Work Zone Traffic Management Guide

200
!"#$%"#& () !*(+,- ./"01 2*34/",3) 521464%+7 8#"1,/9 :;< =%"-4 ><:?

Transcript of Work Zone Traffic Management Guide

Prepared by Public Works Authority Ashghal`Version 1.0 March 20131INTRODUCTION 1.1Background1.11.2Document Structure1.11.3Objective of the Guide1.11.4Principles of Temporary Traffc Management - RESPECT1.21.5Contractual Requirements 1.21.6Defnitions1.21.7Glossary1.31.8Roles and Responsibilities 1.51.8.1Roads Authority1.51.8.2Ministry of nterior (Traffc Police)1.51.8.3Utility Agencies1.51.8.4TDP Designer1.51.8.5TDP Reviewer / Safety Auditor / nspector1.61.8.6TDP Contractor1.61.8.7Site Traffc Management Supervisor1.61.8.8Site Traffc Management Personnel 1.62PRINCIPLES OF TEMPORARY TRAFFIC MANAGEMENT2.12.1Safe System2.12.2Objectives of TTM2.12.3Types of Work2.12.3.1Static2.12.3.2nspection/Maintenance2.22.3.3Mobile2.22.3.4Emergency2.22.3.5Area wide2.22.3.6Duration 2.22.4Work Type Considerations 2.32.4.1Staging of Works 2.42.5Traffc Diversion Plans (TDPs)2.42.5.1Defnition and objective of TDP2.42.5.2QPro and Road Opening Permits2.42.5.3What to include in a TDP2.42.5.4Generic TDPs2.52.5.5Amendments2.52.5.6dentifcation of Stakeholders2.52.5.7Stakeholder Engagement2.62.6TDP Design Considerations2.62.6.1Types of Road2.62.6.2Consistency2.72.6.3Departures from standard2.72.6.4Work Zone Road Safety Audits2.82.6.5Risk Assessment 2.82.6.6ncident Documenting Process 2.92.6.7Mitigating Measures2.92.7Training and Accreditation 2.9 3PROCESSES3.13.1Overview3.13.2Planning3.23.2.1nstigating the Process3.23.2.2Preparation of Traffc Diversion Plan3.23.2.3Work Zone Stage 2 Road Safety Audit3.2TABLE OF CONTENTS3.2.4Review of Traffc Diversion Plan3.23.3Approval3.43.3.1Submission for Approval3.43.3.2Review and Analysis 3.43.3.3Approval 3.43.4mplementation3.63.4.1TTM mplementation 3.63.4.2Verifcation of Compliance3.63.5nspection and Enforcement3.83.5.1Routine On-site nspections3.83.5.2Work Zone Stage 3 Road Safety Audit3.83.5.3Monitoring and Non-Conformance Reporting3.83.6Clearance and Reopening 3.103.6.1Notifcation of Completion3.103.6.2Clearance 3.103.6.3Re-opening3.103.7Emergencies and Unplanned Works3.124PRINCIPLES OF WORKS ZONES 4.14.1General Principles4.14.2Multiple Work Zones4.14.3Lateral Components4.14.3.1Works Area4.14.3.2Lateral Safety Buffer4.14.4Longitudinal Components 4.54.4.1Advance Warning Area4.54.4.2Transition Area (Taper)4.54.4.3Longitudinal Safety Buffer 4.74.4.4Works Area4.74.4.5Termination Area 4.74.5Carriageway narrowing on single carriageways4.84.6Lane reduction on divided carriageways4.104.7Pedestrian safety4.104.8Speed Limits through Work Zones4.124.8.1Speed Enforcement4.134.9Work Zone mplementation, Maintenance and Clearance4.134.9.1mplementation4.134.9.2Maintenance4.134.9.3Clearance4.145EQUIPMENT5.15.1Principles5.15.2Confict with Permanent TCDs5.15.3Signing5.15.3.1Sign Sizes5.25.3.2Sign Locations5.35.3.3Warning Signs5.35.3.4Mandatory and Regulatory Signing5.75.3.5Diversion Signing 5.105.3.6nformation Signing5.115.3.7Sign Supports5.135.4Temporary Safety Barriers 5.145.4.1Delineation of safety barriers and barricades5.145.4.2End Treatments5.155.5Traffc Channeling Devices5.155.5.1Temporary water-flled barricades5.155.5.2Traffc Cones5.165.5.3Screens 5.175.5.4Permeable delineation5.175.5.5Road Markings5.175.6Work Zones at night time5.185.7Other Devices and Equipment5.185.7.1Portable Traffc Signals5.185.7.2Electronic Arrow Boards5.195.7.3Dynamic Message Signs (DMS)5.205.7.4Speed Cameras5.205.7.5Vehicles 5.215.7.6Truck and Trailer Mounted Attenuators5.225.7.7High Visibility Clothing5.226TYPICAL LAYOUTS6.16.1ntroduction6.16.2nterpretation and Application6.16.3General principles6.16.3.1Lateral and Longitudinal Components6.16.3.2Pedestrian Provision in Work Zones6.16.3.3Traffc Control Devices6.16.3.4Temporary Safety Barriers and Channeling Devices6.16.3.5Temporary Speed Limits6.16.3.6Work Zones at Night Time 6.16.4Production of Traffc Management Drawings (TMD)6.26.4.1Use of TL Selection Tables6.26.4.2nterpretation of the TLs6.26.4.3Applying TLs to site-specifc drawings6.26.5Typical Layout Selection Tables6.3Appendix A - Traffic Diversion PIan Registration FormAppendix B - SampIe Work Zone Contract CIauseAppendix C - Brief Incident Report FormAppendix D - SampIe Site Assessment Report and Non-Conformance NoticeAppendix E - User Response FormAppendix F- Screen DetaiIsTABLE OF TABLESTable 1.1General Traffc Management Defnitions1.3Table 2.1Guidance on Selection of Appropriate TTM for various Work Types and Duration2.3Table 2.2Road Types2.7Table 2.3Requirement for Work Zone Road Safety Audits2.8Table 4.1Clear Zone values4.3Table 4.2Barrier/Channeling Device Decision Chart4.4Table 4.3Taper Lengths4.7Table 4.4Longitudinal Safety Buffer length4.7Table 4.5Traffc Control Decision Chart4.9Table 5.1Sign Shape and Color Standards5.2Table 5.2Chromaticity and luminance factors for yellow sign face material5.2Table 5.3Standard sign sizes in Work Zones5.3Table 5.4Warning Signs specifcally for Work Zones5.3Table 5.5Other Warning Signs when used within Work Zones5.6Table 5.6Mandatory and Regulatory Signs associated with Work Zones 5.7Table 5.7Other Regulatory Signs when used within Work Zones5.9Table 5.8Diversion Signs5.10Table 5.9nformation Signs5.11Table 5.10Flashing Lamp or Beacon Spacing5.15Table 5.11Traffc Cone Spacing5.17Table 5.12Road markings within Long-Term Work Zones5.17Table 6.1Static TTM Selection Table6.3Table 6.2Mobile/Short-term Works Selection Table6.4TABLE OF FIGURESFigure 2.1Risk Assessment Matrix2.9Figure 3.1Processes3.1Figure 3.2Stage 1 Workfow Planning3.3Figure 3.3Stage 2 Workfow Approval3.5Figure 3.4Stage 3 Workfow mplementation3.7Figure 3.5Stage 4 Workfow nspection and Enforcement3.9Figure 3.6Stage 5 Workfow Clearance and Reopening3.11Figure 4.1Lateral Work Zone Components (Long Term Works)4.2Figure 4.2Lateral Work Zone Components (Short and Medium Term Works)4.3Figure 4.3Lateral Work Zone Components (Departure for Short Term Works only) 4.4Figure 4.4Longitudinal Work Zone Components4.5Figure 4.5Advance Warning Area signing4.6Figure 4.6Minor Works signing4.8Figure 4.7Footway Diversion into the Carriageway4.10Figure 4.8Pedestrian Provision4.11Figure 4.9Pedestrian Provision (increased hazard)4.11Figure 4.10Example of Speed Reduction Signing Requirement4.12Figure 6.1Key to Symbols used on Typical Layouts6.31INTRODUCTIONQatar Work Zone Traffc Management Guide!"!!"!#!$ %&'()*+,'%)&!"!$ -./0123456As part of the operation and maintenance of a highway network, it is necessary at times to implement Temporary Traffc Management (TTM) measures to facilitate road works, temporary closures or incident management.Work Zones on or near a road may affect the safety and limit the free movement of road users through and in the vicinity of the Work Zone.t is therefore particularly important to plan all works activities to optimize road safety, road space and work effciency whilst minimizing congestion, delay and inconvenience for all road users.All planned works on roads accessible to the public that will have an effect on the operation of the road require a Traffc Diversion Plan (TDP) to be prepared in accordance with this Guide.The TDP consists of a set of documents produced by the agency proposing the works, or their contractor, that details the processes to be followed for a specifc Work Zone to plan, gain approval, implement, maintain and clear TTM devices associated with that Work Zone in a safe and effective manner.!"7$ *3/4895:$;:24/:429Following this introductory Chapter, this document is divided into fve further Chapters: Chapter 2 defnes the principles of Temporary Traffc Management, explains how to classify works according to activity, road type and duration, and provides a framework for developing a Traffc Diversion Plan (TDP); Chapter 3 describes the detailed processes to be followed in the planning, implementation, monitoring and decommissioning of temporary traffc management.t describes the interface with the QPro system and how to submit a Traffc Diversion Plan for approval; Chapter 4 defnes the principles that must be applied to the implementation of Work Zones to ensure an acceptable level of safety;Chapter 5 provides a detailed description of the Traffc Control Devices, delineation devices and other devices and equipment specifcally associated with Work Zones, and provides instructions for their deployment; and Chapter 6 gives a number of Typical Layouts, mainly for long-term works, that can be used or adapted to provide a Traffc Management Drawing for a specifc Work Zone.Specifc layouts are provided for Mobile and Short and Medium term works.These are only to be used following a site-specifc risk assessment that departure from full static TTM is acceptable.!"9/:?@9$3A$:B9$C4?69The objective of this Guide is to provide all agencies, authorities, consultants and contractors engaged in work on or alongside the road with clear and comprehensive guidance on temporary traffc management measures to ensure:Safe and effcient passage of vehicles and other road users though road works; andSafe work environments for road workers whilst minimizing disruption in the adjoining road network.This Guide describes the temporary traffc measures that shall be used at Work Zones on all public roads to warn, instruct and guide road users in the safe negotiation through or around the Work Zone.t also describes the special signs to be used at Work Zones, and the processes that must be followed to ensure compliance.The purpose of TTM is to provide a road environment that is safe for all road users and workers during construction works, while maintaining access and traffc fow.Application of the principles detailed in this Guide will provide a uniform high standard of traffc control at Work Zones.1.2Qatar Work Zone Traffc Management Guide1.21.21.2Each Work Zone may have unique elements that will require the application of good engineering judgment.This Guide provides a set of principles for signing and delineation that will promote the safety of both the road user and road worker.The uniform and consistent treatment of similar hazards at Work Zones by the application of standardized layouts will promote safety by assisting road users in identifying potential hazards and negotiating safe passage through or around the works.1.4PrincipIes of Temporary Traffic Management - RESPECTThe purpose of Temporary Traffc Management is to warn and guide vehicles and other road users safely and effciently through work areas whilst providing protection to road workers.The following principles should be applied at all Work Zones: Responsibility to all road users;Elimination or management of conficts;Speed limits should be appropriate for the site-specifc condition; Protection of the workforce by use of appropriate safety buffers, PPE and training; Early warning of any obstructions ahead;Clear direction to all road users; andTraffc Control Devices to be designed and used in accordance with the Qatar Traffc Manual; To ensure a uniform approach to TTM, it is essential that all agencies and individuals associated with the planning, approval, implementation, inspection, enforcement and clearance of Work Zones understand and apply these principles in all stages of the Work Zone process. 1.5ContractuaI RequirementsThis document sets out a code of practice that shall be followed by any agency, designer, contractor or sub-contractor involved in the planning, approval, implementation, maintenance or removal of works on a public road.Any agency responsible for commissioning works on roads to which the public have access should make compliance with this document a condition of contract in the case of works carried out on their behalf, and any bid that does not include an element of cost for the Work Zone Traffc Management process is rejected. A sample contract clause is contained in Appendix B.The guidelines contained in this document are specifcally directed to establishing and maintaining a safe environment for road users and the workforce within Work Zones.However, they should be considered supplementary to the Occupational Safety and Health requirements as set out in the QCS.1.6DefinitionsFor the purposes of this document: "Shall or "must indicates that a particular requirement is mandatory;"Should indicates a recommendation; and"May indicates an option.Qatar Work Zone Traffc Management Guide1.31.31.7GIossaryTable 1.1 provides defnitions as applied to various terms used within this document: TabIe 1.1- GeneraI Traffic Management DefinitionsCarriageway The area of a Road that is specifcally for vehicular use, generally separated from adjacent verges, medians and footways by a curb.Carriageways may include cycle lanes where they are at the same levelClearance Plan A document that forms part of a TDP that includes a Method Statement outlining safe working practices and methodologies for the clearance of TTM.Clear Zone The roadside area adjacent to the nearest traffc lane available for safe use by errant vehicles.This area must be relatively fat, kept clear of non-frangible hazards and free of workers.Diversionary Route A temporary change in route in order to close a road or because of continuing unacceptable levels of congestion. Sometimes such a diversion may be necessary only for traffc proceeding in one direction.mplementation Plan A document that forms part of a TDP that includes a Method Statement outlining safe working practices and methodologies for the implementation of a WZTMS.Where work is staged, the ImpIementation PIan shall also describe the procedures to be followed for each change-over of TTM arrangements.Method Statement A summary of proposed procedures, prepared by the TDP Designer to describe the safe implementation, maintenance and clearance of TTM measuresNetwork Traffc mpact Assessment Details of traffc analysis and modeling to assess the impact of temporary works and diversions on the wider traffc network.May require micro-simulation for high-impact schemes.Non-Motorized Users(NMU) A term used to refer to road users who are not in motor vehicles or motorcycles (i.e. cyclists, pedestrians, wheelchair users.)Program of nspections A structured approach to the inspection and review of WZTMS by defning the responsibility for specifc reviews and inspections throughout the duration of Works.Personal Protective Equipment (PPE)All equipment (including clothing affording protection against the weather) which is intended to be worn or held by a person at work and which protects them against one or more risks to their health or safety, includingsafety helmets, gloves, eye protection, high-visibility clothing, safety footwear and safety harnesses.QPro Ashghal's internet based system for the management of Road Opening Permits and co-ordination of works on the road network.Right of Way The area of public highway, generally between property boundaries, including carriageways, cycleways, footways, verges and mediansRoad (also public road) For the purposes of this document, Road has the same defnition as Right of Way.Road Opening Permit (ROP) A permit granted by the Approvals Body, allowing the undertaking of works on the road network.Road User Any person making use of any part of a road, including pedestrians, cyclists and drivers of vehicles.!"#Qatar Work Zone Traffc Management Guide!"#!"#!"#Safety Barrier Temporary concrete or steel safety barriers that meet minimum containment testing criteria and are capable of providing redirection of vehicles whilst experiencing minimal defection.Safety Buffer The area provided around the $%&'()*+,-./0 to protect site personnel from traffc.No-one must enter the Safety Buffer in the normal course of work.t should only be necessary to enter this area to maintain cones, barriers and road signs.Materials and equipment must not be placed in this area.Stakeholder Management Plan Schedule of stakeholders likely to be affected by the works and details of how they will be notifed and engaged throughout the life of the project.Temporary Traffc Management (TTM) The physical measures and combination of traffc control devices used to guide all road users through a $%&'+1%)0 whilst ensuring the safety of road users and the workforce.Temporary Water-flled barricade A delineation device that can be flled with sand or water.Although they have a similar size and appearance to concrete 2.&&(0&3, they do not offer similar levels of defection and must therefore not be used where 3.4056+2.&&(0&3 are specifed.Traffc n general use, any road user or group of road users that pass along or across a &%.7.The term may be qualifed by 'pedestrian', 'vehicular' or 'NMU' (Non-Motorized Users) to clarify the type of traffc.Traffc Control Devices (TCD) Any signs (mandatory, warning and informatory, either fxed or electronic), delineation devices (road markings, Raised Refective Pavement Markers (RRPM), safety barriers, temporary water-flled barricades and cones) and Traffc Signals (temporary and permanent), the function of which is to regulate driver behavior to suit the road environment. Traffc Diversion Plan (TDP) A set of documents produced by an agency proposing works, or their contractor, that details the processes to be followed for a specifc Work Zone to plan, gain approval, implement, maintain and clear 889 devices associated with that Work Zone in a safe and effective manner.The 8:; will contain various documents, including but not limited to 8&.44(/+9.).*03?@ A30%), major impact to permanent road alignmentAlways required1 week 1 weekSome impact during peak periods 1 week 1 month 3 monthsMinor impact on capacity (e.g. single lane closure on 3-lane road, footway diversion on single carriageway)1 month 3 months 6 monthsUpon completion of works, the Final Completion Certifcate will not be issued until the Approvals Body is satisfed that the road has been reinstated to its original condition or better.Traffc Diversion Plan Registration Form Page 4!""#$%&'()(*(+,-".#(/012(30$#(40$51,65(4.,78#Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuidePERFORMANCE REQUIREMENT - TRAFFIC MANAGEMENTContractor ResponsibiIities and ObIigations The safety of all road users is paramount to the Employer.The Managing Contractor is responsible for managing the safe and effcient fow of traffc at all times along all highways within the Contract Area to meet the Contract Requirements.Traffic ManagementThe Managing Contractor is responsible for Traffc Management of all operations which are part of this Contract in accordance with the Qatar Work Zone Traffc Management Guide (WZTMG), the Qatar Traffc Manual (QTM) and any associated Laws and Regulations to protect the safety of the travelling public and the safety of workers.The Managing Contractor is responsible for ensuring Traffc Management operations are up to date with the latest versions of these Manuals, Laws and Regulations.Traffic Diversion PIansThe Managing Contractor shall develop and submit to the Employer, in advance of carrying out any work on site, a Traffc Diversion Plan for all activities that vary the normal operating conditions of the highway.A Traffc Diversion Plan (TDP) is a set of documents describing the nature and extent of the temporary traffc management measures at a work site and how road users will be managed to ensure their safety. TDPs shall include a summary document (see WZTMG Appendix A) containing an overview of the project and contact details of those associated with the works. t shall be accompanied by Traffc Management Drawing(s) showing the type and location of all traffc control devices needed including, but not limited to, crash attenuator vehicles, temporary traffc signs, line marking, safety barriers and electronic arrow boards. t shall also include mplementation and Clearance Plans and details of the Program of nspections.Where worked is staged, details of the change-over procedures shall also be provided.The Managing Contractor shall develop and submit generic TDPs to the O&M Project Manager for each of the standard work types covered under the Contract within 3 months of Commencement Date.The generic TDPs shall also outline methodology and sequencing details for the installation and removal of temporary traffc measures to ensure the safety of works personnel and road users by using measures such as mobile works and vehicle crash attenuators where appropriate.t should be noted that a generic TDP may not be appropriate for every situation.For any work that deviates substantially from an approved generic TDP, a job specifc TDP shall be developed and approved prior to carrying out any work. The Managing Contractor shall carry an approved TDP at each work site and be able to produce a copy on request at all times. Safety EquipmentThe Managing Contractor must ensure that all employees wear high-visibility clothing on the upper body at all times while on site. This shall include full-length sleeves to ensure full upper-body conspicuity for the wearer.When working during the hours of darkness, lower body high visibility clothing shall also be worn.High visibility warning clothing shall comply with EN 471 Table 1, Class 3 as a minimum. Qatar Work Zone Traffc Management GuideAll works vehicles must be ftted with high visibility rear chevron markings and either a roof mounted fashing amber warning light bar or two independent roof mounted fashing amber warning beacons, visible through 3600.High visibility rear chevron markings should comprise red retrorefective material and fuorescent yellow non-retrorefective material of not less than 150mm width each, inclined at 45-600 to the horizontal and point upwards. These markings should cover as much of the rear facing portion of the vehicle as possible without obscuring windows, vehicle lighting or registration plates.The outer edges of the rear surface of the vehicle shall also be defned by a red retro-refective strip at least 50mm wide. Any work vehicle located within or alongside a live traffc lane that is not adequately protected by appropriate Traffc Management measures shall either be equipped with an appropriate impact attenuator or protected by a vehicle that is equipped with an impact attenuator. !"##$%&'()&"%*The Managing Contractor shall advise the TCC Dispatch when traffc management plans are being implemented including when works are planned, when works commence and when workers are off the road and traffc fows have returned to normal. The Managing Contractor shall undertake a forecast of any traffc delays and, where appropriate, prepare a publicity plan and undertake stakeholder management for the traffc management.+,%(-)&,*./"0.%"%1'"#2-&(%',3$)'"#,.4(05,)Traffc Diversion PlansDevelop and submit generic Traffc Diversion Plans to the Employer within 3 months of the Commencement DateCopy of Traffc Diversion Plan relevant to work being carried out available onsite 100% of the time !"%*,6$,%',."/.7"%1!"#2-&(%',Traffc Diversion PlansQR 5,000 for failure to have developed and submitted the generic TMPs to the Employer within 6 months of the Commencement DateQR 3,000 for each instance where an approvedTraffc Diversion Plan for the works being carried out is not available onsite upon requestQR 1,500 per day or part thereof that the generic TMPs have not been submitted to the EmployerQR 1,000 per day or part thereof for each instance where an approved Traffc Diversion Plan for the works being carried out is not available onsite upon request!""#$%&'()(*(+,-(.$/&%#$0(1#"2,0(32,4Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideBrief ncident Reporting Form Page 1!"#$%&'()%'*+,-Project Name:Location:Client:./&+0%/'(*/0(1%-2#/-%()%'*+,-Nature of ncident: (Sketch to be provided overleaf)Location of ncident:Date of ncident:(dd/mm/yy)/ /Time of ncident:(24-hour clock):mpact of ncident on Road Network:Contributing Factors:Effectiveness of Contingency Plan:ncident Response Actions:Recommendations for any change in design, response action or works that may help to prevent recurrence of such !"#!$%"&'(Qatar Work Zone Traffc Management GuideBrief ncident Reporting Form Page 2!"#$%&'()'*+%,-#+$.Please include North Point, road names, details of temporary and permanent signs, markings, barriers, delineation and other traffc control devices as appropriate.!""#$%&'()(*(+,-".#(+&/#(!00#00-#$/(1#"23/(,$%(42$*52$623-,$7#(42/&7#Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management Guide!""#$%&'()(*(+,#-(.#,"/$,#(0/-1Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management GuideQatar Work Zone Traffic Management GuideEdition: First Edition 1.0User Response FormThe Work Zone Traffc Management Guide represents the product of extensive research, examination of global best practice and consideration of what is appropriate for Work Zones in Qatar.However, we are all human and fallible, and it is possible that there are errors or inconsistencies in this edition of the Guide. f, in the course of using the Guide, you identify any such issues, it would be greatly appreciated if you could let us know so that amendments can be incorporated in the next edition.Similarly, we would be pleased to receive any general comments you may wish to make.Please use the form below for noting any items that you wish to raise.Please complete all felds necessary to identify the relevant itemChapter Number: Appendix Letter:Page Number: Table Number: Paragraph Number: Figure Number:Description/Comment:Please continue on separate sheet if requiredYour name and contact details (optional):Name: Telephone:Organisation: email:Position: Address:You can post the completed form to:MichaeI de Roos Fabian MarshROADS SAFETY SPECIALIST Traffic & Safety SpeciaIistDesign Management (Roads Section)Public Works Authority P.O.Box 22188 Doha,QatarRoads Operations & Maintenance ManagementP.O.Box 22188 Doha,Qataror email it to:[email protected]@ashghal.gov.qaWe cannot acknowledge every response, but be assured that your comments will be read, and that your contributions will ensure that the Guide continues to meet the needs of its users.Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management Guide!""#$%&'()*(+,-##$(%#./&01(Qatar Work Zone Traffc Management GuideQatar Work Zone Traffc Management Guide