: EDGEWOOD ESTATES DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SHELBY CITYOH7004511
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057688EP001 Facility Source: Surface Water Facility Class: CLASS 3
Facility Name: SHELBY CITY
Sample(s) Required betweenINORGANICS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013
Not RequiredRADIOLOGICALS
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2013 10/31/2013
Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013
A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.
SHELBY CITYOH7004511
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SHELBY, CITY OF DISTRIBUTION Facility Class: CLASS 1
20 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
10 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
10 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SHELBY, CITY OF DISTRIBUTION27 RYAN RD
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/2013
SHELBY CITYOH7004511
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SHELBY, CITY OF DISTRIBUTION27 RYAN RD
Facility Class: CLASS 1
1 Sample(s) Required between 12/8/2013DISINFECTION BYPRODUCTS and 12/14/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: SHELBY, CITY OF DISTRIBUTION527 S. GAMBLE ST
Facility Class: CLASS 1
1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013
Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SHELLY ACRES WATER ASSOCIATIONOH7004612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057689EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: SHELLY ACRES WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
SHELLY ACRES WATER ASSOCIATIONOH7004612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SHELLY ACRES WATER ASSOC DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SHELLY ACRES WATER ASSOC DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SHILOH VILLAGE OFOH7004712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057690EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: SHILOH WTP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
SHILOH VILLAGE OFOH7004712
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SHILOH, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1
10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SHILOH, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SHILOH VILLAGE OFOH7004712
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: SHILOH, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SOUTHERN ESTATES WATER ASSOC PWSOH7004812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057691EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: SOUTHERN EST WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
SOUTHERN ESTATES WATER ASSOC PWSOH7004812
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SOUTHERN EST WATER ASSOC DIST
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: SOUTHERN EST WATER ASSOC DISTADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 5OH7004912
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057692EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 5OH7004912
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5 DIST
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5 DISTADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WALNUT HILLS WATEROH7005032
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057695EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: WALNUT HILLS WATER TREATMENT PLANT
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
WALNUT HILLS WATEROH7005032
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WALNUT HILLS WATER DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WALNUT HILLS WATER DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WALNUT HILLS WATEROH7005032
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: WALNUT HILLS WATER DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WILLOW PARK WATER ASSOCIATIONOH7005112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057696EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: WILLOW PARK WATER ASSOCIATION
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
WILLOW PARK WATER ASSOCIATIONOH7005112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WILLOW PARK WATER ASSOCI DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WILLOW PARK WATER ASSOCI DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ALTMAN HTS COMM WATER ASSOCIATIONOH7005312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057697EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: ALTMAN HEIGHTS ALLOTMENT
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
ALTMAN HTS COMM WATER ASSOCIATIONOH7005312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ALTMAN HTS COMM WTR ASSO DISTRIBUTIO
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: ALTMAN HTS COMM WTR ASSO DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HANLEY VILLAGE WATER ASSOCIATION PWSOH7005412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057698EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: HANLEY VLG WATER ASSOC
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HANLEY VILLAGE WATER ASSOCIATION PWSOH7005412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HANLEY VLG. WATER ASSOC. DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HANLEY VLG. WATER ASSOC. DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
LINCOLN TERRACE COMMUNITY WATEROH7005512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057699EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: LINCOLN TERRACE COMMUNITY
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013
Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
LINCOLN TERRACE COMMUNITY WATEROH7005512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: LINCOLN TERR. COMM. WELL DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: LINCOLN TERR. COMM. WELL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 6OH7005612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE04/15/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057700EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 6 STU 1
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredRADIOLOGICALS
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 6OH7005612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE04/15/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7060590EP002 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 6 STU 2
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 6OH7005612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD #6 DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD #6 DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 3OH7005812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057701EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 3
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 3OH7005812
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 3OH7005812
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 2OH7005912
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057702EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 2
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 2OH7005912
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIO Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013
Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 2OH7005912
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIOADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
HEATHERWOOD TERRACE TOWNHOUSESOH7006012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057703EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: HEATHERWOOD TERRACE TOWNHOUSES
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HEATHERWOOD TERRACE TOWNHOUSESOH7006012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HEATHERWOOD TERRACE TOWNHOUSES DI Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: HEATHERWOOD TERRACE TOWNHOUSES DIADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MIFFLIN CARE CENTEROH7006412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057707EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: MIFFLIN CARE CENTER
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MIFFLIN CARE CENTEROH7006412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MIFFLIN CARE CENTER DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MIFFLIN CARE CENTER DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
AQUA OHIO - MANSFIELD SYSTEM 10OH7006612
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057708EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: AQUA OHIO - MANSFIELD SYSTEM 10
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
AQUA OHIO - MANSFIELD SYSTEM 10OH7006612
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: AQUA OHIO - MANSFIELD SYS 10 DIST
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: AQUA OHIO - MANSFIELD SYS 10 DISTADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MADISON WATER DISTRICTOH7006712
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057709EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MADISON WATER DISTRICT
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MADISON WATER DISTRICTOH7006712
Page 1 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MADISON WATER DISTRICT DISTRIBUTION Facility Class: CLASS 1
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MADISON WATER DISTRICT DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MADISON WATER DISTRICTOH7006712
Page 2 of 2
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: MADISON WATER DISTRICT DISTRIBUTIONADDRESS NOT KNOWN
Facility Class: CLASS 1
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
WERNER-GOMPF FUNERAL SERVICES, LTD
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7030112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WERNER-GOMPF FUNERAL SERVICES DISTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WERNER-GOMPF FUNERAL SERVICESGround Water
7057711
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
COMMUNITY BIBLE CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7030512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COMM BAPTIST BIBLE CH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COMMUNITY BIBLE CHURCH MANSFIELDGround Water
7057713
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BG'S ANGELINES PIZZA
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7030912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BG'S ANGELINES PIZZA DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BG'S ANGELINES PIZZA WTPGround Water
7061337
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DUKES BAR PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7031412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DUKES BAR DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DUKES TAVERNGround Water
7057717
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OHIO HILLTOP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7032212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OHIO HILLTOP DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OHIO HILLTOPGround Water
7057720
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LEWS TAVERN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7032912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LEWS TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LEWS TAVERNGround Water
7057722
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MIFFLIN ELEMENTARY SCHOOLOH7033412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057725EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MIFFLIN ELEMENTARY SCHOOL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013
MIFFLIN ELEMENTARY SCHOOLOH7033412
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MIFFLIN ELEMENTARY SCHOOL DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MIFFLIN ELEMENTARY SCHOOL DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CORNELL ABRAXAS OHIOOH7033512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057726EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: CORNELL ABRAXAS OHIO
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenRADIOLOGICALS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
GROSS ALPHA - 4002 RADIUM-228 - 4030
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CORNELL ABRAXAS OHIOOH7033512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
CommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CORNELL OHIO DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CORNELL OHIO DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ODOT REST AREA 3-33 EAST
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7034012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODOT-REST AREA 3-33 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODOT REST AREA 3-33Ground Water Facility Class: CLASS A
7057727
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODOT REST AREA 3-34 WEST
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7034112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODOT-REST AREA 3-34 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODOT REST AREA 3-34Ground Water Facility Class: CLASS A
7057728
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SNOW TRAILS NO 1 - RENTAL
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7034712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to12/1 3/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SNOW TRAILS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SNOW TRAILSGround Water
7057730
Sample(s) Required between 1/1/2013NITRITE - 1041 1 and 5/31/2013
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SPRINGMILL DRIVE-IN THEATRE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7034812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPRINGMILL DR-IN THEATRE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPRINGMILL DR-IN THEATREGround Water
7057731
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ST MARY OF THE SNOWS SCHOOLOH7035012
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057732EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: ST MARY OF THE SNOWS SCHOOL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
ST MARY OF THE SNOWS SCHOOLOH7035012
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: ST MARYS CHURCH & SCHOOL DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: ST MARYS CHURCH & SCHOOL DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CHURCH OF GOD PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7035212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CHURCH OF GOD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF GODGround Water
7057733
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WALTON LAKE COMPANY 1
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7035812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WALTON LAKE COMPANY 1 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WALTON LAKE CO NO 1Ground Water
7057736
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WALTON LAKE COMPANY 3 PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7036012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WALTON LAKE COMPANY 3 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WALTON LAKE CO NO 3Ground Water
7057738
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTBROOK COUNTRY CLUBOH7036112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057739EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: WESTBROOK COUNTRY CLUB
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
WESTBROOK COUNTRY CLUBOH7036112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: WESTBROOK COUNTRY CLUB DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: WESTBROOK COUNTRY CLUB DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 11/8/2013DISINFECTION BYPRODUCTS and 11/14/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
APOSTOLIC CHRISTIAN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7036312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: APOSTOLIC CHRISTIAN CH. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: APOSTOLIC CHRISTIAN CHURCHGround Water
7057740
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TEMPLED HILLS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7036512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TEMPLED HILLS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TEMPLED HILLSGround Water
7057741
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CLAY MEMORIAL LUTHERAN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7036812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CLAY MEMORIAL LUTHERAN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CLAY MEMORIAL LUTHERANGround Water
7057743
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HERITAGE INN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7037712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HERITAGE INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HERITAGE INNGround Water
7057749
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SACRED HEART SCHOOLOH7037812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057750EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: SACRED HEART SCHOOL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
SACRED HEART SCHOOLOH7037812
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: SACRED HEART SCHOOL DISTRIBUTION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
ODNR-MALABAR FARM STATE PARK INN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7037912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to2/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR-MALABAR ST PK INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR MALABAR ST PK INNGround Water
7057751
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MILLIRON IRON AND METALOH7038212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/11/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057752EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: MILLIRON INDUSTRIES
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024
FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MILLIRON IRON AND METALOH7038212
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MILLIRON IRON & METAL DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
MOOSE LODGE #341
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7038312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MOOSE LODGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MOOSE LODGEGround Water
7057753
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PEBBLE CREEK GOLF CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7038512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PEBBLE CREEK GOLF CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PEBBLE CREEK GOLF CLUBGround Water
7057754
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ROME COMMUNITY CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7039112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ROME COMMUNITY CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ROME COMMUNITY CHURCHGround Water
7057758
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SAINT TIMOTHY LUTHERAN CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7039212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ST TIMOTHY LUTH CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAINT TIMOTHY LUTH CHURCHGround Water
7057759
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SHELBY COUNTRY CLUB
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7039312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHELBY COUNTRY CLUBGround Water
7057760
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SOUTHSIDE DRIVE THRU
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7039612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SOUTHSIDE DRIVE THRU DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SOUTHSIDE DRUVE THRUGround Water
7057761
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SUNSET DRIVE-IN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7039912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SUNSET DRIVE-IN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SUNSET DRIVE-INGround Water
7057763
Sample(s) Required between 7/1/2013NITRITE - 1041 1 and 9/30/2013
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
TAYLORTOWN COMMUNITY CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7040012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: TAYLORTOWN COMMUNITY CH. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: TAYLORTOWN COMMUNITY CHURCHGround Water
7057764
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
NORTH BEND CHURCH OF THE BRETHREN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7040812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: NORTH BEND CH OF THE BRTHRN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: NORTH BEND CH OF THE BRETHRENGround Water
7057768
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MOWANA-ONEIDA LODGE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MOWANA-ONEIDA LODGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MOWANA ONEIDA LODGEGround Water
7057770
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MOWANA-OSWEGO LODGE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MOWANA-OSWEGO LODGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MOWANA OSWEGO LODGEGround Water
7057771
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MOWANA-INTER HILL
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MOWANA-INTER HILL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MOWANA INTER HILLGround Water
7057772
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MOWANA-MOHICAN LODGE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MOWANA MOHICAN LODGEGround Water
7057773
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP OTYOKWAH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP OTYOKWAH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP OTYOKWAHGround Water
7057774
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CLEAR FORK SCHOOLSOH7041812
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057775EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: CLEAR FORK SCHOOLS
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CLEAR FORK SCHOOLSOH7041812
Page 1 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CLEAR FORK SCHOOLS DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CLEAR FORK SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CLEAR FORK SCHOOLSOH7041812
Page 2 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: CLEAR FORK SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
7-ELEVEN STORE # 36177
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7041912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: 7-ELEVEN STORE # 36177 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 2 and 1/31/2013Sample(s) Required between 2/1/20132 and 2/28/2013Sample(s) Required between 3/1/20132 and 3/31/2013Sample(s) Required between 4/1/20132 and 4/30/2013Sample(s) Required between 5/1/20132 and 5/31/2013Sample(s) Required between 6/1/20132 and 6/30/2013Sample(s) Required between 7/1/20132 and 7/31/2013Sample(s) Required between 8/1/20132 and 8/31/2013Sample(s) Required between 9/1/20132 and 9/30/2013Sample(s) Required between 10/1/20132 and 10/31/2013Sample(s) Required between 11/1/20132 and 11/30/2013Sample(s) Required between 12/1/20132 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: 7-ELEVEN STORE # 36177Ground Water Facility Class: CLASS A
7057776
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HIDDEN HOLLOW PWS
Page 1 of 1
2013 MONITORING SCHEDULE07/12/2013Effective Date:
OH7042112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: HIDDEN HOLLOW DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: HIDDEN HOLLOWGround Water
7062486
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LAKE MARIA, INC.
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7042612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE MARIA, INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAKE MARIA INCGround Water
7057780
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LAKE TIMBERLIN CAMP RESORT
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7042712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LAKE TIMBERLIN CAMP RESORT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LAKE TIMBERLIN CAMP RESORT TPGround Water
7057781
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
LITTLE WASHINGTON CONGREGATIONAL CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7043012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LITTLE WASH.CONGR.CHURCH DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LITTLE WASH CONGR CHURCHGround Water
7057783
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MADISON SOUTH ELEMENTARYOH7043112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057784EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MADISON SOUTH ELEMENTARY SCH
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MADISON SOUTH ELEMENTARYOH7043112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MADISON SOUTH ELEMENTARY DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
MADISON COMPREHENSIVE HIGH SCHOOLOH7043212
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057785EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MADISON COMPREHENSIVE HIGH SCHOOL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MADISON COMPREHENSIVE HIGH SCHOOLOH7043212
Page 1 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
MADISON COMPREHENSIVE HIGH SCHOOLOH7043212
Page 2 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
ODNR- MALABAR FARM STATE PARK BIG HOUSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7043512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR MALABAR FARM BIG HOUSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR MALABAR FARM ST PARK BIG HOUSEGround Water
7057786
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MANSFIELD INN PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7043712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MANSFIELD INN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MANSFIELD INNGround Water Facility Class: CLASS A
7057787
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OAK PARK TAVERN
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7044012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OAK PARK TAVERN DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OAK PARK TAVERNGround Water
7057788
Sample(s) Required between 4/1/2013NITRITE - 1041 1 and 6/30/2013
Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PLEASANT HILL GOLF COURSE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7044112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PLEASANT HILL GOLF COURS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PLEASANT HILL GOLF COURSEGround Water
7057789
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
JR PROPERTIES OF MANSFIELD - SR 430
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7044412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: JR PROP OF MF - SR 430 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: JR PROPERTIES OF MANSFIELD - SR 430 TPGround Water
7057790
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
RICHLAND RURAL LIFE CENTER PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7044512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RICHLAND RURAL LIFE CTR. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RICHLAND RURAL LIFE CTRGround Water
7057791
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SKYWAY EAST
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7044712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SKYWAY EAST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SKYWAY EASTGround Water
7057792
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BUTLER MOHICAN KOA
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7045012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to5/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BUTLER MOHICAN KOA DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BUTLER MOHICAN KOAGround Water
7057795
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
PLEASANT HILL OUTDOOR CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7045412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: PLEASANT HILL OUTDOOR CENTER DISTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: PLEASANT HILL OUTDOOR CENTERGround Water
7057799
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MADISON EARLY CHILDHOOD LEARNING CENTEROH7045512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057800EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MADISON EARLY CHILDHOOD LEARNING CENTER
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and10/1/2013 12/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and10/1/2013 12/31/2013
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
MADISON EARLY CHILDHOOD LEARNING CENTEROH7045512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MADISON EARLY CHILDHOOD LEARNING CT
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
JOURNEY LIFE CENTER PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7046112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: JOURNEY LIFE CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: JOURNEY LIFE CENTERGround Water Facility Class: CLASS A
7057806
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MCDONALDS RESTAURANT-HANLEYOH7046312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057808EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: MCDONALDS RESTAURANT HANLEY
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MCDONALDS RESTAURANT-HANLEYOH7046312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MCDONALDS RESTAURANT-HANLEY DISTRI
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MCDONALDS RESTAURANT-HANLEY DISTRIADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
SPEEDWAY 9190
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7046612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SPEEDWAY 9190 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 2 and 1/31/2013Sample(s) Required between 2/1/20132 and 2/28/2013Sample(s) Required between 3/1/20132 and 3/31/2013Sample(s) Required between 4/1/20132 and 4/30/2013Sample(s) Required between 5/1/20132 and 5/31/2013Sample(s) Required between 6/1/20132 and 6/30/2013Sample(s) Required between 7/1/20132 and 7/31/2013Sample(s) Required between 8/1/20132 and 8/31/2013Sample(s) Required between 9/1/20132 and 9/30/2013Sample(s) Required between 10/1/20132 and 10/31/2013Sample(s) Required between 11/1/20132 and 11/30/2013Sample(s) Required between 12/1/20132 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SPEEDWAY 9190Ground Water Facility Class: CLASS A
7057810
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ENGLEFIELD OIL/RTE. 97 DUCHESS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7046812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ENGLEFIELD OIL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ENGLEFIELD OILGround Water Facility Class: CLASS A
7057812
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
KOREAN UNITED METHODIST CHURCH PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7047312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KOREAN UN METHODIST CHURCHGround Water
7057816
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MADISON COMMUNITY YOUTH PARK PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7047612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 8/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MADISON COMM. YOUTH PARK DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MADISON COMM YOUTH PARKGround Water
7057819
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MCDONALDS RESTAURANT-BELLVILLEOH7048312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057822EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: MCDONALDS RESTAURANT BELLVILLE
Not RequiredINORGANICS
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
MCDONALDS RESTAURANT-BELLVILLEOH7048312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: MCDONALDS RESTAURANT-BE DISTRIBUTIO
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: MCDONALDS RESTAURANT-BE DISTRIBUTIOADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
KCS STEAK AND RIBS PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7048812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: KCS STEAK & RIBS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: KCS STEAK & RIBSGround Water
7057827
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MICKEY MART #21
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7048912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MICKEY MART DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MICKEY MART #21Ground Water Facility Class: CLASS A
7057828
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
INNOVATIVE CARE AND SERVICES LLCOH7049112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057830EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: PARK AVENUE CHILD CARE AND EDUCATION
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
INNOVATIVE CARE AND SERVICES LLCOH7049112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: PARK AVENUE CHILD CARE AND EDUCATION
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
MILLIRON AUTO PARTS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7049212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MILLIRON AUTO PARTS DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MILLIRON AUTO PARTSGround Water
7057831
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CRESTVIEW LOCAL SCHOOLOH7049412
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057833EP001 Facility Source: Ground Water Facility Class: CLASS 1
Facility Name: CRESTVIEW LOCAL SCHOOL
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
CRESTVIEW LOCAL SCHOOLOH7049412
Page 1 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTION
Not RequiredLEAD - 1030 AND COPPER - 1022
2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013
Samples should be collected at the same time and place as the Total Coliform samples.
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS201
Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
CRESTVIEW LOCAL SCHOOLOH7049412
Page 2 of 2
2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Substantial Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS202
Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTIONADDRESS NOT KNOWN
1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:
TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950
VOISARD MANUFACTURINGOH7049512
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7057834EP001 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: VOISARD MFG INC
Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024
FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -
Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:
ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
VOISARD MANUFACTURINGOH7049512
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: VOISARD MANUFACTURING INC. DISTRIBUTI
Not RequiredLEAD - 1030 AND COPPER - 1022
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
CORNERSTONE GRACE BRETHREN CHURCH PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7049912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CORNERSTONE GRACE BRETHE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CORNERSTONE GRACE BRETHERNGround Water
7057837
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
QUEST WORSHIP CENTER, INC.
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7051212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: QUEST WORSHIP CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: QUEST WORSHIP CENTERGround Water
7057844
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
COLUMBIA GAS TRANS-PAVON
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7051612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: COLUMBIA GAS TRANS-PAVON DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: COLUMBIA GAS TRANSMISSION CORP PAVONIA CGround Water
7057847
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
GORMAN NATURE CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7051712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GORMAN NATURE CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GORMAN NATURE CENTERGround Water
7057848
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FIVE POINTS COUNTRY MARKET PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7052012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FIVE POINTS COUNTRY MARK DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FIVE POINTS COUNTY MARKETGround Water
7057851
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OHIO BIRD SANCTUARY - UPPER BUILDING
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7052212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 11/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OHIO BIRD SANCTUARY - UPPER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OHIO BIRD SANCTUARY - UPPERGround Water
7057853
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTBROOK COUNTRY CLUB- SHOP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7052812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WESTBROOK G COURSE SHOP TPGround Water
7057859
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
WESTBROOK COUNTRY CLUB HOLE # 12
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7052912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: WESTBROOK GOLF COURSE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: WESTBROOK COUNTY HOLE # 12Ground Water
7057860
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SAVE-A-LOT MARKET-ASHLAND ROAD PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7053112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SAVE-A-LOT MKT-ASHLAND ROAD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SAVE-A-LOT MARKETGround Water Facility Class: CLASS A
7057861
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
RUMPKE OF NORTHERN OHIO
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7053212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RUMPKE NORTHERN OHIO DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RUMPKE NORTHERN OHIO MANSFIELD HAULINGGround Water Facility Class: CLASS A
7057862
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OHIO BIRD SANCTUARY - LOWER BUILDING
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7053412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OHIO BIRD SANCTUARY LOWER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OHIO BIRD SANCTUARY - LOWERGround Water
7057864
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SHOWTIME
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7053512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SHOWTIME DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHOWTIMEGround Water
7057865
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DOLLAR GENERAL STORE NO 324
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7053612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DOLLAR GENERAL STORE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DOLLAR GENERAL STOREGround Water Facility Class: CLASS A
7060655
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MOHICAN SCHOOL 2 -GROVE PORT RIVER LODGE
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7054212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: GROVE PORT RIVER LODGE 2 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: GROVE PORT RIVER LODGE 2Ground Water
7060671
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MOHICAN SCHOOL 3 - CHING ACH GOOK
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7054312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MOHICAN SCHL - CHING ACH GOOK 3 DISTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MOHICAN SCHOOL - CHING ACH GOOK 3 TPGround Water
7060672
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR MALABAR FARMS ST PARK HORSE CAMP PW
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7054412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 11/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ODNR MALABAR FARMS ST PARK HORSE CAMP DIGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ODNR MALABAR FARMS ST PARK HORSE CAMPGround Water
7060840
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
AUTO ZONE #0783
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7054912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: AUTO ZONE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: AUTO ZONEGround Water
7061192
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MAYFLOWER CONGREGATIONAL CHURCH
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MAYFLOWER CONGREGATIONAL CHURCH DISTRIBUGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MAYFLOWER CONGREGATIONAL CHURCHGround Water
7061207
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MCELROY CHURCH OF CHRIST PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MCELROY CHURCH OF CHRIST DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CHURCH OF CHRISTGround Water
7061208
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
CAMP MOWANA-RETREAT PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: CAMP MOWANA - RETREAT DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: CAMP MOWANA - RETREATGround Water
7061227
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
POSSUM RUN GREENHOUSES INC PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055712 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: POSSUM RUN GREENHOUSES INC. DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: POSSUM RUN GREENHOUSES INCGround Water
7061421
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FREEWILL BAPTIST CHURCH PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: FREEWILL BAPTIST CHURCH TRUSTEES DISTRIBGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: FREEWILL BAPTIST CHURCHGround Water
7061524
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
BIBLE WALK PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7055912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: BIBLE WALK DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: BIBLE WALKGround Water
7061569
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
DIAMOND HILL CATHEDRAL CHURCH PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: DIAMOND HILL CATHEDRAL DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: DIAMOND HILL CATHEDRAL CHURCHGround Water Facility Class: CLASS A
7061570
Sample(s) Required between 10/1/2013NITRITE - 1041 1 and 12/31/2013
Sample(s) Required between 10/1/2013NITRATE - 1040 1 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SHELLY ACRES SWIM CLUB PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056112 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to6/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SHELLY ACRES SWIM CLUB DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHELLY ACRES SWIM CLUBGround Water
7061587
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SHELBY DRIVING RANGE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 9/30
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SHELBY DRIVING RANGE DISTRIBUTIONGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SHELBY DRIVING RANGEGround Water
7061720
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
HDT TACTICAL SYSTEMSOH7056312
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7061772EP001 Facility Source: Ground Water
Facility Name: HDT TACTICAL SYSTEMS, INC TP
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013
Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:
2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036
PENTACHLOROPHENOL - 2326 PICLORAM - 2040
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
HDT TACTICAL SYSTEMSOH7056312
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: HDT TACTICAL SYSTEMS, INC DISTRIBUTION
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
ARMOR BEARERS MINISTRIES INT'L, INC.
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ARMOR BEARERS MINISTRIES DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ARMOR BEARERS MINISTRIES INT'L, INC.Ground Water
7061979
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
ODNR - MALABAR FARM - LOUIS BROMFIELD
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056612 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: LOUIS BROMFIELD VISITOR CENTER DISTRIBUTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: LOUIS BROMFIELD VISITOR SITEGround Water
7061994
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
IMPACT WORSHIP CENTER
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Substantial Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: IMPACT WORSHIP CENTER DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: IMPACT WORSHIP CENTERGround Water Facility Class: CLASS A
7062075
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
OHIO DREAMS ACTION SPORTS CAMP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7056912 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: OHIO DREAMS ACTION SPORTS CAMP DISTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: OHIO DREAMS ACTION SPORTS CAMPGround Water
7062080
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SNOW TRAILS NO 2 HOUSE PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7057012 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to12/1 3/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SNOW TRAILS NO 2 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SNOW TRAILS NO 2Ground Water
7062081
Not RequiredNITRITE - 1041
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
FAITH UM CHURCH OF RICHLAND COUNTYOH7057112
ENTRY POINT MONITORING SCHEDULE
Page 1 of 1
2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Chemicals Monitoring Requirements
Operating Period: to1/1 12/31
SamplingLocation
Facility ID: SMP ID:
7062434EP002 Facility Source: Ground Water Facility Class: CLASS A
Facility Name: TREATMENT PLANT
Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:
ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020
CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085
Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013
Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013
Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1
Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013
FAITH UM CHURCH OF RICHLAND COUNTYOH7057112
Page 1 of 1
2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:
Nontransient NoncommunitySystem Type:
DISTRIBUTION MONITORING SCHEDULE
Groundwater Rule Minimal Treatment System
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
SamplingLocationSamplingLocation SMP ID:
Facility ID: DS1DS000
Facility Name: DISTRIBUTION SYSTEM
5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013
Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx
1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013
ONTARIO CHRISTIAN FELLOWSHIP
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7057212 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: ONTARIO CHRISTIAN FELLOWSHIP DISTRIBUTIOGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: ONTARIO CHRISTIAN FELLOWSHIPGround Water Facility Class: CLASS A
7062227
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
APOSTOLIC CHRISTIAN CH-FELLOW HALL
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7057312 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: APOSTOLIC CHRISTIAN-FELLOWSHIP HALL DISTGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: APOSTOLIC CHRISTIAN CH-FELLOWSHIP HALLGround Water
7062240
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
MANSFIELD FUEL AND FOOD PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7057412 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to1/1 12/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: MANSFIELD FUEL AND FOOD DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: MANSFIELD FUEL AND FOODGround Water Facility Class: CLASS A
7062322
Not RequiredNITRITE - 1041
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
SNOW TRAILS NO 3 TUBING PWS
Page 1 of 1
2013 MONITORING SCHEDULE01/01/2013Effective Date:
OH7057512 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.
Groundwater Rule Minimal Treatment System
Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to12/1 3/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: SNOW TRAILS NO 3 DISTRIBUTIONGround Water
DS1
Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: SNOW TRAILS NO 3Ground Water
7062431
Sample(s) Required between 1/1/2013NITRITE - 1041 1 and 5/31/2013
Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.
RIVER TRAIL CROSSING RV PARK PWS
Page 1 of 1
2013 MONITORING SCHEDULE04/15/2013Effective Date:
OH7084812 Transient NoncommunitySystem Type:
THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378
Operating Period: to4/1 10/31
Chemicals Monitoring Requirements
DISTRIBUTION MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: DS000 Facility Source:
Facility Name: RIVER TRAIL CROSSING RV PARK DISTGround Water
DS1
Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013
Chemicals Monitoring Requirements
ENTRY POINT MONITORING SCHEDULE
SamplingLocation SMP ID:
Facility ID: EP001 Facility Source:
Facility Name: RIVER TRAIL CROSSING RV PARKGround Water
7062487
Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013
Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013
Well
Where to Collect Samples For a Small Public Water System
Treatment* PressureTank*
(First available tap after treatment*): use for NITRATEand NITRITE samples
(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples
DistributionSystem
EP001
DS000
* If system does not have treatment, EP001 is the first tap after the well.