Induction ProgrammeInduction Programme
Projects & Real EstateProjects & Real Estate
-
8/8/2019 NTW Project Induction
2/25
ORGANISATION CHART(NWS- PROJECTS & REAL ESTATE)
Network Services AVP
Mr. Pawan Badika
Project Head
Mr. Rajeev Agarwal
Mr. Anurag
Singh
(Infra electrical)
Mr. Gopakumar
Pillai
(Telecomin-charge)
Mr. Anuj Rawat
(USOF In-chare)
Mr. Bharat Dhore
(OFC,
site acquisition,etc)
Mr. Jayanth
Nagampalli
MIS & budgetarymanagement
Mr. Sandeep
Sinha
(Infra civil)
Mr. Anand Jain
(3G coordinator)
Ashish Jagtap
(Txn imp & colo)
C Koul
(Telecom engineer)
G Ramesh
(Telecom engineer)
Imdadul Majid
(Telecom Engineer)
Ashok C Kumar
(OFC & Acq SPOC)
Mahesh Havaldar
(OFC)
Ram B Yadav
(OFC)
Deepanshu
(Acquisition)
Anshu Jain
(Telecom engineer)
Garaga Satish
(Telecom Engineer)
Shailendra Soni
(Infra-CG)
P. Mandal
(Telecom engineer)
Mandalika sarma
(Logistics support)
Anil Pandey
(Telecom engineer)
-
8/8/2019 NTW Project Induction
3/25
Project RolloutProject Rollout
-
8/8/2019 NTW Project Induction
4/25
Overview of Activities
Site Acquisition
Green Field Site Rooftop Site
-
8/8/2019 NTW Project Induction
5/25
Overview of Activities
Site Acquisition
Working out options of feasible locations for site installation as provided byPlanning Department
Acquisition of space for Roof Top/Ground Based sites at various towns/locationsfeasible for putting up new sites
Negotiating with owners in terms of area, rent and other terms & conditions, for
space provided at building roof top/land, at location finalized for site installation
Obtaining documents related to respective building/land from its owner &preparing documents such as drawings, lease agreements, etc. after checking therelevant documents
Liasoning with various Govt. bodies for obtaining power supply at site, NOC for
tower erection, at site.
Coordinating with legal advisors for ongoing civil litigations at various locations inMP & CG.
-
8/8/2019 NTW Project Induction
6/25
Overview of Activities
Creating Site Infrastructure
Rooftop Site Ground based Site
-
8/8/2019 NTW Project Induction
7/25
Overview of Activities
Site Infrastructure Includes
Shelter (A Pre FabricatedRoom for in housing TelecomEquipments i.e., BTS, Servo,Battery Bank etc.)
DG (Diesel Generatorfor Power backup)
Tower (A MetalStructure forSupporting Antennas
and Micro Waves)
-
8/8/2019 NTW Project Induction
8/25
Overview of Activities
Civil Execution
Tower Foundation and Erection Site Type GBT (Ground Base Tower)
RTT (Roof Top Tower)
RTP (Roof Top Pole)
-
8/8/2019 NTW Project Induction
9/25
Overview of Activities
Readiness of Infrastructure
-
8/8/2019 NTW Project Induction
10/25
Overview of Activities
Civil Execution DG Installation and Commissioning Shelter Installation
Out Door BTS Foundation
-
8/8/2019 NTW Project Induction
11/25
Overview of Activities
-
8/8/2019 NTW Project Induction
12/25
Overview of Activities
Installation & Commissioning of BTS and M/W
-
8/8/2019 NTW Project Induction
13/25
MSS/MGW Equipment Section
Glass partition In equipment room
to have cost effective operations
of ACs
Switch Room
FM 200 Cylinder
PAC
-
8/8/2019 NTW Project Induction
14/25
Transmission / POI & DDF Area
FMS
Battery Bank for BTS
-
8/8/2019 NTW Project Induction
15/25
Electrical Panel
LT Panels
-
8/8/2019 NTW Project Induction
16/25
Challenges
Legal Hassles in site Acquisition. Material shortages/ Long lead times.
Manage liasoning efforts in Rollout, specially NOCpermission.
Maintain the No-1 position in MP and CG circle in acompetitive telecom environment, new operators inqueue as well for launch of their own services.
-
8/8/2019 NTW Project Induction
17/25
Achievements
Cumulative commissioned more than 5950 BTS Site
& covering More then 4000 towns.
-
8/8/2019 NTW Project Induction
18/25
Overview of Activities
Site handing over to O & M for Maintenance
-
8/8/2019 NTW Project Induction
19/25
USOFUSOF
MP and CGMP and CG
-
8/8/2019 NTW Project Induction
20/25
What is USOF project all about?
1. USOF project is agreement for provision of mobile
services in specified rural and remote areas.
2. USOF site basically consists of one IP (Infra provider)
and three USPs (Universal service providers).3. Services will be launched individually by each USP
under single tower and maintenance charges will be
shared amongst all three USPs.
-
8/8/2019 NTW Project Induction
21/25
USOF Project
39
34
37
36
16
43
42
41
40
18
17
15
Bastar
Rajghar
Guna & Ashok
Nagar
Vidisha
Sidhi
Circle
NameIP Name Other USP
Total
ClusterTotal sites
MP Circle BSNL BSNL & RT 8 722
BSNLBSNL, RT
&RC3 322
NIT BSNL & RT 1 150
12 1194
CG Circle
Total
-
8/8/2019 NTW Project Induction
22/25
Highlights and achievements
First operator in MP and CG to reach at coverage of
More then 800 USOF towns where as other competitors
couldnt even match 50% of our USOF coverage.
Target and challenges
Launch services prior to the operators which are not thepart of USOF agreement like Airtel in order to increase
mobile penetration.
-
8/8/2019 NTW Project Induction
23/25
NLDNLD
MP and CGMP and CG
-
8/8/2019 NTW Project Induction
24/25
MP Fiber Network Map
Jhabua
Badwah
Bhusaval
Sanawad
Ratllam Ujjain
Biaora
Bhopal
Indore
Sagar
Jabalpur
Allahabad
Satna
Garwah
Ambikapur
Korba
Champa
Bilaspur
Raipur
Nagpur
Sawaimadhopur
Gwalior
Agra
Bareli
Seoni
Dhamnod
Sanoda
Shivpuri
Jhansi
Pithampur
Guna
Ashok Nagar
Itarsi
Multai
Neemuch
Mandsaur
Towards Rajasthan
Bhind
Dabra
Harda
KhandwaChindwara Raigarh
Kathgora
Robertganj
Singroli
Rewa
Pandurna
Towards Gujarat
ON
I
I
OFC
76
WI
ICLOFCOWN/
WAP)
7
Kota
-
8/8/2019 NTW Project Induction
25/25