Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan...

52
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course

Transcript of Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan...

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Module 4Work Zone Applications

Traffic Control Plan Development Course

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy Common Work Zone

ProjectsA wide variety of projects for

TTC existSome include:

– Mill and Overlay– CPI– Left turn lane construction– Bridge deck repair– ADA jobs– Full reconstruction (cross-over &

detour)2

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy Common Work Zone

ProjectsCont.

– Bridge painting– Centerline Rumbles

3

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Temporary traffic control strategies, devices, and contracting/ construction techniques and coordination are used to facilitate traffic flow and safety through and around work zones

4

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Construction Phasing/Staging– Staging refers to how the contractor

will position the equipment and materials

– Phasing refers to the sequencing of the aspects of the project-one project at a time

– The impacts of a work zone on traffic can be minimized by using operationally-sensitive phasing and staging throughout the life of the project 5

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Full Roadway Closures– Involves complete closure of a roadway

for periods of time to minimize the duration of the project and improve worker safety

– Closures maybe brief, short-term or long-term

– Lane shifts or closures last for varying durations of time

6

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Reduced Lane Widths to Maintain Number of Lanes (Constriction)– Involves reducing the width of one or

more lanes to maintain the existing number of lanes

– Reduce shoulder width to maintain number of lanes

– Shoulder closures– Lane shift to shoulder/median

7

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

One-Lane, Two-Way Operation– Involves using one lane for both

directions of traffic, allowing work activities to occur in the other lane that is now closed

8

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Two-Way Traffic on One Side of Divided Facility (Crossover)– Involves closing one side of a divided

facility to permit the work to proceed without traffic interference while both directions of traffic are accommodated on the opposing side of the roadway

9

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Reversible Lanes– Also known as variable lanes or contra-

flow lanes, involves sharing lane(s) of travel to accommodate peak-period traffic flow

10

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Ramp Closures/Relocation– Closing one or more ramps in or near

the work zone for specific time periods or construction phases to allow work access or improve traffic flow on the mainline

11

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Freeway-To-Freeway Interchange Closures– Involves closing one or more freeway-

to-freeway interchange connectors over a period of time

12

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Night Work– Work is performed at night (end of

evening peak period to beginning of morning peak period) to minimize work zone impacts on traffic and adjacent businesses

13

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Weekend Work– Construction work (all or individual

phases) is restricted to weekend periods from the end of the Friday afternoon peak period to the beginning of the Monday morning peak period

14

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Work Hour Restrictions for Peak Travel– Restricting work hours of the work that

may impact traffic does not occur during periods of peak travel demand and congestion (e.g., peak hours, holidays, and special events)

15

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Pedestrian/Bicycle Access Improvements– Involves providing alternate facilities

for bicyclists and pedestrians (including those with disabilities in accordance with the Americans with Disabilities Act of 1990) in places where the work zone impacts their accessibility

16

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Business Access Improvements– Some projects will have a direct impact

on businesses, particularly to accessibility

– Accessibility improvements for businesses may include signage or information to direct motorists to the business(es) and/or relocation of access locations

17

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Control Strategies

Off-Site Detours/Use of Alternate Routes– Involves re-routing some or all traffic

off of the roadway under construction and to other existing roadways

18

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

19

MUTCD Work Zone Layout

Common Work Zone Layouts– Trained Editorial Discussion – Keeping Editorial No-nonsense

(TED)

(KEN)

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

20

MUTCD Work Zone Layout

6J-I General– These layouts should be used during

the development of detailed traffic control plans

– They should only be used under the direction of a traffic engineering professional

– They should be combined with the principles and figures contained elsewhere in this manual

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

21

MUTCD Work Zone Layout

Symbols

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

22

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

23

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

24

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

25

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

26

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

27

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

28

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

29

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

30

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

31

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

32

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

33

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

34

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

35

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

36

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

37

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

38

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

39

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

40

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

41

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

42

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

43

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

44

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

45

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

46

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

47

MUTCD Work Zone Layout

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

48

MUTCD Work Zone Layout

TTC Template Sheets for Stationary Work Zones

www.dot.state.mn.us/trafficeng/workzone/ttc-templets.html#metro

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier Use

Positive Work Zone Protection– Title 23 CFR 630.1108(a) indicates that

the need for longitudinal traffic barrier and other positive protection devices shall be based on an engineering study

49

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier Use

Positive Work Zone Protection– Use positive protective measures to

separate workers on highway construction projects

– Use temporary longitudinal traffic barriers to protect workers on highway construction projects in long-duration stationary work zones when the project design speed is anticipated to be high & the nature of the work requires workers to be within 1 lane-width from the edge of a live travel lane 50

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier Use

Positive Work Zone Protection– When positive protective devices are

necessary, those devices are paid for on a unit-pay basis, unless doing so would create a conflict with innovative contracting approaches, such as designbuild or some performance-based contracts

51

Offi

ce o

f Tr

affi

c, S

afe

ty a

nd

Tech

nolo

gy

Barrier Use

Work Zone Drop-Offs– Additional channelizing devices should be

placed in areas that may be considered hazardous to the public or workers• Full longitudinal channelizing when traffic is

adjacent to longitudinal drop-offs greater than 4 inches

• Full longitudinal channelizing and barriers when traffic is adjacent to longitudinal drop-offs greater than 12 inches

• Full longitudinal channelizing when roadway geometry, dust, weather, or darkness restricts visibility of the open travel lane

52