Spesa Utile Plus - Associazione Smart Communities Developers (SCOD)
New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.
Transcript of New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.
![Page 1: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/1.jpg)
New Ideas in Utility & Railroad CoordinationSCOD Annual Meeting
Indianapolis
![Page 2: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/2.jpg)
TCA 54-5-804TCA 54-5-804TCA 54-5-804TCA 54-5-804
Utility ReimbursementUtility Reimbursement
Chapter No. 86 PUBLIC ACTS, 2003 1CHAPTER NO. 86
HOUSE BILL NO. 900By Representatives Head, Shepard, Borchert, Mike Turner, Hackworth, Eldridge,Coleman, Maddox, McMillan, Pinion, McDonald, Tindell, Rinks, Fitzhugh, Harmon,McDaniel, McCord, Russell Johnson, Overbey, Harrison, Cobb, Fraley, Hargrove,Gresham, Bittle, Vincent, Wood, Hood
Substituted for: Senate Bill No. 588
By Senators Williams, Cooper, McNally, Fowler
AN ACT to amend Tennessee Code Annotated, Title 4; Title 54 and Title 55, relative totransportation.
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE:
SECTION 1. Tennessee Code Annotated, Title 54, Chapter 5, Part 8, is amended bydeleting § 54-5-802 in its entirety and by substituting instead the following language:Section 54-5-802. As used in this part, unless the context otherwise requires:
[Definitions]2
![Page 3: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/3.jpg)
If the Project is Qualified under Chapter 86,
TCA 54-5-804 effective September 1, 2003
For a Utility to be Eligible:
Project let for Contract Bid after September 1, 2003.
Utility must submit plans within the 120 to 165 days
Utility must have a permit for facilities on public ROW
Utility must execute a relocation agreement with the State
> Relocate Prior to the Letting
> Included in the State highway Construction Contract
3
Chapter 86 Eligibility
![Page 4: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/4.jpg)
Chapter Chapter 8686
PolicyPolicy
Chapter Chapter 8686
PolicyPolicy
4
Qualified projects are:
- Grade & Drain w/ROW acquisition
- Bridge replacement on State system
Projects which are NOT qualified:
Local Interstate Connectors (LIC)
Resurfacing (State or Federal funded)
State Industrial Access (SIA)
Minor intersection w/no ROW acquired
Bridge Repair
Safety
Maintenance
Signal Installation
Minor projects w/limited funding
![Page 5: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/5.jpg)
Chapter 86Chapter 86Policy Policy
ChangesChanges
Chapter 86Chapter 86Policy Policy
ChangesChanges
Compliance Documentation
• Municipally owned
• Utility District
• Utility Cooperatives
![Page 6: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/6.jpg)
6
* 2008-2009 FY based on current project schedule through end FY** Total Projects Let data includes maintenance projects, but removes special Mowing, and Emergency lettings for the months that CH86 has been in effect.
Chapter 86 Scorecard
Fiscal Year MOVEIN MOVE PRIOR
CH86ADDEDCOST
Construction TotalProjects
Let**Total
CH86ConstrCompl
ConstrLate
UtilityDelay
2003 – 2004 24 33% 48 66% $ 7.6 million 72 28 12 2 $502,121,270
2004 – 2005 45 43% 60 57% $ 24.1 million 105 37 11 1 $614,523,988
2005 – 2006 40 53% 36 47% $ 13.5 million 76 23 2 0 $815,798,596
2006 – 2007 15 38% 25 62% $ 6.7 million 40 6 0 0 $225,304,474
2007 – 2008 61 51% 58 49% $33.7 million 119 $743,175,729
2008 – 2009 70 57% 52 43% $ 39.0 million 122
![Page 7: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/7.jpg)
7
Work Schedule
![Page 8: New Ideas in Utility & Railroad Coordination SCOD Annual Meeting Indianapolis.](https://reader035.fdocuments.in/reader035/viewer/2022062408/56649ef55503460f94c08c98/html5/thumbnails/8.jpg)
Joe ShawAssistant Director, ROW Division
Telephone: 615-741-2891
Fax: 615-532-1548
Email: [email protected]
QUESTIONS?
8