Offshore Wind Farm Design: Installation

19
1 Installation 2 Outline Parts to install Equipment and methods per item Example for Horns Rev Tomorrow: A2Sea and Ballast Nedam

Transcript of Offshore Wind Farm Design: Installation

Page 1: Offshore Wind Farm Design: Installation

1

1

Installation

2

Outline

• Parts to install

• Equipment and methods per item

• Example for Horns Rev

Tomorrow:

A2Sea and Ballast Nedam

Page 2: Offshore Wind Farm Design: Installation

2

3

Parts to install

4

Parts to install

Page 3: Offshore Wind Farm Design: Installation

3

5

Parts to install

6

Parts to install

Page 4: Offshore Wind Farm Design: Installation

4

7

OWT installation

•Foundation pile

•(Transition piece)

•Tower

•Nacelle

•Blades

8

OWT installation

Foundation pile:

•Driving

•Drilling

•Suction

Page 5: Offshore Wind Farm Design: Installation

5

9

Scour Protection Installation Driving Pile

OWT installation

10

OWT installation

Page 6: Offshore Wind Farm Design: Installation

6

11

12

Page 7: Offshore Wind Farm Design: Installation

7

13

Suction Bucket for 3MW turbine in Frederikshavn, Denmark

14

OWT installation

Transition Piece:

• To connect all external details: boat landing, J-tubes, platform

• To correct driving misalignment

• To offer a flange

Page 8: Offshore Wind Farm Design: Installation

8

15

OWT installation

16

OWT installation

At Arklow Banks: misalignment < 0.1o

Arklow Wind Farm, Ireland7 x GE 3.6 Offshore

Page 9: Offshore Wind Farm Design: Installation

9

17

OWT installation

18

Slip-Joint

OWT installation

Page 10: Offshore Wind Farm Design: Installation

10

19

OWT installation

20

Turbine installation

Page 11: Offshore Wind Farm Design: Installation

11

21

Turbine installation

“Bunny Ear Method”

22

Cable installation

•In-field cables

•Shore connection

•Connection to turbine

•Landfall

Page 12: Offshore Wind Farm Design: Installation

12

23

Cable installation

24

Cable installation

Page 13: Offshore Wind Farm Design: Installation

13

25

Cable installation

26

Cable installation

Trenching against:

•Fishing gear

•Anchors

•….

Or rock-dump

Page 14: Offshore Wind Farm Design: Installation

14

27

Cable installation

28

Shore Connection

Page 15: Offshore Wind Farm Design: Installation

15

29

Shore Connection

30

Shore Connection

Directional Drilling

Page 16: Offshore Wind Farm Design: Installation

16

31

Transformation Platform

32

Transformation Platform

Page 17: Offshore Wind Farm Design: Installation

17

33

# of vessels

•Foundation pile•Transition piece•Tower + turbine•Rock dumping•Cable laying•Trenching•Diver support

•Heavy lifting•Shore connection•Tugs•Personnel transp.

11 topics

> 20 vessels

34

Players

A2Sea

Page 18: Offshore Wind Farm Design: Installation

18

35

Players

Mammoet van Oord

36

Players

Seacore

Page 19: Offshore Wind Farm Design: Installation

19

37

Players

Mayflower Energy