Project Name Rev Drawing No Scale : Original Drawing Size : Drawing Title Dimensions : A1 As constructed For construction Date: Design: Drawn: For tender For target cost Preliminary c Copyright Amey www.amey.co.uk www.staffordshire.gov.uk Trim to this line for A1 . . 0 10 20 30 40 50 100 A1 J:\Highways\Major Projects\Powerhouse Central\Branston Locks\1. Phase One - Link Road and Canal Bridge\CAD\Disciplines\WIP\1 Live Drgs\CDX8620-R05-13 - Service ducting.dwg CDX8620-R05-13 Grid reference : Approved by:- (Drawing NOT approved if this box is empty) Checked by:- Original Version CDX8620/R05/13 T0 Service Ducting 1:500 RS RS Other Branston Locks - Phase One CONSULTING Revisions Rev Detail By Date Notes 1. For details of existing services refer to Drawing Number CDX8620/R27/01-07 2. For details of new service provision works refer to Drawing Number CDX8620/R27/09-13 and Appendix 1/16 3. For details of street lighting proposals refer to Drawing Number SCC-HL-1001 4. For drainage proposals refer to Drawing Number CDX8620/R05/01-12 5. For details of illuminated traffic signs refer to Drawing Number CDX8620/R12/01 & 03. 6. Main contractor to excavate for and lay one way 125mm dia. black coloured ducts to verge and footway areas providing a cover of 450mm, indicated thus:- 7. Main contractor to excavate for and lay two way 125mm dia. black coloured ducts to verge and footway areas providing a cover of 750mm, indicated thus:- 8. Main contractor to excavate and lay one way 100mm dia. orange coloured duct to carriageway providing cover of 750mm indicated thus:- 9. Joint pit for LV/SL connection to be provided approximately every 250m. Straight joint ( 2 x 1 x 0.75m) Breech joint (2.5 x 1 x 0.75 metres) 9. The exact cable/ducting requirements between the DLH mains cable network and private cable network is to be agreed during the target Cost 10. Street Lighting orders shall be placed by SCC. 11. All works and materials to be supplied and installed fully compliant with the latest issue of the following E-on Street Lighting documents; i) 'Street Lighting Design Policy', ref SLP500. ii) 'Specification for Road Lighting and Lit Traffic Signs on New Developments' document ref SLP501. iii) 'Highway Works Detail Drawings', document ref SLP502. iv) Trench depths in pavement or private land shall be 530mm (min. cover over cable 450mm) and in carriageway shall be 600mm (min. cover 520mm). v) Where cables are not protected in a duct they must be blinded with 75mm of crushed stone dust and approved yellow 'electric cable' marker tape laid above. vi) For details of WPD ducting requirements refer to quotation vii) It is the responsibility of the contractor to liaise with the DLH for a mains service to street lighting and lit traffic signs unless otherwise instructed. The Main Contractor shall; x excavate all trenches and intermediate cable joint bays (2000mm-2500mm) to the specification and satisfaction of WPD. x supply and lay 'danger electric cable' warning tape to specification ENA TS 12-23 and shall cover the ducts. x ensure that trench depths in pavement or private land shall be 530mm (min. cover over cable 450mm) and in carriageway shall be 600mm (min. cover 520mm). x ensure that trench width for single cable is 300m and for two cables 400mm (min. 150mm spacing). x shall liaise with WPD/E-on representative prior to undertaken any works. x shall be responsible for all traffic management and co-ordination including that required by WPD/Eon for their installation and jointing works.

Transcript of Notes - East Staffordshire Application... · 2016-04-15 · Signs on New Developments' document ref...

Page 1: Notes - East Staffordshire Application... · 2016-04-15 · Signs on New Developments' document ref SLP501. iii) 'Highway Works Detail Drawings', document ref SLP502. iv) Trench depths

Project Name

RevDrawing No

Scale :

Original Drawing Size :

Drawing Title

Dimensions :A1

As constructed

For construction

Date:

Design:

Drawn: For tender

For target cost

Preliminary

c

Copyright Amey

www.amey.co.ukwww.staffordshire.gov.uk

Trim

to this line for A1

..

010

20

30

40

50

100

A1

J:\H

ighw

ays\M

ajor Projects\Pow

erhouse Central\Branston Locks\1. Phase O

ne - Link Road and Canal Bridge\CAD

\D

isciplines\W

IP\1 Live D

rgs\CD

X8620-R05-13 - Service ducting.dw

g

CD

X8620-R05-13

Grid reference :

Approved by:- (Drawing NOT approved if this box is empty)

Checked by:-

Original Version

CDX8620/R05/13 T0

Service Ducting

1:500

RS

RS

Other

Branston Locks - Phase One

CONSULTING

Revisions

Rev Detail

By

Date

Notes

1. For details of existing services refer to Drawing

Number CDX8620/R27/01-07

2. For details of new service provision works refer

to Drawing Number CDX8620/R27/09-13 and

Appendix 1/16

3. For details of street lighting proposals refer to

Drawing Number SCC-HL-1001

4. For drainage proposals refer to Drawing Number

CDX8620/R05/01-12

5. For details of illuminated traffic signs refer to

Drawing Number CDX8620/R12/01 & 03.

6. Main contractor to excavate for and lay one way

125mm dia. black coloured ducts to verge and

footway areas providing a cover of 450mm,

indicated thus:-

7. Main contractor to excavate for and lay two way

125mm dia. black coloured ducts to verge and

footway areas providing a cover of 750mm,

indicated thus:-

8. Main contractor to excavate and lay one way

100mm dia. orange coloured duct to carriageway

providing cover of 750mm indicated thus:-

9. Joint pit for LV/SL connection to be provided

approximately every 250m.

Straight joint ( 2 x 1 x 0.75m)

Breech joint (2.5 x 1 x 0.75 metres)

9. The exact cable/ducting requirements between

the DLH mains cable network and private cable

network is to be agreed during the target Cost

10. Street Lighting orders shall be placed by SCC.

11. All works and materials to be supplied and

installed fully compliant with the latest issue of

the following E-on Street Lighting documents;

i) 'Street Lighting Design Policy', ref SLP500.

ii) 'Specification for Road Lighting and Lit Traffic

Signs on New Developments' document ref

SLP501.

iii) 'Highway Works Detail Drawings', document

ref SLP502.

iv) Trench depths in pavement or private land

shall be 530mm (min. cover over cable 450mm)

and in carriageway shall be 600mm (min. cover

520mm).

v) Where cables are not protected in a duct they

must be blinded with 75mm of crushed stone

dust and approved yellow 'electric cable' marker

tape laid above.

vi) For details of WPD ducting requirements refer

to quotation

vii) It is the responsibility of the contractor to liaise

with the DLH for a mains service to street lighting

and lit traffic signs unless otherwise instructed.

The Main Contractor shall;

excavate all trenches and intermediate cable joint bays

(2000mm-2500mm) to the specification and satisfaction of

WPD.

supply and lay 'danger electric cable' warning tape to

specification ENA TS 12-23 and shall cover the ducts.

ensure that trench depths in pavement or private land shall

be 530mm (min. cover over cable 450mm) and in

carriageway shall be 600mm (min. cover 520mm).

ensure that trench width for single cable is 300m and for

two cables 400mm (min. 150mm spacing).

shall liaise with WPD/E-on representative prior to

undertaken any works.

shall be responsible for all traffic management and

co-ordination including that required by WPD/Eon for their

installation and jointing works.