November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit...

14
November 10, 2011

Transcript of November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit...

Page 1: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

November 10, 2011

Page 2: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

AgendaAgenda

• Project Overview

• Background

• Road Safety Audit Process Overview

• Comments

Page 3: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

MCDOT Pedestrian RSA CorridorsMCDOT Pedestrian RSA Corridors

Georgia Avenue – March 2009

Piney Branch Road – October 2008

Rockville Pike June 2009

Wisconsin AvenueDecember 2008

Reedie DriveApril 2010

Randolph Road September 2010

Colesville Rd at University BlvdJanuary 2010

Connecticut Avenue May 2011

I-495

I-270

Colesville Road, November 2011

Page 4: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

Study AreaStudy Area

• Approx. 1/3 mile long

• Two signals

• Three unsignalized intersections

• 30-35 mph posted speed

Page 5: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

BackgroundBackground

• Selected as High Incidence Area based on pedestrian collision density

• 26 pedestrian collisions over 7 years (2004-2010)

• 73% of ped collisions resulted in injury or severe injury

• Heavy pedestrian activity related to land uses and public transportation

• Multi-lane Major Highway running through an densely developed, urban corridor

Page 6: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

What is a Road Safety Audit?What is a Road Safety Audit?

A road safety audit is a

formal safety performance examination

of an existing or future road or intersection

by an independent audit team.

Page 7: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

What is an RSA?What is an RSA?

An RSA is a tool that:• Is a formal process

• Focuses on safety issues

• Proactive review of observed and potential safety issues to reduce risk

• Considers various environmental conditions

• Considers all road users

Page 8: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

RSA ProcessRSA Process

RSA team will conduct

Steps 3-6 over 2 day

session

Review relevant data

to include:

•Community input

•Maps/drawings

•Future plans

•Crash data

•Traffic volume (pedestrians and vehicles)

•Signal phasing and timing

Page 9: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

4. Field Review4. Field Review

• Observe road user characteristics

• Observe surrounding land uses

• Observe link points to the adjacent transportation network

Page 10: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

5. RSA Analysis5. RSA Analysis

• Workshop setting

• Review background reports and design criteria

• Systematically review drawings and other information/data

• Identify, prioritize, and mitigate safety issues

Page 11: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

6(a). Preliminary Findings Discussion6(a). Preliminary Findings Discussion

• RSA team, design team, owner

• Discuss preliminary findings and possible solutions

• Use results to write RSA report

Page 12: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

6(b). RSA Report6(b). RSA Report

• Documents the results of the RSA

• Identifies and prioritizes safety issues

• Includes suggestions for improvements

Page 13: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

Potential RSA Team MembersPotential RSA Team Members

• Maryland SHA

• Montgomery County Police Department

• Montgomery County DOT

• Neighboring Jurisdictions

Page 14: November 10, 2011...November 10, 2011. Agenda •Project Overview •Background •Road Safety Audit Process Overview •Comments. MCDOT Pedestrian RSA Corridors Georgia Avenue –

We appreciate your feedback!We appreciate your feedback!

Comments and InputComments and Input