Speaker Name; Tufani Ram 13-14/02/2013 NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power Plants

Transcript of NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference...

Page 1: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

Speaker Name; Tufani Ram 13-14/02/2013

NTPC O&M Conference 2013

Performance and Optimization of Water Utilisation Increase of Existing Power Plants

Page 2: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Introduction

• Water is a vital commodity for the population and being utilised substantially high quantity possible in the Power Sector as it is one of the largest consumers

• Performance increase and options to reduce water consumption in existing power plants will be introduced

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Potable water

Power Industry

Irrigation

Water is a vital Resource

Page 3: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

1st topic Integrated Performance Improvement

2nd topic Water Utilisation Increase

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 4: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Example Power Station “Arnot”

• Arnot is a coal fired power plant that was originally rated 6 x 350MWe owned by ESKOM

• Located in South Africa in the Mpumalanga Province

ESKOM Needs:

• Modernisation and life extension for all 6 units

• Capacity increase − From 350 MWe 400MWe

• Minimal outage time and Cost

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 5: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Assessment and Review of Options

G

CPP

Aux.

APH

ESP FGD

Bottom Ash Transfer Storage

Fly Ash Transfer Storage

NH3 Unloading Storage Transfer

Main Fuel Unloading Storage Transfer

Start up Fuel Storage Transfer

Sorbent Unloading Storage Preparation Transfer

Product Transfer Storage Loading

(Preparation)

Demin

MWT

CTW WW

FF

Electrical Equipment

DCS

V V V V V V

HVAC Fire Fighting

Compressed Air

SCR

Integrated System Optimization with balanced component interaction

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 6: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

G

CPP

Aux.

APH

ESP FGD

Bottom Ash

Transfer

Storage

Fly Ash

Transfer

Storage

NH3

Unloading

Storage

Transfer

Main Fuel

Unloading

Storage

Transfer

Start up Fuel

Storage

Transfer

Sorbent Unloading Storage Preparation Transfer

Product Transfer Storage Loading

(Preparation)

Demin

MWT

CTW WW

FF

Electrical Equipment

DCS

V V V V V V

A systems-level approach covering the Total Plant Optimization

• ECO|RAM™ draws from both Customer and ALSTOM experience to ensure as many improvement ideas as possible are considered.

• Strength of the methodology: ability to quickly assess and select realistic ideas to be investigated further

• Comprehensive analysis and ranking provides a shortlist of Viable Potentials for the Customer to consider for investment

• The co-operative approach of ECO|RAM™ also ensures that the plant owner is aware of the direction of the investigation from start to finish.

ECO|RAM™: analysis methodology covering Plant design, operation & maintenance

Integrated Solutions – Plant Assessments ECO|RAM™ : ECOnomic Reliability Availability Maintainability

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 7: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

- 6

Arnot Assessment

- Determine maximum plant capacity increase achievable with: No Turbine Modifications Minor Turbine Modifications Major Turbine Modifications

- Determine required technical measures for each stage

ESKOM GOALS

Assessment Workflow

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 8: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Arnot Implementation

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

• Implementation

Assessment

Page 9: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Arnot Boiler Scope

• Complete replacement of firing components

• New Secondary & Offset Air Nozzles with Low NOx design features

• Regenerative Airheater Upgrade

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 10: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Arnot Boiler Scope

• Superheater & Reheater Material Upgrade

• High Performance Classifier

• Steam Drum Internals

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 11: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

• HP cylinder − Inner Casing − Bladed Rotor

• IP Cylinder − Inner Casing − Bladed Rotor − Inlet & Extraction Connections

Arnot Turbine Scope

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 12: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Arnot Plant Retrofit Results

Benefits • Steam-water cycle optimisation maximising

• Unit performance guarantees

• Short time scales with quick MWe to the grid system

• Extending plant lifetime by 20 years in an economically and environmentally viable manner (NOx reduction)

• Minimal outage time and cost

*weighted nominal turbine generator output 406-408MW

Benefits Before After

Power Output 350 MW 408 MW*

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 13: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Agenda

1st topic Integrated Performance Improvement

2nd topic Water Utilisation Increase

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 14: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

3.45

0.12 0.25

0.11 0.07

Evaporative and blow down losses Ash disposal *

DEMIN water make up Drinking and service water

Clarifier sludge etc. Coal dust suppression

Water Utilisation Increase

• 70-90% evaporative and blow down losses

• Blow down water is a continuous extraction from the cooling water to maintain the concentration of TDS (Total Dissolved Solids)

Water consumption in an evaporative cooled power plant

m³/MWh

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 15: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Main Water Consumer

• Evaporative losses are nearly linear dependent on the thermal load on the cooling water

• Options: − 100% dry cooling − Power output reduction − Hybrid cooling

Reduce the evaporative losses of existing wet cooling system

3.45

Cooling tower evaporative and blow down losses

m³/MWh

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 16: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

100% Dry Cooling

• Fully dry cooled power plants are common and proven technology

• Large scale air cooled condenser units like Matimba (6 x 665MWe) in South Africa

• 100% dry cooling conversion is in most cases not viable as a retrofit measure

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Air Cooled Condenser

Page 17: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

• Hybrid Cooling with Air Cooled Condenser (ACC)

− Steam extraction with pressure offset to

main condenser − Modified inner and outer casing of the LP

turbine(s) for large steam extractions − New LP rotor with state of the art blading − Small space requirements for an ACC

(high condensation temperature)

Hybrid Cooling for existing power plants

Existing Power Plant

Hybrid Cooling

Hybrid Cooling

Condensation Pressure: 0,03-0,1 bara

Condensation Pressure: 0,35-0,75 bara

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 18: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Hybrid Cooling Concept

New LP turbine with Hybrid Cooling Interface and state of the art steam path

Hybrid Cooling Interface with steam ducts

Control Valve

Air Cooled Condenser p=0,35 -0,7 mbar

Existing surface condenser with reduced backpressure due to reduced heat load

1

1

2

2

4 3

3

4

5

5

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 19: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Sankey Diagram of the simple Rankine Cycle

Chemical

Energy

In Fuel

Electrical Energy

Thermal

Energy in Cooling Water

Thermal Energy Flue Gas

To Stack – 88MWth

To Condenser 250 MWth

To Grid 210MWe

3% to Auxiliary Power NOTE: Aux Power = ~7%

of Electric Power

Steam power plant with 210 MWe power output

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 20: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Sankey Diagram of the simple Rankine Cycle

Chemical

Energy

In Fuel

Electrical Energy

Thermal

Energy in Cooling Water

Thermal Energy Flue Gas

To Stack – 62MWth To Condenser

175MWth

To Grid 147MWe

3% to Auxiliary Power NOTE: Aux Power = ~7%

of Electric Power

Option: Load Reduction

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 21: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Sankey Diagram of the simple Rankine Cycle

Chemical

Energy

In Fuel

Electrical Energy

Thermal

Energy in Cooling Water

Thermal Energy Flue Gas

Option: 30% Hybrid Cooling Share

Hybrid Cooling*

*Assuming 30% Hybrid Cooling Share

To Stack – 88MWth

To Condenser 175 MWth

To Grid 204MWe

3% to Auxiliary Power NOTE: Aux Power = ~7%

of Electric Power

To Air 75MWth

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 22: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Impact of Hybrid Cooling

Original Hybrid Cooling

Assuming 30% Hybrid Cooling share

Hybrid Cooling

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

0%

50%

100%

Power Output Water Consumption

0%

50%

100%

Power Output Water Consumption

210 M

We

204 M

We

Indica

tives

for in

forma

tion o

nly

4m³/M

Wh

3m³/M

Wh

Page 23: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

• Hybrid Cooling is a Retrofit Solution for existing power plants

• 20-45% reduced water consumption possible

• Flexible heat sink

• Improved availability

• Low efficiency loss − Off loading the existing condenser leads to improved LP turbine exhaust pressure

• Applicable for mechanical or natural draft recirculation cooling systems and once through cooled power plants

Benefits of Hybrid Cooling

Hybrid Cooling

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 24: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

© ALSTOM 2011. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liabi lity and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Summary

• Combining Plant Assessments and Plant Retrofit, is an effective measure for successful and cost effective performance increase and lifetime extension

• Hybrid Cooling is a Retrofit option for existing steam power plants to reduce water consumption and maintain power output

Performance and Water Utilization Increase

Performance and Water Utilisation Increase – NTPC O&M Conference 2013

Page 25: NTPC O&M Conference 2013 Performance and … 2013 Presentations/Day-2 at PMI...NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power

www.alstom.com

Thank You All