New was raised by the Gulf Cooperation Council · 2016. 11. 7. · I/O MiCOM C264 P633 Transformer...

25

Transcript of New was raised by the Gulf Cooperation Council · 2016. 11. 7. · I/O MiCOM C264 P633 Transformer...

  • The concept of electrical interconnection

    was raised by the Gulf Cooperation Council

    (GCC) in early 80s to ensure security and

    stability of their local electrical networks.

    Technical and economical studies for

    feasibility were conducted during mid 80s

    to justify the requirements and benefits.

    Brief History

  • • Initiation – Early 80’s

    • Committee formed – 1986

    • First Detailed Study – 1990

    • Authority established by Royal Decree - 2001

    • • Second Study – 2003

    • GCC Joint Ministerial committee meeting in Kuwait allowed ‘Go Ahead’ - 2004

    Pre-Construction

    • Tendering & Adjudication - 2005

    • Contracts Awarded for : - Construction (2005) - Org. Develop (2005) - Legal (2006)

    • Preliminary ROW Survey (Land) - 2004

    • Sea Survey Contract 2004

    • Recruitment Process

    Construction • Regulation • Systems

    Operations

    • System Maintenance

    • Training

    • Market Operations

    Operations

    Summary of Activities

  • Established in July 2001 by Royal Decree No. M/21

    Owned by the six GCC Countries the authorized share capital is ($US 1,407,000,000) divided into (1,407,000) shares of ($US 1,000)

    each share.

    The Authority is managed by a (twelve member) Board of Directors; each member country is represented by two members. The Chairmanship is rotated among the member states every three years.

    The primary objective of the Authority is to: link up the power grids of the six GCC countries operate and maintain the interconnection become a leading player in the regional electricity market

    About GCC Interconnection Authority

  • 2014 GCC total installed capacity is about 110 GW with peak demand of 100 GW

    Kuwait

    Saudi Arabia

    Bahrain

    Qatar

    UAE

    Oman

  • Kuwait

    Saudi Arabia

    Bahrain

    Qatar

    UAE

    Oman

    Contribution by country to GCC peak demand

  • Phase I

    Phase II

    Phase III

  • BAHRAIN

    U.A.E.

    EMIRATES NATIONAL GRID

    AL FOUHAH 220kV 220kV

    AL FADHILI 400kV

    JASRA 400kV GHUNAN

    400 kV

    600MW

    SALWA 400kV

    SALWA 400kV

    QATAR

    1200 MW

    90km 90km

    DOHA SOUTH SUPER 400kV DOHA SOUTH SUPER 400kV

    290km 290km

    150km 150km

    SILAA 400kV 400kV

    1400 MW

    OMAN

    OMAN NORTHERN

    GRID

    MHADAH

    220 kV

    400MW

    52km

    112km

    100km 100km

    KUWAIT

    AL ZOUR 400kV

    AL ZOUR 400kV

    310km

    1200

    MW SAUDI ARABIA

    SEC - ERB

    HVDC

    BACK - TO - BACK

    1200MW

  • Country

    (Arabic Alphabetical Order) Percentage%

    United Arab Emirates 15.40

    Kingdom of Bahrain 9.00

    Kingdom of Saudi Arabia 31.60

    Sultanate of Oman 5.60

    State of Qatar 11.70

    State of Kuwait 26.70 TOTAL 100.00

  • Total

    The value of the awarded contracts to the six contractors are as follows:

    $251,705,956

    $217,451,173

    $310,300,246

    $343,122,125

    $34,546,981

    Actual Value

    $17,901,497

    ABB

    Areva-Cogelex

    NCC & MEEDCO

    Prysmian-Nexans

    Areva-Cogelex

    Contractor

    SNC-Lavalin

    Substations

    HVDC

    OHL

    Cable

    Control

    Lots

    Supervision

    $1,175,027,978

    10

    Contracts Value for Phase I

  • Project Timeframe

    The Project timeframe for the Phase I Interconnection Project is as follows:

    Event Date

    Project Commissioning Year 2009

    Tendering Period

    Bid Evaluation

    Pre-Award Meetings

    April 2005

    May-August 2005

    September 2005

    Contract Award Ceremonies

    Project Construction Commencement

    November 2005

    December 2005

  • Total

    The value of the awarded three(3) contracts are as follows:

    $ 69,104,000

    $ 43,718,000

    $ 5,611,105

    Actual Value

    NCC Transmission Line Group

    NCC Substation Group

    Areva-Cogelex

    Contractor

    OHL

    Substation

    Control

    Contract No

    $118,433,105

    12

    Contracts Value for Phase III

  • Project Timeframe

    The Project timeframe for the Phase III Project is as follows:

    Contract Award

    Completion Date

    Salwa (KSA) to Silla (UAE) Transmission Line

    August 2008

    March 2011

    Date

    Contract Award

    Completion Date

    July 2009

    May 2011

    Contract Award November 2009

    Silla (UAE) 400 KV Substations Date

    Control, Protection and Telecommunication Date

    Completion Date May 2011

  • GCC Ministerial Committee

    GCCIA Board of Directors

    GCCIA - CEO

    General Agreement

    PETA

    E & W Ministerial Committee Level

    General Assembly & Board Level

    GCC Utilities Level

    Articles / Bylaws

    Planning Committee

    Operating Committee

    Advisory & Regulatory Committee

    Transmission & Metering Codes

    Member States

    Utilities 14

    Overall Framework

  • First Energization : 17 Feb 2009

    Synchronized Operations

    26th July 2009

    Kuwait – Qatar Synchronized

    20th July 2009

    UAE Synchronized

    24th July 2011

    Oman and UAE interconnected

    end of 2011

  • Since the 1st day of the operational phase for GCC Interconnection, the security and reliably of the overall interconnected network is highly enhanced

    Over 1200 incidents were recoded on the overall interconnected network that range from single generator tripping up to 3000 MW with no impact on system security

    GCC Interconnection helped to avoid partial or total blackout during some of the critical incidents for some of the MS grids

  • • Harmonization of Policies and Procures has been achieved through Operation Committee and Panning Committee

    • Both committees meet on quarterly basis where all GCC TSOs representatives meet and discuss the common interest

    Policies and Procures Harmonization

  • Installation of PMU and Power Performance System

    • GCCIA installed PMUs network that covers all the GCCIA substations with master station at ICC for accurate analysis of system incidents

    • this system avails a real time centralized collection of PMUs information which enables GCCIA to implement a Wide Area Monitoring (WAM) system to have real time visualization of the status of operation of the power system

  • Integration of all substation systems is also achieved through the implementation of substation automation through the introduction of the PACiS Integrated Control System (ICS) with bidirectional communication to EMS SCADA

    The ICC is connected to all MSs NCCs through Inter-Control Center Communications Protocol (ICCP/TASE.2) that provides data exchange over wide area networks (WANs) between control centers on real time basis

    19

    EMS and DCS Systems

  • Redundant PACiS

    Gateways

    EMS SCADA

    IEC104

    ALSTOM

    MiCOM C264 I/O P633 Transformer Diff

    Protection

    Redundant Ring

    SBUS IEC61850

    Utility SCADA

    System

    ICP Link

    Existing

    Substation

  • Fiber Optic Opportunity

    GCCIA engaged in utilizing the OPGW fibre optic cable which is part of the transmission line and land & submarine cable

    The cable consists of 96 fibres; in which 24 fibres will be reserved for electrical power uses and the remaining 72 fibres can be used for future applications

    Currently negotiating with major telecommunication providers for the leasing and usage of the remaining fibres.

  • Although the energy trading has commenced between two of GCC counties during summer 2010, the utilization of the interconnection for energy trading is low

    Major Challenges that limit the energy trading includes subsidies and Regulatory issues

    Energy Trading

  • Establishing The Interconnection

    2005-2011

    Initiating a GCC Power Market

    2010-2020

    Initiating a GCC Power Market

    2010-2020

    Beyond the GCC Power Market 20120-2025

    Beyond the GCC Power Market 20120-2025

    Future Prospects Future Prospects

  • EJLIST

    UCTE

    East

    Arab Maghreb GCC

    24

    Future Prospects

  • Thank you