NOVEMBER 2016 INSPECTION CCR LANDFILL TS POWER PLANT Prepared for: Newmont Nevada Energy Investment, LLC 914 Dunphy Ranch Road Battle Mountain, Nevada 89820 Prepared by: NewFields Mining Design & Technical Services 1301 N. McCarran Blvd., Suite 101 Sparks, Nevada 89431 NewFields Project 475.0221 January 2016

Transcript of NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015...

Page 1: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

 

 

  

NOVEMBER 2016 INSPECTION CCR LANDFILL 

TS POWER PLANT    

Prepared for:       

Newmont Nevada Energy Investment, LLC 914 Dunphy Ranch Road 

Battle Mountain, Nevada 89820   

Prepared by:      

NewFields Mining Design & Technical Services 1301 N. McCarran Blvd., Suite 101 

Sparks, Nevada 89431     

NewFields Project 475.0221 January 2016 

Page 2: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

 

 

TABLE OF CONTENTS  1.  INTRODUCTION .......................................................................................................................... 1 2.  PROJECT DESCRIPTION ............................................................................................................... 1 

2.1.  Site Inspection .................................................................................................................. 2 3.  KEY OBSERVATIONS MADE DURING INSPECTION ..................................................................... 3 

3.1.1.  General Condition of the Landfill Perimeter ....................................................... 3 3.1.2.  General Condition of the CCR .............................................................................. 3 3.1.3.  Collection Pond .................................................................................................... 3 3.1.4.  Stormwater Controls ........................................................................................... 3 

4.  SUMMARY .................................................................................................................................. 3   LIST OF FIGURES 

Figure 1  Vicinity Map Figure 2  Site Plan   LIST OF APPENDICES 

APPENDIX A Inspection Tables  APPENDIX B Selected Photographs   

Page 3: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017    

Page 1 

1. INTRODUCTION 

This  report  presents  the  results  of  the  December  2016  Inspection  of  the  Coal  Combustion 

Residue (CCR) Landfill at the TS Power Plant (TSPP), which is owned and operated by Newmont 

Nevada Energy Investment, LLC (Newmont).  The project site is located approximately three (3) 

miles north of the Interstate 80 Dunphy exit in Eureka County, Nevada as shown in Figure 1.   

This report  is  intended to meet the 2015 Coal Combustion Residue Rule 40CFR Part 257.84(b) 

requiring an annual inspection by a qualified professional engineer for existing CCR landfills.   

2. PROJECT DESCRIPTION 

The TSPP  facilities are  located within Sections 11 and 14, Township 33N and Range 48E and 

includes a CCR landfill located approximately 0.5 miles northeast of the power plant.  The CCR 

landfill  is a  fully geomembrane‐lined  facility  (80‐mil HDPE) with a  total designed  footprint of 

approximately 36 acres and a maximum CCR design height of 60 feet.   During the operational 

life of the power plant, the CCR landfill will be constructed incrementally as six (6) adjoining six 

(6)‐acre cells plus two (2) storage ponds to contain run‐off from the design storm event falling 

on the landfill.  The individual cells are to be developed in stages as needed to provide storage 

capacity for the planned life of the power plant facility.  Each cell is hydraulically independent.  

The design storage can be achieved at a maximum CCR height of 60 feet.  In addition to ash, the 

CCR  landfill was designed and permitted  to contain cooling tower side stream softening  filter 

press sludge. 

Currently, two cells (Cell 1 and Cell 2) and one (1) pond (Pond 1) have been constructed.  Cell 1, 

the southwestern cell of the  landfill, was part of original plant construction and has operated 

from 2008  to present.   Cell 2,  an  identical  six  (6)  acre  cell  immediately north of Cell 1, was 

constructed in 2013 and is currently accepting the designated waste streams.  Based on survey 

information  and  loading  quantities  provided  by  Newmont,  the  landfill  currently  contains 

approximately 232,600 cubic yards of designated waste.   During 2016 at  total of 6,500 cubic 

yards  of  combined  fly  ash,  bottom  ash  and water  treatment  sludge was  disposed  of  in  the 

landfill.      Cell  1  has  approximately  20  feet  of material  placed  and  the  placement  of  ash  is 

progressing to the north into Cell 2.  Currently, Cell 2 has very little material on it. 

Stormwater control consists of  internal collection of precipitation falling on the  landfill facility 

(contact water or run‐off) and the diversion of external non‐contact water (run‐on).  To provide 

internal storm water collection and drainage, the base of CCR landfill was graded to drain from 

the northwest to southeast at a slope of 1.4 percent.  Internal drainage reports to the collection 

pond located at the down gradient end of the facility.  The individual landfill cells are separated 

by  3‐foot  high  and  12‐feet  wide  (base  width)  internal  divider  berms  constructed  with  2:1 

Page 4: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017    

Page 2 

(horizontal to vertical) slopes.  Perimeter containment is provided by 20‐foot wide (base width) 

by 5‐foot high perimeter berms with 2:1 fill or 2:1 cut slopes within natural soils. 

The landfill cells are fully lined with an 80‐mil HDPE geomembrane liner placed over a prepared 

subgrade.   The  lining system extends to the external containment berms.   A drainage blanket 

with  an  integral network of underdrain piping overlies  the  geomembrane  and  serves  as  the 

storm water runoff and  leachate collection system.   The drainage blanket consists of a 2‐foot 

thick layer of free draining gravel.  The internal underdrain piping consists of perforated 4‐inch 

and 8‐inch diameter corrugated polyethylene pipe (CPEP) placed on 30‐foot centers within the 

drainage  blanket material.   A  collection  channel  is  located  along  the  eastern  down  gradient 

edge of the individual cells to collect storm water runoff and leachate.  The channel discharges 

to the storm water pond(s) located at the southern margin of the landfill. 

Two  storm water collection ponds have been designed down gradient and adjacent  to Cell 1 

and Cell 4.   The western pond, Pond 1, has been constructed and serves Cell 1 and Cell 2 and 

the  future Cell 3.   The southeastern Pond 2  (future) will serve Cells 4, 5 and 6 once  they are 

placed  into operation.    The ponds  are  lined with  an  80‐mil HDPE  geomembrane overlying  a 

geosynthetic clay liner (GCL). 

The landfill facilities are separated from run‐on from the natural up gradient watersheds by the 

perimeter berms surrounding the facility and the storm water diversion system.  The diversion 

channels  have  been  designed  to  safely  pass  the  peak  flow  from  a  100‐year,  24‐hour  storm 

event. 

2.1. Site Inspection 

The Inspection of the CCR Landfill was conducted on November 30th, 2016.  The work items for 

the inspection involved the following elements: 

A site visit and inspection of the facility was performed by Kevin Lutes, P.E. of NewFields; 

The results of the inspection of the facility were briefly discussed with site personnel; 

Photographs were taken of typical and key features noted during the inspection; 

Inspection tables were completed to document the inspection; and 

This report was prepared. 

Appendix  A  includes  the  tables  completed  for  the  November  2016  inspection.    Selected 

photographs taken during the site inspection are presented in Appendix B of this report.  Figure 

1 provides a vicinity map and Figure 2 presents a general site plan of the CCR  landfill showing 

the location of relevant features of the facility. 

Page 5: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017    

Page 3 

3. KEY OBSERVATIONS MADE DURING INSPECTION 

3.1.1. General Condition of the Landfill Perimeter 

The entire perimeter of the facility was toured as part of the inspection and appeared to be in 

good  to excellent  condition.   Photographs 1, 2, 3, and 4 are  illustrative of  typical  conditions 

along  the  facility  perimeter.    The  perimeter  containment  berms were  observed  to  be well 

constructed and the HDPE liner is exposed and appears to be in excellent condition.  No signs of 

damage to the lining system were noted during the inspection.  General housekeeping practices 

around and within the facility were good and the facility appeared to be well maintained. 

No  signs  of  leachate  flow,  seepage,  global  slope  instability,  or  significant  deformation were 

observed within the facility during the site inspection. 

3.1.2. General Condition of the CCR 

The  materials  placed  within  the  landfill  are  predominantly  contained  within  Cell  1  to  an 

approximate height of 20  feet.   Placement of material  is proceeding  to  the north  into Cell 2.  

Materials  have  been  placed  with  approximate  angle  of  repose  slopes, minor  sloughing  on 

exterior  slopes  observed  during  2015  inspection was  not  observed  during  2016  inspection. 

Photograph 3 shows typical conditions of the materials contained within the landfill. 

No signs of seepage, global slope  instability, or significant deformation were observed within 

the facility during the site inspection. 

3.1.3. Collection Pond 

The collection pond had minor accumulated water  in the base of the pond.   No  leachate flow 

from  the  landfill  to  the  pond  was  observed  at  the  time  of  the  inspection.    The  HDPE 

geomembrane was in good condition and no damage or defects were noted. 

3.1.4. Stormwater Controls 

Stormwater  is  routed  around  the  perimeter  of  the  facility  by  diversion  channels  and/or  the 

perimeter berms that surround the landfill.  An access ramp over the perimeter berm is located 

near the southwest corner of Cell 1.  Stormwater controls were observed to be consistent with 

the intent of the design and no issues were noted as part of the inspection. 

4. SUMMARY 

The  following  conclusions  are  formed  based  on  the  site  inspection  performed  in 

December 2016 by NewFields. 

Page 6: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page
Page 7: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

       

 

 

 

FIGURES 

 

 

Page 8: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

LOCATION MAP

VICINITY MAP

Page 9: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

0 300 600

FEET

Page 10: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

       

  

APPENDIX A‐INSPECTION TABLES 

   

Page 11: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

TABLE A.1 Background Information 

December 2015 CCR Landfill Inspection TS Power Plant, Eureka County, Nevada 

 

Page A‐1

Inspected by:  Kevin Lutes, P.E. 

Inspection Date:  November 30th, 2016 

Weather conditions:  Cloudy, light winds and cool 

Purpose of facility:  Storage  of  CCR  and  cooling  tower  side  stream  softening  filter  press sludge. 

Date of last Facility Inspection by the EOR:  December 8th, 2015 

Date of last Facility Inspection Report:  January 8th, 2016 

Initial construction date:  Cell 1 ‐ 2008 and Cell 2 ‐ 2013 

Original facility engineered by:  AMEC (2005) 

Type of facility:  Non‐Impounding  landfill.    Fully geomembrane  lined with 80‐mil HDPE.  External  stormwater/leachate  collection  pond  lined with  80‐mil  HDPE over GCL. 

Watershed:  The up gradient watershed is collected and routed to the east and west via stormwater diversion channels. 

Monitoring:  Four groundwater monitoring wells in the area surrounding the landfill. Three down gradient and one up gradient a shown on Figure 2. 

Design/as‐built data available:  Yes.  On‐site. 

Volume of solids stored:  232,600 cubic yards of solids. 

CCR production rate:  5.9 tons per hour of ash (maximum). 

Special ‘as‐built’ features:  None 

US features inspected/reviewed:  Yes 

Perimeter walk‐over conducted:  Yes 

Discharge facilities inspected:  N/A 

Surveillance program available:  Yes 

Storage ponds/other facilities inspected:  Stormwater/Leachate Collection Pond (Pond 1) down gradient of Cell 1‐2 facility. 

New developments DS of facility:  None 

General condition of facility:  Overall,  facility  is  in  good  condition.    No  signs  of  leachate,  seepage, instability or distress. 

Next Inspection required:  Annually 

  

Page 12: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

TABLE A.2 Inspection of Facility 

December 2015 CCR Landfill Inspection TS Power Plant, Eureka County, Nevada 

 

Page A‐2

OBSERVED FEATURES  YES  NO  PHOTO NOS.  COMMENTS / NOTES 

1.0  Facility Perimeter 

1.1 Evidence of Erosion    X  3, 4, 5,   No erosion along the perimeter of the landfill berms was noted. 

1.2 Evidence of Movement    X  See 1.1   

1.3 Evidence of Sloughing    X  See 1.1  Not in the constructed perimeter berms. 

1.4 Evidence of Cracking    X  See 1.1   

1.5 Vegetation  X  X  2  Minor vegetation on the liner cover material 

1.6 Other Unusual Conditions    X     

1.7 Evidence of Repairs    X     

2.0  Landfill Materials 

2.1 Lateral Movement    X     

2.2 Evidence of Settlement    X     

2.3 Evidence of Cracking    X     

2.4 Erosion    X  See 2.1  Localized. 

2.5 Other Unusual Conditions    X     

2.6 Evidence of Repairs    X     

2.7 Miscellaneous    X     

3.0  General 

3.1 Solution Pond(s)  X   6  External Stormwater/Leachate Collection Pond.  Composite lined with 80‐mil HDPE over GCL. 

3.2 Embedded/buried structures 

  X     

3.3 Accessible by Truck  X    7  Landfill access ramp 

3.4 Public Access    X    Area fenced. 

3.5 Other Unusual Conditions    X     

 

Page 13: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

       

 

 

 

 

 

 

 

 

 

 

 

APPENDIX B‐SELECTED PHOTOGRAPHS 

 

 

 

 

 

 

 

 

 

 

Page 14: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2016 Inspection CCR Landfill, TS Power Plant Photo Log – Appendix A Project No. 475.0221 January 18th, 2016    

B‐1 

                       

Photo 1:  Panoramic from northeast corner, looking southwest 

   

Page 15: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Photo Log – Appendix A Project No. 475.0221 January 8, 2016    

B‐2 

                           

  Photograph 2:  Cover Material over geomembrane 

                              Photograph 3:  East side of Cell 1 (looking north)

Page 16: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Photo Log – Appendix A Project No. 475.0221 January 18, 2017    

B‐3 

                           

  Photograph 04:  East side of Cell 2 near northeast corner (looking south). 

                            

  Photograph 5:  Cell 2 

   

Page 17: NOVEMBER 2016 INSPECTION TS · 2019. 8. 27. · Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Project No. 475.0221 January 18, 2017 Page

Newmont Nevada Energy Investment, LLC December 2015 Inspection CCR Landfill, TS Power Plant Photo Log – Appendix A Project No. 475.0221 January 18, 2017    

B‐4 

                           

  Photograph 6:  Collection Pond 

                            

  Photograph 7:  Access Ramp