ATTACHMENT t
IA-46 SEISMIC EVALUATION
REPORT FOR NMP1
96031,40279 96031.1PDR ADOCK 05000220
I p PDR
NIAGARAMOHAWK NUCLEARENGINEERING
NUCLEARKNGINKKRIlYGREPORT
TITLE: NINE MILEPOINT UNIT 1
USI A-46 SEISMIC EVALUATIONREPORT
REPORT NO: NER-1S-012 REVISION NO: 0
PREPARED BY: MPR Associates Date: November 1995
REVIEWED BY:Carmen R. AgostaStructural Engineer, Unit 1
Date: Z Z4
APPROVED BY:Mohammed F. Alvi, SupervisorCiviVStructural, Unit 1
1
Nine Mile Point Unit i
USI A-46 Seismic Evaluation Report
MPR-'t 600Revision 0
November 1995
Principal Contributors
C. S. SchlasemanD. R. McGowan
Prepared for
Niagara Mohawk Power CorporationNine Mile Point Nuclear Station Unit 1
PO Box 63Lycoming, NY 13093
Carmen R. Agosta
CONTENTS
~Secti n
l. INTRODUCTION
1.1 Purpose
1.2 Plant Description
1.3 Background
1.4 Report Organization
2. SAFE SHUTDOWN EARTHQUAKE
2.1 Ground Response Spectra
2.2 In-Structure Response Spectra
3. PROJECT TEAM
4. SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
4.1 Safe Shutdown Path Selection
4.1.1 Safe Shutdown Systems4.1.2 Supporting Systems
4.2 Operations Department Review of SSEL
4.3 Safe Shutdown Equipment List and Subsets
5. MECHANICALAND ELECTRICAL EQUIPMENT REVIEW
5.1 Summary of Review
~Pa e
1-2
2-1
2-1
3-1
4-1
4-14-4
4-7
4-7
5-1
5.1.15.1.25.1.35.1.4
Seismic Capacity vs. DemandEquipment Class DescriptionsEquipment AnchorageSeismic Interaction
5-15-25-45-4
CONTENTS (Continued)
$eg~in
5.2 Instances of Intent but Not Letter of Caveat Met
~Pa e
5-4
11. REFERENCES
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
Rbsum& for Seismic Capability Engineers
Composite Safe Shutdown Equipment List (SSEL)
Seismic Review Safe Shutdown Equipment List (SSEL)
Screening Verification Data Sheets (SVDS)
Third-Party Audit Report
5.3 Summary of Outliers
6. TANKAND HEAT EXCHANGER REVIEW
6.1 Summary of Review
6.2 Summary of Outliers
7. CABLE AND CONDUIT RACEWAY REVIEW
7.1 Summary of Raceway Review
7.2 Evaluation of Bounding Samples
7.3 Summary of Outliers.
8. PLAN FOR ADDRESSING UNRESOLVED OUTLIERS
9. SIGNIFICANTOR PROGRAMMATIC DEVIATIONSFROM THE GIP (10. THIRD-PARTY AUDITSUMMARY
5-4
6-1
6-1
7-1
7-1
7-2
8-1
9-1
10-1
TABLES
~Tie4-1 List of Procedures Used for Safe Shutdown Equipment List Review
5-1 Response Spectrum Exceedances for Building ElevationsContaining SSEL Equipment
5-2 Intent but Not Letter of Caveat Summary
5-3 Equipment Outlier Description and Resolution Summary
6-1 Tank and Heat Exchanger Outlier Description and Resolution Summary
7-1 Raceway Outlier Description and Resolution Summary
Laae
4-8
5-5
5-6
5-7
6-2
7-3
FIGUEUN
Pii;ure
2-1 Comparison of SSRAP Bounding Spectrum with NMP-1 Safe ShutdownEarthquake Spectrum
P~ae
2-3
Section 1
INTRODUCTION
1.1 PURPOSE
The purpose of this report is to document the seismic evaluations performed to addressUnresolved Safety Issue (USI) A-46 at Nine Mile Point Unit 1 (NMP-1), using the GenericImplementation Procedure (GIP) by the Seismic Qualification UtilityGroup (SQUG). Therelay evaluations are documented in a separate report.
1.2 PLANT DESCRIPTION
NMP-1 consists of a single unit, 610MW boiling water reactor located along the south shoreof Lake Ontario, in Scriba, NY. The plant was designed by General Electric (NSSS) andNiagara Mohawk Power Corporation (NMPC) (balance of plant), was constructed by Stone& Webster, and began commercial operation in 1969. NMP-1 is owned and operated byNMPC.
1.3 BACKGROUND
Because of the extent of the changes in the requirements for seismic qualification ofequipment over the years, the U.S. Nuclear Regulatory Commission (NRC) initiated USI A-46, "Seismic Qualification of Equipment in Operating Nuclear Plants," in December 1980.The purpose of USI A-46 is to verify the seismic adequacy of essential equipment inoperating plants which had not been qualified in accordance with more recent criteria.
In 1982, SQUG was formed to develop a practical approach for seismic qualification ofequipment in operating plants. The approach developed by SQUG was to use experiencewith the performance of power plant and industrial equipment in actual earthquakes as theprimary basis for evaluating the seismic ruggedness and functionality of essential equipmentin nuclear power plants. In 1983, the NRC issued NUREG 1018 which includes a generalendorsement of the use of experience data for verification of the seismic adequacy ofequipment in nuclear plants.
In early 1987, the NRC issued Generic Letter (GL) 87-02 to owners of operating nuclearplants which were licensed prior to development of modern seismic qualification standards.The recipients of GL 87-02 are referred to as A-46 plants and include NMP-l. Essentially,all owners of A-46 plants, including NMPC, are SQUG members. GL 87-02 requiresowners to take action to verify the seismic adequacy of important equipment in their plants.The SQUG approach embodied in the GIP is explicitly recognized by the NRC as thepreferred method for accomplishing this objective.
1-1
In 1992, the NRC issued Supplement No. 1 to GL 87-02 tReference 2] which transmittedSupplemental Safety Evaluation Report No. 2 on SQUG GIP, Revision 2, as corrected onFebruary 14, 1992 tReference 1]. References 1 and 2 are the basis for the seismicevaluations described in this report.
In References 4 and 5, NMPC described their approach for resolving USI A-46. Thisapproach was accepted by the NRC in References 6 and 7.
1.4 REPORT ORGANIZATION
The remaining sections of this report are organized in accordance with Section II.9.4 of theGIP [Reference 1]. These sections include the following:
~ Section 2, "Safe Shutdown Earthquake" —The NMP-1 Ground Response Spectra (GRS)and In-Structure Response Spectra (IRS) are described. The bases for determining howseismic demand is determined for each equipment are provided in Section 5, anddocumented on the SVDS forms in Appendix D of this report.
~ Section 3, "Project Team" —The NMPC project team is discussed. Rbsumbs for SCEsare included in Appendix A of this report.
~ Section 4, "Safe Shutdown Equipment List (SSEL)"—This section contains informationfrom the SSEL report recommended for submittal to the NRC, per Section II.9.2 of theGIP. The safe shutdown path selection and NMPC Operations Department review of theSSEL are discussed. Lists of equipment on the Composite SSEL and Seismic ReviewSSEL are included in Appendices B and C of this report. The list of equipment includedon the Relay Review SSEL is included in the Relay Report [Reference 3].
~ Section 5, "Mechanical and Electrical Equipment Review"—Screening Verification andWalkdown results for mechanical and electrical equipment are discussed, in addition tothe SVDS forms provided in Appendix D. Instances in which the intent of a caveat ismet without meeting the specific wording of the caveat rule are identified. A summaryof outliers and their resolution is provided.
~ Section 6, "Tank and Heat Exchanger Review"—Results of the tanks and heatexchangers review are discussed. A summary of outliers and their resolution isprovided.
~ Section 7, "Cable and Conduit Raceway Review"—Results of the raceway review,including bounding samples and outliers, are summarized..
~ Section 8, "Plan for Addressing Unresolved Outliers"—The plan and schedule foraddressing remaining unresolved outliers are discussed.
~ Section 9, "Significant or Programmatic Deviations from the GIP"—A statement is madethat no significant or programmatic deviations from the GIP are made at NMP-1. The
1-2
minor exception to the GIP noted in NMPC's September 18, 1992 letter to the NRC[Reference 4] is discussed in Section 4.1.1 of this report, "Safe Shutdown Systems."
~ Section 10, "Third-Party Audit Summary" —The Third-Party Audit is summarized. TheAudit report is included in Appendix E.
1-3
Section 2
SAFE SHUTDOWN EARTHQUAKE
2.1 GROUND RESPONSE SPECTRUM
The original design of Nine Mile Point Unit 1 (NMP-1) is based on a statistical evaluation ofthe seismic history of the plant's location which indicated that only insignificant groundmotion would be experienced at the site. As part of the NMP-1 seismic re-evaluationprogram, an upgraded design basis ground response spectrum (GRS) was developed for aSafe Shutdown Earthquake (SSE).
The new GRS, developed by Dames and Moore in 1984, was based on a probabilisticassessment of the frequency of exceedance of various ground acceleration, velocity, andresponse spectrum levels at the NMP-1 site. The Dames and Moore study utilized theprocedures documented by Tera Corporation (1980) in the report of work for LawrenceLivermore National Laboratory and the Probabilistic Risk Assessment Guide (AmericanNuclear Society, 1981) and relied on the expertise of Dames and Moore, a wide range ofexpert opinion summarized by Bernreuter, et al. (1984), and other studies of easternseismicity, including those by Hadley and Devine (1974), and Tera Corporation (1980).Earthquake catalogs of Chiburis (1981) and the U.S. Geoseismic Services were also used.
Dr. Lynn R. Sykes (Lamont-Doherty Geological Laboratory) and Mr. James McWhorter(Dames and Moore) delineated seismogenic zones and their credibility, and estimated theirparameters.
The selected ground motion is the 5% damped spectrum anchored at a Peak GroundAcceleration (PGA) of 0.13g, as shown in Figure 2-1.
2.2 IN-STRUCTURE RESPONSE SPECTRA
The NMP-1 in-structure response spectra (IRS) were developed using the time historymethod based on three-dimensional building models. The motions in the three directionswere applied simultaneously. The three components of the earthquake were combinedexactly.
The time history generation process involves, in general, the following steps:
~ Make an initial guess of the power spectrum from the response spectrum
~ Synthesize the time history based on the power spectrum and random phase angles
2-1
~ Compute the response spectrum from the time history
~ Adjust the power spectrum based on the comparison response spectra
~ Iterate on the previous steps until convergence
The four sets of time histories were generated from the new GRS using all eight dampingcurves in NUREG/CR-0098. The damping values used are 0.5%, 1%, 2%, 3%, 5%, 7%,10%, and 20%. The time histories envelope all damping curves simultaneously. Since theresponse spectra curves specified were not necessarily consistent, different damping curvestend to govern the power in different frequency bands, and the resulting time histories arequite conservative.
Two Niagara Mohawk Power Corporation (NMPC) letters [References 4 and 5] inform theUSNRC that the IRS as described above would be used for the A-46 Program. The firstletter includes a description and plots of the IRS. In their response to NMPC [Reference 7],the USNRC defines the.NMPC IRS as "realistic, median-centered" per GIP Section II.4.2[Reference 1].
2-2
Figure 2-1Comparison of SSRAP Bounding Spectrum
With NMP-1 Safe Shutdown Earthquake Spectrum
0.9
0.8
Spectral Acceleration (g)
-::;:::Five'::::Peice'nI.:':.Dampirig
0.7
0.6
0.5—
~ ~ ~
SSRAP Bounding Spectrum <1)
0.4
0.3
0.2
NMP-1 SSE:
0.1
00 10 15 20 25
Frequency (Hz)
30 35 40
1. SSRAP Bounding Spectrum is discussed in Section 4 of the GIP.
Section 3
PROJECT TEAM
The reviews of the seismic adequacy of several mechanical and electrical equipment items on theNMP-1 Safe Shutdown Equipment List (SSEL) were originally conducted during the SQUG pilotplant walkdowns in February 1988 [see Reference 8]. These walkdowns were performed bySeismic Review Teams (SRTs) consisting ofNMPC and other utilitypersonnel and contractors.In April 1989, a supplementary walkdown was conducted by three ofthe Seismic CapabilityEngineers (SCEs) involved in the pilot walkdowns.
In accordance with NMPC's commitment to use Revision 2 ofthe GIP [Reference 4], furtherwalkdowns were performed in 1993, 1994, and 1995. The majority ofthese "final"walkdownswere conducted by an SRT consisting ofC. Agosta (NMPC) and W. Djordjevic (Stevenson Ec
Associates), both ofwhom are SCEs and licensed professional engineers. Additional "final"walkdowns were performed by C. Agosta and C. Schiaseman (MPR Associates), who is also an
SCE and licensed professional engineer, and by C. Agosta and two other NMPC SCEs, A. Patwaand M.F. Alvi,both ofwhom are SCEs and licensed professional engineers. Resumes for all fiveSCEs are included in Appendix A.
Dr. Robert P. Kennedy ofStrucutral Mechanics Consulting, Inc., served as Third-Party Auditorfor the "final"walkdowns, i.e., those conducted in accordance with Revision 2 of the GIP. Dr.Kennedy was Chairman of the Senior Seismic Review and Advisory Panel (SSRAP), jointlyadvising both nuclear power utilities and the U.S. NRC on issues relating to seismic ruggedness ofexisting nuclear power plants. He is a consultant on seismic evaluation and design for more than50 nuclear facilities throughout the world.
3-1
Section 4
SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
The NMP1 Safe Shutdown Equipment List (SSEL) was prepared in accordance with SectionII.3 and Appendix A of the GIP tReference 1].
4.1 SAFE SHUTDOWN PATH SELECTION
4.1.1 Safe hutdown em
The following sections describe the safe shutdown systems and main operating proceduresteps necessary to meet USI A-46 requirements. The four basic functions of reactivitycontrol, pressure control, inventory control, and decay heat removal are covered. Eachsection describes the plant systems and main operator actions that are used to accomplishthese safe shutdown functions.
R~ii I R 'ill I I II& lgd C IRdD'~
~
~
~
~ ~
~ ~
~
~
~ ~
(CRD) System. Control rod insertion (scram) is initiated by either an automatic ReactorProtection System trip or from an operator-initiated manual trip.
The CRD hydraulic control system includes a high-pressure nitrogen and water accumulator,common master scram valves, and their corresponding pilot valves for each one of the 129control rods. The scram discharge header is used for all the individual CRD hydrauliccontrol units.
Each CRD mechanism has its own accumulator, common master scram valves, and pilotvalves. Thus, only one drive can be affected by a single, random failure. Reactivity canstill be controlled following this single, random failure since the core is designed to remainsubcritical with the rod of highest worth fullywithdrawn, assuming all operable rods arefully inserted. Sensors used to initiate high reactor pressure or low reactor water levelreactor scrams are also included in the SSEL.
Instrumentation used to monitor reactor reactivity for NMP-1 is not identified as a part of theresolution of USI A-46. Instead, the neutron monitoring system used at NMP-1 is evaluatedas a part of the generic program to comply with Regulatory Guide (RG) 1.97, Revision 2,"Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and EnvironsConditions During and Following an Accident." The NRC's letter to Niagara Mohawk datedNovember 19, 1986, and its enclosed Safety Evaluation Report (SER), were both related toconformance with RG 1.97. The NRC letter and SER accepted interim use of the existingneutron monitoring system at NMP-1 until an acceptable alternative was developed.
4-1
The Boiling Water Reactor Owner's Group submitted NEDO-31558, "Position on NRCRegulatory Guide 1.97, Revision 3, Requirements for Post-Accident Neutron MonitoringSystem". NEDO-31558 proposed alternative criteria for neutron flux monitoringinstrumentation in lieu of the Category 1 criteria stated in RG 1.97.
The staff completed its review of NEDO-31558, and by letter dated January 13, 1993, to theBoiling Water Reactor Owner's Group, issued a safety evaluation report. The safetyevaluation report concluded that for current Boiling Water Reactor operating licensees, thecriteria of NEDO-31558 are acceptable. This position was accepted by the NRC.
The NEDO-31558 document states equipment seismic qualification is not required [Reference9].
Re r C plant Pi ir ntr 1. The Electromatic Relief Valves (ERVs) were identifiedas the primary means to control Reactor Coolant System (RCS) pressure because they permitrapid depressurization of the RCS allowing use of the low-pressure Core Spray andContainment Spray Systems for inventory control and decay heat removal, respectively.
Each of two main steam lines has three ERVs installed between the flow restrictors and MainSteam Isolation Valves (MSIVs). Any three of the six ERVs are sufficient to depressurizethe RCS. The valves are actuated by the Automatic Depressurization System (ADS), ormanually from the control room. The instrumentation used to monitor the RCS pressure isincluded in the SSEL.
Although the Emergency Cooling System (ECS) is the normal and preferred method forachieving safe shutdown from an operational viewpoint, for A-46 resolution it is designatedas an additional, optional system for RCS pressure control and decay heat removal because itfalls short of GIP requirements in two areas:
~ A single failure of an ERV to reseat would render the ECS ineffective,
~ There is about 48 hours of make-up water for the emergency condensers in the make-uptanks and condensate storage tanks, but the GIP requires 72 hours of operation. Adiesel-driven fire pump and a motor-driven fire pump are available for make-up.
The ECS has two independent trains, each containing two emergency condensers. Trainscould be in operation to provide sufficient capacity for pressure control and decay heatremoval following a reactor isolation at fullpower. The trains are placed in operation byopening the emergency condenser condensate return isolation valves (39-05 and 39-06).
The ECS operates by natural circulation. Steam rises from the reactor vessel to the tube sideof the condensers, where it is condensed by boiling the shell-side condenser water. As thetube-side steam is condensed, it returns by gravity flow to the suction line of the reactorcoolant recirculating pump and, thus, to the reactor. The steam that is generated on the shellside of the condenser is vented to the atmosphere. The system is normally in stand-by and isactuated by high reactor pressure or low-low reactor water level with a 12 second delay.
4-2
0
The shell side of each condenser loop contains approximately 21,000 gallons of water(minimum of 10,680 gallons in each condenser). Makeup water to the condensers can begravity-fed from the two elevated 40,000-gallon makeup water storage tanks. This providesabout 8 hours of continuous operation. Additional water can be supplied to the makeup tanksthrough the Condensate Transfer System from the two 200,000-gallon condensate storagetanks. The makeup tanks, emergency condensers, and condensate storage tanks together canprovide water for approximately 48 hours of continuous operation.
The following process variables are monitored by SSEL equipment for the ECS: theemergency condensers'hell-side levels, the makeup water storage tanks'evels, and thecondensate storage tanks'evels.
R ct r Co 1 n In n n r 1. The Reactor Coolant System (RCS) inventory iscontrolled at low pressure using the Core Spray System. The Core Spray System consists oftwo independent, automatically-actuated, full capacity loops. Each core spray loop consistsof two 100% capacity pump sets (a pump and a topping pump per set). Each pump set hassufficient capacity to cool the core fuel assemblies in case of a small or large break LOCA'.The system is normally in standby and is automatically actuated by high drywell pressure orlow-low reactor water level. However, the core spray system can also be manually initiatedto maintain reactor vessel level.
The Control Rod Drive (CRD) hydraulic system can be used to deliver makeup to the RCSwhile the plant is at high pressure and thereby control RCS inventory. There are two 100percent capacity CRD hydraulic system trains, each including a horizontal, multi-stagecentrifugal pump capable of delivering 50 gpm of makeup flow. Suction for each CRDpump is from the two 200,000-gallon condensate storage tanks.
Since the CRD Hydraulic System has limited pumping capacity, it is necessary to minimizeleakage from the reactor coolant system. One potential leak site from which significantreactor coolant can be lost is through the recirculation pump seals. These seals are cooled bythe Reactor Building Closed Loop Cooling System which in turn is cooled by the ServiceWater or Emergency Service Water System. Because these two supporting systems areincluded in the SSEL, this potential leakage path is not a concern.
Air-operated valves 44-149 and 44-151 will fail close upon loss of station air, and the stationair system is not included in the SSEL. Therefore, the filter bypass line has been identifiedas the delivery path from the CRD hydraulic system to the reactor vessel. In order for thisline to be used, isolation valve 28-18 willhave to be opened manually by an operator.
The following process variables are monitored by SSEL equipment when controlling RCSinventory with the CRD hydraulic system: reactor vessel water level and the condensatestorage tanks'evels.
'This statement is for illustrative purpose. A LOCA is assumed not to occur simultaneouslywith a seismic event.
4-3
Deca H t Removal. The Containment Spray System was chosen as the primary system tosatisfy the safe shutdown requirements for the decay heat removal function. The EmergencyCooling System (described in "Reactor Coolant Pressure Control") was identified as anoptional high-pressure method to remove decay heat.
There are two separate and independent Containment Spray Systems, each having two 100percent capacity pumps. Loops 111 and 112 are considered to be the primary (Train 1)containment spray trains. Loops 121 and 122 are considered to be the secondary (Train 2)containment spray trains. Water for the Containment Spray System is pumped from thesuppression chamber, through a heat exchanger, and back to the suppression chamberthrough the main spray line or a bypass test line.
Raw cooling water is the cooling fluid for the containment spray heat exchanger. The rawwater is taken directly from the main intake tunnel and supplied by the Containment SprayRaw Water (CSRW) system, which consists of a pump, strainer, valves, and instrumentation.The CSRW System is considered to be a support system for the Containment Spray System.
The CSRW System supplies cooling water to the containment spray heat exchangers viadedicated raw water pumps. There are four 100 percent capacity CSRW trains. The CSRWpumps are six-stage, vertical, centrifugal pumps that are run from the emergency dieselgenerator powerboards (¹102 and ¹103). The pumps take suction from the condensercirculating water intake tunnel. The raw water passes through the containment spray heatexchangers and motor-operated blocking valves, before being released to the dischargemanifold.
The following process variables are monitored by SSEL equipment for decay heat removalwith the Containment Spray System: the RCS temperature and suppression chambertemperature.
u in em
The following sections describe the supporting systems necessary to ensure that the basic safeshutdown functions described above willbe achieved. These systems do not directly performa safe shutdown function, but must operate in order to support the safe shutdown systems.
Electrical Di ri ution. Upon loss of offsite power, the diesel generators automaticallystart. Diesel generator 102 (EDG102) provides power to powerboard 102 and dieselgenerator 103 (EDG103) provides power to powerboard 103. Powerboards 102 and 103provide 4160V power to vital pumps, control logic channels, and powerboards 16 and 17,respectively. In turn, powerboards 16 and 17 provide 600V power to other vital pumps,battery chargers, RPS power, the station computer, and other powerboards.
The DC electrical system provides normal and emergency onsite power to instrumentationand control buses, reactor protection system buses, nuclear instrumentation buses, andemergency lighting panels. The DC electrical system consists of a 125V system and a 24Vsystem.
4-4
The safety-related 125VDC system consists of two batteries (BATT11 and BATT12), twostatic battery chargers, and two distribution boards (BB11 and BB12) in separate,independent trains. The static chargers convert AC power from the Emergency AC PowerBoards (supplied by diesel generators) directly into DC power. The 125VDC systemprovides power to the DC valve boards, starting power for emergency diesels, DC electricalcontrol boards, remote shutdown panels, breaker control for various 4160V powerboards,etc.
The 24VDC electrical system consists of two 48VDC (center tapped) batteries and four24VDC battery chargers. The 24VDC batteries provide power to four nuclearinstrumentation buses.
R c r B ildin l ed o lin em. The Reactor Building Closed LoopCooling (RBCLC) System supports the control room HVAC system by supplying coolingwater to the control room HVAC chillers. It also supplies water to the non-safety relateddrywell air coolers, and various reactor auxiliary systems and components. Three RBCLCpumps are used to circulate water through the system, two normally in service and one instandby. Water discharged through the pumps then passes through the shell side of any ofthe three RBCLC heat exchangers in service. The RBCLC water is cooled by water fromthe Emergency Service Water or Service Water System, which passes through the tube sideof these heat exchangers. The RBCLC water is then supplied to the six drywell air coolerheat exchangers. These heat exchangers provide cooling of the air inside the drywell.Additionally, unrelated to HVAC and other BOP systems, the RBCLC system providescooling water to the recirculation pump seal coolers. This cools the seals to protect againstreactor coolant leakage.
.ThS i WSyp id* ling f bhhRBCLCdTBCLC System heat exchangers. The Emergency Service Water System only suppliesessential cooling water to the Reactor Building sections of the system, including the RBCLCheat exchangers. There are two emergency service water pumps arranged in parallel whichtake water from the intake forebay in the screen house. Service water then passes throughthe tube side of the three RBCLC heat exchangers before entering the service waterdischarge header.
Allactive RBCLC equipment and emergency service water equipment necessary to supportthe operation of the RBCLC heat exchangers are listed in the SSEL. However, passiveequipment (e.g., redundant heat exchangers) which is used only as a system boundary wasnot included in the SSEL. It was assumed that sufficient time would exist for operators toisolate any such equipment whose pressure integrity fails.
Di el ne t r u o, The two emergency diesel generator units and their auxiliarysystems fulfilla supporting function for the ERVs, the Core Spray System, the ContainmentSpray System, and the supporting and optional systems. The diesel generators provideelectrical power for motor-operated emergency equipment in the event that off-site power islost. Each diesel generator provides power to an emergency bus (102 for EDG102 and 103for EDG103).
4-5
When needed, the diesel engines are started with their air start systems. Each air startsystem consists of five air receivers, which supply high-pressure air to the diesel air-startmotors. DC power is used to start air flow to the diesels.
Fuel for the diesel engines is supplied by the fuel oil handling and storage system. There isa 400-gallon, built-in day tank, a 12,000-gallon underground storage tank, a transfer pump,and an automatic level control system for each diesel engine. Diesel engine power is usedfor the fuel handling systems.
The engine cooling system is a closed cooling water system which surrenders the heat to heatexchangers cooled by the Diesel Generator Cooling Water System. There are two heatexchangers and one cooling water pump per diesel generator. Diesel engine power is usedfor the cooling water systems.
Each EDG room has two fans and,a roll-up door to provide ventilation for the diesel engine.
HVAC. Portions of the NMP-1 heating, ventilation and air conditioning (HVAC) systemsare included in the SSEL. These systems support other safe shutdown equipment by coolingelectronic and mechanical components during the 72 hours following a safe shutdown. Theportions of the plant HVAC systems included in the SSEL are: the Control Room HVACSystem, the non-safety related drywell air coolers, and the Reactor Building EmergencyExhaust System.
The Control Room HVAC System is a supporting system for the other safe shutdownsystems because it prevents the control room area from becoming excessively warm, whichcould have an adverse effect on the performance of both operators and electronics. Thereare two control room emergency vent fans arranged in parallel which draw in outside air.The air then passes through two cooling coils arranged in series. After the air is cooled, itenters the control room circulation fan and is delivered to the control room area. Thecontrol room circulation fan is equipped with a spare motor for increased reliability. Thetwo cooling coils are supplied with chilled water by two chiller units and two chilled watercirculation pumps. The chiller units give up heat to the RBCLC system.
There are six drywell air coolers used for cooling drywell equipment. The drywell aircoolers have fans which force air over a heat exchanger. The heat exchanger is cooled bywater from the RBCLC system.
The Reactor Building Emergency Exhaust System is designed to filter radioactivecontaminants out of reactor building air before exhausting it to the atmosphere. Because thissystem can be operated with power from the emergency diesels, it has been included on thesafe shutdown equipment list as a method to provide cooling to reactor building equipment.The normal reactor building ventilation system was not included on the safe shutdownequipment list because it is not connected to the diesel generators.
4-6
The Reactor Building Emergency Exhaust System consists of two 1600 cfm fans arranged inparallel. These fans force air from the reactor building through filters before exhausting it tothe stack.
Ventilation for the battery room is provided by the turbine building HVAC system. Theturbine building HVAC, however, is not included in the safe SSEL because it is not poweredfrom an emergency bus. The effect of battery room temperature on battery performance isnot a concern because it is assumed that at least one diesel willoperate. This has beenresolved by calculation S10-H,GAS-HV01-01 (refer to NRC IR 92-19, page 3).
4.2 OPERATIONS DEPARTMENT REVIEW OF SSEL
NMP-1 Operations Department has reviewed the Safe Shutdown Equipment List (SSEL)necessary to meet USI A-46 requirements. Comments made during the review process onshutdown systems and operating procedures credited with coping with a seismic event havebeen resolved and incorporated. Operations agrees that the four basic functions of reactivitycontrol, pressure control, inventory control, and decay heat removal can be accomplished asdescribed in this report.
4.3 SAFE SHUTDOWN EQUIPMENT LIST AND SUBSETS
Printouts of the SSEL database are included in Appendices B and C. Appendix B is a
~
~ ~ ~
~
~
~printout of the Composite SSEL, which includes equipment requiring Seismic Reviews andRelay Reviews. Appendix C contains the Seismic Review SSEL.
4-7
Table 4-1
List of Procedures Used for Safe Shutdown Equipment List Review
e in Procedure
N1-OP-1Nl-OP-2N1-OP-5N1-OP-8N1-OP-10N1-OP-11N1-OP-13N1-OP-14N1-OP-18N1-OP-20Nl-OP-30N1-OP-33AN1-OP-33BN1-OP-40N1-OP-45Nl-OP-47AN1-OP-47BN1-OP-49
Nuclear Steam Supply SystemCore Spray SystemControl Rod Drive SystemPrimary Containment Area Cooling SystemReactor Building Heating Cooling and Ventilation SystemReactor Building Closed Loop Cooling SystemEmergency Cooling SystemContainment Spray SystemService Water SystemService, Instrument, and Breathing Air Systems4.16KV, 600V, and 480V House Service115KV System345KV SystemReactor Protection and ATWS SystemEmergency Diesel Generators125VDC Power System24VDC Power SystemControl Room Ventilation System
Emer enc e tin Pr ced re
N1-EOP-2N1-EOP-4N1-EOP-8
RPV ControlPrimary Containment ControlEmergency RPV Depressurization
in Proced re
N1-SOP-1N1-SOP-5N1-SOP-6N1-SOP-11N1-SOP-17
Reactor ScramLoss of 115KVInstrument AirFailureEarthquakeVessel/Containment Isolation
4-8
Section 5
MECHANICALAND ELECTRICALEQUIPMENT REVIEW
5.1 SUIVPd'ARY OF REVIEW
The reviews of the seismic adequacy of several mechanical and electrical equipment items onthe NMP-1 Safe Shutdown Equipment List (SSEL) were originally conducted during the
SQUG pilot plant walkdowns in February 1988. These walkdowns were performed inaccordance with Revision 1 of the Generic Implementation Procedure (GIP), and aredocumented in Reference 8. In April 1989, a supplementary walkdown was conducted bythree of the Seismic Capability Engineers (SCEs) involved in the pilot walkdowns. Thesewalkdowns were also performed in accordance with Revision 1 of the GIP.
In accordance with NMPC's commitment to use Revision 2 of the GIP [Reference 4], furtherwalkdowns were performed in accordance with GIP Section II.4 in 1993, 1994, and 1995.The majority of these "final" walkdowns were conducted by a Seismic Review Team (SRT)consisting of C. Agosta (NMPC) and W. Djordjevic (Stevenson & Associates), both ofwhom are SCEs and licensed professional engineers. Additional "final" walkdowns wereperformed by C. Agosta and C. Schlaseman (MPR Associates), who is also an SCE andlicensed professional engineer, and by C. Agosta and two other NMPC SCEs, A, Patwa andM.F. Alvi, both of whom are SCEs and licensed professional engineers. Resumes for allfive SCEs are included in Appendix A.
Signed Screening Verification Data Sheets (SVDSs) for each SSEL equipment item arecontained in Appendix D. The SVDSs are organized by equipment class, and by SRTs.
5.1.1 ei i acit v Demand
The NMP-1 design basis ground response spectrum (GRS) discussed in Section 2 isenveloped by the SQUG Bounding Spectrum for all frequencies. A comparison of the NMP-1 in-structure "realistic" response spectra (RRS) with 1.5 times the SQUG BoundingSpectrum, as required by GIP Section II.4.2, is summarized in Table 5-1. The ReactorBuilding RRS exceed the amplified Bounding Spectrum (ABS) over specific frequency rangesfor three elevations containing SSEL equipment, The Turbine Building, which is modeled inseparate sections, has five areas containing SSEL equipment that have RRS exceedances overspecific frequency ranges.
The "effective grade" elevation, as defined in Section II.4.2.3 of the GIP, is the averageelevation of the ground surrounding the building along its perimeter. At NMP-1 the TurbineBuilding is founded on rock at elevations 243 ft. and 250 ft. above sea level. The ReactorBuilding is founded on rock at elevation 198 ft, but changes from an essentially monolithic
5-1
concrete block structure (including the reactor base mat) to that of reinforced concrete wallsand floors at about elevation 240-243 ft. Grade elevation is 261 ft. During the 1988 pilotwalkdowns, it was conservatively assumed that the effective grade is about elevation 240-243ft. On this basis, the plant elevations that are considered to be within 40 ft. of effectivegrade are those in the Reactor and Turbine Buildings up to and including the 281 ft.elevation.
The 40 ft. and 8Hz rules from GIP Section II.4.2.3 were used as appropriate for seismiccapacity vs. demand (i.e., BS was compared with GRS). RRS demands vs. ABS capacitieswere used mainly for SSEL equipment with natural frequencies less than 8Hz. For SSELequipment on the upper elevations of the Reactor and Turbine Buildings, RRS vs. ABS wereused for equipment with fundamental frequencies outside the exceedance range, or 1.5 timesthe RRS vs. Generic Equipment Ruggedness Spectra (GERS) capacities were used forequipment meeting the GERS caveats defined in Appendix B of the GIP. Equipment withoutGERS, and for which the natural frequency could not be established as being outside theABS exceedance range shown in Table 5-1, were identified as outliers.
5.1.2 imn I D ri i
The vast majority of NMP-1 SSEL equipment items are typical of those found in the SQUGearthquake experience database and meet all applicable GIP Appendix B caveats andinclusion rules. Exceptions were identified as GIP outliers. The following paragraphsdiscuss NMP-1 SSEL equipment by class type.
The NMP-1 SSEL contains six General Electric (GE) 7700 frame powerboards (motorcontrol centers), four 600V GE powerboards classified as low-voltage switchgear and theirtransformers, and one additional transformer. Except for one MCC located at elevation 300ft. in the Turbine Building, all of these items are located on the 261 and 281 ft. floors in theReactor Building. Six of the medium-voltage switchgear on the SSEL are located on the 261ft. elevation of the Turbine Building, and two additional units are on the 277 ft. elevation.These switchgear are standard GE metal-clad switchgear with "Magne-Blast" breakers. Allof these equipment items, except for the medium voltage switchgear, meet all equipmentclass caveats (being the applicable bounding spectrum), GERS, anchorage, and interactioneffects, including the dimensional and weight limitation guidelines for equipment classinclusion. It is unknown whether two of the medium voltage switchgear have lateral restraint(other than the jacking mechanism) of their vertically-racked breakers as required by theclass inclusion rules. These switchgear, therefore, were identified as outliers.
There are 13 horizontal pumps on the NMP-1 SSEL, and 16 vertical pumps. Allhorizontalpumps meet applicable equipment class caveats, except for the four core spray toppingpumps which have anchorage outliers and are discussed in the anchorage section. Allvertical pumps meet applicable equipment class caveats, except for the eight deep-wellvertical pumps in the containment spray raw water, emergency service water, and DGcooling water systems. These pumps each have impeller shaft unsupported lengths thatexceed the GIP screening maximum unsupported limitof 20 ft. These pumps were identifiedas outliers.
5-2
Numerous fluid-operated and solenoid valves, and about a dozen motor-operated valves, wereevaluated throughout the plant. Allvalves meet applicable equipment class caveats.
Of the five NMP-1 SSEL fans, the two reactor building emergency exhaust fans meet allapplicable equipment class caveats. The three fans that are part of the control room HVACsystem meet all applicable equipment class caveats, except for their anchorages, which areidentified as outliers.
Air handlers on the NMP-1 SSEL include two cooling coils that are part of the control roomHVAC system, and six drywell air coolers and fans. Allair handlers meet applicablecaveats, except for the anchorage of the control room HVAC cooling coils, which areoutliers. The structural integrity of one additional air handler, the laboratory air coolingcoil, was confirmed because it can not be isolated from the control room HVAC chilledwater system. It was not, however, required to be seismically verified.
The two control room HVAC chillers on the NMP-1 SSEL meet all of the equipment classscreening criteria, except for anchorage adequacy. These were documented as outliers.
Distribution panels on the NMP-1 SSEL include both small, wall-mounted units, and large,floor-mounted panels. Alldistribution panels are standard components that meet allapplicable equipment class caveats.
Batteries and battery racks at NMP-1 were replaced in 1990, and meet all applicableequipment class caveats.
New static battery chargers and inverters were installed and operational at the conclusion ofRFO13 in 1995. The new static chargers, inverters, and the 24V DC battery chargers meetall applicable equipment class caveats.
The two emergency diesel generators at NMP-1 are typical of those found in power plantapplications and meet all of the applicable equipment class screening criteria.
The four instrument racks on the NMP-1 SSEL meet all of the applicable equipment classscreening criteria, except for the anchorage outlier identified for the MSIV instrument rack.All transmitters, controllers, switches, etc., also included with this class meet applicablecaveats.
The 38 torus temperature sensors on the NMP-1 SSEL meet all applicable GIP class caveats.
Half of the 62 instrumentation & control g&C) cabinets on the NMP-1 SSEL are large,floor-mounted auxiliary control cabinets located below the Main Control Room in theAuxiliary Control Room. These cabinets are grouped in rows containing 6 to 11 cabinets,and meet all applicable class caveats, except for some cabinets which do not meet anchoragerequirements and were identified as outliers. The Main Control Room cabinets on the SSEL
5-3
include 8 large, walk-through panel boards and 1 control console. These cabinets, and theremaining control panels in the Turbine and Reactor Buildings, meet all applicable equipmentclass caveats, except for some cabinets which do not meet anchorage requirements and wereidentified as outliers. Note that approximately 60 SSEL items identified as equipment class20 are components contained within an I&C panel or control board, and were seismicallyverified using the GIP "Rule-of-the-Box."
5.1.3 ui ment An ho e
To verify the adequacy of equipment anchorage, both field inspections and analyticalcalculations were performed in accordance with GIP Section II.4.4.1 and Appendix C.
The NMP-1 MCCs, low-voltage switchgear and transformers were all classified as outliersdue to inadequate anchorage, or anchors not covered by the GIP geaded cinch anchors).Other equipment anchored with cinch anchors were identified as outliers, including controlroom HVAC equipment on Turbine Building Elevation 300', two 4160V switchgear, the corespray topping pumps, two battery boards, an instrument rack, and six control and protectiverelay cabinets for the battery chargers, UPS and the MG set. These outliers have beenresolved as shown in Table 5-3.
About two-thirds of the auxiliary control room SSEL cabinets, 7 of the 9 main control roompanels, and the two 125V DC valve boards have inadequate anchorage. Allof these cabinetswere identified as outliers, and have been resolved as shown in Table 5-3.
The remaining anchorage outiiers are for the ceramic isolators on the two EDG relayresistors (neutral grounds). These outliers were resolved as shown in Table 5-3.
5.1.4 i mi Ine ci n
During the equipment walkdowns, evaluations were made of potential seismicinteraction concerns, including the control room ceiling, per GIP Section II.4.5 andAppendix D. In general, it was found that adjacent items are adequately spaced, andoverhead items adequately supported, to preclude impacts. Some seismic interactionconcerns, however, were identified for specific equipment items and were classified as
outliers.
5.2 INSTANCES OF INTENT BUT NOT LETTER OF CAVEATMET
Instances in which the intent of a particular caveat is met without meeting the specificwording of the caveat rule are identified in Table 5-2.
5.3 SUMMARYOF OUTLIERS
A total of 117 outliers were written for NMP-1 SSEL equipment items. Short descriptions ofeach equipment outlier and its resolution are provided in Table 5-3.
5-4
$ I
Table 5-1
Response Spectrum Excedances for Building ElevationsContaining SSEL Equipment
Structure
Reactor Building
Turbine Building
Elevation
298'18'40'61'Turbine
Bldg. Extension)
289'TurbineBldg. Extension)
291'00'04'Turbine
Bldg. Extension)
Frequency Range WhereRRS Exceeds ABS
5Hz-9Hz4.5 Hz - 11 Hz
4.5 Hz - 25 Hz
17 Hz-23 Hz
4Hz-6Hz
9 Hz - 16 Hz
9 Hz - 18 Hz
9 Hz - 18 Hz
5-5
Page 1 of 1
Table 5-2
Intent but Not Letter of Caveat Summary
Equipmcnt ID Lcttcr of Caveat Not Mct Reason Intent of Caveat is Mct
PB1671
210.141A Actuator and yoke are braced independently of pipe. Valve is well supported on rigid frame and actuator is anchored to thesame frame and is judged acceptable.
MCC cutout cover-plate size exceeds GIP maximum dimensions. Standard GE unit whose structural adequacy is judged acceptable.
210.142A Actuator and yoke are braced indepcndcntly ofpipe. Valve is wc!i supported on rigid frame and actuator is anchored to thesame frame and is judged acceptable.
20 Panel contains strip chart rccordcrs. Rccordcrs arc well supported and do not pose any threat to othercquipmcnt in pand and are judged acccptablc.
Page 1 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note I)
Class Equipment ID Equipment Description Outlicr DescriptionOutlicr Resolution
Anchorage I 161A AP/600 V Powerboard P16IA Marginal anchorageResolved by adding base anchorageEc cnd braces
Anchorage 161B AP/600 V Powcrboard 0'161B Marginal anchorageRcsolvcd by adding base anchorageEc end braces
Anchorage 167 AP/600 V Powcrboard 1167 Marginal anchorageResolved by adding base anchorageEc end braces
Anchorage 171A AP/600 V Powerboard P171A Marginal anchorageRcsolvcd by adding base anchorage8r cnd braces
Anchorage 171B AP/600 V Powcrboard f17 IB Marginal anchorageResolved by adding base anchorageEc end braces
Anchorage/Interaction
1671 AP/600V Powcrboard Cinch anchors
The existing base anchorage mccts
design bases loads, but docs not meet
GIP equipment class anchor cavcats.Install additional base anchors.(Rcf. DER 1-95-3101)
Anchorage 16A AP/600 V Powcrboard PI6A Marginal anchorage
Thc existing base anchorage mccts
design bases loads, but does not mcctGIP equipment class anchor cavcats.Weld thc cabinet base to the existingembcddcd channel.(Rcf. DER 1-95-3140)
Anchorage 16B AP/600 V Powerboard 016B Marginal anchorage
Thc existing base anchorage mccts
design bases loads, but docs not meet
GIP cquipmcnt class anchor cavcats.
Weld thc cabinet base to the existingcmbcdded channel.
(Rcf. DER 1-95-3140)
0
Page 2 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Class Equipment ID Equipment Description Outlier DescriptionOutlicr Resolution
Anchorage 17A AP/600 V Powcrboard //17A Marginal anchorage
The existing base anchorage meets
design bases loads, but docs not mcctGIP equipmcnt class anchor cavcats.Weld the cabinet base to the existingembedded channel.(Ref. DER 1-95-3140)
Anchorage 17B AP/600 V Powcrboard //17B Marginal anchorage
The existing base anchorage meets
design bases loads, but docs not meet
GIP cquipmcnt class anchor cavcats.Weld the cabinet base to the existingembedded channel.
(Ref. DER 1-95-3140)
Anchorage 12 AP/4160V Powcrboard 12 Anchored one side only
Thc existing base anchorage meets
design bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.
Anchor the other side of the cabinetto the existing embcddcd channel.(Ref. DER 1-95-3 103)
Anchorage 3 AP/4160V Powcrboard 11 Anchored one side only
The existing base anchorage mcctsdesign bases loads, but docs not meet
GIP cquipmcnt class anchor caveats.Anchor the other side of the cabinetto thc existing embedded channel.(Rcf. DER 1-95-3102)
Anchorage/Cav cats
3 101/2A-I 4160V Aux Feeder to 0102 Cinch anchors
The existing base anchorage mcctsdesign bases loads, but docs not mcctGIP equipment class anchor cavcats.
Weld cabinet to existing cmbeddcdchannels and do a bolt tightncsscheck. (Rcf. DER 1-95-3141)
0
Page 3 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Class Equipmcnt ID Equipmcnt Description Outlier DescriptionOutlier Resolution
Anchorage/Cavcats
Anchorage/Cav cats
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
101/2B-1
TRANS 167A
TRANS 16A
TRANS 16B
TRANS 17A
TRANS 17B
81-49
81-50
81-51
81-52
210.1-36
210.1-37
79-53
79-54
4160V Aux Fccdcr to ¹103
AP/600 to 120/208 V Transformer
AP/4160 to 600 V Transformer
AP/4160 to 600 V Transformer
AP/4160 to 600 V Transformer
AP/4160 to 600 V Transformer
CRS/Core Spray Topping Pump ¹112
CRS/Core Spray Topping Pump ¹111
CRS/Core Spray Topping Pump ¹121
CRS/Core Spray Topping Pump ¹122
CRAC/Chill Water Circ Pump ¹12
CRAC/Chill Water Circ Pump ¹12
DGCW/DG Cooling Water Pump ¹103
DGCW/DG Cooling Water Pump ¹102
Cinch anchors
Embedded channels anchored withcinch anchors
Supporting unanchored powcrboards
Supporting unanchored powcrboards
Supporting unanchored powerboards
Supporting unanchored powcrboards
Cinch anchor
Cinch anchor
Cinch anchor
Cinch anchor
Cinch anchors
Cinch anchors
Shaft caveat not mct
Shaft caveat not mct
The existing base anchorage meets
design bases loads, but does not meet
GIP cquipmcnt class anchor cavcats.Weld cabinet to existing embcddcdchannels and do a bolt tightncsscheck. (Rcf. DER 1-95-3141)
Adequate as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation and bolttightncss check
Adequate as-is by calculation and bolttightncss check
Adequate as-is by calculation and bolttightness check
Adequate as-is by calculation and bolttightness check
Adequate as-is by calculation and bolttightncss check
Adequate as-is by calculation and bolttightness check
Adequate as-is by calculation
Adequate as-is by calculation
93%1 CSRW/Cont Spray Raw Water Pump ¹112 Casing length cxcccds 20'imit Adequate as-is by calculation
I
R
Page 4 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note I)
Cavcats
Cavcats
Caveats
Anchorage
Anchorage
Anchorage/Demand
Class Equipmcnt ID
6 93W2
6 9343
6 9344
6 7M3
6 72-04
70-53
21041
9 210-61
9 21042
Equipment Description
CSRW/Cont Spray Raw Water Pump IIIICSRW/Cont Spray Raw Water Pump 4122
CSRW/Cont Spray Raw Water Pump PI21
SW/Emcr Scrvicc Water Pump PI2
SW/Emer Service Water Pump PI I
Chiller Control Valve
CRAC/Emcr Vent Fan Pl I
CRAC/Emer Vent Fan 012
CRAC/Cont. Rm HVAC Circ. Fan
Outlier Description
Casing length excccds 20'imit
Casing length cxcceds 20'imit
Casing length cxcccds 20'imit
Shaft length )GIP maximum
Shaft length )GIP maximum
Valve offse caveat not mct
Cinch anchors
Cinch anchors
Cinch anchors, Capacity <dcmand-frcq
Outlicr Resolution
Adcquatc as-is by calculation
Adcquatc as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation
Adcquatc as-is by calculation
Adequate as-is by calculation
Adcquatc as-is by calculation and bolttightncss check
Adcquatc as-is by calculation and bolttightness check
Adequate as-is by bolt tightnesscheck
Anchorage 10 210-49 CRAC/Cooling Coil f12 Cinch anchorsAdequate as-is by bolt tightncsscheck
Anchorage
Anchorage/Demand
Anchorage/Demand/
Interaction
10 210-50
11 210.1-119
210.1-120
CRAC/Cooling Coil NII
CRAC/Chiller Pl I
CRAC/Chiller 412
Cinch anchors
Base isolator and demand spectrum
Base isolator and demand spectrum
Adequate as-is by bolt tightncsscheck
Thc existing base anchorage meets
design bases loads, but docs not meet
GIP equipmcnt class anchor cavcats.Brace the vibration isolator to thefloor. (Ref. DER 1-95-3216)
Thc cxistingbasc anchoragemcctsdesign bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Brace the vibration isolator to thefloor. (Rcf. DER 1-95-3216)
Anchorage 14 BBII AP/125 V DC Baucry Board III Cinch anchors Adequate as-is by calculation
Page 5 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Anchorage
Interaction
Interaction
Interaction
Interaction
Class
14
16
16
16
16
Equipment ID
BB12.
UPS 162A
UPS 162B
UPS 172A
UPS 172B
Equipmcnt Description
AP/125 V DC Battery Board 012
Uninterruptible Power Supply
Unintcrruptible Power Supply
Unintcrruptible Power Supply
Unintcrruptible Power Supply
Outlicr Description
Cinch anchors
Fluorcsccnt tubes could fall and impactcabinet containing csscntial relays
Fluorcsccnt tubes could fall and impactcabinet containing csscntial relays
Huorcsccnt tubes could fall and impactcabinet containing essential relays
Huoresccnt tubes could fall and impactcabinet containing csscntial relays
Outlicr Resolution
Adequate as-is by calculation
Resolve by securing tubes.
(Rcf. PID )F12754)
Resolve by securing tubes.
(Rcf. PID f12754)
Resolve by securing tubes.
(Rcf. PID f12754)
Resolve by securing tubes.
(Rcf. PID f12754)
Interaction
Interaction
Anchorage
Anchorage
Anchorage
16
16
17
17
18
SBC 171A
SBC 171B
RC102
RC103
MSIVIR
Static Battery Charger
Static Battery Charger
AP/DG 102 Relay Resistor (NeutralGround)
AP/DG 103 Relay Resistor (NeutralGround)
AP/Main Stcam Isolation Valve InstrumentRack
Huorcsccnt tubes could fall and impactcabinet containing csscntial relays
Fluorcsccnt tubes could fall and impactcabinet containing csscntial relays
Ceramic insulators
Ceramic insulators
Cinch anchors
Resolve by securing tubes.
(Ref. PID 012754)
Resolve by securing tubes.
(Rcf. PID 012754)
Adequate as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation. Bolttightncss check is required.
Anchorage 20 1S3'4 CTRIJAux Control Relay Cabinet 1S34 Plug weld on one side only
The existing base anchorage mccts
design bases loads, but docs not meetGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingembedded channels.
(Rcf. DER 1-95-3151)
Page 6 o
Table 5-3 =
Equipment Outlier Description and Resolution Summary
Type(Note I)
Class Equipment ID Equipmcnt Description Outlicr DescriptionOutlicr Resolution
Anchorage 20 IS35 CTRL/Aux Control Relay Cabinet IS35 Plug weld on one side only
The existing base anchorage meets
design bases loads, but does not meet
GIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingembcddcd channels.(Rcf. DER 1-95-3151)
Anchorage IS36 CTRL/Aux Control Relay Cabinet IS36 Plug weld on one side only
The existing base anchorage mccts
design bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Rcf. DER 1-95-3151)
Anchorage IS514
CTRL/Aux Control Cabinet IS51 Plug weld on onc side only
The existing base anchorage meets
design bases loads, but does not meet
GIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Ref. DER 1-95-3147)
Anchorage 20 IS52 CTRL/Aux Control Cabinet IS52 Plug weld on one side only
The existing base anchorage meets
design bases loads, but docs not meetGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingembedded channels.(Ref. DER 1-95-3 147)
Anchorage 1$ 53 CTRL/Aux Control Cabinet IS53 Plug weld on one side only
The existingbase anchoragemcctsdesign bases loads, but docs not meet
GIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Ref. DER 1-95-3147)
'I
Page 7 o
Table 5-3
Equipment Outlier Description and Resolution Summary
'ype(Note I)
Class Equipmcnt ID Equipment Description Outlicr DescriptionOutlicr Resolution
Anchorage. 20 IS54' CTRL/Aux Control Cabinet IS54 Hug weld on onc side only
The existing base anchorage meets
design bases loads, but docs not meetGIP cquipmcnt class anchor 'caveats.
Weld cabinet frame to existingcmbcddcd channels.(Rcf. DER 1-95-3147)
Anchorage 20 IS55 CTRL/Aux Control Cabinet IS55 Plug weld on one side only
The existing base anchorage mccts
design bases loads, but does not mcctGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Ref. DER 1-95-3147)
Anchorage IS56 CTRL/Aux Control Cabinet IS56 Plug weld on one side only
The existing base anchorage meets
design bases loads, but does not meetGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingembcddcd channels.(Rcf. DER 1-95-3147)
Anchorage IS57 CTRL/Aux Control Cabinet IS57 Hug weld on one side only
The existing base anchorage mcctsdesign bases loads, but docs not meetGIP equipment class anchor cavcats.Weld cabinet frame to'existingcmbcddcd channels.
(Ref. DER 1-95-3147)
Anchorage IS59 CTRL/Aux Control Cabinet IS59 Plug weld on one side only
The existing base anchorage mcctsdesign bases loads, but does not mcctGIP equipmcnt class anchor cavcats.Weld cabinet frame to existingembedded channels.(Rcf. DER 1-95-3148)
II
Page 8
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note I)
Equipment ID Equipment Description Outlicr DescriptionOutlier Resolution
Anchorage
Anchorage
20 - IS60
IS62
CTRL/Aux Control Cabinet IS60
CTRL/Aux Control Cabinet IS62
Plug weld on one side only
Plug weld on one side only
The existing base anchorage meets
design bases loads; but docs not mcctGIP equipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Ref. DER 1-95-3148)
Thc cxistingbase anchoragcmcetsdesign bases loads, but docs not meet
GIP equipment class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.
(Rcf. DER 1-95-3148)
Anchorage IS63 'rRL/AuxControl Cabinet IS63 Plug weld on onc side only
The existing base anchorage mcctsdesign bases loads, but docs not meetGIP equipment class anchor cavcats.Wcid cabinet frame to existingcmbcddcd channels.(Rcf. DER 1-95-3148)
Anchorage . 20 IS64 CTRL/Aux Control Cabinet IS64 Plug weld on one side only
The existing base anchorage mcctsdesign bases loads, but does not meetGIP equipment class anchor caveats.Weld cabinet frame to existingcmbcddcd channels.
(Rcf. DER 1-95-3 148)
Anchorage 20 1$ 65 CrRL/Aux Control Cabinet IS65 Plug weld on one side only
The existing base anchorage mcctsdesign bases loads, but docs not meetGIP equipment class anchor caveats.Weld cabinet frame to existingcmbeddcd channels.(Rcf. DER 1-95-3148)
Page 9 o
Table 5-3
Equipment Outlier Description and Resolution Summary
TYpe(Note I)
Class Equipmcnt ID Equipment Description Outlicr DescriptionOutlicr Resolution
Anchorage 20 IS70 CTRL/Aux Control Cabinet IS70 Plug weld on one side only
The existing base anchorage meets
design bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Rcf. DER 1-95-3149)
Anchorage
Anchorage
IS73
1874
CI'RL/AuxControl Cabinet IS73
CTRL/Aux Control Cabinet IS74
Plug weld on onc side only
Plug weld on one side only.
The existing base anchorage mccts
design bases loads, but docs not mcctGIP equipment class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Rcf. DER 1-95-3149)
The existing base anchorage meets
design bases loads, but docs not meet
GIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingembedded channels.(Rcf. DER 1-95-3149)
Anchorage
Interaction
Interaction
20
20
1875
IS80
IS82
CTRL/Aux Control Cabinet IS75
CTRIJAux Control Cabinet IS80
CTRL/Aux Control Cabinet IS82
Plug weld on one side only
Seismic interaction with unanchoredadjacent cabinets
Seismic interaction with unanchoredadjacent cabinets
The existing base anchorage meets
design bases loads, but docs not mcctGIP equipment class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.
(Rcf. DER 1-95-3149)
Seismic interaction with unanchoredIS37 to IS39 cabinets. Weldunanchored cabinets.(Ref. DER 1-95-3150)
Seismic interaction with unanchoredIS37 to IS39 cabinets. Weldunanchored cabinets.(Rcf. DER 1-95-3150)
Page 10 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Class Equipmcnt ID Equipmcnt Description Outl icr DescriptionOutlier Resolution
Interaction
Interaction
Interaction
Interaction
Interaction
Anchorage
20
20
20
20
20
20
1884
ls85
ls86
ls87
ls88
CP161A-B
CTRL/Annunciator Control Cabinet 1S84
CTRL/Aux Control Cabinet IS85
CTRL/Aux Control Cabinet IS86
CTRL/Aux Control Cabinet 1S87
CTRL/Aux Control Cabinet 1S88
AP/Battery Charger 161A and 161B ControlCabinet
Seismic interaction with unanchored
adjacent cabinets
Seismic interaction with unanchoredadjacent cabinets
Seismic interaction with unanchoredadjacent cabinets
Seismic interaction with unanchoredadjacent cabinets
Seismic interaction with unanchoredadjacent cabinets
Cinch anchors
Seismic interaction with unanchored1S37 to 1S39 cabinets. Weldunanchored cabinets.(Rcf. DER 1-95-3150)
Seismic interaction with unanchored1S37 to 1S39 cabinets. Weldunanchored cabinets.(Rcf. DER 1-95-3150)
Seismic interaction with unanchored1$37 to 1S39 cabinets. Weldunanchored cabinets.(Rcf. DER 1-95-3150)
Seismic interaction with unanchored1S37 to 1S39 cabinets. Weldunanchored cabinets.
(Rcf. DER 1-95-3150)
Seismic interaction with unanchored1S37 to IS39 cabinets. Weldunanchored cabinets.(Rcf. DER 1-95-3150)
Adequate as-is by calculation
Anchorage 20 PRC162AP/UPS 162A and 162B Prot. RelayCabinet
Cinch anchors Adequate as-is by calculation
Anchorage
Anchorage
Anchorage
20
20
20
CP167
PRC167
CP171 A-B
AP/Computer Power Supply MG Sct 0167Control Pnl
AP/MG Sct SI67 Prot. Relay Cabinet
AP/Battery Charger 171A and 171B ControlCabinet
Cinch anchors
Cinch anchors
Cinch anchors
Adcquatc as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation
Page 11
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Anchorage
Class
20
Equipmcnt ID
PRC 172
Equipmcnt Description
AP/UPS 172A and 172B Prot. RelayCabinet
Outlicr Description
Cinch anchors
Outlier Resolution
Adequate as-is by calculation
Interaction 20 CTRL/Control Board Pnl A Potential interaction with nearbyunsccurcd platform ladders
Resolved by securing platformladders to building column
Anchorage
Anchorage
20
20
CTRL/Control Board Pnl F
CTRL/Control Board Pnl G
Anchorage on one side only
Anchorage on one side only
Thc existing base anchorage meets
design bases loads, but does not meetGIP equipment class anchor cavcats.Install a brace bctwccn the twocabinet sections.(Rcf. DER 1-95-3215)
The existing base anchorage meets
design bases loads, but docs not meetGIP equipment class anchor cavcats. ~
Install a brace bctwccn the twocabinet sections.
(Rcf. DER 1-95-3215)
Anchorage
Anchorage
20
20
H CTRL/Control Board Pnl H
CTRL/Control Board Pnl K
Anchorage on one side only
Anchorage on one side only
The existing base anchorage mcctsdesign bases loads, but does not mcctGIP equipmcnt class anchor cavcats.Install a brace bctwccn the twocabinet sections.(Rcf. DER 1-95-3215)
'the existing base anchorage meets
design bases loads, but does not mcctGIP cquipmcnt class anchor caveats.Install a brace bctwccn thc twocabinet sections.
(Rcf. DER 1-95-3215)
Page 12 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Class Equipmcnt ID Equipment Description Outlicr DescriptionOutlicr Resolution
Anchorage 20 CTRL/Control Board Pnl L Anchorage on one side only
The existing base anchorage meets
design bases loads, but docs not meet
GIP cquipmcnt class anchor caveats.
Install a brace bctwccn thc twocabinet sections.(Rcf. DER 1-95-3215) .
Anchorage 20 M CTRL/Control Board Pnl M Anchorage on one side only
Thc existing base anchorage meets
design bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Install a brace between the twocabinet sections.(Rcf. DER 1-95-3215)
Anchorage 20 N CTRL/Control Board Pnl N Anchorage on one side only
The existing base anchorage mcctsdesign bases loads, but docs not mcctGIP equipmcnt class anchor cavcats.
Install a brace betwccn the twocabinet sections.(Rcf. DER 1-95-3215)
Anchorage VBII CTRL/125 V DC Vlv Board tl 1 Marginal anchorage
Rcsolvcd by welding the cabinetframe to the existing cmbcddcdchannel.
Anchorage/Demand
20
.Anchorage 21
VB12
.305-128
CTRL/125 V DC Vlv Board P12
CRD/Hydraulic Control Units
Bounding spectrum
Anchor/Frame connections unknown
Evaluate cabinet for seismic loads
Adequate as-is by calculation
~ Anchorage
Caveat
Anchorage
21
08A
21
305-128
3344
CRD/Hydraulic Control Units
RCU/Reactor Clean-up ISO Vlv
EDG 102 AirStart Tank 01
Anchor/Frame connections unknown
Valve offse cannot be rnct
Cinch anchors
Adcquatc as-is by calculation
Adequate as-is by calculation
Adequate as-is by calculation and bolttightncss check
Anchorage 21 9645 EDG 102 AirStart Tank k2 Cinch anchorsAdequate as-is by calculation and bolttightncss check
Page 13 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note I)
Class Equipmcnt ID Equipmcnt Description Outl ter Dcscnpt>onOutlicr Resolution
Anchorage 21 EDG 102 AirStart Tank //3 Cinch anchorsAdequate as-is by calculation and bolttightness check
Anchorage 21 EDG 102 AirStart Tank //4 Cinch anchorsAdequate as-is by calculation and bolttightness check
Anchorage
Anchorage
Anchorage
Anchorage
21
21
21
21
96-31-
96-32
96-33
EDG 102 AirStart Tank //5
EDG 103 AirStart Tank //I
EDG 103 AirStart Tank A2
EDG 103 AirStart Tank //3
Cinch anchors
Cinch anchors
Cinch anchors
Cinch anchors
Adequate as-is by calculation and bolttightness check
Adcquatc as-is by calculation and bolttightncss check
Adcquatc as-is by calculation and bolttightncss check
Adequate as-is by calculation and bolttightncss check
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
21
21
20
21
21
96-34
96-35
IS4
60-10
EDG 103 AirStart Tank //4
EDG 103 AirStart Tank //5
CTRIJAux Control Relay Cabinet IS4
ECMU/Emcr Cond Make-Up Tank 112
ECMU/Emcr Cond Make-Up Tank PI I
AP/4160V Powcrboard 1102
Cinch anchors
Cinch anchors
Plug weld one side only
Anchorage adequacy unknown
Anchorage adequacy unknown
Allcubiclcs arc not wcldcd
Adequate as-is by calculation and bolttightncss check
Adequate as-is by calculation and bolttightncss check
The existing base anchorage mcctsdesign bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbcddcd channels.(Ref. DER-1-95-3152)
Adequate as-is by calculation
Adequate as-is by calculation
Thc existing base anchorage mcctsdesign bases loads, but does not mcctGIP equipmcnt class anchor caveats.Weld cabinet frame to existingcmbeddcd channels.(Rcf. DER-1-95-3091)
Page 14 o
Table 5-3
Equipment Outlier Description and Resolution Summary
Type(Note 1)
Class Equipmcnt ID Equipment Description Outlicr DescriptionOutlicr Resolution
Anchorage 103 AP/4160V Powerboard 0103 Allcubiclcs are not wcldcd
The existing base anchorage meets
design bases loads, but docs not mcctGIP cquipmcnt class anchor cavcats.Weld cabinet frame to existingcmbeddcd channels.(Rcf. DER-1-95-3091)
Interaction 21 71-126 RBCLC Ivlake-up Tank Seismic interaction with laundry barrelsRelocate bancls south of ColumnLine H
Notes:
2.3.
Type ofoutlicr includes: 'Anchorage for outlicrs not mccting Anchorage rcquircmcnts, 'Cavcats'or outlicrs not meeting Caveat rcquircmcnts, Demand'or outlicrswhose capacity is less than seismic Demand, and 'Interaction'or outliers not meeting seismic Interaction rcquircmcnts.The Deviation Event Rcport (DER) describes the deviation, addresses operability of the component and completion date which all actions willbe complctcd.The Problem Identification Document (PID) dcscribcs the concern and will invoke a work order to do the field work.
Section 6
TANKAND HEAT EXCHANGER REVIEW
6.1 SUMMARYOF REVIEW
The tanks and heat exchangers on the NMP-1 SSEL were evaluated in accordance withSection II.7 of the GIP preference 1]. The NMP-1 SSEL includes 18 tanks and 11 heatexchangers. Ten of the tanks are start air tanks for emergency diesel generators. Theselarge, wall-mounted tanks meet all of the applicable strength, load path, and anchoragescreening criteria, except that their anchorage includes the use of cinch anchors. Thereforethey are outliers, as shown in Table 6-1.
The two horizontal emergency condenser makeup water tanks meet GIP criteria, except forthe baseplate for the longitudinal braces. The outliers for these 4 tanks are shown on Table6-1.
The two sets of hydraulic control unit (HCU) accumulators for the 144 control rod drives(CRD) (counted as two equipment items on the NMP-1 SSEL) are small tanks located onReactor Building 237'. These accumulators meet all applicable GIP screening criteria,except that the adequacy of their anchorage was unknown at the time of the walkdown. Theanchorage outliers are described in Table 6-1.
The remaining two tanks are the underground diesel fuel oil storage tanks. Because the GIPdoes not cover underground tanks, these tanks are outliers, as shown in Table 6-1.
The 11 heat exchangers on the NMP-1 SSEL include the 4 emergency condensers, 3 RBCLCheat exchangers, and 4 containment spray heat exchangers. All 11 heat exchangers arehorizontal units located in the Reactor Building, and all meet applicable GIP screeningcriteria.
6.2 SUMMARYOF OUTLIERS
The 18 tank and heat exchanger outliers, and their resolutions, are summarized inTable 6-1.
6-1
,,Tank and Heat Exchanger Outlier Description and Resolution Summary
Page 1
Type(Note I)
Anchorage
Anchorage
Interaction
Class
21
21
21
EquipmcntID
60-10
71-126
Equipmcnt Description
ECMU/Emcr Cond Makeup Water Tank 012
ECMUIEmer Cond Makeup Water Tank /'/ll
RBCLC Makeup Tank
Outl icr Description
Anchorage adequacy unknown
Anchorage adequacy unknown
Seismic interaction with laundry barrels
Outlicr Resolution
Adequate as-is by analysis
Adequate as-is by analysis
Relocate barrels south ofColumn Line H
Cavcats
Caveats
Anchorage
Anchorage
21
21
21
21
82 43
82-44
9645
FOHS/DG Fuel Oil Storage Tank 0103
FOHS/DG Fuel Oil Storage Tank 1102
DSA/DG 4102 Start AirTank 41
DSA/DG 0102 Start AirTank //2
Underground tanks are not covered by the GIP
Underground tanks are not covered by the GIP
Cinch anchor
Cinch anchor
Adequate as-is by analysis
Adequate as-is by analysis
Adequate as-is by analysis andbolt tightncss check
Adequate as-is by analysis andbolt tightness check
Anchorage
Anchorage
Anchorage
Anchorage
21
21
21
21
9648
96-31
DSA/DG f102 Start AirTank A3
DSA/DG 0102 Start AirTank 44
DSA/DG tl02 Start AirTank PS
DSA/DG f103 Suut AirTank lII
Cinch anchor
Cinch anchor
Cinch anchor
Cinch anchor
Adequate as-is by analysis andbolt tightness check
Adequate as-is by analysis andbolt tightncss check
Adequate as-is by analysis andbolt tightncss check
Adequate as-is by analysis andbolt tightncss check
Anchorage
Anchorage
21
21
96-32
96-33
DSA/DG 0103 Start AirTank A2
DSA/DG 1103 Start AirTank //3
Cinch anchor
Cinch anchor
Adequate as-is by analysis andbolt tightness check
Adcquatc as-is by analysis andbolt tightncss check
Anchorage
Anchorage
Anchorage
Anchorage
Interaction
21
21
21
21
21
96-35
96-36
305-125
305-128
71-126
DSA/DG 0103 Start AirTank //4
DSA/DG 4103 Start AirTank //5
CRD/Hydraulic Control Unit Accumulator
CRD/Hydraulic Control Unit Accumulator
RBCLC Make-up Tank
Cinch anchor
Cinch anchor
Anchorage adequacy unknown
Anchorage adequacy unknown
Seismic interaction with laundry barrels
Adequate as-is by analysis andbolt tightness check
Adequate as-is by analysis andbolt tightness check
Adequate as-is by analysis
Adequate as-is by analysis
Relocate barrels south ofColumn Line H
Notes:1. Type of outlicr includes: Anchorage for outlicrs not mccting Anchorage requirements, and Cavcats for outlicrs not mccting Caveat rcquircmcnts.
Section 7
CABLE AND CONDUITRACEWAYREVIEW
7.1 SUMMARYOF RACEWAYREVIEW
The reviews of cable tray and conduit systems at NMP-1 were performed per the guidelinesof Section II.8 of the Generic Implementation Procedure (GIP) [Reference 1].Allraceways which support electrical wires for SSEL equipment were reviewed. Thesereviews were conducted on an area-by-area basis, and include areas that could containdivisional (Class 1E) cables. Walkdown evaluations covered elevations within the ReactorBuilding, Turbine Building, and the Screenhouse.
Most of the raceway walkdowns were performed in April 1993 by a team of two SCEs, bothwith PE's. The raceways in the Screenhouse and Drywell were walked down by two SCEsin February 1995. In general, almost all raceways and raceway support systems evaluatedare of rugged construction and meet all applicable caveats and inclusion rules.
Cable trays at NMP-1 are typically 24" in width, with 4" siderails. Tray spans are generallyabout 6 to 8 feet. Multiple tiers of trays are common at NMP-1, and tray fills typicallyrange from 30% to 50% full.
The conduit and cable tray systems at NMP-1 are typically supported by rod hung trapeze-type hangers. The structural steel grade used in construction of these hangers is assumed tobe A-36 except for cold-formed components. The cold-formed components are from theUnistrut Division of GTE Products Corporation and consist of various strut members andfittings.
Raceway supports are anchored to concrete ceilings in the Reactor Building by use of castiron inserts or strut runners either welded to embedded plates or secured with'expansionanchors. For the Turbine Building and Screenhouse, embedded ("Globe" ) struts are usedinstead of cast iron inserts. In areas where the ceiling is of Q-Deck type, support rods areanchored to structural steel beams via clamps, or attached to strut runners welded to the Q-decking. The Q-Deck capacity is given in Nuclear Engineering Report NERlS009.
7.2 EVALUATIONOF BOUNDINGSAMPLES
As part of the in-plant review, worst-case bounding samples of raceway supports wereselected for further Limited Analytical Reviews (LARs). LARs were selected to encompassthe diversity of the plant's existing raceway support systems. A total of eight worst-caseLARs were selected during the in-plant reviews of the raceway support systems at NMP-1.
7-1
The two LARs selected from the Reactor Building walkdowns meet all GIP requirements,except for the use of cast iron inserts, which is common in the Reactor Building. Supportsusing cast iron inserts do not meet GIP screening criteria, and are discussed below in theoutlier summary section.
7.3 SUMMARYOF OUTLIERS
Four raceway outliers were identified during the walkdowns. These outliers are summarizedin Table 7-1. One outlier was identified for a Turbine Building raceway that had two cut-offrods. Another outlier was also for a Turbine Building raceway, having a short rod supportbetween two longer rod supports.
The raceway walkdowns also identified two generic outliers: (1) cast iron inserts used tosupport raceways in the Reactor Building, and (2) fire protection system piping attached toand adjacent to Turbine Building raceways. The capacity of the cast iron inserts wasdetermined by analysis and was used to evaluate LAR ¹1 and LAR ¹2, which both meet theGIP screening requirements. Since there is no indication that the rods may not be fullyinserted, fullcapacity is used. PID ¹12396 identifies this concern, and further fieldveri6cation that the threaded rod is fully inserted is planned. In the Turbine Building, fireprotection system piping is attached to cable trays via deflector plates, or is immediatelyadjacent to rod hung cable tray systems. The concern is that the seismic deformation of therod hung system would possibly break the fire piping, which has threaded couplings, andwater would spray onto the cables. Potential damage to cables due to spray from the fireprotection piping was evaluated in the NMP-1 IPEEE Identification of Structures, Systems,and Components", report number SAS-I3U1-1, and found acceptable.
7-2
Page 1 of 1
Table 7-1
Raceway Outlier Description and Resolution Summary
OutlierNumber
CB-TB-261(issue 2)
PlantLocation
TB
261'utlier Description
LAR ¹5 (1) has two cut rods, and (2) has a span length greater than the GIPmaximum of 10'.
Outlier Resolution
DER 1-95-2518'dd a newsupport+
CB-TB-261
CB-TB-261(issue 1)
TB261'ire protection system piping is attached to cable trays or is immediately
adjacent to tray systems. Potential seismic interaction may cause threaded
couplings on fire piping to fail and spray water on cables.
LAR ¹1 has a short rod support between two much longer rod supports.
Cast iron inserts are commonly used in Reactor Building to attach threaded rodtype supports to building concrete.
Potential damage to cables due tofire piping spray was evaluatedand found acceptable.
The reason for the short rods areconduit supports attached to theserods. Remove the conduitsupports.
Capacity of NMP-1 cast ironinserts was determined byanalysis. Conduct a walkdown toverify the threaded rod is notfullyinserted. See PID ¹12396.
1. The Deviation Event Report (DER) describes the deviation, addresses operability of the component, and completion date which all actions willbecompleted.
Section 8
PLAN FOR ADDRESSING UNRESOLVED OUTLIERS
The plan for addressing unresolved outliers is described in Table 8-1 using the DeviationEvent Report (DER) process. All field work noted in the Outlier Resolution column willbecompleted at the conclusion of RFO15 (1999).
8-1
Page 1
Table 8-1
Unresolved Outlier Resolution Summary
Type(Note I)
Anchorage/Interaction
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage/Cavcats
Anchorage/Cavcats
Anchorage/Demand
Anchorage/Demand/
Interaction
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Class
20
20
Equipmcnt ID
1671
16A
16B
17A
17B
12
101/2A-I
101/2B-I
210.1-119
210.1-120
IS34
IS35
IS36
IS51
IS52
IS53
1$54
Equipment Description
AP/600V Powcrboard
AP/600V Powerboard 416A
AP/600V Powcrboard P16B
AP/600V Powcrboard 117A
AP/600V Powcrboard 0I7B
AP/4160V Powcrboard 12
AP/4160V Powcrboard 11
4160V Aux Feeder to 0102
4160V Aux Feeder to 4103
CRAC/Chiller PI I
CRAC/Chiller 012
CTRL/Aux Control Relay Cabinet IS34
CTRL/Aux Control Relay Cabinet IS35
CTRL/Aux Control Relay Cabinet IS36
CTRL/Aux Control Cabinet ISS I
CTRL/Aux Control Cabinet IS52
CTRL/Aux Control Cabinet IS53
CTRL/Aux Control Cabinet IS54
Outlicr Description
Cinch anchors
Marginal anchorage
Marginal anchorage
Marginal anchorage
Marginal anchorage
Anchored one side only
Anchored one side only
Cinch anchors
Cinch anchors
Base isolator and demand spectrum
Base isolator and demand spectrum
Plug weld on one side only
Plug weld on onc side only
Plug weld on onc side only
Plug weld on one side only
Plug weld on one side only
Plug weld on onc side only
Plug weld on onc side only
Outlicr Resolution(Note 2)
DER 1-95-3 101 Install additionalanchors
DER 1-95-3140 Weld cabinet
DER 1-95-3140 Weld cabinet
DER 1-95-3140 Weld cabinet
DER 1-95-3140 Weld cabinet
DER 1-95-3 103
DER 1-95-3102 Weld other side
DER 1-95-3141 Weld cabinet
DER 1-95-3141 Weld cabinet
DER 1-95-3216 Brace base
DER 1-95-3216 Brace bMe
DER 1-95-3151 Weld other side
DER 1-95-3151 Weld other side
DER 1-95-3151 Weld other side
DER 1-95-3147 Weld other side
DER 1-95-3147 Weld other side
DER 1-95-3147 Weld other side
DER 1-95-3147 Weld other side
Page 2
Table 8-1
Unresolved Outlier Resolution Summary
Type(Note 1)
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Anchorage
Interaction
Interaction
Interaction
Interaction
Interaction
Class
20
20
20
20
Equipmcnt ID
ls55
ls56
1$ 57
1859
1S60
1862
1863
IS64
IS65
1870
1S73
1S74
1S75
1880
1882
ls84
ls85
1$ 86
Equipment Description
CTRL/Aux Control Cabinet 1$ 55
CTRL/Aux Control Cabinet 1S56
CTRIJAux Control Cabinet 1S57
CTRL/Aux Control Cabinet 1S59
CTRL/Aux Control Cabinet 1S60
CTRL/Aux Control Cabinet 1S62
CTRL/Aux Control Cabinet 1S63
CTRL/Aux Control Cabinet 1S64
CTRL/Aux Control Cabinet 1S65
CTRL/Aux Control Cabinet 1S70
CTRIJAux Control Cabinet 1S73
CTRIJAux Control Cabinet 1S74
CTRL/Aux Control Cabinet 1S75
CTRL/Aux Control Cabinet 1S80
CTRL/Aux Control Cabinet IS82
CTRL/Annunciator Control Cabinet 1S84
CTRL/Aux Control Cabinet 1S85
CTRIJAux Control Cabinet IS86
Outlicr Description
Hug weld on one side only
Plug weld on one side only
Plug weld on onc side only
Plug weld on one side only
Plug weld on one side only
Plug weld on onc side only
Plug weld on one side only
Plug weld on one side only
Hug weld on one side only
Plug weld on one side only
Plug weld on onc side only
Plug weld on one side only
Hug weld on one side only
Seismic interaction with unanchored adjacentcabinets
Seismic interaction with unanchored adjacentcabinets
Seismic interaction with unanchored adjacentcabinets
Seismic interaction with unanchored adjacentcabinets
Seismic interaction with unanchored adjacentcabinets
Outlier Resolution(Note 2)
DER 1-95-3147 Weld other side
DER 1-95-3147 Weld other side
DER 1-95-3147 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3148 Weld other side
DER 1-95-3149 Weld other side
DER 1-95-3149 Weld other side
DER 1-95-3149 Weld other side
DER 1-95-3149 Weld other side
DER 1-95-3150 Weld cabinets
DER 1-95-3150 Weld cabinets
DER 1-95-3150 Weld cabinets
DER 1-95-3150 Weld cabinets
DER 1-95-3150 Weld cabinets
Page 3
Table 8-1
Unresolved Outlier Resolution Summary
ype(Note 1)
Interaction
Equipmcnt ID
ls87
Equipmcnt Description
CTRL/Aux Control Cabinet 1S87
Outlicr Description
Seismic interaction with unanchored adjacentcabinets
Outlicr Resolution(Note 2)
DER 1-95-3150 Weld cabinets
Interaction
Anchorago
Anchorago
Anchorage
Anchorage
Anchorago
Anchorage
ls88
H
CTRL/Aux Control Cabinet 1S88
CTRL/Control Board Pnl F
CTRL/Control Board Pnl G
CTRL/Control Board Pnl H
CTRL/Cont I Bom aa K
CIRIJControl Board Pnl L
CTRL/Control Board Pnl M
Seismic interaction with unanchored adjacentcabinets
Anchorago on ono side only
Anchorago on one side only
Anchorago on one sido only
Anchorage on ono side only
Anchorage on one sido only
Anchorago on ono side only
DER 1-95-3150 Weld cabinets
DER 1-95-3215 Brace panels togcthcr
DER 1-95-3215 Brace panels together
DER 1-95-3215 Brace panels togcthcr
DER 1-95-3215 Brace panels togcthcr
DER 1-95-3215 Braco panels together
DER 1-95-3215 Braco panels togcthcr
Anchorage
Anchorago
Anchorage
20 N
1$4
CIRL/Control Board Pnl N
CTRL/AuxControl Relay Cabinet 1S4
AP/4160V Powcrboard ¹102
Anchorago on one sido only
Hug weld one side only
Allcubicles aro not wcldcd, a gap existsbctwccn the door and frame.
DER 1-95-3215 Braco panels togcthcr
DER 1-95-3152 Weld other side
DER 1-95-3090 Weld cabinet
Anchorago
Interaction N/A N/A
PB161 dt,
PB171
AP/4160V Powcrboard ¹103
Control Room Ceiling Tiles
AP/600V Powcrboard 161 Sc 171
Allcubicles are not welded, a gap existsbctwcen the door and frame.
Tho ceiling tiles are not tied down
Gaps between pand and braces
DER 1-95-3091 Weld cabinet
Tie down tiles
Install shim material
Notes:
1. Type ofoutlicr includes: 'Anchorage'or outlicrs not meeting Anchorage rcriuircmcnts, "Caveats'or outlicrs not mccting Caveat requirements, "Demand'or outlicrs whosocapacity is less than seismic Demand, and Interaction'or outlicrs not mccting seismic Interaction requirements.
2. Tho Deviation Event Report (DER) describes tho deviation, addrcsscs operability of the component, and completion date which all actions willbe completed.
Section 9
SIGNIFICANT OR PROGRAMMATICDEVIATIONSFROM THE GIP
No significant or programmatic deviations from the GIP have been made in the NMP-1 A-46Program.
9-1
Section 10
THHUhPARTY AUDITSUINMARY
As required by Section I.2.2.7 of the GIP [Reference 1], a Third-Party Audit was performedby one individual who was not part of the Seismic Review Teams. The Third-Party Auditreport is included in Appendix E of this report, and is summarized below.
The site visit portion of the peer review was conducted on August 28-30, 1995. Walkdownswere conducted before the Screening Evaluation Worksheets (SEWS) were reviewed. Asampling of SEWS chosen based on the peer walkdown was subsequently reviewed andgenerally found to be in good order.
The walkdown has been conducted in a competent manner and results are in accordance withthe guidance of the Generic Implementation Plan (GIP) and NP-6041 documentation. Thevast majority of the findings noted were already found and documented by the walkdownteam, so the peer reviewer believes this walkdown to have been conducted in a thorough andprofessional manner. The so-called "seismic housekeeping" was found to be excellent. Veryfew items such as desks, bookcases, ladders, and the like were found in the proximity ofsafety-related equipment. When they were in the general proximity of equipment, as was thecase in the Main Control Room, the items were chained to a structural column.
The following addresses the peer review audit findings.
The lead insert expansion anchors (cinch anchors) were used for some mechanical andelectrical equipment and were declared outliers. NMP-1 is currently performing a bolttightness check per Appendix C.2.3 of the GIP. Three components anchorage remain to bechecked using a Document Change Request (DCR). The anchorage willbe checked during aforced outage or a refuel outage due to ALARAand personnel safety concerns.
The lube oil reservoirs on pumps appear to be loose. By design, the oil reservoir fits looselyover a metal cup and no further modification is required. This finding is closed.
A number of cable tray supports are attached to a sheet metal deck. Further analysis wasdone and the results are given in Section 7 of this report.
The majority of cable tray supports in the Reactor Building have a cast iron insert foranchorage. An ultrasound test on a statistical sample willbe performed to assure thethreaded rod is sufficiently inserted into the insert. See Table 7-1 of this report.
EDG 102 and EDG 103 power board cubicals are not all anchored. The SEWS are revisedand the power boards are outliers. The gaps between the door and frame willbe addressedon the outlier resolution forms for the power boards. See Table 8-1 of this report.
10-1
Section 10 (Cont.)
The fuel oil tanks, the room exhaust fans, and the roll up doors for the diesel generatorswere added to the SSEL. This finding is closed.
The condensate water storage tanks are optional equipment for a GIP analysis. No action isrequired as this is optional equipment. This finding is closed.
The Control Room chillers are outliers, and a DER has been written to address a plantmodification. See Table 8-1 of this report.
A bolt tightness check was done for the cinch anchors for 1671 power board. Allboltsachieved the proper torque. This finding is closed.
Valves 202-34 and 202-35 were judged to have independent braces. The SEWS were revisedto show this judgment is conservative. This finding is closed.
An analysis concluded tanks 60-09 and 60-10 base plates are acceptable. This finding isclosed.
The RBCLC tank 71-126 was found acceptable for a Section 7 GIP analysis. This item isclosed.
Battery Boards BB11 and BB12 SEWS Revision 0 states a cable tray is attached to the top ofthe boards and is considered in the board weight. This item is closed.
System interaction of the EDG room fire panel and ventilation system is currently beingevaluated. See DER 1-95-2987 and Table 2-2 of the USI A-46 Relay Evaluation Report.
An HCLPF evaluation for the Foam Room was judged that no seismic failure willoccur.This item is closed.
A Problem Identification Document (PID) is written to address tieing down of the ControlRoom ceiling panels. See Table 8-1 of this report.
The Control Room and Auxiliary Control Room panels are outliers, and a plant modificationis addressed using DER process. See Table 8-1 of this report.
The gaps between the MCC braces and the cubical is addressed in a PID. See Table 8-1 ofthis report.
The HCU anchorage was evaluated and were found to be adequate. This finding is closed.
The containment spray pump SEWS were revised to assume the pumps are flexible.Analysis shows the pump anchorage is adequate for applied loads. This finding is closed.
The welding of Power Board 16 and 17 is addressed in a DER. See Table 8-1 of this report.
10-2
Section 11
RE<I<'ERENCES
1. Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear PlantEquipment, dated February 1992, copyright Seismic Qualification UtilityGroup(SQUG), Revision 2, corrected February 14, 1992.
2. USNRC, "Supplement No. 1 to Generic Letter (GL) 87-02 that Transmits SupplementalSafety Evaluation Report No. 2 (SSER No, 2) on SQUG Generic ImplementationProcedure, Revision 2, as Corrected on February 14, 1992 (GIP-2)," dated May 22,1992.
3. MPR Associates, Inc., MPR-1450, "Nine Mile Point Nuclear Station —Unit 1, USI A-46Relay Evaluation Report," Revision 1, dated April 1994.
4. Niagara Mohawk Power Corporation Letter (C. D. Terry) to USNRC, NMP1L 0695,dated September 18, 1992.
5. Niagara Mohawk Power Corporation Letter (C. D. Terry) to USNRC, NMP1L 0728,dated January 22, 1993.
6. US Nuclear Regulatory Commission Letter (D. S. Brinkman) to NMPC (B. R. Sylvia),dated November 17, 1992.
7. US Nuclear Regulatory Commission Letter (D. S. Brinkman) to NMPC(B. R. Sylvia), dated March 24, 1993.
8. MPR Associates, Inc., "Results of BWR Trial Plant Review, Nine Mile Point Unit 1,"prepared for Seismic Qualification UtilityGroup (SQUG), April 1988.
9. Niagara Mohawk Power Corporation Letter (C. D. Terry) to USNRC, NMP1L 0765,dated June 18, 1993.
11-1
Appendix A
RCSUMRS FOR SEISMIC CAPABILITYENGINEERS
Carmen R. AgostaMohammed F. AlviWalter DjordjevicAbdussattar Patwa
Caroline S. Schlaseman
CARMEN R. AGOSTA
PROFESSIONALHISTORY Niagara Mohawk Power Corporation, Corporate Offices, Syracuse, New York, Structural
Engineer, 1989-Present
Bechtel Power Corporation, Gaithersburg, Maryland, Civil/Structural Engineer, 1981-1989
EXPERIENCE NIAGARAMOHAWKPOWER CORPORATIONSTRUCTURAL ENGINEER - NINE MILE POINT UNIT 1
Project Manager for the Seismic Qualification Utility Group (SQUG) Program.Responsible for equipment seismic verification, by using SQUG methods, resultingin a substantial cost savings for the company. Provide engineering evaluation ofequipment mounting, conduit and cable tray supports and in-situ modal testing ofselected electrical cabinets. Develop design specifications forcontrol ofheavy loads,concrete expansion anchors and generic conduit and cable tray supports. Thegeneric support details developed for these specifications accelerates the modifica-tion design process. Proficient in STADD, ICES-STRUDL, Word Perfect and HarvardGraphics computer programs. Maintain seismic qualification and equipmentcertification files.
BECHTEL POWER CORPORATIONCIVIL/STRUCTURALENGINEER - THREE MILE ISLAND PROJECT
Contract Administrator for tools fabricated at off-site machine shops. Designedunique tools such as an underwater abrasive saw, rotary sealer and an airliftpump.Tooldesig n was performed using AutoCADcomputer program. These tools providedan efficient means for defueling the TMI-2 reactor vessel.
.CIVIL/STRUCTURALENGINEER - YANKEEATOMIC ELECTRIC PROJECT
Designed Control Rod Drive pipe supports utilizing the STADD structural analysiscomputer program foroptimum design solutions. The project was performed on timeand under budget.
CIVIL/STRUCTURALENGINEER - TURKEY POINT PROJECT
Responsible for modifications to the Turkey Point Nuclear Plant for 10CFR50Appendix R compliance. The modifications included design of pipe supports.
CIVIL/STRUCTURALENGINEER - SNUPPS PROJECT
Performed design and analysis on various power block structures during theconstruction phase of Callaway Unit 1. Evaluated steel framing connections withhigh strength bolts in accordance with AISC Manual of Steel Construction andCooper-Turner Industries resulting in no rework of these connections. Analyzedexisting steel framing members foradditional applied loads. Disposition field changerequests and non-conformance reports written against design drawings.
CIVIL/STRUCTURALENGINEER - SUSQUEHANNA PROJECT
Determined the structural adequacy of the Reactor Building liner plate for appliedloads prior to initial plant start-up. The analysis concluded the liner plate wasadequate and did not impact start-up. Reviewed the as-built drawings of plantframing steel to determine structural adequacy.
CIVIL/STRUCTURALENGINEER - DAVIS BESSE PROJECT
Evaluated the as-built drawings of pipe supports to assure compliance with ANSIB31.1 and ASME Section III. Analyzed the main steam pipe whip restraint supportsusing ICES STRUDL-II structural analysis computer program.
EDUCATION West Virginia University, Morgantown (1981)B.S. Civil Engineering
State University of New York, Delhi (1974)A.A.S. Building Construction
REGISTRATION Professional Engineer, Commonwealth of Pennsylvania
RESUME OFMOHAMMEDFAROOQ ALVI,P.E.
Supervisor, Civil/Structural Unit 1
EMPLOYMENT HISTORY.
Niagara Mohawk Power Corporation301 Plainfield Road, Syracuse, NY 13212September 1988 to PresentSupervisor, Civil/Structural Design for Nine Mile Point Unit 1 Nuclear Power Plant
Sargent k, Lundy EngineersConsulting Engineers55 E. Monroe Street, Chicago, IL 60603May 1983 to September 1988Lead Structural Engineer for Various Nuclear Power Plant Projects
Klein &Hoffman, Inc.Consulting Engineers100 South Wacker Drive, Chicago, IL 60606Senior Structural Engineer
SUMMARY OF PROFESSIONAL EXPERIENCE.
SUPERVISORY:
Supervise a group of 5 engineering personnelPrepare manpower forecasts for short and long term needsPrepare performance appraisals/evaluations of those under my supervisionConduct classroom training ofengineering personnel for specifications, guidelines,etc.Supervise plant outage modifications, including structural analysis, design,installation, and project documentationCompleted various training on tiered leadership, supervisory skills, effectivecommunication, technical writing, and 10CFR50.59 safety evaluations
SUMhLWY OF PROFESSIONAL EXPERIENCE (Continued):
~TH HNI AL:
Extensive nuclear plant experience in structural engineeringExperience in structural analysis/design of residential and industrial buildingsProject engineering experience in nuclear power plantsPrepared structural design criterias, design control packages, and engineeringspecifications for nuclear power plant structuresPerformed structural analysis of space frames using STRUDL, LRGBOR, andused many other in-house structural engineering programsWorked as a liaison between engineering and contractors to resolve field problemsand contractual issuesPerformed calculations for design changes, dispositioned Deviation Event Reports(DERs), Non-Conformance Reports (NCRs), and Document Change Requests(DCRs), etc., for nuclear power plantsPerformed calculations for analysis and design of steel and concrete structures,including beams, columns, walls, slabs, pipe supports, conduit supports, expansionanchors, pipe ship restraints, embedded plates, underground tanks, retaining walls,etc., used ACI, AISC, UBC, and ASME codes.Performed seismic qualification of unreinforced masonry walls in nuclear powerplants, used ACI code for masonry structuresReviewed and approved contract specifications, concrete and steel shop drawings,and modification packagesSuccessfully completed the Seismic Qualification Utility Group (SQUG) andIPEEE training. Worked on seismic qualification of equipment using GenericImplementation Procedure (GIP)Familiar with Standard Review Plan (SRP), IE Bulletins, and Regulatory Guidesfor Nuclear Power PlantsAttended seminars on structural repair of concrete and masonry using latesttechniques
PROFESSIONAL LICENSES:
Registered Professional Engineer, State of New York
PROFESSIONAL SOCIETY MEMBERSHIP:
Member, American Society of CivilEngineers (ASCE)
REFERENCES:
Furnished upon request
WALTEROJORDJEVIC
EDUCATiON:
B,S. - Civil Engineering, University of Wisconsin at Madison, 1974M.S. - Structural Engineering, Massachusetts Institute of Technology, 1976
REGISTRATION:
State of California, State of VNscansin, Commonwealth af Massachusetts, Stateof Michigan
PROFESSIONAL HISTORY:
Stevenson 8 Associates, Inc., Vice President and General Manager of the Boston office,1983 - present
URS/JohnA. Blume8 Associates, Engineers, Boston, Massachusetts, GeneralManager, 1980-1983; San Francisco, California, Supervisory Engineer, 1979-1980
ImpellCorporatlon, San Francisco, California, Senior Engineer,1876-'1979
Stone & Webster Engineering Cogoratlon, Boston, Massachusetts, Engineer, 1974-197B
PROFESSIONAL EXPERIENCE:
hlr. Djordjevlc founded the Stevenson 8 Associates Boston office in 1983 and serves asVice President and General Manager of the Boston area office.
Mr. Djordjevicis expert in the area of dynamic qualification of electrical and mechanical equipment.He has participated in and managed over twenty major projects involving the evaluation andqualification of vibration sensitive equipment and seismic hardening of equipment. As demon-strated by his committee wark and publications, Mr. Djordjevic has participated in and contributedsteadily to the development of equipment qualification and vibration hardening methodology.
Mr. DjardjBvlds previous walkdown experience iriciuded all of the SEP plants (8 plants), NineMile-Unlt1, D,C, Caok- Units1 8 2, the Hanfard Reservation Purexfacility and the Savannah RiverPlant Reservation L-Reactor.
Representative prajects include overseeing the SEP shake-table testing af electrical raceways, in-sltu testing of control panels and instrumentation racks at various nuclear facilities, equipmentanchorage walkdowns and evaluations at various nuclear facilities, principal author of theGER'rlVALVEsoftware package to evaluate nuclear service valves, and contributing author in
the development of tha ANCHOR and EDASP software packages commercially distributed byStevenson 8 Associates.
Mr. Djordjevic has been involved extensively in the reassessment of safety-related equipment forcommercial nuclear facilities and government U,S, Department of Energy facilities, for which hemaintains an active Q<earanca status, Ha has served on advisory groups and raview tear'ns
touring older existing nuclear facilities to assess safety and has performed earthquakereconnaissance at such installations following seismic events.
PROFESSlONAL GROUPS:
Member, Institute of Eectrlcal and Electronics Engineers, Nuclear Power Engineering CommitteeWorking Group SC 2.5 (IEEE-344)
Chairman, American Society of Civil Engineers Nuclear Structures and Materials Committee,Working Group for the Analysis and Design of Electrical Cable Support Systems
Member, American Society of Mechanical Engineers Operation, Application, and ComponentsCommittee on Valves, Working Group GC-5
Abdussattar M. Patwa
75 Erie StreetOswego, NY 13126
TEL: (315) 342-6725 (Home), 349-2850 (Office)
a 3/9 (/pQ
OB CTIVEivii and tructural Engineer, management position in a growing company where skills and qualifications can
be utilized for the advancement of the company.
SUMMARY
Over 30 years experience in the design and construction of civil and structural Ennieering projects. Last 15 .
years in the power plant industry, designing and analyzing nuclear plant structures as well as componentsupports, foundations, coordination with plant maintenance and regulatory agencies. Proficient in preparationof hand calculations, sound working knowledge in finite element programs such as STRUDL, dynamic pipedesign and fiexibilityanalysis by Superpipe, Pipemaster. Well versed with major design codes for piping andcomponent supports. Strong seismic background, familiarity with computer application in tracking historicaldata from VAXand PRIME systems. SQUG/IPEEE qualifie for older plants similar to NMP unit 1.
EXPERIENCE
3/90 to Present
11/93 to Present
3/90 to 10/93
10MS to 2/90
NIAGARAMOHAWKPOWER CORPORATIONNine Mile Point Unit 1 Nuclear Power Station, Lycoming, NY 13093
CiviVStructural design Department
As a Senior Structural Engineer designed and developed modification packages forCorespray Minimum Flow lines piping design by Superpipe, coordinated systemshutdown cooling mod, Battery chargers, H'20z monitoring system replacements.
~ Prepared design verifications of various outage modifications.~ Prepared calculations for Deficiency Reports generated by Design-Basis
Reconstitution Program.- Performed SQUG walkdowns.
Site Engineering Department
Senior Structural Engineer responsible in providing on-site resource in resolving day today plant civiVstructural problems, performed site walkdowns to design and developfield-oriented modifications. Interfaced with other disciplines under criticalcircumstances in preparing quick response to field problems and installation concernsfor avoiding operation delays.
~ Managed structural portion of schedule for modifications and completionwithin the budget.
~ Developed unique method of supporting pipe layout and organized quickreturn to power of the plant outage.
~ Received recognition Rom ALARAdeprtment for design of radiationshieldings during the outages.
~ Prepared seismic design and installation of scaffolding requests.~ Organized calculations, procedures for coordination with NRC and INPO
institutes on audits and inspections.
Sargent & Lundy Engineers, Chicago, Illinois
- Worked 2 years as a Consultant/Contractor at Nine Mile Point 1 Nuclear Plant.Assingnment involved reponsibilities in resolving nonconformances due to In ServiceInspection Program, field walkdowns of piping supports, cracks in masonry and pouredin concrete walls and seismic design of the modifications.
c.
11/75 to 9/78
12/73 to 10/75
4/66 to 12/73
6/61 to 3/66
EDUCATION
CERTIFICATES
REGISTRATION
MEMBERSHIP
~ Worked 4 years at Enrico Fermi Nuclear Power Plant as a Senior StructuralEngineer. Supervised and trained project teams of 3 to 20 engineers for performing
design analysis, reviewing structural problems in Drywell containment steel, slab overtorus component supports, penetrations.
~ Developed project unique criteria oa component supports and procedures inaccordance with NRC regulatioas.
~ Coordinated with the client and contractors in monitoring manpower needswhile meeting project schedules and budgets.
- Approximately 4 years at Commonwealth Edison's LaSalle county Nuclear station.As a Senior and Lead Field Engineer, was involved in the developmeat of designcriteria, instructions aad project schedules. Responsible for organiziag field teams forwalkdown, preparation of reports and interfacing with clients on resolutions ofproblems in containment internal structures, cable trays, masonry walls and componentsupports.
Worked 1-1/2 years in Sargent & Lundy Office in Chicago, Illiaois in the design andreview of steel and concrete stuctures, and miscellaneous embedment plate problemsfor Zion, Dresden and Quad cities Nuclear Power Stations owned by CommonwealthEdison Company.
SKIDMORE, OWINGS aad MERRILL, Architects-Engineers, Chicago, Illinois.
Worked as Project Structural Engineer in the designs and specifications of largehanger structures, highrise buildings in steel and concrete and facilities.
BARNARDand BURK, INC., Louisiana,Worked as Senior Engineer in the design of petro-chem. refinery, industrial, processplant structures and facilities, effluent drainage system and steel frames.
Sir WILLIAMHALCROWS; RENDEL PALMER &TRENTON; Sir BRUCE WHITEWOLFE BARRY'S, London, England.
Worked 7-1/2 years as a Senior Structural Engineer with Consulting Engiaeers in thedesign and execution of multi-storey frame buildings, marine structures, bridges,quay walls, commercial facilities, power plant foundations, including checks oacontractors shop drawings and designs on various alternatives.
M.N. DASTUR & CO. and structural fabricators Bombay, India.
Worked as Engineer involving design of water tanks, multi-storey frame buildings,bridge girders, sheds and supervision of constuction work. Sometime in preparationand check of shop drawings and inspections of fabrication and erection of sheds.
B.S. in Civil Engineering (1961)-University of Poona, India.Completed courses in steel aad concrete structures including prestessed concrete andsoil mechanics in London, England.
(1) ASME B & PV Code Section IG, Piping design course.(2) Equipment Selection and Relay Evaluation Program by NRC and SQUG (Seismic
Qualification UtilityGroup)(3) AVCA, lOCFR5039, Licensing Engineering 1992.(4) Seismic Capability Engineer (SQUG)
Registered Professional Engineer, States ofNew York, Illinois, Mississippi, andLouisiana.Registered Structural Eagineer, State of Illinois.Chartered Structural Engineer(MIStructE), England, U.K.
American Society of Civil Engineers (1973).Institution of Structural Engineers, London, England. (Chartered Structural Engineer)
RMPRASSOCIATES INC.ENGINEERS
CAROLINE S. SCHLASEMAN, P.E.
EDUCATION
Duke University, B.S.E. Civil/Structural Engineering, 1981
MPR EXPERIENCE
Since Joining MPR in 1981, Ms. Schlaseman has been involved in analysis and problem solving ofa variety of tasks related to nuclear and fossil-fueled electric generating stations. This work hasincluded:
Nuclear Plant Seismic Adequacy AssessmentCoordinated and participated in seismic adequacy walkdowns and evaluations of approximately600 equipment items required for safe shutdown of a single-unit BWR. Work was performed inaccordance with the NRC-approved Generic Implementation Procedure (GIP), and includedscreening walkdowns and seismic capacity calculations for equipment anchorages. Coordinationof waikdowns included scheduling, tracking, and interfacing with outage management, healthphysics, craft support, QA, and the client's project engineer. Also performed seismic adequacywalkdowns of approximately 600 equipment items at a two-unit PWR. In addition to equipmentwalkdowns, supported seismic relay evaluation by assisting in establishment of appropriateseismic demand for relays mounted in a variety of enclosures, e.g., control room panels andswitchgear. Primary author of USI A<6 Seismic Evaluation Report for a BWR's NRC submittal.
Nuclear Plant Design BasisManaged a task to develop topical design criteria documents for an older BWR plant's designbasis reconstitution program, and prepared the topical design criteria document for seismicclassification of structures, systems, and components for this program. Prepared detailedscope/plan document for nonseismic external events design criteria document, and independentlyreviewed this document prepared by others. Evaluated current design requirements for seismic,flooding, tornado and other extreme external events, and the effect of these requirements onolder, operating nuclear units. Coordinated effort to review FSAR sections against StandardReview Plan (NUREG800) requirements for all balance of plant systems in a PWR seeking toresume construction. Participated in an NRC safety system functional inspection audit of a BWR,including preparation of calculations to document the design basis of audited systems.Researched and documented an older plant's sources, indexes, and methodologies for retrieval ofdesign basis information by engineers. Participated in function and task analysis, and detaileddesign review of a PWR control room.
Piping Systems, Components, and SupportsPerformed stress analyses of piping systems, components, and supports in nuclear power plants.Analyses included dynamic (frequency response spectrum) analysis, and leak-before-break failureanalysis for selected piping systems under normal, seismic, and accident loading conditions.Designed hardware modifications as required by ASME and AISC Code criteria. Researched andevaluated original seismic analyses for piping systems in an older nuclear power plant, andprepared upgraded, alternative seismic reanalysis criteria for piping systems. Assessed theadequacy of the original seismic design analysis for the concrete stack at an older BWR.Participated in evaluation of a BWR's recirculation piping susceptibility to IGSCC, includingrecommendations for stress improvement in the weld heat-affected zones.
Caroline S. SchlasemanPage 2
Root Cause Failure EvaluationsEvaluated the root cause and defined corrective actions for power plant equipment. Includesvalve failures in nuclear power plant fluid system, large steam turbine bearing failure, and aleaking control rod drive flange seal.
Turbine-GeneratorsPrepared procurement specifications for large steam turbine rotor and blade path retrofits.Performed technical evaluations of vendor proposals to supply steam turbines and turbinecomponents. Followed procurement, installation, and pre- and post-outage performanceimprovement testing of retrofit turbine-generator. Performed turbine water induction preventionstudies for fossil-fueled generating stations. Researched reliability and maintainability of waterinduction related equipment through personnel interviews, inspections, and discussions withequipment vendors.
Fossil-Fueled PlantsEvaluated proposed structural modiTications to a large fossil-fueled boiler, to allow conversionfrom forced draft firing to balanced draft operation. Reviewed boiler vendor drawings andcalculations, performed check calculations, discussed proposed modifications with vendor, andwalked-down boiler. Developed structural inspection procedure for counterflow natural draftcooling towers. Inspections and evaluations of material condition of auxiliary equipment infossil-fueled generating stations as part of material condition/life extension study.
REGISTRATION
Registered Professional Engineer, Commonwealth of Virginia
OTHER
Successfully completed the Seismi'c Qualification UtilityGroup (SQUG) course for SeismicCapability Engineers, as defined by the NRC's Unresolved Safety Issue (USI) A<6 Program.
Appendix B
COMPOSITE SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Page No. 1
Report Date/Tine: 12-22-95 / 13:18:10Hine Hile Point Unit 1
SAFE SNUTDWH EQUIPHENT LIST (SSEL)-Conposite-
Data Base File Haec/Date/Tine: I46)l 3.DSF / 12/22/95 / 3:16:16Sort Criteria: ID NunberFilter Criteria: (Evai. Concern CONTAII5 'A')Progran File Nano 8 Version: SSBI 2.2
LIHE EQUIPIB. TRAIN CLASS HARK %.
~$$ $ $$ $$ $ $$ $ $ $ $$ $$ $$ $ $ $ $$$$$$$$ $ $ $
(I) (2) (3) (4)
4185 1 08A 01-01
4186 2 08A 0142
4190 2 07 01-03
4191 2 088 01-03C
4192 2 088 01-030
4192A 2 088 01-03E
4187 1 07 01-04
4188 1 088 01-04C
4189 1 088 01-040
4189A 1 088 DIME
SYSTBI/EQUIPHENTDESCRIPT ION
~ $ $$$$$$$ $ $$$ $ $$$$$$$$ $ $$$$$ $$$$$$
(5)
Dug. No./Rev./lone Building~ $$$$ $ $$ $$$$$$$$$$$$ Ssssssssss
(7)(6)
HS/HAIN STEN OUTSIDE ISO VLV 43 8-22109M/4PILOT
l5/HAIN STEAH OUTSIDE ISO VLV $3 8-22109M/4PILOT
l5/HAIN SlEAH OUTSIDE ISO VLV l3 8-22109-C3/4PII.OT
TB
TB
HS/NIH STEAH OUTSIDE ISO VLV 44 C-18006-Cl/28/Bl TB
HS/HAIN STEAH OUTSIDE ISO VLV 44 8-2210943/4PILOT
HS/HAIN STEN OUTSIDE ISO VLV l4 8-22109-C3/4
PILOT'S/HAIN
STEN ONSIDE ISO VLV l4 8-22109M/4PILOT
TB
TB
HS/HAIN STEAN INSIDE 150 VLV 41 C-18006-Cl/28/84 W
HS/HAIH STEN II5IDE ISO VLV 42 C-18006-Cl/28/82 W
HS/HAIN STEN OUTSIDE ISO VLV 43 C-18006-Cl/28/85 TB
EQUIPHENT
Fir.Elv.~$$$ $ $$ $ $$
(8)
259
261
261
261
261
261
261
261
261
LOCATION ——-> <- OP. ST. ->Rn. or Ron/Col. SORT N3TES Homal Desired~ $ $ $ $$$$$$$$$$$ Ossa $ $ $ $$$ $$$$$$$ $$$$$$$
(9) (10) (11) (12) (13)
PWER SIB>PORTING SYS. REQ'D INTERCONIECTIONS REG.
REQD7 WG. Ial./REV. 8 SUPPORTING CB)OHBITS ISSUE~Sass $$$$ $$$$$$$$$$$ $$$$$$ $ $ $$ $ $$$ $$$$ $$$ $$ $$$$$
(14) (15) (16) (D)
AZ210
I5IV RH 5 19 OP BI CLOSED YES 01-03C, 01430, 0143E Al
HSIV RH
H5IV RH
5 R 19,27, AIR31
5 R 19,27, AIR31
YES C-19839-CIS/7, RPS, 8811, 8812, RIK AIC-19839419/10 01-03A) H) L) HSIVIR»
YES C-19839418/7, RPS, 8811, 8812, RIK AlC-19839419/10 01-03A, H, L, HSIVIR»
I5IV RH R 19 YENT VENT HSIVIR» AI
HSIV RH 5 09>19 OPEN CLOSED YES 01-04C, 0144D> 01-04E AI
I5IV RH
HSIV RH
I5IV RH
5 R 19,27, AIR31
5 R 19>27, AIR31
R 19 VENT VEHT
YES C-19839-CIS/7, RPS, 8811, 8812, RIK AIC-19839-C19/10 01-04A, H, L) HSIVIR»
YES C 19839418/7 RPS 8811> 8812 RIK AIC-19839-C19/10 01-04A, H> L, I5IVIR
HSIVIR» Al
5 R 19,31 OPEN CLOSED YES C-19437-C2/34 RPS, 1618, RHC 014IA AI
5 R 19,31 OPEH CLOSED YES C-19440-C2/31 RPS, 1718, RIK 0142A Al
3128 1 7 01-102A
3126 1 7 01-1028
3132 2 7 01-102C
3134 2 7 01-102D
3130 1 7 01-102 E
3136 2 7 01-102 F
3144 10P 22 01-119A
CERTIFICATION:
HS/HAIN STEAH OIERGOKYELECTRCHATIC RV l3
HS/NAIH STEAH OIERGOKYELECTRCHATIC RV IlHS/HAIN SlEAH OIERGOKYELECTRCHATIC RV l2
HS/NAIH STEAH EHERGOKY
ELECTRIIATIC RV l4
I5/HAIN SlEAH EHERGOKYELECTRCHAlIC RV 45
l5/HAIN STEAH EHERGOKYELECTRCHAlIC RV l6
HS/HAIH STEAH SAFETY YLV
C-1800241/30/83 W
C-18002-Cl/30/82 W
C-18002-Cl/30/C2 W
C-18002-CI/30/C3 W
C-1800241/30/83 W
C-18002-Cl/30/C3 W
C-18002-Cl/30/Cl W
259
VEST
VEST
SR
SR
SR
SR
SR
SR
36
CLOSED OP/CL YES C-19839-C18/7
CLOSED OP/CL YES C-19839418/7
8812, 103, IUK 01-21, AIPIS-36-90C, N
8812, 103, RIK 01-22, AIPIS-36-90D) N
CLOSED OP/CL YES C-19839419A/2 8811, 102, RIK 01-18, AIPIS-36-90E) L
CUBED OP/CL YES C-19839418/7
CU5ED CLOSED
8812, 103, RIK 01-23, AlPIS-36-90F, H
Al
CLOSED OP/CL YES C-19839419A/2 8811. 102, RIK 01-19, AIPIS-36-90A> L
CLOSED OP/CL YES C-19839-C19A/2 8811, 102, RIK 01-20, AIPIS-36-908, L
The infornation identifying the equipnent requ to bring the plant tois, to the best of our knouledge and belief rre and bur . (On
CARHEN R. AGOSTA/ ENGINEER
rntor ype ane te gnature
GOHAI4IED F. ALVI ENGINEER
r nt or ype t e gnature
safe shutdovn condition on this Safe Shutdovn Equipnent List (SSEL)r nore signatures of Systens or Operations Engineers)
/~/e~ate
Page No. 2Rcport Date/Tine: 12-22-95 / 13:18:10
Hinc Hlle Point Unit 1SAFE SNUTDOVN ElgIPHEHT LIST (SSEL)
-Coaposlte-
Data Base Flic Kane/Date/Tine: 86>1 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nane I Version: SSEH 2.2
LINEM. TRAIN
~$$ $ $$ $$$$$
ElgipCLASS NARK M.
41898 1 07 01-PV3»
4189C 1 07 01-PV4»
4222 1 088 05-OIC
6141 10P 088 0541C
4223 1 088 05-OID
6142 10P 088 05-OID
4221 1 07 054 1R
6140 10P 07 05-OIR
(I) (2) (3) (4)
3145 10P 22 01-1198
3146 10P 22 01-119C
3147 10P 22 01-1190
3149 10P 22 01-119F
3150 IOP 22 01-119G
3151 10P 22 01-119H
3152 10P 22 01-1193
3154 10P 22 01-119H
41928 2 07 01-PVI*
4192C 2 07 Ol-pY2»
SYSTEH/EOUIPHEHT
DESCRIPTION
(5)
HS/HAIN STEAH SAFETY VLV
HS/HAIN STEAH SAFETY VLY
HS/HAIN STEIH SAFETY VLV
HS/HAIN STEAN SAFETY VLV
HS/HAIH STEAH SAFETY VLV
HS/HAIN STEAH SAFETY VLV
HS/HAIN STEAH SAFETY VLV
HS/HAIN STEAH SAFETY VLV
Dwg. No./Rev./Zone Building~$$$$$$$ $ $ $ $$$$$$$$$
(6) (7)
C-18002-Cl/30/Cl DV
C-18002-Cl/30/Cl ON
C-18002-Cl/30/Cl DV
C-18002-Cl/30/Cl DH
C-18002-CI/30/Cl DV
C-18002-Cl/30/Cl DV
C-1800241/30/Cl DV
C-1800241/30/Cl DV
HS/HAIN STEAN OUTSIDE ISO VLV l3 8-22109M/4PILOT
HS/HAIN STEAN OUTSIDE ISO VLV 43 8-22109M/4
PILOT'S/HAIN
STEAN OUTSIDE ISO VLV l4 8-22109M/4PILOT
HS/HAIN STEAN OUTSIDE ISO YLV 44 8-22109~4PILOT
ECV/EC 11 LOOP VENT FIRST ISO VLV C-180174/42/D2PILOT
ECY/EC 11 LOOP VENT FIRST ISO VLV C-l80174/42/D2PII.OT
ECV/EC 11 LOOP VENT FIRSI'SO VLV C-18017-C/42/DlPII.OT
ECV/EC 11 LOOP VENT FIRST ISO VLV C-180174/42/DlPILOT
TB
TB
TB
TB
RB
RB
RB
ECV/EC 11 LOOP VENT FIRSI'SO YLV C-180174/42/D2 RB
ECV/EC ll LOOP VENT FIRST ISO YLV C-180174/42/D2 RB
EOUIPHENT
Flr.Elv.~$$$$$$$ $$
(8)
261
261
261
261
LOCATION ——-> <- OP.Rn. or Row/Col. SOR'f MTES Homal
(9) (10) (11) (12)
36
36
36
36
36
36
36
CLOSED CLOSED HO
CLOSED CMSED NO
CLOSED CLOSED IRI
CLOSED CLOSED ND
CLOSED CLOSED M
CLOSED CLOSED IR)
CLOSED CLOSED IBI
CLOSED CLOSED M
AI
Al
AI
AI
AI
AI
AI
AI
HSIV RH
HSIV RH
HSIV iUi
NSIV RH
5 12,19 5-Cl 5-Cl
5 12,19 5-C2 S-Cl NO
5 12>19 5-Cl S<1 N3
5 12,19 5-C2 S41 M
HSIVIR»
HSIVIR»
HSIVIR»
HSIVIR»
AI
AI
AI
AI
PB> ECVYR»
PB> ECWR»
PB, ECWR»
PB> ECWR»
5 R 19,27, AIR31
5 R 18,27, AIR31
5 R 19,27, AIR31
5 R 18>27, AIR31
VENT YES C 19839<IBA/2> RPS> H> L 8811 8812> AlC-19839419A/2 RHS 05-01A, ECWR»
VENT YES C-19839<IBA/2> RPS, H, L, 8811> 8812, AIC-19839419A/2 RHS 05-01A, ECWR»
VENT YES C-19839-CIBA/2, RPS, H, L, 8811, 8812, AIC-19839-C19A/2 RHS 05-01A, ECWR»
C 19839 CIBA/2> RPS> H> L> 8811> 8812 ~ AIC-19839-C19A/2 RHS 05-01A, ECWR»
PB, ECWR» 5 19 OP EH CMSED YES
PB, ECWR» 5 18 OPEN CMSED YES
05-01C, 05-OID AI
0541C> 05-010 Al
5T. —> POVER 5UPPORTING SYS. REI}'D IHTERCONECTIONS REG.Desired RE)07 DVG. M./REV. 8 M>PORTING CBB>ONENTS ISSUE~$$ $$$$ $$ $ $$ $$$$$$ $$$$$$$$$ $$$$$$$$$$$$$$$$$$$ $ $$$ $$$$$
(13) (14) (15) (16) (17)
CERTIFICATION:
The lnfornatlon identifying the equipnent requir to bring the plant to a safe shutdown condition on this Safe Shutdown Equipnent List (SSEL)is, to the best of our knowledge and belief, rec and ac rate. (One r nore signatures oF Systens or Operations Engineers)
CARNEN R. AGOSTA/ ENGINEER c'~fW/P~rntor ype ane te gna re a
ljHQWED F. ALVI / ENGINEER
r ntor ype ane t e tegnature
Page No. 3Report Date/fine: 12-22-95 / 13:18:10
Nine Hiie Point Unit 1SAFE SNUTDOVH EQUIPHEHT LIST (SSEL)
-Conpositc-
Data Base Flic Nano/Date/Tine: I46>1 3.MF /12/22/95 /13:16:16Sort Criter ia: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nane 6 Version: SSOI 2.2
LINE EQUIPID. TRAIH ClASS
$$ $ $ $$ $$ $ $$ $$$$$
(I) (2) (3)$$$$$$$$$$$$ $ $ $$ $$
(4)
SYSTEH/EQUIPHEHT
DESCRIPTION~$ $ $ $ $$$$$ $ $ $ $$$ $ $ $ $ $ $$$$$$ $$$$ $$ $
(5)
Dug. Ho./Rev./Lone~$$$ $ $ $ $$$$ $ $$$ $ $$$$
(6)
Building~$$$$$$$$$
(7)
EQUIPHENT
Fir.Elv.$$$$$$$$$$
(8)
NATION --->Rn. or Rou/Col.
(9)
SORT IDTES~$$$ $$$$$$
(10) (11)
<—OP.Homal
(12)
ST. —> PGNER SUPPORTIHG SYS. REQ'D INTERCONECTIONS REG.Desired REQD7 DUG. ID./REV. 8 SUPPORTING Og>ONEHTS ISSUE$$$$$ $$ $$$$$ $ $$$$$$$$$$$$$$ $$ $$ $$$$$$$ $$$ $$$$$$$$$ $$$ $$
(13) (14) (15) (16) (17)
4228 1 088 05-04C
6147 20P 088 05-04C
4229 1 088 05-04D
6148 20P 088 05-04D
ECV/EC 12 lOOP VM FIRST ISO VLV C-180174/42/E2PILOT
ECV/EC 12 LOOP VEHT FIRST ISO VLV C-18017</42/ELPII.OT
ECV/EC 12 lOOP VENT FIRST ISO VLV C-180174/42/E2PILOT
ECV/EC 12 UNP VM FIRST ISO VLV C-180174/42/E2PILOT
RB 340
PS ECWR»
PB> ECVYR»
PB> ECWR»
PS> ECWR»
5 R 19,27, AIR31
5 R 18,27, AIR31
5 R 19,27, AIR31
5 R 18,27, AIR31
VENT YES C-1983%418A/2> RPS, RHS 0544A, N, L, AlC 19839<ISA/2 ECWR»> 8811> 8812
VENT YES C-1983WISA/2> RPS> RHS 05-04A, N, L, AIC-19839419A/2 ECVVR», 8811> 8812
VM YES C 19839<ISA/2> RPS> RHS 0544A N> L> AlC-19839419A/2 ECWR», 8811, 8812
VENT YES C-19839-CIBA/2> RPS> RHS 05-04A, H, L, AlC-19839419A/2 ECWR», 8811> 8812
4227 1 07 05-04R
6146 20P 07 05-04R
4224 2 07 05-11
6143 20P 07 05-11
4225 2 088 05-11C
6144 20P 088 05-IIC
4226 2 088 05-IID
6145 20P 088 05-IID
4230 2 07 05-12
6149 10P 07 05-12
4231 2 088 05-12C
6150 IOP 088 05-12C
4232 2 088 05-12D
ECV/EC ll LOOP VEHT SECOD ISO VLV C-I8017</42/D2PILOT
ECV/EC 11 LOOP VENT SECOD ISO VLV C-180174/42/D2PILO'I
ECV/EC 11 LOOP VENT SECOD ISO VLV C-180174/42/DlPILOT
ECV/EC 11 lOOP VENT SECOD ISO VLV C-180174/42/DlPllOT
RB
RB
RB
ECV/EC 12 LOOP VEHT SECOD ISO VLV
ECV/EC 12 lOOP VM SECOD ISO VLV
C-18017-C/42/E2
C-18017-C/42/E2
ECV/EC 12 lOOP VENT SECOD ISO YLV C-18017-C/42/E2PILOT
ECV/EC 12 LOOP VENT SECOD ISO VLV C-18017-C/42/E2PILOT
ECV/EC 12 LOOP VM SECOD ISO VLV C-18017-C/42/ElPILOT
RB
RB
ECV/EC 12 LOOP VEHT FIRST ISO YLV C-180174/42/E2 RB
ECV/EC 12 LOOP VEHT FIRST 150 VLV C-180174/42/EL RB
ECV/EC 11 LOOP VENT SECOD ISO VLV C-18017-C/42/D2 RB
ECV/EC 11 LOOP VENT SECOD ISO VLV C-180174/42/02 RB
340
PS, ECWR» S 19 OPEN CLOSED YES
PS, ECWR» 5 18 OP EH CLOSED YES
PS, ECWR» 5 19 OP EH CLOSED YES
0544C, 05~ Al
0544C> 0544D Al
05-11C> 05-llD Al
05-11C> 05-llD Al5 18 OP EH CU5ED YESPS ECWR»
PS> ECWR» 5 R 19>27, AIR31
5 R 18,27, AIR31
5 R 19,27, AIR31
5 R 18,27, AIR31
PS, ECVYR»
PS> ECYYR»
PS, ECWR»
05-12C > 05-12D Al
05-12C> 05-12D Al
5 lg OPEN CU5ED YESPS> ECWR»
PS, ECVYR» 5 18 OPEN CLOSED YES
PS> ECVYR»
PS, ECWR»
PB, ECWR»
5 R 19,27, AIR31
5 R 18>27> AIR31
5 R 19,27, AIR31
VENT YES C 19839418A/2> RPS> H> l> 8811> 8812> AlC-19839419A/2 RHS 05-128, ECWR»
VEHT YES C-19839418A/2> RPS, H, L, 8811, 8812, AlC-19839-C19A/2 RHS 05-128> ECWR»
VEHT YES C-19839-CIBA/2, RPS> H> l, 8811, 8812, AlC-19839419A/2 RHS 05-12S, ECWR»
VENT YES C-19839418A/2> RPS> H> l. 8811> 8812> AlC-19839419A/2 RHS 05-118, ECWR»
VENT YES C 19839<ISA/2> RPS ~ H> L> 8811> 8812> AlC-19839419A/2 RHS 05-118 > ECWR»
VENT YES C 19839418A/2 ~ RPS> H> l 8811 8812> AlC-19839-CIBA/2 RHS 05-118> ECWR»
VENT YES C-19839<ISA/2> RPS, K> l, 8811, 8812, AlC-19839419A/2 RHS 05-118, ECWR»
CERTIFICATION:
The infornation identifying the cquipnent rcquir bring plant to a safe shutdoun condition on this Safe Shutdovn Equipnent List (SSEL)is, to thc best of our knouiedgc and belief, rect and r . ( or nore signatures of Systens or Operations Engineers)
CARHEH R. AGOSTA/ ENGINEER /'-~/e-r nt or ype ane t e gnatur atc
IDNAINED F. ALVI / ENGINEER trntor ype ane te gnature
l
0
Page No. 4Rcport Date/tine: 12-22-95 / 13:18:10
Nine Hlie Po1nt Unit 1SAFE SHUTDNN EQUIPHENT LIST (SSEL)
-Conposite-
Data Base File Haec/Date/Tine: 146>l 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nano 8 Version: SSEN 2.2
LIHE EQUIP
NI. TRAIH CIASS~$0000 00000 00000
(I) (2) (3) (4)
SYS TEN/EQUIPHEHT
DESCRIPTION
(5) (6)~ 00000$ $0$0$ $0$ $$$$ $$ $ $$$ $ $ $$$0000 $$$$$0$ 0$ $$$$$ $ $$ $ $ $
Building~$ $ 0$ 00000
(7)
EQUIPHEHTFlr.Elv.
~ 000000000
(8)
LOCATION ---> <- OP.Rn. or Rou/Col. SORT NOTES Nornal
(9) (10) (11) (12)
St. -> PNER SUPPORTING SYS. REQ'D IHTERCNNECTIONS REG.Desired REQ07 NG. HO./REV. 4 SUPPORTING COSIONEHTS ISSUE$$$ $ $ $0 00000 000000000000000 $$ $ $$$ $ $$$$$$$$$0000000 00000
(13) (14) (15) (16) (17)
6151 10P 088 05-12D
8105A 1 03 101/2A-1
8106A 2 03 IOV28-I
8105 1 03 102
PB> ECWR»
AT
TB 277 A4
AP/4160 V PNERBOARD 4102 C-19410-Cl/21 TB 261 DIB
ECV/EC 12 LOOP VENT SECMI ISO VLV C-18017</42/ElPILOT
AP/4160 V PNERSOARD 4101 FEEDER
TO PNERSMD 4102
AP/4160 V PNERBOARD 1101 FEEDER
TO PNERBOARD 1103
5 R 18,27, AIR31
S R 32 H/A N/A
5 R 32 H/A N/A
5 R 32 H/A N/A
YES AI
YES Al
YES C-19839-C7/3, EDG102, 161A, 1618, AlC-1943741/20> 8812, 8811C-194374@4
YES C-19839<ISA/2> RPS, H, L. 8811, 8812> AIC-19839-C19A/2 RHS 05-128, ECWR»
8106 2 03 103 AP/4160 V PNERSOARD 4103 C-1941lhCI/21 TS 261 EIS 5 R 32 N/A N/A YES C-19839M/4, EDG103, 171A, 1718, AlC-19440<1/19> 8812, 8811C-1944hC2/31
8193 1 03 11
4203 1,2 OBA 110-127
2011 1 088 113-273
2012 1 088 113-274
2013 2 088 113-275
2014 2 088 113-276
2015 10P1 088 113-277
2004 1 088 117
2006 1 088 118
8194 2 03 12
2019 1 088 120
CRD/SCRAN DISCHARGE VOLNE TEST C-1801~23/C4YLV
CRD/TRAIN ll SCRAN VLV PILOlS (129 C-1801641/23/82lOTAL)
CRD/TRAIN 12 SCRAN VLV PILOTS (129 C-18016-Cl/23/82lOTAL)
AP/4160V PNERBOARD 12
CRD/DIRECTIONAL CONTROL VALVES C-18016-Cl/23/Bl(129 TOTAL)
RB
RB
RB
TB
RB
AP/4160V PNERBOARD ll C-19423<1/16
RBSS/REACTOR COOLANT SAIBILE INCR C-1800641/28/F3ISO VLV
CRD/SCRAH TNC INLET ISO VLV PILOT C-18016~23/04 RB
CRD/SCRAN TNC IHLET ISO VLV PILOT C-18016<2/23/04 RB
CRD/SCRAM TAlC INLET ISO VLV P ILDT C-18016-C2/23/D4 RB
CRD/SCRAN TAIC INLET ISO VLV P ILOT C-18016~23/D4 RB
261
259
237
237
261
237
A4 N/A H/A H3 Al
S R 09,19 AIR VENT YES
5 R 09,19 AIR VEHT YES
5 R 09,19 AIR VEHT YES
S R 09,19 AIR VENT YES
5 R 19 AIR VENT YES
5 R 09 AIR VENT YES
5 R 09 AIR VENT YES
RPS
RPS
RPS
RPS
RIC 113-277A
RPS
RPS
AI
AI
Al
Al
Al
Al
AI
5
R
N/A H/A M
CU5ED CU5ED H3
AI
AI
R 19,31 CLOSED CU5ED 147 C-1943841/22 RPS> 167, RHS 110-1278 Al
CERTIFICATIN:
The infornation identifying the cqulpnent rcqu1s, to the best of our knou1cdge and belief corr
CARMEN R. ACOSTA/ EHGIHEER
rntor ype ane tcBIANED F. AI.VI / EiaiIHEERr nt or ype ane t e
to bri the plant to a safe shutdom condition on this Safe Sbutdovn Equipnent L1st (SSEL)t a c . or nore signatures of Systens or Operations Engineers)
/ zt w/PJatcgna
gnature
e
Page No. 5Rcport Date/Tine: 12-22-95 / 13:18:10
Hine Hilc Point Unit 1SAFE SHUTOOVN EQUIPHENT LIST (SSEL)
-Conposlte-
Data Bast File Hane/Date/Tine: III>1 3.DBF / 12/22/95 / 13:16:16Sort Crltcrla: ID HunberFilter Criteria: (Eval. Concern COHTAINS 'A')Progran File Nane 8 Vcrslon: SSEH 2.2
LINE EQUIPIII. TRAIN CLASS
~$$$ $$ $ $$ $ $ ,$ $ $ $$
(I) (2) (3)
2021 1 088 121
2022 1 088 122
2020 1 088 123
2003 I 07 126
2005 1 07 127
8113 1 01 161A
8114 1 01 1618
8116 1>2 01 167
811Q 1,2 01 1671
8109 I 02 16A
8110 I ~ 02 168
8117 2 01 171A
8118 2 01 1718
8111 2 02 17A
8112 2 02 178
8172 1>2 20 1510
8172A 1>2 20 1512
8103 1 20 153
8173 1,2 20 1534
(4)
5YSTEN/EQUI PHEHT
DESCRIPT ION
(5)
CRO/DIREClIONAL CONTROL VALVES
(129 lOTAL)
CRD/DIRECTIONAL CONTROL VALVES
(129 TOTAL)
CRD/DIRECTIONAL CONTROL VALVES
(129 tOTAL)
CRD/SCRN INLET VALYES (129 TOTAL)
CRD/SCRN DISCNARCE VALVES (129TOTAL)
AP/600 V POVERSOARD I161A
AP/600 V POVERSOARD I1618
AP/600 V POVERSOARD I167
AP/600 VOLT POVERSOARO 1671
AP/600 V POVERBMO IIQ
AP/600 V POVERSOARD I168
AP/600 V POVERBOARD I171A
AP/600 V POVERSOARD I1718
AP/600 V POVERSOARD I17A
AP/600 V POVERSOARD I178
CTRL/AUXILIARYCOHTROL CABINH1510
ClRL/AUXILIARYCONTROL CABINET1512
AP/DIESEL GEHERATOR I102 RELAYCABIHH
ClRL/AUXILIARYCOHTROL RELAY
CABINH 1534
(6)
Building$$$$$$ $ $ $$
(7)
C-18016-Cl/23/Bl RB
C-18016-Cl/23/82 RB
C-1801&41/23/A2 RB
C-1943741/20
C-19437M
C-19438-Cl/22
C-1949:I/28
C-1943&CI/28
C-19440-Cl/19
C-1944K531
C-19439<1/21
C-19439<1/21
C-34854<2/I
RB
RB
RB
TB
RB
RB
RB
RB
RB
RB
'IB
TB
C-19410-Cl/21 TB
C-22004M/21 TB
C-18016-Cl/23/Al RB
C-18016-Cl/23/Al RB
EQUI PHENT
Flr.Elv.~ $ $ $$$ $ $ $$
(8)
237
237
237
237
237
261
261
281
281
281
261
261
281
281
261
261
261
261
LOCATION —-> <- OP. ST. —>Rn. or Ron/Col. SORT NOTES Homal Desired
(9) (10) (11) (12) (13)
CLOSED CLOSED
POVER SIPPORTINC SYS.REQ07 OVG. III./REV.$ $ $ $$ $ $ $ $ $$ $ $ $ $$$ $$$
(14) (15)
REQ'0 IHTERCOtIIECTIOHS REG.
8 SUPPORTINC CCtOHEHTS ISSUE~ $$$ $ $ $ $$$$$$ $ $ $$$ $ $ $ $ $ $ $$ $$
(16) (17)
AI
R CLOSED CLOSED H3 AI
R CLOSED CLOSED H3 AI
H, N4
Q7, 8
AS16
S 09 CMSEO OPEN YES
5 09 CLOSED OPEN
5 R 32 H/A N/A
S R 32 N/A H/A
5 R 32 H/A N/A
5 R 32,35 H/A H/A
YES
YES
YES
YES
YES
1174, 118I
117I, 118I
168, 178
167
Al
AI
AI
AI
AI
Al
L, H4
L, H4
AI
AI
L, H12
L, H12
S R 32 H/A N/A
5 R 32 H/A N/A
YES
YES
17A
178
AI
AI
QIO, 11
QIO, 11
S R 32 N/A N/A YES C-19839-CIO/1 TRANS 178, 8812
5 R 32 H/A N/A YES C-19839410/I TRANS 178, 8812
AI
AI
5 17 H/A N/A
5 17,32 H/A H/A
5 17>32 H/A N/A
5 17 H/A N/A
YES
YES
YES
YES
AI
Al
AI
AI
5 R 32 H/A H/A YES C-19839-C9/1 TRANS 168, 8811
5 R 32 N/A H/A YES C-19839-C9/1 TRANS 168> 8811
CERTIFICATION:
The infornation Mcntlfylng the equipnent requir ingis, to the'best of our knovlcdge and belief, rect a d ac
CARHEN R. ACOSTA/ ECINEERrntor ype ane tc
ISIIED F. ALVI / ENGINEER
rntor ype ane te gnature
plant to a safe shutdoun condition on this Safe Shutdovn Equipnent List (SSEL)a (One o nore signatures of Systens or Operations Engineers)
( /-r-k-ate
l2
Page Ho. 6Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Nile Point Unit 1SAFE SNUTDONH ElglpNEHT LIST (SSEL)
-Conposlte-
Data Base File Nano/Date/Tine: I46>1 3.DBF /-12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CNTAIHS 'A')Prograa File Nano 8 Version: SSDI 2.2
LINEIXI. TRAIN
~$$$$$ $$$ $$
(I) (2)
EGUIP
CUSS NRK IXI.~$ $ $ $ $$$$$$$$$$$ $$$$$$$
(3) (4)
SYSTEH/EOUIPHENTDESCRIPT IN
$$$$$$$$$$$$$$$$$$$$$$ $ $$$ $ $ $ $ $$$$
(5)
Dug. Ho./Rev./Lone Building$$$$$$$$$$$$$$$$$$$$ SSSSSSSSSS
(6)
EOUIPHEHT
Flr.Elv.~$$$$$$$$$
(8)
LOCATIN ---> <- OP
Rn. or Rou/Col. SORT NOTES Homal
(9) (10) (11) (12)
ST. -> PNER SIX>PORTING SYS. RED'0 IHTERCONECTINS REG.
Desired RENT DVG. H3./REV. 8 SIR>PORT IIR> CO>NENTS ISSUE~$$$$$$ $$ $ $$ $$$$$$$$$ $$$$$$ $$$$$$$$$$$$$$$$ $ $$$$$$ $$$$$
(13) (14) (15) (16) (17)
8174 1,2 20 1535
8175 1,2 20 1536
8104 2 20 154
8140 1,2 20 1551
8141 1>2 20 1552
8154 1,2 20 1553
8138 1,2 20 1S54
8155 1,2 20 1555
8142 1,2 20 1556
8143 1,2 20 1557
81438 1,2 20 1559
8143A 1,2 20 1560
8143C 1,2 20 1562
81430 1>2 20 1563
8143F 1,2 20 1564
CTRL/AUXILIARYCONTROL REUYCABINET 1535
CTRL/AUXILIARYCNTROL REUYCABIHET 1536
AP/DIESEL GENERATOR %103 REUYCASIHET
CTRL/AUXILIARYCONTROL CABINET1551
CTRL/AUXILIARYCNTROL MINET1552
CTRL/AUXILIARYCNTROL CABINET
1553
CTRL/AUXILIARYCONTROL MINET1554
CTRL/AUXILIARYCONTROL CABINET1555
CTRL/AUXILIARYCONTROL CABINET1S56
CTRL/AUXILIARYCNTROL CABIHET1557
CTRL/AUXILIARYCONTROL CASIHET1559
CTRL/AUXILIARYCONTROL CASINET1560
CTRL/AUXILIARYCNTROL CABINET1562
CTRl/AUXILIARYCONTROL CABINET
1563
CTRL/AUXILIARYCONTROL CABINET1564
C-2200446/9
C-2200644/9
C-19410-CI/21
C-2308441/17
C-2308441/17
C-19957-CI/36
C-19957-CI/36
C-19957-Cl/36
C-2308641/18
C-23086<1/18
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
261
261
261
261
261
261
261
261
261
261
261
261
261
261
261
5 17 H/A H/A YES
5 17 H/A H/A YES
5 17,32
5 17 H/A YES
5 17 YES
5 17 YE5
5 17,32 YES
5 17 YES
5 17>32 YES
5 17>32 'N/A YES
5 17 YES
5 17>32 YES
5 17,32, H/A35
YES
S 17,32 N/A H/A YES
5 17 N/A H/A YES
PNL 167A
HG172
HG172
Al
AI
AI
AI
AI
AI
AI
Al
AI
AI
AI
AI
AI
AI
Al
CERTIFICATION:
The lnfornatlon ldcatlfylng the equlpnent required lng the plaat to a safe shutdoua condition oa this Safe Shutdom Equlpncnt List (SSEL)ls, to the best of our knowledge and belief, ect an ac ate One o re signatures of Sgstcns or Operations Engineers)
CARHEN R. AGOSTA/ ENGINEER sf~o! pirator ype ane te gnature ate
X X QelED F. ALVI DaiINEER 'lz--z4-'br nt or ype t e ategnature
0
I~
(
Page No. 7Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SNUTDOVH ElgIPNENT LIST (SSEL)
-Conpos lte-
Data Base File Kane/Date/Tine: ISS>1 3.DBF,/ 12/22/95 / 13:16:16Sort Crlterla: ID NunberFilter Crlterla: (Eval. Concern CONTAIHS 'A')Progran File Haec 6 Version: SSEH 2.2
LIHE . EOUIPNO. TRAIN CLASS
~$$$$$ 00000 $0000
(1) (2) (3) (4)
SYSTEH/EOUIPNENTDESCRIP IION Dug. Ho./Rev./Zone Bulldlng
(7)~$ 00$ $$ $ 00$ $ $$$$$ $ $0$ $ $ $$ $ $0$ $0000 $$ 0$ $$$$$$ 00$ 0$ 0$ $ 00
(5) (6)
EOUIPNEHT
Flr.Elv.$$0$ $ $ $ $$0
(8)
LOCAtION —->Rn. or Rou/Col.~$$$$$$0$ $$ $ 0$ 0
(9)
SORT NOTES~ 000 $00000
(10) (11)
<- OP.HomalF000000
(12)
ST. —> PWER 51>PORTING> SYS. RED'D IHTERCOSECTIONS REG.
Desired RE007 WG. Ia)./REV. 6 SltPORTING C SPNEHTS ISSUEEEESEEE $0000 EEEEESEEEEEEE$ 0 $$00$ $ $$$$ $ $ $$ 000$ 0$ $$$ 00000
(13) (14) (15) (16) (17)
8176 1,2 20 1565
8177 1,2 20 1569
8178 1,2 20 1570
8178A 1,2 20 1573
8143E 1,2 20 1574
8179 1>2 20 1575
8162 1 20 1580
8180 1>2 20 1582
8181 1,2 20 1S84
8182 1,2 20 15&5
8183 1,2 20 1586
8184 1,2 20 1587
8185 1>2 20 1588
7413 1,2 10 20141
7425 1,2 10 201-02
7423 1,2 10 20103
7421 1,2 10 201-04
CERTIFICATION:
CTRL/ANILIARYCONTROL CABINET1565
CTRUANILIARYCONTROL CASINET1569
CTRUANILIARYCONTROL CASIHET1570
CTRUANILIARYCONTROL CABINET1573
CTRUANILIARYCONTROL CABIHET1574
CTRUANILIARYCONTROL CASIHET1575
CTRL/ANILIARYCONTROL CABIHET1580
CTRL/ANIL IARY CONTROL CABINET1582
C-22014<1/15
C-2201241/13
C-1943646/16
261
261
TB 261
TB 261
TB 261 ACR
TB 261 ACR
TB 261
TB 261 ACR
TB 261
CTRL/ANILIARYCONTROL CABINET1585
CTRl/ANILIARYCONTROL RElNCASIHET 1586
CTRL/ANILIARYCONTROL RElAYCASINET 1587
CTRL/ANILIARYCONTROL RElAYCABINET 1588
RBCLC/ORWELL AIR COOLER 411
RSCLC/ORWELL AIR COOLER 412
RSCLC/ORWELL AIR COOLER 413
RSCLC/DRWELL AIR COOLER 414
TB
TB
C-22012-CI/13 TB
TB
C-18022-C2/28/D3 W
C-1802242l28/Dl W
C-18022~28/02 W
C-1802242/28/02 W
261
261
261
261
AZO
AZ110
CTRL/ASINCIATOR CABINET 1584 C-2201241/13
5 17,32 H/A H/A
S 17 H/A N/A
5 17 H/A N/A
S 17,32 N/A N/A
YES
YES
YES
YES
5 17,32, N/A35
5 17,32 H/A N/A
S 17 H/A H/A
YES
YES
YES
SR
SR
SR
SR
RMING RMIHG YES
RMING RMING YES
RMING RMING YES
RMIHG RMIHG YES
5 17 N/A H/A YES
5 17 N/A H/A YES
5 17 N/A N/A YES
5 17 N/A H/A YES
5 17 H/A H/A YES
5 17 N/A N/A YES
AI
AI
AI
AI
AI
AI
Al
AI
AI
A'I
AI
AI
AI
AI
AI
AI
AI
The lnfornatlon ldentlfylng the equlpnent requl lng thels, to the best of our knoutedge and belief, rree a a a
CARNEN R. AGOSTA/ ENGINEER
rntor ype ane te gn re
00NAHIED F. ALVI / EKIHEERr nt or ype ane t e gnature
plant to a safe shutdovn condltlon on this Safe Shutdovn Equlpnent List (SSEL)
( r nore signatures of Sgstens or Operations Engineers)
/u/~~ate
z.--QSate
'I
Page Ho. 8Report Date/Tine: 12-22-95 / 13r18:10
Nine Hlle Point Unit 1SAFE SHIUTDOVH EQUIPHEHT LIST (SSEL)
-Coaposlte-r
r r rData Base File Ksae/Date/fleer Iif1 3.08F / 12/22/95 / 13:16:16Sort Crlter la: ID HuaberFilter Crlterlar (Eval. Concern CONTAINS 'A')Progras File Hase 8 Version: SSEH 2.2
LINEIRI. TRAIN
~$$$$$ $$$$$
(1) (2)
EQUIPCuSS HARN N3.~$ $ $$ $$$$$$ $ $$ $ $ $ $$$$$$
(3) (4)
SYSTBI/EQUIPNEHTDESCRIPTION
~$$$$$$$$$$$$$$$ $ $$$$$$$$$$$$$$$$$
(5)
Dug. No./Rcv./Zone~ $ $$$ $$$ $ $ $$$$$$$$ $$
(6)
Bulldlng.$$$$$$ $ $$$
(7)
EQUIPNMFlr.Elv.
~$$$$$ $$$$
(8)
LOCATION —-> <- OP. ST. —>Rs. or Rou/Col. SNT NOTES Horsal Desired
(9) (10) (11) (12) (13)
POUER SIRPORTING SYS. REQ'D IHTERCONECTIOHS REG.
REQD7 OVG. N./REV. 8 SII'PORTING COfOHENTS ISSUE~$ $ $$ $$$ $$$$$$$$$$$$ $$$$$$$$$$$$$$$$ $$$$$$$ $$$$$
(14) (15) (16) (17)
7417 1,2 10 201-05
7415 1,2 10 201-06
5145 IOP1 19 201.2-491
5158 20P1 19 201.2492
5133 1 19 201.2493
5134 IOP1 19 201.2-494
5135 IOP2 19 201.2-495
5136 10P3 19 201.2-496
5137 IOP4 19 201.2-497
5138 10PS 19 201.2-498
5139 1OPG 19 201.2-499
5140 10P7 19 201.2-500
5141 10P8 19 201.2-501
5142 10P9 19 201.2-502
5143 IOP9 19 201.2-503
5144 IOP9 19 201.2-504
RBCLC/DRYVELL AIR COOLER i15
RBCLC/DRYVELL AIR COOLER i16
C-18022-C2/28/D3 DH
C-18022-C2/28/D3 DV
225
225
TORUS 198
TNUS 198
COHTAIWEHT/TORUS TBfERATIREELOIEHT
COHTAINW/TORI5 lOfERATIREELEHEHT
CONTAIWENT/TORI5 TBtERATIREELENW
CONTAIWENT/TORI5 TBfERATIREELOIEHT
CONTAINEHT/IORI5 TBfERATIREELENENT
CONTAINW/TORUS TBtERATIREELEHM
CONTAINM/TORI5 TBtERATIREELEHEHT
CONTAINM/TORUS TOfERATIREELEHW
CONTAINM/TORI5 TBtERATIREELEHM
CONTAINW/IORI5 TOfERATIREELEHW
COHTAINM/TORI5 TBtERATIREELIHEHT
CONTAINEHT/TORI5 TBfERATIREELEHENT
C-1801441/47/C6 TNI5 198
C-18014-Cl/47/C6 TORUS 198
C-1801441/47/C6 TORUS 198
C-18014-Cl/47/C6 TORI5 198
C-18014-Cl/47/C6 TORUS 198
C-18014-Cl/47/C6 lORI5 198
C-1801441/47/C6 lORI5 198
C-1801441/47/C6 lORUS 198
C-1801441/47/C6 TNUS 198
C-18014-Cl/47/C6 TORUS 198
C-18014-Cl/47/C6 TORUS 198
C-18014-Cl/47/C6 INI5 198
COHTAIWEHT/TNUS AIR TOfERATIRE C-1801441/47/CSELEHEHT
COHTAINEHT/TNI5 AIR TOfERAlNE C-1801441/47/CSELEHEHT
SCS 72
SC17 288
SC2 18
SG4 54
SCB 126
SGIO 162
SC11 180
SC12 198
SC14 234
SC16 270
SC17 288
SCIB 306
SG20 342
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
RINIHG RUNIHG YES
RINIHG RUNIHG YES
N/A H/A YES C-34853-C3/1 1569
N/A N/A YES C-34854-C3/1 1S10
H/A N/A YES C-34853-C2/1 1S69
N/A H/A YES C-34853~ 1569
N/A H/A YES C-34853%2/1 1569
H/A H/A YES C-34853-C2/1 1569
N/A H/A YES C-3453-C2/1 1569
N/A H/A YES C-3485342/1 1569
H/A N/A YES C-3453M/1 1569
N/A N/A YES C-34853~ 1S69
H/A H/A YES C-34853M/1 1569
N/A H/A YES C-34853-C3/1 1569
H/A H/A YES C-34853-C3/1 1569
H/A H/A YES C-34853-C3/1 1569
AI
AI
AI
Al
Al
Al
Al
Al
Al
AI
AI
AI
AI
Al
Al
Al
CERTIFICATION:
Thc lnforsatlon ldcntlfylng the equlpsent rcqul~lng the plant to a safe shutdom condltlon on this Safe Shutdorm Equlpaent List (SSEI.)ls, to the best of our Rnowlcdge and belief, rrcct apd a te. or re slgnaturcs of Systess or Operations Engineers)
CARHEH R. AGOSTA/ ENCIHEER ~/~c ~~rntor ype ane te gnaturc ate
RSIANED F. ALVI / ENGINEER l2--z4-Mr nt or ype t e goature ate
Page No. 9Rcport Date/t tee: 12-22-95 / 13:18:10
Nine Hite Point Unit 1SAFE SHUIDOVN ElgIPNENT LISl (SSEL)
<onpos lte-
Data Base File Hase/Date/Tine: Wpl 3.DBF. / 12/22/95 / 13:16:16Sort Crltebla: ID HusberFilter Crlterla: (Eval. Concern CNTAIHS 'A')Progras File Hase 8 Version: SSEH 2.2
LINE EIIUIPNO. TRAIH CLASS
~ $ $ $ $$ $$$$$ $$$$$
(1) (2) (3) (4)
5146 2 19 201.2-505
5147 20P1 19 201.2-506
5148 20P2 19 201.2-507
5149 20P3 19 201.2-508
5150 20P4 19 201.2-509
5151 20PS 19 201.2-510
5152 20P6 19 201.2-511
5153 2OP7 19 201.2-512
5154 20PB 19 201.2-513
5155 20P9 19 201.2-514
5156 20P9 19 201.2-515
5157 20P9 19 201.2-516
5161 1 20 201.2-517
5162 2 20 201.2-518
5164 2 20 201.2-519
SYSTEH/EOUIPNEHTDESCRIPTION
$$$ $ $$$$$$$ $ $$ $ $ $$ $ $ $ $$$$ $ $$$$$$$$
(5)
CNTAIWEHT/tORUS TOtERATNEELEHENT
CONTAIWEHT/TORUS TOP ERATNEELEHEHT
CONTAIWEHT/fORUS TOfERATIIEELENENT
CNTAIWENT/TORI5 TOfERAllIEELEHEHT
CNTAIWENT/TORUS TQfERATIEELENEHT
COHTAIWENT/tORI5 TBB'ERATIREELEHENT
CNTAIWENT/TORUS TOfERATNEELEHEHT
CONTAIWENT/TORUS TOfERAllIEELEHENT
COHTAIWENT/TORUS TOB ERATIIEELEHENT
CONTAIWENT/fORUS TOtERATIIEELEHEHT
CNTAIWENT/TORUS TOtERATIIEELEHEHT
GITAIWENT/fORI5 TOP ERATIIEELEHEHT
CONTAIWEHT/tORI5 TOP ERATIIECOIOITINER 8 RECORDER
CNTAIWENT/tORUS TIHPERATIIECNOITIONER 8 REGRDER
CONTAIWEHT/TORI5 TOtERATNEIIOICATOR
<----- EOUIPHEHT LOCATIN —-->Bulldlng 'Flr.EIv. Rs. or Row/Col.
(6)
C-18014-CI/47/C6
(7)
TORUS
(8) (9)
198 SG2 18
C-18014<1/47/86 TB 261 ACR-1510
C-18014<1/47/C6 TB*
261 ACR-1569
C-18014-Cl/47/C6 TB 277 CR PHL K
C-18014-CI/47/C6 TORI5 19$ SG4 54
C-1801441/47/C6 TORUS 19$ SG6 90
C-18014-CI/47/C6 'fORI5 198 568126
C-18014-CI/47/C6 TORI5 198 SGIO 162
C-1801441/47/C6 lORI5 198 SG11 180
C-1801441/47/C6 TORUS 198 SG12 198
C-18014<1/47/C6 TORUS 19$ SG14 234
C-1801441/47/C6 TORUS 19$ SG16 270
C-1801441/47/C6 TORI5 198 - SG17 288
C-18014-Cl/47/C6 TORUS 19$ SGIB 306
C-1801441/47/C6 TORUS 198 SG20 342
SORT NOTES~ $ $$ $$ $ $ $$
(10) (11)
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
<- OP
Horsal
(12)
N/A N/A YES C-34854-C2/1 1510 Al
H/A YES C-34854<2/1 1SIO Al
H/A YES C-3485442/1 ISIO Al
N/A N/A YES C-3485442/1 1510
H/A N/A YES C-34854<2/1 1510
H/A H/A YES C-3485442/1 1SIO
N/A H/A YES C-34854-C3/1 1510
H/A H/A YES C-34854M/1 1510
H/A N/A YES C-34854M/1 1SIO
H/A H/A YES C-34854M/1 1510
H/A N/A YES C-3485443/1 1510
H/A N/A YES C-34854~1 1510
Al
Al
Al
AI
Al
AI
AI
AI
Al
H/A H/A
N/A N/A
H/A N/A
YES
YES
YES
1510, RPS BUS 12
1569, RPS BI5 11
1569, RPS BUS ll
Al
Al
Al
ST. -> PNER NPORTING SYS. RE)'0 IHTERCNNECTIOHS REG.Desired RE007 DUG. HG./REV. 8 SIIPORTIHG CON'NENTS ISSUE~$ $$$ $ $ $ $ $ $ $ $ $ $ $ $ $$$$$$ $ $ $$ $$ $ $$ $ $$$$$ $ $$$$$ $$$ $$$ $$$$$
(13) (14) (15) (16) (17)
CERTIFICATIN:
The lnforsatlon Identify lng the cqulpsent requlrIs, to the best of our knowledge and beltcf, rrcc
CARHEH R. AGOSTA/ ENGINEER
rntor ype asc teIOHAWED F. ALVI ENGINEER
rntor ype anc tc
bring the plant to a safe shutdown condltlon on this Safe Shutdown Equlpsent List (SSEL)and cur . ( or sore signatures of Systess or Operattons Engineers)
+><reg-
naa atc
aP7 ~~-u, A~ategnature
Il
II
r
/
Page No. 10Report Date/TIne: 12-22-95 / 13:18:10
Nine Hile Point Unit 1SAFE SHUTMWH EQUIPHENT LIST (SSEL)
-Conposlte-
Data Base File Nane/Date/Tine: ISS>1 3.DBF.--. / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nano 8 Version: SSEH 2.2
LINEM. TRAIN
assess esses
(1) (2)
EQUIPCIASS HARK lo.~$$$$ $$$$$$$$$$ $ $ $ $$$$$
(3) (4)
5163 1 20 201.2-520
5165 3 20 201.2-521
5159 3 19 201.2-521A
5167 3 20 201.2-5218
5166 4 20 201.2-522
5160 4 19 201.2-522A
5168 4 20 201.2-5228
SYSTEN/EQUIPHENT
DESCRIPTION$$$$$$$$$$$$$ $ $$$$$$$$$$$$$$$$$$$ $
(5)
COHTAINEHT/TORUS TBS>ERATIHEIIBICATOR
COHTAINEHT/TORI5 TBS>ERATINE
TRAHSHITTER
COHTAINENT/TORUS TQS>ERATNEELENEHT
COHTAINEHT/TORI5 TBS>ERATINEIIQICATOR
COHTAINEHT/TORI5 TQS>ERATIIIETRAHSHI T TER
CONTAINEHT/TORI5 TBS>ERATIRE
ELEHEHT
CONTAINENT/IORI5 TQS>ERATIREIIDICATOR
(6) (7) (8) (9)
C-18014-Cl/47/86 TB 277
C-18014-Cl/47/F6 TB 250
C-18014-Cl/47/F6 TORUS 198
C-1801441/47/F6 TB 250
C-18014-Cl/47/F6 TB 277
C-18014-Cl/47/F6 TDRI5 198
C-18014-Cl/47/F6 TB 277
CR PNL K
RSP 11
SGS 72
RSP ll
RSP 12
SG17 277
RSP 12
<----- EQUI PHEHT LOCATION --->Dvg. Ho./Rev./Zone Building Flr.Elv. Rn. or Row/Col. SORT ISITES
~see $$$$$$
(10) (11)
SR
<—OP. ST. ->Homal Desiredsssssss $$$$$$$
(12) (13)
N/A N/A
POVER SIS>PORTING SYS. REQ'D IHTERCONECTIONS REG.
REQD7 DVG. ISI./REV. 8 SUPPORTING CO>OHENTS ISSUEesses $$$ $$$$$$$$$$$$ $$$$$$$$$ $$ $$$$$$$$$$$ $ esses
(14) (15) (16) (17)
ISIO> RPS BUS 12 AIYES
SR H/A N/A YES C-3481442/12 201.2-521A AI
S R — N/A N/A YES C-34813-Cl/11 201.2-521A AI
SR H/A N/A YES C-34813-C4/10 201.2-522A AI
5 R 28 N/A N/A YES C-3481344/10 RSP, 120 VAC ISBMUH AI
SR H/A H/A YES C-3481344/10 201.2-522A Al
5 R 28 N/A N/A YES C-34813-Cl/11 RSP, 120 VAC ISSMUH AI
7609 1 18 202-102
7615 2 18 202-103
7617 2 09 202-33
7618 1 07 202-34
7619 1 088 202-348
7620 2 07 202-35
7621 2 088 202-358
RSAC/EHER EXHAI5T FAH l12 C-18013-C/23/HS TB
RSAC/ENER EX FAN IllOUTLET ISOL C-18013-C/23/H4VLV
RBAC/BIER EX FAH IllOUTLET ISOL C-18013-C/23/H3VLV PILOT
RBAC/EHER EX FAH I12 OUTLET ISOL C-18013-C/23/HSVLV
RBAC/ENER EX FAN l12 OUTLET ISOL C-18013</23/H4VLV PILOT
TB
TB
TB
RBAC/EHER EX FLOH TRANSNITTER C-18013-C/23/H3 TB
RSAC/BIER EX FLOU TRANSHITTER C-18013-C/23/NS TB
302
302
H13
H13
H12
P13
H13
H13
SR
SR
SR
5
SR
5
SR
H/A N/A
N/A N/A
OFF OH
CU5ED OPEN
AIR VENT
CLOSED OPEN
YES
YES
YES
YES
IXI
AIR VENT YES
AI
AI
1718, IUC 202-33A> RBPS AI
RBPS, RIC 202-53A AI
AI
RBPS, RIC 202-33A AI
AI
7601 1,2 07 202-36
7602 1,2 OSB 202-36C
7603 1,2 088 202-360
RBAC/EHER EX ISOL VLV
RSAC/BIER EX ISOL VLV PILOT
RSAC/EHER EX ISOL YLV PILOT
C-180134/23/F2 TB
C-18013-C/23/F2 TB
C-18013-C/23/F2 TB
H13
P13
P13
5
R
OPEH OPEN
VBIT YEHT
VBIT VEHT
RBPS, RIC 202-36A AI
Al
Al
CERTIFICATION:
The infornation identifying the equlpnent requlr bring the plant to a safe shutdem condition on this Safe Shutdovn Equlpnent List (SSEL)is, to the best of our knowledge and belief, rect nd accu te. (One o nore signatures of Systens or Operations Engineers)
CARHEN R. AGOSTA/ ENGINEER /',g PJriant or ype ane t e gna re ate
HONANED F. ALVI ENGIHEER
r nt or ype ane t e ategnature
la
41
4
Page Ho. 11Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SNUTDOVH EOUIPHENT LIST (SSEL)
-Con pos ite-
Data Base File Hane/Date/Tine: Ilg>1 3.DBF,/ 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Cr iterla: (Eval. Concern NHTAINS 'A')Progran File Nane 8 Version: SSEH 2.2
LIHE EIQIPNO. TRAIH CLASS HARK M.
(I) (2) (3) (4)
7604 1 07 202-37
7605 1 088 202-37C
7610 2 07 202-38
7611 2 088 202-38C
7608 1 18 202-49C
7607 1 18 202-490
7606 1 07 202-50
7612 2 07 202-51
7616 1 09 202-53
7614 2 18 202-92C
7613 2 18 202-92D
7149 1 09 209M
7150 2 09 20944
7151 1 09 20945
7152 2 09 20946
7303 1 09 21041
7306 2 09 21042
7319 1,2 OBA 210-28
7318 1,2 OBA 210-30
SYSTEH/EOUIPIKNTDESCRIPTION
$$$$$$$$$$$$$$ $ $$$$$$$$$$$$$$$$$$$
(5)
Dwg. No./Rcv./Zone~$$$$$ $ $$ $$$ $$ $ $ $ $$$
(6)
Building$$$$$ $ $$$$
(7)
RSAC/OKR D FAN ill INLET ISOLVLV
RSAC/OKR D FAN ill IHLET ISOLVLV PILOT
RSAC/QSI D FAN l12 INLET ISOLVLV
RSAC/EHER D FAH l12 INLET ISOLVLV PILOT
RBAC/EHER D FLN CONTROLLER
RBAC/EHER D E/P CONYERTER
C-180134/23/F4 TB
C-180134/23/F3 TB
C-180134/23/FS TB
C-180134/23/F4 TB
C-180134/23/H2 TB
C-180134/23/N2 TB
RBAC/EHER D FAN ill FLON CNTROL C-18013-C/23/N4VLV
RSAC/OKR EX FAH I12 FLOI CNTROL C-180134/23/HSVLV
TB
RSAC/THER DM5T FAN illRBAC/OKR EX FLN CONTROLLER
RSAC/EHER D E/P CNYERTER
EDG 102 ROOF EXNAI5T FAH
EDG 102 ROOF EXHAI5T FAN
EDG 103 ROOF DHAI5T FAH
EDG 103 ROOF EXNAI5T FAH
CRAC/EHER YEHT FAN illCRAC/EHER VENT FAN I12
C-180134/23/H4 TB
C-18013</23/NS TB
C-18013-C/23/N5 TB
C-19437-C
C-19437-C
C-1944hC
C-1944K TB
C-18047-C/22/A3 TB
C-180474/22/A2 TB
CRAC/INSTRQKHT SN0P ISOL YALVE
(2)C-18047-C/22/ES TB
CRAC/CIRCUIATIN LIIK ISOL YALYE C-180474/22/CS TB
EOUIPIKNTFlr.Elv.
~$ $ $ $ $ $$ $$
(8)
291
291
291
291
289
291
291
289
277
NATION ---> <- OP.Rn. or Row/Col. SORT NOTES 'Homal
(9) (10) (11) (12)
ST. -> POVER SIB>PORTING SYS.Desired REO07 DUG. H3./REV.~$$$$$$ $ $$$$ $$ $$$$$$$$$ $$$$
(13) (14) (15)
P13
P13 SR
CLOSED OPEH
AIR VENT
NO
YES
P13 S — CLOSED OPEN IKI
P13 5 R — AIR VEHT YES
P13
013
013
5 R — H/A H/A YES
5 R — H/A N/A YES
OPEN OPEN Ill
OPEH OPEH HO
SR
SR
N13 SR
EDG RON 102 SR
EDG RON 102 SR
EDG 103 ROON SR
OFF N
H/A N/A
N/A N/A
YES
YES
YES
OFF N YES 1618
OFF N YES 1618
OFF N YES 1718
816
SR
SR
OFF RINING YES
OFF RINIHG YES
YES
YES
EDG RON 103 SR OFF N YES 1718
AI
RBPS> RC 202-38A AI
AI
202-49F
AI
AI
AI
202-92F AI
1618, INC 202-53A, RBPS Al
Al
Al
74A9
74AIO
74AIO
RIC 21041A> H, 1671A AI
RIC 21042A> H, 1671C AI
RHS 210-288
RNS 210-308
AI
AI
RED>D IHTERCONECTINS REG.
8 SUPPORTING OOB>OtKHTS ISSUE$$$$$$$$$$ $ $ $$$$$$$$$$$ $$$$$
(16) P (17)
RSPS, RC 202-37A Al
CERTIFICATIN:
The lnfornatlon identifying the equlpnent requ ~to bring the plant tols, to the best of our knowledge and belief rrect a ra (One
CARHEH R. AGOSTA/ ENGINEER
a safe shutdown condition on this Safe Shutdown Equipnent List (SSEL)nore signatures of Systcns or Operations Engineers)
/~cl~~r ntor ype ane t e
W%4KD F. ALVI ENGINEER
r ntor ype ane t e
gna
gnature
0
I
P'
Page Ho. 12Rcport Date/T Inc: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SNUTDOVH ElgIPHENT LIST (SSEL)
-Conpos Itc-
Data Base File Nane/Date/Tine: Ilg>l"3.DBF = I 12/22/95 / 13:16:16Sort Crlterla: ID NunberFilter Crlterla: (Eval. Concern CONTAINS 'A')Progran Flic Nane 8 Version: SSEH 2.2
LINEHI. TRAIH
$00000 $0000
(I) (2)
ElglpCuSS HAe N3.HISS $$00$ $000000000000
(3) (4)
SYSTEH/EOUIPHEHT
DESCRIPTION~000$ $$ $00$ $ $ $$$$$$ 00$ $$ $$$$$$0 $$
(5) (6)
Building~SSSSSSHS
(7)
EOUIPHENT
fir.Elv.$$ $ $ $ $ $ $ $ $
(8)
LOCATION ——> <- OP.
Rn. or Rov/Col. SORT NOTES Homal
(9) (10) (11) (12)
ST. -> POVER SUPPORTING SYS. RED>D INTERCONECTIONS REG.
Deslrcd REO07 DUG. III./REV. I SIB>PORTIC COtOHENTS ISSUE~HSSSS $0000 $ $$ $ $$ $ $ $$ @$ $$$ $$0$$$$$$$$$$$$0$ $$0$$$ $0000
(13) (14) (15) (16) (17)
7317 1,2 OIA 210-31
7315 1 08A 210-34
7316 2 08A 210-35
7301 1 07 21lh40
7302 1 088 210-408
7304 2 07 210-41
7305 2 088 2104 1B
7325 2 10 21(449
7322 1 10 210-50
7311 1,2 09 21(Ail
7314 1,2 18 210-67
7312 1>2 18 21049
7313 1,2 18 210-90
7320 1 07 210.1-01
7321 1 088 210.141A
7323 2 07 210.1-02
7324 2 088 210.1-02A
7328 1 ll 210.1-119
7334 2 11 210.1-120
7327 I 05 210.1-36
CRAC/AUX ROEN ISOL VALVE
CRAC/AUX ROOH ISOL VALVE (2)
CRAC/AUX ROCH IML VALVE (2)
CRAC/INER VEHT FAN Ill ISOL VALVE
C-18047-C/22/CS TB
C-18047-C/22/GS TB
C-18047-C/22/G6 TB
C-18047-C/22/A2 TB
CRAC/ENER YENT FAH Ill ISOL VALVE C-18047-C/22/A2PILOT
TB
CRAC/EHER YENT FAN I12 ISOL VALVE C-18047-C/22/A2 TB
CRAC/EHER VENT FAH I12 ISOL VALVE C-18047</22/AlPILO'I
TB
CRAC/COOLING COIL I12
CRAC/COOLING COIL IllC-18047-C/22/D3 TB
C-18047-C/22/E3 TB
CRAC/CONTROL ROEN HYAC CIRCULA'IIOH C-18047-C/22/E3FAH
CRAC/INLET AIR TDB> C-18047-C/22/C3 TB
CRAC/CIRC FAH TDI> CONTROL C-18047-C/22/F2 TB
CRAC/COOL COIL f11 ONTROL VALVE C-18047-C/22/E3 TB
CRAC/COOL COIL IllCtNTROL VALVE C-18047-C/22/E3PILOT
CRAC/COOL COIL 412 ONTROL YALYE C-180474/22/D3 TB
CRAC/COOL COIL I12 CtNTROL VALVE C-18047</22/E3PII.OT
CRAC/CHILI.ER IllCRAC/CHILLER I12
C-18047-C/22/G2 TB
C-180474/22/E2 TB
CRAC/CHILL HATER CIRC PQB> I12 C-18047-C/22/f2 TB
CRAC/CIRC FAN OUTLET TDI> ELEHENT C-18047-C/22/F3 TB
261
816
816
817
A16
A16
AIO
AIO
817
817
817
NO
OPEN OPEN YES
OPEN OPEN YES
SR
CLOSED OPEH
AIR VENT
NO
NO
5 — CLOSED OPEH NO
S R — AIR VENT
5
5
N/A N/A NO
N/A H/A NO
SR
SR
SR
5
SR
5
SR
SR
SR
SR
N/A H/A YES
N/A — N/A YES
N/A N/A YES
CLOSED OPEN III
AIR VENT YES
OPEN OPDI III
AIR VENT YES
RMIII'MINGYES
RMIIR> RMING YES
RMI% RMIHG YES
5 R 30 RMIIR> RMING YES
RHS 210-318
RHS 210-34C
RHS 210-35C
RIB: 210-OIA
RHC 210-02A
K, 1671A, 1671C
RNS 210.1-15
RNS 210.1-56C
Al
AI
AI
Al
AI
AI
AI
AI
AI
AI
AI
AI
Al
Al
Al
Al
AI
AI
AI
AI
CERTIFICATION:
The Infornatlon ldcntlfylng the cqulpnent rcqu tols, to the best of our knovledge and belief rrect
CAIHEN R. AGOSTA/ ENGINEER
r nt or ype t e
IINAWED F. ALVI / ENGINEER
r nt or ype t e
lng plant to a safe shutdom condltlon on this Safe Shutdovn Equlpnent List (SSEL)d a a ( r nore signatures of S stensgr Operations Engineers)
rz. z<r'eiategna re
~asagoature
1
4
~, t
I
Page Ho. 13Rcport Date/Tine: 12-22-95 / 13:IB:10
Nine Hiie Point Unit 1SAFE SHUTDWH EQUIPNENT LIST (SSEL)
-Conpos itc-
Data Base File Nane/Date/Tine: IIPI 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID HtabcrFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Haec 8 Version: SSEH 2.2
LIHE EQUIP
io. TRAIN CLASSF00000 00000,00000
(I) (2) (3) (4)
SYSTEN/EQUI PNEHT
DESCRIPTION000000000$ 000000000000000000000000
(5)
Dug. Ho./Rcv./Zone~00000$ 00000$ 0000000
(6)
Building000$ 000000
(I)
EQUIPNEHT
Fir.Eiv.F 000000000
(8)
LOCATION —-> <-OP. ST. —>Rn. or Row/Col. SORT RIES Homal DesiredF00000000000000 0000 000000 0000000 0000000
(9) (10) (11) (12) (13)
PWER SIPPNTIHi SYS. REQ>D IHTERCOWECTIOHS REC.
REQDI WG. HI./REV. 8 SIPPORTING CQPONEHTS ISSUEF0000 000000000$ $ 0$ 00 00000000000$ 00000000000 00000
(14) (15) (16) (17)
7333 2 05 210.1-37
7326 1,2 08A 210.1-56
7337 2 18 210.145
7331 1 18 210.148
7332 1 18 210.1 89
6324 10P 05 28-15
6325 20P 05 28-17
6341 20P R 28-18
6326 10P 07 28-23
6327 10P 07 28-24
6328 2OP 07 28-29
6329 20P 07 28-30
2001 1 21 305-125
2002 1 21 305-128
4233 2 R 31-OIR
4234 1 R 31-02R
4235 1 08A 3147
4236 2 08A 31-08
5120 1OP1 20 3242
CRAC/CHILLER lllFLW SNITCH C-180474/22/El TB
CRDH/CONTROL ROO DRIVE PQP Ill C-18016-CI/23/A6 RB
CRDH/CONTROL ROD NIYE PQP I12 C-1801641/23/86 RB
CRD/CRD DRIVE HATER FILTER BYPASS C-1801641/23/G4 RB
CRD/ND PQP lllTOPERATNECONTROL VLV
CRD/CRD PQP lllSEAL PSV
CRD/CRD PQP I12 TOPERATNECONTROL YLV
CRD/CRD PQP I12 SEAL PSV
CRD/HYDRAULIC CONTROL WIT H20-H2ACCN'5 (129 TOTAL)
CRD/HYDRAULIC CONTROL WIT N2ACCQIKATORS (129 TOTAL)
IV/FEEWATER RISER CHECK VLV lll
C-18016-Cl/23/A6 RB
C-1801641/23/A6 RB
C-18016-Cl/23/86 RB
C-1801641/23/86 RB
C-1801641/23/83 RB
C-18016-Cl/23/83 RB
C-18006-Cl/28/Dl TB
FVIFEEWATER RISER NECK VLV I12 C-18006<1/28/CS TB
FVROOP illFEEWATER ISO YLV C-18006<1/28/Dl TB
IVROOP l12 FEEWATER ISO VLV C-18006-Cl/28/C5 TB
RCS/RECIRC PQP lll INLETTOPERATNE HV/I CONVERTER
C-18020-C/21/GS IB
NAC/CHILL HATER CIRC PQP I12 C-18047-C/22/F2 IB
NAC/CHILL HATER BYPASS VALVE C-18047-C/22/D3 IB
CRAC/CHILLER I12 IOP CONTROLLER C-18047-C/22/Dl TB
NAC/CHILLER lllTOP CONTROLLER C-18047-C/22/El TB
237
237
237
237
237
237
237
237
237
261
261
261
261
250
817
816
816
816
816
H12
N12
N12
H12
M12
N12
HSIV iUI
HSIV RN
HSIV RH
HSIV iUI
RSP 11
SR
SR
SR
SR
SR
RWNING RWHING YES
OP EH OP EH N0
N/A H/A YES
N/A H/A YES
H/A N/A YES
Al
RHS 210.1-56C, SET AlPOIHT
AI
AI
AI
5 R 04 OFF RWHING YES
5 R 04 OFF RWHING YES
CLOSED OPOI N0
5 29 CLOSED OPEN YES
16A> 168> CST LEVEL AI
17A, 178, CST LEVEL AI
AI
AI
5 06 CU5EO OP/CL N0
5 29 CLOSED OPEN YES
AI
AI
5 06 CLOSED OP/CL N0 Al
H/A N/A
N/A N/A
N0
N0
AI
AI
26 OPEN CLOSED NO AI
AI
AI
AI
SR N/A H/A AI
26 OPEN CU5ED N0
5 R 19>22 OPEN CLOSED YES C-19437~ 1618, RIC 31<TA
5 R 19,22 OPEN CU5ED YES C-1940@/31 1718, RIC 31-08A
r nt or ype t e
IIUQNED F. ALVI / ENGINEER
rntor ype ane tc
gnatUrc
goature
CERTIFICATION:
Ihe infornation identifying the equipnent requ to br ng t plant tois, to the best of our knoulcdge and belief rrect a a rate (
CARHEH R. ACOSTA/ ECINEER
a safe shutdam condition on this Safe Shutdam Equipnent List (SSEL)or nore signatures of Systcns or Operations Engineers)
~f~w/Fate
atc
It
'td
'I
Page Ho. 14Report Date/Tine: 12-22-95 / 13:18:10
Hine Hlle Point Unit 1SAFE SHUTDONI EGUIPHEHT LISI'SSEL)
-Conposlte-
Data Base File Hase/Date/Tine: Nfl 3.DBF, / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAIHS 'A')Prograa File Naae 8 Version: SSEH 2.2
LINEM. TRAIN
~$$$$$ $$$$$
(I) (2)
ElgipCLASS NARK H0.~OOOO $$ $ $$$$$$$ $ $ $ $ $$$$
(3) (4)
SYSTEH/EOUIPHEHTDESCR IP T ION
~$$$$$$$$$$ $ $$$$$$$$$$$$$$$$$$$$$$
(5)
Dug. Ho./Rev./lone Building~$$$$$$$$$ $ $$$$$$$$$ $$$$$$$$$$
(6)
EOUIPHEHT
F lr.Elv.~$$ $$$ $$$$
(8)
LOCATION —-> <—OP. ST. ->Ra. or Rov/Col. SORT NOTES Horaal Desired$$$$$$$ $$$$$$$$ OOOO $$$$$$ $$$$$$$ $$$$$$$
(9) (IO) (11) (12) (13)
PWER SQ)PORTING SYS. RED'D INTERCONIECTIONS REG.
RE007 WG. M./REV. '8 SQ)PORTING CCffOHENTS ISSUE$$ $$$ $$$$$$$$$$$$$$$ $$ $$$ $$$$$ $ $$ $$ $$$$$ $$ $ $$$$$
(14) (15) (16) (17)
5101 1 19 32-02A
5106 IOP1 19 3242A
5129 10P1 20 32428
5115 1 20 32-02C
5124 1 20 32-02D
5121 20P1 20 32-03
5102 2 19 32~
5105 20P1 19 32-03A
5130 20P1 20 32-038
5116 2 20 32-03C
5125 2 20 32-030
5122 30P1 20 32-04
5104 3 19 32-04A
5107 30P1 19 324Q
5131 30P1 20 32-048
RCS/RECIRC PQt Ill INLETTDfERATNE ELEHENT
RCS/RECIRC PQf 411 INLETTofERATIRE ELEHEHT
RCS/RECIRC PQf 411 INLETTofERATIE llSICATOR
RCS/RECIRC PQf 411 REACTOR
TofERATIIE HV/I CONVERTER
RCS/RECIRC PQf illREACTOR
TofERATNE IHOICATOR
RCS/RECIRC PQf 412 INLETTDfERATIRE HV/I CONVERTER
RCS/RECIRC PQf 412 IHLETTofERATIIE ELEHEHT
RCS/RECIRC PQf 412 IHLETTDfERATIIE ELEHEHT
RCS/RECIRC PQf 412 INLETTofERATNE INOICATOR
RCS/RECIRC PQf 412 REACTOR
TDfERAllIE HV/I CONVERTER
RCS/RECIRC PQf 412 REACTOR
TOfERATQIE INOICATOR
RCS/RECIRC PQf 414 INLETTDfERATIIE NV/I CONVERTER
RCS/RECIRC PQf 414 INLETTDfERATNE ELEHEHT
RCS/RECIRC PQf 414 INLETTofERATIRE ELEHEHT
RCS/RECIRC PQf 414 INLETTDfERATIIE INDICAT0R
C-180204/21/E4 W
C-1802lhC/21/E4 W
C-1802(hC/21/65 TB
C-180204/21/64 TB
C-1805%/21/N4 TB
C-180204/21/G5 TB
218 RC LP 11
218 RC LP 11
250 RSP 11
261 ACR-1536
277 CR PN. F
250 RSP 11
C-180204/21/E4 W 218
C-180204/21/E4 W
C-18020-C/21/GS TB
C-180204/21/G4 TB
C-180204/21/H4 TB
C-180204/21/GS TB
C-180204/21/E4 W
C-180204/21/E4 W
218
250
261
277
277
218
218
RC LP 12
RC LP 12
RSP 11
ACR-IS36
CR PNL F
RSP 12
RC LP 14
RC LP 14
C-180204/21/65 TB 277 RSP 12
R 05,18, H/A28
H/A YES C-34813<1/11 RSP, 3242, 32-mB, 120 AlVAC QBMVH
SR H/A N/A YES AI
SR N/A H/A YES C-22006-C4/9 1536, RPS BUS 12 Al
SR
SR
H/A N/A
N/A H/A
YES
YES
Al
Al
R 05,19 N/A N/A YES C-22006<4/9 32-03C) 32-03D Al
R 05)18, H/A28
N/A YES C-3481341/11 RSP) 32-03, 32-038) 120 AlVAC QBMIM
SR N/A N/A YES AI
SR N/A N/A YES C-22006-C4/9 1536, RPS BUS 12 Al
SR
SR
N/A N/A
N/A N/A
YES
YES
AI
AI
R 05,19 N/A N/A YES C-2200644/9 32-04C, 32-040 AI
R 05,18, N/A28
N/A YES C-3481344/IO RSP, 32-04, 32-048) 120 AlVAC QBMNN
SR N/A H/A YES AI
R 05,19 N/A H/A YES C-220844/9 32-02C, 32-02D AI
CERTIFICATION:
The inforaation Identifying the equipaent required bringls, to the best oF our knou1edge and belief, ct nd a
CARHEH R. AGOSTA/ EH) INEER
r nt or ype t e
NHANED F. ALVI ENGINEER
r nt or ype t e
e plant to a safe shutdovn condition on this Safe Shutdovn Equlpaent List (SSEL)ate. ( r nore signatures of Systeas or Operations Engineers)
/3. ZS/Pi
'C
'e
Page Ho. 15Rcport Date/line: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SNUTDOVN ElgIPHEHT LIST (SSEL)
4eposltc-
Data Base File Nano/Date/Tine: )If1 3.DBFo / 12/22/95 / 13:16:16Sort Cr lterla: ID HunberFilter Criteria: (Eval. Concern CONTAII5 'A')Progran File Haec 8 Version: SSBI 2.2
LIHE EQUIPC. TRAIN ClASS HARK H0.
~ $$$$$ $$$ $$ $ $ $$$ $ $$ $ $ $ $ $ $ $$ $ $ $ $$$$
(1) (2) (3) (4)
5117 3 20 3244C
5126 3 20 32440
5123 40P1 20 3245
5103 4 19 3245A
5108 40P1 19 3245A
5132 40P1 20 32458
5118 4 20 3245C
5127 4 20 32-050 .
4237 1,2 23 32-187
4238 1,2 23 32-188
4239 1,2 23 32-189
4240 1>2 23 32-190
4241 1,2 23 32-191
5109 5 19 32~
5128 5 20 32-405A
5119 5 20 32-4058
4215 2 OBA 33-OIR
5YSTBI/EOUIPHEHTDESCRIPT ION
~$$$$$$ $ $ $ $ $ $ $ $ $ $ $$ $ $ $$$$$$$ $ $ $$$$
(5)
RCS/RECIRC PIIP I14 REACTOR
TBPERATNE HY/I CONERTER
RCS/RECIRC Pllf I14 REAClOR'TBP ERATNE INDICATOR
RCS/RECIRC Pllf I15 IHLETIBPERATIRE HY/I CONVERTER
RCS/RECIRC PIIP IIS IHLETTBPERATIIE ELEHENT
RCS/RECIRC PIIP I15 IHLETTBfERATNE ELEHEHT
RCS/RECIRC PIIP I15 IHLETTBfERATNE IIIIQTOR
RCS/RECIRC PIIP I15 REACTOR
TBfERATIIE NY/I CONVERTER
RCS/RECIRC PIIP I15 REACTOR
TBfERATIIE INDICATOR
RR/RECIRCRATIN PIIP IllRR/RECIRCUlATIOH PIIP I12
RR/RECIRCULATIN PIIP I13
RR/RECIRCULATIN Pilf I14
RR/RECIRCULATION PIIP IIS
RCS/RECIRC PIP I13 IHLETTBfERATIIE ELEHEHT
RCS/RECIRC PIIP I13 REACTOR
TBPERATIIE IIIIQTOR
RCS/RECIRC PIP I13 REACTOR
TBfERATNE HY/I CNYERTER
RCU/REACTOR CLEAIP IHl.ET INERISO YLV
<--—-- EOUIPHENT LOCATIN ---> <- OP
Dgdg. No./Rev./Zone Building Fir.Elv. Rn. or Row/Col. SORT NOTES Homal
(6) (7) (8) (9) (10) (11) (12)
ST. -> PWER SN>PORTIC SYS. RED'0 IHTERCMECTINS REG.Desired REO07 WG. IS./REV. 8 SIP PORTING COPNENTS ISSUE~$ $ $ $ $ $ $ $ $ $$ $$ $$$$$$ $ $ $$$$$ $$ $ $$$$$$ $ $ $ $$ $ $$ $ $ $ $$$ $$$$ $
(13) (14) (15) (16) (17)
C-1802lhC/21/64 TB
C-180204/21/H4 TB
C-1802(WC/21/GS TB
C-180204/21/E4 W
C-18020-C/21/E4 W
C-180204/21/GS lB
C-180204/21/64 TB
C-180204/21/H4 TB
C-18006-Cl/28/G3 RB
C-18006-CI/28/G3 RB
C-1800641/28/63 RB
C-1800&CI/28/F3 RB
C-1N&CI/28/F3 RB
C-180204/21/ES W
C-1802&/21/E6 TB
C-18020-C/21/ES TB
C-1N$41/28/F2 W
261
277
218
218
261
218
261
ACR-1S36
CR PHL F
RSP 12
RC LP 15
RC LP 15
RSP 12
AN-1536
CR PHL F
RC LP 11
CR PHL F
ACR-IS36
5 R — N/A H/A YES C-25X&C4/9 1536 AI
SR H/A H/A YES Al
5 R — H/A N/A YES AI
R 05,18, N/A28
N/A YES C-34813-C4/10 RSP, 32-05, 32-058, 120 AIVAC IINOBI
SR H/A N/A YES AI
SR H/A N/A YES C-220&C4/9 1536 AI
H/A H/A
RMIC OFF
RMIHG OFF
RMIC OFF
RMIHG OFF
RMIC Off
SR
05
05
05
05
05
R 05 N/A N/A
YES
N0
N0
N0
N0
YES 32~B> 32~
AI
AI
AI
AI
AI
AI
AI
SR H/A N/A YES Al
SR N/A H/A YES C-22006-C4/9 1536 Al
5 R 19,22, OPEN CMSED YES C-19444:2/31 171B, RPS, RlC 33-OIA Al31
R 05,19 H/A H/A YES C-2200644/9 32-05C, 32-050 Al
CERTIFICATIN:
The lnfornatlon Identifying the cqulpnent requlls, to thc best of our knovlcdgc and belief rrcct
CARNEH R. AGOSTA/ ENGINEER
rntor ype ane teIKNANED F. ALVI EC IHEER
rntor ype anc tc
bringPe lant to a safe shutdem condition on this Safe Shutdovn Equlpnent List (SSEL)od r ( or aors ~ tgaatores oy Eysteas or 0>eratloas Eaglsersg
g->S ggna rc ~te
( 24agnature
Page No. 16Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDOVN EOUIPNEHT LIST (SSEL)
Zonposite-
Data Base FIIe Kase/Date/Tine: QB>l 3.DBF . / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progras File Nasa 8 Version: SSEH 2.2
LIHE EQUIPN3. TRAIN CLASS
~$$ $ $$ $$$$ $ $$$$$
(I) (2) (3) (4)
SYSTEH/EOUIP KENT
DESCRIPTION
(5)
EJUIPNENT LOCATION —--> <—OP
Fir.Elv. Rs. or Rou/Col. SORT RITES NoraalDug. Ho./Rev./Zone Building~$$$$ $$$$$$ $$$ $$$$$$
(6)~$$$$$ $ $$$ $$$$$$$$$$ $$$$$$$$$ $ $$ $$$ $ $ $$ $$$$ $$ $$$ $ $$$
(7) '8) (9) (10) (11) (12)
ST. —> POVER SIR>PORTING SYS. REII'0 IHTERCNRIECTIN5 REC.
Des Ired REQDT DUC. MI./REV. 8 SIB'PORTING CN>ONENTS ISSUE~$$$$$$ $$$$$ $$$$$$$ $$$$$ $$$ $$$$$$$$$$$$$$$$$$ $$$$$ $$$$$
(13) (14) (15) (16) (17)
4213 1 OBA 33-02R
4212A 1 R 33-03
4212 2 08A 3344
2023 1 18 3643A
RCU/REACTOR CLEAMB> IHLET OWERISO CHECK YLV
C-18006-Cl/28/Fl RB
RCU/REACTOR CLEAMB> OWLET OWER C-18006-Cl/28/G5150 YLV
RB
RCS/RCS I.EVEL TRN5HITTER C-180154/27/83 RB
RCU/REACTOR CLEAMB> OWLET IIRIER C-1800641/28/64ISO YLV
261
261
5 R 19,31 OPDI CLOSED YES C-19437-C2/34 1618, RPS, RIB: 3342A Al
26 NO AI
5 R 19>31 OPEN CLOSED YES C 19839422/6 RPS> VB12> RIC 3344A Al
N INST RH 5 R 18 H/A H/A YES C-22005M/13 RPS CAB A, K, 120 AlVAC-RPS BUS 11> 1586,1587, COB>WER CAB>
1S84
4101 1 18 36-03A
2024 1 18 36-038
4103 3 18 36-038
2029 2 18 36-03C
4104 4 18 3643C
2030 2 18 3643D
4102 2 18 36-030
RCS/RCS LEYEL TRANSHITIER
RCS/RCS LEYEL TMQllTTER
RCS/RCS LEYEL TRAI5HITTER
RCS/RCS LEVEL TRAI5HITTER
RCS/RCS LEYEL TRAI5HITTER
RCS/RCS LEVEL TMSHITTER
RCS/RCS LEVEL TRAI5HITTER
C-180154/27/83 RB
C-180154/27/83 RB
C-180154/27/83 RB
C-18015-C/27/C3 RB
C-18015-C/27/C3 RB
C-180154/27/C3 RB
C-180154/27/G3 RB
N INST RH 5 R 19 H/A N/A YES C-22005M/13 RPS CAB A, H, 120 AlVAC4PS BI5 11, 1586,1587, COB>UTER CAB,1584
N INST RH 5 R 18 N/A H/A YES C-22005414/IO RPS CAB B> H> 120 AIVAC4PS BUS 12, 1586,1588, COB'WER CAB,1584
N INST RH S R 19 H/A H/A YES C-22005414/10 RPS CAB B, H, 120 AIVAC-RPS BUS 12, 1586,1588, COB>WER CAB,1584
E II5T RH S R 18 N/A H/A YES C-22005-CB/12 RPS CAB C, K, 120 YAC AlRPS BUS 11> 1586> 1587>COB>WER CAB> 1584
E INST RH S R 19 H/A N/A YES C-22005KB/12 RPS CAB C, K, 120 VAC AlRPS BUS ll, 1586, 1587,COtUTER CIB> 1584
E IHST RH 5 R 18 N/A H/A YES C-22005411/10 RPS CAB D, K, 120 VAC AlRPS BUS 12, 1586, 1588,CCIB>WER CIB, 1584
E INST RH 5 R 19 N/A H/A YES C-22005411/10 RPS CAB D, K, 120 VAC AlRPS BUS 12, 1586, 1588>COIB>WER CAB> 1584
CARHEN R. ACOSTA/ ECINEERrntor ype ane te
RIAHII4IED F. ALVI ENGINEER
r nt or ype t e
gnature
gnature
CERTIFICATION:
The inforsation identifying the equipaent required to bring the plant toIs, to the best of our knovledge and belief, and a cur te. (
a safe shutdom condition on this Safe Shutdovn Equi paent List (SSEL)or nore signatures of Systess or Operations Engineers)
X/Zd. 8a
)
P
Page No. 17Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDOVH ElgIPHEHT LIST (SSEL)
4eposite-
Data Base F lie Hase/Date/Tine: IBPI 3.DBF / 12/22/95 / 13:16:16Sort Crlterla: ID NusberFilter Criteria: (Eval. Concern CONTAIi5 'A')Progras File Hase 8 Version: SSBl 2.2
LINE EQUIPTRAIN CLASS
$$$$$$ $ $ $ $ $ $ $$$$
(I) (2) (3)
2025 1 18 36-04A
2026 1 18 36-048
2031 2 18 36-04C
2032 2 18 3644D
2027 1 18 3647A
3103 IOP2 18 36-07A
2028 1 18 36-078
2033 2 18 36-07C
2034 2 18 36-070
3106 20P1 18 36-070
(4)
SYSTBl/El@ IPHEHT
DESCRIPT IOH~$$$$$$$$$$$$$$$$$$$ $$$$$$ $ $$$$$$$
(5)
RPS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RCS/RCS PRESQIE TRANSHITTER
RCS/RCS PRESSNE TRANSHITTER
RPS/RCS PRESSNE TRANSHITTER
RPS/RCS PRESSNE TRANSHITTER
RCS/RCS PRESSNE TRN5HITTER
RCS/RCS PRESQIE TRAi5HITTER
Dug. Ho./Rcv./Zone Building~$$$$ $ $$$ $ $ $$ $$$$$$$ $$$$$$$$$$
(6)
C-180154/27/C3 RB
C-18015-C/27/83 RB
C-18015-C/27/F3 RB
C-18015-C/27/F3 RB
C-18015-C/27/83 RB
C-18015-C/27/83 RB
C-IBOI54/27/83 RB
C-180154/27/63 RB
C-180154/27/63 RB
C-180154/27/63 RB
EQUIPHENT
Fir.Elv.$$ $ $ $ $$$$$
(8)
LOCATION ——> <—OP.Rs. or Rov/Col. SMT NOTES Norsal
ST. -> PONER QPPOR'IINC SYS. RED'D IHTERCOIBIECTIONS REG.
Desired RE)07 DUG. M./REV. 8 SUPPORTINC OIPONNEHTS ISSUE~$$$$$$ $$$$$ $$$$$$$$$$$$$$$ $$ $ $$$$$$$ $ $$$$$ $ $$$$$ $ $$ $ $ $
(13) (14) (15) (16) (17)~$$$$$
(11)~$$$$$$$$$$$$$$ $$$$
(9) (10)
W IHSI'H 5 R
N IHST RH S R
E IHSTRH SR
EIB5TRH SR
(12)
AlYES
YES
H/A H/A
H/A N/A
H/A N/A
H/A H/A
Al
AIYES
AIYES
W INST RH S R 18 N/A N/A YES C-22005-C4/13 RPS CAB A, H, 120 AIVAC-RPS SUS 11, 1587,COPUTER CAB, 1584
W li5'I RH S R 19 H/A H/A YES C-22005<4/13 RPS CAB A, H, 120 AIVAC-RPS BUS ll, 1587,COPUTER M, 1584
N INST RH 5 R
N IHST RH 5 R
H/A H/A
H/A H/A
YES AI
AI
E II5T RH 5 R 18 H/A N/A YES C-22005-C10/9 RPS CAB D, H, 120 VAC AIRPS BUS 12, 1588,DBPUTER CAS, 1584
E IHST RH S R 19 N/A H/A YES C-22005410/9 RPS CAB D, H, 120 VAC AIRPS SUS 12, 1588>CCIPUTER CAS> 1584
4107 1 20 36-09
4108 2 20 36-10
3104 IOP3 18 36-102
3111 IOP3 20 36-102A
3115 20P2 20 36-103
3102 IOPI 18 36-104
3110 IOP2 20 36-25
4109 3 20 36-26
3114 20PI 20 36-27
RCS/RCS LEVEL INDICATOR
RCS/RCS LEVEL IMIICATOR
RCS/RCS PRESQIE TRANSHITTER
RCS/RCS PRESQIE INDICATOR
RCS/RCS PRESSNE RECORDER
RCS/RCS PRESSNE TRN5HITTER
RCS/RCS PRESSNE INDICATOR
RCS/RCS LEVEL MICATOR
RCS/RCS PRESSNE INDICATOR
C-18015</27/83 TS
C-18015</27/63 TB
C-180154/27/A2 RB
C-180154/27/A2 TB
C-180154/27/Al TB
C-180154/27/A3 RB
C-18015-C/27/83 TB
C-18015-C/27/83 TB
C-180154/27/62 TB
277
277
277
277
277
277
RSP 12
RSP 12
RSP 11
SR
SR
CR PNL F 5 R
CR PHL F 5 R
N INST lUi 5 R
CR CONE SR
CR CONE SR
N IHST RH 5 R N/A H/A YES
H/A N/A YES
N/A N/A
H/A N/A
YES
YES
N/A H/A YES C-22005-CS/13 F, 3643A
N/A N/A YES C-22005411/10 F, 36-03D
H/A N/A YES C-22004M/3
H/A N/A YES C-22004-C9/3
N/A H/A YES C-23077-C3/19 HC 167
AI
AI
AI
AI
AI
AI
Al
Al
Al
CERTIFICATION:
The lnforsatlon identifying the equi psent requiredls, to the best of our knovlcdge and belief, ect a
CARHEN R. ACOSTAI ENGINEER
r ntor ype ane t e
ICNAieiED F. ALVI ENCINEER
r nt or ype t e
lng plant to a safe shutdovn condition on this Safe Shutdovn Equlpsent List (SSEL)ac a . (One sore signatures of Spstess or Operations Englnecrs)
/'~r~ui~agna re
gnaturc
f
Page Ho. 18Report Date/Tine: 12-22-95 / 13:18:10
Nine Hi le Point Unit 1SAFE SHUTDOVH EOUIPHEHI LIST (SSEL)
<onposlte-
Data Base File Nane/Date/Tine: Qtl 3.MF ./ 12/22/95 / 13:16:16Sort Criteria: ID HINberFilter Criteria: (Eval. Concern GNTAII5 'A')Progran Flic Hane 8 Version: SSEH 2.2
LINE ElgipIa. TRAIN CLASS IWX H3.
~$$$$$ ~ esse $$$$$ $$ $ $$$$$$$$$$$$ $ $$
(I) (2) (3) (4)
4110 4 20 36-28
3101 1 18 36-31
4111 5 18 36-31
3108 1 20 36-31A
3107 IOP4 18 36-318
4115 5 20 36-31C
3105 2 18 36-32
4112 6 18 36-32
3113 2 20 36-32A
3112 20P3 18 36-328
4116 6 20 36-32C
3116 1,2 20 36-34
4105 5 18 36-76
4119 5 20 36-TEA
4117 5 20 36-768
4106 6 18 36-77
4120 6 20 36-77A
4118 6 20 36-778
SYSIDVEOUIPHEHTDESCRIPTION
~$ $ $ $$ $ $ $ $$$$$ $$$$$$$$$$$$$$ $ $sses
(5)
Dwg. Ho./Rev./Zone~$$$$$$$$$$$$$ $$ $ $ $ $
(6)
Building$$ $ $ $ $$ $$$
(7)
RCS/RCS LEVEL INDI CAIOR
RCS/RCS PRESSINE TRANSHITTER
RCS/RCS PRESSIIE TRANSHITTER
RCS/RCS PRESSIIE INDICATOR
RCS/RCS PRESSIIE INDICATOR
CTRl/GNTROL COtOHEHT (RKTIOH6EHERAIOR)
RCS/RCS PRESSINE TRANSNITTER
RCS/RCS PRESSURE IRNSNITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS PRESSRE INOICAIOR
C-18015-C/27/G3 TS
C-18015-C/27/A3 RB
C-18015-C/27/A3 RB
C-18015-C/27/81 TB
C-18015-C/27/A2 RB
C-18015-C/27/82 TB
C-180154/27/H3 RB
C-18015-C/27/H3 RB
C-180154/27/HI TB
C-180154/27/H2 RB
TB
RCS/RCS PRESSNE INDICATOR
RCS/RCS lEVEL TRN5HITTER
RCS/RCS LEVEL INDICATOR
CTRUCOHTROL CORNENT(IRILTIPLIER/DIVIDER)
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL INDICATOR
CTRUCOHTROL COfONDIT(WLTIPLIER/DIVIDER)
C-180154/27/DI TS
C-18015</27/A3 RB .
C-18015</27/Al TB
C-18015-C/27/A2 TB
C-180154/27/H3 RB
C-180154/27/Hl TB
C-180154/27/H2 TB
CTRUGNTROL COBYNENT (RKTIOH C-18015-C/27/H2GENERATOR)
EQUIPHEHT
Flr.Elv.$$$$$$$$$$
(8)
261
261
261
261
LOCATION ---> <- OP.Rn. or Row/Col. SORT NOTES Nornal~oeeoeoeooeoeee $$$ $
(9) (10)$$$$$$
(11) (12)
ST. —> POVER SWPORTING SYS. REO'0 IHTERCONIECTIOHS REG.
Desired RE007 DUG. H3./REV. 8 St@PORTING COFNEHTS ISSUE~$$$ $$ $ $$ $$$ $ $$$ $$$$$$$$$$$ $$$$$$ $ $$$$$$$$$$$$$$$$ $$$$$
(13) (14) (15) (16) (17)
RSP ll SR H/A H/A Al
CR PNL F 5 R
H II5T RH 5 R
ACR-1534 5 R
N/A N/A YES C-22004M/21 36-31
N/A IVA YES C-2200443/21 36-31
N/A N/A YES C-22004M/21 36-31
Al
AI
AI
E INST RH 5 R 19 N/A N/A YES C-2200446/9
E ll5I RH S R 18 H/A N/A YES C-22004-C6/9
1535, F, E, COfUTER AICAS
1535, F, E, COB'UTER AICAS
CR PHL F 5 R
E IHSIRH SR
ACR-1535 5 R
CR COH E 5 R
H II5T RH 5 R
CR PHL F 5 R
ACR-1534 5 R
H/A IVA YES C-2200446/9 36-32
N/A N/A YES C-2200446/9 36-32
AI
AI
N/A IVA YES 1535 AI
N/A N/A YES C-2200443/21 36-31, 36-32 AI
N/A N/A YES C-22004-C4/12 1534, F, E, OWNER AlCAB
N/A N/A YES C-22004M/21 36-31, 36-76 Al
H/A IVA YES C-2200443/21 36-31> 36-76> 1534 Al
E INST RH 5 R IVA IVA YES C-2200446/9 1534, F, E, COtUTER AlM
CR PHL F 5 R
ACR-1S35 5 R
IVA N/A YES C-2200446/9 36-32, 36-77
H/A H/A 1535
Al
Al
H INST RH 5 R 19 N/A H/A YES C-22004M/21 1534, 1535, F, E, AICHUTER M 1U13
H IHST RH 5 R 18 N/A H/A YES C-22004M/21 1534, IS35, F, E, AlCO@UTER CAS 1U13
CERIIFICATIOH:
Ihe Infornatlon Identifying thc equipnent requlr Ingis, to the best of our knowledge and belief, rect a a a
CARHEH R. AGOSTA/ ECIHEERrntor ype ane te gnature
plant to a safe shutdown condition on this Safe Shutdown Equipoent List (SSEL)(One r nore signatures of Systcns or Operations Engineers)J cre-
ate
aNAWED F. AlVI ENGINEER
rntor ype ane te gnature
I
Page Ho. 19Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point lhlt 1SAFE SHUTOOVH EQUIPHM LIST (SSEL)
4eposltc-
Data Base Flic Haec/Date/Tine: IllI 3.DBF. / 12/22/95 / 13:16:16Sort Cr Itcrla: ID NunberFIIter Crlterla: (Eval. Concern CONTAINS 'A')Progran Flic Haec 8 Version: SSEH 2.2
LINE EQUIPID. TRAIH CLASS
(1) (2) (3) (4)
3129 1 18 36-90A
3127 1 18 36-908
3133 2 18 36-90C
3135 2 18 36-900
3131 1 18 36-90E
3137 2 18 36-90F
3143 1 08A 37-01
6197 20P OBA 37-01
4199 1,2 DBA 38-01
4202 1,2 OBA 38-13
6118 10P 07 3945
6119 10P 088 394SE
6120 10P 088 39%SF
6121 10P 088 39-056
6122 IOP 088 3945H
SYSTEH/EQUIPHEHTDESCRIPT ION
(5)sosssas«sssssssssss
(6)
HS/HS EHERG ELECTRNATIC RV llll C-18015</27/A3PRESS IIDICAT SVITCH
HS/HS ENERG ELECTRNATIC RV l112 C-180154/27/A3PRESS INDICAT SVITCH
HS/HS EHERG ELECTRNATIC RV l121 C-180154/27/H3PRESS IIDICAT SVITCH
HS/HS ENERG ELECTRNATIC RV ll22 C-180154/27/H3PRESS IIDICAT SVITCH
HS/HS EHERC ELECTRNATIC RV l113 C-180154/27/A3PRESS IIDICAT SV ITCH
HS/I5 EHERC ELECTRCHATIC RV l123 C-180154/27/H3PRESS IIDICAT SV ITCH
RHV/REACTOR HEAD YENT IISIER BLOCK C-1800241/30/02YLV llRHV/REACTOR HEAD VENT IIIER BLOCK C-18002-Cl/30/D2YLV llSDC/SIITOOVN COOLING OUTLET IWER C-18006-Cl/28/F4ISO VLV
SDC/SNUTOOVN COOLING RETNH INSIDE C-ISX&CI/28/F2ISO YLV
EC/LOOP lllCODENSER RETNN ISO C-180174/42/C6YLV
EC/LOOP Ill CODEHSER RETNH ISO C-18017-C/42/CSVLV PILOT
EC/LOOP lllCODENSER RETNH 150 C-18017</42/C5VLV PILOT
EC/LOOP illCODENSER RETNN ISO C-180174/42/CSVLV PILOT
EC/LOOP lllCODEHSER RETNN ISO C-180174/42/CSVLV PILOT
'ulldlng~Sssssssss
(7)
EQUIPHMFlr.Elv.
~Sssssasss
(8)
RS
RS
RS
RS
261
259
RB 281
RB 281
RB 281
RB 281
RB 281
RB 284
LOCATIN ---> <—OP.Rn. or Ron/Col. SORT IDTES Nornal
ST. -> POVER SI>PORTING SYS. REQ'0 IHTERCOSIECTINS REG.
Desired REQD7 OVG. ID./REV. 8 SNPORTIHG COS>OHMS ISSUE~assess asses ssasssssss«ssa sss«ssssssssssssssssss Oases
(13) (14) (15) (16) (17)(9) (10) (11) (12)
H/A AIYESV IHSI'H 5 R
V INST RH S R
E INST RH S R
E INS'I RH 5 R
V INST RH 5 R
E IHSTRH SR
AlH/A H/A
N/A H/A
N/A N/A
N/A N/A
H/A H/A
YES
AlYES
AIYES
AIYES
AI
AZ145
AZ145
AZ315
19>23> CU5ED CLOSED NO C-1943841/22 167, RPS> RIL 38-13A AI31
IV RON 5 09 CU5ED OPEH NO 3945E> 39@SF> 394SG> Al3945H
IV RON
IV RON
IV RON
IV RON
5 R 09 AIR VENT YES C-34812-Cl/6 RHS 39-05C, RPS llA Al
S R 09 AIR VEHT YES C-3481241/6 RI5 3905C> RPS llA AI
S R 09 AIR YM YES C-19839418/7 RIB: 3945A, 8812, N, L AI
5 R 09 AIR VM YES C-19839418/7 RIL'9-05A, 8812, H, L AI
R 19 CU5ED CU5ED ID C-1944042/31 1718, RIL 37-OIA AI
R 18 CU5ED CLOSED ID C-19440-C2/31 1718, RIL 37-OIA AI
R 19,31 CU5ED CLOSED NO C-1943841/22 167, RPS, RIB: 38-OIA AI
CERTIFICATIN:
The Infornatlon Identlfylng the cqulpnent requ~l Ing the plant to a s fe shutdovn condltlon on this Safe Shutdem Equlpnent List (55EL)ls, to thc best of our knouledgc and belief correct a d ac a (One nore signatures of Systenspr Operations Engineers)
CARHEN R. ACOSTA/ ENGIHEER
/'~/~clair-
r nt or ype t e gnl te lto
IHHIIlED F. ALVI / ENCINEER
r nt or ype t c gnlturc l
rl
~ q 4
Page No. 20Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hilc Point Unit 1SAFE SNWDOVH ElgIPHENT llSI'SSEL)
-Cosposite-
Data Base File Hase/Date/Tine: III)l3.DSF / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CNTAINS 'A')Progras File Hase 8 Version: SSEH 2.2
LIHE ElglpID. TRAIN CUSS
(I) (2) (3) (4)
6123 20P 07 39-06
6124 20P 088 3946E
6125 20P 088 3946F
6126 20P 088 3946C
6127 20P 088 3946H
6112 IOP OBA 39-07R
6113 20P OBA 39-OSR
6111 IOP OSA 39-09R
6113A 20P OBA 39-10R
4207 1 088 39-11C
6129 IOP 088 39-11C
4208 1 088 39-llD
6130 IOP 088 39-11D
4206 I 07 39-11R
6128 IOP 07 39-1lR
SYSTEH/EOUIPHENT
DESCRIPT IN
(5)
ILtg. No./Rev./Zone Building~ $ 000000000000000000 00$ 0000000
(7)(6)
EOUIPHENT
fir.Elv.~0000$ 0000
(8)
RB 281
RB 281
RB 281
RB
RB 281
RB 298
RB
EC/LOOP Ill STEAH OUTLET INSIDEISO VLV
EC/LOOP I12 STEAH OWLET IHSIDEISO VLV
EC/LOOP Ill EHERCOKY GMENSERMAIH ISO VLV PILOT
EC/LOOP Ill EHERCBKY COMENSERMAIN ISO VLV PILOT
EC/LOOP Ill OiERCOKY CND95ERDRAIN 150 VLV PllOT
EC/LOOP Ill EHERGBKY GMENSERDRAIN 150 VLV PILOT
EC/LOOP Ill EHERGEIKY GMENSERDRAIN ISO VLV IlllEC/LOOP Ill EHERGOKY GMEHSERMAIN ISO YLV Sill
C-18017-C/42/D4 RS
C-180174/42/E4 RB
C-18017-C/42/84 RB
C-18017</42/84 RS
C-180174/42/84 RB
C-18017-C/42/84 RB
C-18017-C/42/84 RB
C-18017-C/42/84 RB
EC/LOOP I12 GMENSER RETIRH ISO C-18017-C/42/F6VLV
EC/LOOP I12 GMENSER RETIRH ISO C-18017-C/42/F5VLV PILOT
EC/LOOP I12 CNDENSER RETIRN ISO C-18017-C/42/FSYLV
Pll01'C/MOP
I12 CODENSER RETLRH 150 C-18017-C/42/FSYLV PILOT
EC/LOOP I12 GMENSER RETIRH 150 C-18017</42/FSYLV PILOT
EC/LOOP IllSTEAN OWLET OWSIDE C-18017</42/04ISO YLV
EC/LOOP I12 STEAH OWLET OUTSIDE C-18017-C/42/E4150 YLV
LOCATION —--> <—OP. ST. ->Rs. or Rov/Col. SORT IDTES Norsai Desired~00000000000000 $000 000000 $$$$$$$ $$$$$$$
(9) (10) (11) (12) (13)
PNER 5$ 'PORTING SYS. REII'0 INTERCNNECTINS REG.
RENT DUG. ID./REV. 8 SIRPORTING CNS>NENTS ISSUE$0000 0000000$ 0$ $$$$$ 00000000000000$ 00$ 00000 $ 0000
(14) (15) (16) (17)
IV ROOH 5 09 CLOSED NEH ID C-19839-CIS/7 3946E> 39@SF) 39-060, Al39-06H
IV ROOH
IV ROOH
IV RON
IV ROOH
IV ROOH
IV ROOH
IV ROCH
IV ROOH R 18)31 OPOI OPOI ID C-19437-C2/34 RIC 39-IOI) RIC 39-10C, Al1618, RPS
IV ROOH
IV ROCH
IV ROCH
IV ROOH
S R 19 AIR VOIT YES C-19859410A/10 8811) 8812) RHS 39-118 > Al1551, 1556
5 R 18 AIR VOIT YES C 19859410I/10 8811) 8812) Rin 39 118 ~ Al1S51, 1556
5 R 19 AIR VENT YES C-19859-CIOA/10 8811) 8812> RI5 39-118> Al1551, 1556
5 R 18 AIR VENT YES C-19859-CIOA/10 8811, 8812, RHS 39-118, Al1551, 1556
IV ROOM 5 19 OPBI CLOSED YES 39-11C) 39-11D Al
IV RON 5 18 OPEN CLOSED YES 39-11C) 39-11D AI
5 R 09 AIR VENT YES C-34812-Cl/6 RHS 3946C) RPS 12A Al
5 R 09 AIR VENT YES C-34812-Cl/6 Rie 39-06C, RPS 12A Al
5 R 09 AIR VENT YES C-19839-CIB/7 RIC 394Q, 8812, H, L Al
5 R 09 AIR VENT YES C-19839-CIB/7 RIC 3946A, 8812, H, L Al
R 1S,31 OPEN OPEN ID C-19839-C21/7 YBII, RPS, IQC 3947A, AlRHC 39-07C
R 18)31 OPEN OPEN ID C-19S39-C22/6 YB12) RPS, RIC 39-08A, AIRHC 39-OBC
R 18)31 OPEH OPEN ID C-19440-C2/31 RPS) 1718, RlC 394SA, AlRIC 39-09C
CERTIFICATIN:
The inforsation idcntifylng thc equipnent requiis, to the best of our keeledgc and belief rrect
CARNEN R. ACOSTA/ ENGINEER
rntor ype ase teHOHIIHED F. AlVI / ENGINEER
rntor ype ane te
bring the plant to a safe shutdovn condition on this Safe Shutdovn Equipsent List (SSEL)nd a a . (One r sore signatures of 5 stesspr Operations Engineers)
z ~aharc ate
2kagoature
Page No. 21Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDOVH EQUIPHEHT LIS'I (SSEL)
-Conposltc-
Data Base File Haec/Date/Tine: III)1 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nano I Version: SSEH 2.2
LINE EQUIPID. TRAIN CLASS HARK ID..
$$$ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $$ $ $ $ $ $ $ $ $ $ $ $ $$$
(I) (2) (3) (4)
4210 2 088 39-12C
6132 20P 088 39-12C
4211 2 088 39-12D
6133 . 2OP 088 39-12D
4209 2 07 39-12R
6131 20P 07 39-12R
4216 1 088 39-13C
6135 20P 088 39-13C
4217 1 088 39-130
6136 20P 088 39-130
4214 1 07 39-13R
6134 20P 07 39-13R
4219 2 088 39-14C
6138 IOP 088 39-14C
4220 2 088 39-140
SYSTEN/EQUIPNEHT
DESCRIP lIONssssssssssssssssesssseessssessssse
(5)
EC/LOOP lll EHERGBKY CNDEHSERDRAIN ISO VLV PILOT
EC/LOOP lll 9!ERGBKY CODENSERDRAIN ISO VLV PILOT
EC/LOOP lll IHERGBKY CNDEHSERDRAIN ISO VLV PILOT
EC/LOOP Ill EHERGBKY COMKHSERDRAIN ISO VLV PILOT
EC/LOOP lllEHERGBKY CNDEHSERDRAIN ISO VLV l112
EC/LOOP Ill EHERGBKY COtD05ERDRAIN ISO VLV l112
EC/LOOP I12 IHERGBKY CNDENSERMAIN ISO VLV PILOT
EC/LOOP I12 ENERGBKY CND05ERDRAIH ISO VLV PILOT
EC/LOOP I12 EHERGBKY CNDENSERDRAIN ISO VLV PILOT
EC/LOOP l12 ENERGBKY CND05ERMAIN 150 VLV PILOT
EC/LOOP I12 EHERGBKY COtD05ERDRAIN 150 VLV I121
EC/LOOP I12 EHERGBKY CND05ERDRAIN ISO VLV l121
EC/LOOP I12 ENERGBKY OM05ERDRAIH 150 VLV PILOT
EC/LOOP ILB EHERGBKY CNDENSERDRAIN ISO VLV PILOT
EC/LOOP ll2 ENERGBKY CERD05ERDRAIN ISO VLV PILOT
Dvg. Ho./Rev./2one~$$$$ $ $ $ $ $ $$$$ $$$$$$
(6)
Building~$$$$$$ $ $$
(7)
C-18017-C/42/G4 RB
C-18017-C/42/G4 RB
C-18017</42/G4 RB
C-18017-C/42/G4 RB
C-18017-C/42/G4 RB
C-18017-C/42/64 RB
C-18017-C/42/G4 RB
C-180174/42/84 RB
C-18017-C/42/84 RB
C-18017-C/42/84 RB
C-18017-C/42/84 RB
C-180174/42/84 RB
C-18017-C/42/84 RS
C-18017-C/42/G4 RS
C-18017-C/42/G4 RB
EQUI PHEHT
Flr.Elv.$$$$$ $ $$ $ $
(8)
LOCATIN ——> <—OP.Rn. or Row/Col. SORT NOTES Homal
(9) (10) (11) (12)
IV ROOH
IV RON
IV RON
IV RON
IV ROOH
IV RON
IV RON
IV RON
298 ~ IV RON
IV RON
IV RON
IV RON
IV RON
IV RON
IV ROCH
ST. —> POVER SUPPORTING SYS. REQ>D IHTERCNIIECTIONS REG.Desired REQ07 DVG. ID./REV. 8 SWPORTIID CCt6>NEHTS ISSUE~$ $ $$$$ $$$$$ $$$$$$$$$$ $$$$$ $$$$$$ $$$$$$$$$$$$$$$$$ $$$$$
(13) (14) (15) (16) (17)
S R 19 AIR VENT YES C-19859<IOA/10 8811) 8812, RHS 39-128) AI1551, 1556
5 R 18 AIR VENT YES C-19859410A/10 8811, 8812, RHS 39-128> AI1551> 1556
5 R 19 AIR VENT YES C-19859-CIOA/10 8811, 8812, RHS 39-128, AI1551> 1556
5 R 18 AIR VENT YES C-19859-CIOA/10 8811, 8812, RHS 39-128, AI1551, 1556
AI5 19 OPEN CL05ED YES
5 18 OPEN CLOSED YES
39-12C, 39-12D
AI39-12C, 39-12D
5 R 19,27, AIR31
5 R 18,27, Ale31
5 R 19,27, AIR31
5 R 18,27, AIR31
VEHT YES C-198594IOA/10 8811, 8812, RHS 39-138, AI1551, 1556> RPS
VEHT YES C-198594IOA/10 8811, 8812, RHS 39-138, AI1551, 1556, RPS
VENT YES C-19859410I/10 8811> 8812> RNS 39-138) AI1551, 1556, RPS
VENT YES C-19859<IOA/10 8811, 8812, RHS 39-138, AI1551, 1556, RPS
39-13C, 39-130 AI5 19 OP EH CLOSED YES
5 18 OP BI CLOSED YES 39-13C, 39-130 Al
5 R 19,27, AIR31
5 R 18>27, AIR31
5 R 19,27, AIR31
VENT YES C-19859<IOA/IO 8811) 8812, RHS 39-148, Al1551> 1556, RPS
VENT YES C-198594IOA/10 8811, 8812, RHS 39-148, Al1551, 1556, RPS
VENT YES C-19859-CIOA/10 8811) 8812) RHS 39-148) Al1551, 1556, RPS
CERT IF I CAT IN:
The lnfornatlon identifying the cqulpnent rls, to the best of our knovledge and belle
CARNEN R. AGOSTA/ BDINEERr nt or ype t e
DNAISED F. ALVI ENGINEER
rntor ype ane te
bring t plant to a safe shutdovn condition on this Safe Shut&we Equlpnent List (SSEL)co rect and a ra (One o nore signatures yf Systems
or Operations Engineers)
o/'~�~P-rgn�atu te
5gnature
I I
1
f'
Page No. 22Report Date/TIne: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHJTDMI EOUIPHENT LIST (SSEL)
<onposlte-
Data Base File Nano/Date/TIne: ITB)1 3.DBF ~ / 12/22/95 / 13:16:16Sort Crlterla: ID )heberFilter Cr l ter la: (Eval. Concern CONTAINS 'A')Progran Flin Nane 8 Version: SSBI 2.2
LINEM. TRAIN
~ $0000 $ 0000
(1) (2)
ElglpCuSS HARK M.
(3) (4)
SYSTOI/ElgIPHEHTDESCRIPTION
(5) (6)
Bulldlng~ $ $$ $ $$$$0
(7)
EOUIPHENT
Flr.Elv.~0$ 0$ 0$ 000
(8)
LOCATION —-> <- OP.Rn. or Rou/Col. SORT MlES Homal~00$ $0$ 0$ $00000 $000 000000 SSSHSS
(9) (10) (11) (12)
ST. -> PNER SIT)PORTING SYS. RED)D IHTERCNBIECTIONS REG.
Desired RE(07 WG. ID./REV. 8 M)PORTING CO>tNEHTS ISSUE~$00000 0$$ $0 HHH000000000 H$0$ $$ $$$ $$$$$$$ $$$$ $ $ SSSH
(13) (14) (15) (16) (17)
6139 10P 088 39-140
4218 2 07 39-14R
6137 10P 07 39-14R
EC/LOOP 412 EHERGOCY COIDEHSER
DRAIN ISO VLV PILOT
EC/LOOP 412 EHERGENCY CNDB5ERMAIN ISO VLV l122
EC/LOOP 412 EHERGBCY COMENSER
DRAIN ISO YLV I122
C-18017-C/42/64 RB
C-18017-C/42/64 RB
C-18017-C/42/64 RB
IV ROII
IV ROGI
IV RON
5 R 18,27, AIR31
5 19 OPEN CU5ED YES 39-14C) 39-140 Al
5 18 OPEN CU5ED YES 39-14C) 39-140 Al
VENT YES C-19859410A/10 8811, 8812, RNS 39-148, AI1551) 1556, RPS
4124 20P1 OBA 4041
4126 2 OBA 4042
4170 2 OBA 4045
4169 1 OBA 4006
4123 2 OBA 4049
4121 10P1 OBA 40-10
4122 1 OBA 40-11
4125 1 OBA 40-12
4161 1 OBA 40-30
4165 2 OBA 40-31
2007 1 07 44.2-15
2008 2 07 44.2-16
2009 2 07 44.2-17
2010 1 07 44.2-18
CRS/C0RE SPRAY IHLET INER ISO VLV C-18007-C/43/E3 N
CRS/CORE SPRAY INLET OUT ISO VLV C-180074/43/F3 RB
CRS/CORE SPRAY TEST ISO YLV
CRS/CORE SPRAY TEst ISO VLV
C-18007</43/03 RB
C-18007-C/43/83 RB
CRD/SCRAH DISCHARGE YDL MLDIMTNBl VOIT ISO YLV
CRD/SCRAH DISCHARGE llDL HOLDINGTAIBl VENT ISO YLV
C-18016-C2/23/A3 RB
C-18016-C2/23/AS RB
CRD/SCRAH DISCHARGE HEADER DRAIN C-1801642/23/E5ISO YLV
CRD/SCRAH DISCHARGE HEADER DRAIN C-1801642/23/F5ISO VLV
RB
CRS/CORE SPRAY IHLET IIOWER ISO VLV C-18007-C/43/E2 N
CRS/CORE SPRAY INLET IIBIER ISO VLV C-18007-C/43/02 N
CRS/CORE SPRAY IHLET IWER ISO YLV C-18007-C/43/D3 N
CRS/CORE SPRAY INLET OUT ISO VLV C-18007-C/43/C3 RB
CRS/CORE SPRAY YEHT INSIDE ISO VLV C-18007-C/43/D2 N
CRS/CORE SPRAY VENT INSIDE ISO VLV C-18007-C/43/E2 N
261
237
261
261
261
237
261
261
237
237
A290 5 R 19 31 CLOSED OPEN YES C 19437~ 1618 ~ IUC 4041A) RPS Al
SE CORNER R 31 OPEN OPEN M C-1943841/22 167, RIC 4042A> RPS Al
KIO R 19,31 CLOSED CLOSED ID C-19438<1/22 167, PHL 167A> IUC Al4045A, RPS
K6 R 19,31 CLOSED CLOSED M C-1943841/22 167, PHL 167A, RIC Al40-06A> RPS
AZ225
5 R 19,31 CLOSED OPEN YES C-19440-C2/31 1718, RIC 4049A> RPS Al
5 R 19,31 CLOSED OPEH YES C-1944hC2/31 1718, IC 40-10A, RPS AI
5 R 19)31 CU5ED OPEN YES C-19437-C2/34 1618> RIC 40-11A> RPS Al
5 09,19 OPEN CU5ED
5 09,19 OPOI CLOSED
YES
YES
113-273, 113-274 AI
113-275, 113-276 Al
5 09,19 OPOI CLOSED YES . 113-275, 113-276 AI
S 09,19 OPEN CLOSED YES 113-273, 113-274 AI
SE CORNER R 31 OPEN OPEH M C-19438-C2/21 167, PHL 167A, RHC AI40-12A, RPS
R 31 CU5ED CU5ED ID C-19437-C2/34 1618) RHS 40-308, RPS Al
R 31 CLOSED CLOSED M C-19440410/10 1718, RI5 40-318, RPS AI
CERTIFICATION:
The lnfornatlon ldentlfylng the equlpnent required Ing the plant toIs, to the best of Nn knouledge and belief, co ect a accur
CARHEH R. AQ5TA/ EC INTER
r nt or ype t e gna re
MHANED F. ALVI EC INEER
t,er nt or ype gniture
a safe shutdoun condltlon on this Safe Shutdem Equlpnent List (SSEL)or re signatures of 5 stens r Operations Engineers)»r pi-
ete
I Z6 5
Jl
h
Page No. 23Report Date/line: 12-22-95 / 13:18:10
Hlnc Hilc Point Unit 1SAFE SWTDGMH EGUIPNENT LIST (SSEL)
Conpos ite-
Data Base File Nano/Date/Tine: QPI 3.DBF . / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Hane t Version: SSEH 2.2
LIHEID. TRAIN
~$0000 $0000
(I) (2)
EQUIP
CIASS HARK M.
(3) (4)
61940 12OP 07 50-15
6336 120P 07 50-15
6194A 12OP R Sly
6333 12OP R 50-63
6332 20P 07 5545
6194C 120P 07 59-07
6335 120P 07 5947
61948 120P 07 59-08
6334 120P 07 59-08
6189 20P 07 6043
6190 2OP 088 6043C»
6185 IOP 21 60-10
6187 IOP 07 60-04
6188 10P 088 6044C»
6186 20P 21 6049
SYSTEN/EOUIPHENT
DESCRIPT!OH
(5)
Dug. Ho./Rev./2one~$$0000$ 0$ $$0$ 0$ $$0$
(6)
CTS/COM SPILL t STORAGE TACS 8 C-180034/34/F3GM H/U LEVEL CV
CTS/COM SPILL t STORAGE TACS t C-180034/34/F3COD N/U LEVEL CV
BuildingF000000000
(7)
CTS/CRD ILES SXTION PRESSIIECONTROL VLV ISO
CTS/CRD POPS SUCTION PRESSIECOHTROL VLV ISO
CN/DEHIH HATER STORAGE TACSBLOCK VLV
C-180034/34/64 TB
C-18003-C/34/G4 TB
C-18016-Cl/23/A4 RB
TB
ECW/ENER GM NKOP TANK 12SlPPLY ISO VLV
ECW/EHER COD NKGP TAC 12SIPPLY ISO VLV PllOT
EOl//ENER C0ID NKGP TAC llSIPPLY 150 YLV
EOlJ/ENER COM NKHP lAC llSIPPLY ISO VLV PILOl
C-180174/42/Gl TB
C-18017-C/42/Gl TB
C-180174/42/Bl TB
C-18017-C/42/81 TB
ECW/ENER GM NKElP VAlER TANK C-18017-C/42/G2ll2
ECW/EHER GM NKEIP HATER TAC C-18017-C/42/Blill
CTS/GMEHSATE H/U COMEHSER N/U C-18003-C/34/F2LEYEL CONTROL YLV
CTS/CODENSATE H/U GMENSER N/U C-18003</34/F2LEVEL CONTROL YLV
CTS/GM05ATE N/U CONDENSER LEVEL C-18003</34/F2CONTROL VLV
CTS/COMENSATE H/U COMENSER LEVEL C-18003-C/34/F2CONTROL VLV
EOUIPHEHT
Fir.EIv.F 000000000
(8)
261
261
261
261
261
250
261
261
LOCATION —-->Rn. or Rou/Col. SORT MTES000000000000000 $000 000000
(9) (10) (11)
FIO
FIO
H,L13
H,L13
H4
H4
H4
<—OP. ST. —> POUER SIPPORTING SYS. RED'D INTERCNBIECTIONS REG.
Homal Desired REO07 DUG. M./REV. t SIPPORTING COPONEHTS ISSUEF000000 0000000 $0000 000$ 0$ 0$0$ $$000 00000000000000000$ 00000 $ 0000
(12) (13) (14) (15) (16) (17)
AIR 19 CU5ED CLOSED ID
R 18 CLOSED CLOSED AI
NNJAL VALVE
NMML VALYE
02)19 OPEN CLOSED M AI
AI02)18 OPEN CLOSED M
R — CU5ED CLOSED M AI
AIR 19 CU5ED CLOSED lD
R 18 CU5ED CLOSED M
R 19 CLOSED CLOSED ID
R 18 CLOSED CLOSED M
5 20 CU5ED OPEN YES
AI
AI
AI
AI
5 R — VEHT AIR YES C-1995145/9 RIC 6NHA, 1556 Al
5 20 CU5ED OPEH YES Al
5 R — VENT AIR YES C-19951M/9 RIC 60-04A> 1551 AI
AlS — N/A N/A N/A
5 — N/A N/A H/A AI
r nt or ype toMHANED F. ALVI ENGINEER
r nt or ype ane t e
CERTIFICATIOH:
lhc Infornation identifying the cquipnent ris, to the best of our knoulcdgc and belief
MHEH R. AQ5TA/ EIDINEER
r bring t+ plant to a safe shutdovn condition on this Safe Shutdem Equipnent List (SSEL)correct a ra . (One nore signatures of Systens or Operations Engineers)
r~ ussrgnaturc ate
)2 24agnature
I
Page No. 24Report Date/Ilae: 12-22-95 / 13:18:10
Nine Nile Point Unit 1'SAFE SHUTDIJN EQUIPHENT LIST (SSEL)
-Coaposlte-
Data Base File Haec/Date/Tine: J46)1 3.DBF. / 12/22/95 / 3:16:16Sort Criteria: ID NuaberFilter Criteria: (Eval. Concern CONTAINS 'A')Prograa File Naae 8 Version: SSEH 2.2
LINE . EQUIP14J. TRAIN CLASS
~ 00000 0000$ $0000
(I) (2) (3) (4)
SYSTEH/EQUI PHENT
DESCR IP lION~0000000$ 0000$ 00000000$ 000$ 00$ 000$
(5)
Ihg. Ho./Rev./Lone~0000000000000000000
(6)
<—--- EQUIPHEHT
Building Flr.Elv.0000000000 0000000000
(7) (8)
LOCATION —->Ra. or Rou/Col. SORT~0000000000000$ $000
(9) (10)
<- OP. ST. -> POVER SIB)PORTIJKi SYS.NOTES Horaal Desired REQDT DVG. IKJ./REV.~ 00000 000000$ 0000000 00000 00000000000000$
(11) (12) (13) (14) (15)
REQ'D IHTERCOWECTIONS REG.
8 SIPPORTIIK) GKOHENTS ISSUE~000000000000000000000$ 0000$
(16) (17)
6183 20P2 R 60-11
6173 10P2 R 60-12
6184 IOP 07 60-13
6160 10P 07 60-17
ECW/EHER CONJ 8121)122 HAKDB>
TQK ISO YLV (HNML)
ECW/ENER CONJ 4111,112NAKEI'AIS
150 YI.V (HAWAl)
C-18017-C/42/62 TB
C-180174/42/82 TB
EOll/INER COJI llll>112 LEVELCONTROL VLV
C-18017-C/42/82 RB
ECW/EHER COJBJHAKEIB) TIE YLV C-18017-C/42/F2 RB
Q-P, 7-9
02 OP EH OP/CL
02 OP EH OP/CL
03 OPEN H/A
HO
NO
5 07 CLOSED OP/CL YES
HAJAML> EC 4121/122 AlLEVEL
HAMML, EC 4111/112 AILEYEL
Al
60-17A> 60-178, 60-17D, Al60-17E, EC Bill/112LEYEL
6163 IOP 20 60-17A ECW/ENER CNBJ 4111,112 LEVEL E/P C-18017-C/42/82CONVERTER
RB Q-P) 7-9 SR H/A N/A YES C-22014<1/15 IS65, K, 120 VAC RPS
BUS11) 60-28
6164 IOP 20 60-178
6161 IOP 088 60-17D
6162 IOP 088 60-17E
6162A IOP 20 60-1 7F
6174 20P 07 60-18
6175 20P 20 60-18A
6179 20P 20 60-188
6181 20P 088 60-180
6182 20P 088 60-18E
6182A 20P 20 60-18F
ECW/ENER CMJ 4111,112 LEVEL
CONTROLLER
ECW/EHER Cll 4111)112 LEVELCONTROL VLV PILOT
ECW/ENER COJBJ 4111)112 LEVELCONTROL VLV PILOT
'MJ/INERCONJ lll1,112 LEVELCONTROL SVllCH
EONIEHER COJO 4121,122 LEVELCONTROL VLV
ECW/EHER COJKJ 4121,122 LEYEL E/PCONVERTER
ECW/INER CNBJ 4121,122 LEVELCONTROLLER
ECW/EHER CMJ 1121,122 LEVELCONTROL VLV PllOT
ECW/EHER CNRJ II21)122 LEVELCONTROL VLV PILOT
ECW/EHER COJBJ l121,122 LEVELCONTROL SNITCH
C-18017-C/42/82 TB
C-18017-C/42/82 RB
C-18017-C/42/82 RB
C-18017-C/42/82 TB
C-180174/42/62 RB
C-180174/42/62 RB
C-18017-C/42/62 TB
C-18017-C/42/62 RB
C-180174/42/62 RB
C-180174/42/62 TB
277
250
277
340
277
CR PNL K SR N/A H/A YES AI
Q-P> 7-9
Q-P) 7-9
S R 09 VEHT AIR YES C-3481241/6 RPSll, RHS 60-17F Al
5 R 09 VENT AIR YES C-34812<1/6 RPSII, RHS 60-17F Al
RSP 11 N/A N/A Al
Q4, 7-9 S 07 CLOSED OP/CL YES 60-18A, 60-188, 60-180, AI60-18E, EC l121/122LEVEL
Q4, 7-9 SR
CR PHL K 5 R
N/A N/A
H/A N/A
YES
YES
Al
Al
Q-P, 7-9
Q-P) 7-9
RSP 12 N/A N/A HA AI
5 R 09 VENT AIR YES C-34812-Cl/6 RPS12, RHS 60-18F Al
5 R 09 VENT AIR YES C-34812-Cl/6 RPS 12) RJ5 60-IBF Al
CARHEN R. AMSTA/ ENCI NEER
r ntor ype aae teJJANED F. ALVI ENS IHEER
rntor ype ane te
gnature
gnature
CERTIFICATION:
The lnforaation identifying the equi paent ~bringls, to the best of our km+ledge and bell, correct a
plant to safe shutdovn condition on this Safe Shutdom Equipaent List (SSEL)( nore signatures of $ysteas or Operations Engineers)
/z/~/"- w~z4,
a
h
Page Ho. 25Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hllc Point Unit 1SAFE SHUTDOMN EOUIPNEHT LIST (SSEL)
-Conposltc-
Data Base File Hase/Date/Tine: JIB>l 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nane I Version: SSEH 2.2
LINEi8. TRAIH
~ $$$$$ $$$$$
(I) (2)
EOUIPCLASS HARK N.~$$$$ $$$$$$$$$$$ $ $$$$ $$
(3) (4)
SYSTEH/EOUIPNEHTDESCRIPTION
~$$$ $$$$$$$$$$ $$$$$$$$$ $ $$ $ $$ $ $$ $ $
(5)
Dug. No./Rev./lone~ $ $$ $ $ $ $$ $ $ $$$$$$$ $$
(6)
Building~$$$$$ $ $ $ $
(7)
EOUIPNENTFir.L'lv.
~$$ $ $ $$$$$
(8)
LOCATION --->Rn. or Ron/Col. SORT$ $ $$$$$$$ $ $ $$$$ OOOO
(9) (10)
NTES$$ $ $ $$
(11)
(- OP. ST. ->Nornal Desired~$ $ $$ $$ $ $ $ $$ $ $
(12) (13)
FOYER SII'PORTING SYS. REO>D IHTERCOJIIECTIONS REG.
RElgl7 DUG. N./REV. 8 SUPPORTING COJIJOHEHTS ISSUE~$ $$$ $$$$$ $ $ $$$$$$$$ $ $ $$ $ $$$$$$$$$$$$$$ $$$$ $$$$$
(14) (15) (16) (17)
6171 IJB>2 18 60-22
6169 1OP2 20 60-22A
6170 10P2 20 60-228
6172 1OP2 20 60-22C
6168 20P1 18 60-23
6176 20pl 20 60-23A
6180 20P1 20 60-238
6178 20P1 20 60-23C
6165 10P 18 60-28
ECJRJ/9!ER CON Bill>112 LEVELTRANSHITIER
C-18017</42/83 RB
RB
ECJBJ/ENER CON llll,112 LEVELCONTROLLER
ECJRJ/EHER CON l111,112 LEYELIJ8ICATOR
ECJRJ/EHER CON l121,122 LEVELTRANSHITTER
ECJRJ/THER CON l121,122 UPCONVERTER
ECJRJIEHER CON l121,122 LEVELCONTROLLER
ECJRJ/EHER CON l121>122 LEVELIJ8ICATOR
EOBJ/EHER COJ8 l111,112 LEYELTRAHSHITTER
C-18017-C/42/82 TB
C-180174/42/83 TB
C-18017-C/42/C3 RB
C-180174/42/G2 RB
C-18017-C/42/G2 TB
C-18017-C/42/62 TB
C-180174/42/83 RB
ECJRJ/ENER CON llll,112 LEVEL E/P C-18017</42/82CONVERTER
318
250
318
277
318
P6
l)4> 7-9
RSP ll
RSP ll
Pll
Q-P> 7-9
RSP 12
RSP 12
P6
SR
SR
H/A N/A YES C-3481MI/11 60-228, RSP AI
H/A N/A YES C-3481341/11 60-228, RSP AI
SR N/A N/A YES C-3481341/11 60-228 AI
SR
SR
H/A N/A
N/A N/A
YES
YES
AI
AI
SR AI
SR N/A N/A YES AI
5 R 28 N/A N/A YES C-2201441/15 1565, K, 120 YAC RPS AlBUS 11, IS82, 120 VAC
IIKHJVN, GIB'UTER CAB,IS85, 125 YX IIB08VN
5 R 28 H/A N/A YES C-34814%2/12 120 VAC IIB08NH AI
6166 10P 20 60-28A
6167 2OP 18 60-29
6177 20P 20 60-29A
4204 1,2 21 9442
6117 20P 21 60-42
4200 1,2 21 60-44
6116 20P 21 60-44
ECJRJ/THER CON l111,112 LEVELINICATOR
ECJRJ/THER CON ll21,122 LEYEL. TRANSHITTER
ECJRJ/THER COI8 l121,122 LEYEL
INICATOR
EC/EHERCBKY CONENSER l122
EC/ENERGBKY COMEHSER l122
EC/EHERGBKY COIBEHSER l121
EC/ENERGBKY CONEHSER l121
C-18017-C/42/83 TB
C-180174/42/63 RB
C-180174/42/62 TB
C-180174/42/H3 RB
C-18017-C/42/H3 RB
C-18017-C/42/F3 RB
C-18017-C/42/F3 RB
277 CR PNL K 5 R
318 Pll SR
277 CR PNL K 5 R
340 P9 5 19
340 PB 5 10,18
340 PB 5 19
340 P9 5 10,18
YES
YES
N/A
N/A
60-28
60-29
AI
AI
AI
AI
AI
AI
AI
CERTI FICAIION:
The lnfornatlon identifying the equi poent required to bring thc plant to a safe shutdoun condition on this Safe Sbutdem Equipnent Ust (SSEL)ls, to the best of our hxwlcdgc and belief, rrcc and a rate. (On r nore signatures of ystens or Operations Engineers)
CARNEN R. AGOSTA/ ENGINEER fz zp PJr ntor ype tc gnaturc s
NNAJIIED F. ALVI / ENGINEER
r ntor ype ane tc a
lt
I
Page Ho. 26Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDMI EQUIPNEHT LIST (SSEL)
4eposlte-
Data Base File Haec/Date/Tine: III>l 3.DBF /. 12/22/95 / 3:16:16Sort Criteria: ID HtaberFilter Cr iterla: (Eval. Concern CONTAINS 'A')Progran File Hase 8 Version: SSQI 2.2
LIHEM. TRAIN
000000 00000
(1) (2)
EQUIPCLASS HARr M.~0000 000000000000000000
(3) (4)
SYSTOI/EOUIPNENTDESCRIPTION
~00000000000000000000000000$ 000000
(5) (6) (7)
Dug. Ho./Rev./Zone Bul ldlngF0000000000000000000 0000000000
EOUIPNENT
Fir.Elv.F000000000
(8)
LOCATION —-> <—OP. 5'T. ->Rn: or Ron/Col. SORT MTES Nornal Desired~0000$ 000000000 0000 000000 0000000 0$ 00000
(9) (10) (11) (12) (13)
FOYER SUPPORTING SYS. RED>D IHTERCONECTIONS REG.
Rile DUG. M./REV. 8 SN>PORTING C ItOHEHTS ISSUE00000 000000000000000 00000000000000000000000 00000
(14) (15) (16) (17)
4198 1,2 21
6115 10P 21 60-45
4197 1,2 21 Qh46
6114 10P 21 60-46
7401 1 05 7(401
7402 2 05 70-02
7403 1 05 70-03
7431 1,2 088 70-100
7434 1,2 088 70-102
7437 1>2 088 70-104
7440 1,2 088 70-106
7412 1>2 088 70-118
7424 1,2 088 70-120
7422 1,2 088 70-122
7420 1,2 088 70-124
7416 1,2 088 70-126
EC/ENERGEIKY COMEHSER 4112 C-180174/42/C3 RB
EC/ENERGENCY COMEHSER Illl C-18017-C/42/A3 RB
EC/ENERGDKY COMENSER 4111
RBCLC/REACTOR BUILDING COOLINGHATER Pllt IllRBCLC/REACTOR BUILDING COOLING
HATER Pllg> I12
RBCLC/REACTOR BUILDING COOLIHGHATER PQI> I13
C-18017-C/42/A3 RB
C-18022 M28/AS RB
C-1802242/28/85 RB
C-18022-C2/28/CS RB
RBCLC/REC IRC PQG> I12 COOLER ISOL C-18022<2/28/ClYLV
RBCLC/RECIRC PQB> I13 COOLER ISX C-1802242/28/C2YLV
RBCLC/RECIRC Pllg> I14 COOLER ISOL C-18022<2/28/C3YLV
RBCLC/RECIRC Pllg> I15 COOLER ISOL C-18022<2/28/C3VLV
RBCLC/DRWELL AIR COOLER Ill ISOL C-1802242/28/D3VALVE
RBCLC/ORWELL AIR COXER I12 ISOL C-18022~28/DlVALVE
RBCLC/IRWELL AIR COXER I13 ISOL C-18022~28/D2VALVE
RBCLC/ORWELL AIR COXER I14 ISOL C-18022~28/D2VALVE
RBCLC/IRWELL AIR COOLER I15 ISOL C-18022~28/03VALVE
EC/ENERGBKY COMENSER I112 '-180174/42/C3 RB P7
P7
P6
P6
SL
SL
6L
225 AZ110
225
225
225
AZ170
225"
AZ250
5 10,18 H/A H/A
S 19 H/A N/A
5 10,18 H/A H/A
5 19 N/A H/A
N/A
H/A
N/A
N/A
SR RINING RINIHG YES
SR RINING RINING YES
R — OPEN OPEN M
R — OPEN OP EH M
R — OPEN OPEN M
R OPEN OPEN M
SR OPEN OPEH M
SR OPEN OP EH M
SR OPEN OP EH M
SR OPEN OPEH M
SR OPEN OPEN M
5 R — RINIHG RINING YES
178
Al
Al
Al
Al
Al
Al
Al
Al
Al
Al
Al
AI
AI
Al
Al
AI
CERTIFICATION:
The infornation identifying the equipnent rls, to the best of our knouledge and belie
CARHEN R. AGOSTA/ EMIHEER
bring he pl nt to safe shutdovn condition on this Safe Shutdovn Equipnent List (SSEL)correc and ra (One r nore signatures of Systenp or Operations Engineers)
0C/eCr nt or ype 't e gnature
MNANED F. ALVI ENGINEER
r nt or ype ane t e gnature
Page Ho. 27Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hllc Point Unit 1SAFE SHUTDOVH EIPJIPHEHT LIST (SSEL)
-Conposlte-
Data Base File Nano/Date/Tine: k@1 3.DBF - / 12/22/95 / 13:16:16Sort Criteria: ID HunbcrFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nane 6 Version: SSBI 2.2
LIHE EGUIPM: TRAIN CUSS
F00000 00000 00000
(I) (2) (3)
HARX III.~00000000000000000
(4)
SYSTEH/EOUIPNENT
DESCRIPT ION~000000000000000000000000000000000
(5)
Dug. Ho./Rcv./2oneF 0000000000000000000
(6)
BuildingF000000000
(7)
EOUIPHENT LOCATION ——>Fir.Elv. Rn'. or Rou/Col. SORT NOTES
F000000000 000000000000000 0000 000000
(8) (9) (10) (11)
<- OP.Homal
(12)
ST. -> POVER QPPORTIHG SYS. REQ'0 INTERCWCTIOHS REG.Desired RE007 DUG. M./REV. 6 SIB'PORTING COtNEHTS ISSUE0000000 00000 000000000000000 0000000000000000000000$ 00000
(13) (14) (15) (16) (17)
7414 lo2 088 70-128
7404 1,2 07 70-137
7407 1 21 70-13R
7408 2 21 70-14R
7409 1 21 70-15R
7406 1,2 18 70-238
7505 1,2 18 70-238
7405 1,2 18 70-23F
7504 1,2 18 70-23F
7329 1 07 70-25
7330 1 088 70-25A
7335 2 07 70-26
7336 2 088 70-26A
7405A 1,2 18 70-284
7337A 1 18 70-332
7332A 1 18 70-333
7410 1,2 07 70-53
7411 1,2 088 70-53Co
7443 1>2 OBA 70-92
RBCLC/DRYVELL AIR COOLER 416 ISOL C-18022-C2/28/D3VALVE
RBCK/RBCK TOtERATNE CONTROL
YALYE
RBCK/RBCLC HX IllRBCLC/RBCLC HX I12
RBCLC/RBCK HX I13
RBCLC/TOPERATNE CONTROLLER
RBCLC/TDB'ERATNE COHHOLLER
C-18022-C2/28/G6 RB
C-1802242/28/DS RB
C-1802242/28/ES RB
C-18022M28/FS RB
C-1802242/28/G6 TB
C-18022-C2/28/66 TB
CRAC/NILLER IllCONTROL YALVEPILOT
C-18047-C/22/Gl TB
SAC/Nlllik I12 CONTROL VALVE C-180474/22/El TB
CRAC/NILLER I12 CONTROL YALVEPILOT
RBCK/TOt. ELEHEHT
CRAC/LO FLOU NILLER 'TRIP
CRAC/LO FLOU CHILLER TRIP
RBCLC/SHUIDOVH COOLING HX ISOLVALYE
RBCLC/SNUTDOVN COOLING HX ISOLVALVE PILOT
RBCLC/RECIRC Pllt COOl.ER OUTLETISOL VLV
C-180474/22/El TB
C-18022-C2/28/GS RB
C-18047-C/22/El TB
C-180474/22/Gl TB
C-18022-C2/28/N4 RB
C-18022-C2/28/N4 RB
C-1802242/28/84 RB
RBCLC/ELECTRO PHDIIATIC CONVERTER C-18022-C2/28/G6 RB
RBCLC/ELECTRO PNDIIATIC CONVERTER C-18022-C2/28/G6 RB
CRAC/NILLER IllCONTROL YALVE C-18047-C/22/Gl 'IB
291
281
281
261
L4
L7
CR PNL H
CR PNL H
6L
6L
SR
SR
OPEN OPEN
HX HX
N/A H/A
H/A N/A
N/A N/A
NO
NO
NO
H3
II)
5 R 19 H/A H/A
5 R 18 N/A N/A
5 R 19 N/A H/A
S R 18 N/A H/A
YES
YES
YES
YES
SR
SR
SR
SR
SR
OP/CL OP EH
AIR VENT
OP/CL OPEN
AIR VEHT
N/A N/A
N/A N/A
N/A H/A
NO
YES
YES
YES
YES
YES
CLOSED CLOSED M
SR AIR VENT NO
NOR 18 OPEN OPEN
RHC 70-53A
RK 70-92A
AI
Al
Al
Al
Al
Al
Al
Al
AI
AI
Al
Al
AI
Al
Al
Al
AI
AI
AI
CERTIFICATION:
The lnfornatlon Mentlfying the cqulpncnt r IfHH~ring the plant tois, to the best of our knouledge and belie correct a ac te., e
CARNEH R. AGOSTA/ ENGINEER
a sa shutdom condition on this Safe Shutdem Equipnent List (SSEL)or rc signatures of 5 stens or Operations Engineers)
rntor ype ane teNHQIIEO F. AlVI / ENGINEER
rntor ype ane te
gnature
gnature
Page Ho. 28Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDOMN EQUIPHENT LIST (SSEL)
<onposlte-
Data Base File kana/Date/Tine: ISB>1 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Haec 6 Version: SSBI 2.2
LINE EQUIPH3. TRAIH CLASS.
(I) (2) (3) (4)
7427A 1,2 OSA 70-94
7428 1,2 088 70-98
1502 2 06 7243
1501 1 06 72-04
7503 1,2 07 72-146
7137 1 06 79-53
7138 2 06 79-54
5191 I OSA 80-01
5190 2 OBA 8042
5186 2 06 8043
5187 1 06 8044
5211 OP OBA 80-118
5184 2 21 80-13
7208 2 21 80-13
5181 1 21 80-14
7205 1 21 80-14
5172 2 07 80-15
5173 2 088 80-ISC
5174 2 088 80-150
SYSTBI/EQUIPHEHTDESCRIPTIOH
(5) (6)
Building$ $ $$$$ $ $$$
(7)
RBCLC/DRYVELL IXOLER OUTLET ISOL C-18022~28/C4VLV
RBCLC/RECIRC PQB'll COOLER ISOL C-18022C2/28/ClVLV
RB
SM/DlER SERVICE MATER PQB> l12 C-1802241/43/D6 SH
SM/ENER SERVICE MATER PQB> ill C-18022-Cl/43/C6 SH
SM/SERVICE MATER TEIB> CONTROL
VALVE
C-18022-Cl/43/Cl RB
CS/CONT SPRAY PQB> llllSUCTIONISO YLV
CS/CONT SPRAY PQB'121 SUCTIONISO VLV
CS/CONT SPRAY PQB> l121
CS/CONT SPRAY PQB> llll
C-18012-C2/36/C5 RB
C-18012~/06 RB
C-18012%2/36/86 RS
C-18012-C2/36/CS RB
CS/CONT SPRAY HEADER ISOL VLV C-18012<2/36/F4 RB
CS/CONT SPRAY HEAT EXCHANGER l122 C-18012-C2/36/H3 RS
CS/COHT SPRAY HEAT EXCHAISiER 4122 C-1801241/17/F3 RB
CS/COHT SPRAY HEAT EXCHANGER l112 C-18012~/63 RB
CS/CONT SPRAY HEAT EXCHAIBiER 4112 C-1801241/17/E3 RB
CS/CONT SPRAY INLET ISO VLV 4121 C-18012M/36/Cl RB
CS/CONT SPRAY INLET ISO VLV PILOT C-1801242/36/CI4121
CS/CONT SPRAY IHLET ISO VLV PILOT C-18012-C2/36/Cl4121
RB
RB
DGCM/DG COOLING MATER PQB> 1102 C-18026-Cl/12/86 SH
DGCM/DG COOLING MATER PQB> l103 C-18026%2/14/86 SN
EQUIPHENT
Flr.Elv.~$$$$$$$$$
(8)
261
261
261
318
318
318
318
LOCATION —-> <—OP. ST. —>Rn. or Ron/Col. SORT NOTES Homal Desired~$$$$$$$ $$$$$$$ ISIS $ $$$$$ $ $$$$$$ $$$$ $ $$
(9) (IO) (Il) (12) (13)
POMER SQ>PORTING SYS. REQ'D IHTERCOWECTIONS REG.
REQD7 INC. IRI./REV. 6 SQ>PORTING> CCB>OHEHTS ISSUE$$$$$ $$$$$ $$$$$$$$$$ $$$$$$$$$$$$$$$$$$$$$$ $ $$$$$
(14) (15) (16) (17)
R 18 . OPEN OPEN N0 RIC 70-94A AI
R — OPEN OPEN AI
515
515
Pll
5 R — OFF RQSIING YES
5 R — OFF RWIHG> YES
5 R — OP/CL OPEN N0
Al
AI
Al
T17
T17
S R 13 OFF RQSIING YES
5 R 13 OFF RWING YES
161B
1718
Al
Al
5 R 13 OFF RQBIIHG YES C-19839-CB/4 103
S R 13 OFF RQSIING YES C-19839M/3 102
Al
Al
P7 SR CLOSED OPEH YES RIK 80-1188 Al
PS
PS
P8
PS
5 19 N/A H/A H/A
5 18 H/A N/A N/A
5 19 H/A N/A N/A
5 18 N/A N/A N/A
RN MATER COOLING Al
RN MA'TER COOLING Al
RN MATER NOLING Al
RN MATER C00LING Al
80-15C> 80-150 Al
IXI C-19951-CS/9, RHC 80-15A, H, BB12 AlC-19839418A/2
R 09 AIR AIR IXI C-19951-CS/9 BB12, K, RIL 80-15A Al
R 18 OPEN OPEH IXI C-19437-C2/34 161B> RHC 804IA Al
R 18 OPEN OPEN IXI C-1943841/22 167, RIL 8042A Al
CERTIFICATION:
The infornation identifying the cqulpnent requ Ing the plant to a safe shutdoun condition on this Safe Sbutdoun Equipnent List (SSEL)is, to the best of our knoulcdge and belief rrect a a a (One nore signatures of Systcn or Operations Engineers)
CARNEH R. AGOSTA/ Ela>INEER ~z erntor ype ane te gnature a
4XNAIlIED F. ALVI / ENGINEER 5r nt or ype t e a
td
Page No. 29Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTmI EOUIPMENT LIST (SSEL)
4eposlte-
Data Base file Haec/Date/TIne: Qf1 3.DBF / 12/22/95 / 13:16:16Sort Crlterla: ID lhjnberFilter Crltcrla: (Eval. Concern CNTAINS 'A')Progran File Haec 6 Version: SSBI 2.2
LIHEITI. TRAIN
~00000 00000
(I) (2)
EQUIPCLASS NARX H3.
(3) (4)
SYSTEN/EOUIPHEHT
DESCRIPIIOH
(5) (7)(6)
Dvg. No./Rcv./2one Build lng~ 00000000$ 00$ 00$ 0000 $ 00000000$
EOUIPNEHT
Flr.Elv.0000000000
(8)
LOCATION —-->Rn. or Rou/Col. SORTF 00000000000000 000$
(9) (10)
NOTES~00000
(ll)
<—OP. ST. —>Homal DesiredF000000 0000000
(12) (13)
POVER SUPPORTING SYS. REII'D INTERCOIBIECTIOHS REG.
REODT DHG. HO./REY. 6 sUPPDRT III: cotNEHTs IssUE~ 0000 00000000$ 0$ 0$ $$ 0$000000000000000000000 00000
(14) (15) (16) (17)
5175 1 07 80-16
5176 1 088 80-16C
5177 1 088 80-160
5189 1 08A 80-21
5192 2 OBA 80-22
5188 2 06 80-23
5185 1 06 80-24
5182 2 21 80-33
7206 2 21 80-33
5183 I 21 80-34
7207 1 21 80-34
5178 2 07 80-35
5179 2 088 80-35C
5180 2 088 80-350
5169 1 07 80-36
5170 I 088 80-36C
5171 I 088 80-360
CS/CONT SPRAY INLET ISO VLV Bill C-18012%2/36/C2 RB
CS/CONI'PRAY INLET 150 VLV P ILOT C-1801242/36/C2fillCS/CONT SPRAY IHLET ISO VLV PILOT C-18012C536/C2llll
RB
RB
CS/CONT SPRAY Ply 4112 SXTIONISO YLV
CS/CONT SPRAY POP I122 SXTIONISO VLV
CS/CONT SPRAY PIBB'122
CS/CONT SPRAY POP lll2
C-18012~/f5 RB
C-1801242/36/E6 RB
C-18012-C2/36/G6 RB
C-18012-C2/36/FS RB
CS/CONT SPRAY INLET ISO VLV P IlOT C-1801242/36/fll122
CS/CONT SPRAY INLET ISO VLV PllO'I C-1801242/36/fl4122
RB
RB
CS/CONT SPRAY INLET ISO VLV 4112 C-18012-C2/36/F2 RB
CS/CONT SPRAY INLET ISO VLV Pl lOI'-18012-C2/36/F24112
CS/CONT SPRAY INLET ISO VLV PILO'I C-1801242/36/F24112
RB
RB
CS/CONT SPRAY HEAT EXCHANGER 4121 C-18012-C2/36/A3 RB
CS/CONT SPRAY HEAT EXCHANGER 4121 C-1801241/17/A3 RB
CS/CONT SPRAY HEAT EXCHANGER 4111 C-1801242/36/83 RB
CS/CONT SPRAY HEAT EXCHANGER l11 1 C-18012-Cl/17/C3 RB
CS/CONT SPRAY INLET ISO VLV ll22 C-18012-C2/36/F 1 RB
281
281
318
318
318
318
281
281
281
PB OPEN OPEN NO C-19951-C5/9 80-16C, 80-16D AI
PB
PB
VENT VENT
AIR AIR
HO C-19839-CIBA/20 8811, L) KBO-16A AIC-19951-CS/9
NO C-19839-C19A/2, 8811, L, KBO-16A AIC-19951-CS/9
N CORNER S R 13 OFF RMING YES C-19839M/4 103
5 R 13 OFF RIBBIIHG YES C-19839-C7/3 102
AI
AI
PB
PB
PB
PB
5 19 H/A N/A
5 18 H/A H/A
5 19 N/A H/A
5 18 N/A H/A
H/A
H/A
H/A
H/A
RN HATER C00LING Al
RN HATER COOLING Al
RN HATER COOLING AI
RN HATER COOLING Al
L7
OPEN OPDI NO C-19839418A/2 80-35C, 80-350 Al
VENT VENT NO C-1995145/9 K 80-35A) N> 8812 Al
AIR AIR NO C-19951-CS/9 K 80-35A) N, 8812 Al
OPEN OPEN NO C-19951-C5/9 80-36C, 80-36D Al
l7
L7 R 09 AIR AIR
NO C-19839-C19A/2, K 80-3Q, BBII, L AlC-19951-C5/9
HO C-19839-C19A/2, K 80-3Q, BBII, L AIC-19951-CS/9
NE CORNER R 18 OPEN OPEN NO C-19438-Cl/22 167, K 80-21A Al
IBI CORNER R 18 OPEN OPEH NO C-194042/31 1718) RIC 80-22A Al
5197 2 07 Sh41 CS/CONI'PRAY TEST LINE ISO VLV C-18012-C2/36/Bl RB P7 CLOSED CLOSED 80-418 AI
CERTIFICATION:
The Infornatlon Identifying thc equlpnent rIs, to the best of our knoulcdgc and belle
CARMEH R. AGOSTA/ ENGINEER
rntor ype ane tcHOHAWED F. ALVI / ENGINEER
rntor ype ane te
to bring the plant to a safe shutdovn condltlon on this Safe Shutdovn Equlpnent List (SSEL)corre t and ac a (One nore slgnaturcs f Systyns or Operations Engineers)
r z/"-fPfgna re a
~ 24gnature
I
f
l
J
II
Page Ho. 30Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hile Point Unit 1SAFE SHUTDOVH EQUIPNENT LIST (SSEL)
<oapositc-
Data Base File Nase/Date/Tine: IIPI 3.DBF..—/ 12/22/95 / 13:16:16Sort Criter ia: ID NuaberFilter Criteria: (Eval. Concern CONTAIHS 'A')Prograa File Hase I Version: SSEH 2.2
LINE EQUIPM. TRAIN ClASS HARK M.
F 00000 00000 00000 000000000000000000
(I) (2) (3) (4)
5199 2 0$8 ~18
5193 1 07
5195 1 0$8 80-448
4160 IOPI OBA 81-01
4159 2 OBA 81-02
4154 IOPI 06 8143
4151 2 06 8144
4182 2 07 81-11
4157 1 OBA 81-21
4158 20PI OBA 81-22
4145 1 06 81-23
4148 20PI 06 81-24
4181 1 07 81-31
4133 20PI 05 81-49
4129 1 05 81-50
4141 IOPI 05 81-51
4137 2 05 81-52
4146 I 07 81-53
SYSTEH/EQUI PNEHT
DESCRIPTION0000000000000000000000000000000000
(5)
CS/CONT SPRAY TEST LIHE ISO VLVPILOT
cDwg. Ho./Rev./Zone Building
F0000000000000000000 0000000000
(6)
C-1801242/36/81 RB
(7)
CS/CONT SPRAY LOOP l112 BYPASS ISO C-18012-C2/36/62VLV TO TORI5
RB
CS/CONT SPRAY LOOP l112 ISO VLVPILOT
C-18012-C2/36/62 RB
CRS/TORUS OUTLH IV-CORE SPRAY PIP C-18007-C/43/F4I121 SXT ISO YLV
CRS/TORI5 OUTLH IV-CORE SPRAY P}P C-18007-C/43/E4I122 SXT ISO VLV
RB
RB
CRS/CORE SPRAY PilP l121
CRS/CORE SPRAY PIIP 4122
CRS/PIIP RECIRC ll2 PRESSIRESAFETY VLV
C-18007</43/GS RB
C-180074/43/GS RB
C-18007-C/43/ID RB
CRS/TORUS OUTLET IV-CORE SPRAY PIP C-18007-C/43/C4llllSXT 150 YLV
CRS/IORI5 OUTLH IV~E SPRAY PIP C-180074/43/C4I112 SXT ISO YLV
RB
RB
CRS/CNE SPRAY PIIP llllCRS/CORE SPRAY PIIP I112
CRS/PIIP RECIRC lllPRESSIRESAFETY YLV
C-18007</43/85 RB
C-18007-C/43/85 RB
C-180074/43/A3 RB
CRS/MTOR llllSEAL COOLING PRESS. C-18007-C/43/84REGULATOR
RB
CRS/CORE SPRAY TOPPING PIIP I112 C-18007-C/43/A4 RB
CRS/CNE SPRAY TOPPING PilP ll11 C-18007</43/A4 RB
CRS/CORE SPRAY TOPPING PIIP I121 C-180074/43/H4 RB
CRS/CORE SPRAY TOPPING PIIP I122 C-18007</43/H4 RB
EQUI PNENT
Fir.flv.F 000000000
(8)
NATION ---> <- OP.Ra. or Row/Col. SORT MTES Norsal
(9) (10) (11) (12)
ST. -> PURER SIPPORTING SYS. REQ'D IHTERCNIIECTIONS REG.
Desired REQD7 DUG. M./REV. I SIPPORTING COPOHENTS ISSUE$000000 00000 000000000000000 00000000000000000000000 00000
(13) (14) (15) (16) (17)
P7 VENT VENT IS
CLOSED CU5ED M
VENT VW IS
C-1995149/9> RHS $441C> H, 8812 AIC-19839-CIBA/2
AI
C-1995149/9) RHS ~) L, 8811 AIC-1%89-C19A/2
SE CORIG R 18 OPEN OPEN M C-1943742/34 161$ ) RIL'1-OIA AI
Sf CORIG R 18 OP EH OPEN M C-19440-C2/31 171B, RIK 81-02A AI
SE COUER S 06 CLOSED OP/CL M AI
SV COUG R 18 OPEN OPEN M C-1943742/34 1618) RIB: 81-21A AI
SH CORNER R 18 OPDI OPEN M C-19440-C2/31 1718, RIL'1-22A Al
SV CORIER 5 R 0$ OFF RINING YES C-1%09</3 102, 81-53) 81-73 Al
SU CORIG 5 R 0$ OFF RINING YES C-19839-CB/4 103, 81-54, 81-74 AI
SH CORHER 5 06 CU5ED OP/CL IS AI
SW CORIG 5 R
SH CORNER 5 R
SE CORNER S R
SE CORIG 5 R
SH CORNER 5
OFF RINING YES C-19839KB/4 103, 81-57, 81-77 AI
OFF RINING YES C-19839-C7/3 102) 81-58, 81-78 AI
OFF RINIHG 'YES C-19839-C7/3 102) 81-59, 81-79 AI
OFF RINING YES C 19839 CB/4 103) 81 60) 8140 AI
OPEN OP/CL IS Al
SE CORNER S R 0$ OFF RINING YES C-1%09</3 102, 81-55, 81-75 AI
SE CORNER 5 R 0$ OFF RINING YES C-1983948/4 103, 81-56) 81-76 AI
CERTIFICATION:
The inforaation identifying the equipsent requ bringis, to the best of our knowledge and belief correct and r
CARNEN R. AGOSTA/ ENGINEER
p ant to a safe shutdown condition on this Safe Shutdown Equipsent List (SSEL)(One sore signatures of Systessgr Operations Engineers)
rntor ype ase teHSIIED F. ALVI ENGINEER
rntor ype ase te
gna re
goature
6
'P
NII
J
'J
l
t'
Page Ho. 31Report Date/Tine: 12-22-95 / 13:18:10
Nine Nile Point Unit 1SAFE SHUTDOWN EOUIPHENT LIST (SSEL)
4aposlte-
Data Base File Hase/Date/Tine: @f1 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nano I Version: SSEH 2.2
LINE EQUIPM. TRAIH CIASS
~$ $ $$$ $ $ $$$ $$$$$
(I) (2) (3) (4) (5) (6)
SYSTEM/EQHPHEHT
DESCRIPT ION Dug. Ho./Rev./Lone BuildingEQJIPHENT
F lr.Elv.$$$$$ $ $ $ $$
(8)
LOCATION ---> <- OP.Rn. or Rou/Col. SORT NOTES Homal
(9) (10) (11) (12)
ST. -> POWER SUPPORTING SYS. REO'D INTERCONECTIOHS REG.
Desired RE(07 DWG. M./REV. 8 SUPPORTING COBNEHTS ISSUE~$$$ $$$ $$$ $$ $$$$ $$$ $ $$$$$$$ $ $$$$$$$$$$ $$$$$$$$$$$$ $$$$ $
(13) (14) (15) (16) (17)
4149 20P1 07 81-54
4155 IOP1 07 81-55
4152 2 07 81-56
4134 20P1 07 81-57
4130 1 07 81-58
4142 10P1 07 81-59
4138 2 07 81-60
4147 1 07 81-73
4150 20P1 07 81-74
4156 10P1 07 81-75
4153 2 07 81-76
4135 20P1 07 81-77
4131 1 07 81-78
4143 IOP1 07 81-79
4139 2 07 81-80
7140 2 21 82-43
7139 1 21 82-44
7201 1 06 93-01
CRS/HOTOR I112 SEAL COOLING PRESS. C-18007-C/43/85REGUlATOR
CRS/MTOR 4121 SEAL COOLING PRESS. C-18007-C/43/64REGUlATOR
CRS/HOTOR I122 SEAL COOLING PRESS. C-18007-C/43/GSREGULATOR
RB
RB
CRS/SEAL COOLIE PRESS. REGUlATOR C-18007-C/43/62 RB
CRS/SEAL COOLIM PRESS. REGUlATOR C-18007-C/43/G2 RB
CRS/SEAL COOLIE PRESS. REGUlATOR C-18007-C/43/62 RB
CRS/SEAL COOLING PRESS. REGULATOR C-18007-C/43/62 RB 237
NS/HOTOR 1111 SEAL COOLING PRESS. C-18007-C/43/84RELIEF VLV
CRS/HOTOR 4112 SEAL COOLING PRESS. C-18007-C/43/85RELIEF YLV
CRS/MTOR I121 SEAL COOLING PRESS. C-18007-C/43/G4RELIEF VLV
CRS/HOTOR I122 SEAL COOLING PRESS. C-18007-C/43/GSRELIEF VLV
RB
RB
RB
RB
CRS/SEAL COOLING PRESS. RELIEF VLV C-18007-C/43/H2 RB
NS/SEAL COOLING PRESS. RELIEF VLV C-18007-C/43/H2 RB
CRS/SEAL COOLING PRESS. RELIEF VI.V C-18007-C/43/H2 RB
CRS/SEAL COOLING PRESS. RELIEF VLV C-18007-C/43/H2 RB
237
237
237
237
CSRW/CONT SPRAY RAW WATER PI% C-18012-CI/17/E5I112
SH 256
fOHS/DG FUEL OIL STORAGE TAIBl 4103 C-18026-C2/14/83 OUTSIDE 261
FONS/DG FUEL OIL STORAGE TAC 4102 C-18026-Cl/12/83 OUTSIDE 261
SW GRHER
SE CORNER
SE GRHER
SW CORNER
SW CORNER
SE CORHER
SE CORNER
5
5
5
5
5
5
5
OPEN OP/CL M
OPEN OP/CL M
OPEN OP/CL M
OPEN OP/CL M
OP EH OP/CL M
OPEN OP/CL M
OP EH OP/CL M
SW CORNER 5 06 CU5ED OP/CL M
SW CORNER S 06 CU5ED OP/CL M
SE CORHER S 06 CU5ED OP/CL M
SE CORNER 5 06 CLOSED OP/CL M
SW GRHER 5 06 CU5ED OP/CL M
SW GRHER 5 06 CLOSED OP/CL M
SE CORNER 5 06 CU5ED OP/CL M
SE GRHER
BC20
BC20
T14A
5 06 CU5ED OP/CL M
S 16 N/A N/A N/A
5 16 H/A N/A N/A
5 R 13 OFF RIIIIIHG YES C-19839-CB/4 102
AI
AI
AI
AI
AI
AI
AI
AI
Al
AI
Al
AI
AI
AI
AI
AI
AI
AI
CERTIFICATION:
The lnfornatlon identifying the equipnent requls, to the best of our knouledge and belief corr
CARHEN R. AQ5TA/ ENGINEER
r ntor ype ane teMHWHED F. ALVI ENGINEER
r at or ype t e
to bring the plant to a safe shutdom condition on this Safe Shutdom Equlpnent List (SSEL)and a ra (One or re signatures of Softens oy Operations Engineers)
Z>-goature
'I
0L-
Page No. 32Report Date/Tine: 12-22-95 / 13:18:10
Nine Hiie Point, Unit 1SAFE SHUTDOMN EQUIPNENT LIST (SSEL)
-Conposite-
Data Base FIIe Nano/Date/T{ae: Iltl3.08F / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Evai. Concern CONTAINS 'A')Prograa Flic Haec 8 Version: SSBI 2.2
LINE EQUIP
M. TRAIN CLASS$$$$$$ $$$$$ $$$$$
(I) (2) (3)
HARK M.~ $$$ $ $$$$$$$$$$$ $ $
(4)
SYSTEH/EQUIPHEHT
DESCRIPT ION~ $ $ $$ $$$ $ $$$$$$ $ $ $ $ $$$ $ $ $$$$$$$$$$
(5)
Dug. No./Rev./2one~$$$$$$$$$$$$ $ $ $$$ $ $
(6)
Building~ $$$ $ $$$$$
(7)
EQUIPHENT LOCATION —->Flr.EIv. Ra: or Row/Col.
$$$$$$$$$$ $$$$$$$$$$$$$$$
(8) (9)
<—OP.SORT MTES Horaai~$$$ $$$$$$ $$$$ $ $$
(10) (11) (12)
ST. -> POVER SitPORTIHG SYS. REQ'0 INTERCOIRIECTIONS REG.
Desired REQ07 DMG. M./REV. 8 SitPORTING COtONENTS ISSUE$$$$$$$ esses $$$$$$$ $$$$$$$$ $$$$$$$$$$$$$$$ $ $$$$$$$ $$$$$
(13) (14) (15) (16) (17)
7203 1 06 93-02
7204 2 06 9343
7202 2 06 93-04
CSRM/CONT SPRAY RN MATER PiltllllCSRM/COHT SPRAY RAN MATER Plltll22
CSRM/CONT SPRAY RAV MATER Plltl121
C-1801241/17/CS SH
C-18012-CI/17/f 5 SH
C-18012<1/17/AS SH
256
256
256
T14A
T14A
T13A
5 R 13 OFF RIBBIIHG YES C-19839-C7/3 102
5 R 13 OFF RIRBIIHG YES C-19839-CB/4 103
5 R 13 OFF RLRBIIHG YES C-19839M/4 103
AI
AI
AI
7211 1 OBA 93-25
7210 2 OBA 93-26
7212 2 OBA 93-27
7209 1 OBA 93-28
4171 1 OBA 93-71
7215 1 OBA 93-71
7213 1 08A 93-72
7214 2 08A 93-73
4173 2 OBA 93-74
7216 2 08A 93-74
7113 1 21
7117 1 21 96-05
7121 1 21 96-06
CSRM/CONT SPRAY RN VTR PIt DISCHG C-1801241/17/C3BLOCK VLV llllCSRV/CONT SPRAY RN VIR Pit DISCHG C-1801241/17/83BLOCK VLV ll21
CSRV/CONT SPRAY RN VTR Pit DISCHG C-1801241/17/F3BLOCK VLV ll22
CSRV/CONT SPRAY RN VTR Pit DISCHG C-1801241/17/03BLOCK VLV l112
CSRV/CONT SPRAY RN MATER 150 VLV C-1801241/17/ClllllCSRM/CORE SPRAY RN MATER ISO VLV C-18012-CI/17/ClllllCSRM/CONT SPRAY RN MATER ISO VLV C-1801241/17/E2l112
CSRV/CONT SPRAY RN MATER 150 VLV C-1801241/17/A2l121
CSRV/CONT SPRAY RN MATER ISO VLV C-1801241/17/Fll122
CSRM/CORE SPRAY RN MATER 150 VLV C-1801241/17/FlI122
RB
RB
RB
RB
RB
RB
RB
RB
RB
DSA/DG I102 START AIR TAIBl ll C-1802641/12/GI TB
DSA/DG I102 START AIR TAIll l2 C-1802641/12/Gl TB
DSA/DG I102 START AIR TAIBl l3 C-1802641/12/Gl TB
318
318
318
318
318
318
318
318
318
318
261
261
261
P9
Q9
Q9
P7
DG 102 RH
DG 102 RH
DG 102 IUI
R
R
R
R
OPEN OPEN M C-19437-C2/34 1618, RHS 93-25A
OPEN OPBI M C-1944hC261 1718, RHS 93-26A
OPEH OPEN M C-19440-C2/31 1718, RHS 93-27A
OPEN OPEN M C-19437-C2/34 1618, RHS 93-28A
R
R
CLOSED CLOSED M C-19437-C2/34 1618, RHS 93-28A
CU5ED CLOSED M C-19440-C2/31 1718, RHS 93-26A
R 19 CU5ED CLI5ED M C-19440-C2/31 1718, RHS 93-27A
R 18 CU5ED CLOSED M C-19440-C2/31 1718, RHS 93-27A
5
5
5
N/A H/A
N/A H/A
H/A N/A
M
M
R 19 CU5ED CLOSED M C-19437~ 1618, IUK 93-25A
R 18 CLOSED CLOSED M C-19437-C2/34 1618, RHS 93-25A
AI
AI
AI
AI
AI
AI
AI
Al
AI
AI
AI
AI
Al
CERTIFICATION:
The inforaation identifying the equipaent r ~ brinis, to the best of our knowledge and bell, correct and cu
CARHEN R. AQ5TA/ ENGINEER
plant to a afe shutdown condition on this Safe Shutdown Equipaent List (SSEL)(One aore signatures ofgystens or Operations Engineers)
2./2W PMr nt or ype t e
MHAIPIED F. ALVI ENGIHEER
rntor ype aae te gnitute
v'
1,1
I
t
Page Ho. 33Report Date/tine: 12-22-95 / 13:18:10
Hine Nile Point Unit 1SAFE SNUTNNH ElgIPHEHT LIST (SSEL)
-Conposite-
Data Base File Hane/Date/Tine: ktl 3.DBF ./ 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nane I Version: SSEH 2.2
LINE Q/IP, IS. TRAIN ClASS HARK M.
$$$$ $ $ $ $ $ $$ $ $ $$$ $$ $ $$ $ $ $ $$ $ $ $ $ $$$$
(I) (2) (3) (4)
7125 1 21 96-07
7129 1 21 96-08
7114 1 07 96-15
7118 1 07 96-16
7122 1 07 96-17
7126 1 07 96-18
7130 I 07 96-19
7134 I 07 96-20
7133 I 07 96-28
7115 2 21 96-31
7119 2 21 96-32
7123 2 21 96-33
7127 2 21 96-34
7131 2 21 96-35
7116 2 07 96-44
7120 2 07 96-45
7124 2 07 96-46
7128 2 07 %r47
SYSTEH/EOUI PHDITDESCR IP TIN
~$$$ $$ $$$$ $ $$$$$ $ $$$$ $ $ $$$ $$ $ sass ~
(5)
Dvg. Ho./Rev./Zone Building~$$ $ $$$$$$ $ $$$ $$$ $$~ $$$$$$$$$$
(6) (7)
DQ/DG I102 START AIR TAIK l4 C-1802&41/12/HI TB
DSA/DG 4102 START AIR TAIK IS C-1802641/12/Hl TB
DQ/DG l102 SMI'IR TAIK llREI.IEF VLV
DQ/OG l102 START AIR TAIK l2RELIEF VLV
DSA/DG 4102 START AIR TAIK I3RELIEF VLV
DSA/DG I102 START AIR TAIK l4RELIEF VLV
DQ/DG I102 START AIR TAIK ISRELIEF VLV
C-18026-Cl/12/Fl TB
C-18026-Cl/12/Cl TB
C-18026-Cl/12/Gl TB
C-18026<1/12/Hl TB
C-1802641/12/Hl TB
DQ/DG ll02 AIR INLET PRESSNEREGULATING YLV
C-1802641/12/IO TB
DSA/DG I103 START AIR TAIK ll C-1802642/14/Cl TB
DSA/DG I103 START AIR TAIK I2 C-18026<2/14/Cl TB
DQ/DG 4103 START AIR TAIK I3 C-1802642/14/Cl TB
DSA/DG I103 START AIR TAIK I4 C-I8026<2/14/Hl TB
DSA/DG l103 START AIR TAIK IS C-1802642/14/Hl TB
l5A/DG ll03 START AIR TAIK llRELIEF VLV
DSA/DG ll03 START AIR TAIK I2RELIEF VLV
DQ/DG I103 START AIR TAIK I3RELIEF VLV
DQ/DG I103 START AIR TAIK I4RELIEF VLV
C-1802642/14/Fl TB
C-18026-C2/14/Gl TB
C-18026-C2/14/Gl TB
C-1802642/14/Hl TB
DSA/DG I102 AIR INLET RELIEF VLV C-1802641/12/63 TB
EOUIPHEHT
Fir.Eiv.~$$$$$ $ $ $$
(8)
LOCATIN —--> <—OP. St. —>Rn. or Ron/Col. SORT MTES Homal Desired~$$$ $$$$$$$$$$$ sass $$$$$$ $$$$$$$ $$$$$$$
(9) (10) (11) (12) (13)
PNER SUPPORTING SYS. REIj'D INTERCOQKCTINS REG.
REOD7 DUG. M./REV. 8 SIR'PRTING COfONEHTS ISSUE~sass $$$$$$$$$$$$$$$ $$$$$$$$$$$ $$$$$$$$$$$$ sssss(14) (15) (16) (17)
261
261
DC 102 RH 5
DC 102 RH S
N/A N/A
N/A N/A
M
M
Al
Al
261 OC 102 RH 5 06 CLOSED OP/CL Al
261 X 102 RH 5 06 CLOSED OP/CL M Al
261
261
261
261
X 102 RH S 06 CLOSED OP/CL
OC 102 RH 5 06 CU5ED OP/CL
DC 102 RH 5 06 CU5ED OP/CL
X 102 RH S 06 CU5ED OP/CL
M
M
M
M
Al
Al
Al
AI
261
261
261
261
261
261
DG 102 RH 5
OC 103 IUI S
OG 103 RH 5
OC 103 RH 5
OC 103 RH 5
OG 103 RH S
OP EH OP/CL
N/A H/A
N/A H/A
N/A H/A
N/A H/A
H/A H/A
M
M
M
M
M
M
Al
AI
AI
AI
AI
AI
261 OC 103 RH S 06 CU5ED OP/CL M AI
AI
261
261
DC 103 RH 5 06 CU5EO OP/CL
OC 103 RH 5 06 CU5ED OP/CL IS
Al
Al
261 X 103 RH S 06 CU5ED OP/CL M
CER tlfICATIN:
The infornation identifying the equipnent r I bringis, to the best of our knowledge and bell, correc and
CARHEN R. AQ5TA/ ECINEERtor nt or ype
plant to safe shutdovn condition on this Safe Shutdovn Equipnent List (SSEL)( or nore signatures of Sys or Operations Engineers)
2- 2a
MNANED F. ALVI ENGINEER
r nt or ype t e gnature
S
l!"
0
Page Ho. 34Report Date/Tine: 12-22-95 / 13:18:10
Hine Hile Point Unit 1SAFE SHUTOOMN EOUIPHENT.LIST (SSEL)
-Conpos Ite-
Data Base FIIe Nano/Date/Tine: Ilg>I 3.DBF ./ 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Haec 4 Version: SSBI 2.2
LIKEN. TRAIN
~$0000 00000
(I) (2)
EOUIP
CLASS HARK IO.~$000 000$ 00$ 0$ $$$00$ $$$
(3) (4)
7132 2 07 96-48
7136 2 07 96-49
7135 2 07 96-52
8134G 1>2 20 A
7339 1,2 10 ASAC*
7109A 1 20 ATSA
71098 1 20 ATSB
7109C 1 20 ATSC
71090 1 20 ATSO
8131 1 15 BATT ll*8148 1 15 BATT ill»
8149 1 15 BATT 112»
8132 2 15 BATT 12»
8150 2 15 BAT'f 121»
8151 2 15 BATT 122»
8133 1 14 8811
8134 2 14 8812
8144 I 16 BClll»
8145 1 16 BC112»
SYSTEH/EOUIPHENT
DESCRIPTION~ 0000$ $0$ $$000000$ $$$$$$$0$$$00000
(5)
DQ/DG 4103 START AIR TAC l5RELIEF VLV
th>g. No./Rev./lone Building
(6)
C-18026-C2/14/Hl
EOUIPHENT LOCATION —->Fir.Elv. Rn; or Rou/Col.
0000000000 $$$$$$00$ $ 00$ $$
(8) (9)
261
.<-OP. St. —>SORI'OTES Homal Desired$000 000000 0000000 0000000
(10) (II) (12) (13)
5 06 CU5ED OP/CL
POVER SI>PORTING SYS. RED'0 IHTERCONECTIONS REG.
RE007 WG. H3./REV. 8 SIHORtlC CO>ONEHIS ISSUE$ 0000 $$$0$ $$0$ 0$ $$$ $ 0000000000000000$ 0$ $$$$ $0000
(14) (15) (16) (17)
HO Al
261 DG 103 RH S 06 CU5ED OP/CL NO Al
DQ/DG 4103 AIR IHLH PRESSIEREGUIATIll> VLV
CTRL/CONTROL BOARD PANEL A
CRAC/AEHIH BLDG COOLING COIL
RPS/ ONNEL A/ANALOG TRIP SYSTBICASINH A
RPS/ CHANEL 8/ANALOG TRIP SYSTEHCABINH 8
RPS/ CHANEL C/ANALOG TRIP SYSIBICASIHET C
RPS/ CHANEL 0/ANALOG TRIP SYSTBICABINET 0
C-180264Vl4/ID TB 261
C-1804641/8/83 TS
RS 281
RB 281
RB
RB 281
Kll
Kll
OPEN OP/CL
D>32> N/A35
34 H/A H/A
S 32 N/A N/A
NO
YES
NO
YES
YES
YES
YES
Al
Al
Al
AI
Al
AI
AI
AP/2320 HP4R, 125 V BATTERY lll C-19839<1/8 277 SAT RH ll 5 14 YES 8811 Al
AP/ 24/48 V OC BATTERY llllAP/ 24/48 V DC BATTERY l112
C-1986K/9
C-198664/9 TB
277
277
SAT RH llSAI RH 11
5
5
YES
YES
AI
Al
AP/2320 Ail>-HR> 125 V BATTERY l12 C-19839-Cl/8 277 BAT RH 12 5 14 YES Al
AP/ 24/48 V DC BATTERY 4121
AP/ 24/48 V DC BATTERY ll22
C-19866-C/9
C-19866</9
AP/125 V DC BATTERY BOARD ill C-19839~15
AP/125 V OC BATTERY BOARD 412 C-19839-C2/14
AP/24 V DC BATTERY CHARGER llll C-19867</2
AP/24 V DC BATTERY CHARGER 4112 C-19867</2
TB
TB
TB
TB
TB
IB
277
277
261
261
277
277
BAT RH 12
SAT RH 12
A9, 10
AIO> 11
AS, 9
AB, 9
5
5
SR
SR
SR
SR
YES
YES
YES
YES C-19841-Cl/16
YES
YES
BATT 11, HG161
BATT-12, HG171
1551
1551
Al
Al
Al
Al
AI
Al
DQ/DG 4103 AIR INLET RELIEF VLV C-18026-C2/14/G3 TB
CERTIFICATION:
Ihe infornation identifying the equipnent r red bring eis, to the best of our knowledge and bel, correct nd
CARHEH R. AQ5TA/ EKINEERr nt or ype t e gnature
I4NANED F. ALVI ENGINEER
rntor ype ane te
lant to safe shutdovn condition on this Safe Shutdovn Equipnent List (SSEL)(One r nore sigoatures of System or Operations Engineers)
a
Page No. 35Report Oatc/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUESOI EQUIPMENT LIST (SSEL)
-Conposlte-
Data Base Flic Hane/Date/Tine: %f1 3.MF / 12/22/95 / 13:16:16Sort Criteria: ID NunberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran Flic Nano 8 Version: SSEH 2.2
LINEIR). TRAIH
~ $ $ $ $$ $$$$$
(I) (2)
EQUIPCLASS HARK N).~$$$$ $$$$$$ $ $ $$$ $ $$ $ $$$
(3) (4)
SYSTEH/EQUIPHENTDESCRIPTIN
~ $ $$ $ $ $ $$$$ $ $$$$$$$$$$$$$$$$$$$$$$
(5) (6) (7)
Dug. Ho./Rev./lone Building~$ $ $ $$$$ $ $$$$ $ $$ $ $$$ $$$$$$$$$$
EQUIPHEHT
Flr.Elv.~$ $ $ $ $$$$$
(8)
LOCATION —-> <- OP. ST. —>Rn. or Rou/Col. SORT NOTES Horall Desired$$$$$$$$$$$$$$$ $ $ $$ $ $ $$$$ $$$$$$$ $$$$$$$
(9) (10) (Ll) (LS) (13)
PNER SUPPORTIHC SYS.REQ07 DUG. HO./REV.~ $$$$ $$ $$$ $ $$$$$$$$$
(14) (15)
REQ'0 INTERCNNECTINS8 SUPPORTIHC CNSNEHTS$$$$$$$$$$ $ $$$$$$$$$$$$
(16)
REG.ISSUE .~$ $$$
(17)
S146 2 16 BC121»
8147 2 16 BC122»
8170 1,2 20 CBIIB»
8171 1,2 20 C8128»
81341 1 20 CP161A-8
8136 1,2 20 CP167
8134K 2 20 CP171A-8
7307 i>2 OSA CRAC401»
7308 1>2 OSA CRAC~»
7154 2 0 D-034
7153 1 0 0-035
3109 1OPI 20 D-372
8203 ] 14 OC+N Ll»
8204 2 14 OC-CN-12»
7141 1 20 OC102
7145 2 20 DC103
7142 I 03 DG102
7144 1 14 DG102 IB
7146 2 03 OC103
AP/24 V OC BATTERY CHARGER 4121 C-198674/2
AP/24 V DC BATTERY CHARGER ll22 C-198674/2
TB
TS 277
CTRIJ125 V DC CNTROL AMI REUYBOARD CONTROL BUS 118
CTRL/125 V DC CNTROL A% REUYBOARD CNIOL BUS 128
AP/BATTERY CHARGER 161A CNTROLCASIHET
AP/CCftUIER POVER QPPLY HC SET4167 CONTROL PHL
AP/BATTERY CHARGER 171A CNTROLCABIHET
CRAC/INLET BLOCK VALVE
CRAC/RECIRC BLOCK VALVE
EDG 103 ROLLS DOOR
EX 102 ROLWP DOOR
RCS/RCS PRESSNE RECORDER
C-19839415/3
C-19839415/3
C-194354/6/17
C-19436-C7/16
C-194394/6/18
18
18
TB
C-18047-C/22/03 TB
C-180474/22/03 TB
C-194374
C-194374 18
C-180154/27/A3 18
261
261
261
277
261
261
261
AP/CR DC EHER LIGHT CNTACTOR C-19534M/9
AP/CR X THER LIGHT CONTACTOR C-1953443/9
TB
TB
277
277
AP/EOG 102 CONTROL CABINET
AP/EDG 103 CONTROL CABIHET
C-1941041/21
C-1941041/21
TB 261
TB 261
18
TB
IB
261
261
261
AP/X 102 NEUTRAL BREAKER GIICLE C-19839M/0
AP/X 102 EHERCENCY DC ISOUT ION C-1941041/21BREAKER MIHET
AP/X 103 NEUTRAL BREAKER CIIICLE C-1983948/4
A10
AIO
5 R — N/A H/A
SR
SR
N/A H/A
N/A H/A
YES
YES
YES
1556
1556
8811
AI
AI
AI
All 5 R — N/A H/A YES 8812 AI
5 32)35 H/A H/A HO AI
AA9
A12
5 32 N/A N/A
S 32,35 N/A N/A
YES
HO
168, 178 AI
AI
A16
A16
R
R
HO
HO
SET POINT, PANEL H Al
SET POINT, PANEL H AI
EOC RON 103 SR
EDG RON 102 SR
CLOSED OPEH YES 1718
CLOSED OPEN YES 1618 74A9X
SR
SR
SR
YES
YES
YES
YES
OFF N
OFF N
OC 102 RH 5 32 H/A N/A
X 103 RH S 32 H/A N/A
AI
Al
Al
Al
AI
OC 102 RH
X 102 RH
X 103 RH
5
5
5
N/A H/A
N/A N/A
H/A N/A
YES
YES
YES
C8118 AI
AI
AI
H/A N/A YES C-2307741/23 HG167
CARHEH R. AGOSTA/ ENGINEER
r ntor ype ane teHOHANEO F. ALVI ENGINEER
rntor ype te
gna re
gnature
CERT IF ICATIOH:
The infornation identifying the equlpnent requ bring the plant to als, to the best of our knowledge and belief rrect a a a (One
safe shutdom condition on this Safe Shutdom Equlpnent List (SSEL)nore signatures of Systens or Operations Engineers)
2-2 Ja
1
I
1i
Page Ho. 36Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SHUTDOVN EOUIPNENT LIST (SSEL)
-Conposlte-
Data Base File Haec/Date/Tine: )46>1 3.DBF / 12/22/95 / 13:16:16Sort Criteria: ID lhaberFilter Criteria: (Eval. Concern CONTAINS 'A')Progran File Nano 6 Version: SSIH 2.2.
LIHE EQIIPM. TRAIN CLASS HARK IKI.
~$0000 00000 $0000 0$ $ $$ $ $$$00000$ $$ $
(I) (2) (3) (4)
7148 2 14 DG103 IB
SYSTEH/EOUIPHENT
DESCRIPTION~000000000000000$ $ $$ $ $ $0$00$ $$0000
(5)
Dwg. Ho./Rev./Zone Building00$ $$$0$ $0$ $$ $ $$$ $0$ 0000000000
(7)(6)
TBAP/DC 103 EHERGEHCY DC ISOLATION C-1941WI/21BREAKER CABIHET
261 OG 103 RH S
EOUIPNEHT LXATIOH—-->Fir.Elv. Rn. or Row/Col. SORT
F000000000 000000000000000 $000
(8) (9) (10)
<—OP. ST. -nNOTES Homal DesiredF00000 $$ $ $0$ $ $$$ $ $ $$
(11) (12) (13)
N/A N/A YES AI
POVER SUPPOR'TING SYS. REO>D IHTERCOWECTIOHS REG.
RElg7 DVG. I47./REV.,B SIB'PORTING CltNENTS ISSUE~$000 $$$$0$ 0$ $$$$$0$ 000$ $$$ $$$$$$$$$$$$$0$ $ $0000
(14) (15) (16) (17)
8171A 1,2 20 E
6266 120P 18 ECVYR»
CTRL/CONSOLE E CONTL RH ELECT
CONTROL CONSOLE
EC/ENERGEIKY CMIEHSER VENT VALVE C-3418544/3RACK
TB
RB PB
5 17 H/A N/A
H/A N/A
YES AI
0541> 05-OIC) 05-OID) Al054k, 0544C, 0540,05-11, 05-1lC) 05-1lD)05-12, 05-12C) 05-12D
8101 1 17 EDC 102
8102 2 17 EDC 103
3140 1) 2 18 EIRR»
8187 1,2 20 F
8191 1,2 20 G
8192 1,2 20 H
8158 1 14 IG12
8159 1 14 IG13
8160 1 14 IG22
8161 1 14 IG23
8188 1,2 20 K
8186 1,2 20 L
7338 1,2 10 lACC»
8205 1,2 14 LP-IIE»
8189 1,2 20 H
AP/EHERGDKY DIESEL GENERATOR 4102 C-1941041/21
AP/EHERGDKY DIESEL GEHERATOR %103 C-1941041/21
TB 261 BG> BEIB 5 R 15
TB 261 BCIB SR 15
RCS/EAST INSTR. ROCH RACK
CTRL/CONTROL BOARD PHL F
CTRL/CONTROL BOARD PHL 6
CTRL/CONTROL BOARD PNL H
AP/24 V DC DISTRIBUTION PNL
AP/24 V DC DISTRIBUTION PHL
AP/24 V DC DISTRIBUTION PNL
AP/24 V DC DISTRIBUTION PHL
CTRL/CONTROL BOARD PHL K
CTRL/CONTROL BOARD PHL L
CRAC/IAB AIR COOLING COIL
AP/LIGHTING PANEL lllE
CTRL/CONTROL BOARD PHL H
C-1983942/14
C-19839~14
C-19839Cfl4
C-19839-C2/14
C-19839-C3/15
TB
TB
TB
TB
TB
TB
TB
TB
277
277
277
277
277
277
CR PNL G
CR PHL G
CR PNL C
CR PNL C
5 17
5 17
5 17
SR
SR
SR
SR
5 17,32
5 17
C-1802142/8/02 TB 817 5 10
C-19534M/9
C-1983942/14
TB
'TB
277 SR
5 17,32
C-184704/14 RB 284 E INST RH 5
OFF
OFF
N/A
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
YES
24/48 YX
24/48 VX
24/48 VDC
24/48 VX
BB11
Al
Al
AI
Al
AI
AI
Al
Al
AI
BBll, BB12, 153> DC102, AI00102 IB> DG102, RC 102
BBII, 8812, 154, DC103, AlDG103 IB, DG103, RC103
PIS-36-9X) PIS-36-900) AlP IS-36-90F
AI
Al
AI
CER IIFICAllOH:
The infornatlon identifying the equipnentis, to the best of our knowledge and bell
CARHEN R. AGOSTA/ ENGINEER
rntor ype ane tea%A%ED F. ALVI ENGINEER
r nt or ype t e
re to bring the plant to a safe shutdown condition on this Safe Shutdown Equipnent List (SSEL), corre and r (One r nore signatures og Systen or Operations Engineers)
~/z e~gnature
t
.Page No. 37Rcport Date/Tine: 12-22-95 / 13:18:10
Nine Hile Point Unit ISAFE SHUTDM EQUIPHENT LIST (SSEL)
-Conpos itc-
Data Base File Haec/Date/Tine: NB>1 3.DSF . / 12/22/95 / 13:16:16Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAIHS 'A')Progran File Haec 8 Version: SSDI 2.2
LIHE EQUIPIo. TRAIN ClASS
~ $ $$ $ $ $ $ $ $$ $ $ $ $$
(I) (2) (3)
HARN IBI.~$ $$$$$$ $ $ $$$$$$$$
(4)
SYSTIH/EQUIPHEHTDESCRIPTION
$$$$$$$$$$$$$$$$ $ $$ $ $$$ $ $$$$$$$$$ $
(5)
D»g. Ho./Rcv./Zone Bul lding~ $$$ $ $ $ $$$$$$$$$$$$$ $$$$$$$$$$
(6)
EQUI PHEHT
Flr.Elv.~$ $ $$$ $ $ $$
(8)
LOCATIN —--> <- OP. ST. —>Rn. or Rou/Col. SORT NOTES Homal Desired~$$$$$$$$$$$$$$ $$$$ $$$ $$$ $$ $$$$$ $ $ $$$$$
(9) (IO) (II) (12) (13)
PNER SI'PORTING SYS. REQ'D INTERCNNECTIOHS REG.
REQDT DUG. HO./REV. 8 SWPORTING COB>NENTS ISSUE~$$$$ $$$$ $$$$$$$$$$$ $$$$$$$$$$$$$ $ $$$$$$$$$ $$$$ $
(14) (15) (16) (17)
8129A 1,2 18 HSIVIRe
8190 1,2 20 H
2006A 1,2 23 NC02
8152 1 20 HI811
8153 2 20 NI812
8120 1,2 20 PNL 167A
8134H 1 20 PRC162
8137 1,2 20 PRC167
8134H 2 20 PRC172
7143 1 17 RC102
7147 2 17 RC103
8166 1,2 20 RSP11
8167 1,2 20 RSP12
81288 1 16 SBC16IA
8128C 1 16 SBC161B
8128D 2 16 SBC171A
8128E 2 16 SBC 1718
8168 1,2 20 SSCI
8169 l>2 20 SSC2
AP/HAIN STEAN 150 VLV INSTRIHEHT C-2705WI/5RNX
CTRl/CNTROL BOARD PHL H
CRD/CNTROL ROD DRIVE
AP/INCLM INST BUS 411
AP/NICLEAR INST BUS 412
AP/DIST PNL 167A BUS
AP/IS>S 162A AMI 1628 PROTECTIVE
REUY CABINET
AP/CCIPUTER POVER SUPPLY HG SET4167 PROTECT RELAY
AP/lPS 172A AMI 1728 PROTECTIVE
RElAY CASIHET
AP/DG 102 REUY RESISTOR (NEUTRALGRIBBI)
AP/DG 103 REUY RESISTOR (NEUTRAL
GRIBBI)
CTRL/RDOTE SHUTDM PHL lllCTRL/REHOTE SNUTDM PHL ll2
C-19839-C2/14
C-18016-Cl/23/82 W
C-198664/9
C-198664/9
C-1943846/9
C-19436-C/5/18
C-194S7/16
C-194394/5/19
C-1941041/21
C-19410-Cl/21
C-19839-C20/6
C-19839420/6
TB
TB
RB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
RB
RB
AP/STATIC BATTERY CHARGER 161A C-1943&C/6/17
AP/STATIC BATTERY CHARGER 1618 C-194364/6/17
AP/STATIC BATTERY CHARGER 17IA C-194394/6/18
AP/STATIC BATTERY CHARGER 1718 C-194394/6/18
CTRL/SHUTDM SUPV CNTROL MINET C-19839420/6ICTRL/SHUTDM SUPV CNTROL CABINET C-19839%20/62
261
277
281
277
261
261
261
261
261
261
281
281
NSIV RH H/A H/A H3 01-03C> 01-030> 0144C> Al01-04D
CR 5 17 H/A N/A
Reactor Vcsscl — 05 OUT SCRAH
CR PNL G 5 R
CR PHL G 5 R
Q7, 8 5 R
H/A H/A
H/A N/A
H/A H/A
5 32,35 H/A H/A
YES
IO
YES
YES
YES
8812 Al
Al
BATT ill, SATT 112 Al
BATT 121, BATT 122 Al
TRAI6 167 Al
AI
AI
A12 5 32>35 H/A H/A AI
DG 102 RH 5
DG 103 RH S
N/A N/A
N/A H/A
YES
YES
AI
AI
A14
C16
A12
A12
5 32 H/A H/A
5 32 N/A N/A
5 R 32,35 H/A N/A
5 R 32,35 H/A N/A
5 R 32,35 H/A H/A
S R 32,35 H/A H/A
5 32 N/A N/A
5 32 N/A N/A
YES
YES
YES
YES
YES
YES
YES
YES
8812, 8811, HG162 Al
8812, 8811, HG172 Al
AI
Al
AI
AI
8812, BB11
BB12, BB11
AI
AI
AA9, AB9 5 32 H/A N/A YES C-19t%41/28 8811> 8812
CERT IFICAl!N:
The lnfornation identifying the equipnent r brin the plant to a safe shutdovn condition on this Safe Shutdovn Equipnent List (SSEL)ls, to the best of our knouIedge and belief corre t nd cur (On or nore signatures of Systens or Operations Engineers)
CARNEN R. AGOST MINEERr ntor ype ane te
OHHAIFIED F. AlVI / ENGINEER
rntor ype ane te
gna re
gnaturc
~"
Page Ho. 38Report Date/Tine: 12-22-95 / 13:18:10
Nine Hlle Point Unit 1SAFE SNUTDOVN EQIIPNENT LIST (SSEL)
4eposlte-
Data Base File Nano/Date/Tine: )46>1 3.DBF / 12/22/95 / 13:16:16Sort Crlterla: ID HuaberFilter Crlterla: (Eval. Concern CONTAINS 'A')Progran Flin Nano 8 Version: SSEH 2.2
LINE EOUIPN. TRAIH ClASS
~00$ 0$ $0000 $0000
(I) (2) (3) (4)
SYSTD(/EOUIPNENTDESCRIPTION .
~$0$ $$$ 0$0$ $$ $ $$ $0$ $ $ 0$ $$$$$ $ $ 0000
(5)
Dug. Ho./Rev./Zone$$$$$$$$$$$ $ $$ $ $$$$$
(6)
BuildingF000000000
(7)
EOUIPNEHT
Flr.Elv.F 000000000
(8)
LOCATION ---> <- OP.Rn. or Rou/Col. SORT H3TES Homal
(9) (10) (11) (12)
ST. —> POHER SUPPORTING SYS. REIj'0 IHTERCONECTIONS REG.
Desired RE007 DUG. H3./REV. 8 SIR>PORTING CRB>OHEHTS ISSUE~ 000000 $0000 000000000000000 $0$ $$$$ $$$0$ $0$ $0$ $$00$ $ 0000
(13) (14) (15) (16) (17)
8119 1,2 04 TRAHS 167A
8107 1 04 TRANS 16A»
8107A 1 04 TRAHS 168»
8108 2 04 TRANS 17A»
8108A 2 04 TRANS 178»
8128F 1 16 UPS162A
81280 1 16 UPS1628
8128N 2 16 UPS172A
8128l 2 16 UPS1728
8164 1,2 20 VBII
8165 1,2 20 VB12
3141 1,2 18 HIRR»
AP/4160 TO 600 V TRANSFORNER
AP/4160 TO 600 V TRAHSFORNER
AP/4160 TO 600 V TRAHSFORNER
AP/4160 TO 600 V TRAHSFORNER
AP/IIINTERRIR>TABLE POVER Sll>PLY162A
AP/IIIHTERRll)TABLEPOVER QJ'PLY1628
AP/IRIIHTERRI)TABLE POVER SI'PLY172A
AP/WINTERRIB>TABLE POVER SWPLY1728
CTRL/125 V DC VLV BOARD 411
CTRL/125 V DC VLV BOARD 412
RCS/VEST INSTR. ROCH RAN
C-19436-Cl/28
C-19436-CI/28
C-19439-Cl/21
C-19439-Cl/21
C-19436-C/5/18
C-194%4/5/18
C-19439-C/5/17
C-19439-C/5/17
C-19839-C21/7
C-19839 W2/6
C-18469-C/18
AP/600 TO 120/208 V TRANSFORHER C-19438-C6/9 RB
RB
RB
RB
RB
TB
TB
TB
TB
RB
281
281
281
281
281
277
277
277
261
291
07> 8
L, H4
L, H4
010> 11
010, 11
SR
5
SR
5
N/A H/A
N/A H/A
N/A H/A
N/A H/A
5 R — N/A H/A
5 R 32,35 N/A H/A
5 R 32,35 H/A H/A
A12
All
JS
5 R 32,35 N/A H/A
5 R 32 H/A H/A
5 R 32 H/A H/A
H INST RH 5 H/A H/A
A12 S R 32,35 N/A N/A
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
NO
167
102
102
AI
AI
AI
AI
AI
Al
AI
AI
AI
8812, 8811 AI
BB12, 8811 AI
PIS-36-908, AlPIS-36-90E) 36-104
CERTIFICATION:
The lnfornatlon ldentlfylng the equlpnentls, to the best oF our knouledge and bell
CARNEN R. AGOSTA/ ENGINEER
r nt or ype t e
NHANED F. ALYI Ba>I NEER
r ntor ype ane to
red brin he p nt to a afe shutdoun condition on this Safe Shutdoun Equlpnent List (SSEL), correct nd (One nore signatures of fystens or Operations Engineers)
gnature ate
ateg'nature
SSEL DESCRIPTION OF CONTENTS
Descri tion of Contents
This column contains a four-digit recordnumber. Note that because some itemshave been deleted from the list, therecord numbers are not always sequential.
This column contains one of the following"train" numbers which serves to groupcomponents required to complete the pathfor the safe shutdown function:
1 = Train 1; can be considered theprimary train. Train 1 equipmentoperates from Diesel Generator 102.Required by the GIP.
2 = Train 2; can be considered thesecondary, or redundant, train.Train 2 equipment operates fromDiesel Generator 103. Required bythe GIP.
3 and up= Train numbers greater than 2are not required by the GIP,but are functionally equivalentto Trains 1 or 2.
10P =
20P =
120P
10P1
10P2
20P1
First option to either Train 1or 2. Not required by the GIP.
Second option to either Train 1or 2. Not required by the GIP.
Option to Trains 1 and 2. Notrequired by GIP.
First option to Train 1; can beused as a back-up to similarequipment in Train 1. Notrequired by the GIP.
Second option to Train 1; canbe used as a back-up to similarequipment in Train 1 or Train10P1. Not required by the GIP.
First option to Train 2; can beused as a back-up to similarequipment in Train 2. Notrequired by the GIP.
SSEL DESCRIPTION OP CONTENTS
Entr Descri tion of Contents
2. Train(Continued)
20P2 Second option to Train 21 can beused as a backup to similarequipment in Train 2 and Train20P1. Not required by the GIP.
3. Equipment Class This column contains a number between 0and 22. The number corresponds to amajor equipment class, assigned in theGIP, which corresponds to the equipmentcategories included in the seismicexperience data base. The "R" equipmentclass is used to identify inherentlyrugged equipment for which USI A-46verification of seismic adequacy is notneeded.
4. Mark No. This column contains an NMP-1 EquipmentID Number, the plant-specific uniqueidentifier as contained in the drawingsused to prepare the SSEL. For somecomponents, an equipment ID number couldnot be readily determined from the P&ID.In these cases, a unique identifier,indicated by an asterisk, was assigned tothe component.
5. System/EquipmentDescription
This column contains an abbreviation forthe system in which the item of equipmentis a part. A slash (/) separates thesystem designation from a description ofthe equipment. See the Index of Acronymsfound in the front matter for the meaningof the abbreviations used for thesystems.
6. Drawing No./Revision/Zone
This column contains the P&ID orelectrical drawing number (and sheet)which identifies the equipment describedby the database record. The second entryis the revision of the drawing used indeveloping the SSEL. When included, thezone where the equipment is identified onthe drawing is indicated with a letter(row) and a number (column).
SSEL DESCRIPTION OF CONTENTS
Entr Descri tion of Contents
7. Building This column identifies the NMP-1 buildingwhere the equipment is located.
DW =RB =TB =SH =
DrywellReactor BuildingTurbine BuildingScreen House
8. Floor Elevation This column contains the elevation of thebuilding floor from which the equipmentcan be seen.
9. Room orRow/Column
10. Sort
11. Notes
This entry identifies the room or nearestbuilding row/column intersection to wherethe equipment is located.
This field assists in manipulating thedatabase. This field contains any one ofthe following four options: "—" — Noseismic or relay review needed, "S"Seismic review only, "R" — Relay reviewonly, "S R" — Seismic and relay reviewneeded.
This column may contain a number whichidentifies a note (applicable to theequipment) found in this appendix.
12. Normal State
13. Desired State
This entry identifies the normal state ofthe equipment during normal operation ofthe plant (e.g., open, closed, or op/clfor valves; on or off for pumps, etc.).This entry identifies the desired stateof the equipment required for the safeshutdown function.
14. Power Req'd?
15. Supporting SystemDrawing No./Revision
This entry identifies whether electricalcontrol or operating power is needed toachieve or maintain the desired state ofthe equipment.
When included, this column contains theelectrical drawing (or P&ID for AOVs),which identifies the operating andcontrol power sources and thecorresponding drawing revision used indeveloping the SSEL.
SSEL DESCRIPTION OF CONTENTS
Entr Descri tion of Contents
16. RequiredInterconnectionsand SupportingComponents
When included, this column contains thesupporting equipment (by EPN) needed bythe equipment described in this databaserecord for it to perform its safeshutdown function. Many supporting orassociated components have a separatedatabase record.
88EL NOTES
This appendix is to be used with the Safe Shutdown Equipment List.1 ~ This line will now allow a loss of inventory or pressure sinceit is a closed loop.
2 ~ This manual valve must be repositioned to perform its safeshutdown function.
3 ~ Equipment in this line does not need to be evaluated since itsstatus does not affect the performance of the safe shutdownsystem.
4 ~ The CRD pump cooler, gear oil cooler, and the seals'oolingloop are all on the same skid and are, therefore, evaluatedtogether.
5. This equipment is considered NSSS and is outside the scope ofthe SQUG walkdown.
6.'lthough accomplishment of safe shutdown functions is notexpected to actuate this spring-operated pressure reliefvalve, the desired state has been designated open/closed sothat the valve is treated as an active item of equipment.
If power or instrument air is lost to the emergency condensermakeup regulating valves 60-17 and 60-18, they will fail inthe open position. If this occurs, the water level in theemergency condensers could be maintained by using manualvalves 60-11 and 60-12 or other means to control makeup flowto the emergency condensers, allowing the optional ESC systemto be used for shutdown.
8. The core spray and containment spray pump motor coolers arelocated on the skid with the pump and motor.
9. This equipment will fail in the desired position upon loss ofpower or instrument air.
10. This equipment is not required to function in order to achievesafe shutdown; however, it is not isolated from a safeshutdown support system. This equipment should, therefore, beexamined to ensure that the piping's pressure/inventoryintegrity will be maintained.
It is assumed that this tank will not overflow.
12. Pilot valves referenced by this note are air-operated, springreturn, four-way pilots. Porting of the air supply to themain steam isolation valves is listed in columns 12 and 13.'
88EL NOTES
13. The pump and its cooler, pressure control valve, and/or lubeoil system are on the same skid and are, therefore, evaluatedtogether.
14. Batteries 11 and 12 are recharged via battery boards BB11 andBB12, respectively.
15. The diesel generator, oil transfer pump, and control panel areon the same skid and are, therefore, evaluated together.
16. This tank is buried and, therefore, is not included inequipment class 21.
17. This cabinet or panel is part of an assembly ofcabinets/panels bolted together. The majority of theseassemblies are in the control room and auxiliary control room;their layout is shown in Figures J-1 and J-2, respectively.
18. This piece of equipment is listed for more than one safeshutdown system. This record will not appear on the seismicor relay review SSEL.
19. This piece of equipment is listed for more than one safe~
~
~
shutdown system. This is the record which will appear in theseismic or relay review SSEL.
20. The operations review should determine a method for opening orbypassing valves 60-03 and 60-04 so that make up water to theECS can be provided from the condensate storage tanks.
21. This note is not used.
22. This valve is a backup for the check valve in the same line.23. The backup for this valve is a check valve in the same line.24. This note is not used.
25. The equipment in this branch line is not included in the SSELand, therefore, seismic adequacy of the equipment in thisbranch line is not verified. The operations review shoulddetermine whether it is feasible to isolate this branch lineto conserve condensate storage tank water inventory.
26. Check valves are considered to be inherently rugged items ofequipment and need not be verified for seismic adequacy. Adiscussion of inherent ruggedness is addressed in the GIP.
SSEL NOTES
27. The source of power for this pilot valve is one of the twosupplies listed in Column 16. Both power supplies are coveredby this SSEL.
28. The relay review program should determine a specific electricpower source for this equipment.
29. P&ID C-18016-C, Sheet 1, shows an input from an instrumentcapillary tube for valves 28-23 and 28-29. Valve controls maybe thermostatic, with no external power source (EquipmentClass 7) .
30.
31 ~
The control room circulation fan is equipped with a sparemotor for increased reliability.The reactor protection system has been listed as a supportingsystem for consistency with the P&ID depiction of the system.Operational check of this function will verify that relianceis not being placed on automatic protective actions toaccomplish the desired safe shutdown function.
32. Items referencing this note contain essential relays, asdocumented in the G.4 Forms of the relay functionality reviewreport titled "Nine Mile Point Nuclear Station Unit 1: USI A-46 Relay Evaluation," Preliminary, dated May 25, 1990. Thesestatus of these items may change when the relay review reportis finalized.
33 'his note number is not used.
34. This heat exchanger was evaluated for structural integritysince it is not isolated from a safe shutdown system.
35. These items were added to the SSEL as a result of the relayevaluation.
36. The main steam safety valves are listed in the SSEL to supportuse of the optional ECS system. A single failure of one ofthese valves would, however, prevent the use of the ECS forsafe shutdown. Since the safety valves are not required tosatisfy GIP safe shutdown requirements, it is not necessary toperform a seismic evaluation of these valves.
Appendix C
SEISMIC REVIEW SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 1
LINENO. CLASS
(2)
NARK NO.aeaaaaaaeaeaaaaaaaaa
(3)
SYSTEM/EQUIPMENTDESCRIPTION
aaaaaaaaaaaaaaaeaarra assr aeeeeaaaaaaaaaa(4) (5) (6)
BUILDING ELEV
(7)
4185 OBA 01-01
4186 OBA 01-02
4190 07 01-03
4191 OSB 01-03C
4192 OSB 01-03D
4187 07 01-04
4188 OSB 01-04C
4189 OSB 01-04D
MS/MAIN STEAM INSIDE ISO VLV III
MS/HAIN STEAM INSIDE ISO VLV N2
MS/MAIN STEAM OUTSIDE ISO VLV II3
MS/MAIN STEAM OUTSIDE ISO VLV II3 PILOT
MS/MAIN STEAM OUTSIDE ISO VLV II3 PILOT
MS/MAIN STEAM OUTSIDE ISO VLV II4
MS/HAIN STEAM OUTSIDE ISO VLV II4 PILOT
DW
DW
TB
TB
TB
TB
TB
MS/MAIN STEAM OUTSIDE ISO VLV |I4 PILOT TB
259 AZ210
261
261
261
261
261
261
MSIV RM
MSIV RM
MSIV RM
MSIV RM
HSIV RH
HSIV RM
259 AZ160
3128 7
3126 7
3132 7
3134 7
3130 7
3136
07
4192C 07
41898 07
4189C 07
01-102A
01-102B
01-102C
01-102D
01-102E
01-102F
Ol-PVl*
Ol-PV2»
Ol-PV3»
01-PV4*
HS/NIN STEAM EMERGENCY ELECTRONTIC RV II3
MS/NIN STEAM EMERGENCY ELECTROMATIC RV II1
DM
DW
MS/NIN STEAM EMERGENCY ELECTROMATIC RV IIS
MS/MAIN STEAM EMERGENCY ELECTROMATIC RV II6
MS/MAIN STEAM OUTSIDE ISO VLV II3 PILOT
MS/NIN STEAM OUTSIDE ISO VLV N3 PILOT
MS/MAIN STEAM OUTSIDE ISO VLV N4 PILOT
MS/MAIN STEAM OUTSIDE ISO VLV N4 PILOT
DW
DW
TB
TB
TB
TB
MS/NIN STEAM EMERGENCY ELECTROMATIC RV II2 DM
MS/NIN STEAM EMERGENCY ELECTROMATIC RV II4 DM
259
259
259
259
259
259
261
261
261
WEST
MEST
EAST
EAST
MEST
EAST
MSIV RM
MSIV RM
MSIV RM
261 MSIV RM
4222 OBB 05-01C
6141 OSB 05-01C
4223 OBB 05-01D
6142 OBB 05-01D
4221 07
6140 07
05-01R
05-01R
4227 07
6146 07
05-04R
05-04R
4224 07
07
05-11
05-11
4228 OBB 05-04C
6147 OBB 05-04C
4229 OSB 05-04D
6148 088 05-04D
ECV/EC 11 LOOP
ECV/EC 11 LOOP
ECV/EC 11 LOOP
ECV/EC 11 LOOP
ECV/EC 11 LOOP
ECV/EC 11 LOOP
ECV/EC 12 LOOP
ECV/EC 12 LOOP
ECV/EC 12 LOOP
ECV/EC 12 LOOP
ECV/EC 12 LOOP
ECV/EC 12 LOOP
ECV/EC 11 LOOP
ECV/EC 11 LOOP
VENT FIRST ISO VLV
VENT FIRST ISO VLV
RB
RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV
VENT FIRST ISO VLV
VENT SECOND ISO VLV
VENT SECOND ISO VLV
RB
RB
RB
RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
VENT FIRST ISO VLV PILOT RB
340
340
340
340
340
340
340
340
340
340
340
340
340
340
PB, ECVVR»
PB| ECVVR»
PB, ECVVR»
PS, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB, ECVVR*
PB) ECVVR*
PB, ECVVR»
PB, ECVVR»
Report Date/Time: 12-22-95 / 13:30:56
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 2
LINENO.
(1)
CLASS
(2)
MARK NO.
(3)
SYSTEM/E(UIPMENTDESCRIPTION
saaaaaaaaaaaasassssssaassssssssassasasssas(4) (S) (6)
BUILDING ELEV
(7)
4230 07
6149 07
05-12
05-12
4231 08B 05-12C
6150 OBB 05-12C
4232 08B 05-12D
6151
8105A
08B
03
05-12D
101/2A-1
8106A 03 101/28-1
4225 OBB 05-11C
6144 08B 05-11C
4226 08B 05-11D
6145 OBB 05-11D ECV/EC 11 LOOP VENT SECOND ISO VLV PILOT
ECV/EC 12 LOOP VENT SECOND ISO VLV
ECV/EC 12 LOOP VENT SECOND ISO VLV
ECV/EC 12 LOOP VENT SECOND ISO VLV PILOT
ECV/EC 12 LOOP VENT SECOND ISO VLV PILOT
ECV/EC 12 LOOP VENT SECOND ISO VLV PILOT
ECV/EC 12 LOOP VENT SECOND ISO VLV PILOT
AP/4160 V POWERBOARD N101 FEEDER TOPOWERBOARD N102
AP/4160 V POWERBOARD N101 FEEDER TOPOWERBOARD N103
RB
RB
RB
RB
RB
RB
RB
TB
TB
ECV/EC 11 LOOP VENT SECOND ISO VLV PILOT RB
ECV/EC 11 LOOP VENT SECOND ISO VLV PILOT RB
ECV/EC 11 LOOP VENT SECOND ISO VLV PILOT RB
340
340
340
340
340
340
340
340
340
340
P8, ECVVR*
PB, ECVVR*
PB, ECVVRA
P8, ECVVR»
P8, ECVVR*
PB, ECVVR*
P8, ECVVR*
PB, ECVVR*
P8, ECVVR*
P8> ECVVRA
277 A4
277 A7
8105 03 102
03 103
8109 02 16A
02 16B
8193 03 11
2011 08B 113-273
2012 OBB 113-274
2013 OBB 113-275
2014 08B 113-276
2015 08B 113-277
2004 08B 117
2006 08B 118
8194 03 12
2003 07 126
2005 07 127
8113 01 161A
8114 01 161B
8116 01 167
8116A 01 1671
AP/4160 V POWERBOARD N102
AP/4160 V POWERBOARD N103
AP/4160V POWERBOARD 11
CRD/SCRAM TANK INLET ISO VLV PILOT
CRD/SCRAM TANK INLET ISO VLV PILOT
CRD/SCRAM TANK INLET ISO VLV PILOT
CRD/SCRAM TANK INLET ISO VLV PILOT
CRD/SCRAM DISCHARGE VOLUME TEST VLV
CRD/TRAIN ll SCRAM VLV PILOTS (129 TOTAL)
CRD/TRAIN 12 SCRAM VLV PILOTS (129 TOTAL)
AP/4160V POWERBOARD 12
CRD/SCRAM INLET VALVES (129 TOTAL)
CRD/SCRAM DISCHARGE VALVES (129 TOTAL)
AP/600 V POWERBOARD N161A
AP/600 V POWERBOARD N161B
AP/600 V POWERBOARD N167
AP/600 VOLT POWERBOARD 1671
AP/600 V POWERBOARD N16A
AP/600 V POWERBOARD N16B
TB
TB
TB
RB
RB
RB
RB
RB
RB
RB
TB
RB
RB
RB
RB
RB
TB
RB
RB
261
261
261
237
237
237
237
237
237
237
261
237
237
261
261
281
300
281
281
D18
E18
A4
NS
NS
NS
N5
N5
M5
M5
M5
MS
M4
M, H4
V~ 8
AB16
L, M4
L) M4
Report Date/Time: 12-22-95 / 13:30:56
I
E
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 3
LINENO. CLASS MARK NO.
SYSTEM/EQUIPMENTDESCRIPTION BUILDING EL EV
(1) (2) (3)SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
(4) (5) (6) (7)
8112 02
8172 20
817 2A 20
17B
1510
1512
8103 20 153
8173 20
8174 20
8175 20
1S34
1535
1536
8104 20 154
8140 20
8141 20
1551
1552
8154 20
20
1553
1554
8155 20
8142 20
8143 20
8143B 20
8143A 20
8143C 20
8143 D 20
8143F 20
8176 20
8177 20
8178 20
8178A 20
8143 E 20
8179 20
8162 20
1555
1556
1S57
1S59
1560
1562
1563
1564
1565
1569
1570
1573
1S74
1S75
1580
8180 20
20
1582
1584
8117 01 171A
8118 01 171B
8111 02 17A
AP/600 V POWERBOARD 8171A
AP/600 V POWERBOARD 81718
AP/600 V POWERBOARD AI17A
AP/600 V POWERBOARD 8178
CTRL/AUXILIARYCONTROL CABINET 1510
CTRL/AUXILIARYCONTROL CABINET 1512
AP/DIESEL GENERATOR 8102 RELAY CABINET
CTRL/AUXILIARYCONTROL RELAY CABINET 1534
CTRL/AUXILIARYCONTROL RELAY CABINET 1S35
CTRL/AUXILIARYCONTROL RELAY CABINET 1S36
AP/DIESEL GENERATOR 8103 RELAY CABINET
CTRL/AUXILIARYCONTROL CABINET 1551
CTRL/AUXILIARYCONTROL CABINET 1S52
CTRL/AUXILIARYCONTROL CABINET 1553
CTRL/AUXILIARYCONTROL CABINET 1554
CTRL/AUXILIARYCONTROL CABINET 1555
CTRL/AUXILIARYCONTROL CABINET 1556
CTRL/AUXILIARYCONTROL CABINET 1557
CTRL/AUXILIARYCONTROL CABINET 1559
CTRL/AUXILIARYCONTROL CABINET 1560
CTRL/AUXILIARYCONTROL CABINET 1562
CTRL/AUXILIARYCONTROL CABINET 1563
CTRL/AUXILIARYCONTROL CABINET 1564
CTRL/AUXILIARYCONTROL CABINET 1565
CTRL/AUXILIARYCONTROL CABINET 1569
CTRL/AUXILIARYCONTROL CABINET 1570
CTRL/AUXILIARYCONTROL CABINET 1$ 73
CTRL/AUXILIARYCONTROL CABINET 1574
CTRL/AUXILIARYCONTROL CABINET 1575
CTRL/AUXILIARYCONTROL CABINET 1580
CTRL/AUXILIARYCONTROL CABINET 1582
CTRL/ANNUNCIATOR CABINET 1584
RB
RB
RB
RB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
261
261
281
281
261
L) M12
L, M12
Q10, 11
Q10) 11
ACR
261
261
ACR
ACR
261 ACR
261
261
ACR
ACR
261 ACR
261
261
261
261
261
261
261
261
261
ACR
ACR
ACR
ACR
ACR
ACR
ACR
ACR
ACR
261 ACR
261
261
261
261
ACR
ACR
ACR
ACR
261 ACR
261 ACR
261 ACR
261 ACR
261 ACR
261 ACR
261 ACR
Report Date/Time: 12-22-95 / 13:30:56
lh
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 4
LINENO,
sassssa(1)
CLASS
(2)
MARK NO.
(3)
SYSTEM/EQUIPMENTDESCRIPTION
ssassaasaassssassaaaaasssassasasaaasaaasss(4)
BUILDINGssassssssss
(5) (7)(6)
ELEV ROOMssssaass sassssssss
8182 20
8183 20
8184 20
8185 20
7413 10
7425 10
7423 10
7421 10
7417 10
7415 10
5145 19
5158 19
5133 19
5134 19
19
5153 19
5136 19
5137 19
5138 19
5139 19
5140 19
5141 19
5142 19
5143 19
5144 19
5146 19
5147 19
5148 19
5149 19
5150 19
5151 19
19
1585
1586
1587
1588
201-01
201-02
201-03
201-04
201-05
201-06
201.2-491
201.2-492
201.2-493
201.2-494
201.2-495
201.2-496
201.2-497
201.2-498
201.2-499
201.2-500
201.2-501
201.2-502
201.2-503
201.2-504
201,2-505
201,2-506
201,2-507
201.2-508
201.2-509
201.2-510
201.2-511
201.2-512
CTRL/AUXILIARYCONTROL CABINET 1585 TB
CTRL/AUXILIARYCONTROL RELAY CABINET 1586 TB
CTRL/AUXILIARYCONTROL RELAY CABINET 1587 TB
CTRL/AUXILIARYCONTROL RELAY CABINET 1588 TB
RBCLC/DRYWELL AIR COOLER 811
RBCLC/DRYWELL AIR COOLER II12
RBCLC/DRYWELL AIR COOLER 813
RBCLC/DRYWELL AIR COOLER N14
RBCLC/DRYWELL AIR COOLER 815
RBCLC/DRYWELL AIR COOLER 816
DW
DW
DW
DW
CONTAINMENT/TORUS AIR TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
AIR TEMPERATURE ELEMENT TORUS
TEMPERATURE ELEMENT TORUS
TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
TORUS
TORUS
TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
TEMPERATURE ELEMENT TORUS
TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
CONTAINMENT/TORUS
TEMPERATURE ELEMENT TORUS
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
TEMPERATURE ELEMENT
TORUS
TORUS
TORUS
TORUS
TORUS
TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT . TORUS
261
261
261
261
ACR
ACR
ACR
ACR
225 AZO
225 AZ72
225 AZ110
225 AZ180
225 AZ254
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
198
SG572'G17
288
SG218'G4
54'G6
90'G8
126'G10
162'G11
180'G12
198'G14
234'G16
270'G17
288'G18
306'G20
342'G2
18'G4
54'G6
90
SG8126'G10
162'G11
180'G12
198'G14
234'25
AZ298
Report Date/Time: 12-22-95 / 13:30:56
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 5
LINENO. CLASS MARK NO.
SYSTEM/EQUIPMENTDESCRIPTION BUILDING ELEV ROOM
(1) (2) (3)ssssssssassssassssssaaasssssssasasssssasas
(4) (5) (6) ('7)
5162 20
5154 19
5155 19
5156 19
5157 19
5161 20
201,2-513
201,2-514
201.2-515
201.2-516
201.2-517
201.2-518
CONTAINHENT/TORUS TEMPERATURE ELEMENT
CONTAINMENT/TORUS TEMPERATURE ELEMENT
TORUS
TORUS
CONTAINMENT/TORUS TEMPERATURE CONDITIONER TBK RECORDER
CONTAINMENT/TORUS TEMPERATURE CONDITIONER TBI RECORDER
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
198
198
198
198
261
261
SG16270'G17
288'G18
306'G20
342'CR-1510
ACR-1S69
5164
5163
5165
5159
5167
5166
20
20
20
19
20
20
201.2-519
201.2-520
201.2-521
201.2-521A
201.2-5218
201.2-522
CONTAINMENT/TORUS TEMPERATURE INDICATOR
CONTAINMENT/TORUS TEMPERATURE INDICATOR
CONTAINMENT/TORUS TEMPERATURE TRANSMITTER
CONTAINMENT/TORUS TEMPERATURE ELEMENT
CONTAINMENT/TORUS TEMPERATURE INDICATOR
CONTAINMENT/TORUS TEMPERATURE TRANSMITTER
TB
TB
TB
TORUS
TB
TB
277
277
250
198
250
277
CR PNL K
CR PNL K
RSP 11
SG572'SP
llRSP 12
5160 19
20
201.2-522A
201. 2-5228
CONTAINMENT/TORUS TEMPERATURE ELEMENT TORUS
CONTAINMENT/TORUS TEMPERATURE INDICATOR TB
198
277
SG17277'SP
12
7609
7615
7617
7618
7619
7620
7621
7601
7604
7605
7610
7611
7608
7607
7616
7614
18
18
09
07
OBB
07
08B
07
07
OBB
07
OBB
18
18
09
18
18
202-102
202-103
202-33
202-34
202-348
202-35
202-358
202-36
202-37
202-37C
202-38
202-38C
202-49C
202-49D
202-53
202-92C
202-92D
RBAC/EHER
RBAC/EMER
RBAC/EMER
RBAC/EHER
RBAC/EMER
RBAC/EMER
RBAC/EMER
RBAC/EMER
RBAC/EHER
RBAC/EHER
RBAC/EHER
RBAC/EHER
RBAC/EMER
RBAC/EHER
RBAC/EMER
RBAC/EMER
RBAC/EMER
EX FLOW TRANSMITTER
EX FLOW TRANSMITTER
EXHAUST FAN 812
EX FAN N11 OUTLET ISOL VLV
TB
TB
TB
TB
EX FAN N11 OUTLET ISOL VLV PILOT TB
EX FAN 812 OUTLET ISOL VLV TB
EX ISOL VLV
EX FAN ltll INLET ISOL VLV
TB
TB
EX FAN 811 INLET ISOL VLV PILOT TB
EX FAN 812 INLET ISOL VLV TB
EX FAN N12 INLET ISOL VLV PILOT TB
EX FLOW CONTROLLER
EX E/P CONVERTER
EXHAUST FAN 811
EX FLOW CONTROLLER
EX E/P CONVERTER
TB
TB
TB
TB
TB
EX FAN 812 OUTLET ISOL VLV PILOT TB
302
302
302
302
302
302
302
302
291
291
291
291
302
302
289
291
291
N13
N13
N12
P13
N13
N13
N13
N13
P13
P13
P13
P13
P13
Q13
N13
N13
N13
Report Date/Time: 12-22-95 / 13:30:56
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 6
LINENO.
ssssasa'(1)
CLASS MARK NO.SYSTEM/EQUIPMENT
DESCRIPTION BUILDING ELEV
(6)sassssa sssssssssssasssassss sasra sssssaassssassssssssaasasssssaasassa saaassasssss
(2) (3) (4) (5) (7)
TB
7150 09 209-04
7151 09 209-05
7152 09 209-06
7303 09 210-01
7306 09 210-02
7301 07 210-40
7302 088 210-408
7304 07 210-41
7305 088 210-418
7325 10 210-49
7322 10 210-50
09 210-61
7314 18 210-67
7312 18 210-89
7313 18 210-90
7320 07 210.1-01
7321 088 210.1-01A
7323 07 210.1-02
7324 088 210. 1-02A
7328 11 210.1-119
7334 11 210.1-120
7327 05 210.1-36
7333 05 210,1-37
7326 08A 210.1-56
7337 18 210.1-85
7331 18 210.1-88
7332 18 210.1-89
EDG 102 ROOF EXHAUST FAN
EDG 103 ROOF EXHAUST FAN
EDG 103 ROOF EXHAUST FAN
CRAG/EMER VENT FAN Nll
CRAC/EMER VENT FAN f12
TB
TB
TB
TB
TB
CRAG/EMER VENT FAN Ill ISOL VALVE TB
CRAC/EMER VENT FAN 811 ISOL VALVE PILOT TB
CRAG/EMER VENT FAN 812 ISOL VALVE
CRAG/EMER VENT FAN f12 ISOL VALVE PILOT
CRAG/COOLING COIL 812
CRAC/COOLING COIL Nll
CRAG/CONTROL ROOM HVAC CIRCULATION FAN
CRAG/INLET AIR TEMP
CRAG/CIRC FAN OUTLET TEMP ELEMENT
CRAG/CIRC FAN TEMP CONTROL
CRAG/COOL COIL 811 CONTROL VALVE
TB
TB
TB
TB
TB
TB
TB
TB
TB
CRAC/COOL COIL Ill CONTROL VALVE PILOT TB
CRAG/COOL COIL 112 CONTROL VALVE
CRAG/COOL COIL 812 CONTROL VALVE
CRAG/CHILLER N1 1
CRAC/CHILLER 812
CRAC/CHILL WATER CIRC PUMP f12
CRAG/CHILL WATER CIRC PUMP f12
CRAG/CHILL WATER BYPASS VALVE
CRAC/CHILLER f12 TEMP CONTROLLER
CRAC/CHILLER 811 TEMP CONTROLLER
CRAG/CHILLER Nll FLOW SWITCH
TB
PILOT TB
TB
TB
TB
TB
TB
TB
TB
TB
7149 09 209-03 EDG 102 ROOF EXHAUST FAN 299
299
299
299
300
EDG ROOM
102
EDG ROOM
102
EDG 103ROOM
EDG ROOM
103
A15
300
300
300
300
300
A16
A16
A16
Alo
Alo
300 A16
300
300
300
A16
A16
A16
300 A15
300 A15
300 A15
300
300
300
300
300
300
300
300
300
A15
817
817
817
817
816
816
816
816
300 A15
300 A16
6324 05 28-15
05 28-17
CRDH/CONTROL ROD DRIVE PUMP IllCRDH/CONTROL ROD DRIVE PUMP 012
RB
RB
237
237
M12
N12
Report Date/Time: 12-22-95 / 13:30:56
~ >
P 1, J
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 7
LINENO.
sss(1)
CLASS
(2)
MARK NO.
(3)
6326 07
6327 07
6328 07
6329 07
2001 21
28-23
28-24
28-29
28-30
305-125
124 20 32-02D
5121 20 32-03
5130 20 32-03B
5116 20 32-03C
5125 20 32-03D
5122 20 32-04
5131 20 32-04B
5117 20 32-04C
5126 20 32-04D
5123 20 32-05
5132 20 32-05B
5118 20 32-05C
2002 21 305-128
4235 OBA 31-07
4236 OBA 31-08
5120 20 32-02
5129 20 32-028
5115 20 32-02C
SYSTEM/EQUIPMENTDESCRIPTION BUILDING ELEV ROOM
aaasaaaaaaaa aaaaaaaa asasaasaaaaasssssasaassssssasssaassssassssasssasssas(4) (5) (6) (7)
237 N12
237 M12
237 N12
237 N12
237 MS
237 M5
261 MSIV RM
261 MSIV RM
250 RSP 11
250 RSP 11
261 ACR-1S36
277 CR PNL F
250 RSP 11
250 RSP 11
261 ACR-1536
277 CR PNL F
277 RSP 12
277 RSP 12
261 ACR-1536
277 CR PNL F
277 RSP 12
277 RSP 12
261 ACR-1536
CRD/CRD PUMP i'll TEMPERATURE CONTROL VLV RB
CRD/CRD PINP Nil SEAL PSV
CRD/CRD PUMP f12 TEMPERATURE CONTROL VLV
RB
RB
CRD/CRD PINP 812 SEAL PSV RB
CRD/HYDRAULIC CONTROL UNIT H20-N2 ACCUM'S(129 TOTAL)
CRD/HYDRAULIC CONTROL UNIT N2 ACCUMULATORS(129 TOTAL)
FW/LOOP 111 FEEDWATER ISO VLV
RB
RB
TB
FW/LOOP 812 FEEDWATER ISO VLV TB
Nll INLET TEMPERATURE MV/I TBRCS/RECIRC PUMPCONVERTER
RCS/RECIRC PUMPINDICATOR
Nll INLET TEMPERATURE TB
Nll REACTOR TEMPERATURE TB
Ill REACTOR TEMPERATURE TB
RCS/RECIRC PUMPMV/I CONVERTER
RCS/RECIRC PUMPINDICATOR .
RCS/RECIRC PUMP 812 INLET TEMPERATUREINDICATOR
RCS/RECIRC PUMP 812 REACTOR TEMPERATUREMV/I CONVERTER
RCS/RECIRC PINP 812 REACTOR TEMPERATUREINDICATOR
TB
TB
TB
RCS/RECIRC PUMP 814 INLET TEMPERATURE MV/I TBCONVERTER
TBRCS/RECIRC PINP 814 INLET TEMPERATUREINDICATOR
RCS/RECIRC PUMP N14 REACTOR TEMPERATUREMV/I CONVERTER
RCS/RECIRC PINP N14 REACTOR TEMPERATUREINDICATOR
TB
TB
RCS/RECIRC PUMP 815 INLET TEMPERATURE MV/I TBCONVERTER
RCS/RECIRC PUMP f15 INLET TEMPERATUREINDICATOR
RCS/RECIRC PUMP N15 REACTOR TEMPERATUREMV/I CONVERTER
TB
TB
RCS/RECIRC PUMP 812 INLET TEMPERATURE MV/I TBCONVERTER
Report Date/Time: 12-22-95 / 13:30:56
h I \ I
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 8
LINENO. CLASS
~ssssss ~ ssaass(1) (2)
MARK NO.ssssaassaaassassssss
(3)
SYSTEM/EQUIPMENTDESCRIPTION
saaaasassasass saaassssaaaaaaaassaasaaassa(4)
BUILDING ELEV ROOMsass araaaa araaaaaa aaaaaaasaa
(5) (6) (7)
5127 20 32-05D
5128 20 32-405A
5119 20 32-4058
4215 OSA 33-01R
4213 08A 33-02R
4212 OSA 33-04
2023 18 36-03A
4101 18 36-03A
2024 18 36-03B
4103 18 36-03B
2029 18 36-03C
4104 18 36-03C
4102
18 36-03D
18 36-03D
2025 18 36-04A
2026 18 36-04B
2031 18 36-04C
2032 18 36-04D
2027 18 36-07A
3103 18 36-07A
2028 18 36-07B
2033 18 36-07C
2034 18 36-07D
3106 18 36-07D
4107 20 36-09
4108 20 36-10
3104 18 36-102
3111 20 36-102A
20 36-103
18 36-104
RCS/RCS
RCS/RCS
RCS/RCS
RPS/RCS
RPS/RCS
RPS/RCS
RPS/RCS
RCS/RCS
RCS/RCS
RPS/RCS
RPS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
RCS/RCS
LEVEL TRANSMITTER
LEVEL TRANSMITTER
LEVEL TRANSMITTER
LEVEL TRANSMITTER
LEVEL TRANSHITTER
LEVEL TRANSMITTER
LEVEL TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE TRANSMITTER
PRESSURE TRANSMITTER
LEVEL INDICATOR
LEVEL INDICATOR
PRESSURE TRANSMITTER
PRESSURE INDICATOR
PRESSURE RECORDER
PRESSURE TRANSMITTER
RCS/RECIRC PUMP 815 REACTOR TEMPERATUREINDICATOR
RCS/RECIRC PUMP f13 REACTOR TEMPERATUREINDICATOR
RCS/RECIRC PUMP 813 REACTOR TEMPERATUREMV/I CONVERTER
RCU/REACTOR CLEANUP INLET INNER ISO VLV
RCU/REACTOR CLEANUP OUTLET INNER ISO VLV
RCU/REACTOR CLEANUP OUTLET OUTER ISO VLV
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL TRANSMITTER
TB
TB
TB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
TB
TB
RB
TB
TB
RB
277 CR PNL F
277 CR PNL F
261 ACR-1536
259 N8
259 NS
261 N9
284 W INST RH
284 W INST RM
284 W INST RH
284
284
284
284
284
284
W INST RM
E INST RM
E INST RM
E INST RH
E INST RH
M INST RH
284 W INST RH
284 E INST RM
284 E UNST RM
284 W INST RM
284 M INST RM
284 W INST RH
284 W INST RM
284 E INST RM
284 E INST RM
277 CR PNL F
277 CR PNL F
284 M INST RM
277 CR CON E
277 CR CON E
284 W INST RM
Report Date/Time: 12-22-95 / 13:30:56
,I
EE 'I It
Nine Mile Point Unit 1SAFE SHUTDOMN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 9
LINENO.
asssssa(1)
CLASS
(2)
NARK NO,
(3)
SYSTEM/EQUIPMENTDESCRIPTION
aaaaasaassasssassssssaaaaaaaarasssssssssss(4) (5) (6)
BUILDING ELEV ROON
(7)
3110 20
4109 20
3114 20
4110 20
3101 18
4111 18
3108 20
3107 18
4115 20
36-25
36-26
36-27
36-28
36-31
36-31
36-31A
36-318
36-31C
3105 18 36-32
4112 18 36-32
3113 20 36-32A
3112
u618 36-32B
20 36-32C
137 18 36-90F
3116 20 36-34
4105 18 36-76
4119 20 36-76A
4117 20 36-76B
4106 18 36-77
4120 20 36-77A
4118 20 36-77B
3129 18 36-90A
3127 18 36-90B
3133 18 36-90C
3135 18 36-90D
3131 18 36-90E
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL INDICATOR
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL INDICATOR
RCS/RCS PRESSURE TRANSMITTER „
RCS/RCS PRESSURE TRANSMITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS PRESSURE INDICATOR
CTRL/CONTROL COMPONENT (FUNCTIONGENERATOR)
RCS/RCS PRESSURE TRANSMITTER
RCS/RCS PRESSURE TRANSMITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS PRESSURE INDICATOR
CTRL/CONTROL COMPONENT (FUNCTIONGENERATOR)
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL INDICATOR
CTRL/CONTROL COMPONENT(MULTIPLIER/DIVIDER)
RCS/RCS LEVEL TRANSMITTER
RCS/RCS LEVEL INDICATOR
CTRL/CONTROL COMPONENT(MULTIPLIER/DIVIDER)
MS/HS EMERG ELECTROMATIC RV till PRESSINDICAT SMITCH
MS/MS EMERG ELECTROMATIC RV 8112 PRESSINDICAT SMITCH
MS/MS EMERG ELECTROMATIC RV 8121 PRESSINDICAT SMITCH
MS/MS EMERG ELECTROMATIC RV 0122 PRESSINDICAT SWITCH
MS/MS EMERG ELECTROHATIC RV 8113 PRESSINDICAT SMITCH
MS/MS EMERG ELECTROMATIC RV f123 PRESSINDICAT SWITCH
TB
TB
TB
TB
RB
RB
TB
RB
TB
RB
RB
TB
RB
TB
TB
RB
TB
TB
RB
TB
TB
RB
RB
RB
RB
RB
RB
277
277
250
250
RSP 12
RSP 12
RSP 11
RSP 11
284 M INST RM
284
277
284
261
W INST RM
CR PNL F
W INST RM
ACR-1534
284 W INST RM
284 E INST RM
284 E INST RM
284 E INST RM
277 CR PNL F
284 E INST RM
261 ACR-1535
277 CR CON E
284 W INST RM
277 CR PNL F
261 ACR-1534
284 E INST RM
277 CR PNL F
261 ACR-1S35
284 W INST RM
284 W INST RM
284 E INST RM
284 E INST RM
Report Date/Time: 12-22-95 / 13:30:56
-4pi"
Nine Nile Point Unit 1SAFE SHUTDOXN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 10
LINENO. CLASS
Sssssss SSSSSSS
(1) '2)MARK NO.
Rsssssssssssssssssss(3)
SYSTEM/Eg UIPMENTDESCRIPTION
sasasaasaaaassassassssssasssasssssssassaas(4)
BUILDINGsssaassaasss
(5) (7)(6)
ELEV ROONSRRRRRSR SRRS sasss
6118 07 39-05
6119 OSB 39-05E
6120 OSB 39-OSF
6121 OSB 39-05G
6122 OSB 39-05H
6123 07 39-06
6124 088 39-06E
6125
6126
088
OSB
39-06F
39-06G
6127 OSB 39-06H
4207 08B 39-11C
6129 OSB 39-11C
4208 OSB 39-llD
6130 08B 39-11D
6135 OSB 39-13C
4206 07 39-11R
6128 07 39-11R
4210 OBB 39-12C
6132 OSB 39-12C
4211 OSB 39-12D
6133 OSB 39-12D
4209 07 39-12R
6131 07 39-12R
4216 OSB 39-13C
EC/LOOP 811 CONDENSER RETURN ISO VLV RB
EC/LOOP 811 CONDENSER RETURN ISO VLV PILOT RB
EC/LOOP 811 CONDENSER RETURN ISO VLV PILOT RB
EC/LOOP 811 CONDENSER RETURN ISO VLV PILOT RB
EC/LOOP 811 CONDENSER RETURN ISO VLV PILOT RB
EC/LOOP 812 CONDENSER RETURN ISO VLV RB
EC/LOOP N12
EC/LOOP 012
EC/LOOP 812
EC/LOOP 812
EC/LOOP NllVLV PILOT
CONDENSER RETURN ISO VLV PILOT RB
CONDENSER RETURN ISO VLV PILOT RB
CONDENSER RETURN ISO VLV PILOT RB
CONDENSER RETURN ISO VLV PILOT RB
EMERGENCY CONDENSER DRAIN ISO RB
EC/LOOP Ill EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP Nll EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP 811 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP 811 EMERGENCY CONDENSER DRAIN ISO RBVLV SillEC/LOOP Nil EMERGENCY CONDENSER DRAIN ISO RBVLV HillEC/LOOP Nil.EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP Nll EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP 811 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP IF11 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP Nll EMERGENCY CONDENSER DRAIN ISO RBVLV f112
EC/LOOP Nll EMERGENCY CONDENSER DRAIN ISO RBVLV 8112
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP dl2 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
281
281
281
281
IV ROOM
IV ROON
IV ROON
IV ROON
281 IV ROON
281
281
281
281
281
298
IV ROOM
IV ROOM
IV ROON
IV ROOM
IV ROON
IV ROON
298 IV ROON
298 IV ROOM
298 IV ROOM
298 IV ROON
298 IV ROON
298 IV ROOM
298 IV ROON
298 IV ROON
298 IV ROON
298 IV ROON
298 IV ROON
298 IV ROOM
298 IV ROON
Report Date/Time: 12-22-95 / 13:30;56
1 J
Nine Mlle Point Unit 1SAFE SHUTDOMN E(UIPMENT LIST (SSEL)
Seismic Review Items
Page No. 11
LINENO.
raaaaaa(1)
CLASS MARK NO.aaaaaaa aaaaaaaaaaaaaaaaaaaa
(2) (3)
SYSTEM/EQUIPMENTDESCRIPTION
aaaaaaaaaaaaaaaaaaaasaaaaaaaaaaaaaaaaaaaaa(4)
BUILDING EL EV ROOMaaaaaaasaasa aaaaaaaa aaasaaaasa
(5) (6) (7)
4217 088 39-13D
6136 08B 39-13D
4214 07 39-13R
6134 07 39-13R
4219 OS 8 39-14C
6138 OSB 39-14C
4220 088 39-14D
6139 08B 39-14D
4218 07 39-14R
137 07 39-14R
6186 21 60-09
6185 21 60-10
4124 OSA 40-01
4123 OSA 40-09
4121 OSA 40-10
4122 08A 40-11
2007 07 44.2-15
2008 07 44.2-16
2009 07 44.2-17
2010 07 44.2-18
6189 07 60-03
6190 08B 60-03C*
6187 07 60-04
6188 088 60-04C*
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISOVLV PILOT
RB
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV f121
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV 8121
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP N12 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP N12 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP N12 EMERGENCY CONDENSER DRAIN ISO RBVLV PILOT
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV 8122
EC/LOOP 812 EMERGENCY CONDENSER DRAIN ISO RBVLV N122
CRS/CORE SPRAY INL'ET INNER ISO VLV
CRS/CORE SPRAY INLET INNER ISO VLV
CRS/CORE SPRAY INLET INNER ISO VLV
CRS/CORE SPRAY INLET INNER ISO VLV
CRD/SCRAM DISCHARGE VOL HOLDING TANK VENTISO VLV
DM
DM
RB
CRD/SCRAM DISCHARGE HEADER DRAIN ISO VLV
CRD/SCRAM DISCHARGE HEADER DRAIN ISO VLV
ECMU/EMER COND NKEUP TANK 12 SUPPLY ISOVLV
ECMU/EMER COND NKEUP TANK 12 SUPPLY ISOVLV PILOT
ECMU/EMER COND NKEUP TANK ll SUPPLY ISOVLV
ECMU/EMER COND MAKEUP TANK ll SUPPLY ISOVLV PILOT
ECMU/EMER COND NKEUP MATER TANK 812
ECMU/EMER COND MAKEUP MATER TANK Ill
RB
RB
TB
TB
TB
TB
TB
TB
CRD/SCRAM DISCHARGE VOL HOLDING TANK VENT RBISO VLV
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
298 IV ROOM
261 AZ90
261 AZ90
261 AZ260
261 AZ225
237 N4
237 N4
237 N5
237 NS
369 HS
369 H8
369 H4
369 H4
369 HS
369 H4
Report Date/Time: 12-22-95 / 13:30;56
0I
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page Ho. 12
LINENO. CLASS MARK NO ~
6182 OSB 60-18E
6182A 20 60-18F
6171 18 60-22
6169 20 60-22A
6170 20 60-22B
6172 20 60-22C
6168 18 60-23
6176 20 60-23A
6180 20 60-23B
6178 20 60-23C
6165 18 60-28
6166 20 60-28A
6167
6177
18 60-29
20 60-29A
4204 21 60-42
6117 21 60-42
21 60-44
aaasaaa aaaaaaa aaaaaaaaaaaaaaaasaas'(I) (2) (3)
6160 07 60-17
6163 20 60-17A
6164 20 60-17B
6161 08B 60-17D
6162 OSB 60-17E
6162A 20 60-17F
6174 07 60-18
6175 20 60-18A
6179 20 60-18B
6181 OSB 60-18D
SYSTEM/EQUIPMENTDESCRIPTION
aasasssssassssassssssssasaaaaaaaasaaaaaaaa(4)
BUILDING EL EV ROOMssasasaassaa aaaasaaa aaasasssas
(7)(5) (6)
ECMU/EMER COND Nlll)112 LEVEL CONTROL VLV
ECMU/EMER COND Sill,112 LEVEL E/PCONVERTER
RB
RB
340
340
Q-P 7-9
Q-P) 7-9
ECMU/EMER COND /till,112 LEVEL CONTROLLER
ECMU/EMER COND 8111,112 LEVEL CONTROL VLVPILOT
TB
RB
ECMU/EMER COND 8111,112 LEVEL CONTROLSWITCH
ECMU/EMER COND N121,122 LEVEL CONTROL VLV
ECMU/EMER COND N121,122 LEVEL E/PCONVERTER
ECMU/EMER COND N121,122 LEVEL CONTROLLER
ECMU/EMER COND N121,122 LEVEL CONTROL VLVPILOT
TB
RB
RB
TB
RB
ECMU/EMER COND 81211122 LEVEL CONTROL VLV RBPILOT
ECMU/EMER COHO 8121)122 LEVEL CONTROLSWITCH
ECMU/EMER COND till)112 LEVEL TRANSMITTER
ECMU/EMER COND fill)112 LEVEL E/PCONVERTER
ECMU/EMER COND dill,112 LEVEL CONTROLLER
ECMU/EMER COND Nlll,112 LEVEL INDICATOR
ECMU/EMER COND 8121,122 LEVEL TRANSMITTER
ECMU/EMER COND f121,122 E/P CONVERTER
ECMU/EMER COND 8121,122 LEVEL CONTROLLER
ECMU/EMER COND 8121)122 LEVEL INDICATOR
ECMU/EMER COND till,112 LEVEL TRANSMITTER
ECMU/BIER COND Nlll)112 LEVEL INDICATOR
ECMU/EMER COND 8121,122 LEVEL TRANSMITTER
ECMU/EMER COND N121,122 LEVEL INDICATOR
EC/EMERGENCY CONDENSER 8122
EC/EMERGENCY CONDENSER iI122
EC/EMERGENCY CONDENSER 8121
TB
RB
RB
TB
TB
RB
RB
TB
TB
RB
TB
RB
TB
RB
RB
RB
277 CR PNL K
340 Q-P, 7-9
340 Q-P, 7-9
250 RSP 11
340 Q-P) 7-9
340 Q-P) 7-9
277 CR PNL K
340 Q-P) 7-9
340 Q-P) 7-9
277 RSP 12
318 P6
340 Q-P) 7-9
250 RSP 11
250 RSP 11
318 Pll
340 Q-P) 7-9
277 RSP 12
277 RSP 12
318 P6
277 CR PNL K
318 Pll
277 CR PNL K
340 P9
340 P9
340 P8
ECMU/EMER COND 8111,112 LEVEL CONTROL VLV RBPILOT
Report Date/Time: 12-22-95 / 13:30:56
, Il 4l'
Nine Nile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 13
LINENO.
sasssas"(1)
CLASS
(2)
MARK NO.
(3)
SYSTEM/EQUIPMENTDESCRIPTION
~ saasssasaaaaasaaaaassaaasssasasassssaaass(4) (5) (6)
BUILDING ELEV
(7)
6116 21
4198 21
6115 21
4197 21
6114 21
7401 05
60-44
60-45
60-45
60-46
60-46
70-01
EC/EMERGENCY CONDENSER f121
EC/EMERGENCY CONDENSER 8112
EC/EMERGENCY CONDENSER 8112
EC/EMERGENCY CONDENSER fillEC/EMERGENCY CONDENSER Sill
RB
RB
RB
RB
RB
RBCLC/REACTOR BUILDING COOLING WATER PUMP RBNll
340
340
340
340
340
298
P8
P7
P7
P6
P6
5L
7402 05 70-02
7403 05 70-03
7412 088 70-118
7424 08B 70-120
7422 08B 70-122
7420 OBB 70-124
7414
08B 70-126
OBB 70-128
7332A
7410
18 70-333
07 70-53
7404 07 70-137
7407 21 70-13R
7408 21 70-14R
7409 21 70-15R
7406 18 70-238
7505 18 70-23B
7405 18 70-23F
7504 18 70-23F
7329 07 70-25
7330 08B 70-25A
7335 07 70-26
7336 08B 70-26A
7405A 18 70-284
7337A 18 70-332
RBCLC/DRYWELL AIR COOLER 812 ISOL VALVE
RBCLC/DRYWELL AIR COOLER 813 ISOL VALVE
RBCLC/DRYWELL AIR COOLER II14 ISOL VALVE
RBCLC/DRY'WELL AIR COOLER 815 ISOL VALVE
RBCLC/DRYWELL AIR COOLER 816 ISOL VALVE
RBCLC/RBCLC TEMPERATURE CONTROL VALVE
RBCLC/RBCLC HX N11
RBCLC/RBCLC HX 8I12
RBCLC/RBCLC HX 813
RBCLC/TEMPERATURE'CONTROLLER
RBCLC/TEMPERATURE CONTROLLER
RBCLC/ELECTRO PNEUMATIC CONVERTER
RBCLC/ELECTRO PNEUMATIC CONVERTER
CRAG/CHILLER 811 CONTROL VALVE
CRAG/CHILLER Nil CONTROL VALVE PILOT
CRAC/CHILLER N12 CONTROL VALVE
CRAG/CHILLER 812 CONTROL VALVE PILOT
RBCLC/TEMP. ELEMENT
CRAC/LO FLOW CHILLER TRIP
CRAG/LO FLOW CHILLER TRIP
RBCLC/SHUTDOWN COOLING HX ISOL VALVE
DW
DW
DW
DW
DW
RB
RB
RB
RB
TB
TB
RB
RB
TB
TB
TB
TB
RB
TB
TB
RB
RBCLC/REACTOR BUILDING COOLING WATER PUMP RB812
RBCLC/REACTOR BUILDING COOLING WATER PUMP RB813
RBCLC/DRYWELL AIR COOLER 811 ISOL VALVE DW
298
298
29&
277
277
L4
LS
L7
CR PNL H
CR PNL H
298 M6
298 M6
300
300
300
300
291
300
300
281
A16
A16
A16
A16
M6
A16
A17
6L
298 SL
298 6L
225 AZ345
225 AZ60
225 AZ100
225 AZ170
225 AZ225
225 AZ280
298
Report Date/Time: 12-22-95 / 13;30:56
',h
N ~
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 14
LINENO. CLASS
(1) (2)
MARK NO.aaaaaaaeaaaaaaaeaaea
(3)
SYSTEM/EQUIPMENTDESCRIPTION
eaaeeeeeaeeeeeeeaaaeeeeeaeaeeaeeeeaeaeeaee(4)
BUILDINGeaaaeeaeeeae
(5) (7)(6)
ELEV ROOMaaaaaaaa aaaaaaaaaa
7411 OBB 70-53C+ RBCLC/SHUTDOWN COOLING HX ISOL VALVE PILOT RB 281 6L
7502 06
7501 06
7503 07
7137 06
7138 06
5186 06
5187 06
72-03
72-04
72-146
79-53
79-54
80-03
80-04
5211 OBA 80-118
SW/EMER SERVICE WATER PUMP ¹12
SW/EMER SERVICE 'HATER PUMP ¹llSW/SERVICE WATER TEMP CONTROL VALVE
DGCW/DG COOLING WATER PUMP ¹102
DGCW/DG COOLING WATER PUMP ¹103
CS/CONT SPRAY PUMP ¹121
CS/CONT SPRAY PUMP ¹lllCS/CONT SPRAY HEADER ISOL VLV
SH
SH
RB
SH
SH
RB
RB
RB
256
256
281
261
261
S15
S15
Pll
T17
T17
NW CORNER198
298 P7
198 NW CORNER
5184 21
7208 21
5181 21
7205 21
5188 06
06
5182 21
7206 21
5183 21
7207 21
5197 07
5193 07
80-13
80-13
80-14
80-14
80-23
80-24
80-33
80-33
80-34
80-34
80-41
80-44
CS/CONT SPRAY HEAT EXCHANGER ¹122
CS/CONT SPRAY HEAT EXCHANGER ¹122
CS/CONT SPRAY HEAT EXCHANGER ¹112
CS/CONT SPRAY HEAT EXCHANGER ¹112
CS/CONT SPRAY PUMP ¹122
CS/CONT SPRAY PUMP ¹112
CS/CONT SPRAY HEAT EXCHANGER ¹121
CS/CONT SPRAY HEAT EXCHANGER ¹121
CS/CONT SPRAY HEAT EXCHANGER ¹lllCS/CONT SPRAY HEAT EXCHANGER ¹lllCS/CONT SPRAY TEST LINE ISO VLV
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
CS/CONT SPRAY LOOP ¹112 BYPASS ISO VLV TO RBTORUS
318
318
318
318
198
PB
PB
PB
PB
NW CORNER
318
318
318
318
298
PB
PB
PB
PB
P7
298 N7
198 NE CORNER
4154 06 81-03
4151 06 81-04
4182 07 81-11
4145 06 81-23
4148 06 81-24
4181 07 81-31
4133 05 81-49
4129 05 81-50
4141 05 81-51
137 05 81-52
CRS/CORE
CRS/CORE
CRS/PUMP
CRS/CORE
CRS/CORE
SPRAY PUMP ¹121
SPRAY PUMP ¹122
RB
RB
RECIRC ¹12 PRESSURE SAFETY VLV RB
SPRAY PUMP ¹lllSPRAY PUMP ¹112
RB
RB
CRS/CORE
CRS/CORE
CRS/CORE
CRS/CORE
SPRAY TOPPING PUMP ¹112
SPRAY TOPPING PUMP ¹111
SPRAY TOPPING PUMP ¹121
SPRAY TOPPING PUMP ¹122
RB
RB
RB
RB
CRS/PUMP RECIRC ¹ll PRESSURE SAFETY VLV RB
198
198
237
198
198
237
237
237
237
237
SE CORNER
SE CORNER
SE CORNER
SW CORNER
SW CORNER
SW CORNER
SW CORNER
SW CORNER
SE CORNER
SE CORNER
Report Date/Time: 12-22-95 / 13:30;56
I
v ~
LINENO. CLASS MARK NO,
Nine Nile Point Unit 1SAFE SHUTDOWN E(UIPMENT LIST (SSEL)
Seismic Review Items
SYSTEM/Eg UIPMENTDESCRIPTION BUILDING ELEV
Page No. 15
4146
aaaaaaa(2) (3)
07 81-53
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa(4)
CRS/MOTOR 8111 SEAL COOLING PRESS.REGULATOR
RB
(5) (6)
198
(7)
SW CORNER
4149 07 81-54
4155 07 81-55
4152 07 81-56
4134 07 81-57
4130 07 81-58
4142 07 81-59
4138 07 81-60
4147 07 81-73
4150 07 81-74
4156 07 81-75
4153 07 81-76
7129 21 96-08
07 96-15
4135 07 81-77
4131 07 81-78
4143 07 81-79
4139 07 81-80
7140 21 82-43
7139 21 82-44
7201 06 93-01
7203 06 93-02
7204 06 93-03
7202 06 93-04
7113 21 96-04
7117 21 96-05
7121 21 96-06
7125 21 96-07
CRS/MOTOR 8112 SEAL COOLING PRESS.REGULATOR
CRS/MOTOR 8121 SEAL COOLING PRESS.REGULATOR
CRS/MOTOR 8122 SEAL COOLING PRESS.REGULATOR
CRS/SEAL COOLING PRESS. REGULATOR
CRS/SEAL COOLING PRESS. REGULATOR
CRS/SEAL COOLING PRESS, REGULATOR
CRS/SEAL COOLING PRESS, REGULATOR
RB
RB
RB
RB
RB
RB
RB
CRS/SEAL COOLING PRESS ~ RELIEF VLV
CRS/SEAL COOLING PRESS. RELIEF VLV
CRS/SEAL COOLING PRESS ~ RELIEF VLV
CRS/SEAL COOLING PRESS. RELIEF VLV
FOHS/DG FUEL OIL STORAGE TANK 0103
FOHS/OG FUEL OIL STORAGE TANK 8102
CSRW/CONT SPRAY RAW WATER PUMP 8112
CSRW/CONT SPRAY RAW WATER PUMP 8111
CSRW/CONT SPRAY RAW WATER PUMP 8122
CSRW/CONT SPRAY RAW WATER PUMP 8121
DSA/OG 8102 START AIR TANK N1
OSA/OG 0102 START AIR TANK N2
OSA/OG 8102 START AIR TANK 83
DSA/DG 8102 START AIR TANK II4
DSA/DG 8102 START AIR TANK II5
RB
RB
RB
RB
OUTSIDE
OUTSIDE
SH
SH
SH
SH
TB
TB
TB
TB
TB
DSA/OG N102 START AIR TANK N1 RELIEF VLV TB
CRS/MOTOR !F111 SEAL COOLING PRESS. RELIEF RBVLV
CRS/MOTOR 8112 SEAL COOLING PRESS. RELIEF RBVLV
CRS/MOTOR 8121 SEAL COOLING PRESS. RELIEF RBVLV
CRS/MOTOR 8122 SEAL COOLING PRESS. RELIEF RBVLV
237
237
237
237
261
261
SW CORNER
SW CORNER
SE CORNER
SE CORNER
BC20
BC20
256 T14A
256
256
256
261
261
261
261
261
261
T14A
T14A
T13A
DG 102 RM
DG 102 RM
DG 102 RM
DG 102 RM
DG 102 RM
DG 102 RM
198 SW CORNER
198 SE CORNER
198 SE CORNER
237 SW CORNER
237 SW CORNER
237 SE CORNER
237 SE CORNER
198 SW CORNER
198 SW CORNER
198 SE CORNER
198 SE CORNER
Report Date/Time: 12-22-95 / 13;30;56
0
h 4 'I
Nine Mile Point Unit 1
SAFE SHUTDOWN EQUIPMENT LIST (SSEL)Seismic Review Items
Page No. 16
LINENO.
'(1)
CLASS
(2)
MARK NO,
(3)
SYSTEM/EQUIPMENTDESCRIPTION
ssssassaasaaasassassssssassssassssssssssas(4) (5) (6)
BUILDING ELEV
(7)
7118 07
7122 07
7126 07
7130 07
7134 07
7133 07
96-16
96-17
96-18
96-19
96-20
96-28
DSA/OG 8102 AIR INLET RELIEF VLV TB
DSA/OG 8102 AIR INLET PRESSURE REGULATING TBVLV
DSA/DG 8102 START AIR TANK N2 RELIEF VLV TB
DSA/OG N102 START AIR TANK II3 RELIEF VLV TB
DSA/OG 8102 START AIR TANK II4 RELIEF VLV TB
DSA/OG 8102 START AIR TANK NS RELIEF VLV TB
261
261
261
261
261
OG 102 RM
DG 102 RM
OG 102 RM
DG 102 RM
DG 102 RM
261 DG 102 RM
7115 21 96-31
7119 21 96-32
7123 21 96-33
7127 21 96-34
7131 21 96-35
7116 07 96-44
7120 07 96-45
7128
07 96-46
07 96-47
8150 15 BATT 121*
15 BATT 122*
7132 07 96-48
7136 07 96-49
7135 07 96-52
8134G 20 A
710 9A 20 ATSA
7109B 20 ATSB
7109 C 20 ATSC
71090 20 ATSD
8131 15 BATT 11*
8148 15 BATT ill*8149 15 BATT 112*
8132 15 BATT 12*
DSA/OG N103 START AIR TANK Nl
DSA/OG 8103 START AIR TANK N2
DSA/OG 8103 START AIR TANK N3
DSA/OG 8103 START AIR TANK N4
DSA/OG 8103 START AIR TANK N5
DSA/OG 8103 START AIR TANK tI1 RELIEF VLV
TB
TB
TB
TB
TB
TB
OSA/OG 8103 START AIR TANK tI2 RELIEF VLV TB
OSA/OG 8103 START AIR TANK tI3 RELIEF VLV
OSA/OG 8103 START AIR TANK 84 RELIEF VLV
OSA/OG 8103 START, AIR TANK 85 RELIEF VLV
DSA/OG 8103 AIR INLET RELIEF VLV
DSA/DG 8103 AIR INLET PRESSURE REGULATINGVLV
CTRL/CONTROL BOARD PANEL A
RPS/ CHANNEL A/ANALOG TRIP SYSTEM CABINETA
TB
TB
TB
TB
TB
TB
RB
AP/2320 AMP-HR, 125 V BATTERY IllAP/ 24/48 V DC BATTERY SillAP/ 24/48 V DC BATTERY 8112
AP/2320 AMP-HR, 125 V. BATTERY 812
AP/ 24/48 V DC BATTERY 8121
AP/ 24/48 V DC BATTERY 8122
TB
TB
TB
TB
TB
TB
RPS/ CHANNEL B/ANALOG TRIP SYSTEM CABINET RBB
RPS/ CHANNEL C/ANALOG TRIP SYSTEM CABINET RBC
RPS/ CHANNEL 0/ANALOG TRIP SYSTEM CABINET RBD
261 DG 103 RM
261 DG 103 RM
261 DG 103 RM
261 DG 103 RM
261 DG 103 RM
261 DG 103 RM
261 DG 103 RM
261 OG 103 RM
261 DG 103 RM
261 OG 103 RM
261 DG 103 RM
261 DG 103 RM
277 CR
281 N5
281 N5
281 Kl1
281 Kl1
277 BAT RM ll277 BAT RM ll277 BAT RM 11
277 BAT RM 12
277 BAT RM 12
277 BAT RM 12
Report Date/Time: 12-22-95 / 13:30:56
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 17
LINENO.
4444444(1)
CLASS
(2)
MARK NO.
(3)
SYSTEM/EQUIPMENTDESCRIPTION
444444444444444&SS&44444444444&44444444444(4) (5) (6)
BUILDING ELEV ROOM
(7)
8133 14
8134 14
8144 16
8145 16
8146 16
8147 16
817.0 20
BB11
BB12
BClll*
BC112*
BC121*
BC122*
CBllB*
AP/125 V DC BATTERY BOARD Nll
AP/125 V DC BATTERY BOARD 812
AP/24 V DC BATTERY CHARGER fillAP/24 V DC BATTERY CHARGER 8112
AP/24 V DC BATTERY CHARGER '8121
AP/24 V DC BATTERY CHARGER 8122
CTRL/125 V DC CONTROL AND RELAY BOARDCONTROL BUS 11B
TB
TB
TB
TB
TB
TB
TB
261
261
277
277
277
277
261
A9) 10
A10, llA8) 9
AS) 9
Alo
Alo
A9
7154
Il)30 D-034
D-035
3109 20 D-372
8203
8204
14 DC-CON-ll*
14 DC-CON-12*
7141 20 DC102
7145 20 DC103
7142 03 DG102
7144 14 DG102 IB
7146 03
7148 14
DG103
DG103 IB
8171A 20 E
6266 18 ECVVRA
8101 17 ED G102
8102 17 E0G103
3140
8187
18 EIRR*
20 F
8171 20 CB12B*
8134I 20 CP161A-B
8136 20 CP 167
8134K 20 CP171A-B
CTRL/125 V DC CONTROL AND RELAY BOARDCONTROL BUS 12B
AP/BATTERY CHARGER 161A CONTROL CABINET
AP/COMPUTER POWER SUPPLY MG SET 8167CONTROL PNL
TB
TB
TB
EDG 103 ROLL-UP DOOR
EDG 102 ROLL-UP DOOR
RCS/RCS PRESSURE RECORDER
AP/CR DC EMER LIGHT CONTACTOR
AP/CR DC EMER LIGHT CONTACTOR
AP/EDG 102 CONTROL CABINET
AP/EDG 103 CONTROL CABINET
AP/DG 102 NEUTRAL BREAKER CUBICLE
TB
TB
TB
TB
TB
TB
TB
TB
AP/DG 102 EMERGENCY DC ISOLATION BREAKER TBCABINET
AP/DG 103 NEUTRAL BREAKER CUBICLE TB
AP/DG 103 EMERGENCY DC ISOLATION BREAKER TBCABINET
CTRL/CONSOLE E CONTL RM ELECT CONTROL TBCONSOLE
EC/EMERGENCY CONDENSER VENT VALVE RACK RB
AP/EMERGENCY DIESEL GENERATOR 8102
AP/EMERGENCY DIESEL GENERATOR 8103
RCS/EAST INSTR. ROOM RACK
CTRL/CONTROL BOARD .PNL F
TB
TB
RB
TB
AP/BATTERY CHARGER 171A.CONTROL CABINET TB
261 All
261 AB
277 AA9
261 A12
261 EDG ROOM
103
261 EDG ROOM
102
277 CR CON E
277 CR
277 CR
261 DG 102 RM
261 DG 103 RM
261 DG 102 RM
261 DG 102 RM
261 DG 103 RM
261 DG 103 RM
277 CR
340 P8
261 BG, BE18
261 8C18
284 E INST RM
277 CR
Report Date/Time: 12-22-95 / 13;30:56
'it
i
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 18
LINENO.
(1)
CLASS
(2)
MARK NO.
(3)
SYSTEM/EQUIPMENTDESCRIPTIONrrrrrrrrrrrrrrrrrr eraser rr rrrrrrrrrrr
(4) (6) (7)(5)
BUILDING ELEV ROONrrrrrrrrrr r erases r rrrsrrrrrr
8191 20 G
8192 20 H
8158 14 IG12
8159 14
8160 14
8161 14
IG13
IG22
IG23
8188 20 K
8186 20
7338 10
8205 14
LACC+
LP-llE*
8189 20 N
8129A 18 NSIVIR"
8190 20 N
8152 20 NIB11
20
8120 20
8134M 20
NI812
PNL 167A
PRC162
8169
f11920 SSC2
04 TRANS 167A
8137 20 PRC167
8134N 20 PRC172
7143 17 RC102
7147 17 RC103
8166 20 RSP11
8167 20 RSP12
8128B 16 S6C161A
8128C 16 SBC161B
8128D 16 SBC171A
8128E 16'BC171B8168 20 SSC1
CTRL/CONTROL BOARD PNL G
CTRL/CONTROL BOARD PNL H
AP/24 V DC DISTRIBUTION PNL
AP/24 V DC DISTRIBUTION PNL
AP/24 V DC DISTRIBUTION PNL
AP/24 V DC DISTRIBUTION PNL
CTRL/CONTROL BOARD PNL K
CTRL/CONTROL BOARD PNL L
CRAG/LAB AIR COOLING COIL
AP/LIGHTING PANEL ¹11E
CTRL/CONTROL BOARD PNL M
AP/MAIN STEAN ISO VLV INSTRUMENT RACK
CTRL/CONTROL BOARD PNL N
AP/NUCLEAR INST BUS ¹11
AP/NUCLEAR INST BUS ¹12
AP/DIST PNL 167A BUS
AP/UPS 162A AND 1628 PROTECTIVE RELAYCABINET
AP/COMPUTER POWER SUPPLY NG SET ¹167PROTECT RELAY
AP/UPS 172A AND 1728 PROTECTIVE RELAYCABINET
AP/DG 102 RELAY RESISTOR (NEUTRAL GROUND)
AP/DG 103 RELAY RESISTOR (NEUTRAL GROUND)
CTRL/REMOTE SHUTDOWN PNL ¹11
CTRL/RENOTE SHUTDOWN PNL ¹12
AP/STATIC BATTERY CHARGER 161A
AP/STATIC BATTERY CHARGER 161B
AP/STATIC BATTERY CHARGER 171A
AP/STATIC BATTERY CHARGER 171B
CTRL/SHUTDOWN SUPV CONTROL CABINET 1
CTRL/SHUTDOWN SUPV CONTROL CABINET 2
AP/600 TO 120/208 V TRANSFORMER
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
RB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
RB
RB
RB
277 CR
277
277
277
277
277
277
277
300
277
277
261
277
277
277
281
277
CR
CR PNL G
CR PNL G
CR PNL G
CR PNL G
CR
CR
B17
CR
CR
NSIV RN
CR
CR PNL G
CR PNL G
A8
261
261
281
281
281
A12
A12
K5
Kll
Q79 8
277 AA9, AB9
277 A12
261 DG 102 RN
261 DG 103 RN
250 A14
277 C16
261 AA8
261 AA8
Report Date/Time: 12-22-95 / 13:30:56
Nine Mile Point Unit 1SAFE SHUTDOWN EQUIPMENT LIST (SSEL)
Seismic Review Items
Page No. 19
LINENO.
saasasa(1)
CLASS
(2)
MARK NO.SYSTEM/EQUIPMENT
DESCRIPTION BUILDING ELEV
(6)sasaassrsrsa r a sassssassssssasssssysssssssssasssaasa arras assassaassss
(3) (4) (5) (7)
8107 04
8107A 04
8108 04
8108A 04
TRANS 16A~
TRANS 16B*
TRANS 17A*
TRANS 17B*
8128F 16 UP S162A
AP/4160 TO 600 V TRANSFORMER
AP/4160 TO 600 V TRANSFORMER
AP/4160 TO 600 V TRANSFORMER
AP/4160 TO 600 V TRANSFORMER
AP/UNINTERRUPTABLE. POWER SUPPLY 162A
RB
RB
RB
RB
TB
281
281
281
281
277
L, M4
L, M4
Q10, 11
Q10, 11
A6
8128G 16
8128H 16
8128I 16
UPS1628
UPS172A
UPS1728
8164 20 VB11
8165 20 VB12
AP/UNINTERRUPTABLE POWER SUPPLY 1628
AP/UNINTERRUPTABLE POWER SUPPLY 172A,
AP/UNINTERRUPTABLE POWER SUPPLY 1728
CTRL/125 V DC VLV BOARD 811
CTRL/125 V DC VLV BOARD N12
TB
TB
TB
TB
TB
277
277
277
A6
A12
A12
291 J5
261 All
3141 18 WIRR* RCS/WEST INSTR. ROOM RACK RB 284 W INST RM
Report Date/Time: 12-22-95 / 13:30:56
Appendix D
SCREENING VERIFICATIONDATASHEETS (SVDS)
Page No. 1Report Date/Tine: 12-22-95 / 14:01:Ol
NINE NILE POINT UHIT 1 Data Base File Nane/Date/Tine: HHP1 3.DBF / 12/22/95 / 13:45:22SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notes. 'AA')Progran File Hane 8 Version: SSEH 2.2
LIHEHO.
~ \ ~ ST \(I)
EQIIPCLASS HARK NO.
(2) (3)
SYST EH/EOUIPHENTDESCRIPT ION
$$$$$$$$$$$$$ ~ s ~ s ~ s ~ a ~ s ~ s ~ s ~ s ~ $ sees
(4)
Building~ $ $ ~ S ~ S ~ $ $
(5)
EQUIPHENT LOCATIOH —--->Fir. Elv. Rn. or Row/Col.
~ S ~ S ~ S ~ S ~ $ ~ S ~ S ~ $ $ ~ S ~ $ $ $ ~ S
(6) (7)
BaseElev. <40'7S ~ S ~ S $ $ ~ \ ~
(8) (9)
Capacity Deaand Cap. >Spectrun Spectrun Denand7~ S ~ S ~ S ~ S S ~ S ~ S ~ $ $ S ~ $ $ ~ @5
(10) (11) (12)
CaveatsOK7
S ~ S ~ S ~ S
(13)
Anchor Inter- EquipOKT act OK2 OKT Notes
$$$ ASS S ~ S ~ $ $ $ S ~ S ~ S ASS AS
(14) (15) (16) (17)
7149 09 209-03
7150 09 209-04
7151 09 209-05
7152 09 209-06
7301 07 210-40
7302 088 210-408
7304 07 210-41
7140 21 82-43
7139 21 82-44
8144 16 BC111*
8145 16 BC112»
8146 16 BC121*
8147 16 BC122*
7154 0 0-034
7153 0 D-035
EDG 102 ROOF EXHAUST FAH
EDG 102 ROOF EXHAUST FAH
EDG 103 ROOF EXHAUST FAH
EDG 103 ROOF EXHAUST FAH
TB
TB
TB
TB
299
299
299
299
CRAC/EHER VEHT FAH 411 ISOL VALVE TB
CRAC/EHER VENT FAH Sll ISOL VALVE TBPILOT
CRAC/EHER VENT FAH 412 ISOL VALVE TB
300
AP/24 V DC BATTERY CHARGER 4111 TB
AP/24 V DC BATTERY CHARGER 0112 TB
AP/24 V DC BATTERY CHARGER 4121 TB
AP/24 V DC BATTERY CHARGER 4122 TB
277
277
277
277
EDG 103 ROLL-UP DOOR
EDG 102 ROLL-UP DOOR
TB
TB
261
261
FONS/DG FUEL OIL STORAGE TANK 4103 OUTSIDE 261
FONS/DG FUEL OIL STORAGE TANK 4102 OUTSIDE 261
EDG ROOH 102 299 NO BS
EDG ROOH 102 299 HO BS
EDG 103 ROOH 299 HO BS
EDG ROOH 103 299 HO BS
A16 300 NO DOC
RRS YES YES YES YES YES AA
RRS YES YES YES YES YES AA
RRS YES YES YES YES YES AA
RRS YES YES YES YES YES AA
RRS YES YES YES YES YES AA
A16
A16
BC20
BC20
AS> 9
AB, 9
AIO
AIO
277 YES BS
277 YES BS
277 YES BS
277 YES BS
GRS YES YES TES YES TES AA
GRS YES YES YES YES YES AA
YES YES YES YES YES AA
YES YES YES YES YES AA
EDG ROOH 103 261 YES BS
EDG ROOH 102 261 YES BS
GRS YES YES YES YES YES AA
GRS YES YES YES YES YES AA
300 HO ABS RRS YES YES YES YES YES AA
300 HO DOC RRS YES YES YES YES YES AA
261 TES YES YES YES TES TES YES YES AA
261 YES YES YES YES TES YES YES TES AA
CERTIFICATION:
All the Infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SeisnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa should be a lice ed professionalengineer.)
CARHEH R. AGOSTA ~./. +-Print or Type Hane g e ate
HONORED F. ALVI 24 ~Print or Type Hane gnature ae
nt or ype ane gnature
g nature
CERTIFICATION:
The Infornation provided to the Seisaic CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS is, to the best of our knowledge andbel lef, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer lsrequired lf the Selsnic Capability Engineers decait necessary.)
nt or ype ane gnature ate nt or ype ane gnature
Page No. 1
Report Date/Tine: 12-22-95 / 13:43:20HIRE HILE POINT UNIT 1 Data Base File Nane/Date/Tine: NHP1 3.DBF / 12/22/95 /, 13:40:04
SCREENING VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID HunberFilter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AP')Progran File Mane 8 Version: SSEH 2.2
LIHEHO.
$ ~ $ $ ~ $
(I)
EQUIPCLASS HARK HO.$ ~ $ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $
(2) (3)
SYSTEH/EQUIPHEHTDESCRIPTION
$ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~
(4)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUIPHEHTFir. Elv.
~ $ ~ $ ~ $ ~ $ ~ $
(6) (7) (8) (9)
LOCATIOH --—-> BaseRn. or Row/Col. Elev. <40'7
Capacity Denand Cap. > Caveats Anchor Inter- EquipSpectrun Spectria Denand7 OK7 OK7 act OK7 OK7 Notes~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ $ ~ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ $ $ ~ $ ~ $ ~ $ $
(10) (11) (12) (13) (14) (15) (16) (17)
4185 OBA 01-01
4186 OBA 01-02
7413 10 201-01
7425 10 201-02
7423 10 201-03
7421 10 201-04
7417 10 201-05
7415 10 201-06
4212 OBA 33-04
7412 088 70-118
7424 088 70-120
7422 088 70-122
7420 088 70-124
7416 088 70-126
HS/HAIH STEAH INSIDE ISO VLV 41 DM
HS/HAIH STEAN INSIDE ISO VLV 42 DM
RBCLC/DRYMELL AIR COOLER 411
RBCLC/DRYMELL AIR COOLER 412
RBCLC/DRYMELL AIR COOLER 413
RBCLC/DRYMELL AIR COOLER 414
RBCLC/DRYMELL AIR COOLER 415
RBCLC/DRYMELL AIR COOLER 416
RCU/REACTOR CLEANUP OUTLET OUTER RBISO VLV
RBCLC/DRYMELL AIR CMLER 411 ISOL DM
VALVE
RBCLC/DRYMELL AIR COOLER 412 ISOL DM
VALVE
RBCLC/DRYMELL AIR COOLER 413 ISOL DM
VALVE
RBCLC/DRYMELL AIR COOLER 414 ISOL DM
VALVE
RBCLC/DRYMELL AIR COOLER 415 ISOL DM
VALVE
259
259
225
225
225
225
225
225
261
AZ210
AZO
AZ72
AZ110
225
225 AZ170
225 AZ225
225 AZ345
225 AZ60
259 YES BS
259 YES BS
225 YES BS
225 YES BS
225 YES BS
225 YES BS
225 YES BS
225 YES BS
261 YES BS
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES 'YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES HO YES YES HO AP
234 YES BS
234 YES BS
234 YES BS
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
GRS YES YES YES YES YES AP
234 YES BS GRS YES 'YES YES YES YES AP
234 YES BS GRS YES YES YES YES 'YES AP
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of on knowledge and be)lef, correct and accurate.'All lnfornatlon'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries ardconclusions. One slgnat should be a ll ensed professionalengineer.)
CARHEN R. AGOSTA Iz/BBIQPrint or Type Nane g nature
ABDBSSIITTAB B. PATIIA $I PPrint or Type Name
SKuJgnature
n or ype ane gnature ae
n or ype awe 9na Ure Date
nt or ype ane gnature ate
CERTIFICATION:
The lnforaatlon provided to the Sei saic CapabilityEngineers regarding systens ard operations of the equi pnentcontained on this SVDS Is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired If the Seisnic Capabl I lty Engineers decaIt necessary.)
Page No. 2Report Date/Tine: 12-22-95 / 13:43:20
NINE NILE POINT UNIT 1SCREEHIHG VERIFICATION DATA SHEET (SUDS)
Data Base File Nane/Date/Tine: NNPI 3.DBF / 12/22/95 / 13:40:04Sort Criteria: ID NunberFlite Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notes 'AP')Progran Flic Hane 8 Version: SSEH 2.2
LIHE EOUIPHO. CLASS HARK NO.
~ $$ ~ ST $ $ ~ $ $ S ~ S ~ $ $ $ ~ S ~ S ~ ES ~ $ $ ~
(1) (2) (3)
SYST EN/EOUIPHEHTDESCRIPT I OH
~ \ ~ S ~ ES ~ $$ ~ S ~ \ ~ $$$ ~ S ~ S ~ ES ~ $ $ $ ~ RES ~
(4)
<————- EOUIPHEHTBui ldlng Fir. Elv.
ST SEE ~ $$ ~ $ ERE ASPERSE
(5) (6)
LOCATION ---—> Base Capacity Denand Cap. > Caveats Anchor Inter- EquipRn. or Row/Col. Elev. <40'2 Spectrun Spectrun Denand7 OK7 OK7 act OK7 OKT Hotes~ $ $ $ $ ~ \ ~ $ $ $ ~ S ~ S ~ ERR ~ ~ S ~ $ $ ~ S ~ S ~ S ~ S SHERRIES \ BESSIE \~ S ~ S ~ S ~ RES AS ~ \ ~ S ~ $ $ ~ SEE ~ ~ S ~ S ~
(7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
7414 088 70-128 RBCLC/DRYHELL AIR COOLER 416 ISOL DNVALVE
225 234 YES BS GRS YES YES YES YES YES AP
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All lnfornation'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsnic Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator should be a licensed professionai-eng lneer.)
CERTIFICATION:
The Infornation provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SUDS is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired if the Seisnic Capability Engineers decait necessary.)
CARHEH R. AGOSTAPrint or Type Nane
ABDUSSATTAR H. PATNAPrint or Type Hane
nt or ype ane
gnature
gnature
ate
~NP siaEINR
nt or ype ane
nt or ype ane
nt or ype ane gnature
ate
ate
Page Ho. 1
Report Date/Tlae: 12-08-95 / 13:30:53HIHE HILE POINT UNIT ONE Data Base File Haae/Date/Tine: NNP1 3.DBF / 12/08/95 / 13:28:14
SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Crlterla: ID HuaberFilter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes. 'AS'Prograa File Naae 8 Version: SSEH 2.2
LIHE EQUIPHO. CLASS HARK NO.
~ $ ~ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ $ $ $ ~ $ ~ $ ~ \ ~ \ ~
(I) (2) (3)
SYSTEH/EQUI PHENTDESCRIPT ION
~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $
(4)
8ul ldlng~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUI PNEHTF lr.Elv.
~ $ ~ $ ~ $ ~ $ $ $
(6)
LOCATION ---->Ra. or Row/Col.~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(7)
BaseElev. <40'7
(8) (9)
CapacitySpectrua~ $ ~ $ ~ $ ~ $
(10)
DeaandSpectrua~ $ $ ~ $ ~ $ ~
Cap. > Caveats Anchor Inter- EquipDeaandl OK7 OK7 act OK7 OK7 Notes~ $ ~ $ ~ $ ~ ~ SOS ASS ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~
(12) (13) (14) (15) (16) (17)
8105 A 03 101/2A-1
81 06A 03 101/28-1
8116A 01 1671
8143E 20 1574
7616 09 202-53
7303 09 210-01
7306 09 210-02
7305 088 210-41B
7325 10 210-49
7322 10 210-50
7311 09 210-61
7314 18 210-67
7312 18 210-89
7313 18 210-90
AP/600 VOLT POMERBOARD 1671
CTRL/AUXILIARYCONTROL CABIHET1S74
RBAC/EHER EXHAUST FAN IllCRAC/ENER VEHT FAN Sll
CRAC/ENER VENT FAH t12
TB
TB
TB
TB
TB
CRAC/EHER VEHT FAN f12 ISOL VALVE TBPILOT
CRAC/COOLING COIL $ 12
CRAC/COOLING COIL S1 1
TB
TB
CRAC/CONTROL ROON HVAC CIRCULATION TBFAH
CRAC/INLET AIR TEHP TB
CRAC/CIRC FN OUTLET TEHP ELEHENT TB
CRAC/CIRC FN TEHP COHTROL TB
AP/4160 V PONERBOARD 4101 FEEDER TBTO POVERBOARD $ 102
AP/4160 V PONERBOARD 4101 FEEDER TBTO PONERBOARD f103
277 A7
277 A4
261
AB16
AIO
A10
A16
A16
A16
A16
289 N13
300 AIS
300 - A15
300 A16
277 YES ABS RRS YES NO HO YES HO AS
277 YES ABS RRS YES NO HO YES HO AS
300 HO ABS RRS YES HO HO NO HO AS
261 YES BS
302 HO ABS
YES HO HO YES HO AS
RRS YES YES YES YES YES AS
300 HO ABS RRS YES HO HO YES HO AS
300 HO ABS RRS YES HO HO YES HO AS
300 HO ABS RRS YES YES YES YES YES AS
300 NO ABS RRS YES HO HO YES HO AS
300 NO ABS RRS YES HO HO YES HO AS
300 HO ABS RRS UNK HO HO YES HO AS
307 NO ABS RRS YES YES TES YES YES AS
305 NO ABS RRS YES YES YES YES YES AS
304 NO ABS RRS YES YES YES YES YES AS
CERTIFICATION:
AII the lnforaatlon contained on this Screening Verlflcatlon Data Sheet(SVDS) ls, to the best of our kewledge and belief, correct and accurate.'All lnforaatlon'ncludes each entry and conclusion (whether verlfled to beselsalcally adequate or not).
Approved: (Signatures of all Selsalc Capablllty Engineers on the SelsalcRevleu Tean (SRl') are required; there should be at least two onthe SRT. All slgnatorles should agree with all of the entries andconclusions. One signatory should be a licensed professionalengineer. )
CERTIFICATION:
The lnforaatlon provided to the Selsalc Capabl I ltyEngineers regarding systeas and operations of the equlpaentcontained on this SVDS Is, to the best of our knouledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer lsrequired if the Selsaic Capablllty Engineers decalt necessary.)
CARHEN R. AGOSTAPrint or Type Haae
CAROLINE S. SCHLASEHAHPrint or Type Haae
9naue
gna ure
ate
ae
r n or ype aae
r nt or ype aae
gnature
gnature a
nt or ype aae gnature ate nt or ype aae
'
A
'I
Page No. 2Report Date/Tlaer 12-08-95 / 13r30r53
NIHE NILE POINT UHIT ONE Data Base Flic Nane/Date/Tiner NHP1 3.DBF / 12/08/95./ 13r28r 14SCREENIHG VERIFICATIOH DATA SHEET (SVDS) Sort Crlterlar ID Nunber
Filter Criterlar (Eval. Concern CONTAINS 'A') AND (SVDS Notes ~ 'AS'Progran File Nane 8 Verslonr SSEH 2.2
LINE EINIPHO. CLASS
~ \ ~ \ ~ \ ~ E ~ E ~
(I) (2)
HARK NO.SYSTEH/EQUIPHEHT
DESCRIPTION~ \ ~ EEEEE ~ \ ~ EEE ~ EE ~ ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E
(3) (4)
8ul ldlng~ E ~ E ~ E ~ E ~ E
(5)
EQUIPHENT LOCATION ----->Fir. Elv. Rn. or Row/Col.
~ \ ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~ E ~
(6) (7)
BaseElev. <40'7~ E ~ E ~ ~ ED ED
(8) (9)
CapacitySpectrun~ EEEE ~ EE
(10)
DenandSpectrun
Cap. > Caveats Anchor Inter- EquipDenand7 OK7 OK7 act OKT OKT NotesEXEGETE ~ EE ~ E ~ E ~ EE ~ E ~ E ~ EE ~ E ~ ~ ED ED ~ E ~ E ~
(12) (13) (14) (15) (16) (17)
7321 088 210.1-01A
7327 05 210.1-36
7333 05 210.1-37
7401 05 70-01
7402 05 70-02
7403 05 70-03
7405A 18 70-284
7337A 18 70-332
7332A 18 70-333
7502 06 72-03
7501 06 72-04
8134G 20 A
8203 14 DC-CON-11*
8204 14 DC-CON-12*
8205 14 Lp-11E*
CRAC/COOL COIL 411 CONTROL VALVE TBPILOT
CRAC/CHILL WATER CIRC PUHP 412 TB
CRAC/CHILL WATER CIRC PUHP 412 TB
RBCLC/REACTOR BUILDIHG COOLIHGWATER PUHP 411
RBCLC/REACTOR BUILDIHG COOLINGWATER PUMP 412
RBCLC/REACTOR BUILDIHG COOLIHGWATER PUHP 413
RBCLC/TEHP. ELEHEHT
CRAC/LO FLOW CHILLER TRIP
CRAC/LO FLOW CHILLER TRIP
RB
RB
RB
RB
TB
TB
SW/EHER SERVICE WATER PUHP 412 SH
SW/EHER SERVICE WATER PUHP $ 11 SH
CTRL/CONTROL BOARD PANEL A TB
AP/LIGHTIHG PANEL 411E TB
AP/CR DC EHER LIGHT CONTACTOR TB
AP/CR DC EHER LIGHT CONTACTOR TB
A15
300
300
298
817
817
SL
298 5L
291
300
256
256
277
277
277
277
H6
A16
A17
515
S15
298 6L
307 NO ABS RRS YES 'YES YES YES YES AS
300 NO ABS RRS YES HO NO YES HO AS
300 HO ABS RRS YES NO HO YES HO AS
298 HO ABS RRS YES YES YES 'YES YES AS
298 HO ABS
298 HO ABS
RRS YES YES YES YES YES AS
RRS YES YES YES YES YES AS
256 YES ABS RRS YES HO
256 YES ABS . RRS YES NO
YES YES NO AS
YES YES NO AS
277 YES ABS
281 YES BS
281 YES BS
281 YES BS
RRS YES YES YES HO NO AS
GRS YES YES YES YES YES AS
GRS YES YES YES YES YES AS
GRS YES YES 'YES YES YES AS
291 HO ABS RRS YES YES YES YES YES AS
300 HO ABS RRS YES YES YES YES 'YES AS
300 HO ABS RRS YES YES YES YES YES AS
CERTIFICATIOHr
All the infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All infornatlon'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsaic Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slg y shoul be a lice ed professionalengineer. )
CARHEH R. AGOSTA /2. e/6Print or Type Mane gna e ate
CAROLIHE S. SCHLASEHAN
/Zest'-Ps
Print or Type Nane gnature
nt or ype ane g nature
nt or ype ane gna e
CERT IFICATIONr
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systeas and operations of the equlpnentcontained on this SVDS is, to the best of our knowledge andbel lef, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired lf the Selsalc Capability Engineers deenit necessary.)
nt or ype ane gnature r nt or ype ane g nature
l
d
J
'
Page Ho. 3Report Date/Tine: 12-08-95 / 13:30:53
HIRE NILE POIHT UNIT ONE Data Base File Hane/Date/Tine: HHP1 3.DBF / 12/08/95-/ 13:28:14SCREEHIHG VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHO (SVDS Hotes 'AS'Progran File Nane 8 Version: SSEH 2.2
LINE EQUIPNO. CLASS HARK HO.
$ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ $ $ ~ $
(I) (2) (3)
SIST EH/EQUIPHENTDESCRIPTION
~ $ ~ S ~ $ ~ $$$ ~ $ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \~ $ ~ $ ~ $
(4)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUIPHEHTFir.Elv.
~ $ ~ $ ~ $ ~ $ ~ $
(6) (7) (8) (9)
LOCATIOH --—-> BaseRn. or Row/Col. Elev. <40'2
CapacitySpectrun$ $ ~ $ ~ $ $ ~
(10)
DenandSpectrun~ $ ~ $ $ $ $ ~
Cap. > Caveats Anchor Inter- EquipDenand2 OK2 OK2 act OK2 OK2 Hotes~ $ ~ $ ~ $ ~ $$ ~ $ ASS ~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ ~
(12) (13) (14) (15) (16) (17)
8137 20 PRC167
8128 F 16 UPS162A
8128G 16 UPS162B
8128H 16 UP S172A
81281 16 UPS1728
AP/COHPUTER POWER SUPPLY HG SET4I67 PROTECT RELAY
AP/UNIHTERRUPTABLE POWER SUPPLY162A
AP/UNIHTERRUPTABLE POWER SUPPLY1628
AP/UHIHTERRUPTABLE POWER SUPPLY172A
AP/UHINTERRUPTABLE POWER SUPPLY1728
TB
TB
TB
TB
TB
277
277
277
277
277
AA9, AB9
A6
A6
A12
A12
277 YES BS GRS YES HO HO YES HO AS
277 YES DOC RRS YES YES YES HO HO AS
277 YES DOC RRS 'YES YES YES HO HO AS
277 YES DOC GRS YES YES YES NO HO AS
277 YES DOC GRS YES YES YES NO HO AS
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) is, to the best of our knowledge and belief, correct and accurate.All infornatlon'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa hould b a licensed professionalengineer.)
CARHEH R. AGOSTA ri qj-Print or Type Hane gna re ate
CAROLINE S. SCHLASEHAH rzrwpsPrint or Type Nane gna re
nt or ype ane gnature llaae
n or ype ane gnature
CERTIFICATION:
The lnfornation provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equi pnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired If the Selsnic Capability Engineers deenlt necessary.)
nt or ype ane g nature ate nt or ype ane gnature
0
Page No. 1Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Rane/Date/Tine: NHP1 3.DBF / 11/26/95 / 14:11:28SCREENING VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SUDS Notes 'AD')Progran File Nane 8 Version: SSEH 2.2
LINENO.
$ ~ $ ~ $ ~
(1)
EQUIPCLASS HARK NO.~ $ $ ~ $ ~ $ ~ $ ~ SE ~ $ ~ $ $ ~ $ ~ $ $ ~
(2) (3)
SYSTEH/EQUIPHENTDESCRIPT I OH
~ S ~ $ ~ $ ~ $ ~ $ ~ $ ~ $$ ~ $$$ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(4)
Building~ S ~ S ~ $ ~ $ ~ E
(5)
EQUIPHEHTFir. Elv.
~ $ ~ $ ~ E ~ $ ~ $
(6) (8) (9)(7)
LOCATION --—-> BaseRn. or Row/Col. Elev. <40'7~ S ~ E ~ $ $ ~ E ~ $ ~ E ~ $ $ ~ $ ~ $ ~ $ ~ S ~
Capacity DeoandSpectrun Spectrun~ $ ~ $ ~ $ $ ~ $ ~ E ~ $ ~ E ~
(10) (11)
Cap. > Caveats AnchorDenand7 OK7 OK7~ E ~ E ~ $ ~ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ $
(12) (13) (14)
Inter-act OK7$ ~ $ $ $ $ ~
(15)
EquipOK7 Notes
~ ES ~ E ~ $ ~ $ ~
(16) (17)
4190 07 01-03
4191 088 01-03C
4192 088 01-030
419 2A 0&8 01-03E
4187 07 01-04
4188 0&B 01-04C
HS/HAIN STEAH OUTSIDE ISO VLV 43 TB
HS/HAIN STEAH OUTSIDE ISO VLV 43 TBPILOT
HS/HAIN STEAH OUTSIDE ISO VLV 03 TBPILOT
HS/HAIN STEAH OUTSIDE ISO VLV 43PILOT
TB
HS/HAIH STEAH OUTSIDE ISO VLV f4PILOT
TB
HS/HAIN STEAH OUI'SIDE ISO VLV f4 TB
261
261
HSIV RH
HSIV RH
261 HSI V RH
261
'SING.
RH
261 HSI V RH
261 HSI V RH
261 'YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
261 'YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
4189 088 01-04D
4189A 088 01-04E
3128 7 01-102A
3126 7 01-1028
3132 7 01-102C
3134 7 01-10 2D
HS/HAIH STEAH OUTSIDE ISO VLV f4 TBPILOT
HS/HAIH STEAH OUTSIDE ISO VLV f4 TBPILOT
HS/HAIN STEAH EHERGENCYELECTROHATIC RV 43
HS/HAIH STEAH EHERGENCYELECTROHATIC RV 41
HS/HAIN STEAH EHERGENCYELECTROHATIC RV 42
HS/HAIH STEAH EHERGENCYELECTROHATIC RV f4
261
261
259
259
259
259
HSIV RH
HSIV RH
NEST
NEST
261 YES BS GRS YES YES
261 YES BS GRS YES YES
,YES YES YES AD
YES YES 'YES AD
259 YES BS
259 YES BS
259 YES BS
GRS YES 'YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
259 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of en knowledge and belief, correct and accurate.'All Infornation'ncludes each entry and conclusion (whether verified to beseisnically adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsalcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signatory should be a licensed professionalengineer.)
CARHEN R. AGOSTAPrint or Type Nane gnat re ate
NALTER DJORDJEVICPrint or Type Naoe ategnat e
nt or ype aae gnature ate
r nt or ype ane gna re ate
CERTIFICATION:
The Infornatlon provided to the Selsnic Capabl I ltyEngineers regarding systeas and operations of the equlpnentcontained on thIs SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer isrequired lf the Seisnic Capability Engineers decait necessary.)
nt or ype ane gnature ate nt or ype ane g nature
I '
Page No. 2Report Date/The: 11-26-95 / 14:14:37
NIHE HILE POINT UNIT ONE Data Base File Nane/Date/Tine: NHPI 3.DBF / ll/26/95./ 14:11:28SCREENIHG VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern COHTAINS 'A') AND (SUDS Hotes 'AD')Progran File Hane 6 Version: SSEH 2.2
LINE EQUIPNO. CLASS
~ $ ~ $ ~ $ ~ $ ~ $ ~
(I) (2)
HARK NO.SYSTEH/EQUI PHEHT
DESCRIPT ION$ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $
(3) (4)
Building~ $ ~ $ $ $ $ $ ~ $
(5)
EQUI PHENTF lr.Elv.
~ $ ~ $ ~ $ ~ \ ~ $
(6) (7) (8) (9)
LOCATION —-—> BaseRn. or Row/Col. Elev. <40'7
CapacitySpectrm$ ~ $ ~ $ $ ~ $
(10)
Denand Cap. > CaveatsSpectrun Denand7 OK7~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(11) (12) (13)
Anchor Inter- EquipOK7 act OK7 OK7 Notes
$ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ $ ~ $ ~ $
(14) (15) (16) (17)
3130 7 01-102E
3136 7 01-102F
4192B 07 01-PVI*
4192C 07 01-PV2*
41898 07 01-PV3* HS/HAIN STEAH OUTSIDE ISO VLV 44PILOT
TB
HS/HAIN STEAH EHERGENCYELECTROHATIC RV 45
HS/HAIN STEAH EHERGENCYELECTROHATIC RV 46
HS/HAIN STEAN OUTSIDE ISO VLV 43 TBPILOT
HS/HAIN STEAN OUTSIDE ISO VLV 43 TBPILOT
259 NEST
261
261
261
HSIV RH
HSIV RH
HSIV RH
259 EAST
259 YES BS
259 YES BS
261 YES BS
261 YES BS
261 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES 'YES YES AD
GRS YES YES YES YES YES AD
GRS 'YES YES YES YES YES AD
GRS YES YES YES YES YES AD
4189C 07 01-PV4*
4222 088 05-OIC
6141 088 05-OIC
4223 08B 05-010
6142 088 05-DID
HS/HAIH STEAH OUTSIDE ISO VLV 44 TBPILOT
ECV/EC 11 LOOP VENT FIRST ISO VLV RBPILOT
ECV/EC ll LOOP VEHT FIRST ISO VLV RBPILOT
ECV/EC 11 LOOP VENT FIRST ISO VLV RBPILOT
ECV/EC 11 LOOP VENT FIRST ISO VLV RBPILOT
261 HSI V RH 261 YES BS GRS YES YES YES 'YES YES AD
PB) ECWR»
P8) ECWR»
340 HO GERS GRS
340 NO GERS GRS
YES YES YES YES YES AD
YES YES YES YES YES AD
340 PB, ECVVR» 340 HO GERS GRS YES YES YES YES YES AD
340 PB, ECWR* 340 NO GERS GRS YES YES YES 'YES YES AD
4221 07 05-OIR
6140 07 05-OIR
ECV/EC 11 LOOP VENT FIRST ISO VLV
ECV/EC 11 LOOP VEHT FIRST ISO VLV
RB
RB
PB, ECWR»
PB, ECWR» 340 NO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES YES YES YES AD
CERTIFICATION:
All the infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All infornatlon'ncludes each entry and conclusion (whether verified to be
selsaically adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator should be a licensed professionalengineer.)
CERTIFICATIOH:
The lnfornatlon provhded to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnlc Capability Engineers decalt necessary.)
CARHEH R. AGOSTAPrint or Type Hane
HALTER NORDJEVICPrint or Type Rane
9 turI
gnature
/Z CJate
I> ir 6a
nt or ype ane
n or ype ane
gnature
g nature
ate
ate
nt or ype ane g nature nt or ype ane gnature
d II
III
II 4.
I
Page No. 3Report Date/Tine: 11-26-95 / 14:14:37
HIRE NILE POINT UNIT ONE Data Base File Hane/Date/Tine: NNPI 3.DBF / 11/26/95./-14:11:28SCREENIHG VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: 10 Hunber
Filter Crlter la: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Rane 8 Version: SSEH 2.2
LIHE EQUIPHO. CLASS NARK NO.
Sassy a saaas s ~ sssssssa ~ $ $ $ $ ~ s ~
(I) (2) (3)
SYSTEH/EQUI PNENTDE SCRIPT ION
~ s ~ \ ~ \ ~ a ~ a ~ s ~ s ~ a ~ a ~ s ~ a ~ a ~ $ $ ~ a ~ s ~ a ~
(4)
Building~ $ $ $ ~ s ~ s ~ s
(5)
EQUI PHENTF lr.Elv.
~ S ~ S ~ S ~ S ~ S
(6) (7) (8) (g)
LOCATION -----> BaseRn. or Row/Col. Elev. <40'7
CapacitySpectrun~ S ~ S ~ S ~ S
(10)
DenandSpectrun~ S ~ $ $ ~ S ~
Cap. > Caveats Anchor Inter- EquipDenand7 OK7 OK7 act OK7 OK7 Notes~ s ~ s ~ a ~ s ~ a ~ a ~ a ~ a ~ a ~ s ~ s ~ s ~ a ~ a ~ a ~ a ~ $ $ $ $
(12) (13) (14) (15) (16) (17)
4228 088 05-04C
6147 088 05-04C
4229 088 05-04D
6148 088 05-04D
4227 07 05-04R
6146 07 05-04R
4224 07 05-11
6143 07 05-11
4225 088 05-11C
6144 088 05-IIC
4226 088 05-110
6145 088 05-110
4230 07 05-12
ECV/EC 12 LOOP VENT FIRST 150 VLV RBPILOT
ECV/EC 12 LOOP VENT FIRST ISO VLV RBPILOT
ECV/EC 12 LOOP VENT FIRST ISO VLV RBPILOT
ECV/EC 12 LOOP VENT FIRST ISO VLV RBPILOT
ECV/EC 12 LOOP VENT FIRST ISO VLV RB
ECV/EC 12 LOOP VENT FIRST ISO VLV RB
ECV/EC ll LOOP VENT SECOND ISO VLV RB
ECV/EC ll LOOP VENT SECOHD ISO VLV RB
ECV/EC ll LOOP VENT SECOHD ISO VLV RBPILOT
ECV/EC ll LOOP VENT SECOND ISO VLV RBPILOT
ECV/EC ll LOOP VENT SECOHD ISO VLV RBPILOT
ECV/EC ll LOOP VENT SECOHD ISO VLV RBPILOT
ECV/EC 12 LOOP VENT SECOHD ISO VLV RB
PB, ECWR»
P8$ ECWR»
PB, ECWR»
340 NO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES YES YES YES AD
340 NO GERS GRS YES YES YES YES YES AD
340 PB, ECWR» 340 HO GERS GRS YES YES YES YES YES AD
340
340
340
340
PB, ECWR»
PB, ECWR»
PB, ECWR»
PB, ECWR»
PB, ECWR»
PB> ECWR*
PB, ECWR»
340 NO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES YES YES YES AD
340 NO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS
340 HO GERS BS
340 HO GERS GRS
YES YES YES YES YES AD
YES 'YES YES YES YES AD
YES YES YES YES YES AD
340 P8, ECWR* 340 NO GERS GRS YES YES YES YES 'YES AD
340 P8, ECWR» 340 NO BS RRS YES YES YES YES YES AD
CERTIFICATIOH:
All the Infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All Infornation'ncludes each entry and conclusion (whether verified to beselsaicaIIy adequate or not).
Approved: (Signatures of all Selsnic Capability Engineers on the SeisnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signatory should be a I lcens professionalengineer.)
CARHEN R. AGOSTA ~/i l~Print or Type Rane ate
HALTER DJORDJEVIC rV/ /2 /Print or Type Nane ate
nt or ype ane gnature
nt or ype. ane g nature
CERTIFICATION:
The Infornatlon provided to the Selsaic CapabilityEngineers regarding systens and operations of the equipoentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer lsrequired If the Selsnic Capability Engineers decolt necessary.)
nt, or ype ane gnature ate nt or ype ane gnature ate
I
0
Ui
M
t 4
Page No. 4Report Date/Tine: 11-26-95 / 14:14:37
HINE HILE POINT UNIT OHE Data Base File Hane/Date/Tine: HHPI 3.DBF / 11/26/95./ 14:11:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Crlterla: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SUDS Notes 'AD')Progran File Rane 6 Version: SSEH 2.2
LINEHO.
$ ~ $ $ ~ $
(I)6149 07 05-12
4231 088 05-12C
6150 088 05-12C
4232 088 05-120
6151 088 05-12D
EOUIPCLASS HARK NO.~ $ ~ $ ~ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $
(2) (3)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
ECV/EC 12 LOOP VEHT SECOHD 150 VLV RB
ECV/EC 12 LOOP VEHT SECOND ISO VLV RBPILOT
ECV/EC 12 LOOP VEHT SECOND ISO VLV RBPILOT
ECV/EC 12 LOOP VENT SECOND ISO VLV RBPILOT
ECV/EC 12 LOOP VEHT SECOHD ISO VLV RBPILOT
SYSTEH/EOUIPHEHTDESCRIPTION
~ $ ~ $ ~ $$ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(4)
El)UIPHENTFir.Elv.
~ $ ~ \ ~ $ ~ $ ~ $
(6)
340
CaveatsOK7
~ $ ~ $ $ $ ~
Cap. >Oeoand7~ $ ~ $ ~ $ ~
(12)
LOCATION ---> Base Capacity DenandRn. or Row/Col. Elev. <40'2 Spectrun Spectrun
Anchor Inter- EquipOK7 act OK7 OK7 Hotes
~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ ~ $ ~ $ ~ ~ $ ~ $ ~
(14) (15) (16) (17)(8) (9) (10)
340 HO BS
(7) (13)
RRS YES YES YES YES YES AOPS, ECWR»
PS, ECWR»
PS> ECWR»
PB, ECWR» 340 HO GERS GRS YES YES YES YES YES AD
P8, ECVVR» 340 NO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES YES YES YES AD
340 HO GERS GRS YES YES 'YES YES YES AD
8105 03 102
8106 03 103
8193 03 11
2011 088 113-273
2012 088 113-274
2013 088 113-275
2014 088 113-276
2015 088 113-277
2004 088 117
AP/4160 V PONERBOARD 4102
AP/4160 V POVERBOARD 4103
AP/4160V PONERBOARD 11
TB
TB
TB
CRD/SCRAH DISCHARGE VOLUHE TESTVLV
RB
CRD/TRAIN ll SCRAH VLV PILOTS (129 RBTOTAL)
CRO/SCRAH TANK INLET ISO VLV PILOT RB
CRD/SCRAH TANK IHLET ISO VLV PILOT RB
CRD/SCRAH TANK IHLET ISO VLV PILOT RB
CRD/SCRAH TANK INLET ISO VLV PILOT RB
261
261
261
237
237
237
237
237
237
018
EIB
A4
HS
HS
HS
HS
HS
HS
261 YES BS RRS YES HO HO YES HO AD
261 YES BS RRS YES HO HO YES HO AD
261 YES BS RRS YES HO HO 'YES HO AO
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS
237 YES BS
GRS YES YES YES 'YES YES AD
GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge ard belief, correct and accurate.'All lnfornation'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries ardconclusions. One signator ld be a licensed professionalengineer.)
CARHEN R. AGOSTA rz//Print or Type Hase gnatur ate
HALTER DJORDJEVIC r /Print or Type Nane aegna
nt or ype ane gnature
nt, or ype aoe gnature
CERT I F ICATIOH:
The infornatlon provided to the Selsalc CapabilityEngineers regarding systens and operations of the equi pnentcontained on this SVOS Is, to the best, of our knowledge ardbelief, correct and accurate.
Appr oved: (One s/gnature of Systens or Operations Engineer lsrequired If the Selsnlc Capability Engineers decoit necessary.)
nt or ype ane g nature nt or ype ane gnature
Page Ho. 5Report Date/Tine: 11-26-95 / 14:14:37
NIHE HILE POINT UNIT ONE Data Base File Hane/Date/Tine: HHPI 3.DBF / ll/26/95 /-14:ll:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A').AHD (SUDS.Notes 'AD')Progran File Mane 8 Version: SSEH 2.2
LINE EQUIPNO. CLASS HARK NO.
~ $ ~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $
(I) (2) (3)
SYSTEH/EQUI PHENTDESCRIPTION
$ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(4)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUIPHENT LOCATIOH ----> Base Capacity Denand Cap. > Caveats Anchor Inter- EquipFir.Elv. Rn. or Rov/Col. Elev. <40'7 Spectrun Spectrun Denandl OKT OKT act OKT OKT Notes
~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ ~ $ ~ $ ~ $ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ $ ~ $ ~ $ ~
(6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
2006 088 118
8194 03 12
2019 088 120
2021 088 121
2022 088 122
2020 088 123
2003 07 126
2005 07 127
8113 01 161A
8114 01 1618
8116 01 167
8109 02 16A
8110 02 168
8117 01 171A
CRD/TRAIN 12 SCRAH VLV PILOTS (129TOTAL)
AP/4160V POMERBOARD 12
CRD/DIRECTIONAL CONTROL VALVES(129 TOTAL)
CRD/DIRECTIONAL CONTROL VALVES(129 TOTAL)
CRD/DIRECTIONAL CONTROL VALVES(129 TOTAL)
CRD/DIRECTIONAL CONTROL VALVES(129 TOTAL)
CRD/SCRAH INLET VALVES (129 TOTAL)
CRD/SCRAH DISCHARGE VALVES (129TOTAL)
AP/600 V POMERBOARD 4161A
AP/600 V POMERBOARO f1618
AP/600 V POMERBOARD 4167
AP/600 V PO'MERBOARD $ 16A
AP/600 V POMERBOARD 4168
AP/600 V POMERBOARD 4171A
RB
TB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
237
261
237
A6
HS
237 HS
237 HS
237
237
237
261
261
281
281
281
261
Ho H4
Q7, 8
L, H4
L, H12
237 YES BS GRS YES TES YES YES YES AD
261 YES BS
237 YES BS
GRS YES HO HO TES HO AD
GRS YES YES YES TES YES AD
261 YES BS RRS YES NO
261 YES BS RRS YES NO
HO YES HO AD
HO YES HO AD
281 YES BS GRS YES NO NO YES HO AD
HO YES HO AD
HO YES HO AD
YES NO281 YES BS RRS
RRS YES NO281 YES BS
261 YES BS RRS YES HO HO YES HO AD
237 YES BS GRS YES YES YES TES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
CERT I F ICATIOH:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon'ncludes each entry and conclusion (whether ver ifled to be
selsnlcally adequate or not).
Approved: (Signatures of all Sel saic Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa hould be a I lc nsed professionalengineer.)
CARHEH R. AGOSTA r/Print or Type Nane 9natur ate
HALTER DJORDJEVIC / Z. /5'rintor Type Nane ategna rq
r n or ype ane gna e
nt or ype ane gnature
CERT I F ICATIOH:
The lnfornatlon provided to the Seisnlc Capabll ltyEngineers regarding systens and operations of the equlpaentcontained on this SUDS ls, to the best of our kewledge andbel lef, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired lf the Selsnlc Capability Engineers decait necessary.)
nt or ype ane gnature ate nt or ype ane g nature
I jl
Page Ho. 6Report Date/Tine: 11-26-95 / 14:14:37
HIRE HILE PDINT UHIT ONE Data Base File Nane/Date/Tine: HHP1 3.DBF /SCREEHIHG VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAIHS 'A')Progran File Hane 8 Version: SSEH 2.2
11/26/95-/-14:11:28
AHD (SUDS Notes ~ 'AD')
LIHEHO.
~ I~ I~ I(I)
EQUIPCLASS HARK NO.~I~ $ $ ~ I~ I~ \ ~ I~ \ ~ \ ~ I~ I~ I(2) (3)
SYSTEH/EQUI PHEHTDESCRIPTION
I ~ I ~ E ~ $$$ ~ $$$ ~ I ~ $$ ~ I ~ I ~ I ~ ES ~ E ~ $ $ ~ I(4)
Building~ I~ I~ $ $ ~ I~
(5)
EQUI PHEHTFir. Elv.
~ I~ I~ I~ $ $ ~
(6)
LOCATION ---> BaseRn. or Row/Col. Elev.~ I~ I~ I~ I~ I~ I~ I~ ~ I~ ES
(7) (8)
Capacity<40'7 Spectrun~ I~ I~ I~ I~ I~ I~
(g) (10)
DenardSpectrunLESSEES'ap.
> Caveats Anchor Inter- EquipDenand7 OK7 OKT act OK7 OK7 Notes~I~ I~ $ $ ~ I~ I~ $ $ I'EE ~ $ $ ~ I~ I~ ~ I~ I~ ~ ESS ~
(12) (13) (14) (15) (16) (17)
8118 01 171B
8111 02 17A
8112 02 178
8172 20 1510
8172A 20 1S12
8103 20 153
8173 20 1534
8174 20 1535
8175 20 1536
8104 20 154
8140 20 1551
8141 20 1552
AP/600 V POHERBOARD 4171B
AP/600 V POMERBOARD 417A
AP/600 V PONERBOARD 4178
CTRL/AUXILIARYCONTROL CABINET1510
CIRL/AUXILIARYCONTROL CABIHET1512
AP/DIESEL GENERATOR 4102 RELAYCABINET
CTRL/AUXILIARY CONTROL RELAYCABINET IS34
CTRL/AUXILIARYCONTROL RELAYCABINET 1535
CTRL/AUXILIARYCONTROL RELAYCABIHET 1536
AP/DIESEL GENERATOR 4103 RELAYCABIHET
CTRI./AUXILIARYCONTROL CABINET1551
CTRL/AUXILIARYCONTROL CABIHET1552
RB
RB
RB
TB
TB
TB
TB
TB
TB
TB
TB
TB
261
281
281
261
L, H12
QIO, 11
QIO, 11
261
261
261 ACR
261 ACR
261 ACR
261 ACR
261 ACR
261 ACR
261 YES BS
281 'YES BS
281 YES BS
'61 YES BS
261 YES BS
261 YES BS
GRS YES HO NO YES HO AD
RRS YES HO HO YES HO AD
RRS YES NO HO YES HO AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
261 YES BS GRS 'YES HO NO YES HO AD
261 YES BS GRS YES HO NO YES NO AD
261 YES BS GRS YES NO HO YES HO AD
261 YES BS GRS YES HO HO YES HO AD
261 YES BS GRS YES HO HO YES NO AD
261 YES BS GRS YES NO HO YES NO AD
CERT IF I CATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'AII lnfornatlon includes each entry and conclusion (whether veriFled to beselsnlcally adequate or not).
Approved: (Signatures of a I I Selsnlc Capabl I Ity Engineers on the SelsnlcReview Tean (SRl') are required; there should be at least two onthe SRT. All signatories should agree with ail of the entries andconclusions. One signa should be a 1 ice ed professionalengineer.)
CARHEH R. AGOSTA (/( ~~Print or Type Nane gnature ate
HALTER MORDJEVIC /'g rPrint or Type Hane a
r nt or ype ane gnature
nt or ype ane gnature
CERTIFICATION:
The lnfornatlon provided to the Seisnlc CapabilityEngineers regarding systens ard operations oF the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired if the Selsnlc Capability Engineers deenlt necessary.)
nt or ype ane gnature nt or ype ane gnature
I
h
0'h
Page Ho. 7Report Date/Tlae: 11-26-95 / 14:14:37
NINE HILE POINT UHIT ONE Data Base Fl le Hane/Date/Tine: NHPI 3.DBF / 11/26/95 / 14:11:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Nuaber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Prograa File Rane 6 Version: SSEH 2.2
LINEHO.
~ $ ~ $ ~ $
(I)
EOUIPCLASS NARK HO.~ $ ~ $ $ ~ $ ~ $ $ $ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $
(2) (3)
SYSTEH/EOUIPHENTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ $ $ ~ $ $ $ ~ $
(4)
Building~ $ ~ $ ~ $ ~ $ $ ~
(5)
EQUIPHEHT LOCATION ----> Base CapacityFir.Elv. Ra. or Row/Col. Elev. <40'7 Spectrun
~ $ ~ $ ~ $ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(6) (7) (8) (9) (10)
DeaandSpectrun~ $ ~ $ ~ $ ~ $
Cap. >Denand7~ $ ~ $ ~ $ ~
(12)
Caveats AnchorOKT OK7
(13) (14)
Inter- Equipact OKT OK2 Hotes~ $ ~ $ ~ $ ~ $ $ $ ~ $ $ ~ $ ~ $
(15) (16) (17)
8154 20 1553
8138 20 1554
8155 20 1555
8142 20 1556
8143 20 - 1557
81438 20 1559
8143A 20 IS60
8143C 20 IS62
81430 20 IS63
8143 F 20 1564
8176 20 1565
CTRL/AUXILIARYCONTROL CABINET1553
CTRL/AUXILIARYCONTROL CABINET1S54
CTRL/AUXILIARYCONTROL CABINET1S55
CTRL/AUXILIARYCONTROL CABINET1556
CTRL/AUXILIARYCONTROL CABINET1557
CTRL/AUXILIARYCONTROL CABINET1559
CTRL/AUXILIARYCONTROL CABINET1560
CTRL/AUXILIARYCOHTROL CABIHET1562
CTRL/AUXILIARYCONTROL CABINET1563
CTRL/AUXILIARYCONTROL CABINET1564
CTRL/AUXILIARYCONTROL CABINET1565
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
261
261
261 ACR
261 ACR
261 ACR
261 ACR
261
261
261 ACR
261 ACR
261 ACR
261 YES BS
261 YES BS
261 YES BS
261 YES BS
261 YES BS
YES HO HO YES HO AD
GRS YES NO NO YES HO AD
GRS YES HO HO YES NO AD
GRS YES HO HO YES HO AD
GRS YES NO NO 'YES NO AD
261 YES BS GRS YES HO HO YES HO AD
261 YES BS GRS YES HO HO YES NO AD
261 YES BS GRS YES NO HO YES HO AD
261 YES BS GRS YES NO HO YES HO AD
261 YES BS GRS YES HO HO YES HO AD
261 YES BS GRS YES NO HO YES HO AD
CERTIFICATION:
All the inforaation contained on this Screening Verification Data Sheet(SVDS) is, to the best of our knowledge and belief, correct and accurate.'All lnforaation'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsalcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agr ee with ail of the entries andconclusions. One signa should be a I lcensed professionalengineer. )
CERTIFICATIOH:
The lnforaatlon provided to the Selsalc CapabilityEngineers regarding systeas and operations of the equi paentcontained on this SUDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer isrequired If the Selsalc Capability Engineers decait necessar y.)
CARNEH R. AGOSTAPrint, or Type Naae
HALTER DJORDJEVICPrint or Type Hane
gnature
/r9na
nt or ype ane
nt or ype ane
gnature
9nature
ate
nt or ype ane gnature nt or ype aae 9nature ate
Page No. 8Report Date/Tine: 11-26-95 / 14:14:37
NINE NILE POIHT UHIT OHE Data Base File Nane/Date/Tine: HNP1 3.DBF / 11/26/95,/. 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nunber
F liter Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notes 'AD')Progran File Nane 8 Version: SSEH 2.2
LINEHO.
~ SSS ~ S
(I)
EQUIPCLASS NARK NO.~ S ~ S ~ ~ S ~ SSS ~ S ~ S ~ S ~ S ~ SS ~
(2) (3)
SYSTEN/EQUI PHENTDESCRIPT IOH
~ SS ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ \~
(4)
BuildingS ~ S ~ S ~ S ~ S ~
(5)
EQUIPHENTF lr.Elv.
~ S ~ S ~ S ~ SS ~
(6)
LOCATIOH --->Rn. or Row/Col.
(7)
Base Capacity Denand Cap. > Caveats Anchor Inter- EquipEl ev. <40'7 Spectrun Spectrun Denand7 OK7 OKT act OKT OK? Notes~ ST ST ~ S ~ S ~ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ ~ S ~ S ~ S ~ ~ S ~ S ~ S ~ S ~ S ~ S ~ ~ S ~ S ~ ~ ST ST
(8) (9) (10) (ll) (12) (13) (14) (15) (16) (17)
8177 20 1569
8178 20 1570
8178A 20 1573
8179 20 1575
8162 20 ISBO
8180 20 IS82
8181 20 IS&4
8182 20 IS85
8183 20 1S86
8184 20 1587
8185 20 1588
5145 19 201.2-491
CTRL/AUXILIARYCONTROL CABINET1569
TB
CTRL/AUXILIARYCONTROL CABIHET TB1570
CTRL/AUXILIARYCONTROL CABIHET1573
CTRL/AUXILIARYCONTROL CABINETIS75
CTRL/AUXILIARYCONTROL CABINET1580
CTRL/AUXILIARYCONTROL CABINET1582
CTRL/ANNUNCIATOR CABIHET 1584
CTRL/AUXILIARYCOHTROL CABIHET1585
CTRL/AUXILIARYCONTROL RELAYCABINET 1586
CTRL/AUXILIARYCONTROL RELAYCABINET IS87
CTRL/AUXILIARYCONTROL RELAYCABINET 1588
TB
TB
TB
TB
TB
TB
TB
TB
TB
COHTAIHNEHT/TORUS AIR TEHPERATURE TORUSELENEHT
261
261
261
261
261
261
261
198 SGS
72'61
ACR
261 ACR
261 ACR
261 ACR
261 YES BS
261 YES BS
261 YES BS
261 YES BS
198 YES BS
GRS YES YES YES HO NO AD
GRS YES YES YES NO NO AD
GRS YES YES YES NO HO AD
GRS YES YES YES NO NO AD
GRS YES YES 'YES YES 'YES AD
261 YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES HO HO YES HO AD
261 YES BS GRS 'YES NO NO YES HO AD
261 YES BS GRS YES HO NO YES NO AD
261 YES BS GRS YES YES YES HO HO AD
261 YES BS GRS YES YES YES NO NO AD
261 YES BS GRS YES YES YES HO NO AD
CERT I F I CATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon'ncludes each entry and conclusion (whether verified to be
selsalcally adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsnlcReview Tean (SRT) are required: there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator ovid be a licensed professionalengineer.)
CARNEN R. AGOSTA i.r,Print or Type Rane gnature ate
HALTER DJORDJEVIC r I<6» fPrint or Type Hane g re'te r nt or ype ane gnature
nt or ype ane g nature ae
CERT IFICATION:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired lf the Selsnlc Capability Engineers deenlt necessary.)
nt or ype ane gnature ate r nt or ype arne gnature
~ I
I
Page Ho. 9Report Date/Tine: 11-26-95 / 14:14:37
HIHE HILE POINT UHIT ONE Data Base File Nane/Date/Tine: NHP1 3.DBF / ll/26/95./ 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Cr lter la: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Nane 5 Version: SSEH 2.2
LINENO.
$ ~ $ ~ $ $
(1)
EQUIPCLASS HARK NO.~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ \ ~
(2) (3)
SYSTEH/EQUI PHENTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ \ ~ \ ~ \ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ $
(4)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUI PHEHTFir.E1v.
~ $ ~ $ $ $ ~ $ $ $
(6) (8) (9)(7)
LOCATION —---> BaseRn. or Row/Col. Elev. <40'2~ $ $ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ ~ $ ~ $ ~ ~ $ ~ $ ~
CapacitySpectrm~ $ ~ $ ~ $ $ $
(10)
DenandSpectrun~ $ ~ $ ~ $ $ ~
Cap. > CaveatsDeaand7 OK7$ $ ~ $ ~ $ ~ ~ $ $ $ $ ~ $
(12) (13)
AnchorOK7
~ $ ~ $ ~ $
(14)
Inter- Equipact OK7 OK7 Notes~ $ ~ $ ~ $ ~ ~ $ ~ $ $ ~ $ ~ $ ~
(15) (16) (17)
5158 19 201.2-492
5133 19 201.2-493
5134 19 201.2-494
5135 19 201.2-495
5136 19 201.2-496
5137 19 201.2-497
5138 19 201.2-498
5139 19 201.2-499
5140 19 201.2-500
5141 19 201.2-501
5142 19 201.2-502
198
COHTAIHHENT/TORUS TEHPERATUREELEHEHT
CONTAINHENT/TORUS TEHPERATUREELEHEHT
CONTAIHHEHT/TORUS TEHPERATUREELEHEHT
COHTAINHENT/TORUS TEHPERATUREELEHENT
CONTAINHENT/IORUS TEHPERATUREELEHENT
CONTAIHHENT/l'ORUS TEHPERATUREELEHENT
COHTAIHHENT/TORUS TEHPERATUREELEHENT
COHTAINHENT/TORUS TEHPERATUREELEHENT
CONTAIHHENT/TORUS TEHPERATUREELEHENT
CONTAIHHENT/TORUS TEHPERATUREELEHENT
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
COHTAINHEHT/TORUS AIR TEHPERATURE TORUSELEHEHT
SG17288'G2
18'G4
54
SG6
90'GB
126'GIO
162
SGll180'G12
198
SG14 234
SG16 270
SG17
288'98
YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES Ad
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS 'YES YES 'YES YES YES AD
GRS YES YES YES YES YES AD
CERTIFICATION:
All the infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornation'ncludes each entry and conclusion (whether verified to be
selsalcaIIy adequate or not).
Approved: (Signatures of all Seisnlc Capability Engineers on the SelsalcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa sh ld be a licensed professionalengineer.)
CARHEH R. AGOSTA f$/lF/PiPrint or Type Nane gnatur
HALTER DJORDJEVIC z, jPrint or Type Nane gnature ate
nt or ype ane gna re
nt or ype ane 9na re ate
CERTIFICATION:
The infornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equi pnentcontained on this SVDS is, to the best of our knowledge andbe) lef, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsalc Capability Engineers decait necessary.)
nt or ype ane g nature ate nt or ype ane gnature
t
~ t
LI
Page Ho. 10Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UHIT ONE Data Base File Hane/Date/Tine: NHP1 3.DBF / ll/26/95 /, 14:ll:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SUDS Notes 'AD')Progran File Nane 8 Version: SSEH 2.2
LINENO.
~ $ ~ $ ~ $
(I)
EOUIP SYSTEM/EQUIPMENTCLASS MARK NO. DESCRIPTION~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ $
(2) (3) (4)
8ul idlng\~ $ ~ $ ~ $ ~ $ ~
(5)
EOUIPMEHTF lr.E1v.
~ $ ~ $ ~ $ ~ $ ~ $
(6)
LOCATION ——-> BaseRn. or Row/Col. Elev.
(7) (8)
Capacity<40'7 Spectrun~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $
(9) (10)
DenandSpectrun~ $ ~ $ ~ $ ~ $
Cap. > Caveats Anchor Inter- EquipDenandl OK7 OK7 act OK? OK2 Notes~ $ $ $ ~ $ ~ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $
(12) (13) (14) (15) (16) (17)
5143 19 201.2-503
5144 19 201.2-504
5146 19 201.2-505
5147 19 201.2-506
5148 19 201.2-507
5149 19 201.2-508
5150 19 201.2-509
5151 19 201.2-510
5152 19 201.2-511
5153 19 201.2-512
5154 19 201.2-513
,CONTAINMEHT/TORUS TEHPERATUREELEHENT
CONTAINHEHT/TORUS TEHPERATUREELEHEHT
CONTAINMENT/TORUS TEHPERATUREELEHEHT
CONTAINMENT/TORUS TEMPERATUREELEHENT
CONTAINMENT/TORUS TEHPERATUREELEHENT
CONTAIHMENT/TORUS TEHPERATUREELEHENT
CONTAIHHEHT/TORUS TEHPERATUREELEHENT
CONTAINMEHT/TORUS TEHPERATUREELEHENT
CONTAINMENT/TORUS TEHPERATUREELEMENT
CONTAIHMEHT/TORUS TEHPERA'IUREELEMENT
CONTAINMEHT/TORUS TEHPERATUREELEMENT
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198
TORUS 198 SGIB306'G20
342'G2
18'G4
54'G6
90'GB
126'GIO
162'GII
180'G12
198'G14
234'G16
270'98
YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES, YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
CERTIFICATIOHr
All the lnfornation contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accur ate.'All infornatlon'ncludes each entry and conclusion (whether verified to beselsnically adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRI') are required; there should be at least two onthe SRT. All signatories should agree with all of the entries ardconclusions. One signat ovid be a licensed professionalengineer.)
CARHEN R. AGOSTAPrint or Type Mane gnatuj'$ ate
HALTER DJORDJEVICPrint or Type Mane ate
nt or ype ane 9nature
nt or ype ane gna re
CERTIFICATION:
The lnfornatlon provided to the Selsnlc Capabl lltyEngineers regarding systens and operations of the equlpaentcontained on this SUDS ls, to the best of our knowledge ardbel lef, correct ard accurate.
Approved: (One signature of Systens or Operations Engineer isrequired if the Selsalc Capability Engineers decait necessary.)
nt or ype ane gnature ate r nt or ype ane gnature
'I lt
Page No. IlReport Date/Tine: 11-26-95 / 14:14:37
NINE NILE POINT UNIT ONE Data Base File Naae/Date/Tine: NHP1 3.DBF / 11/26/95./ 14:11:28SCREENIHG VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAIHS 'A') AND (SVDS Notes 'AD')Progran File Hane 8 Version: SSEH 2.2
LINE EIP IPHO. CLASS
~ $ ~ $ ~ $ ~ $ ~ $ $
(I) (2)
HARK HO.$ ~ $ ~ \ ~ $ ~ \ ~ $ ~ $ $ ~ $ ~ $
(3)
5155 19 201.2-514
5156 19 201.2-515
5157 19 201.2-516
5161 20 201.2-517
5162 20 201.2-518
5164 20 201.2-519
5163 20 201.2-520
5165 20 201.2-521
5159 19 201.2-521A
5167 20 201.2-5218
5166 20 201.2-522
SYSTEH/EOUIPHEHTDESCRIPT IOH
~ $$$ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $$$$ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(4)
CONTAINHENT/TORUS TEHPERATUREELEHEHT
CONTAINHEHT/TORUS TEHPERATUREELEHENT
COHTAIHHEHT/TORUS TEHPERATUREELEHEHT
CONTAINHENT/TORUS TEHPERATURECONDITIOHER 8 RECORDER
COHTAINHEHT/TORUS TEHPERATURECONDITIONER 8 RECORDER
CONTAINHENT/TORUS TEHPERATUREINDICATOR
CONTAINHEHT/TORUS TEHPERATUREIHDICATOR
COHTAINHENT/TORUS TEHPERATURETRANSHITTER
COHTAINHENT/TORUS TEHPERATUREELEHEHT
CONTAINHEHT/TORUS TEHPERATUREINDICATOR
COHTAINHENT/TORUS TEHPERATURETRNISHITTER
EquipOK2 Notes
$ $ $ $ ~ ~ $ ~ $ ~
(16) (17)
<————- EOUIPHEHT
Building F lr.Elv.~ $ ~ $ ~ $ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $
(5) (6)
Capacity Denand Cap. > CaveatsSpectrun Spectrua Denand7 OK7~ $ $ ~ $ ~ $ ~ ~ $ $ ~ $ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(10) (11) (12) (13)
LOCATION --—->Rn. or Row/Col.~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(7)
Anchor Inter-OK7 act OK7
~ \ ~ $ $ $ \~ $ ~ $ ~ $
BaseElev. <40'7~ $ $ ~ $ $ ~ $ ~ $
(8) (9) (14)
YES
(15)
YES YES ADYES YESSG17 288'98 YES Bs
198 YES Bs
198 YES Bs
TORUS 198
TORUS 198
TORUS 198
TB 261
TB 261
TB 277
SGIB 306'RS 'YES YES YES YES YES AD
GRS YES YES YES YES YES ADSG20342'ESAD
YES AD
YES AD
YES AD
YES AD
ACR-ISIOACR-1510
ACR-1569ACR-1569
CR PHL K
CR PNL K
CR PNL K
277 CR PNL K BOXTB
250 RSP 11 RSP 11TB
TORUS 198 SGS72'B
TB
250
277
RSP 11
RSP 12
BOX RSP 11
RSP 12
YES AD
YES AD
198 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon includes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. AII signatories should agree with all of the entries andconclusions. One signatory should be a licensed professionalengineer.)
CERT IF I CAT IOH:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnlc Capability Engineers decalt necessary.)
CARHEN R. AGOSTAPrint or Type Naue
WALTER DJORMEVICPrint or Type Wane gnature ate
nt or ype ane
nt or ype ane
g nature
gnature
ate
nt or ype ane gnature ate r nt or ype ane 9nature
I
Page Ho. 12Report Date/The: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Haoe/Date/Tine: HHP1 3.DBF / 11/26/95 / 14:11:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Nuober
Filter Criteria: (Eval. Concern CONTAIHS 'A') AHD (SVDS Notes 'AD')Prograo File Naoe 6 Version: SSEH 2.2
LIHEHO.
ASS ~ ST
(I)
EQUIPCLASS HARK NO.~ S ~ S ~ ~ S ~ S ~ $$$ ~ S ~ S ~ S ~ SOS
(2) (3)
S'ISTEH/EQUI PHENTDESCRIPTION
~ S ~ S ~ S ~ \ ~ S ~ S ~ \ ~ S ~ S ~ S ~ $$$$$ ~ ST \ USES
(4)
Building
(5)
EQUI PHEHTFir.Elv..
~ S ~ S ~ S ~ S ~ S
(6) (7) (8) (9)
LOCATION -----> BaseRo. or Row/Col. Elev. <40'7
Capacity Deoand Cap. > Caveats Anchor Inter- EquipSpectruo Spectruo Deoand7 OK7 OK7 act OK7 OK7 Notes~ S ~ S ~ $ $ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ \ ~ $ $ ~ \ ~ $ $ \ ~ ST \ ~ ASS USES ~ S ~ S ~ ~ S ~ $ $
(10) (11) (12) (13) (14) (15) (16) (17)
5160 19 201.2-522A
5168 20 201.2-5228
CONTAINHEHT/TORUS TEHP ERATUREELEHEHT
CONTAINHEHT/TORUS TEHPERATUREINDICATOR
TORUS
TB.
198
277
SG17277'SP
12
198 YES BS
BOX RSP 12 YES AD
GRS YES YES YES YES YES AD
7609 18 202-102
7615 18 202-103
7617 09 202-33
7619 088 202-348
7621 088 202-358
RBAC/EHER EX FLOW TRAHSHITTER TB
RBAC/EHER EX FLOW TRANSHITTER
RBAC/EHER EXHAUST FAN 412
RBAC/EHER EX FAN 411 OUTLET ISOLVLV PILOT
TB
TB
TB
RBAC/EHER EX FAN 412 OUTLET ISOL TBVLV PILOT
H13
N13
N12
H13
H13
302 HO GERS RRS
302 HO ABS RRS
302 HO GERS RRS
302 HO GERS RRS
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
302 NO GERS RRS YES YES YES YES YES AD
7601 07 202-36
7602 088 202-36C
7603 088 202-36D
7604 07 202-37
7605 088 202-37C
7610 07 202-38
RBAC/EHER EX ISOL VLV
RBAC/EHER EX ISOL VLV PILOT
RBAC/EHER EX ISOL VLV PILOT
RBAC/EHER EX FAH 411 INLET ISOLVLV
RBAC/EHER EX FAH 411 INLET ISOLVLV PILOT
RBAC/EHER EX FAN f12 INLET ISOLVLV
TB
TB
TB
TB
TB
291
H13
P13
P13
P13
291 P13
291 P13
302 HO GERS RRS
291 HO GERS RRS
YES YES YES YES YES AD
YES YES YES YES YES AD
291 HO BS GRS YES YES YES YES YES AD
291 HO GERS RRS YES YES YES YES YES AD
302 HO GERS RRS YES YES YES YES YES AD
302 HO GERS RRS YES YES YES 'YES 'YES AD
CERTIFICATION:
All the inforoatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All inforoation'ncludes each entry and conclusion (whether verified to beseisoically adequate or not).
Approved: (Signatures of all Selsoic Capability Engineers on the SelsolcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat ould be'a licensed professionalengineer.)
CARHEH R. AGOSTA lS// lePrint or Type Naoe gnatur ate
WALTER DJORDJEVIC fz rPrint or Type Haoe gna e ate
nt or ype aoe g nature
r nt or ype aoe gnature ae
CERTIFICATION:
The inforoatlon provided to the Selsolc CapabilityEngineers regarding systeos and operations of the equipoentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeos or Operations Engineer lsrequired lf the Seisoic Capability Engineers decoit necessary.)
r nt or ype aoe gnature ate r nt or ype aoe gnatur e ate
[ ~ J
I'
,1
Page No. 13Report Date/Tine: 11-26-95 / 14r14r37
NINE HILE POINT UHIT ONE Data Base File Wane/Date/Tiner HHPI 3.DBF / ll/26/95./ 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern COHTAIHS 'A') AND (SVDS Notes 'AD')Prograra File Wane 8 Version: SSEH 2.2
LIHEHO.
~ $ ~ $ ~ $
(I)
EQUIPCLASS HARK HO.~ $ ~ $ ~ ~ $ ~ $ ~ $ $ ~ $ $ ~ $ $ ~ $ ~ $ ~
(2) (3)
SISTEH/EQUIPHENTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $$$ ~ $ ~ $ ~ $$$ ~ $$ ~ $ ~ $ ~ $ ~ $ $ $ $
(4)
Building$ ~ $ ~ $ ~ $ ~ $ ~
(5)
EQUIPHEHTFlr.Elv.
$ $ ~ $ ~ $ ~ $ ~ $
(6)
LOCATION ----> BaseRn. or Row/Col. Elev. <40'7
(8) (9)
CapacitySpectrun~ $ $ ~ $ ~ $ ~
(10)
DecrardSpectrun~ $ ~ $ ~ $ ~ $
Cap. > Caveats Anchor Inter- EquipDecrard7 OK7 OKT act OKT OKT Notes~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ ~ ~ $ ~ $ $ ~ $ $ $ $ ~ $ ~ $ ~ $ ~
(12) (13) (14) (15) (16) (17)
7611 088 202-38C
7608 18 202-49C
7607 18 202-49D
7606 07 202-50
7612 07 202-51
7614 18 202-92C
7613 18 202-920
7320 07 210.1-01
7323 07 210.1-02
7324 088 210.1-02A
7328 11 210.1-119
7334 11 210.1-120
7326 08A 210.1-56
7337 18 210.1-85
7331 18 210.1-88
RBAC/EHER EX FAH 412 INLET ISOLVLV PILOT
RBAC/EHER EX FLOW COHTROLLER
RBAC/EHER EX E/P COHVERTER
TB
TB
TB
RBAC/EHER EX FAH 411 FLOW CONTROL TBVLV
RBAC/EHER EX FAN f12 FLOW CONTROL TBVLV
RBAC/EWER EX FLOW CONTROLLER
RBAC/EHER EX E/P CONVERTER
TB
TB
CRAC/COOL COIL 411 CONTROL VALVE TB
CRAC/COOL COIL 412 COHTROL VALVE TB
CRAC/COOL COIL 412 CONTROL VALVEPILOT
CRAC/CHILLER Oil
CRAC/NILLER 412
CRAC/CHILL WATER BIPASS VALVE
TB
TB
TB
TB
CRAC/NILLER 412 TEHP CONTROLLER TB
CRAC/CHILLER 411 TEHP CONTROLLER TB
291
289
291
291
P13
P13
Q13
Q13
H13
N13
N13
A15
A15
A15
817
817
816
816
816
291 HO GERS RRS IES YES YES IES YES AD
302 HO GERS RRS YES YES YES IES YES AD
302 HO GERS RRS YES YES YES YES YES AD
302 HO GERS RRS YES YES YES YES YES AD
289 HO GERS RRS 'YES YES YES YES YES AD
291 HO GERS RRS
291 HO GERS RRS
YES YES YES YES TES AD
YES YES YES YES IES AD
YES HO BS RRS 'YES YES YES YES YES AD
307 HO ABS RRS YES YES YES YES IES AD
307 NO ABS RRS YES YES YES YES TES AD
300 HO BS RRS HO NO NO YES NO AD
300 NO BS RRS HO NO HO HO NO AD
300 NO GERS RRS YES YES YES YES YES AD
300 NO GERS RRS YES YES YES IES YES AD
300 NO GERS RRS YES YES YES YES TES AD
CERTIFICATION:
All the Infornation contained on this Screening Verification Data Sheet(SVDS) Is, to the best, of our knowledge and belief, correct and accurate.'All lnfornatlon'ncludes each entry ard conclusion (whether ver lfled to beselsnically adequate or not).
Approved: (Signatures of all Seisnic Capability Engineers on the SeisnlcReview Tean (SRT) are required: there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slg should be a licensed professionalengineer.)
CARHEH R. AGOSTA (Z~ /~Print or Type Hane gna re ate
WALTER DJORDJEVIC /ZzPrint or Type Hane ate
r nt or ype aue gna re ate
r nt or ype ane gna re ate
CERT I F ICATIOHr
The Infornation provided to the Seisnic CapabilityEngineers regarding systens and operatIons of the equipnentcontained on this SVDS Is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Seisnic Capability Engineers decalt necessary.)
nt or ype ane gnature ate r nt or ype aoe gnature ate
El
Page No. 14Report Date/Tine: 11-26-95 / 14:14:37
HIHE HILE POINT UHIT ONE Data Base File Nane/Date/Tine: NHPI 3.DBF / 11/26/95./ 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: IO Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') ANO (SVDS Notes 'AD')Progran File Haae 8 Version: SSEH 2.2
LINENO.
S ~ S ~ S ~
(1)
EQUIPCLASS HARK NO.~ S ~ S ~ ~ S ~ $ $ ~ S ~ S ~ S ~ S ~ S ~ S ~
(2) (3)
SYSTEH/EQUIPHENTDESCRIPTIOH
S ~ $$$ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~
(4)
Bul lding~ \ ~ S ~ S ~ S ~ S
(5)
EQUIPHEHT LOCATION --->Fir. Elv. Rn. or Rov/Col.
~ S ~ S ~ S ~ S ~ S ~ $ $ $ ~ S ~ S ~ S ~ S ~ S ~
(6) (7)
BaseElev. <40'7SASHES SASHES
(8) (9)
CapacitySpectrun~ S ~ S ~ S ~ S
(10)
DenandSpectrun~ S ~ $ $ ~ $ $
Cap. > Caveats Anchor Inter- EquipDeoand7 OKT OKT act OKT OKT Notes$ $ ~ S ~ S ~ ~ S ~ $ $ ~ S ~ \ ~ ST \ ~ $$$ ASS SASHES $$ ~ ST
(12) (13) (14) (15) (16) (17)
7332 18 210.1-89
6324 05 28-15
6325 05 28-17
6341 R 28-18
6326 07 28-23
6327 07 28-24
6328 07 28-29
6329 07 28-30
2001 21 305-125
2002 21 305-128
CRAC/CHILLER 411 FLOW SWITCH TB
ND/ND PUHP 411 TEHPERATURECONTROL VLV
CRD/CRD PUHP 411 SEAL PSV
CRD/CRD PUHP 412 TEHPERATURECONTROL VLV
CRO/CRD PUHP 412 SEAL PSV
RB
RB
RB
RB
CRD/HYDRAULIC CONTROL UNIT H20-N2 RBACCUH'S (129 TOTAL)
CRO/HYDRAULIC CONTROL UNIT N2ACCUHULATORS (129 TOTAL)
RB
CRDH/CONTROL ROD DRIVE PUHP 411 RB
NDH/CONTROL ROD DRIVE PUHP 412 RB
CRO/ND DRIVE WATER FILTER BYPASS RB
237
237
237
237
816
H12
N12
N12
N12
237
237
H12
H12
237
237
H12
237 H5
237 YES BS
237 YES BS
GRS YES YES 'YES YES YES AD
GRS YES YES YES YES YES AD
237 YES BS
237 YES BS
237 YES BS
237 YES BS
237 YES BS
237 YES BS
GRS YES YES TES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
GRS YES NO NO YES NO AD
GRS YES NO NO YES HO AD
300 HO GERS RRS YES YES YES YES YES AD
4235 OSA 31-07
4236 USA 31-08
5120 20 32-02
5101 19 32-02A
RCS/RECIRC PUHP 411 INLETTEHPERATURE HV/I CONVERTER
RCS/RECIRC PUHP 411 INLETTEHPERATURE ELEHENT
TB
O'
FW/LOOP 411 FEEOWATER ISO VLV TB
FW/LOOP 412 FEEOWATER ISO VLV TB
261
261
250
HSIV RH
HSIV RH
RSP 11
261 YES BS GRS
261 YES BS GRS
RSP 11
YES YES YES YES YES AD
YES YES YES YES YES AD
YES AO
218 RC LP 11 237 YES BS GRS YES YES TES YES YES AD
CERTIFICATION:
All the lnfornation contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knNIledge and belief, correct and accurate.Ail Infornation Includes each entry and conclusion (whether verified to be
seisnlcally adequate or not).
Approved: (Signatures of all Selsaic Capability Engineers on the SeisnicRevieu Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator ould be a I lcens professionalengineer.)
CARHEH R. AGOSTA /~ /Print or Type Nane gnatur e ate
WALTER OJORDJEVIC j L/Print or Type Nane at
nt or ype ane gnature ae
nt or ype ane gnature ~ae
CERTIFICATION:
The Infornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equipaentcontained on this SVDS is, to the best of our kewledge ardbel lef, correct and accurate.
Approved: (One signature of Systens or Operations Engineer Isrequired if the Selsaic Capability Engineers decait necessary.)
nt or ype ane gnature nt or ype ace gnature ate
'
If
0
Page No. 15Report Date/Tlner 11-26-95 / 14:14:37
HIRE HILE POINT UNIT ONE Data Base File Mane/Date/Tlner NHP1 3.DBF / ll/26/95 /.-14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Crlterla: ID Nunber
Filter Crlterla: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Nane 6 Version: SSEH 2.2
LINE EQUIPNO. CLASS HARK HO.
~ S ~ S ~ S ~ S ~ S ~ ~ $ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~
(I) (2) (3)
SYSTEH/EQUIPHENTDESCRIPTION
~ S ~ S ~ $$$ ~ S ~ S ~ S ~ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ ~
(4)
Building$ $ ~ S ~ S ~ S ~ S
(5)
EQUIPHEHTF lr.Elv.
~ S ~ $ $ $ ~ S ~ S
(6) (8) (9)(7)
LOCATION ----> BaseRn. or Row/Col. Elev. <40'7~ S ~ S ~ S ~ $ ~ $ $ ~ S ~ S ~ S ~ S ~ ASS AS
CapacitySpectrun~ S ~ S ~ $ $ $
(10)
DeaandSpectrun
Cap. > Caveats Anchor Inter- EquipDenand7 OK7 OK7 act OK7 OK7 Notes~ S ~ S ~ $ $ ~ S ~ $ $ ~ S ASS ASS ~ S ~ $ $ ~ S ~ $ ~ S ~ ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
5106 19 32-02A
5129 20 32-02B
5115 20 32-02C
5124 20 32-02D
5121 20 32-03
5102 19 32-03A
5105 19 32-03A
5130 20 32-038
5116 20 32-03C
5125 20 32-03D
5122 20 32-04
RCS/RECIRC PUHP 411 INLETTEHPERATURE ELEHENT
RCS/RECIRC PUHP fll INLETTEHPERATURE INDICATOR
RCS/RECIRC PUHP Ill REACTORTEHPERATURE HV/I CONVERTER
RCS/RECIRC PUHP ill REACTORTEHPERATURE INDICATOR
RCS/RECIRC PUHP 412 INLETTEHPERATURE HV/I CONVERTER
RCS/RECIRC PUHP $ 12 INLETTEHPERATURE ELEHENT
RCS/RECIRC PUHP f12 INLETTEHPERATURE ELEHENT
RCS/RECIRC PUHP 412 INLETTEHPERATURE INDICATOR
RCS/RECIRC PUHP 412 REACTORTEHPERATURE HV/I CONVERTER
RCS/RECIRC PUHP 412 REACTORTEHPERATURE INDICATOR
RCS/RECIRC PUHP II4 INLETTEHPERATURE HV/I CONVERTER
TB
TB
TB
DM
DM
TB
TB
TB
TB
218 RC LP 11 237 YES BS GRS YES YES YES YES YES AD
250
261
277
250
RSP 11
ACR-1536
CR PNL F
RSP 11
RSP 11
ACR-IS36
CR PNL F
RSP 11
YES AD
YES AD
YES AD
YES AD
250 RSP 11
261 ACR-1536 BOX
277
277
CR PNL F BOX
RSP 12 BOX
RSP 11
ACR-IS36
CR PNL F
RSP 12
YES AD
YES AD
YES AD
YES AD
218 RC LP 12 237 YES BS GRS YES YES YES YES YES AD
218 RC LP 12 237 YES BS GRS YES YES YES YES 'YES AD
CERTIFICATION:
All the lnfornation contained on this Screening Verlflcatlon Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'Al I lnfornatlon'ncludes each entry and conclusion (whether ver lfled to beselsalcally adequate or not).
Approved: (Signatures of al I Selsnlc Capabl I lty Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All slgnatorles should agree with all of the entries andconclusions. One signa should be a licensed professionalengineer . )
CARHEN R. AGOSTA nfi le-Prlnt or Type Mane gnature ate
MALTER DJORDJEVIC / rPrint or Type Nane ate
nt or ype ane gnature ate
nt or ype ane gnature ate
CERT IF I CAT IONr
The lnfornatlon provided to the Selsalc CapabllltyEngineers regarding systens ard operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge ardbel lef, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequlr ed lf the Selsalc Capablllty Engineers decolt necessary.)
nt or ype ane gnature nt or ype ane gnature
h
I I
'
0II
~ '
Page Ho. 16Report Date/The: 11-26-95 / 14:14:37
NIHE HILE POINT UNIT ONE Data Base Fl le Nane/Date/Tine: NMP1 3.DBF / 11/26/95 / 14: ll:28SCREENIHG VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notes 'AD')Progran File Mane 6 Version: SSEM 2.2
LIHENO.
~ 0 ~ 000
(1)
EQUIPCLASS HARK HO.~ 0 ~ 0 ~ 0$ ~ $ $ $ ~ $ $ ~ 0 ~ 0 ~ ES ~ 0
(2) (3)
SYSTEM/EQUI PHENTDESCRIPT IOH
~ 0 ~ 0 ~ 0 ~ 0 ~ $ $ ~ 0 ~ 0 ~ 0 ~ 0 ~ $ $ $ ~ 0 ~ 0 ~ E ~ 0 ~ 0 ~
(4)
Building~ 0 ~ 0 ~ 0 ~ 0 ~ 0
(5)
EQUIPHENTFir. Eiv.
0 ~ E ~ 00 ~ 0 ~ 0
(6)
LOCATION -—-->Rn. or Row/Col.~ 0 ~ 0 ~ E ~ 0 ~ 00 ~ SE ~
(7)
BaseElev. <40'7~ \ ~ $ $ \ ~ \ ~ 0
(8) (9)
CapacitySpectrun~ 0 ~ $ $ ~ 00
(10)
DenandSpectrun0 ~ 0 ~ E ~ $ $
Cap. >Denand70 ~ 0 ~ 0 ~ 0
(12)
CaveatsOK7
~ 0 ~ 0 ~ 0 ~
(13)
AnchorOK2
~ 0 ~ 0 ~ 0
(14)
Inter-act OK7000 ~ 0 ~ 0
(15)
EquipOK7 Notes
~ 0 ~ 0 ~ ~ 0 ~ 0 ~
(16) (17)
5104 19 32-04A
5107 19 32-04A
5131 20 32-04B
5117 20 32-04C
5126 20 32-040
5123 20 32-05
5103 19 32-05 A
5108 19 32-OSA
5132 20 32-OSB
5118 20 32-05C
5127 20 32-OSD
RCS/RECIRC PUMP 414 INLETTEMPERATURE ELEHENT
RCS/RECIRC PNP f14 INLETTEHPERATURE ELEHENT
RCS/RECIRC PUMP 414 INLETTEHPERATURE IHDICATOR
RCS/RECIRC PUMP f14 REACTORTEHPERATURE MV/I COHVERTER
RCS/RECIRC PUMP 414 REACTORTEHPERATURE INDICATOR
RCS/RECIRC PUMP 415 INLETTEMPERATURE HV/I CONVERTER
RCS/RECIRC PUHP 4 IS INLETTEHPERATURE ELEMEHT
RCS/RECIRC PUMP f15 INLETTEMPERATURE ELEMENT
RCS/RECIRC PUHP 4 IS INLETTEHPERATURE INDICATOR
RCS/RECIRC PUHP 415 REACTORTEMPERATURE HV/I CONVERTER
RCS/RECIRC PNP 415 REACTORTEHPERATURE INDICATOR
DN
TB
TB
DW
DW
TB
TB
TB
218
218
RC Lp 14
RC LP 14
237 YES BS
237 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
277
261
277
277
RSP 12
ACR-1536
CR PNL F
RSP 12
BOX
RSP 12
ACR-1536
CR PNL F
RSP 12
YES AD
YES AD
YES AD
'YES AD
277 RSP 12
261 ACR-1S36 BOX
277 CR PNL F BOX
RSP 12
ACR-1536
CR PNL F
YES AD
YES AD
YES AD
218 RC LP 15 237 YES BS GRS YES YES YES YES YES AD
218 RC LP 15 237 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornation contained on this Screening Verification Data Sheet(SVDS) ls, to the best of en knowledge and belief, correct and accurate.All Infornation'ncludes each entry and conclusion (whether verlfled to be
selsalcally adequate or not).
Approved: (Signatures of all Selsnic Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. Ail signatories should agree with all of the entries andconclusions. One slg should be a lice ed professionalengineer.)
CARMEH R. AGOSTA // FrPrint or Type Mane gnatyre/
HALTER DJORDJEVIC PV'/ 2- /Print or Type Nane ategnature
nt, or ype ane gnature ate
nt or ype ane g nature ae
CERTIFICATION:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired If the Seisalc Capability Engineers decalt necessar y.)
nt or ype are g nature ate nt or ype ane gnature ate
'
Page No. 17Report Date/Tiae: 11-26-95 / 14:14r37
HIRE HILE POIHI'NIT ONE Data Base File Naae/Date/Tine: NHP1 3.DBF / 11/26/95-/ 14r 11:28SCREEHING VERIFICATION DATA SHEET (SVDS) Sort Crlter lar ID Nuaber
Filter Criterlar (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Prograa File Haae 6 Verslonr SSEH 2.2
LINENO.
~ $$$ AS
(1)
EQUIPCLASS HARK HO.~ S ~ $ ~ ~ S ~ S ~ $ ~ S ~ $ $ ~ $ ~ S ~ $ $
(2) (3)
SYSTEH/EQUIPHENTDESCRIPTION
~ S ~ S ~ S ~ $ ~ $$$ ~ \ ~ S ~ $ ~ S ~ S ~ $$ ~ S ~ $ ~ \ ~ $ $
(4)
8ul ldlng~ $ $ ~ $ ~ $ ~ $ $
(5)
EQUIPHEHTFir .Elv.
~ $ ~ $ $ $ ~ S ~ S
(6)
NATION ----> BaseRa. or Row/Col. Elev.~ $ ~ S ~ $ ~ $ $ $ ~ S ~ $ ~ ~ S ~ S ~
(7) (8)
Capacity<40'2 Spectrua~ S ~ S ~ ~ S ~ S ~ S ~ $
(9) (10)
DeaardSpectrun~ S ~ S ~ $ ~ S
Cap. > Caveats AnchorDeaand2 OK2 OK2S ~ S ~ $ ~ $ ~ S ~ S ~ S ~ ~ $ ASS ~
(12) (13) (14)
Inter-act OK2~ S ~ S ~ S ~
(15)
EquipOK2 Notes
~ S ~ S ~ ASS AS
(16) (17)
5128 20 32-405A
5119 20 32-4058
4215 OBA 33-OIR
4213 OBA 33-02R
2023 18 36-03A
4101 18 36-03A
2024 18 36-038
4103 18 36-038
2029 18 36-03C
4104 18 36-03C
2030 18 36-030
4102 18 36-030
2025 18 36-04A
2026 18 36-048
2031 18 36-04C
RCS/RECIRC PUMP 413 REACTORTEHPERATURE INDICATOR
RCS/RECIRC PUHP 413 REACTORTEHPERATURE HV/I CONVERTER
RCU/REACTOR CLEANUP IHLET IHNERISO VLV
TB
TB
DW
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RPS/RCS LEVEL TRANSHITTER
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RCU/REACTOR CLEANUP OUTLET INNER DW
ISO VLV
277
261
259
259
CR PNL F
ACR-1536
NB
NB
W INST RH
W INST RH
W INST RH
W INST RH
E INST RH
E INST RH
E INST RH
E IHST RH
W INST RH
W INST RH
E IHST RH
259 YES BS
259 YES BS
284 IES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
CR PNL F
ACR-1536
YES AD
YES AD
GRS YES YES YES IES YES AD
GRS YES YES YES YES YES AD
GRS YES IES IES YES YES AD
GRS YES YES YES YES 'YES AD
YES YES YES YES YES AD
GRS YES YES 'YES YES YES AD
GRS YES IES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES IES YES YES YES AD
YES IES YES YES YES AD
GRS IES YES YES YES YES AD
GRS YES IES YES YES YES AD
GRS IES YES YES YES 'IES AD
CERTIFICATION:
A'll the lnforaation contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct ard accurate.'All Inforaatlon includes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsaicReview Teaa (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slg hould e a licensed professionalengineer. )
CARHEH R. AGOSTA ./i /e-Prlnt or Type Naae 9nat ate
WALTER DJORDJEVIC /y 1fPrint or Type Naae 9 na tlife'te r nt or ype aae gnature
r n or ype aae gna re
CERTIFICATION:
The lnforaatlon provided to the Selsalc Capabl 1 1 tyEngineers regarding systeas and operations of the equlpaentcontained on this SVDS is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer lsrequired if the Selsalc Capabl I 1ty Engineers decaIt necessary.)
nt, or ype aae gnature nt or ype aae gnature ate
N
Jl
0
Page Ho. 18Report Date/Tine: 11-26-95 / 14:14:37
NINE NILE POINT UNIT ONE Data Base File Hane/Date/Tine: NNP1 3.DBF / ll/26/95./ 14:ll:28SCREEHIHG VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes. ~ 'AD')Progran File Nane 8 Version: SSEH 2.2
LINE Eig IPHO. CLASS
0 '0 ' ~ 0 ~ 0 ~
(I) (2)
NARK NO.~ 0 ~ 0 ~ 00 ~ 0 ~ 0 ~ 0 ~ 00 '
(3)
SYSTEN/EOUIPHENTDESCRIPTION
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0
(4)
Building~ 0 ~ 0 ~ 0 ~ 0 ~ 0
(5)
EOUIPMEHT LOCATION —-->Fir.Elv. Rn. or Row/Col.
~ \ ~ 0 ~ \ ~ 0 ~ 0 ~ 0 ~ 0 ~ \ ~ 0 ~ 0 ~ 0 ~ 0 ~
(6) (7)
BaseElev. <40'7~ 0 ~ 0 ~ ~ 0 ~ 0 ~
(8) (9)
Capacity Denand Cap. >Spectrun Spectrun Denand7~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ \ ~ 0 '0
(10) (11) (12)
CaveatsOK7
~ 0 ~ 0000(13)
Anchor Inter- Equi pOK7 act OKT OK7 Notes
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 00 ~ 0 '0 0 ~ 0 ~ 0
(14) (15) (16) (17)
2032 18 36-04D
2027 18 36-07A
3103 18 36-07A
2028 18 36-078
2033 18 36-07C
2034 18 36-07D
3106 18 36-07D
4107 20 36-09
4108 20 36-10
3104 18 36-102
3111 20 36-102A
3115 20 36-103
3102 18 36-104
3110 20 36-25
4109 20 36-26
3114 20 36-27
4110 20 36-28
RPS/RCS LEVEL TRANSNITTER
RCS/RCS PRESSURE TRANSHITTER
RCS/RCS PRESSURE TRAHSHITTER
RPS/RCS PRESSURE TRAHSHITTER
RPS/RCS PRESSURE TRAHSHITTER
RCS/RCS PRESSURE TRAHSNITTER
RCS/RCS PRESSURE TRAHSHITTER
RCS/RCS LEVEL IHDICATOR
RCS/RCS LEVEL INDICATOR
RCS/RCS PRESSURE TRANSHITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS PRESSURE RECORDER
RCS/RCS PRESSURE TRANSHITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL INDICATOR
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL INDICATOR
RB
RB
RB
RB
RB
RB
RB
TB
TB
RB
TB
TB
RB
TB
TB
TB
TB
277
277
277
277
277
277
250
250
E UHST RH
N IHST RH
N IHST RN
N INST RH
N IHST RH
E INST RH
E INST RH
CR PHL F
CR PHL F
N INST RH
CR COH E
CR COH E
N INST RN
RSP 12
RSP 12
'SP llRSP 11
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
284 YES BS
BOX
AD YES BS
BOX
284 YES BS
BOX
BOX
GRS
CR PHL F
CR PHL F
YES YES 'YES YES YES AD
YES YES YES YES YES AD
YES AD
YES AD
GRS YES YES YES YES YES AD
CR COH E
CR COH E
RSP 12
RSP 12
RSP 11
RSP 11
YES AD
YES AD
YES YES YES YES YES AD
YES AD
YES AD
YES AD
YES AD
GRS 'YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All infornation'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat hould be a licensed professionalengineer. )
CARNEH R. AGOSTA .(i /~Print or Type Hane gnarl ate
,I
HALTER DJORDJEVICPrint or Type Hane agnature g
nt or ype ane gnature ate
nt or ype ane gnature ate
CERTIFICATION:
The infornation provided to the Selsnic CapabilityEngineers regarding systens and operations of the equi pnentcontained on this SVDS is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnic Capability Engineers deenlt necessary.)
nt or ype ane gnature nt or ype ane g nature ate
ll t1
I
4
0II 1
Page No. 19Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UHIT ONE Data Base File Naae/Date/Tine: NNP1 3.DBF / ll/26/95s/ 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Cr lterla: 10 Nuaber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Prograa File Haae 8 Version: SSEH 2.2
LINE EQUIPHO. CLASS HARK HO.
AS USES ~ S ~ S ~ ~ S ~ S ~ S ~ S ~ \ ~ S ~ S USES
(I) (2) (3)
SYSTEH/EQUI PHEHTDESCRIPTION
SS ~ \ ~ SS ~ \ ~ S ~ \ ~ S ~ S ~ S ~ S ~ S ~ S ~ SS AS AS AS
(4)
Bul ldlng~ SSS ~ SS ~ S ~
(5)
EQUIPHENTF lr.Elv.
~ S ~ S ~ SS ~ S ~
(6) (7) (8) (9)
LOCATION --—-> BaseRa. or Row/Col. Elev. <40'2
CapacitySpectrua~ S ~ S ~ S ~ S
(10)
DeaandSpectrua~ S ~ S ~ S ~ S
Cap. > Caveats Anchor Inter- EquipDeaand2 OK2 OK2 act OK2 OK2 Hotes~ S ~ S ~ S ~ ~ S ~ S ~ S ~ AS USES ~ S ~ S ~ S ~ ~ S ~ S ~ ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
3101 18 36-31
4111 18 36-31
3108 20 36-31A
4115 20 36-31C
3105 18 36-32
4112 18 36-32
3113 20 36-32A
3112 18 36-328
4116 20 36-32C
3116 20 36-34
4105 18 36-76
4119 20 36-76A
4117 20 36-768
4106 18 36-77
4120 20 36-77 A
RCS/RCS PRESSURE TRANSHITTER
RCS/RCS PRESSURE TRAHSHITTER
RCS/RCS PRESSURE INDICATOR
CIRL/CONTROL COHPONEHT (FUNCTIONGEHERATOR)
RCS/RCS PRESSURE TRAHSHITTER
RCS/RCS PRESSURE TRANSHITTER
RCS/RCS PRESSURE INDICATOR
RCS/RCS PRESSURE INDICATOR
RB
RB
TB
TB
RB
TB
RB
RCS/RCS PRESSURE INDICATOR
RCS/RCS LEVEL TRAHSHITTER
RCS/RCS LEVEL INDICATOR
CTRL/CONTROL COHPONENT(HULTIPLIER/DIVIDER)
RCS/RCS LEVEL TRANSHITTER
RCS/RCS LEVEL INDICATOR
TB
RB
TB
TB
RB
TB
CTRL/CONTROL COHPOHENT (FUHCTIOH TBGENERATOR)
277
261
277
261
277
277
261
277
W INST RH
W INST RH
CR PHL F
ACR-1S34
E INST RH
E INST RH
CR PNL F
E INST RH
ACR-1S35
CR CON E
W INST RH
CR PNL F
ACR-IS34
E IHST RH
CR PHL F
284 YES BS
284 YES BS
284 YES BS
2&4 YES BS
284 YES BS
BOX
284 YES BS
284 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
CR PHL F
ACR-1S34
YES AD
YES AD
CR PHL F
YES YES YES YES YES AD
'YES AD
GRS YES YES YES YES YES AD
ACR-1535
CR COH E
YES AD
YES AD
GRS YES YES YES YES YES AD
CR PNL F
ACR-IS34
YES AD
YES AD
GRS YES YES YES YES YES AD
CR PHL F YES AD
GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnforaatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All lnforaatlon'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SeisalcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agr ee with all of the entries andconclusions. One slgnat should be a licensed professionalengineer.)
CARHEH R. AGOSTAPrint or Type Haae gnatur ate
WALTER DJORDJEVIC 2/Print or Type Haae ig tur ate
nt or ype aae gnature IISe
nt or ype aae gnature
CERTIFICATION:
The lnforaatlon provided to the Selsalc CapabilityEngineers regarding systeas and operations of the equlpaentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeas or Operations Engineer lsrequired if the Selsaic Capability Engineers decait necessary.)
nt or ype aae g nature ate nt or ype aae gnature ate
0
II
LINENO.
F 000 '(I)
EOUIPCLASS HARK NO.~ 0 ~ 0 ~ ~ $ $ 0 ~ 0$ ~ $ 0$ ~ \ ~ \ ~ 0
'2)(3)
SYSTEH/EOUIPHENTDESCRIPTION
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ $0$ ~ 0 ~ 0 ~ $$ ~ SS ~ 0 ~ 0 ~ 0 ~ 0 ~ 0
(4)
Page No. 20Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Nane/Date/Tine: NHP1 3.DBF / ll/26/95 / 14:11:28SCREENING VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID Nunber-
Fllter Criteria: (Eval. Concern CONTAINS 'A') AND (SUDS Notes 'AD')Progran File Mane 8 Version: SSEH 2.2
<--------- EOUIPHEHT LOCATION -----> Base Capacity Denand Cap. > Caveats Anchor Inter- EquipBuilding Fir.Elv. Rn. or Row/Col. Elev. <40'7 Spectrun Spectrun Denand7 OKT OKT act OK7 OK7 Notes
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ $ $ $ $ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 '0 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ 0'0 0 ~ 0 ~ 0
(5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
4118 20 36-778
3129 18 36-90A
3127 18 36-90B
CTRL/COHTROL COMPONENT
(HULTI PLIER/DIVIDER)
HS/HS EHERG ELECTROHATIC RV 4111PRESS INDICAT SMITCH
TB
RB
HS/HS EHERG ELECTROHATIC RV $ 112 RBPRESS INDICAT SMITCH
261 ACR-1535 ACR-1535 YES AD
M INST RH 284 YES BS GRS YES YES YES YES YES AD
M IHST RH 284 YES BS GRS YES YES YES YES YES AD
3133 18 36-90C
3135 18 36-90D
3131 18 36-90E
3137 18 36-90F
6118 07 39-05
6119 088 39-05E
6120 088 39-05F
6121 088 39-OSG
HS/HS EHERG ELECTROHATIC RV 4121PRESS INDICAT SMITCH
HS/HS EHERG ELECTROHATIC RV $ 122PRESS INDICAT SMITCH
HS/HS EHERG ELECTROHATIC RV f113PRESS INDICAT SMITCH
HS/HS EHERG ELECTROHATIC RV f123PRESS INDICAT SMITCH
EC/LOOP Ill CONDENSER RETURN ISOVLV
EC/LOOP fll CONDENSER RETURN ISOVLV PILOT
EC/LOOP 411 CONDENSER RETURN ISOVLV PILOT
EC/LOOP 411 CONDENSER RETURH ISOVLV PILOT
RB
RB
RB
RB
RB
RB
RB
RB
E INST RH
E INST RH
N INST RH
284 YES BS
284 YES BS
284 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
281 IV ROOH
281 IV ROOH
281 YES BS GRS YES YES YES YES 'YES AD
281 YES BS GRS YES YES YES YES YES AD
281
281
IV ROON
IV ROON
281 YES BS
281 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
284 E INST RH 284 YES BS GRS YES YES YES YES YES AD
CERI'IF I CATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) Is, to the best of our knowledge ard belief, correct ard accurate.All lnfornatlon'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Sel sole Capability Engineers on the SelsnlcReview Tean (SRT) are r equired; there should be at least two onthe SRT. All signatories ould agree with all of the entries andconclusions. One slg y hould be a licensed professionalengineer. )
CARHEN R. AGOSTAPrint or Type Mane gnatur ate
HALTER DJORDJEVIC /Print or Type Mane gnature ae
nt or ype ane gnature ate
r nt or ype ane gnature ate
CERTIFICATION:
The lnfornatlon provkded to the Selsnlc CapabilityEngineers regarding systens and operations of the equi pnentcontained on this SUDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired If the Selsnlc Capab1 I lty Engineers deenlt necessary.)
r nt or ype ane gnature ate nt or ype ane gnature ate
P
4
- J
L
a
qh I
Page No. 21Report Date/The: 11-26-95 / 14:14:37
NINE HILE POINT UNIT OHE Data Base File Hane/Date/Tine: HHPI 3.DBF / ll/26/95 / 14:11:28SCREENING VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID Huober
Filter Criteria: (Eval. Concern CONTAIHS 'A') AHD (SUDS Notes 'AD')Progran Flic Haoe 5 Version: SSEH 2.2
LINENO.
~ $ ~ \ ~ $
(I)
EOUIPCLASS HARK HO.~ $ $ $ ~ $ $ $ $ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(2) (3)
SYSTEH/EDUIPHEHTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $
(4)
Bul lding~ $ $ ~ $ $ ~ $ ~ $
EOUIPHEHT LOCATIOH ---->Flr.EIv. Rn. or Row/Col.
$ ~ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $
(6) (7)
BaseElev. <40'2~ $ $ ~ $ $ ~ $ ~ $
(8) (9)
CapacitySpectrua~ $ ~ $ ~ $ ~ $
(10)
Deoand Cap. >Spectrua Deoandl
(ll) (12)
Caveats Anchor Inter- EquipOK2 OK2 act OK2 OK2 Notes
~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ \ ~ $ ~ $ ~ $ ~
(13) (14) (16) (16) (17)
6122 088 39-OSH
6123 07 39-06
6124 088 39-06E
6125 088 39-06F
6126 088 39-06G
6127 088 39-06H
4207 088 39-11C
6129 088 39-11C
4208 088 39-11D
6130 088 39-110
4206 07 39-11R
EC/LOOP 411 CONDENSER RETURN ISOVLV PILOT
RB
EC/LOOP 412 CONDENSER RETURN ISOVLV PILOT
EC/LOOP 412 CONDENSER RETURN ISOVLV PILOT
EC/LOOP 412 COHDEHSER RETURN ISOVLV PILOT
EC/LOOP 411 EHERGENCI COHDEHSERDRAIN ISO VLV PILOT
EC/LOOP fll EHERGENCY COHDEHSERDRAIN ISO VLV PILOT
EC/LOOP sll EHERGENCY COHDEHSERDRAIN ISO VLV PILOT
EC/LOOP Oil EHERGENCT CONDENSERDRAIN ISO VLV PILOT
EC/LOOP 411 EHERGEHCY CONDENSERDRAIN ISO VLV fill
RB
RB
RB
RB
RB
RB
RB
RB
EC/LOOP f12 CONDENSER RETURN ISO RBVLV
EC/LOOP 412 CONDENSER RETURH ISO RBVLV PILOT
281 IV ROOH
281 IV ROOH
281 IV ROOH
281 IV ROOH
281 IV ROOH
298
298
IV ROOH
IV ROOH
281 IV ROOH
298 IV ROOH
298 IV ROOH
298 IV ROOH
281 IES BS
281 YES BS
281 YES BS
281 YES BS
281 YES BS
281 YES BS
GRS IES IES YES YES IES AD
GRS TES YES IES YES 'YES AD
GRS YES YES YES 'YES YES AD
GRS YES YES YES YES YES AD
YES 'YES YES YES YES AD
GRS YES YES YES YES YES AD
298 NO GERS RRS YES YES YES YES YES AD
298 NO GERS RRS 'YES YES 'YES YES YES AD
298 HO GERS RRS YES YES YES YES YES AD
298 HO GERS RRS YES YES YES IES YES AD
298 HO GERS RRS — YES YES YES IES YES AD
CERT IF ICATIOH:
All the Inforoatlon contained on this Screening Verification Data Sheet(SVDS) Is, to the best of our knowledge ard belief, correct ard accurate.AII Infornatlon'ncludes each entry ard conclusion (whether verified to be
selsolcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at, least two onthe SRT. All signatories should agree with all of the entries ardconclusions. One signator hould be a licensed professionalengineer.)
CARHEH R. AGOSTA /a~Print or Type Haoe g ry ate
HALTER DJORDJEVIC />/i8'JPrint or Type Nane 9naturee ate
r nt or ype ane g nature ate
r nt or ype ane g nature ~aae
CERTIFICATION:
The Infornation provided to the Selsulc Capabl I ltyEngineers regarding systeos ard operations of the equlpoentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeos or Operations Engineer lsrequired if the Selsnlc Capabi I lty Engineers decolt necessary.)
nt or ype aoe gnature nt or ype aoe g nature ate
l
f
~ 1
Page No. 22Report Date/Tine: 11-26-95 / 14:14:37
HIHE HILE POINT UNIT ONE Data Base File Naoe/Date/Tine: NHPI 3.DBF / 11/26/95 /.14:11:28SCREENING VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAIHS 'A') AHD (SVDS Hotes 'AD')Prograo File Naoe 5 Version: SSEH 2.2
LINE EQUIPHO. CLASS HARK HO.
~ $ ~ $ ~ s ~ $ $ ~ s ssssssssssss ~ $ $ $ $ $
(1) (2) (3)
SYSTEH/EQUIPHENTDESCRIPT ION
~ s ~ s ~ $ $ $ $ $ $ $ $ ~ $ $ $ $ $ $ $ ~ s ~ s ~ s ~ $ $ $ $ $ ~
(4)
Building$ $ ~ $ $ ~ S ~ $ $
(6)
EQUI PHEHTFir. E1v.
seas ~ s ~ s ~ s
(6)
LOCATION ----> BaseRo. or Row/Col. Elev. <40'7~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ ~ S ~ $ $ ~ S ~ S ~
(7) (8) (9)
Capacity Deoand Cap. >Spectruo Spectruo Deoand7$ $ $ $ $ $ ~ s $ $ ~ $ $ $ $ $ s ~ $ $ $ $ $
(10) (11) (12)
CaveatsOK7
~ S ~ $ $ ~ S
(13)
Anchor Inter- EquipOK7 act OKT OK7 Hotes
Seasan $ $ $ ~ S ~ S ~ S ~ S ~ ~ S ~ S ~
(14) (IS) (16) (17)
6128 07 39-IIR
4210 088 39-12C
6132 088 39-12C
4211 088 39-12D
6133 088 39-12D
4209 07 39-12R
6131 07 39-12R
4216 088 39-13C
6135 088 39-13C
4217 08B 39-13D
6136 08B 39-13D
EC/LOOP Sll EHERGENCY CONDENSERDRAIN ISO VLV 4111
EC/LOOP 411 EHERGENCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP Sll EHERGENCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP Sll EHERGENCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP Sll EHERGENCY CONDENSERDRAIH ISO VLV PILOT
EC/LOOP Sll ENERGENCY COHDEHSERDRAIN ISO VLV 9112
EC/LOOP Oil EHERGENCY CONDENSERDRAIN ISO VLV 0112
EC/LOOP 412 EHERGENCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP 412 EHERGENCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP 812 EHERGEHCY CONDEHSERDRAIN ISO VLV PILOT
EC/LOOP 412 EHERGEHCY CONDENSERDRAIN ISO VLV PILOT
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
RB
298
298
298
298
298
IV ROOH
IV ROOH
IV ROOH
IV ROOH
IV ROOH
298
298
298
IV ROOH
IV ROON
IV ROON
298 IV ROON
298 IV ROON
298 IV ROON
298 NO GERS RRS YES YES YES YES YES AD
298 HO GERS RRS YES YES YES YES YES AD
298 NO GERS RRS YES 'YES YES YES 'YES AD
298 NO GERS RRS YES YES YES YES TES AD
298 NO GERS RRS
298 NO GERS RRS
YES YES YES YES YES AD
YES YES 'YES YES YES AD
298 NO GERS RRS
298 NO GERS RRS
YES YES YES YES YES AD
YES YES YES YES 'YES AD
298 NO GERS RRS YES YES YES 'YES YES AD
298 NO GERS RRS YES YES YES YES YES AD
298 HO GERS RRS YES YES YES YES YES AD
nt or ype aoe 9natur'e ate
CERTIFICATION:
All the lnforoatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All inforoatlon'ncludes each entry and conclusion (whether verified to be
seisolcally adequate or not).
Approved: (Signatures of al I Selsolc Capability Engineers on the Sei soleReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa should be a licensed professionalengineer. )
CARHEH R. AGOSTA .i/~~Print or Type Naoe 9na Urp ate
WALTER DJORDJEVIC gl, /E /jPrint or Type Naoe ategnatura
nt or ype aoe gnature ate
nt or ype aoe
nt or ype aoe
gnature
gnature
ate
ate
CERTIFICATION:
The lnforoatlon provided to the Selsolc CapabilityEngineers regarding systeos ard operations of the equipoentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeos or Operations Engineer lsrequired if the Selsolc Capabl I lty Engineers decolt necessary.)
0
0
Page No. 23Report Date/The: 11-26-95 / 14:14:37
NINE KILE POINT UHIT OHE Data Base File Hane/Date/Tine: NNP1 3.DBF / 11/26/95 /$ 14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Nane 6 Version: SSEH 2.2
LINEHO.
~ S ~ S ~ S
(I)
EIQIPCLASS HARK HO.S ~ S ~ S ~ $ ~ \ ~ $$$$ ~ S ~ S ~ S ~ ST
(2) (3)
SYSTEH/EDUIPHEHTDESCRIPT ION
~ $$$ ~ $ ~ S ~ $$$ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S
(4)
Bul lding~ S ~ S ~ S ~ S ~ S
(5)
EOUIPHEHT LOCATION --->Fir. Elv. Rn. or Row/Col.
~ S ~ S ~ S ~ S ~ S S ~ $ $ $ $ ~ S ~ S ~ S ~ S ~
(6) (7)
BaseElev. <40'7S ~ S ~ S ~ S ~ $ $
(8) (9)
Capacity DenandSpectrun SpectrunS ~ S ~ S ~ $ $ $ $ $ ~ S ~ $ $
(10) (11)
Cap. > CaveatsDenand7 OK7~ $ $ ~ S ~ S ~ S ~ S ~ S ~
(12) (13)
Anchor Inter - EquipOK7 act OK7 OK7 Notes
~ S ~ S ~ S ~ S ~ S ~ $ $ S ~ $ $ ~ SASHES
(14) (15) (16) (17)
4214 07 39-13R
6134 07 39-13R
4219 088 39-14C
6138 088 39-14C
4220 08B 39-14D
6139 088 39-14D
4218 07 39-14R
6137 07 39-14R
4124 08A 40-01
4126 08A 40-02
4170 08A 40-05
4169 OBA 40-06
4123 OBA 40-09
EC/LOOP 412 ENERGEHCY COHDEHSERDRAIN ISO VLV 4121
EC/LOOP 412 EHERGEHCY CONDENSERDRAIN ISO VLV 4121
EC/LOOP 412 EHERGEHCY CONDENSERDRAIN ISO VLV PILOT
EC/LOOP 412 EHERGENCY COHDENSERDRAIN ISO VLV PILOT
EC/LOOP 412 EHERGENCY CONDENSERDRAIH ISO VLV PILOT
EC/LOOP 412 EHERGENCY COHDENSERDRAIN ISO VLV PILOT
EC/LOOP 412 EHERGEHCY CONDEHSERDRAIN ISO VLV 4122
EC/LOOP 412 EHERGEHCY CONDENSERMAIN ISO VLV 4122
RB
RB
RB
RB
RB
RB
RB
CRS/CORE SPRAY TEST ISO VLV
CRS/CORE SPRAY TEST ISO VLV
RB
RB
CRS/CORE SPRAY INLET IHHER ISO VLV DW
CRS/CORE SPRAY INLET INNER ISO VLV DW
CRS/CORE SPRAY IHLET OUT ISO VLV RB
298
298
298
298
298
IV ROON
IV ROOH
IV ROON
IV ROON
IV ROON
261
237
237
237
261
AZ90
SE CORNER
KIO
K6
AZ90
298 IV ROOH
298 IV ROON
298 IV ROOH
298 HO GERS RRS
298 HO GERS RRS
YES YES YES YES YES AD
YES YES YES YES 7ES AD
298 HO GERS RRS YES YES YES YES YES AD
298 HO GERS RRS
298 HO GERS RRS
298 HO GERS RRS
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
237 YES BS
261 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
298 HO GERS RRS YES YES YES YES YES AD
298 HO GERS RRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
237 YES BS GRS YES YES YES YES YES AD
CERT IF ICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.'All lnfornatlon'ncludes each entry and conclusion (whether verified to beselsnlcal ly adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnicReview Tean (SRI') are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat s ld be a licensed rofesslonalengineer.)
CARNEN R. AGOSTA re~Print or Type Nane gnature ate
WALTER DJORDJEVIC /z iPrint or Type Wane as
nt or ype ane gnature ate
nt or ype ane gnature ate
CERTIFICATION:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpoentcontained on this SUDS Is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnic Capability Engineers decalt necessary.)
nt or ype ane g nature / nt, or ype ane g nature ate
I w
J
Page No. 24Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Hane/Date/Tine: NHPI 3.DBF / 11/26/95./ 14:ll:28SCREENING VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes ~ 'AD')Progran File Nane 8 Version: SSEH 2.2
LINEHO.
~ Sa ~ Sa
(1)
EQUIPCLASS HARK NO.sasss s ~ a ~ a ~ a ~ a ~ a ~ s ~ s ~ s ~
(2) (3)
SYSTEM/EQUI PHEHTDESCRIPTION
s ~ a ~ s ~ s ~ a ~ s ~ sss ~ a ~ s ~ s ~ s ~ s ~ s ~ s ~ a ~ s ~
(4)
Building~ a ~ s ~ s ~ s ~ s
(5)
EQUIPHENT LOCATIOH ---->Fir.Elv. Rn. or Row/Col.
~ ss ~ s ~ s ~ s ~ ~ s ~ s ~ s ~ s ~ s ~ Essa(6) (7)
BaseElev. <40'7~ S ~ S ~ ~ S ~ S ~
(8) (9)
CapacitySpectrun~ S ~ S ~ S ~ S
(10)
DenandSpectrun~ ssssaas
Cap. > Caveats Anchor Inter- EquipDenand7 OK? OK7 act OKT OKT NotesS ~ S ~ S ~ S ~ S ~ S ~ S ~ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
4121 OBA 40-10
4122 08A 40-11
4125 08A 40-12
2007 07 44.2-15
2008 07 44.2-16
2009 07 44.2-17
2010 07 44.2-18
6194C 07 59-07
6335 07 59-07
6189 07 60-03
6190 088 60-03C
6187 07 60-04
CRS/CORE SPRAY INLET INNER ISO VLV DN
CRS/CORE SPRAY INLET INHER ISO VLV DN
CRS/CORE SPRAY INLET OUT ISO VLV RB
CRD/SCRAM DISCHARGE VOL HOLDINGTANK VENT ISO VLV
CRD/SCRAH DISCHARGE VOL HOLDIHGTANK VENT ISO VLV
RB
RB
CTS/CONDENSATE M/U CONDENSER H/ULEVEL CONTROL VLV
ECMU/EMER COND MAKEUP TANK 12SUPPLY ISO VLV
ECMU/EMER COHO HAKEUP TANK 12SUPPLY ISO VLV PILOT
ECMU/EMER COND HAKEUP TANK 11SUPPLY ISO VLV
TB
TB
TB
TB
CRD/SCRAH DISCHARGE HEADER DRAIH RBISO VLV
CRD/SCRAH DISCHARGE HEADER DRAIN RBISO VLV
CTS/CONDENSATE M/U CONDENSER H/U TBLEVEL COHTROL VLV
261
261
237
237
AZ225
SE CORNER
N4
237
237 NS
369 HB
369 H4
237 N5
250 08
250 DB
369 H8
261 YES BS
261 YES BS
237 YES BS
237 YES BS
237 YES BS
237 'YES BS
237 TES BS
GRS YES YES YES YES 'YES AD
GRS YES YES YES TES YES AD
GRS YES YES YES YES TES AD,
GRS YES YES YES YES TES AD
GRS YES TES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES TES YES AD
250 YES BS GRS YES YES YES YES YES AD
250 YES BS GRS YES YES YES YES 'YES AD
369 NO BS RRS YES YES YES TES YES AD
BOX 60-03 YES AD
369 NO BS RRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All infornatlon includes each entry and conclusion (whether verified to be
selsnically adequate or not).
Approved: (Signatures of'll Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with ail of the entries andconclusions. One slg y ould be a I lcensed professionalengineer. )
CARMEH R. AGOSTAPrint or Type Nane gna re ate
HALTER DJORDJEVIC zzPrint or Type Nane ategnatqre
nt or ype ane gna re
r nt or ype ane gnature
CERI'IF ICATIOH:
The Infornatlon provided to the Selsnic CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired if the Selsnlc Capability Engineers deenIt necessary.)
nt or ype ane gnature ate nt or ype ane gnature ate
0
7
A
0I
Page Ho. 25Report Date/Tlnel 11-26-95 / 14l14l37
NINE HILE POINT UNIT ONE Data Base File Nalae/Date/Tirrel HHPI 3.DBF / 11/26/95 / 14llll28SCREENING VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Nuober
F liter Crlterlal (Eval. Concern CONTAINS 'A') AHD (SVDS Notes-'AD')Progran File Harre 8 Verslonl SSEH 2.2
LINE EQUIPNO. CLASS
~ S ~ S ~ S ~ ST ST
(I) (2)
HARK NO.~ S ~ S ~ S ~ S ~ SS ~ S ~ S ~ S ~
(3)
SYSTEH/EQUI PHENTDESCRIPT IOH
~ SSS ~ S ~ SSS ~ SSS ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S
(4)
Building~ S ~ S ~ S ~ S ~ S
(5)
EQUI WENTF lr.Elv.
~ S ~ S ~ S ~ S ~ S
(6) (7) (8) (9)
LOCATION -----> Basehr. or Row/Col. Elev. <40'7
CapacitySpectrurr~ S ~ S ~ S ~ S
(10)
Della ndSpectrurr~ S ~ S ~ S ~ S
Cap. > Caveats Anchor Inter- EquipDeoand7 OK7 OK7 act OK7 OK7 Notes~ S ~ S ~ S ~ S ~ S ~ S ~ \ S ~ S ~ S ~ ~ S ~ S ~ S ~ SASHES SS ~ ST
(12) (13) (14) (15) (16) (17)
6188 088 60-04C»
6186 21 60-09
6185 21 60-10
6184 07 60-13
6160 07 60-17
6163 20 60-17A
6164 20 60-178
6161 088 60-17D
6162 088 60-17E
6162A 20 60-17F
6174 07 60-18
6175 20 60-18A
ECNU/EHER COND HAKEUP TANK llSUPPLY 150 VLV PILOT
TB
ECHU/EHER COND HAKEUP WATER TANK TB412
ECHU/EHER COND HAKEUP WATER TANK411
TB
ECHU/EHER COHD HAKEUP TIE VLV RB
ECHU/EHER COND fill >112 LEVELCOHTROL VLV
RB
ECHU/EHER COND 4111,112 LEVEL E/P RBCONVERTER
ECHU/EHER COND IIII,II2LEVELCONTROLLER
ECHO/EHER COND fill,112 LEVELCONTROL VLV PILOT
ECHU/EHER COND 1111,112 LEVELCONTROL VLV PILOT
ECHU/EHER COND 4111,112 LEVELCOHTROL SWITCH
ECHU/EHER COND 4121>122 LEVELCOHTROL VLV
TB
RB
RB
TB
RB
ECHU/EHER COND 4121,122 LEVEL E/P RBCONVERTER
BOX 60-04 'YES AD
369
369
340
H4
Q-P, 7-9
369 HO BS
BS NO BS
369 NO BS
340 HO BS
Q-P, 7-9
277 CR PHL K
340 Q-P, 7-9 BOX
340 Q-P, 7-9 BOX
250 RSP 11 BOX
RRS YES NO HO 'YES NO AD
RRS YES NO HO YES NO AD
RRS YES YES YES YES YES AD
RRS
60-17
CR PNL K
60-17
60-17
RSP 11
YES YES YES YES YES AD
YES AD
YES AD
YES AD
YES AD
YES AD
340 Q-P, 7-9 BOX 60-18 YES AD
340 Q-P> 7-9 340 HO BS RRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge ard belief, correct and accurate.All infornatlon includes each entry and conclusion (whether verified to be
seisnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SeisaicReview Tearr (SRT) are required; there should be at least two onthe SRT. All signatories should agr ee with all of the entries andconclusions. One signa ovid e a licensed professionalengineer. ) rCARHEH R. AGOSTA
Print or Type Narre 9MUll'te/ /Z/P'WALTER MORDJEVICPrint or Type Hare g nature ate
nt or ype arre gnature alake
nt or ype ane g nature
CERTIFICATION:
The Infornation provided to the Selsnlc CapabilityEngineers regarding systerrs ard operations of the equi poentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired if the Selsaic Capability Engineers decaIt necessary.)
nt or ype ane gnature ate nt or ype ane gnatur e ate
/
Page No. 26Report Date/Tine: 11-26-95 / 14:14:37
HIRE NILE POINT UHIT ONE Data Base F I le Nane/Date/Tine: NHP1 3.DBF / 11/26/95./ 14:11:28SCREEHIHG VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Nane 8 Version: SSEH 2.2
LINENO.
~ $ ~ $ ~ $
(I)
EQUIPCLASS HARK HO.~ $ ~ $ $ ~ $ $ $ ~ $ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(2) (3)
SYSTEH/EQUIPHEHTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $ ~ $$ ~ $ ~ $ ~ $ ~ $$ ~ $ ~ $ ~ $ ~ $ ~ $ $ $
(4)
Building~ $ ~ $ ~ $ ~ $ ~ $
(5)
EQUI PHEHTFir.Elv.
~ $ ~ $ ~ $ ~ $ ~ $
(6) (7) (8) (9)
LOCATIOH ----> BaseRn. or Row/Col. Elev. <40'7~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
Capacity Denand Cap. > Caveats Anchor Inter- EquipSpectrun Spectrun Denandl OKT OK7 act OK7 OK7 Notes~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ ~ $ ~ $ ~ \ ~ ~ $ ~ \ ~ $ $ $ $ ~ $ ~ $ ~ \ ~ $ ~ ~ $ ~ $ $
(10) (11) (12) (13) (14) (15) (16) (17)
6179 20 60-188
6181 088 60-180
6182 088 60-18E
6182A 20 60-18F
6171 18 60-22
6169 20 60-22A
6170 20 60-228
6172 20 60-22C
6168 18 60-23
6176 20 60-23A
6180 20 60-238
ECHO/EHER COHD 4121,122 LEVELCONTROLLER
ECHO/EHER COND 4121,122 LEVELCONTROL VLV PILOT
ECHO/EHER COND 4121,122 LEVELCONTROL VLV PILOT
ECHU/EHER COND 4121)122 LEVELCOHTROL SNITCH
ECHU/EHER COHO fill>112 LEVELTRANSHITTER
TB
RB
RB
TB
RB
ECHO/EHER COND fill)112 LEVELCONTROLLER
ECHO/EHER COHO f111,112 LEVELINDICATOR
ECHU/EHER COND f121)122 LEVELTRANSHITTER
ECHU/EHER COND II21,122 E/PCOHVERTER
ECHU/EHER COND 4121 ~ 122 LEVELCONTROLLER
TB
TB
RB
RB
TB
ECHO/EHER COND 4111)112 LEVEL E/P RBCONVERTER
277
340
CR PNL K
Q-P) 7-9
Q-P, 7-9
BOX
BOX
CR PNL K
60-18
60-18
YES AO
YES AD
YES AD
277 RSP 12
318 P6
Q-P, 7-9
250 RSP 11
250 RSP ll
318 Pl 1
318 HO TRS
BOX
BOX
BOX
RSP 12
60-17
RSP 11
RSP 11
YES AO
YES YES YES YES YES AD
YES AD
YES AD
YES AD
340 Q-P, 7-9 BOX
277 RSP 12 BOX
60-18
RSP 12
YES AD
YES AD
318 NO TRS CRS YES YES YES YES YES AO
CERTIFICATION:
All the Infornation contained on this Screening Verification Data Sheet(SVOS) ls, to the best of our knowledge and belief, correct and accurate.'All Infornatlon'ncludes each entry and conclusion (whether verified to beselsnlcally adequate or not).
Approved: (Signatures of all Seisnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat should be a I ice ed professionalengineer. )
CARHEH R. AGOSTA ./ /~Print or Type Rane g nature ate
HALTER DJORDJEVIC /L /VI/Print or Type Rane ategnatur
nt or ype ane gnature
nt or ype ane gnature ~aaa
CERTIFICATION:
The infornatlon provided to the Selsnic CapabilityEngineers regarding systens and operations of the equipnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired If the Selsnlc Capability Engineers deenIt necessary.)
nt or ype ane gnature nt or ype ane g nature
W
li
t
y
II ~
Page No. 27Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Nane/Date/TIne: HHP1 3.DBF / 11/26/95.,/ 14:11:28SCREEHIHG VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nuober
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Naoe 8 Version: SSEH 2.2
LINE EQUIPHO. CLASS HARK NO.
ASS ~ I' I~ I~ ~ I ~ I ~ I ~ I ~ I ~ $~SS ASS
(1) (2) — (3)
SYST EH/EQUIPHENTDESCRIPTION
~ I ~ I ~ \ ~ I ~ I ~ I ~ I ~ I ~ I ~ I ~ I ~ \ ~ I~ I~ $ $ ~ I~
(4)
Building~ I~ I~ $ $ ~ I~
(5)
EQUIPHEHT LOCATION -----> Base CapacityFlr.Elv. Rn. or Row/Col. Elev. <40'7 Spectruri
~ I~ I~ I~ I~ I ~ I~ I~ I~ I~ I~ I~ $ $ ~ I~ I~ ~ I' ~ I~ I~ I~ I~
(6) (7) (8) (9) (10)
DenandSpectrua
Cap. > Caveats Anchor Inter-. EquipDeoandl OK7 OK7 act OKT OK7 Hotes~ $ $ ~ I~ I ~ I~ \ ~ \ ~ ~ I~ I~ I ~ I~ I~ $ $ ~ I~ I~ ~ I~ $ $
(12) (13) (14) (15) (16) (17)
6178 20 60-23C
6165 18 60-28
ECHO/EHER COND 4121>122'EVELINDICATOR
ECHU/EHER COND 4111,112 LEVELTRAHSHITTER
TB
RB
277
318
RSP 12 BOX RSP 12 YES AD
P6 318 HO TRS CRS YES YES YES YES YES AD
6166 20 60-28A
6167 18 60-29
6177 20 60-29A
4204 21 60-42
6117 21 60-42
4200 21 60-44
6116 21 60-44
4198 21 60-45
6115 21 60-45
4197 21 60-46
6114 21 60-46
7404 07 70-137
ECHU/EHER COND 4111,112 LEVELINDICATOR
ECHU/EHER COHO 4121>122 LEVELTRAHSHITTER
ECHU/EHER COND 4121,122 LEVELINDICATOR
EC/EHERGEHCY CONDENSER 4122
EC/EHERGENCY CONDENSER 4122
EC/EHERGENCY CONDENSER 4121
EC/EHERGENCY CONDENSER f121
EC/EHERGENCY CONDENSER 4112
EC/EHERGENCY CONDENSER 4112
EC/EHERGENCY CONDEHSER fillEC/EHERGEHCY CONDENSER 4111
RBCLC/RBCLC TEHPERATURE CONTROL
VALVE
TB
RB
TB
RB
RB
RB
RB
RB
RB
RB
RB
RB
277
318
277
340
340
340
340
340
340
340
298
CR PHL K
Pll
CR PNL K
PB
PB
P7
P7
P6
P6
N6
CR PHL K YES AD
CR PHL K YES AD
340 HO BS
340 HO BS
340 HO BS
340 NO BS
340 HO BS
340 HO BS
340 NO BS
340 HO BS
RRS YES YES YES 'YES 'YES AD
RRS YES YES YES 'YES YES AD
RRS YES YES YES YES YES AD
RRS YES YES YES YES YES AD
RRS YES YES YES YES YES AD
RRS YES TES YES YES YES AD
RRS YES YES YES YES YES AD
RRS YES YES YES YES YES AD
298 HO GERS RRS YES TES YES YES YES AD
318 HO TRS CRS YES YES YES YES YES AD
CERTIFICATION:
All the Inforoatlon contained on this Screening Verification Data Sheet(SUDS) ls, to the best of our knowledge and belief, correct and accurate.All Infornatlon'ncludes each entry and conclusion (whether verified to be
selsalcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SeisaicReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa hould be a licensed professionalengineer. )
CARHEN R. AGOSTA . i /.—Print or Type Haoe gna re ate
HALTER DJORDJEVIC />a vPrint or Type Haoe 9 nature) ate
nt or ype aoe gna ure
nt or ype aoe gnature ate
CERT IF ICATION:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systeos and operations of the equlpoentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One slgnatur e of Systeos or Operations Engineer Isrequired lf the Seisoic Capability Engineers decalt necessary.)
nt or ype aoe gnature > ate nt or ype aoe gnature ate
Page Ho. 28Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT OHE Data Base File Hase/Date/Tine: NHP1 3.DBF / 11/26/95../. 14:11:28SCREENIHG VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes. 'AD')Progr au File Nane 8 Version: SSEH 2.2
LIHE EOUI P SYSTQI/EQUIPHENTNO. CLASS HARK HO. DESCRIPTION
~ S ~ S ~ $ ASS AS ~ S ~ S ~ S ~ SES ~ S ~ S ~ $ $ $ ~ $ ~ S ~ \ ~ S ~ S ~ S ~ $ ~ S ~ S ~ S ~ E ~ S ~ S ~ E ~ S ~ S ~ S
(I) (2) (3) (4)
<————- EOUIPHEHTBul ldlng Fir. Elv.
A \ LESSNESS ~ $ $ $ $ $ ~ E ~ S
(5) (6)
LOCATION ----> Base CapacityRu. or Row/Col. Elev. <40'2 Spectrm~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ ~ S ~ $ $ ~ \ ~ $ $ SE ~ ES ~ S ~
(7) (8) (9) (10)
DeuandSpectrla~ E ~ S ~ S ~ S
Cap. > Caveats Anchor Inter- EquipDeaand7 OKT OK7 act OK7 OK7 Notes~ S ~ S ~ S ~ ~ S ~ S ~ S ~ SEE \ AS ~ \ ~ S ~ S ~ ~ S ~ S ~ ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
L4
LS
L7
CR PHL H
CR PNL H
7405 18 70-23F
7504 18 70-23F
7329 07 70-25
7330 088 70-25A
7335 07 70-26
7336 088 70-26A
7410 07 70-53
7411 088 70-53C*
RBCLC/ELECTRO PHEUHATIC CONVERTER RB 298
RBCLC/ELECTRO PNEUHATIC CONVERTER RB 298
CRAC/CHILLER 411 CONTROL VALVE TB
CRAC/CHILLER 411 CONTROL VALVE TB 300PILOT
H6
H6
A16
A16
CRAC/CHILLER f12 CONTROL VALVE TB
CRAC/CHILLER 412 CONTROL VALVE TBPILOT
RBCLC/SHUTDOVH COOLING HX ISOL RBVALVE
RBCLC/SHUTDONN COOLING HX ISOL RBVALVE PILOT
A16
A16
281 6L
6L281
7407 21 70-13R RBCLC/RBCLC HX 411 RB 298
7408 21 70-14R RBCLC/RBCLC HX 412 RB 298
7409 21 70-15R RBCLC/RBCLC HX 413 RB 298
7406 18 70-238 RBCLC/TEHPERATURE CONTROLLER TB 277
7505 18 70-238 RBCLC/TEHPERATURE COtlTROLLER TB 277
298 NO BS
298 NO BS
298 HO BS
RRS YES YES YES YES YES AD
RRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
CR PHL H
CR PNL H
70-137
70-137
300 NO GERS RRS
300 HO GERS RRS
300 HO GERS RRS
300 NO GERS RRS
YES AD
YES AD
YES AD
YES AD
YES YES YES YES YES AD
YES 'YES H/A YES YES AD
YES 'YES YES YES YES AD
YES YES H/A YES YES AD
70-53 YES AD
281 YES BS GRS YES HO YES YES HO AD
7137 06 79-53 DGOI/DG COOLIHG HATER PUHP 4102 SH
7503 07 72-146 SN/SERVICE HATER TEHP CONTROL RBVALVE
281
261
Pll
T17
281 YES BS GRS YES YES H/A YES YES AD
256 TES BS GRS YES NO YES YES HO AD
CERT IF ICAT ION:
All the Inforaatlon contained on thIs Screening Verification Data Sheet(SVDS) is, to the best of our knowledge and belief, correct and accurate.'All Info@nation'ncludes each entry and conclusion (whether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsulc Capability Engineers on the SeisulcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator ould be a licensed professionalengineer.)
CERTIFICATION:
The Infornatlon provided to the Selsnic CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Seisaic Capability Engineers decolt necessary.)
CARHEH R. AGOSTAPrint or Type Naue
HALTER DJORDJEVICPrint or Type Nane
gnatur
gnature
2 //rSPate
nt or ype aue
nt or ype aue
9nature
gnature
ate
nt or ype ane gnature nt or ype ane 9nature
Page No. 29Report Date/The: 11-26-95 / 14:14:37
NIHE HILE POINT UNIT ONE Data Base File Hase/Date/Tioer NHPl 3.DBF / ll/26/95. /,. 14r ll:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Cr lterla: ID Nurrber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Prograrr File Harre 8 Version: SSEH 2.2
LIHEHO.
~ $ ~ $ $ ~
(1)
7138 06 79-54
5186 06 80-03
5187 06 80-04
5211 OSA 80-118
5184 21 80-13
7208 21 80-13
5181 21 80-14
7205 21 80-14
5189 OSA 80-21
5192 OSA 80-22
5188 06 80-23
5185 06 80-24
5182 21 80-33
7206 21 80-33
5183 21 80-34
7207 21 80-34
EQUIPCLASS HARK NO.
(2) (3)
SYSTEH/EQUI PHENTDESCRIPTION
~ $ ~ $ ~ $ ~ $ ~ $$ ~ $$ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ $ $
(4)
Bu I 1 ding$ ~ $ ~ $ ~ $ ~ $ ~
(5)
DGCN/DG COOLING NATER PUHP 4103 SH
CS/CONT SPRAY PUHP 4121
CS/CONT SPRAT PUHP tillRB
RB
CS/CONT SPRAY HEADER ISOL VLV RB
CS/CONT SPRAY HEAT EXCHANGER 4122 RB
CS/CONT SPRAY HEAT EXCHANGER 4122 RB
CS/CONT SPRAY HEAT EXCHANGER 4112 RB
CS/CONT SPRAY HEAT EXCHANGER 4112 RB
CS/CONT SPRAI PUHP 4112 SUCTIONISO VLV
CS/CONT SPRAY PUHP 4122 SUCTIONISO VLV
CS/COHT SPRAY PUHP 4122
CS/CONT SPRAY PUHP 4112
RB
RB
RB
RB
CS/CONT SPRAY HEAT EXCHANGER 4121 RB
CS/CONT SPRAY HEAT EXCHANGER 4121 RB
CS/CONT SPRAY HEAT EXOIAHGER 4111 RB
CS/CONT SPRAY HEAT EXCHAHGER 4111 RB
261
198
198
298
318
318
318
318
198
198
198
198
318
318
318
318
T17
N CORHER
N CORHER
P7
PB
PB
P8
PS
HE CORHER
NH CORHER
N CORNER
HE CORNER
PS
P8
P8
PS
EQUIPHEHT LOCATION --->F lr.E1v. Ro. or Row/Col.
~ $ ~ $ ~ $ ~ $ $ ~ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~
(6) (7)
BaseElev. <40'2~ $ ~ $ ~ $ ~ $ ~ $
(8) (9)
CapacitySpectruo~ $ ~ $ ~ $ ~ $
(10)
256 YES BS
198 YES BS
198 YES BS
Cap. > CaveatsDeoandl OK2~ $ ~ $ ~ $ ~ $ ~ $ ~ $ ~ $
(12) (13)
DerrandSpectrrsm~ $ ~ $ ~ $ ~ $
GRS YES HO
Anchor Inter-OK2 act OK2
EquipOK2 Notes
$ ~ $ ~ $ ~ $ ~ $ ~
(16) (17)(15)(14)
YES YES HO AD
GRS YES YES YES YES IES AD
GRS YES YES YES YES YES AD
318 HO BS
318 HO BS
318 HO BS
318 HO BS
198 YES BS
198 YES BS
198 YES BS
198 YES BS
318 HO BS
18 HO BS
318 HO BS
318 NO BS
RRS
RRS
RRS
RRS
YES YES YES YES YES AD
YES YES YES IES YES AD
YES YES YES YES YES AD
YES YES YES IES YES AD
GRS YES YES YES 'YES YES AD
GRS YES YES YES IES YES AD
GRS YES YES YES IES YES AD
GRS YES YES YES YES IES AD
RRS YES YES YES YES YES AD
RRS YES YES IES YES YES AD
RRS YES YES 'IES YES YES AD
RRS YES YES YES YES YES AD
298 HO GERS RRS YES YES H/A IES YES AD
CERTIFICATION:
All the Infornatlon contained on this Screening Verification Data Sheet(SVDS) Is, to the best of our knowledge and belief, correct and accurate.All Inforrration'ncludes each entry and conclusion (whether verified to be
selsuically adequate or not).
Approved: (Signatures of all Seisrrlc Capability Engineers on the SeisrricReview Tearr (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signator should be a licensed professionalengineer.)
CERTIFICATION:
The Inforrration provided to the Seisoic CapabilityEngineers regarding systeos and operations of the equi poentcontained on this SVDS is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systeos or Operations Engineer lsrequired if the Seisulc Capability Engineers deerait necessary.)
CARHEN R. AGOSTAPrint or Type Narre
HALTER DJORDJEVICPrint or Type Harre
gna ure
gna ur
ate
at
nt or ype aoe
r nt or ype aoe
gnature
gnature ate
nt or ype aoe g nature ate nt or ype aoe gnature ate
l
4
Page No. 30Report Date/The: 11-26-95 / 14:14:37
NIHE HILE POINT UHIT OHE Data Base F I le Nane/Date/Tine: HNP1 3.DBF / 11/26/95 / 14:11:28SCREEHIHG VERIFICATION DATA SHEET (SVDS) Sor t Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notess ~ 'AD')Progr an File Hane 8 Version: SSEH 2.2
LINENO.
~ $ ~ $ $ $
(I)
EDUIPCLASS HARK HO.~ S ~ $ ~ ~ S ~ S ~ $ ~ $ ~ S ~ S ~ $ ~ $ ~ $
(2) (3)
SYSTEN/EljUIPHENTDESCRIPT ION
~ $$ ~ $ ~ S ~ S ~ S ~ $ ~ S ~ $ ~ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ $ ~
(4)
Bul ldlng~ S ~ S ~ $ ~ $ $ ~
(5)
EOUIPHEHTFir. E1v.
~ S ~ S ~ $ $ ~ $ ~
(6)
LOCATION —-->Rn. or Row/Col.~ S ~ S ~ $ $ $ ~ $ ~ S ~ $ $
(7)
BaseElev. <40'2
(8) (9)
Capacity DenandSpectrun Spectrun~ $ ~ $ ~ \ ~ \ S ~ S ~ \ ~ $ $
(10) (11)
Cap. >Denandj$ $ $ $ ~ $ $
(12)
Caveats Anchor Inter- EquipOK7 OKj act OK7 OKl Notes
~ S ~ $ $ ~ S $ ~ $ ~ $ ~ ST $$$ ~ $ ~ S ~ S ~ ~ $ $ $ ~
(13) (14) (15) (16) (17)
5178 07 80-35
5179 088 80-35C
5180 088 80-35D
5169 07 80-36
5170 088 80-36C
5171 088 80-36D
5197 07 80-41
5199 088 80-41B
5193 07 80-44
5195 088 80-448
4154 06 81-03
4151 06 81-04
4182 07 81-11
CS/CONT SPRAY TEST LIHE ISO VLVPILOT
RB
CS/COHT SPRAY LOOP fll2 BYPASS ISO RBVLV TO TORUS
CS/CONT SPRAY LOOP 4112 ISO VLVPILOT
CRS/CORE SPRAY PUHP 4121
CRS/CORE SPRAY PUHP f122
CRS/PUNP RECIRC 412 PRESSURESAFETY VLV
RB
RB
RB
RB
CS/COHT SPRAY INLET ISO VLV 4122 RB
CS/CONT SPRAY INLET ISO VLV PILOT RB$ 122
CS/CONT SPRAY IHLET ISO VLV PILOT RB4122
CS/CONT SPRAY IHLET ISO VLV 4112 RB
CS/CONT SPRAY INLET ISO VLV PILOT RBf112
CS/CONT SPRAY INLET ISO VLV PILOT RBI112
CS/CONT SPRAY TEST LIHE ISO VLV RB
281
281
Nl
N7
281 N7
281
281
Ll
L7
281 Ll
198
198
237
SE CORNER
SE CORHER
SE CORNER
298 Pl
298 Pl
298 N7
298 H7
281 YES BS
281 YES BS
281 YES BS
RRS TES YES
YES YES
YES
YES
YES YES AD
YES YES AD
GRS YES YES YES YES YES AD
281 YES BS RRS
281 YES BS GRS
YES YES YES YES
YES YES YES YES
YES AD
YES AD
281 YES GERS RRS YES YES YES YES YES AD
298 NO BS
298 NO BS
RRS YES YES YES YES YES AD
RRS YES YES YES YES YES AD
198 YES BS
198 YES BS
237 YES BS
YES YES YES YES YES AD
'YES YES YES YES YES AD
YES YES YES YES YES AD
298 NO BS RRS YES YES YES YES YES AD
298 HO GERS RRS 'YES YES YES YES YES AD
CERTIFICATION:
All the lnfornation contained on this Screening Verification Data Sheet(SVDS) Is, to the best of our knowledge and belief, correct and accurate.All lnfornatlon'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signatory should be a licensed ofesslonalengineer.)
CERTIFICATION:
The infornation provided to the Selsnlc CapabilityEngineers regarding systeas and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer isrequired lf the Selsalc Capability Engineers deenIt necessary.)
CARNEH R. AGOSTAPrint or Type Nane
'NALTER NORDJEVICPrint or Type Hane
re
gnatur
a
Znt or ype ane
nt or ype ane
9nature
g nature
ate
ate
nt or ype ane gnature nt or ype ane gnature
I
lt
4
Page Ho. 31Report Date/Tine: 11-26-95 / 14:14:37
NINE NILE POINT UNIT OHE Data Base File Hane/Date/Tine: NHP1 3.DBF / ll/26/95./ 14:ll:28SCREEHIHG VERIFICATIOH DATA SHEET (SUDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SUDS Notes 'AD')Progran File Wane 8 Version: SSEH 2.2
LINENO.
~ S ~ S ~ S
(I)
EQUIPCLASS HARK NO.S ~ S ~ S $ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ ~
(2) (3)
SYSTEN/EQUI PNENTDESCRI PI'ION
~ S ~ S ~ S ~ Ss ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ ~ S ~ S ~ S
(4)
Building~ S ~ S ~ S ~ $ ~ S
(5)
EQUI PNEHTF lr.Elv.
~ $ $ ~ S ~ S ~ $ $
(6)
LOCATION ----->Rn. or Row/Col.~ S ~ S ~ S ~ $ $ ~ S ~ S ~ S
(7)
Base CapacityElev. <40'2 Spectrun~ S ~ S ~ ~ S ~ S ~ ~ S ~ S ~ S ~ S
(8) (9) (10)
DenandSpectrun~ S ~ S ~ S ~ S
Cap. > Caveats Anchor Inter- EquipDenand7 OKT OK7 act OK7 OK7 Notes~ S ~ S ~ S ~ ~ S ~ S ~ S ~ ~ \ ~ S ~ S ~ S ~ S ~ $ $ S ~ S ~ S ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
4145 06 81-23
4148 06 81-24
4181 07 81-31
4133 05 81-49
4129 05 81-50
4141 05 81-51
4137 05 81-52
4146 07 81-53
4149 07 81-54
4155 07 81-55
4152 07 81-56
4134 07 81-57
4130 07 81-58
4142 07 81-59
4138 07 81-60
CRS/CORE SPRAY PUNP fillCRS/CORE SPRAY PUNP 9112
CRS/PUHP RECIRC fll PRESSURESAFETY VLV
RB
RB
RB
CRS/CORE SPRAY TOPPIHG PUNP f112 RB
CRS/CORE SPRAY TOPPING PUNP fill RB
CRS/CORE SPRAY TOPPING PUHP f121 RB
CRS/CORE SPRAY TOPPING PUNP 4122 RB
CRS/HOTOR fill SEAL COOLIHG PRESS. RBREGULATOR
CRS/NOTOR 4112 SEAL COOLING PRESS. RBREGULATOR
CRS/HOTOR f121 SEAL COOLIHG PRESS. RBREGULATOR
CRS/NOTOR f122 SEAL COOLING PRESS. RBREGULATOR
CRS/SEAL COOLING PRESS. REGULATOR RB
CRS/SEAL COOLING PRESS. REGULATOR RB
CRS/SEAL COOLING PRESS. REGULATOR RB
CRS/SEAL COOLING PRESS. REGULATOR RB
198
198
237
237
237
237
237
198
SW CORHER
SW CORHER
SW CORHER
SW CORHER
SW CORHER
SE CORNER
SE CORHER
SW CORHER
198 YES BS
198 YES BS
237 YES BS
237 YES BS
237 YES BS
237 YES BS
237 YES BS
198 YES BS
YES YES YES YES YES AD
YES YES YES TES YES AD
GRS YES YES YES YES YES AD
GRS
YES HO
YES NO
HO YES NO AD
HO YES NO AD
GRS YES HO HO YES HO AD
GRS YES NO HO YES HO AD
GRS YES YES YES TES YES AD
198
237
SE CORHER 198 YES BS GRS YES YES YES YES YES AD
SW CORNER 237 TES BS GRS TES YES YES YES YES AD
237 SW CORNER 237 YES BS GRS YES YES YES TES YES AD
237
237
SE CORNER 237 YES BS GRS YES YES YES YES YES AD
SE CORHER 237 YES BS GRS YES YES YES YES YES AD
198 SW CORNER 198 YES BS GRS YES YES YES YES YES AD
198 SE CORHER 198 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon Includes each entry and conclusion (whether verified to be
seisnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat ould be a licensed professionalengineer .)
CARNEN R. ACOSTA fr. / /rPrint or Type Wane ate r nt or ype ane gnature
CERTIFICATION:
The lnfornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equipnentcontained on this SVDS Is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired if the Selsnlc Capability Engineers deenlt necessary.)
WALTER DJORDJEVICPrint or Type Nane nt or ype ane gnature
nt or ype ane gnature r nt or ype ane gnature ate
4
I 4'
Page No. 32Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Nane/Date/Tine: HHP1 3.DBF / ll/26/95 /„14:ll:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHD (SVDS Notes ~ 'AD')Progran File Nano 8 Version: SSEH 2.2
LINEHO.
~ S ~ S ~ S
(I)
EOUIPCLASS HARK HO.~ $ ~ S ~ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S
(2) (3)
SYSTEH/EOUIPHEHTDESCRIPTION
~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ \ ~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ $ ~ S
(4)
BuildingS ~ S ~ $ $ ~ $ $ ~
(5)
EOUIPHENT LOCATION ---->F lr.Elv. Rn. or Row/Col.
~ $ $ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~
(6) (7)
Base Capacity DenandElev. <40'7 Spectrun Spectrun
(8) (9) (10) (11)
Cap. >Denandl~ S ~ S ~ $ $
(12)
CaveatsOK7
~ S ~ S ~ $ $
(13)
Anchor Inter- EquipOK7 act OK7 OK7 Notes
~ $$ ~ ST S ~ $ $ ~ S ~ ~ S ~ S ~ ~ S ~ $ $
(14) (15) (16) (17)
4147 07 81-73
4150 07 81-74
4156 07 81-75
4153 07 81-76
4135 07 81-77
4131 07 81-78
4143 07 81-79
4139 07 81-80
7201 06 93-01
7203 06 93-02
7204 06 93-03
7202 06 93-04
7211 OBA 93-25
CSRM/CONT SPRAY RAM MATER PUHPSI12
CSRM/CONT SPRAY RAN MATER PUMPsillCSRN/COHT SPRAY RAN MATER PUHP4122
CSRW/CONT SPRAY RAM MATER PUHP4121
SH
SH
SH
CSRM/COHT SPRAY RAM MTR PHP DISCHG RBBLOCK VLV Sill
CRS/HOTOR 4111 SEAL COOLIHG PRESS. RBRELIEF VLV
CRS/HOTOR 4112 SEAL COOLIHG PRESS. RBRELIEF VLV
CRS/HOTOR 4121 SEAL COOLIHG PRESS. RBRELIEF VLV
CRS/HOTOR 4122 SEAL COOLING PRESS. RBRELIEF VLV
CRS/SEAL COOLING PRESS. RELIEF VLV RB
CRS/SEAL COOLING PRESS. RELIEF VLV RB
CRS/SEAL COOLIHG PRESS. RELIEF VLV RB
CRS/SEAL COOLIHG PRESS. RELIEF VLV RB
198
198
198
198
237
237
237
237
256
SM CORHER
SN CORHER
SE CORHER
SE CORNER
SN CORNER
SN CORHER
SE CORHER
SE CORHER
T14A
256 T14A
256 T13A
318
256 T14A
198 YES Bs
198 YES Bs
198 YES Bs
198 YES Bs
237 YES Bs
237 YES Bs
237 YES Bs
237 YES Bs
256 YES Bs
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES NO YES YES HO AD
256 YES BS GRS YES HO YES YES 'O AD
256 YES BS GRS YES HO YES YES HO AD
256 YES Bs GRS YES NO YES YES NO AD
318 HO BS RRS YES YES YES YES YES AD
CERTIFICATION:
All the infornatlon contained on this Screening Verification Data Sheet(SUDS) is, to the best of our knowledge and belief, correct and accurate.'All Infornatlon'ncludes each entry and conclusion (whether verified to beselsnlcally adequate or not).
Approved: (SIgnatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRl') are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa hould b a I lcensed professionalengineer.)
CARHEH R. AGOSTA w'(l~rPrint or Type Nane gnatu e
MALTER DJORDJEVICPrint or Type Nane gna ure ate
nt or ype ane gna ure
nt or ype ane g nature
CERTIFICATION:
The Infornatlon provided to the Selsnlc CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SUDS Is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnlc Capability Engineers deenlt necessary.)
nt or ype ane gnature nt or ype ane g nature
J h
Page Ho. 33Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Wane/Date/Tine: NHP1 3.DBF / 11/26/95 /,.14:11:28SCREENING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern COHTAIHS 'A') AND (SVDS Notes 'AO')Progran File Hane 8 Version: SSEH 2.2
L INE EOUIPHO. CLASS HARK NO.
~ S ~ Ss ~ BEAST ~ \ ~ S ~ S ~ S ~ S ~ S ~ S ~ ST \(I) (2) (3)
SYSTEH/EljUIPHENTDESCRIPT ION
S ~ S ~ S ~ S ~ S ~ Ss ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S
(4)
Building~ S ~ E ~ S ~ S ~ S
(5)
EQUI PHENTFir.Elv.
~ S ~ S ~ SEE ~ S
(6)
LOCATION -----> BaseRn. or Row/Col. Elev. <40'7~ S ~ S ~ S ~ S ~ S ~ S ~ Ss SHE'S ~ S ~ SS
(8) (9)
Capacity Denand Cap. > Caveats Anchor Inter- EquipSpectrua Spectrun Denand? OK7 OK7 act OKT OKT Notes~ Ss ~ S ~ E ~ ~ S ~ S ~ S ~ S ~ SES ~ S ~ ~ S ~ E ~ S ~ ~ S ~ S ~ S S ~ S ~ S ~ S BEAST ~ E ~ E ~
(10) (11) (12) (13) (14) (15) (16) (17)
7210 OBA 93-26
7212 OBA 93-27
7209 OBA 93-28
4171 OBA 93-71
7215 OBA 93-71
7213 08A 93-72
7214 OBA 93-,73
4173 08A 93-74
7216 08A 93-74
7113 21 96-04
7117 21 96-05
7121 21 96-06
7125 21 96-07
DSA/DG 4102 START AIR TANK 41
DSA/OG 4102 START AIR TAHK 42
DSA/DG 1102 START AIR TANK 43
TB
TB
TB
DSA/OG 4102 START AIR TAHK f4 TB
CSRW/COHT SPRAY RAM WTR PHP DISCHG RBBLOCK VLV $ 121
CSRM/COHT SPRAY RAW WTR PHP DISCHG RBBLOCK VLV f122
CSRW/CONT SPRAY RAW WTR PHP DISCHG RBBLOCK VLV 4112
CSRW/CONT SPRAY RAM MATER ISO VLV RB4111
CSRW/CORE SPRAY RAM WATER ISO VLV RBfillCSRW/CONT SPRAY RAM WATER ISO VLV RB4112
CSRM/CONT SPRAY RAN WATER ISO VLV RB$ 121
CSR'W/CONT SPRAY RAN WATER ISO VLV RB$ 122
CSRM/CORE SPRAY RAW WATER ISO VLV RB4122
318 318 HO GERS RRS YES YES YES YES YES AO
318 318 HO BS RRS YES YES YES YES YES AD
318 318 HO GERS RRS YES YES YES YES YES AD
318 N7 318 NO BS RRS YES YES YES YES YES AO
318 H7
318 N7
318 P7
318 HB
318
318 NO BS RRS 'YES YES YES YES YES AO
318 HO BS RRS YES YES YES YES YES AD
318 HO BS GRS YES YES YES YES YES AO
318 HO BS RRS YES YES YES TES YES AO
BS NO BS GRS YES YES 'YES 'YES YES AD
261
261
261
261
DG 102 RH 261 YES BS RRS YES HO HO YES NO AD
OG 102 RH 261 YES BS RRS YES NO NO YES HO AD
OG 102 RH 261 YES BS RRS TES HO HO YES HO AO
DG 102 RH 261 YES BS RRS YES HO NO—
YES HO AO
CERT IF I CATION:
All the lnfornatlon contained on this Screening Verification Data Sheet-(SVDS) is, to the best of our knowledge ard belief, correct and accurate.All infornatlon'ncludes each entry ard conclusion (whether verified to be
selsnlcaily adequate or not).
Approved: (Signatures of ail Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One s lg houid e a I lcensed professionalengineer.)
CARHEH R. AGOSTA i-b./~~Print or Type Mane gnature
WALTER DJORDJEVICPrint or Type Nane ategnature
r nt or ype ane gnature ate
nt or ype ane gnature
CERT IF ICATION:
The infornatlon provided to the Selsnlc CapabilityEngineers regarding systens ard operations of the equipnentcontained on this SVDS is, to the best of our knowledge ardbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer Isrequired if the Selsnic Capability Engineers deenit necessary.)
nt or ype ane gnature ate nt or ype ane g nature ate
I A
't
1
I4
Page Ho. 34Report Date/Tine: 11-26-95 / 14:14:37
HIHE NILE POINT UNIT OHE Data Base File Nane/Date/Tine: HHPI 3.DBF / 11/26/95./.14:11:28SCREEHIHG VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: IO Hunber
Filter Criteria: (Eval. Concern CONTAIHS 'A') AHD (SVDS Notes-'AD')Progran File Hane 6 Version: SSEH 2.2
LIHEHO.
~ $ ~ $ ~ $
(I)
EIQIPCLASS HARK NO.~ S ~ $ ~ ~ S ~ S ~ $$$ ~ S ~ $ ~ S ~ S as
(2) (3)
SYSTEH/EOUIPHEHI'ESCRIPTION
~ $ ~ $ ~ $$$$ ~ $ ~ $ ~ $ ~ $ ~ S ~ $ ~ S ~ $ ~ S ~ $ ~ $ ~ $ $
(4)
Building~ $ ~ $ ~ $ ~ $ $ $
(5)
EOUIPHENTFir.Elv.
~ S ~ S ~ S ~ S ~ $
(6) (8) (9)(7)
LOCATIOH ---> BaseRn. or Row/Col. Elev. <40'7$ $ $ ~ $ ~ $ ~ $ ~ $ ~ S ~ $ $ ~ $ ~ S as ass
CapacitySpectrun~ $ ~ \ ~ $ ~ $
(10)
DeaandSpectrun$ ~ $ ~ $ ~ $ ~
Cap. > Caveats Anchor Inter- EquipDenand7 OK7 OK7 act OK7 OKT Notes~ $$$ ~ ST S ~ S ~ $ ~ S ~ S ~ S ~ $ $ ~ $ ~ S ~ $ ~ S ~ $ $ ~ $ ~ $ ~
(12) (13) (14) (15) (16) (17)
7129 21 96-08
7114 07 96-15
7118 07 96-16
7122 07 96-17
7126 07 96-18
7130 07 96-19
DSA/DG 4102 START AIR TANK flRELIEF VLV
DSA/OG 4102 START AIR TANK f2RELIEF VLV
DSA/DG 4102 START AIR TANK 83RELIEF VLV
DSA/DG 4102 START AIR TANK I4RELIEF VLV
OSA/DG 4102 START AIR TANK 85RELIEF VLV
TB
TB
TB
TB
TB
DSA/OG 4102 START AIR TANK 45 TB 261
261
261
261
261
DG 102 RH
DG 102 RH
OG 102 RH
DG 102 RM
DG 102 RM
261 YES BS
261 YES BS
261 YES BS
261 YES BS
261 YES BS
RRS YES HO HO YES NO AD
GRS 'YES YES YES YES YES AD
GRS 'YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
261 DG 102 RN 261 YES BS GRS YES YES YES YES YES AD
7134 07 96-20
7133 07 96-28
7115 21 96-31
7119 21 96-32
7123 21 96-33
7127 21 96-34
7131 21 96-35
7116 07 96-44
DSA/DG 4102 AIR INLET RELIEF VLV TB
DSA/OG 4102 AIR INLET PRESSUREREGULATING VLV
DSA/DG 4103 START AIR TANK tlDSA/DG 4103 START AIR TANK 42 TB
DSA/DG 4103 START AIR TANK 41RELIEF VLV
TB
DSA/DG 4103 START AIR TANK 43 TB
DSA/DG 4103 START AIR TANK 44 TB
DSA/DG 4103 START AIR TAHK 45 TB
261
261
261
261
261
261
261
261
DG 102 RH
DG 102 RH
DG 103 RH
DG 103 RH
DG 103 RH
DG 103 RH
DG 103 RH
OG 103 RH
261 YES BS
261 YES BS
261 YES BS RRS YES HO
261 YES BS RRS YES NO
261 YES BS RRS YES HO
HO YES NO AD
NO YES HO AD
NO YES NO AD
HO YES HO AD
HO YES HO AD
RRS YES HO
RRS YES HO
261 YES BS
261 YES BS
261 YES BS GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
CERTIFICATION:
AII the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All infornatlon'ncludes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signa should e a licensed professionalengineer. )
CERTIFICATION:
The lnfornatlon provided to the Selsnlc Capabl1 ltyEngineers regarding systens and operations of the equipnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer Isrequired lf the Selsnlc Capability Engineers decait necessary.)
CARHEH R. AGOSTAPrint or Type Haoe
HALTER OJORDJEVICPrint or Type Hane 9na
e'teate
nt or ype ane
r nt or ype ane
gnature
gnature
ae
nt or ype ane gnature ate nt or ype ane g nature
I
0
Page No. 35Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Nane/Date/Tine: NHPl 3.DBF / 11/26/95 /, 14:11:28SCREEHIHG VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AHO (SVDS Notes ~ 'AD')Progran File Hane 8 Version: SSEH 2.2
LINE EQUIPHO. CLASS HARK HO.
(I) (2) (3)
SYSTEH/EQUI PHEHTDESCRIPTION
~ SS ~ SSS ~ S ~ S ~ S ~ S ~ S ~ SS ~ S ~ SSS ~ S ~ S ~ S ~ S
(4)
Bul ldlngS ~ SSS ~ S ~ S ~
(5)
EQUIPHEHTFir. Elv.
~ S ~ S ~ S ~ S ~ S
(6) (7) (8) (9)
LOCATION ——-> BaseRn. or Row/Col. Elev. <40'7~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ ~ S ~ S ~ S ~ SSS
CapacitySpectrm~ S ~ S ~ S ~ S
(10)
DenandSpectrun~ S ~ S ~ S ~ S
Cap. > Caveats Anchor Inter- EquipDenand1 OK7 OK1 act OK1 OK7 NotesASSISTS ~ S ~ S ~ \~ ~ S ~ \ ~ S ~ S ~ S ~ S ~ ~ ST ST ~ ST ST
(12) (13) (14) (15) (16) (17)
7120 07 96-45
7124 07 96-46
7128 07 96-47
7132 07 96-48
1136 07 96-49
7135 07 96-52
1109A 20 ATSA
71098 20 ATSB
7109C 20 ATSC
7109 D 20 ATSO
8131 15 BATT 11*
8148 15 BATT 1 1 1*
8149 15 BATT 112»
CERTIFICATION:
DSA/OG 8103 START AIR TANK f2RELIEF VLV
DSA/OG 4103 START AIR TANK f3RELIEF VLV
DSA/DG f103 START AIR TANK 44RELIEF VLV
DSA/DG 4103 START AIR TANK f5RELIEF VLV
TB
TB
DSA/DG 4103 AIR INLET RELIEF VLV TB
DSA/DG 4103 AIR INLET PRESSUREREGULATIHG VLV
TB
API 24/48 V OC BATTERY 4111
AP/ 24/48 V OC BATTERY 4112
TB
TB
RPS/ CHANNEL A/ANALOG TRIP SYSTEH RBCABINET A
RPS/ CHANNEL 8/ANLOG TRIP SYSTEH RBCABINET 8
RPS/ CHANNEL C/ANLOG TRIP SYSTEH RBCABINET C
RPS/ CHANNEL D/ANALOG TRIP SYSTEH RBCABINET D
AP/2320 AHP-HR, 125 V BATTERY 411 TB
261
261
261
261
261
261
281
281
281
DG 103 RH
DG 103 RH
OG 103 RH
DG 103 RH
DG 103 RH
OG 103 RH
NS
HS
Kll
261 YES BS
261 YES BS
261 YES BS
261 YES BS
261 'YES BS
261 YES BS
281 YES BS
281 YES BS
281 YES BS
GRS YES YES YES YES YES AO
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS - YES YES YES 'YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AO
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
281 KII 281 YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
277 BAT RH 11 277 YES TRS CRS YES YES YES YES YES AD
217 BAT RH 11 277 YES BS RRS YES YES YES YES YES AD
277 BAT RH 11 277 YES BS RRS 'YES YES YES YES YES AD
All the infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All infornation includes each entry and conclusion (whether verified to be
selsalcally adequate or not).
Approved: (Signatures of al I Selsnlc Capability Engineers on the SeisulcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slg should be a llcen professionalengineer.)
CARHEN R. AGOSTAPrint or Type Hane gnat re ate n or ype ane gnature ate
The lnfornatlon provided to the Seisalc CapabilityEngineers regarding systens and operations of the equipnentcontained on this SVDS is, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Selsnlc Capability Engineers decalt necessary.)
HALTER DJOROJEVICPrint or Type Nane gnatur ate nt or ype ane gnature
nt or ype ane gnature 'te nt or ype ane gnature Uaae
0
Page Ho. 36Report Date/Tine: 11-26-95 / 14:14:37
NINE HILE POINT UNIT ONE Data Base File Nane/Date/Tine: HHP1 3.DBF / ll/26/95 / 14:ll:28SCREENING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern COHTAINS 'A') AND (SVDS Hotes 'AD')Progran File Hane 8 Version: SSEH 2.2
LIHE EQUIPNO. CLASS
ASS as ~ ~ s ~ s ~
(1) (2)
HARK NO.~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S
(3)
SYSTEH/EQUI PHEHTDESCRIPT ION
~ s ~ s ~ $$$ ~ s ~ s ~ $$$$ ~ s ~ $$$ ~ s ~ s ~ s ~ a ~ s ~
(4)
Building~ a ~ s ~ s ~ s ~ a
(5)
EQUI PHENTF lr.Elv.
~ s ~ a ~ a ~ a ~ s
(6)
LOCATION ——->Rn. or Row/Col.s ~ a ~ s ~ s ~ s ~ s ~ s ~ a
(7)
BaseElev. <40'7~ s ~ a ~ ~ a ~ a ~
(8) (9)
CapacitySpectrun~ $ $ $ ~ a ~ s
(10)
DenandSpectrun~ $$$ uses
Cap. > Caveats Anchor Inter- EquipDemard7 OK7 OK7 act OKY OK7 Notes~ aaaass $ $ $ $ $ $ $ a ~ a ~ s ~ alaskan ~ s ~ s ~ ASS ~ a
(12) (13) (14) (15) (16) (17)
8132 15 BATT 12»
8150 15 BATT 121*
8151 15 BATT 122»
8133 14 8811
8134 14 8812
8170 20 C8118*
8171 20 C8128»
81341 20 CP161A-8
8136 20 CP1 67
8134K 20 CP171A-8
3109 20 D-372
7141 20 DC102
7145 20 DC103
7142 03 DG102
AP/2320 AHP-HR, 125 V BATTERY 012 TB
AP/ 24/48 V DC BATTERY f121
AP/ 24/48 V DC BATTERY 4122
TB
TB
AP/125 V DC BATTERY BOARD Oil TB
AP/125 V DC BATTERY BOARD f12
CTRL/125 V DC CONTROL AND RELAYBOARD COHTROL BUS 118
CTRL/125 V DC CONTROL AND RELAYBOARD CONTROL BUS 128
AP/BATTERY CHARGER 161A CONTROLCABINET
AP/COHPUTER PONER SUPPLY HG SETf167 CONTROL PNL
AP/BATTERY CHARGER 171A CONTROLCABINET
RCS/RCS PRESSURE RECORDER
AP/EDG 102 CONTROL CABINET
AP/EDG 103 CONTROL CABINET
TB
TB
TB
TB
TB
TB
TB
TB
TB
AP/DG 102 NEUTRAL BREAKER CUBICLE TB
277
277
277
261
261
261
261
261
277
261
277
261
261
261
BAT RH 12
BAT RH 12
BAT RH 12
A9, 10
AIO, 11
A9
A11
A12
CR CON E
DG 102 RH
DG 103 RH
DG 102 RH
277 YES TRS
277 YES BS
277 YES BS
261 YES BS
261 YES BS
261 YES BS
YES YES YES YES YES AD
RRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
GRS 'YES HO HO YES NO AD
YES HO NO YES HO AD
GRS YES YES YES YES YES AD
261 YES BS GRS YES HO
E PAHEL
NO YES HO AD
YES AD
261 YES BS
261 YES BS
261 YES BS
GRS YES YES YES YES YES AD
GRS YES YES YES YES YES AD
RRS YES NO NO YES NO AD
261 YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES HO NO YES HO AD
277 YES BS GRS YES NO NO YES HO AD
CERTIFICATION:
All the Infornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knorrledge ard belief, correct and accurate.'All lnfornatlon'ncludes each entry and conclusion (rrhether verified to beselsalcally adequate or not).
Approved: (Signatures of all Selsnlc Capability Engineers on the SelsnlcRevierr Tean (SRT) are required: there should be at least trro onthe SRT. All signatories should agree rrlth all of the entrIes ardconclusions. One slgnat ovid be a licensed rofesslonalengineer.)
CARHEH R. AGOSTA 2. /Print or Type Hane g e ate
/'ALTERDJORDJEVICPrint or Type Haue gnatur ae
nt or ype ane gna ure ae
nt or ype ane gnature ae
CERTIFICATION:
The lnfornatlon provided to the Selsalc CapabilityEngineers regarding systens ard operations of the equlpnentcontained on this SVDS is, to the best of our knorrledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired lf the Sei saic Capability Engineers decaIt necessary.)
nt or ype ane gnature ate nt or ype ane gnature
.
Page No. 37Report Date/The: 11-26-95 / 14:14:37
HINE HILE POINT UNIl'HE Data Base File Nane/Date/Tine: HHP1 3.DBF / ll/26/95./ 14:11:28SCREEHING VERIFICATIOH DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAIHS 'A') AND (SVDS Notes 'AD')Progr an File Hane 6 Version: SSEH 2.2
LINE EOUI PHO. CLASS
~ S ~ S ~ S ~ S ~ $ $
(1) (2) (3)
SYSTEH/EQUIPHENTDESCRIPT ION
(4)
Building
(5)
EOUIPHENT LOCATION —-—> Base Capacity Decmard Cap. > Caveats Anchor Inter- EquipFir.Elv. R>a. or Row/Col. Elev. <40'7 Spectrua Spectrua Deoard7 OK7 OK7 act OK7 OK7 Notes
~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ ESSES JESSE ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ $ $ ~ ESSE ST CEASES ~ E ~ S ~ S ~ ~ E ~ S ~ ~ E ~ E ~
(6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17)
7144 14 DG102 IB
7146 03 DG103
7148 14 DG103 IB
8171A 20 E
6266 18 ECVVR*
8101 17 EDG102
8102 17 EOG103
3140 18 EIRE
8187 20 F
8191 20 G
8192 20 H
8158 14 IG12
8159 14 IG13
8160 14 IG22
8161 14 IG23
CTRL/COHSOLE E CON'IL RH ELECTCONTROL CONSOLE
TB
EC/EHERGEHCY COHDENSER VENT VALVE RBRACK
AP/EHERGEHCY DIESEL GENERATOR 4102 TB
Ap/EHERGEHCY DIESEL GEHERATOR 4103 TB
RCS/EAST IHSTR. ROON RACK
CTRL/CONTROL BOARD PHL F
CTRL/CONTROL BOARD PHL G
CIRL/CONTROL BOARD PNL H
AP/24 V DC DISTRIBUTION PHL
AP/24 V DC DISTRIBUTION PHL
AP/24 V DC DISTRIBUTION PHL
AP/24 V DC DISTRIBUTION PHL
RB
TB
TB
TB
TB
TB
TB
TB
AP/DG 102 EHERGEHCY DC ISOLATION TBBREAKER CABINET
AP/DG 103 HEUTRAL BREAKER CUBICLE TB
AP/DG 103 EHERGEHCY DC ISOLATION TBBREAKER CABIHET
261
261
261
DG 103 RH
DG 103 RH
261 YES BS
261 YES BS
RRS YES HO HO YES HO AD
GRS YES YES YES YES YES AD
277 CR
340 P8
261
261
BG> BEIB
BCIB
E IHST RH
277 'YES BS GRS YES YES YES YES YES AO
340 HO BS RRS YES YES YES YES YES AO
261 YES BS GRS YES YES YES YES YES AD
261 YES BS GRS YES YES YES YES YES AD
284 YES BS GRS YES YES YES YES YES AD
277
277
277
277
277
277
277
CR PNL G
CR PNL G
CR PHL G
CR PNL G
277 YES BS GRS
277 YES BS GRS
277 YES BS GRS
277 YES BS GRS
277 YES BS GRS
277 YES BS GRS
277 YES BS GRS
'YES NO
YES NO
YES HO
HO YES HO AD
HO YES HO AD
HO YES NO AD
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
YES YES YES YES YES AD
DG 102 RH 261 YES BS GRS YES YES YES YES 'YES AD
CERTIFICATION:
All the Inforoation contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct ard accur ate.All infornation Includes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Seisnic Capability Engineers on the SelsnicReview Tean (SRI') are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One signatory should be a licensed professionalengineer .)
CERl'IFICATIOH:
The lnfornatlon provided to the Seisnic CapabilityEngineers regarding systeas ard operations of the equipoentcontained on this SVDS ls, to the best of our knowledge ardbelief, correct and accurate.
Approved: (One sIgnature of Systens or Operations Engineer lsr equlred lf the Selsnlc Capability Engineers decalt necessary.)
CARHEH R. AGOSTAPrint or Type Naoe
HALTER OJORNEVICPrint or Type Nane
9 u
9na Ur
ate nt or ype ane
nt or ype ane
g nature
gnature
ae
ae
nt or ype ane gnature nt or ype aoe g nature ate
t
Page Ho. 38Report Date/TIne: 11-26-95 / 14:14:37
NIHE NILE POINT UHI'I ONE Data Base File Nane/Date/Tine: NHP1 3.DBF / ll/26/95 /. 14:11:28SCREENING VERIFICATION DATA SHEET (SUDS) Sort Criteria: ID Hunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notes 'AD')Progran File Nane 8 Version: SSEH 2.2
LIHE EQUIPNO. CLASS HARK NO.
~ S ~ S ~ \ ~ \ ~ ST ~ $ ~ S ~ $ ~ $ ~ S ~ $ ~ S ~ $ ~ S
(1) (2) (3)
SYSTEH/EQUI PHENTDESCRIPTION
~ $$$ ~ $ ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ $ ~ S ~ S ~ S ~ S ~ S
(4)
<-—--- EQUIPHENT
Building Fir.Elv.~ $ $ ~ S ~ S ~ S ~ ~ S ~ S ~ S ~ S ~ S
(5) (6)
LOCATIOH -—--> BaseRn. or Row/Col. Elev.~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ $$ ~ ST
(7) (8)
Capacity Denand<40'7 Spectrun Spectrun$$ ~ ST ~ S ~ $ $ ~ S ~ ~ S ~ S ~ S ~ S
(9) (10) (11)
Cap. > Caveats Anchor Inter- EquipDenand7 OK7 OK7 act OK7 OK7 Notes~ S ~ $ $ ~ S ~ S ~ S ~ S ~ $$$ ~ ST ~ S ~ S ~ S ~ ~ S ~ $ $ ~ S ~ S ~
(12) (13) (14) (15) (16) (17)
8188 20 K
8186 20 L
8189 20 H
8129A 18 HSI VIR»
8190 20 H
8152 20 H I811
8153 20 N I812
8120 20 PNL 167A
8134H 20 PRC162
8134N 20 PRC172
7143 17 RC102
7147 17 RC103
8166 20 RSP11
8167 20 RSP12
81288 16 SBC161A
CERTIFICATION:
CTRL/CONTROL BOARD PHL K
CTRL/CONTROL BOARD PHL L
CTRL/CONTROL BOARD PHL H
TB
TB
TB
CTRL/COHTROL BOARD PHL H
AP/NUCLEAR INST BUS 411
AP/NUCLEAR INST BUS 412
AP/DIST PNL 167A BUS
AP/UPS 162A AHD 162B PROTECTIVERELAY CABINET
AP/UPS 172A AND 1728 PROTECTIVERELAY CABIHET
AP/DG 102 RELAY RESISTOR (NEUTRALGROUND)
AP/DG 103 RELAY RESISTOR (NEUTRALGROUND)
CTRL/REHOTE SHUTDONN PNL 411
CTRL/REHOTE SHUTOOVN PHL 412
TB
TB
TB
RB
TB
TB
TB
TB
TB
TB
AP/STATIC BATTERY CHARGER 161A TB
AP/HAIN STEAH ISO VLV INSTRUHENT TBRACK
277
277
277
261
277
277
277
281
277
277
261
261
250
277
261
CR
CR
CR
HSIV RH
277 YES BS
277 YES BS
277 YES BS
261 YES BS
GRS YES HO HO YES NO AD
GRS YES HO HO YES HO AD
GRS YES HO HO YES NO AD
GRS YES NO HO YES HO AD
Qji 8 281 YES BS GRS YES YES YES YES YES AD
277 YES BS GRS YES NO HO YES HO AD
A12 277 YES BS GRS
r
YES HO NO YES HO AD
DG 102 RH 261 YES BS GRS YES NO HO YES HO AD
DG 103 RH 261 YES BS GRS YES HO NO YES NO AD
A14
C16
250 YES BS GRS YES YES TES YES YES AD
277 YES BS GRS YES YES YES YES YES AD
261 YES DOC RRS YES YES YES YES YES AD
CERT IF ICATIOH:
277 YES BS GRS YES NO HO YES NO AD
CR PHL G 277 YES BS GRS YES YES YES YES YES AD
CR PNL G 277 YES BS GRS YES YES YES YES YES AD
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) Is, to the best of our knowledge and belief, correct and accurate.All lnfornatlon'ncludes each entry and conclusion (whether verified to be
selsalcal ly adequate or not).
Approved: (Signatures of all Selsalc Capability Engineers on the SelsnlcReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slg should e a I lcens professionalengineer. )
CARHEH R. AGOSTA 2Print or Type Nano g nature ate n or ype ane gnature
The lnfornatlon provided to the Selsaic CapabilityEngineers regarding systens and operations of the equipaentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired if the Selsnlc Capability Engineers decalt necessary.)
NALTER DJORDJEVICPrint or Type Nane gna e nt or ype ane gnature
nt or ype ane gnature ate nt or ype ane gnature
0
h
~ g
I ~
Page Ho. 39Report Date/Tine: 11-26-95 / 14:14:37
NIHE HILE POINT UNIT OHE Data Base Flic Hane/Date/Tine: HHP1 3.DBF / 11/26/95 / 14:ll:28SCREEHING VERIFICATION DATA SHEET (SVDS) Sort Criteria: ID Nunber
Filter Criteria: (Eval. Concern CONTAINS 'A') AND (SVDS Notesss'AD')Progran File Hane 8 Version: SSEH 2.2
LINENO.
~ \ ~ S ~ S
(I)
EQUIPCLASS HARK HO.S ~ SSS S ~ SSS ~ S ~ S ~ S ~ S ~ S ~ S ~
(2) (3)
SYSTEH/EQUIPHEHT0ESCRI PT IOH
~ S ~ S ~ S ~ SS ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ S ~ SSS ~ S ~ S ~
(4)
Building\~ S ~ S ~ \ ~ \ ~
(5)
EQUIPHEHTFir.Elv.
~ SSS ~ SS ~ SS
(6)
LOCATION --->Rn. or Row/Col.~ S ~ S ~ S ~ S ~ S ~ S ~ S ~
(7)
Base Capacity Deoand Cap. >Elev. <40'7 Spectrun Spectrun Deoand7~ S ~ S ~ ~ S ~ S ~ ~ S ~ SS ~ S ~ ~ S ~ SSS ~ S ~ S ~ S ~ S ~
(8) (9) (10) (11) (12)
Caveats Anchor Inter- EquipOKT OK7 act OKT OKT Notes
~ S ~ S ~ SS AS USES ~ S ~ S ~ S ~ ~ S ~ S ~ ~ S ~ S ~
(13) (14) (15) (16) (17)
8128C 16 S8C161B
81280 16 SBC171A
8128 E 16 58C171B
8168 20 SSCI
8169 20 SSC2
8119 04 TRANS 167A
8107 04 TRANS 16A»
8107A 04 TRAHS 16B»
8108 04 TRAHS 17A»
8108A 04 TRANS 178»
8164 20 VB11
8165 20 VB12
3141 18 NIRR»
AP/4160 TO 600 V TRAHSFORHER
AP/4160 TO 600 V TRAHSFORHER
AP/4160 TO 600 V TRANSFORHER
AP/4160 TO 600 V TRAHSFORHER
CTRL/125 V DC VLV BOARD sllCTRL/125 V DC VLV BOARD 412
RCS/NEST INSTR. ROON RACK
RB
RB
RB
RB
TB
TB
RB
AP/STATIC BATTERY CHARGER 161B TB
AP/STATIC BATTERY CHARGER 171A TB
AP/STATIC BATTERY CHARGER 1718 TB
CTRL/SHUTDOVH SUPV COHTROL CABINET RB1
CTRL/SKUTDOVN SUPV CONTROL CABINET RB2
AP/600 TO 120/208 V TRANSFORHER RB
261
261
261
281
A12
A12
KS
281
281
281
281
281
261
291
Q7, 8
L, H4
L, H4
QIO, 11
QIO, 11
AII
JS
N IHST RH
281 K11
261 YES DOC RRS YES YES YES YES YES AD
261 YES DOC RRS YES YES YES HO NO AD
261 YES DOC RRS YES YES YES NO NO AD
281 'YES BS GRS YES YES YES YES YES AD
281 YES BS GRS YES YES YES YES YES AD
281 YES BS GRS YES HO HO YES HO AD
281 YES BS GRS YES HO 'YES YES HO AD
281 YES BS GRS YES HO YES YES HO AD
281 YES BS GRS YES HO YES YES HO AD
281 YES BS GRS YES HO YES YES HO AD
261 YES BS RRS YES YES HO YES HO AD
291 HO BS RRS NO YES HO YES HO AD
284 'YES BS GRS YES YES YES YES YES AD
CERTIFICATION:
All the lnfornatlon contained on this Screening Verification Data Sheet(SVDS) ls, to the best of our knowledge and belief, correct and accurate.All lnfornatlon Includes each entry and conclusion (whether verified to be
selsnlcally adequate or not).
Approved: (Signatures of all Selsaic Capability Engineers on the SeisnicReview Tean (SRT) are required; there should be at least two onthe SRT. All signatories should agree with all of the entries andconclusions. One slgnat ould be a licensed professionalengineer.)
CERTIFICATION:
The lnfornatlon provided to the Selsnic CapabilityEngineers regarding systens and operations of the equlpnentcontained on this SVDS ls, to the best of our knowledge andbelief, correct and accurate.
Approved: (One signature of Systens or Operations Engineer lsrequired If the Selsnic Capability Engineers decoit necessary.)
CARHEN R. AGOSTAPrint or Type Hane
HALTER DJORDJEVICPrint or Type Nano gnature
/br/ ffate
nt or ype ane
nt or ype ane
gnature
gna re
ate
ate
nt or ype ane ate nt or ype ane gnature
Appendix E
THIRD-PARTY AUDITREPORT
Robert P. Kennedy
Structural Mechanics Consulting, Inc.
18971 VillaTerrace, Yorba Linda, CA 92686 ~ (714) 777-2163
Scptcmber 28, 1995
P.E. FranciscoNiagara Mohawk Power CorporationP. Q. Box 63
Lycoming, New York 13093
Subject: Nine Mile Point Unit 1 A46 and IPEEE-Seismic Peer Review
Dear Mr. Francisco:
Please let this letter serve as a report on the third party audit peer review walkdown for the A-46(SQUG) and IPEEE evaluation ofthe Nine Mile Point Unit 1 (NMP1) plant. The site visit portion ofthe peer review was conducted by myself on August 28-30, 1995. Walkdowns werc conducted beforethe Screening Evaluation Worksheets (SEWS) were reviewed. A sampling of SEWS chosen basedon the peer walkdown was subsequently reviewed and generally found to be in good order. Generaland specific comments on the walkdowns and the SEWS reviewed are provided below.
Accessible areas of the plant were reviewed excluding the Drywell (Primary Containmcnt) and highradiation areas. Areas which were inaccessible due to radiological concerns were the PrimaryContainment, and a few areas in the Reactor building including the Reactor Water Cleanup Roomand East 4 West Instrument rooms. Corner rooms in the Reactor building were accessible and thuswere visited.
The walkdown has been conducted in a comp tent manner and results are in accordance with theguidance ofthe Generic Implementation Plan (GIP) and NP-6041 documentation. The vast majorityof the findings noted in this letter were already found and documented by the walkdown team, so thepccr revicwcr believes this walkdown to have been conducted in a thorough and professional manner.Tlie NMP1 plant has been found to be in good condition with respect to seismic ruggedness owing togood original design and modifications made to meet information bulletins and notices during the pasttwenty fivyears. The so-called "seismic housekeeping" was found to be excellent. Very few itemssuch as desks, bookcases, ladders and the like were found in the proximity ofsafety-relatedequipmcnt. When they were in the general proximity ofequipment as was the case in the maincontrol room, the items were chained to a structural column. Such practices speak well for the plant.
During the pccr review walkdowns a number of important observations as given below were made forthe consideration of the A-46 and IPEEE seismic capability engineers (SCE):
- Leaded, so~lied "Cinch", anchors were used for some mechanical and electricalequipment - some ofwhich is inaccessible because it is contained within the foundation.Expansion type ancliors are not generally recommended for vibratory equipmcnt. Moreover,leaded anchors have a known lesser capacity than thc anchors considered in the GIP and are
I ~
Nine Mile Point 1 Peer ReviewPage 2
therefore considered outliers. The peer reviewer agrees that the Savannah River test data 1
may be used to establish Cinch anchor load capacities; however, as the data indicates asignificant percentage ofthe anchors failed a tightness check. NMP1 must undertake atightness check program on all accessible anchors. Based on the failure percentage, adiscount factor willneed to be applied to inaccessible anchors to account for a possiblefailure.
- A number ofAA6 equipment have been determined to be outliers for which furtheranalytical study willnot produce higher capacities. As such, design retrofits are likely to beneeded for those equipment. At this time no attempt has been made to calculate HCLPFs forthese equipment items. The peer reviewer recommends conceptual design fixes be completedand the HCLPF capacities be calculated based on the conceptual designs.
- Several lube oil reservoirs on pumps were found loose on a random sampling basis. Thesereservoirs might fall offduring a seismic event causing the pump to seize shortly thereafter.They should be routinely checked to ensure they are secure on the pump.
- A significant portion ofelectrical raceways are anchored to "Robertson Floor System"decking. This decking utilizes sheet metal which is of low tensile load capacity based onpreviously performed analytical studies. It is recommended that further data based on actualcapacity testing and more analytical study be developed to hopefully establish higher tensileload capacities for floor decking type. A similar problem exists for beam clamps ofcertainmanufacturers. Currently, the given tensile load capacities make a large portion oftheraceways ofthese designs A46 outliers and willgovern the plant HCLPF as well for theIPEEE study.
- The majority ofthe reactor building ra+mays have a cast iron insert for anchorage. Theseinserts have failed during previous earthquakes. A statistical sampling should be done toassure the threaded rod is sufficiently inserted into these inserts (at least 3 threads).
- Mr. Kirchner's theory that fire lines and structural members willprovide support toraceways is generally reasonable. However, at a minimum it willbe difficultto prove thatcables willnot be pulled from connectors. Therefore, I do not recommend this approach foruse in screening raceways. Although unlikely, it may be useful on some very specific andisolated cases where analytical methods fail and cost effective fixes are unavailable.
S ecific A-46 and IPEEE Related Comments
Diesel Generator Ar
Equipment in Area The peer reviewer agrees with the judgments ofthe Seismic ReviewTeam (SRT), in general. Equipment reviewed included the diesel generator itselfand itssupport equipment including the neutral ground breaker cabinet and resistor, DG102 and 103
Lead E ansion Anchor Load a aci in Reactor Buildin s at the Savannah River Site, E. L. Bryant,Westinghouse Savannah River Company, RTR-2661, August 15, 1989.
/
Nine Mile Point 1 Peer ReviewPage 3
control panels, and the air start tanks. The breaker cabinet and resistor anchorage, and airstart tanks were classificd as outliers. It docs not appear that the fuel oil storage tanks (mainstorage tank or day tanks) were on the SSEL list and this is questioned. At the time ofthepeer review, the speed nuts that secure the doors ofDG102 were found not engaged (loose).The nuts should be tightened.
Local Room Roll-up Door and Motor The SRT judged the roll-up door and its drive motorto be screened at the 0.3g PGA level for the Review Level Earthquake (RLE). The peerreviewer concurred with this judgment.
4160V Switch ear Rooms
PB 102 &103 The powerboards PB102 and 103 were documented to only have four plugwelds (in two cubicles) among 11 cubicles in all on the rear side. Although the anchorageanalysis shows suKcient load capacity for A46, the peer reviewer judged this condition asunacceptable, thus anoutlier. Atleasteveryothercubicleshouldbepositivelyanchored. Acloser inspection of the rear side and/or additional welding willbe required. Some frontcubicle doors were found to be able to rattle due to gaps at the top (or bottom) ofthe doorsince the door latching mechanism is only.at a single, mid-height point. This may introducehigh frequency input to any essential relays on the door due to potential impacts. It isrecommended that s~led speed nuts be added at the top and/or bottom ofthe door or arubber-like gasket be introduced on the door frame to absorb any potential impacts. Thesomewhat loose doors identified were marked R1022 (on PB 102), and R1023 and R1031(both on PB 103).
Condensate 0'ater Storage Tank (CST) The tank is well anchored and adequate pipingflexibilityis also evident. It is classified. as an outlier due to not passing the top chair platecriterion ofthe GIP. The peer reviewer agrees with this although it was noted that a yieldline analysis of the top plate would probably result in an adequate HCLPF capacity. NMP1agreed to calculate this capacity.
Chtllers 210.1-1 19 &-120 The chiller is mounted on neoprene pads. While they can takeshear load to some level, it is agreed they cannot sustain tensile loads. The bolts ofapproximately 1/2" diameter in the center ofthe pad may go through the pad and would thentake.up the tensile load. The seismic loads on the neoprene pads need to be evaluated againsta reasonable shear and tension acceptance criteria.
PB 1671 The peer reviewer agrees that because this MCC is anchored with Cinch anchors itis an outlier and willbe subject to the bolt tightness checking program.
Valves 202-34 &-35 These valves were judged to have independent braces by the SRT. Thepeer reviewer believes this judgment is conservative and the SRT concurred and are changingthe determination.
~ ~ ~
~ I ) ~
Nine Mile Point l Peer ReviewPage 4
Emergency Condenser Makeup Tanks 60-09 d'c -10 The tanks were classified as outliers dueto the limitingcapacity of the baseplates for the longitudinal braces. Independentcalculations performed by the peer reviewer confirm this conclusion. It is recommended thata HCLPF capacity be established for this tank based on the yield line capacity ofthebaseplates. NMPC has agreed to perform this calculation. This SRT adjudged the sightglass acceptable on these tanks. The peer reviewer chose not to disagree; however, he statedthat this is a controversial subject and suggested that NMPC investigate whether or notshatter proof replacements were easily available.
RBCLC Tank This tank was not previously evaluated. The SRT willperform an evaluation.The sight glass is again a noteworthy consideration, although the SRT adjudged themacceptable. Barrels and a laundry cart stored in the area could pose interaction hazards to thesight glass and should be re-located.
Station Batteries, UPS and Chargers/Inverters This equipment had no issues identified andthe peer reviewer agreed with the SRT's findings and conclusions.
Battery Boards BB11 and BB12 The boards have a cable tray bolted to the top and shouldconsider that additional weight in the anchorage evaluation.
Fire Panel 1 This panel has not been evaluated by the SRT as ofyet. An internal boardwhich is loose may affect essential relays contained in this fire suppression control panel.
"F "Buildin
Valve Board VB11 This MCC is housed inside a non-seismically designed building calledthe foam building. Since the building is not designed to current codes or any previousversion ofthe Uniform Building Code, it is recommended that a simple evaluation for seismiccapacity be performed. The steel frame is not moment resisting, so the masonry block wallswillneed to be considered for carrying lateral load.
creenhou e Buildin
The equipment in this building had no issues identified and the peer reviewer agreed with theSRT's findings and conclusions.
M n: d Auxilia Control Rooms
Control Room Ceiling The ceiling appears to be adequately secured such that there willbeno general failure ofthe ceiling. The aluminum diffusers above the center ofthe room,however, are not secured by tie-wrap to the T-bars and may fall in a seismic event and posea personnel hazard. The diffusers should be positively secured to the T-bars by plastic tie-wrap or clips.
Control Room Cabinets The control room cabinets are generally not well anchored. Theyare shimmed and the shims are welded on one side only such that uplift forces would pry on
~ I
Nine Mile Point i Peer ReviewPage 5
the weld which is undesirable. The panel is "walk-through" type and the front and rearportions are not tied together. The recommended fix is to cross-tie the panels so that upliftthen becomes improbable. No other issues were identified. Seismic housekeeping in thecontrol room was excellent.
AuxiliaryControl Room Cabinets Some of the control room cabinets are not generally wellanchored. They are shimmed and the shims are welded on one side only such that upliftforces would pry on the weld. A design fixto stitch weld the cabinet to the embedded steel isthe recommended fix. Panels IS68-1S69and 1S49-1S50 are not bolted together and couldimpact one another. The SEWS correctly calls out this situation, but an unsecured spacerwas used to address the "gap" issue. This spacer would need to be secured and the cabinetsbolted together to be effective. Qthcrwise, determining the cabinets do not contain essentialrelays would make the fixa moot point. A review ofthe SEWS for 1S4 shows a filletweldassumed for two welds in this cabinet. Subsequent inspection by the peer reviewer with theSRT resulted in agreement that these two welds were one-half filledplug welds, not filletwelds, and the anchorage analysis should be appropriately amended. The results willstill beacceptable for A46 criteria.
Reactor Buildin
Poiverboards PB161A&B, PB171A&B and PB167 These MCCs are top braced; however, asmall gap exists between the braces and the MCC housings which poses an impact hazard.Introducing a neoprene-like pad in the gap willsatisfy this potential concern.
Hydraulic Control Units (HCU) The HCUs should be checked for anchorage and frameintegrity as well as a judgment given regarding the seismic ruggedness of the overhead piping(insert 4 withdrawal lines and scram discharge header).
Corner Room Pumps The containment spray and core spray pumps are vertical pumps. Inthe SEWS they were assumed rigid. The peer reviewer suggests a calculation to prove thisassumption or assume the pumps are flexible.
Pressure Transmitters The pressure transmitters seen through the gates ofthe east and westiiistrument rooms appear sound and have been tug tested by the SRT to ensure they aresecure.
Poiverboards 16 and 17 They are not positively anchored in every cubicle and should be
plug.welded to the embedded steel at least in every other cubicle, front and rear.
U I A<6 Rela evaluation
I peer reviewed the Demand and Capacity aspects of the USI A-46 Relay Evaluation. Iconcur with the general approaches used to establish seismic demand at the floor levels andwith the cabinet amplification factors chosen. The work appears to have been thoroughlyand competently performed. Relay outliers have been appropriately identified.
~ ~
Nine Mile Point l Peer ReviewPage 6
IPEEE Onl Related Comments
The piping is laterally well restrained. No issues were noted for safety-related piping and itcan be screened at the 0.5g PGA HCLPF value.
In addition, a number ofIPEEE scope components were screened by the SRT when thosesame components passed A-46 criteria. This peer reviewer concurs that these componentswhich passed A46 criteria can be screened-out from review at a HCLPF capacity of0.3g.However, HCLPF capacity estimates should still be made for the anchorage ofthesescreenedwut components. Furthermore, any component which is an A-46 criteria outliershould be revisited with respect to its HCLPF capacity.
My review ofHCLPF capacity calculations for raceway supports and block walls willfollow in asubsequent letter.
Ifyou have questions or comments, please contact the undersigned.
Very truly yours,
Robert P. KennedySeismic Review Walkdown P r Reviewer