Installation
2
Outline
• Parts to install
• Equipment and methods per item
• Example for Horns Rev
Tomorrow:
A2Sea and Ballast Nedam
2
3
Parts to install
4
Parts to install
3
5
Parts to install
6
Parts to install
4
7
OWT installation
•Foundation pile
•(Transition piece)
•Tower
•Nacelle
•Blades
8
OWT installation
Foundation pile:
•Driving
•Drilling
•Suction
5
9
Scour Protection Installation Driving Pile
OWT installation
10
OWT installation
6
11
12
7
13
Suction Bucket for 3MW turbine in Frederikshavn, Denmark
14
OWT installation
Transition Piece:
• To connect all external details: boat landing, J-tubes, platform
• To correct driving misalignment
• To offer a flange
8
15
OWT installation
16
OWT installation
At Arklow Banks: misalignment < 0.1o
Arklow Wind Farm, Ireland7 x GE 3.6 Offshore
9
17
OWT installation
18
Slip-Joint
OWT installation
10
19
OWT installation
20
Turbine installation
11
21
Turbine installation
“Bunny Ear Method”
22
Cable installation
•In-field cables
•Shore connection
•Connection to turbine
•Landfall
12
23
Cable installation
24
Cable installation
13
25
Cable installation
26
Cable installation
Trenching against:
•Fishing gear
•Anchors
•….
Or rock-dump
14
27
Cable installation
28
Shore Connection
15
29
Shore Connection
30
Shore Connection
Directional Drilling
16
31
Transformation Platform
32
Transformation Platform
17
33
# of vessels
•Foundation pile•Transition piece•Tower + turbine•Rock dumping•Cable laying•Trenching•Diver support
•Heavy lifting•Shore connection•Tugs•Personnel transp.
11 topics
> 20 vessels
34
Players
A2Sea
18
35
Players
Mammoet van Oord
36
Players
Seacore
19
37
Players
Mayflower Energy