2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · OH2900612 FAIRBORN PUBLIC WATER...

155
MOUNT ST. JOHN OH2900112 2020 DISTRIBUTION SCHEDULE Nontransient Noncommunity System Type: Ground Water Rule Substantial System Operating Period: to 1/1 12/31 01/01/2020 Effective Date: THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Also, monitoring schedules may be revised during the year based on sampling results. For water emergencies that occur after hours, please call 800-282-9378 DISTRIBUTION MONITORING SCHEDULE Chemicals Monitoring Requirements Sampling Location SMP ID: Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTION DS000 Sample(s) Required between 3/31/2020 1 TOTAL COLIFORM (TCR) - 3100 1/1/2020 and Sample(s) Required between 6/30/2020 1 4/1/2020 and Sample(s) Required between 9/30/2020 1 7/1/2020 and Sample(s) Required between 12/31/2020 1 10/1/2020 and Sample(s) Required between 3/31/2020 1 TOTAL CHLORINE - 1000 1/1/2020 and Sample(s) Required between 6/30/2020 1 4/1/2020 and Sample(s) Required between 9/30/2020 1 7/1/2020 and Sample(s) Required between 12/31/2020 1 10/1/2020 and Samples should be collected at the same time and place as the Total Coliform samples.

Transcript of 2020 ENTRY POINT SCHEDULE Effective Date: 01/01/2020 ...€¦ · OH2900612 FAIRBORN PUBLIC WATER...

  • MOUNT ST. JOHNOH2900112

    2020 DISTRIBUTION SCHEDULE

    Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: MOUNT ST. JOHN DISTRIBUTIONDS000

    Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

    Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

  • BOWERSVILLE VILLAGE PWSOH2900212

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954582EP001

    Facility Name: BOWERSVILLE VILLAGE

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • BOWERSVILLE VILLAGE PWSOH2900212

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 3365 MAYSVILLE STREET

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • BOWERSVILLE VILLAGE PWSOH2900212

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BOWERSVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Not RequiredLEAD - 1030 AND COPPER - 1022

  • FAIRBORN PUBLIC WATER SYSTEMOH2900612

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954585EP001

    Facility Name: FAIRBORN - SANDHILL

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 3Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • FAIRBORN PUBLIC WATER SYSTEMOH2900612

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960642EP002

    Facility Name: FAIRBORN - NORTH PARK

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP002EP002

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • FAIRBORN PUBLIC WATER SYSTEMOH2900612

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/202030TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and

    Sample(s) Required between 1/31/202030TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 3744 GERMANY LANE

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • FAIRBORN PUBLIC WATER SYSTEMOH2900612

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 2430 KAUFFMAN AVE

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: FAIRBORN, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • GREENE COUNTY - DAYOH2900803

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1DS201 4380 MOHAVE

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • GREENE COUNTY - DAYOH2900803

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: GREENE COUNTY - DAY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Not RequiredLEAD - 1030 AND COPPER - 1022

  • BELLBROOK WATER WORKSOH2901112

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954587EP001

    Facility Name: BELLBROOK WTP 1

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

  • BELLBROOK WATER WORKSOH2901112

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

    Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • BELLBROOK WATER WORKSOH2901112

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: BELLBROOK WATER WORKS DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • JAMESTOWN VILLAGE PWSOH2901712

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954589EP001

    Facility Name: JAMESTOWN NEW PWS

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • JAMESTOWN VILLAGE PWSOH2901712

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

    Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 202 HUNTERS POINTE

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • JAMESTOWN VILLAGE PWSOH2901712

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 35 SOUTH LIMESTONE ST.

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: JAMESTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • WRIGHT STATE UNIVERSITYOH2902012

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954592EP001

    Facility Name: WRIGHT STATE UNIVERSITY WTP

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • WRIGHT STATE UNIVERSITYOH2902012

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 1/31/202020TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and

    Sample(s) Required between 1/31/202020TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202020 2/1/2020 andSample(s) Required between 3/31/202020 3/1/2020 andSample(s) Required between 4/30/202020 4/1/2020 andSample(s) Required between 5/31/202020 5/1/2020 andSample(s) Required between 6/30/202020 6/1/2020 andSample(s) Required between 7/31/202020 7/1/2020 andSample(s) Required between 8/31/202020 8/1/2020 andSample(s) Required between 9/30/202020 9/1/2020 andSample(s) Required between 10/31/202020 10/1/2020 andSample(s) Required between 11/30/202020 11/1/2020 andSample(s) Required between 12/31/202020 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS201 UNIVERSITY HALL

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • WRIGHT STATE UNIVERSITYOH2902012

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1DS202 DIGGS LAB

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT STATE UNIVERSITY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • SPRING VALLEY VILLAGEOH2902422

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954594EP002

    Facility Name: SPRING VALLEY STU 2

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP002EP002

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 4/1/2020 and 6/30/2020

  • SPRING VALLEY VILLAGEOH2902422

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 1480 PAINTERSVILLE ROAD

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • SPRING VALLEY VILLAGEOH2902422

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 2547 US ROUTE 42 SOUTH

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY,VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • SPRING VALLEY ESTATES MHPOH2902512

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954595EP001

    Facility Name: SPRING VALLEY ESTATES MHP

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • SPRING VALLEY ESTATES MHPOH2902512

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/17/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • SPRING VALLEY ESTATES MHPOH2902512

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/17/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: SPRING VALLEY ESTATES MH DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • XENIA CITY PWSOH2902812

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954597EP001

    Facility Name: XENIA CITY

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 3Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • XENIA CITY PWSOH2902812

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/202030TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and

    Sample(s) Required between 1/31/202030TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202030 2/1/2020 andSample(s) Required between 3/31/202030 3/1/2020 andSample(s) Required between 4/30/202030 4/1/2020 andSample(s) Required between 5/31/202030 5/1/2020 andSample(s) Required between 6/30/202030 6/1/2020 andSample(s) Required between 7/31/202030 7/1/2020 andSample(s) Required between 8/31/202030 8/1/2020 andSample(s) Required between 9/30/202030 9/1/2020 andSample(s) Required between 10/31/202030 10/1/2020 andSample(s) Required between 11/30/202030 11/1/2020 andSample(s) Required between 12/31/202030 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 819 COLORADO DR.

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • XENIA CITY PWSOH2902812

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 517 UNION RD

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: XENIA, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • YELLOW SPRINGS VILLAGE PWSOH2903012

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954598EP001

    Facility Name: YELLOW SPRINGS VLG

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • YELLOW SPRINGS VILLAGE PWSOH2903012

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

    Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 DOLLAR GENERAL 1485 XENIA AVE

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • YELLOW SPRINGS VILLAGE PWSOH2903012

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 RAHN PARK DAYTON STREET

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: YELLOW SPRINGS, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • WRIGHT-PATTERSON AFB AREA B PWSOH2903312

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954600EP001

    Facility Name: WRIGHT-PATTERSON AFB AREA B STU 1

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 2Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA B PWSOH2903312

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960515EP002

    Facility Name: WRIGHT-PATTERSON AFB AREA B STU 2

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Source: Ground Water

    EP002EP002

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA B PWSOH2903312

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

    Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS201 OFF OF SPAATZ CIRCLE (TAP 1)

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • WRIGHT-PATTERSON AFB AREA B PWSOH2903312

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2DS202 C AND 10TH STREET

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, B DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954601EP001

    Facility Name: WRIGHT PATTERSON AFB AREA AREA A STU 1

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 2Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 6/1/2020 and 10/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960516EP002

    Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 2

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 2Facility Source: Ground Water

    EP002EP002

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 6/1/2020 and 10/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960517EP003

    Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 3

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Source: Ground Water

    EP003EP003

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenRADIOLOGICALS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:GROSS ALPHA - 4002 RADIUM-228 - 4030

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960518EP004

    Facility Name: WRIGHT-PATTERSON AFB AREA AREA A STU 4

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Source: Ground Water

    EP004EP004

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS000

    Sample(s) Required between 10/31/20201ASBESTOS - 1094 6/1/2020 and

    Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

    Sample(s) Required between 1/31/202015TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and

    Sample(s) Required between 1/31/202015TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and

    Samples should be collected at the same time and place as the Total Coliform samples.

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS201 MUSTANG DRIVE (TAP 19)

    Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

  • WRIGHT-PATTERSON AFB AREA A PWSOH2903412

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378

    DISTRIBUTION MONITORING SCHEDULE

    ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1DS202 SHERWOOD STREET (TAP 20)

    Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

    Chemicals Monitoring Requirements

    SamplingLocationSamplingLocation SMP ID:

    Facility ID: DS1 Facility Name: WRIGHT-PATTERSON AFB, A/C DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

    Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

    Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

  • GREENE CO.-NORTHWEST REG WATEROH2903512

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2954602EP001

    Facility Name: GREENE CO NORTHWEST REGIONAL WTP 1

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 3Facility Source: Ground Water

    EP001EP001

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • GREENE CO.-NORTHWEST REG WATEROH2903512

    ENTRY POINT MONITORING SCHEDULE

    2020 ENTRY POINT SCHEDULE

    CommunitySystem Type: Operating Period: to1/1 12/31

    SamplingLocation

    Facility ID: SMP ID:

    2960519EP002

    Facility Name: GREENE CO. NORTHWEST REGIONAL WTP 2

    Effective Date: 01/01/2020

    THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.Also, monitoring schedules may be revised during the year based on sampling results.

    For water emergencies that occur after hours, please call 800-282-9378** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

    Chemicals Monitoring Requirements

    Facility Class: CLASS 1Facility Source: Ground Water

    EP002EP002

    Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

    Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -

    Sample(s) Required betweenNITRITE - 1041 1 1/1/2020 and 5/31/2020

    Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 5/31/2020

    Not RequiredRADIOLOGICALS

    Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

    Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

  • GREENE CO.-NORTHWEST REG WATEROH2903512

    2020 DISTRIBUTION SCHEDULE

    CommunitySystem Type: Ground Water Rule Substantial System

    Operating Period: to1/1 12/31

    01/01/2020Effective Date:

    THIS SCHEDULE MAY NOT INCLUDE ALL MON