NTPC Performance December 08

download NTPC Performance December 08

of 53

Transcript of NTPC Performance December 08

  • 7/31/2019 NTPC Performance December 08

    1/53

    WRHQ

    Wish you a very Happy & Wonderful New Year 2009

    http://www.pbase.com/chris_green/things_that_growhttp://www.pbase.com/chris_green/things_that_growhttp://www.pbase.com/chris_green/things_that_grow
  • 7/31/2019 NTPC Performance December 08

    2/53

    WRHQ

    Wish you a very Happy & Wonderful New Year 2009

  • 7/31/2019 NTPC Performance December 08

    3/53

    WRHQ

  • 7/31/2019 NTPC Performance December 08

    4/53

    WRHQ

    Highlights

    Kahalgaon Unit 6 declared commercial on30.12.2008

    Sipat Unit 5 declared commercial on

    01.01.2009 NTPC recorded highest ever day Generation

    of 629.325 MUs on 17.12. 2008

    NTPC Coal Stations recorded highest day

    Generation of 559.738 MUs on 16.12.2008

    Vindhyachal recorded highest day

    generation of 80.606 MUs on 03.12.2008

  • 7/31/2019 NTPC Performance December 08

    5/53

    WRHQ

    (Dec 2008)

  • 7/31/2019 NTPC Performance December 08

    6/53

    WRHQ

    Monthly Performance

    NTPC Coal station = Mus

    Generation MUs

    (Dec 2008)

    2338.5

    1992.9

    1970.8

    1590

    1524.3

    1488.3

    1

    072.3

    972.3

    787.8

    771.3

    649.2

    475.3

    468.8

    344.6

    306.1

    0

    400

    800

    1200

    1600

    2000

    2400

    2800

    Vindh

    yachal

    Talcher

    Kaniha

    Ramag

    undam

    Korba

    Rihand

    S

    ingrauli

    F

    arakka

    Kah

    algaon

    Un

    chahar

    Simhadri

    Dad

    ri(Coal)

    Badarpur

    Sipat

    Talcher

    T

    hermal

    Tanda

    MonthlyG

    en(MUs)

    16752

    15770(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    7/53WRHQ

    Monthly Performance

    NTPC Coal station = %

    PLF %

    103

    .87

    103

    .67

    102

    .44

    101

    .88

    101

    .76

    101

    .32

    100

    .85

    100

    .69

    100

    .02

    96

    .41

    93

    .51

    90

    .62

    90

    .08

    89

    .29

    85

    .92

    0

    20

    40

    60

    80

    100

    120

    Da

    dri

    (Coa

    l)

    Simha

    dri

    Rihan

    d

    Ramagun

    dam

    Korba

    Sipa

    t

    Unc

    ha

    har

    Ta

    lcher

    Therma

    l

    Singrau

    li

    V

    indhyac

    ha

    l

    Tan

    da

    Ba

    darpur

    Fara

    kka

    Ta

    lcher

    Kan

    iha

    Ka

    ha

    lgaon

    PLF(%)

    (Dec 2008)

    97.11

    96.81(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    8/53WRHQ

    Monthly Performance

    NTPC Coal Station = %

    Availability Factor %

    (Dec 2008)

    100

    100

    99

    .95

    99

    .83

    99

    .72

    99

    .17

    98

    .56

    98

    .48

    97

    .75

    97

    .55

    97

    .47

    95

    .48

    94

    .25

    93

    .54

    91

    .75

    86

    88

    90

    92

    94

    96

    98

    100

    102

    Sipa

    t

    Sim

    ha

    dri

    Ta

    lcher

    Ka

    niha

    Da

    dri(

    Coa

    l)

    Ramagun

    dam

    Talcher

    The

    rma

    l

    Rihan

    d

    K

    orba

    Ka

    halgaon

    Unch

    ahar

    Sing

    rau

    li

    Far

    akka

    Vindhya

    cha

    l

    Badarpur

    T

    an

    da

    AVF

    (%)

    97.72

    95.77(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    9/53WRHQ

    Monthly Performance

    NTPC Coal Station = %

    Planned Outage %

    0 0 0 0 0 0 0 0 0 0 0 0

    2.9

    53.0

    73.2

    6

    0

    1

    1

    2

    2

    3

    3

    4

    Singrauli

    Rihand

    Unchahar

    Dadri(Coal)

    K

    orba

    Vindhy

    achal

    Sipat

    Ramagu

    ndam

    Sim

    hadri

    Kaha

    lgaon

    Ta

    lcher

    Kaniha

    Ta

    lcher

    Th

    ermal

    Fa

    rakka

    T

    anda

    Bad

    arpur

    Planned

    outage%

    (Dec 2008)

    0.36

    2.19(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    10/53WRHQ

    Monthly Performance

    NTPC Coal Stations = %

    Forced outage

    (Dec 2008)

    0 0 0 0.0

    50.2

    8 0.83 1

    .44

    1

    .52

    1

    .58 2

    .25

    2.4

    5

    2.5

    3 3.2

    5.1

    8 5.75

    0

    1

    2

    3

    4

    5

    6

    7

    Da

    dri(Coal)

    Sipat

    Simhadri

    Talche

    rKaniha

    Rama

    gundam

    Talcher

    Thermal

    Rihand

    Korba

    Farakka

    Kahalgaon

    U

    nchahar

    Singrauli

    Badarpur

    Tanda

    Vindhyachal

    Forcedoutage

    %

    1.91

    1.89(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    11/53WRHQ

    Monthly Performance

    NTPC Coal Stations = %

    Equipment Partial Loss %

    (Dec 2008)

    0 0.

    01

    0.

    04

    0.

    05

    0.

    07

    0.

    12

    0.

    12

    0.

    15

    0

    .26

    0

    .27

    0.

    31

    0.

    32

    0.

    38 0

    .53

    0.

    77

    0.0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    Dadri(Coal)

    Sipat

    Talcher

    Kaniha

    Rihand

    Talcher

    Thermal

    S

    ingrauli

    U

    nchahar

    Korba

    Vind

    hyachal

    Ramagundam

    S

    imhadri

    Farakka

    Tanda

    B

    adarpur

    Ka

    halgaon

    Equpt.Pa

    rtialLoss%

    0.21

    0.16(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    12/53WRHQ

    Monthly Performance

    NTPC Coal Stations = %

    APC %

    (Dec 2008)

    6.37

    5.

    07

    5.

    18

    5.

    22

    5.

    55.

    95

    6.

    04

    6.

    09

    6.

    15

    6.

    65

    7.

    12

    7.

    71

    7.

    72

    9.

    22

    9.

    54

    12.

    1

    0

    2

    4

    6

    8

    10

    12

    14

    Simha

    dri

    Sipa

    t

    Ramagun

    da

    m Ta

    lcher

    Kan

    iha

    Fara

    kka

    Rihan

    d

    Vindhyac

    ha

    l

    Korba

    Singrau

    li

    Da

    dri

    (Coa

    l)

    U

    nc

    ha

    har

    Ka

    ha

    lgaon

    Ba

    darpur

    Ta

    lcher

    Therma

    l

    Tan

    da

    A

    PC%

    6.38(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    13/53WRHQ

    Monthly Performance

    NTPC Coal Stations = ml/KWh

    Specific Oil ml/KWh

    (Dec 2008)

    0.0

    10.0

    4

    0.0

    4

    0.0

    5

    0.0

    6

    0.0

    70.1

    2

    0.1

    30.1

    40.1

    4

    0.3

    80.5

    60.6

    1 0.7

    50.7

    9

    0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    Sipat

    Dad

    ri(Coal)

    Ramagundam

    Korba

    S

    imhadri

    Rihand

    Unchahar

    Talcher

    Thermal

    S

    ingrauli

    Vind

    hyachal

    Kahalgaon

    Tanda

    B

    adarpur

    TalcherKaniha

    Farakka

    Sp.O

    il

    (ml/KWhr)

    0.25

    0.16(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    14/53WRHQ

    Monthly Performance

    NTPC Coal Stations = Kg/ KWh

    Specific Coal Kg/KWh

    (Dec 2008)

    0.699

    0.5

    98

    0.6

    18

    0.6

    23

    0.6

    45

    0.6

    61

    0.6

    68

    0.6

    82

    0.7

    0.7

    09

    0.7

    37

    0.7

    68

    0.7

    91

    0.8

    0.8

    03

    0.8

    17

    0

    0.1

    0.2

    0.30.4

    0.5

    0.6

    0.7

    0.8

    0.9

    Ramag

    unda

    m

    Dadri(Coal)

    Rihand

    Unch

    ahar

    Sipat

    K

    orba

    Sing

    rauli

    Vindhyachal

    Sim

    hadri

    T

    anda

    Talcher

    The

    rmal

    Far

    akka

    Badarpur

    Ta

    lcher

    Ka

    niha

    Kahalgaon

    Sp.

    Coal(

    Kg/KWH)

    0.695(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    15/53WRHQ

    Monthly Performance

    NTPC Coal Stations = Kcal/Kwh

    Heat Rate Kcal/KWh

    (Dec 2008)

    2332

    2346

    2346

    2350

    2367

    2368

    2372

    2373

    2376

    2381

    2408

    2413

    2685

    2719

    2852

    0

    500

    1000

    1500

    2000

    2500

    3000

    Rihan

    d

    Sipa

    t

    Sim

    ha

    dri

    Ta

    lcher

    Kan

    iha

    K

    orba

    Vindhyac

    ha

    l

    Singrau

    li

    Ramag

    un

    da

    mUnc

    ha

    har

    Da

    dri(Coa

    l)

    Fara

    kka

    Ka

    ha

    lgaon

    Bad

    arpur

    T

    an

    da

    Ta

    lcher

    Therma

    l

    Hea

    tRa

    te(Kca

    l/Kw

    h)

    2393

    2396(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    16/53WRHQ

    Monthly Performance

    NTPC Coal Stations = MUs

    Grid Loss ( outage + PL) MUs

    (Dec 2008)

    34

    0 0 0 0 0 0 0 0.3 1

    .3 2 2 2.5 4

    .6 5.8

    15.4

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    Korba

    Vin

    dhyac

    ha

    l

    Sipa

    t

    Ramagun

    da

    mSimhadri

    Ta

    lcher

    Kaniha

    Ta

    lcher

    Thermal

    Tanda

    Unc

    ha

    har

    Rihan

    d

    Da

    dri

    (Coa

    l)

    Singrauli

    Farakka

    K

    ahalgaon

    Badarpur

    Gri

    dLoss

    (Mus

    )

    4.1(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    17/53WRHQNTPC Coal Stations = MUs

    Coal Loss MUs

    (Dec 2008)

    419

    0 0 0 0 0 0 0 0 0 0 0 0

    64

    .81

    07

    .4

    246.8

    0

    50

    100

    150

    200

    250

    300

    Singrau

    li

    Rihan

    d

    Unc

    ha

    har

    Tan

    da

    Da

    dri

    (Coa

    l)

    Ba

    darpur

    Korba

    Vin

    dhyac

    ha

    l

    Sipa

    t

    Ram

    agun

    dam

    Simha

    dri

    Ta

    lcher

    Therma

    l

    Fara

    kka

    K

    aha

    lgaon

    Ta

    lcher

    Kan

    iha

    Lo

    ss

    Coa

    l(Mus

    )

    Monthly Performance

    166.7(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    18/53WRHQ

    Monthly Performance

    NTPC Coal Stations = Nos.

    No. of Outages

    (Dec 2008)

    0 0 01 1 1 1

    2

    4 45

    67

    9

    11

    0

    2

    4

    6

    8

    10

    12

    Sipat

    Ram

    agundam

    Simhadri

    Rihand

    D

    adri(Coal)

    Talch

    erKaniha

    Talcher

    Thermal

    Korba

    Singrauli

    Unchahar

    Kahalgaon

    Farakka

    Badarpur

    Vindhyachal

    Tanda

    No.of

    Outage(Nos)

    52

    45(Dec 07)

  • 7/31/2019 NTPC Performance December 08

    19/53WRHQ

    Monthly Performance

    (Dec 2008)

    DC, SG, AG (%)

    106.4

    105.3

    7

    104.4

    2

    103.9

    4

    103.7

    8

    102.8

    102.6

    2

    101.5

    4

    100.8

    2

    98.3

    3

    95.9

    3

    92.8

    7

    91.4

    90.5

    5

    85.9

    998.6

    9

    103.2

    3

    105.3

    7

    104.0

    5

    103.9

    103.7

    8

    102.8

    101.1

    3

    101.5

    4

    100.4

    8

    98.3

    3

    92.9

    5

    91.7

    6

    90.8

    8

    90.5

    5

    85.4

    298.2

    6

    105.3

    3

    106.3

    5

    104.6

    104.7

    8

    104.6

    2

    103.7

    1

    102.2

    8

    102.3

    4

    101.2

    1

    98.7

    6

    94.3

    7

    92.3

    4

    91.6

    91.2

    3

    87.0

    599.1

    2

    0

    20

    40

    60

    80

    100

    120

    Dadri(Coa

    l)

    Simhad

    ri

    Rihan

    d

    Ramagundam

    Sip

    at

    Korb

    a

    Unchahar

    TalcherThermal

    Singrau

    li

    Vindhyachal

    Badarpu

    r

    Tand

    a

    Farakk

    a

    TalcherKanih

    a

    Kahalgao

    n

    NTPC(Coa

    l)

    %

    DC % SG % AG %

    Monthly Performance

  • 7/31/2019 NTPC Performance December 08

    20/53WRHQ

    ( Apr to Dec 2008)

    C l i P f

  • 7/31/2019 NTPC Performance December 08

    21/53WRHQ

    Cumulative Performance

    19457

    16065

    15923

    13024

    12547

    11791

    7763

    6328

    6311

    6250

    5448

    4062

    27

    41

    27

    26

    24

    77

    0

    4000

    8000

    12000

    16000

    20000

    24000

    Vin

    dhyachal

    TalcherKaniha

    Ramagundam

    Korba

    Rihand

    Singrauli

    Farakka

    Simhadri

    U

    nchahar

    Kahalgaon

    Da

    dri(Coal)

    Badarpur

    Talcher

    Thermal

    Sipat

    Tanda

    Gene

    ration(Mus)

    132914NTPC Coal Stations = MUs.

    Cumulative Generation MUs

    ( Apr to Dec 2008)

    129703(FY 07-08)

    C l ti P f

  • 7/31/2019 NTPC Performance December 08

    22/53WRHQ

    Cumulative Performance

    NTPC Coal Stations = %

    Cumulative PLF %

    ( Apr to Dec 2008)

    88.85

    98.2

    7

    96.8

    7

    95.8

    8

    95.0

    5

    93.9

    7

    92.7

    9

    91.0

    7

    90.4

    3

    90.2

    9

    89.3

    3

    87.2

    9

    85.3

    1

    81.1

    4

    80.0

    4

    73.5

    2

    0

    20

    40

    60

    80

    100

    120

    Dadri(Coal)

    Sipat

    Simhadri

    Rihand

    Korba

    Ramagunda

    m

    Unchahar

    Vindhyachal

    Talcher

    Thermal

    Singrauli

    Badarpur

    Tanda

    Talcher

    Kaniha

    Kahalgaon

    Farakka

    PLF(%)

    90.19(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    23/53WRHQ

    Cumulative Performance

    NTPC Coal Stations = %

    Availability Factor %

    ( Apr to Dec 2008)

    96.65

    95.6

    5

    94.33

    93.2

    5

    92.0

    9

    91.6

    9

    91.5

    6

    91.5

    2

    90.1

    3

    89.9

    4

    89.7

    5

    89.3

    4

    87.6

    8

    85.9

    3

    85.8

    9

    80

    82

    8486

    88

    90

    92

    94

    96

    98

    Sipat

    Dadr

    i(Coal)

    Rihand

    Simhadri

    Ramagundam

    Ba

    darpur

    T

    alcher

    Thermal

    Korba

    Vindh

    yachal

    T

    alcher

    Kaniha

    Kahalgaon

    Unchahar

    Singrauli

    Tanda

    Farakka

    AVF%

    90.7

    90.47(FY 07-08)

  • 7/31/2019 NTPC Performance December 08

    24/53

    WRHQ

    Cumulative Performance

    NTPC Coal Stations = %

    Planned Outage %

    ( Apr to Dec 2008)

    6.72

    0

    3.3

    6

    3.5

    7 5.1

    4

    5.4

    75.9

    86.4

    7

    6.6

    57.3

    8

    7.4

    3

    7.6

    8

    7.6

    9

    7.7

    5 9.1

    11

    1.9

    4

    0

    24

    6

    8

    10

    12

    14

    Sipat

    Rihand

    Dadri(Coal)

    Kahalgaon

    Badarpur

    Simhadri

    Ramagunda

    mTalcher

    Thermal

    Korba

    V

    indhyachal

    Talcher

    Kaniha

    Singrauli

    Unchahar

    Farakka

    Tanda

    PlannedOutage%

    7.49(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    25/53

    WRHQ

    Cumulative Performance

    NTPC Coal Stations = %

    Forced outage %

    ( Apr to Dec 2008)

    0.76

    0.76

    1

    .11

    1.4

    2

    1.4

    41

    .64

    1.7

    22

    .13

    2.3

    1

    2.4

    42

    .91

    3.3

    53

    .93 4

    .64

    5.11

    0

    2

    4

    6

    Da

    dri

    (Coa

    l)

    Simha

    dri

    Korba

    Ba

    darpur

    Ram

    agun

    dam

    Ta

    lcher

    Kan

    iha

    Ta

    lcher

    Therma

    l

    Tan

    da

    Rihan

    d

    Vin

    dhyac

    ha

    l

    U

    nc

    ha

    har

    Sipa

    t

    Fara

    kka

    Singrau

    li

    K

    aha

    lgaon

    Force

    dOu

    tage

    %

    2.36

    1.94(FY 07-08)

  • 7/31/2019 NTPC Performance December 08

    26/53

    WRHQ

    Cumulative Performance

    %NTPC Coal Stations =

    Equipment Partial Loss %

    ( Apr to Dec 2008)

    0.67

    0.0

    50.1

    4

    0.1

    7

    0.2

    20.2

    80.35 0

    .42 0.49

    0.6

    9 1.0

    2 1.3

    61.4

    21.5

    2

    2.2

    52.8

    7

    0

    1

    1

    2

    2

    3

    3

    4

    D

    adri(Coal)

    Korba

    Simhadri

    Vindhyachal

    Rihand

    Singrauli

    Unchahar

    R

    amagunda

    mSipat

    Talcher

    Kaniha

    Farakka

    Tanda

    Kahalgaon

    Talcher

    Thermal

    Badarpur

    Equpt

    .PartialLoss%

    0.67(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    27/53

    WRHQ

    Cumulative Performance

    %NTPC Coal Stations =

    APC %

    ( Apr to Dec 2008)

    5.3

    1

    5.3

    15.7

    5

    5.8

    3

    6.0

    6

    6.2

    9

    6.4

    87

    .15

    7.3

    7

    7.5

    17

    .95

    8.2

    89.3

    910

    .06

    12

    .03

    0

    24

    6

    8

    10

    12

    14

    Sipa

    t

    S

    imha

    dri

    Talcher

    Kan

    iha

    Ramagun

    dam

    Korba

    Vind

    hyachal

    Rihan

    d

    S

    ingrau

    li

    Fara

    kka

    Dad

    ri(Coal)

    Kaha

    lgaon

    Unc

    ha

    har

    Badarpur

    Ta

    lcher

    Therma

    l

    Tan

    da

    APC%

    6.74

    6.75(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    28/53

    WRHQ

    Cumulative Performance

    ml/KWhNTPC Coal Stations =

    Specific Oil ml/KWh

    ( Apr to Dec 2008)

    0.41

    0.1

    0.1

    1

    0

    .14

    0.1

    9

    0.2 0

    .26

    0.3

    4

    0.3

    5

    0.3

    80

    .46

    0.5

    80

    .66

    0.8 0

    .91

    1.43

    0

    0.2

    0.4

    0.6

    0.8

    1

    1.2

    1.4

    1.6

    Korba

    Simhadri

    Da

    dri

    (Coa

    l)

    Ramagunda

    m Rihand

    Vindhyac

    ha

    l

    Unchahar

    Singrauli

    Talcher

    Thermal

    Sipa

    t

    Kahalgaon

    Ba

    darpur

    Talcher

    Kan

    iha

    Tanda

    Fara

    kka

    Sp

    Oil(ml/Kwh)

    0.29(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    29/53

    WRHQ

    Cumulative Performance

    Kg/KWhNTPC Coal Stations =

    Specific Coal Kg/KWh

    ( Apr to Dec 2008)

    0.6

    35

    0.6

    43

    0.6

    47

    0.6

    55

    0.6

    74

    0.6

    82

    0.6

    82

    0.7

    21

    0.7

    37

    0.7

    59

    0.7

    95

    0.8

    07

    0.8

    070.82

    1

    0.83

    6

    0.0

    0.1

    0.2

    0.3

    0.4

    0.5

    0.6

    0.7

    0.8

    0.9

    Rama

    gunda

    m

    Dadri(Coal)

    R

    ihand

    Unc

    hahar

    Sipat

    Korba

    Vindhyachal

    Sin

    grauli

    Sim

    hadri

    Tanda

    Badarpur

    Fa

    rakka

    Talcher

    K

    aniha

    Talcher

    Th

    ermal

    Kahalgaon

    Sp.Coal

    (Kg/Kwh)

    0.713 0.706(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    30/53

    WRHQ

    Cumulative Performance

    Kcal/KWhNTPC Coal Stations =

    Heat Rate Kcal/KWh

    ( Apr to Dec 2008)

    2408

    2350

    2354

    2357

    2368

    2371

    2375

    2380

    2390

    2391

    2400

    2415

    2418

    2736

    2758

    2874

    0

    5001000

    1500

    2000

    2500

    3000

    3500

    Rihan

    d

    Simha

    dri

    Sipa

    t

    Ta

    lcher

    Kan

    iha

    Ramagun

    dam

    Korba

    Vindhyac

    ha

    l

    Unc

    ha

    har

    Da

    dri

    (Coa

    l)

    Singrau

    li

    Ka

    ha

    lgaon

    Fara

    kka

    Tan

    da

    Ba

    darpur

    Ta

    lcher

    Therma

    lHea

    tRate(Kca

    l/Kw

    h)

    2412(FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    31/53

    WRHQ

    Cumulative Performance

    MusNTPC Coal Stations =

    Grid Loss ( outage + PL) MUs

    ( Apr to Dec 2008)

    0 0 0 0.5

    0.7 2

    .1 11.6

    14 1

    4.6 18.9 26

    .2

    26.2

    28

    .1

    4

    0.6

    147

    .9

    0

    20

    40

    60

    80

    100

    120

    140

    160

    Korba

    Sipa

    t

    S

    imha

    dri

    Vind

    hyac

    ha

    l

    Ram

    agun

    da

    mTalcher

    Therma

    l

    Tanda

    S

    ingrau

    li

    Ta

    lcher

    Kaniha

    Rihan

    d

    Unchahar

    Fara

    kka

    Kahalgaon

    Dad

    ri(Coa

    l)

    B

    adarpur

    LossG

    rid

    (MUs)

    331.5919.4

    (FY 07-08)

    Cumulative Performance

  • 7/31/2019 NTPC Performance December 08

    32/53

    WRHQ

    Cumulative Performance

    MusNTPC Coal Stations =

    Coal Loss MUs

    ( Apr to Dec 2008)

    3922.5

    0 0 0 0 0 0 0 0.2

    10.3 4

    2.5 140

    .9

    215

    .1 598.9

    1130.4

    1784.1

    0200

    400

    600800

    1000

    1200

    14001600

    1800

    2000

    Unchahar

    Tan

    da

    Ba

    darpur

    Korba

    Sipat

    Simhadri

    Ta

    lcher

    Therma

    l

    Dadri(Coal)

    Singrau

    li

    Ramagun

    dam

    Rihan

    d

    Vindhyac

    ha

    l

    Kahalgaon

    Farakka

    Ta

    lcher

    Kan

    iha

    CoalLoss(MUs)

    552.7(FY 07-08)

    ( A D )

  • 7/31/2019 NTPC Performance December 08

    33/53

    WRHQ

    Cumulative Performance

    NTPC Coal Stations =

    No. of Outages

    ( Apr to Dec 2008)

    3

    12 1

    7 22 23

    31 3

    3 34 3

    5 36 3

    7 43 4

    4

    55

    67

    0

    10

    20

    30

    40

    50

    60

    70

    80

    Sim

    ha

    dri

    Sipa

    t

    Da

    dri(Coa

    l)

    R

    ihan

    d

    Korba

    T

    alcher

    K

    an

    iha

    Kaha

    lgaon

    Badarpur

    Ta

    lcher

    Th

    erma

    l

    Sin

    grau

    li

    Ramagun

    da

    m Unc

    ha

    har

    Fara

    kka

    Tan

    da

    Vindhyac

    ha

    l

    Ou

    tage

    s

    (Nos

    )

    492Nos.

    452(FY 07-08)

  • 7/31/2019 NTPC Performance December 08

    34/53

    WRHQ

    Cumulative Performance ( Apr to Dec 2008)

    1.5

    0 3.8

    3

    4.25

    5

    .14

    5

    .17

    5.2

    9

    5.5

    0

    5.8

    36.7

    0

    6.8

    0 8.2

    5

    8.6

    0

    8.8

    0

    13.7

    5

    0.00

    2.00

    4.00

    6.00

    8.00

    10.00

    12.00

    14.00

    16.00

    Sim

    ha

    dri

    Korba

    Da

    dri(Coa

    l)

    Sin

    grau

    li

    Ta

    lcher

    K

    an

    iha

    Ramagu

    ndam

    R

    ihan

    d

    Ta

    lcher

    Th

    erma

    l

    Vindhy

    ac

    ha

    l

    Bad

    arpur

    Kaha

    lgaon

    Unc

    ha

    har

    Fa

    rakka

    Tan

    da

    Sipa

    tOu

    tagespe

    run

    it

    (Nos

    )

    NTPC Coal Stations =

    No. of Outages per Unit

    Nos.6.566.03

    (FY 07-08)

  • 7/31/2019 NTPC Performance December 08

    35/53

    WRHQ

    Cumulative Performance

    DC,SG,AG %

    ( Apr to Dec 2008)

    100.2

    99.3

    97.3

    96.1

    95

    94.2

    92.7

    92

    91.9

    90.5

    89.5

    84.5

    82

    79.4

    73.2

    89.99

    8.3

    99.3

    97.3

    95.7

    95

    94.1

    89.6

    92

    91

    90.5

    89.3

    83.9

    82

    79.1

    72.9

    89.51

    00

    100

    98

    96

    96

    95

    91

    92

    92

    91

    90

    84

    83

    80

    74

    90

    0

    20

    40

    60

    80

    100

    120

    Dadri(Coa

    l)

    Sipa

    t

    Simhadri

    Rihand

    Korba

    Ramagundam

    Badarpu

    r

    Vindhyacha

    l

    Unchaha

    r

    Talcher

    Therma

    l

    Singrauli

    Tanda

    Talche

    r

    Kaniha

    Kahalgaon

    Farakk

    a

    NTPC(Coal)

    %

    DC % SG % AG %

    April-November 2008

  • 7/31/2019 NTPC Performance December 08

    36/53

    WRHQ

    Best Power Stations in the country

    April November 2008

    101.7

    101.6

    1

    00.0

    99

    .5

    97.6

    96.0

    95.5

    94.9

    93.8

    94.1

    93.0

    92.2

    92.1

    91.6

    91.5

    91.2

    90.4

    89.8

    89.7

    89.0

    88.4

    88.0

    87.9

    87.1

    86.9

    75

    80

    85

    90

    95

    100

    105

    SOUTH

    ERNREP.

    BUDG

    E-BUDGE

    DAHANU

    TORR.

    POWER

    DADRICoal

    SIPAT

    TITAGARH

    SIMHADRI

    G

    HTP(Leh

    RIHAND

    KORBA

    KOTA

    TROMBAY

    RAMA

    GUNDAM

    Dr.N

    .TataRao

    NORTH

    K'Kheda-II

    UNCHAHAR

    VINDH

    AYACHAL

    TAL

    CHERTh.

    RAYALASEEMA

    S

    INGRAULI

    ROPAR

    METTUR

    B

    ADARPUR

    PLF(%)

    ALL INDIA 74.9

    PRIVATE SECTOR 93.4

    CENTRAL SECTOR 80.5

    SEB'S 69.1

    NTPC(COAL) 87.8

  • 7/31/2019 NTPC Performance December 08

    37/53

    WRHQ

    NTPC BHEL JV (NBPPPL)

    JV Company has agreed to increasethe share capital from 5 Crores to 750Crores. BHEL has identified to transfer

    its 750 MW turnkey project of ONGC toJV Company. NTPC has identifiedexpansion project of Shaktinagar or

    Vindhyachal to be transferred to JVCompany

  • 7/31/2019 NTPC Performance December 08

    38/53

    WRHQ

    News from Business Environment

    GOI appoints a high level committeefor preparing National RenewableEnergy Law mandating purchase of

    renewable energy, tradablerenewable energy certificates andpenalties thereof. Already 12 SERCs

    have fixed up a purchase obligation of10% of renewable energy

  • 7/31/2019 NTPC Performance December 08

    39/53

    WRHQ

    News from Business Environment

    India entered into agreement withNepal to set up a trading entity with30% indian equity. Four corridors

    Butwal

    Gorakhpur

    Duhabi Purnea

    DhalkebarMuzaffarpur

    Anarmani

    Siliguri

    are identified, so that power can beimported from 2013

  • 7/31/2019 NTPC Performance December 08

    40/53

    WRHQ

    News from Business Environment

    Volatility in the liquid fuel marketresulted in plummeting of Naphthaprice from its peak of Rs. 78,096 / MT

    on 16.07.08 (Energy charge Rs. 14.78)to Rs. 23,140 / MT on 09.12.08 (Energycharge Rs. 4.38)

  • 7/31/2019 NTPC Performance December 08

    41/53

    WRHQ

    Brief Outage Details

    December 2008Coal Stations

    OUTAGES (No.) TRIPS (No.)

  • 7/31/2019 NTPC Performance December 08

    42/53

    WRHQ

    STATION

    2002

    2003

    2003

    2004

    2004

    2005

    2005

    2006

    2006

    2007

    2007

    2008

    2007

    2008

    2008

    2009

    2002

    2003

    2003

    2004

    2004

    2005

    2005

    2006

    2006

    2007

    2007

    2008

    2007

    2008

    2008

    2009

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    DEC

    APR

    DEC

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    MA

    R

    APR

    DEC

    APR

    DEC

    SINGRAULI 41 47 45 42 68 44 35 36 15 20 12 12 30 14 13 12

    RIHAND 14 12 10 24 32 19 19 22 4 7 3 14 12 10 10 8

    UNCHAHAR 53 50 44 26 35 43 28 43 37 30 30 14 20 24 14 23

    TANDA 124 98 94 67 48 50 39 55 56 48 68 30 27 29 23 37

    DADRI

    (COAL)38 28 24 32 13 18 10 18 19 17 16 21 4 13 7 5

    BADARPUR 80 40 53 43 54 44 34 34 42 20 22 13 24 18 13 14KORBA 40 34 26 25 27 40 30 23 25 18 7 11 9 10 7 5

    VINDHYACHA

    L67 53 45 46 46 70 53 67 38 26 20 18 17 25 19 34

    SIPAT 12 12

    RAMAGUNDA

    M44 37 28 51 40 43 35 38 11 7 10 28 9 17 15 14

    SIMHADRI 20 37 16 19 14 16 13 3 12 23 8 9 6 8 7

    FARAKKA 79 73 85 70 69 59 42 44 46 34 44 30 21 28 18 20

    KAHALGAON 41 41 31 35 32 20 17 33 12 16 18 9 13 5 4 15

    TALCHER (K) 30 58 53 60 55 55 43 31 9 35 27 31 34 27 22 14

    TALCHER (T) 79 76 81 65 60 63 54 35 41 49 37 27 18 28 26 12

    TOTAL 750 684 635 605 593 584 452 494 367 350 322 267 244 256 198 225

    Station/Unit/ Badarpur

  • 7/31/2019 NTPC Performance December 08

    43/53

    WRHQ

    Station/Unit/

    Equipment.

    Badarpur

    Unit-3

    Date 14-Dec-08

    Brief

    Description

    Tripped on GT Buccholtz protection. In Buccholtzrelay, no gas was observed, instead vacuum wasfound developed in the transformer tank andBuccholtz pipeline, though conservator oil level was

    normal. The vacuum was broken. The reserve oilpump was also put in service.It was observed that due to inadequate flow of oilfrom conservator tank to transformer oil tank, createdoil starvation at Buccholtz relay causing its operation .The following checks were also done.a) The operation of valve between conservator tankand Buccholtz relay was checkedb) The valve outside air cell of conservator to breatherline was checked.c) The pipeline from conservator to breather was airblown to check /clear any blockage.DGA result from R&D was found satisfactory.

    Station/Unit/ Talcher Kaniha

  • 7/31/2019 NTPC Performance December 08

    44/53

    WRHQ

    Station/Unit/

    Equipment.

    Talcher Kaniha

    Unit-3

    Date 16-Dec-08

    Brief

    Description

    HP and IP control valves closed leading to drop inload from 350 MW to 24 MW. This led to suddendecrease in steam pressure before HPT blading,resulting in LPBP tripping to manual. Load controllerchanged over to speed controller and load came

    down to 0 MW with closure of HPCV / IPCV. SinceLPBP got changed over to manual and was in closedcondition, boiler tripped on Reheater protection.Though control fluid and trip oil pressure were steady,HP and IP secondary oil pressures observed to havedropped from 4.06 and 5.62 kg/cm2 to 1.92 and 0.74

    kg/cm2. The EHC command was 54.9 % and whencontrol valves started closing, the commandincreased to 59.26%. Since load had dropped from350 MW to 24 MW, load controller changed over tospeed controller and EHC command reduced to19.5%. Further checking of EHC position feedback

    revealed that even though EHC command was 59.26

    Station/Unit/ Talcher Kaniha

  • 7/31/2019 NTPC Performance December 08

    45/53

    WRHQ

    Station/Unit/

    Equipment.

    Talcher Kaniha

    Unit-3

    Date 16-Dec-08

    Brief

    Description

    Electro Hydraulic Converter, the Plunger coil, the EHCpanel cards and the output of the Collins Transformerwere checked. No abnormality was observed exceptfault in one DO card used for indications in verticalpanel and plunger coil supply, the same was

    replaced. The turbine was rolled and synchronized.Turbine was kept in hydraulic mode and the EHC waschecked. No abnormality was found in the hydrauliccircuit.Since no problem was observed in the operation ofEHC during checking and during Turbine run up,

    reason could be established for dip in secondary oilpressures which had resulted in closing of all the HPand IP control valves.Since during checking, balance voltage got

    disturbed, EHTC coil was replaced and balancevoltage was adjusted. EHC characteristic was also

    checked. Freeness of EHC converter was checked.

  • 7/31/2019 NTPC Performance December 08

    46/53

    WRHQ

    Major Events

    duringDecember 2008

    Station/Unit/ Farakka

  • 7/31/2019 NTPC Performance December 08

    47/53

    WRHQ

    Station/Unit/

    Equipment.

    Farakka

    Unit 3

    Date 12-Dec-08

    Brief Description Disturbance was observed in hotwell level,deaerator level and CST level. During this

    disturbance system debris got entrapped in

    CEP suction strainers. Subsequently CEPs

    tripped one by one. Later inspection of the

    pumps revealed that the shafts of both theCEPs got damaged.

    Root Cause Being investigated

    Remarks Committee formed

    Station/Unit/ Simhadri

  • 7/31/2019 NTPC Performance December 08

    48/53

    WRHQ

    Station/Unit/

    Equipment.

    Simhadri

    Unit 2 ID Fan 2B

    Date 31-Dec-08

    Brief Description One of the coils in ID fan 2B motor failed.Spare coupling not available. Work got

    extended due to difficulty in removing

    motor end coupling due to non-availability

    of jigs and fixtures

    Root Cause

    Remarks Revived on 04.01.2009

  • 7/31/2019 NTPC Performance December 08

    49/53

    WRHQ

  • 7/31/2019 NTPC Performance December 08

    50/53

    WRHQ

  • 7/31/2019 NTPC Performance December 08

    51/53

    WRHQ

  • 7/31/2019 NTPC Performance December 08

    52/53

    WRHQ

    Communications

    from COS duringDecember 2008

    Reference OS/ST/Steam Path Audit/1140

  • 7/31/2019 NTPC Performance December 08

    53/53

    Reference

    No.OS/ST/Steam Path Audit/1140

    Date

    BriefDescription

    Steam Path Audit cum Training atVindhyachal during O/H of Unit 2

    Action Letter sent to WR-stations for

    deputation of engineers toVindhyachal for training to

    develop in house capability

    Remarks Training cum Audit from 09.09.08

    by M/s Encotech supplier ofsoftware