NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL...

36
GSFC 429-99-02-01 NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITE SYSTEM (NPOESS) PREPARATORY PROJECT (NPP) SYSTEM ENGINEERING MANAGEMENT PLAN (SEMP) March 22, 2000 GODDARD SPACE FLIGHT CENTER GREENBELT, MARYLAND INTEGRATED PROGRAM OFFICE SILVER SPRING, MARYLAND Downloaded from http://www.everyspec.com

Transcript of NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL...

Page 1: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL

SATELLITE SYSTEM (NPOESS) PREPARATORY PROJECT (NPP)

SYSTEM ENGINEERING

MANAGEMENT PLAN (SEMP)

March 22, 2000

GODDARD SPACE FLIGHT CENTER GREENBELT, MARYLAND

INTEGRATED PROGRAM OFFICE SILVER SPRING, MARYLAND

Downloaded from http://www.everyspec.com

Page 2: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original i March 22, 2000

NPP System Engineering Management Plan (SEMP)

March 22, 2000

GODDARD SPACE FLIGHT CENTER GREENBELT, MARYLAND

INTEGRATED PROGRAM OFFICE SILVER SPRING, MARYLAND

Downloaded from http://www.everyspec.com

Page 3: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original ii March 22, 2000

Original signed by

Original signed by

Original signed by

Original signed by

NPP System Engineering Management Plan

Prepared By: NPP Formulation Study Team Reviewed By: ______________________________________________ Ray Taylor, NASA GSFC Date Project Formulation Manger ______________________________________________ Michael Crison, NPOESS IPO Date NPOESS Space Segment Manager Approved By: ______________________________________________ Christopher J. Scolese, NASA GSFC Date Associate Director of Flight Projects for EOS ______________________________________________ John D. Cunningham, NPOESS IPO Date System Program Director, NPOESS IPO

GODDARD SPACE FLIGHT CENTER GREENBELT, MARYLAND

INTEGRATED PROGRAM OFFICE SILVER SPRING, MARYLAND

Downloaded from http://www.everyspec.com

Page 4: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original iii March 22, 2000

CHANGE RECORD PAGE

DOCUMENT TITLE: NPP System Engineering Management Plan DOCUMENT DATE: March 22, 2000

ISSUE DATE PAGES AFFECTED DESCRIPTION Original

03/22/2000

All Pages

Approved by CCR 429-99-02-001

EOS 420-CM-05 (4/92)

Downloaded from http://www.everyspec.com

Page 5: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original iv March 22, 2000

DOCUMENT TITLE: RELEASE DATE: NPP System Engineering Management Plan (SEMP) March 22, 2000

LIST OF AFFECTED PAGES

Page No. Revision Page No. Revision Page No. Revision Page No. Revision Cover Page

Original

Title Page Original Signature

Page Original

iii Original iv Original v Original vi Original

1-1 Original 1-2 Original 1-3 Original 1-4 Original 1-5 Original 1-6 Original 2-1 Original 2-2 Original 2-3 Original 2-4 Original 2-5 Original 2-6 Original 2-7 Original 2-8 Original 2-9 Original

2-10 Original 2-11 Original 2-12 Original 2-13 Original 2-14 Original 2-15 Original 2-16 Original 2-17 Original 3-1 Original 3-2 Original 3-3 Original 3-4 Original A-1 Original A-2 Original

EOS 420-CM-04 (4/92)

Downloaded from http://www.everyspec.com

Page 6: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original v March 22, 2000

Table of Contents

Section Page

1.0 INTRODUCTION.........................................................................................................1-1

1.1 NPP Background.....................................................................................................1-1 1.2 System Overview....................................................................................................1-1 1.3 Purpose...................................................................................................................1-4 1.4 Roles and Responsibilities......................................................................................1-4 1.5 Program Review and Schedule ..............................................................................1-5 1.6 Applicable Documents ............................................................................................1-6

2.0 MISSION SYSTEM ENGINEERING ............................................................................2-1

2.1 NPP Mission System Engineering Introduction ......................................................2-1 2.2 Products Generated During the Formulation Phase of NPP..................................2-2

2.2.1 Program Level Products .................................................................................2-2 2.2.2 Project Level Products ....................................................................................2-3 2.2.3 System Engineering Products ........................................................................2-3 2.2.4 Science and Application Products ..................................................................2-5 2.2.5 Space Segment Products...............................................................................2-5 2.2.6 C3 Segment (C3S) Products ..........................................................................2-5 2.2.7 IDPS Products ................................................................................................2-6 2.2.8 Science Data Segment (SDS) Products ........................................................2-6 2.2.9 Archive and Distribution Segment (ADS) Products ........................................2-6

2.3 Mission System Engineering Process....................................................................2-8 2.3.1 Mission System and Operations Concept Development...............................2-8 2.3.2 Mission System Requirements Analysis ........................................................2-8 2.3.3 Mission Requirements Review (MRR)............................................................2-12 2.3.4 Mission System Design ..................................................................................2-12 2.3.5 Mission Design Review/Mission Confirmation Review...................................2-15

2.4 Configuration Management (CM) ............................................................................2-15 2.5 Quality .....................................................................................................................2-15 2.6 Test and Verification Planning.................................................................................2-15 2.7 Risk Management ...................................................................................................2-15 2.8 System Engineering and Project Management Tools ............................................2-15

3.0 REVIEW BOARDS AND WORKING GROUPS.........................................................3-1

3.1 Programmatic/Technical Review Boards ...............................................................3-1 3.1.1 NPP Review Board (NRB) ..............................................................................3-1 3.1.2 Flight Assurance Review Board......................................................................3-2 3.1.3 NPP System Engineering Review Board (SERB)..........................................3-2 3.1.4 Interim Science Panel .....................................................................................3-2

3.2 Working Groups ......................................................................................................3-3 3.2.1 System Engineering Working Group ..............................................................3-3 3.2.2 IDPS Working Group.......................................................................................3-3 3.2.3 Interface Control Working Group ....................................................................3-3 3.2.4 Test and Verification Working Group..............................................................3-4 3.2.5 Science Data Processing Working Group......................................................3-4 3.2.6 Archive and Distribution Working Group.........................................................3-4

APPENDIX A: ACRONYM LIST..........................................................................................A-1

Downloaded from http://www.everyspec.com

Page 7: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original vi March 22, 2000

Figures

Figure Page Figure 1-1 NPP Mission Overview .....................................................................................1-3 Figure 2-1 NPP Mission Formulation Process ..................................................................2-1 Figure 2-2 NPP Mission Phases........................................................................................2-2 Figure 2-3 Phased development and hierarchy for the NPP documents ..........................2-7 Figure 2-4 Mission System and Operations Concept........................................................2-9 Figure 2-5 Mission System Requirements Analysis ..........................................................2-11 Figure 2-6 Mission Requirements Review.........................................................................2-13 Figure 2-7 Mission System Design....................................................................................2-14 Figure 2-8 Mission Design Review/Mission Confirmation Review ....................................2-16 Figure 3-1 NPP Mission Formulation Organization ...........................................................3-1 Figure 3-2 Working Groups................................................................................................3-3

Downloaded from http://www.everyspec.com

Page 8: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-1 March 22, 2000

1.0 INTRODUCTION The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) is a joint mission being formulated by the National Aeronautics and Space Administration (NASA) and the NPOESS Integrated Program Office (IPO). The NPP mission provides remotely sensed land and atmospheric data that serves the meteorological and global climate change communities. This document is the NPP System Engineering Management Plan (SEMP), identifying the system engineering activities to be performed during the NPP mission formulation phase.

1.1 NPP BACKGROUND The NPP is a joint-agency mission intending to serve the NASA and IPO user communities. The decision to pursue a joint mission was a direct result of discussions between the IPO and NASA, and the NASA Earth Science Enterprise (ESE) Post-2002 Mission Planning Workshop held in August 1998 in Easton, Maryland. The NPOESS is a collection of satellites and ground capabilities supporting the operational needs of the civilian meteorological, oceanographic, environmental, climatic, and space environmental remote sensing programs. NPOESS is the follow-on and convergence of the NOAA Polar Orbiting Environmental Satellites (POES) and the Defense Meteorological Satellite Program (DMSP). Additionally, the NPOESS provides global change data for systematic measurements used by NASA and the Earth science research communities. The first NPOESS flight is planned for 2008. NPOESS provides instruments and spacecraft as part of the Space Segment, spacecraft operations and ground receive capabilities via the Command, Control, and Communication segment, and operational data processing and distribution to identified Weather Centrals by the Interface Data Processing segment. The NPP mission serves as bridge between Earth Observing System (EOS) and the NPOESS programs. The NPP mission is planned for late 2005. For NASA, NPP is part of the EOS program, providing extended observations for key sustained systematic, measurements identified in the EOS Science Plan. For IPO, NPP provides risk reduction as an opportunity to demonstrate and validate new instruments, algorithms, and pre-operational processing capabilities prior to the first NPOESS flight.

1.2 SYSTEM OVERVIEW The NPP is a joint partnership between NASA and the NPOESS IPO whose mission is to accomplish the following objectives: - Demonstrate and validate global environmental imaging and sounding instruments, algorithms and pre-operational ground systems in order to provide risk reduction to the first NPOESS flight.

Downloaded from http://www.everyspec.com

Page 9: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-2 March 22, 2000

- Provide continuity of the calibrated, validated and geo-located EOS Terra and Aqua systematic global imaging and sounding observations for NASA Earth Science research. For mission definition and formulation purposes, the NPP System is defined at the highest level in terms of six segments. These segments are used for the purpose of describing the System with the understanding that some functions currently found within one segment may ultimately be implemented in another segment, should it be deemed appropriate. See Figure 1-1, NPP System Overview. The NPP is planned for an 824 km polar, sun-synchronous orbit with a 10:30 am descending node, equatorial crossing time. Sensor data are acquired continuously, stored onboard and are subsequently downlinked to polar ground stations for capture, preprocessing, and routing to the processing sites within the United States. Additionally, a continuous, realtime direct broadcast capability is planned for transmitting all instrument, and auxiliary data to users equipped to receive these data. - Space Segment The Space Segment (SS) consists of the satellite and ground support equipment (GSE). The satellite is comprised of the spacecraft and instruments. The instrument complement includes: Visible-Infrared Imager Radiometer Suite (VIIRS), Cross-Track Infrared Sounder (CrIS), and the Advanced Technology Microwave Sounder (ATMS). The possibility of an instrument of opportunity (IOO) is still being evaluated. - Command, Control and Communications Segment The Command, Control and Communications Segment (C3S) provides the NPP satellite operations capabilities, communication routing of mission data and the ground receive stations. The C3 Segment also provides for the overall mission management, including coordinating the joint program operations needs. Mission Management represents both the operational and scientific communities. - Interface Data Processing Segment The Interface Data Processing Segment (IDPS) provides for ingest of raw sensor telemetry received from the polar ground stations. The artifacts from the communication routing are removed, providing raw data records (RDRs), which are subsequently processed to create Sensor Data Records (SDRs) and Environmental Data Records (EDRs). The RDRs, SDRs, and EDRs are made available to five meteorological Centrals for use in application specific weather related predictions. The five centrals are:

- National Environmental Satellite, Data, and Information Service (NESDIS) - Air Force Weather Agency/55th Space Weather Squadron, - Fleet Numerical Meteorology and Oceanography Center (FNMOC), and - Naval Oceanographic Office (NAVOCEANO).

Downloaded from http://www.everyspec.com

Page 10: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-3 March 22, 2000

Figure 1-1. NPP Mission Overview

User Community

Cmn d

, Cntr l

, Comm Segment

Cmn, Cntr, Comm

d l Segment • Manage Mission • Manage Satellite Operations - Plan mission events - Build command sequence - Perform Eng and Analysis - Analyze health and safety - Analyze flight dynamics - Maintain satellite database - Prepare & send satellite cmds

- Simulate satellite - Maintain flight software • Route mission data

• Manage Mission • Manage Satellite Operations - Plan mission events - Build command sequence - Perform Eng and Analysis - Analyze health and safety - Analyze flight dynamics - Maintain satellite database - Prepare & send satellite cmds - Simulate satellite

- Maintain flight software • Route mission data

I/F Data Processing Segment

I/F Data Processing

Segment • Schedule & manage resources • Ingest raw SMD telemetry • Process RDRs , SDRs , EDRs • Validate data records • Perform operations calibration proc • Provide data records to ADS & SDS

• Schedule & manage resources • Ingest raw SMD telemetry • Process RDRs , SDRs , EDRs • Validate data records • Perform operations calibration proc • Provide data records to ADS & SDS

Archive & Dist Segment

Archive & Dist

Segment • Ingest & validate data records • Manage archive • Interface with users • Generate user products • Track user orders • Generate accounting reports

• Ingest & validate data records • Manage archive • Interface with users • Generate user products • Track user orders • Generate accounting reports

Science Data Segment

Science Data

Segment • Schedule & manage resources • Ingest and validate RDRs • Process/Re-Process RDRs to Level 1B • Generate science data products • Perform science calibration proc • Provide science products to ADS

• Schedule & manage resources • Ingest and validate RDRs • Process/Re-Process RDRs to Level 1B • Generate science data products • Perform science calibration proc

• Provide science products to ADS

Launch Support Segment

Launch Support

Segment • Launch vehicle • Launch support equipment • Real property installation equip • Launch facilities

• Launch vehicle • Launch support equipment • Real property installation equip • Launch facilities

• Spacecraft - Control satellite - Support data collection - Provide NB communication - Provide WB communication - Thermal and electrical power - Provide failsafe protection • VIIRS • CrIS • ATMS • IOO (TBR) • Provide test support

Space Segment

Raw SMD Telemetry

RDRs

Science Products

Centrals

RDRs, SDRs, EDRs

RDRs, SDRs, EDRs

Downloaded from http://www.everyspec.com

Page 11: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-4 March 22, 2000

- Science Data Segment The Science Data Segment (SDS) ingests the RDRs from the IDPS. The SDS validates format and volume/size of the RDRs, ensuring all data are received. The SDS processes the RDRs, creating a Level 1B product. The Level 1B is comparable to the IDPS SDR product, but is generated using, science algorithms. The RDRs are stored for the life of the mission, permitting reprocessing when improved science algorithms are made available from the science community. The Level 1B data are provided to a small, competitively selected science user group who are responsible for generating identified Level 2/3 science products. These products are unique to the science research community or represent a significant science improvement beyond the IDPS EDRs. - Archive and Distribution Segment The Archive and Distribution Segment (ADS) receives the RDRs, SDRs, and EDRs from the IDPS and the Level 1B and Level 2/3 products from the SDS. All of these data are archived, as are the associated metadata, upon which users may search and order data. Upon request, data products are distributed to users and billed for the cost of fulfilling the request. - Launch Service Segment The Launch Service Segment (LSS) provides those assets and services associated with the launch vehicle (LV) and the payload integration. Included along with the launch vehicle, are all ground support equipment, property, and facilities to integrate the spacecraft to the LV, verify their integration, and conduct pre-launch testing with the remainder of the ground system.

1.3 PURPOSE The purpose of the NPP SEMP is to define the approach to planning and executing the System Engineering activities associated with the Formulation Phase of the NPP development life cycle. The SEMP will be updated once the Formulation Phase has been completed and transitioned to the Implementation Phase.

1.4 ROLES AND RESPONSIBILITIES The NPP roles and responsibilities are based upon the Initial Implementation Agreement (IIA) between the NASA and the NPOESS IPO. The IPO and the NASA Office of Earth Science shall jointly manage the program and assume the following division of responsibilities (summarized from the IIA): IPO: - Manage and fund the development of the CrIS - Manage and fund the development of the augmented VIIRS

Downloaded from http://www.everyspec.com

Page 12: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-5 March 22, 2000

- Provide mission flight operations - Provide the following ground system activities:

- Stored mission data receive ground station - Primary and backup telemetry and command via National Oceanic and

Atmospheric Administration (NOAA) Command and Data Acquisition (CDA) facilities, Air Force Satellite Control Network

- Network services for data return to Continental United States (CONUS) - Prototype operational data processing - Prototype operational calibration and validation - Ground system integration

NASA: - Perform mission System Engineering, integration and testing - Manage and fund the development of the spacecraft bus - Manage and fund the development of the ATMS - Manage and fund the procurement of the launch vehicle - Prepare for, conduct, and oversee launch and post-launch on-orbit checkout - Provide the following ground system capabilities

- Rate buffer subsystem for ground stations - Backup telemetry and command via Tracking and Data Relay Satellite (TDRSS)

- Provide engineering support for anomaly resolution for the life of the mission - Participate with the IPO and NOAA in science level calibration/validation activities

Additionally, NASA is currently in negotiations with the IPO and NOAA regarding the development and operations of the data archive and distribution services. This activity will be addressed once an agreement on how to proceed is reached between NASA and the other parties.

1.5 PROGRAM REVIEW AND SCHEDULE As defined by the NPG: 7120.5A NASA Program and Project Management Processes and Requirements, the management of the NPP will be conducted in three phases; Program Formulation, Program Implementation, and Program Evaluation. The NPP is currently in the Formulation Phase, which is scheduled to end approximately February 2001 with a Mission Confirmation Review. The Formulation Phase was preceded by a feasibility study, which ended with the approval for NPP to proceed to the Formulation Phase in May 1999. For NPP, the Formulation Phase consists of three major activities: Mission System and Operations Concept Development, Mission Requirements Analysis, and Mission System Design. The Mission System and Operations Concept Development and the Mission Requirements Analysis culminated with the Mission Requirements Review (MRR) in March 2000. The Mission System Design begins after the MRR and results in the Mission Design Review (MDR)/Mission Confirmation Review (MCR) in February 2001.

Downloaded from http://www.everyspec.com

Page 13: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 1-6 March 22, 2000

1.6 APPLICABLE DOCUMENTS Initial Implementation Agreement between National Aeronautics and Space Administration (NASA) and National Polar-Orbiting Operational Environmental Satellite System (NPOESS) Integrated Program Office (IPO) for the NPOESS Preparatory Project (NPP), November 27, 1999 NASA GSFC, Recommended Approach to Software Development, Revision 3, Software Engineering Laboratory Series, SEL-81-305, June 1992, Greenbelt, Maryland. NPG: 7120.5A, NASA Program and Project Management Processes and Requirements, NASA Procedures and Guidelines, April 3, 1998 ANSI/ASQC Q9001-1994, Quality Management and Quality System Elements – Guidelines, American Society for Quality Control Standards Committee for American Standards Committee Z-1 on Quality Assurance, 1994. Application Portability Profile (APP) The U.S. Government’s Open System Environment Profile Version 3.0, NIST Special Publication 500-230, National Institute of Standards and Technology, Systems and Software Technology Division, Computer Systems Library, February 1996, Gaithersburg, Maryland. Open System Environment (OSE): Architectural Framework for Information Infrastructure, NIST Special Publication 500-232, Frederick Schulz, National Institute of Standards and Technology, Systems and Software Technology Division, Computer Systems Library, Gaithersburg, Maryland. NASA Systems Engineering Handbook, National Aeronautics and Space Administration, June 1995

Downloaded from http://www.everyspec.com

Page 14: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-1 March 22, 2000

2.0 MISSION SYSTEM ENGINEERING Mission System Engineering is only one of the processes that are executed during the formulation phase. Figure 2-1 illustrates the overall NPP Formulation Phase development process. Key system engineering elements of the Formulation Phase process include operations concept development, requirements development and analysis, architecture synthesis, and requirements allocation to segments.

The following paragraphs in this section describe the execution of the major Mission System Engineering processes and products that will support the development of the NPP Formulation Phase.

2.1 NPP MISSION SYSTEM ENGINEERING INTRODUCTION For the NPP System Engineering effort, the Formulation and Implementation Phases are subdivided into the following activities: • Formulation Phase

- Mission System and Operations Concept - Mission System Requirements Analysis - Mission System Design

The Mission System and Operations Concept and Mission System Requirements Analysis activities culminate with the MRR. The MRR approves such documents as

EOS Requirements and Concepts

NPOESS Requirements and Concepts

Mission Requirements Specification

Operational concept

definition

Requirements Allocation Traceability

NPP Formulation

Guidance

Define, Derive Refine Function &

Perf . Reqts

System Architecture

Synthesis

Functional Analysis & Allocation -SAMP, IORD,TRD, Instr .

SRDs

Lower Level (Element) Reqmts. Specs

Physical Architecture

Lower Level (Element)

Reqmts. Specs

Operational Concept

Document Functional Architecture

Design Constraints

Design Loop

Reqts Loop

-NPP IAA, ATMS IAA -NPP Formulation Plan

-Decompose for more - Allocate to Architectural elements -Allocate H/W, S/W, people - Modeling and Simulation - Performance Analysis - Error Budgets

- Cost - Existing Contracts - Existing Facilities - NPOESS Transition

Interface Definitions

- Define/Refine Segment alternatives - System Level Trade Studies

- Functional Reqts ., by Segment - Mission & Segment Level Performance Reqts - Rationale and Source

Figure 2-1. NPP Mission Formulation Process

- EOS PCA

Downloaded from http://www.everyspec.com

Page 15: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-2 March 22, 2000

the Level 2 Mission Requirements and the System and Operations Concept along with other programmatic documentation. The Mission System Design activity culminates with the MDR and the MRR. The MDR evaluates the next level of requirements, their allocation and design detail such as segment specifications and architecture descriptions. The MCR is a programmatic review that either confirms the progression to the Implementation Phase or provides additional direction to the NPP Mission.

• Implementation Phase

- Segment Design, Implementation and Test (Segment System Engineering) - Mission System Integration and Testing - Mission Operations and Maintenance

Figure 2-2 illustrates the NPP Formulation and Implementation phases and activities.

Figure 2-2. NPP Mission Phases

The Formulation Phase activities (Sys & Ops Concept, Mission Requirements Analysis, and Mission Design) have specific entry and exit criteria (as described in the following Activity Tables). However, certain aspects of each activity may be performed during other activities. For example, during the Mission Design activity, an architecture characteristic may change the System and Operations Concept that may lead to a change in Level 2 Mission Requirements.

2.2 PRODUCTS GENERATED DURING THE FORMULATION PHASE OF NPP A large number of products are generated during the formulation phase. These include products generated by the Mission System Engineering effort, Project Management, and the products generated by segments of the NPP. These are listed below:

2.2.1 Program Level Products • NPP Program Requirements

Level 1 NPP mission requirements • ATMS Initial Implementation Agreement

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

Mission Sys & Ops

Concept

MRR MDR/ MCR

Downloaded from http://www.everyspec.com

Page 16: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-3 March 22, 2000

Initial Implementation Agreement between NASA and IPO for ATMS, dated August 27, 1998. This IIA accomplishes the development, procurement, and delivery of a new NASA research ATMS instrument to the NPOESS IPO

2.2.2 Project Level Products • NPP Formulation Plan

The Project Formulation Plan (PFP) represents the agreement between the NASA Earth Observing System Program Office and the IPO for the work to be performed in support of the NPP Formulation. It defines the requirements and constraints imposed by the EOS Program Office and IPO and the services and products to be provided by the Project Formulation Manager (PFM).

• Configuration Management Plan

Configuration Management Plan identifies the CM process including the various boards and the responsibilities, and provides the processes, forms, and board chairmanship.

• Transition Plan

Transition Plan identifies the planning for the possible transitioning of operational, tool, system, and technology from the bridge mission for consideration/use by the NPOESS. Does not cover science observation transition from NPP to NPOESS; this is covered in the Science Plan.

• Technology Plan

Technology Plan identifies the enabling and enhancing technologies being planned/considered for the mission and the activities and milestones for the technology development required to determine the feasibility of their use.

• Risk Management Plan

Identifies the process to be used for the management of risks to the definition and implementation of the mission, including technical, cost, schedule, and programmatic.

• Safety and Security Plan

Identifies activities to assure that all project safety responsibilities in program management system acquisition and mission execution are successfully discharged and that personnel, equipment and facilities are protected from hazardous conditions.

2.2.3 System Engineering Products • System Engineering Management Plan (SEMP)

SEMP identified the System Engineering approach for formulation; includes the SE processes, products, tools and working groups and includes all SE discipline areas. This document will be updated after MDR for the implementation phase.

• System and Operations Concept

System and Operations Concept provides the functional model and associated operational scenarios upon which the model operates. Data flow diagrams, data

Downloaded from http://www.everyspec.com

Page 17: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-4 March 22, 2000

dictionary, functional description, and operational scenarios are also included in this document.

• NPP Mission Requirements (Level 2)

NPP Mission Requirements document contains the Level 2 requirements based on the System and Ops Concept. It includes functional, performance, interface and operational requirements at the Mission Level.

• Performance Verification Plan

Performance Verification Plan provides a system level verification plan, identifies the integration activities, sequencing, test phasing, and tool utilization.

• Architecture Description Document

Architecture Description Document describes the NPP system architecture at the element level, as allocated from the segments; including hardware and software for those elements.

• SI&T Plan

SI&T Plan describes the implementation plan for the system level integration, including the verification methods/criteria, test sequencing, and mapping to the mission level requirements.

• Segment Interface Documents

These documents give the interface requirements, including performance specification for the data flow between the NPP Segments. The following Interface Requirement Documents (IRDs) have been identified.

- SS to C3S IRD

Identifies the interface requirements between the SS and the C3S. - SS to LSS IRD

Identifies the interface requirements between the SS and the LSS - C3S to LSS IRD

Identifies the interface requirements between the C3S and the LSS. - C3S to IDPS IRD

Identifies the interface requirements between the C3S and the IDPS. - IDPS to SDS IRD

Identifies the interface requirements between the IDPS and the SDS. - IDPS to ADS IRD

Identifies the interface requirements between the IDPS and the ADS. - SDS to ADS IRD

Identifies the interface requirements between the SDS and the ADS.

Downloaded from http://www.everyspec.com

Page 18: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-5 March 22, 2000

2.2.4 Science and Application Products • Science Plan

Science Plan identifies the approach for incorporating the science community involvement in the NPP mission

• Calibration and Validation Plan Calibration and Validation Plan identifies the approach for providing instrument calibration, characterization, trending and QA, and represents both operational and science calibration and validation objectives.

2.2.5 Space Segment Products • Spacecraft Specification

NPP Spacecraft documents contain the Level 3 requirements for the Spacecraft, based on the Level 2 mission requirements and System Ops Concept. It includes functional, performance, interface and operational requirements at the Segment Level.

• VIIRS Specification

VIIRS specification identifies the detailed instrument and algorithm level specifications for the development of the instrument and algorithms. Also called the A-Spec.

• CrlS Specification

CrlS specification identifies the detailed instrument and algorithm level specifications for the development of the instrument and algorithms. Also called the A-Spec.

• ATMS Specification

ATMS specification identifies the detailed instrument and algorithm level specifications for the development of the instrument and algorithms. Also called the A-Spec.

• Launch Vehicle Specification

Launch Vehicle specification identifies the spacecraft system requirements for use in launch vehicle studies, preliminary design, and detailed design.

2.2.6 C3 Segment Products • C3S Operations Concept tailored for NPP

C3S Operations Concept provides the functional model and associated operational scenarios upon which the model would operate. Data flow diagrams, data dictionary, functional description, and operational scenarios are also included in this document.

• C3 Segment Specification

C3S Specification contains the Level 3 requirements based on the Level 2 Mission requirements and C3S Ops Concept. It includes functional, performance, interface and operational requirements at the Segment Level.

Downloaded from http://www.everyspec.com

Page 19: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-6 March 22, 2000

2.2.7 IDPS Products • IDPS Operations Concept (Tailored for NPP)

IDPS Operations Concept Document provides the functional model and associated operational scenarios upon which the model would operate, tailored for NPP. Data flow diagrams, data dictionary, functional description, and operational scenarios are also included in this document.

• IDPS Specification (Tailored for NPP)

IDPS Specification contains the Level 3 requirements based on the Level 2 Mission requirements and IDPS Ops Concept. It includes functional, performance, interface and operational requirements at the Segment Level, tailored for NPP

2.2.8 Science Data Segment Products • SDS Operations Concept

SDS Operations Concept Document provides the functional model and associated operational scenarios upon which the model would operate. Data flow diagrams, data dictionary, functional description, and operational scenarios are also included in this document.

• SDS Specification

IDPS Specification contains the Level 3 requirements based on the Level 2 Mission requirements and SDS Ops Concept. It includes functional, performance, interface and operational requirements at the Segment Level.

2.2.9 Archive and Distribution Segment Products • ADS Operations Concept

ADS Operations Concept Document provides the functional model and associated operational scenarios upon which the model would operate. Data flow diagrams, data dictionary, functional description, and operational scenarios are also included in this document.

• ADS Specifications

ADS Specifications Document contains the Level 3 requirements based on the Level 2 mission requirements and ADS Ops Concept. It includes functional, performance, interface and operational requirements at the Segment Level.

Figure 2-3 illustrates the phased development and hierarchy for the NPP documents.

Downloaded from http://www.everyspec.com

Page 20: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-7 March 22, 2000

NPP FORMULAT ION PHASE PRODUCT TREE

Feasibil i ty AuthoritySept. 17, 1998

NPP Ini t ia l Implementat ion

AgreementNov. 27, 1999 Formulation Authority

Nov. 6, 1998

EOS ProgramCommitment Agreement

= IPO CCB

= NPP CCB

Single Acquisit ion Management Plan

(SAMP)

EOS ProgramCommitment

Agreement AppendixN P P F i n a l I A

ATMS Init ial Implementat ion

AgreementAug. 27, 1998

ATMS F ina l IA

IORD

N P PProgram

Requirements (Level 1)

E O S -G Program Plan4 2 0-P G -7120.1.1

April 30, 1999( IN REV IEW) P

RO

GR

AM

CO

NT

RO

L

ProjectFormula t ion

PlanGSFC 429-99 -01-01

ProjectFormula t ion

ScheduleGSFC 429 -99-01 -02

Configurat ion M a n a g e m e n t

PlanGSFC 429 -99-01 -03

Transit ion PlanGSFC 429 -00 -01 -05

BusinessOpportunity

PlanGSFC 429 -00-01 -08

Project Implementat ion

PlanGSFC 429 -00-01 -07

Safety & Secur i ty Plan

GSFC 429 -00-01 -06

RiskM a n a g e m e n t

PlanGSFC 429 -99-01 -04

Mission Prel iminary Design -

P R O J E C T M A N A G E M E N T S Y S T E M E N G I N E E R I N G S P A C E S E G M E N TSCIENCE DATA

S E G M E N T

C O M M A N D , C O N T R O L& C O M M U N I C A T O N S

S E G M E N TINTERFACE DATA

P R O C E S S I N G S E G M E N TA R C H I V E & D I S T R I B U T I O N

S E G M E N T

NP

P F

OR

MU

LA

TIO

N

PR

OJ

EC

T C

CB

CO

NT

RO

L

CMB 02 /10 /00

VI IRS

C r I S

Launch Vehicle Specif ication

Launch Vehicle Acqu is i t ion Package

S D S O p e r a t i o nC o n c e p t

SDS Speci f icat ion

SDS Acqu i s i t i onPackage (s )

A D S O p e r a t i o nC o n c e p t

ADS Speci f icat ion

ADS Acqu i s i t i onPackage (s )

System Engineer ing Management P lan

GSFC 429 -99-02 -01

NPP Miss ion Requirements

(Level 2)GSFC 429 -99-02 -03

Architecture Descript ion Documen t

GSFC 429 -00-02 -06

ATMS

S/C

L A U N C H S U P P O R T S E G M E N T

C3S Operat ionsConcep t

(Tai lored for NPP)

C3S Speci f icat ion(Tai lored for NPP)

S P D R RAcquisit ion

P a c k a g e

IDPS OperationsC o n c e p t

(Tailored for NPP)

IDPS Specification(Tailored for NPP)

S P D R RAcquisit ion

P a c k a g e

SS to C3S IRD

SS to LSS IRDC3S to LSS IRD

IDPS to SDS IRDIDPS to ADS IRD

S D S t o A D S I R D

Segment Interface Requirements

DocumentsGSFC 429 -00-02 -08

C3S to IDPS IRD

S C I E N C E & APPLICATION

Technology PlanGSFC 429 -00 -02- 05

Prior to Formulat ion -

Miss ion System & Operat ions Concept -Miss ion System Requi rements -

Miss ion System Des ign -

Systems Safety and Mission Assurance

Reqmnt .’s forNPP Spacecra f t

UIID

Specif ication

S/CGSFC 429 -00 -07 -01

Acquis i t ion Package

Acquis i t ion PackageIDD

S R DSpecif ication

UIIDGSFC 429 -99-04 -01

Performance Ver i f icat ion Plan

GSFC 429 -00-02 -04

Science PlanGSFC 429-00 -03-01

Calibration & Validation Plan

GSFC 429 -00-03 -02

IDD

S R D

UIIDGSFC 429 -99-05 -01

Specif ication

Acquis i t ion Package

Science Rqmnt’s

Specif ication

Acquis i t ion Package

UIIDGSFC 429 -99 -06 -01

S O W

IDD

N A S 5 -00115 (GenCorp Inc.)N A S 5 -00116 (Bal l Corp)

S -4 8 0 -99S-4 8 0 -99

GSFC 429 -00- 07-02

GSFC 429 -00-07 -03

C o m m o n Sec t ion o f SRD

SI&T PlanGSFC 429 -00-02 -07

S y s t e m & Operat ions Concept GSFC 429 -99 -02 -02

Note: I C D s, GS Element Speci f icat ions & Phase C/D type acquis i t ion packages are not yet included A T M S S S M A Reqmnt ’s

Figure 2-3. Phased development and hierarchy for the NPP documents

Downloaded from http://www.everyspec.com

Page 21: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-8 March 22, 2000

2.3 MISSION SYSTEM ENGINEERING PROCESS This section describes the System Engineering process for the Formulation Phase of the NPP Mission.

2.3.1 Mission System and Operations Concept Development This activity began with the identification of draft Level 1 NPP requirements, external interfaces, and the IIA. These inputs are the starting point for the development of the NPP Context Diagram and Data Flow Diagrams. The Context Diagram depicts all the external interfaces to the NPP Mission. The Data Flow diagrams (DFDs) depict all the interfaces between external elements as well as internal interfaces between segments as defined in Section 1.1 System Overview. Once the DFDs have reached maturity, operational scenarios are developed identifying the functional sequences of events and flow of information between functions. The operational scenarios aid in further maturation of the DFDs and the system concept collectively. The DFDs, operational scenarios and associated information comprise CONOPS. The Data Flows Diagrams and CONOPS are updated until all interfaces and functions of each segment are sufficiently defined in order to generate Level 2 requirements. Figure 2-4 highlights the Mission System and Operations Concept activities.

2.3.2 Mission System Requirements Analysis Requirements Development Once the CONOPS becomes stable, the Level 2 Mission Requirements Document (MRD) is developed. The MRD contains overall mission and segment requirements. The CONOPS and MRD will be updated simultaneously to reflect consistency between operation concepts and Level 2 requirements. Additional inputs to the MRD may originate from NPOESS requirement specifications or other projects with similar Level 1 requirements or objectives. After the CONOPS and MRD have become stable (i.e. no major changes are being processed), each Level 2 Mission Requirement is traced to Level 1 Requirements. Also, each Level 2 Mission Requirement is traced to a verification method. Requirements Analysis When the Level 1 and verification trace activities are complete, the Level 2 Mission Requirements will be analyzed for the following quality characteristics: - Realistic - Requirements must be achievable

Downloaded from http://www.everyspec.com

Page 22: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-9 March 22, 2000

ENTRY CRITERIA EXIT CRITERIA

MEASUREMENT

METHODS AND TOOLS

KEY ACTIVITIES

Figure 2-4. Mission System & Operations Concept

NPP FORMULATION PHASE MISSION SYSTEM ENGINEERING PROCESSES

PRODUCTS

Mission Sys & Ops Concept

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

MRR MDR/ MCR

- IIA - Level I requirements-draft - External interfaces identified - Formulation Plan

Mission Sys & Ops Concept

- System and Operations Concept (Draft)

Formal - Sys & Ops Concept

Supporting Documentation - Context and Data flow diagrams

System Engineering Working Group - Develop context and data flow diagrams - Develop Ops Scenarios - Generate data dictionary - Iterate with requirements definition - Validate System concept with Ops.

Scenarios and identify/resolve # of inconsistencies

- # of inconsistencies (TBRs/TBDs) in functional Model

System Engineering Review Board - Review concept of operations - Coordinate programmatic issues with

PRB

Project Review Board - Provide oversight to SERB

- Working Groups - Team work

Downloaded from http://www.everyspec.com

Page 23: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-10 March 22, 2000

- Unambiguous – Requirements must be clearly stated and are not likely to be

subjected to different interpretations - Consistent - Requirements must use uniform notation, symbols, terminology, and

structure and not contradict themselves technically - Complete - The requirements should be at a level of detail that provides for

translation of the requirement into design - Testable (Verifiable) The requirements are verifiable by test/demonstration/analysis

and can be translated into acceptance criteria - Traceable - to some higher level requirements/specifications (Level 1). Once this activity is compete, Level 1/2 and verification trace matrices are completed and updated CONOPS and MRD are produced. A Requirements Analysis Report is also generated describing any operations concept or requirements that remain incomplete, ambiguous, untraceable, or non-verifiable/testable. The Requirements Analysis Report also includes standard metrics such as number of requirements, number of requirements traced, number of TBDs, etc. Trade Studies As part of the Requirements Analysis phase, trade studies or independent analyses may be performed under the direction of mission management. The purpose of trade studies or independent analyses is to provide: - Alternative operation scenarios or requirements - Technology risk reduction - Alternative architectures - Operation scenarios/requirements validation - Other. Critical Technologies The NPP Mission includes enabling and enhancing technologies. The Low Noise Amplifiers (LNAs) for ATMS is considered a mission enabling technology and serves to meet the mission objectives. Other technologies are considered mission enhancing technologies and serve to demonstrate key capabilities that are not in line to be used for mission success. These include: - Ka-band phased array for data down link - Spacecraft on-board processing - Optical communication for rapid delivery of data to users The NPP Technology Plan addresses the development and integration of these technologies into the NPP Mission. Performance Verification Plan Also during the Requirements Analysis Phase, a draft Performance Verification Plan (PVP) is developed. The PVP outlines the overall approach to integrating and testing all NPP segments, from development through integration and testing, and on-orbit operations. Figure 2-5 highlights the Mission System Requirements Analysis activities.

Downloaded from http://www.everyspec.com

Page 24: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-11 March 22, 2000

Mission System Requirements Analysis

ENTRY CRITERIA EXIT CRITERIA

MEASUREMENTS

METHODS AND TOOLS

KEY ACTIVITIES

System Engineering Working Group - Develop Mission Requirements - Allocate requirements to segments - Trace L2 Mission Reqmts to L1 Reqmts - Trace L2 Mission Reqmts to verification

method - Conduct trade studies - Define Performance Verification

approach - Update System & Ops Concept

System Engineering Review Board - Review Sys & Ops Con, L2 Mission

Reqmts - Coordinate programmatic issues with

PRB

NPP Review Board - Provide oversight to SERB - Review Sys & Ops Con, L2 Mission

Reqmts

- System & Operations Concept Document - Draft

- Level 1 Requirements -Draft

- Level 2 Mission Requirements Doc - Review - System & Operations Concept Doc - Review - Performance Verification Plan - Draft - Technology Plan - Draft - Transition Plan-Draft - Risk Management Plan-Review - Cal/Val Plan-Draft

- # of inconsistencies in DFDs - Percentage of L2 reqmts

traced to L1 reqmts - Percentage of L2 reqmts

traced to verification method - # TBDs and TBRs in L2s - # of open trades

- Working Groups - Trade Studies - IMDC - DOORS - Teamwork

Figure 2-5. Mission System Requirements Analysis

NPP FORMULATION PHASE MISSION SYSTEM ENGINEERING PROCESSES

PRODUCTS

Formal - Sys & Ops Concept - Level 2 Mission Reqmts - Performance Verification Plan

Supporting Documentation - Reqmts Trace Matrix - Reqmts Analysis Report - Trade Study Reports

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

Mission Sys & Ops

Concept

MRR MDR/ MCR

Downloaded from http://www.everyspec.com

Page 25: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-12 March 22, 2000

2.3.3 Mission Requirements Review (MRR) The Mission System and Operations Concept and Mission Requirements Analysis activities conclude with the Mission Requirements Review. All documents and associated products (analysis, trade studies, and technology assessments) for the System and Operations Concept, and Mission Requirements Analysis activities are reviewed by a panel chaired by GSFC Flight Assurance organization. The panel is comprised of representatives from IPO, other NASA organizations, science, and external parties. Products are scrutinized for maturity, clarity as well as end item produceability. The NPP Mission System Engineering, Segment and Science teams are responsible for presenting to management the technical, cost and schedule aspects of the NPP Mission to management. Figure 2-6 highlights the Mission Requirements Review activities.

2.3.4 Mission System Design Mission System Design begins with the approval of the NPP MRR and the release of the baselined System and Operations Concept, Mission Requirements Document, and a draft version of the Performance Verification Plan. Mission Scenarios and Mission System Architecture At the beginning of the Mission System Design activity, an end-to-end Mission System Architecture is developed based on several factors such as: critical technologies, existing infrastructure, or new NPP capabilities, and Level 2 requirements allocation. In parallel to the development of this architecture, Mission Scenarios are developed in order to validate the end-to-end architecture as well as the CONOPS and MRD. Both Mission Scenarios and the Mission System Architecture are iterated with the development of the other NPP products to be developed during the Mission System Design activity, such as the Interface Requirements Documents and the segment specifications. Interface Requirements and Segment Specifications Interface Requirements Documents (IRDs) are developed between the segments in parallel with the development of the segment specifications, such as the Spacecraft Specifications. (Segment specifications are produced by each segment developer). Once the Mission Scenarios, Mission System Architecture and IRDs are stable, the final Performance Verification Plan and System Integration and Testing Plan are developed. Figure 2-7 highlights the Mission System Design activities.

Downloaded from http://www.everyspec.com

Page 26: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-13 March 22, 2000

M iss ion Requ i rements Rev iew

ENTRY CRITERIA EXIT CRITERIA

MEASUREMENTS

METHODS AND TOOLS

KEY ACTIVITIES

Mission Requirements Review - Review the status of Mission Requirements

definition and other related activities of the formulation phase

- Identify RIDs/AIs, TBDs/TBRs in L2s - MRR approval and/or recommendations

Figure 2-6. Mission Requirements Review

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

NPP FORMULATION PHASE MISSION SYSTEM ENGINEERING PROCESSES

Mission Sys & Ops

Concept

PRODUCTS

Formal - MRR Summary

Supporting Documentation - List of waivers - List of TBD/TBRs

MRR MDR/ MCR

- Level 2 Mission Requirements Doc - Review - System & Operations Concept Doc - Review - Performance Verification Plan - Draft - Technology Plan - Draft - Transition Plan - Draft - Risk Management Plan - Review - Cal -Val Plan - Draft

- MRR Summary - MRR approval and/or actions

- # of RIDs and Ais - - # of TBDs/TBRs in L2s

Systems Engineering Working Group - Coordinate technical aspects of the MRR - Present the results/status of the

formulation phase Mission Requirements activities to the MRR

- Support MRR by providing additional information/clarifications

- MRR Board

Downloaded from http://www.everyspec.com

Page 27: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-14 March 22, 2000

Mission System Design

ENTRY CRITERIA EXIT CRITERIA

MEASUREMENTS

METHODS AND TOOLS

KEY ACTIVITIES

System Engineering Working Group - Develop Mission System Architecture(s) - Trace segment spec reqmts to L2 Mission

Reqmts - Conduct trade studies - Update Performance Verification Plan - Develop Interface Reqmts Docs - Define System Integration & Test

Approach

NPP Review Board - Provide oversight to SERB - Review Segment Specs, Sys Arch,

Performance Verification Plan

- NPP MRR approval - Level 2 Mission Requirements Doc -

Baselined - System & Operations Concept Doc -

Baselined - Performance Verification Plan - Draft

- Percentage of L2 and L3 reqmts traced to each other

- Percentage of interfaces docs completed - # of open TBD/TBRs per I/F Doc.

- Working Groups - Trade Studies - IMDC - TBD tool

Figure 2-7. Mission System Design

NPP FORMULATION PHASE MISSION SYSTEM ENGINEERING PROCESSES

PRODUCTS

Formal - Segment Specifications - Segment Ops Concepts - Performance Verification Plan - Mission System Architecture - IRDs - SI&T Plan

Supporting Documentation - Trade Study Reports - Mission Scenarios

- All Segment Specs (L3) - Baselined - All Segment Ops Concepts (L3) Baselined - Performance Verification Plan Baselined - Mission System Architecture Baselined - Interface Reqmts Doc- Baselined - System Integration & Test Plan - Baselined

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

Mission Sys & Ops

Concept

MRR MDR/ MCR

Systems Engineering Review Board - Review Segment Specs, Sys Arch,

Performance Verification Plan - Coordinate programmatic issues with

PRB

Downloaded from http://www.everyspec.com

Page 28: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-15 March 22, 2000

2.3.5 Mission Design Review/Mission Confirmation Review The Mission System Design and the entire Formulation Phase concludes with the MDR and MCR. The purpose of the MDR is to review the complete NPP Mission, from requirements and specifications, to operations concepts, to architectures and risk from a technical, cost and schedule aspect. The MDR, like the MRR is chaired by the GSFC Flight Assurance organization with representatives from IPO, other NASA organizations, and science and external organizations. The MCR is conducted at the Program level between NASA, IPO and NOAA. The purpose of this review is to evaluate the technical merits of the NPP Mission against each agencies budget and mission goals. Approval for proceeding to the Implementation Phase may be expected approximately 3 months after the MCR. Figure 2-8 highlights the MDR/MCR activities.

2.4 CONFIGURATION MANAGEMENT (CM) Configuration Management activities within the system engineering process will conform to the GSFC ISO and NPP Configuration Management Plan.

2.5 QUALITY Products developed by the system engineering effort will conform to the GSFC and NPP ISO procedures and guidelines.

2.6 TEST AND VERIFICATION PLANNING During the Implementation Phase, test and verification planning begins once a conceptual architecture is developed during the Mission System Design activities. The initial plan, the Performance Verification Plan (PVP), addresses the top-level plan and activities that are necessary to complete verification of the NPP mission. The PVP addresses development, integration, testing, launch integration, as well as on-orbit verification activities across all elements of the NPP.

2.7 RISK MANAGEMENT Risk Management process for System Engineering activities are within the Project Risk Management activities. All System Engineering risk management activities are in direct support of the NPP Manager.

2.8 SYSTEM ENGINEERING AND PROJECT MANAGEMENT TOOLS Due to the distributed nature of the NPP, commercially available tools have been selected to support the system engineering and project management process. The following tools and a brief description of their use are given below.

Downloaded from http://www.everyspec.com

Page 29: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-16 March 22, 2000

Mission Design Review/Mission Confirmation Review (MDR/MCR)

ENTRY CRITERIA EXIT CRITERIA

MEASUREMENTS

METHODS AND TOOLS

KEY ACTIVITIES

Systems Engineering Working Group - Present results/Status of Mission Systems

Design and related activities to the Board - Support the MDR/MCR Board by providing

additional information/ clarifications as required

Figure 2-8. Mission Design Review/Mission Confirmation Review

Mission System Reqmts Analysis

Mission System Design

Segment Design,

Implementation, and Test

Mission System

Integration and Test

Mission Operations

and Maintenance

Formulation Phase Implementation Phase

N P P F O R M U L A T I O N P H A S E MISSION SYSTEM E N G I N E E R I N G P R O C E S S E S

Mission Sys & Ops

Concept

P R O D U C T S

Formal - MDR/MCR Report

Supporting Documentation - List of Waivers List of TBDs/TBRs

MRR MDR/ MCR

- All Segment Specs (L3) - Baselined - All Segment Ops Concepts (L3) - Baselined - Performanc e Verification Plan - Baselined - Mission System Architecture - Baselined - Interface Reqmts Doc - Baselined - System Integration & Test Plan - Baselined

MDR/MCR - Mission Design Review and approval/

recommendations - Identify Waivers, TBDs/TBRs - Mission confirmation and approval to

proceed to the implementation Phase.

- # of TBDs/TBRs in L3s - # of RIDs/AIs - # of open trades

- MDR / MCR Board

- MDR/MCR Report - Mission Design approval and/or

recommended actions - Mission Confirmation and approval to

proceed to the Implementation Phase and recommendations

Downloaded from http://www.everyspec.com

Page 30: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 2-17 March 22, 2000

“DOORS” – requirements data base, analysis and reports “Teamwork” – data flow diagram development, analysis, reports, and data dictionary “Mesa/Vista” – web-based integrated project management tool support for schedules, action items, risk management, configuration management, meeting coordination, on-line dialog.

Downloaded from http://www.everyspec.com

Page 31: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 3-1 March 22, 2000

3.0 REVIEW BOARDS AND WORKING GROUPS

3.1 PROGRAMMATIC/TECHNICAL REVIEW BOARDS This section describes the NPP review boards. Figure 3-1 depicts the hierarchical relationship between the NPP technical and programmatic organizations.

Figure 3-1. NPP Mission Formulation Organization

3.1.1 NPP Review Board (NRB) The purpose of this review board is to evaluate and approve all products and schedules associated with the Formulation Phase and to evaluate the progress towards MRR milestones. The NRB also is responsible for the approval of the Integrated Master Schedule, and controls all Level 2 milestones, and formulation budget. The NRB is led by the NPP Project Managers. The NASA Project Manager chairs the NRB, while the IPO Project Manager serves as the deputy chair. Issues that cannot be resolved at the NPP Mission Management level are brought to the attention of the NPP Program Management for resolution. Board members include representatives from the following: - NPOESS IPO - C3 Segment - IDPS Segment - Space Segment - Science Data Segment - Launch Segment

NPP Program Management

NASA EOS Program

Manager

NOAA NPOESS System Program Director

NPP Mission Management

NASA NPP Project

Manager

IPO NPP Project

Manager

NPP Technical Management

NASA NPP Mission System Manager

NPP System Engineering

Review Board

NPP Review Board

NPP Flight Assurance Review Board

Downloaded from http://www.everyspec.com

Page 32: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 3-2 March 22, 2000

- Archive and Distribution Segment - Interim Science Panel - Mission System Engineering The NRB nominally meets monthly.

3.1.2 Flight Assurance Review Board The purpose of this review board is to evaluate the technical aspects of NPP. The board provides an independent assessment of the NPP progress at major reviews. The reviews (including MRR and MDR) are chaired by a member of the GSFC Flight Assurance Office and co-chaired by a member of the IPO. Additional board members include: field experts from other GSFC directorates/divisions and/or external organizations. Independent reviews leading up to the launch of NPP are described in the NPP Performance Verification Plan (PVP) and NPP Systems and Integration and Test Plan (SI&T).

3.1.3 NPP System Engineering Review Board (SERB) The purpose of this review board is to evaluate the technical aspects and review milestones for all segments and interfaces. The SERB responsibilities include: - Oversight of the system engineering process execution as described in Section 2.2 - Recommendation for approval to the NPP Mission Requirements, System and

Operations Concept, and Performance Verification Plan to the NRB - Resolution of technical issues - Coordination with NRB for programmatic issues The SERB is chaired by the NPP System Manager. An IPO representative serves as the deputy chair. Member representatives include: - IDPS - C3 - Science Data Segment - Space Segment - Archive and Distribution Segment - Launch Segment - Interim Science Panel The SERB nominally meets once every two weeks.

3.1.4 Interim Science Panel The purpose of the Interim Science Panel (ISP) is to provide scientific insight and recommendations to the requirements and design definition of the NPP instruments. The ISP is led by the NPP Formulation Scientist and is comprised of appointed members with directly applicable expertise.

Downloaded from http://www.everyspec.com

Page 33: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 3-3 March 22, 2000

3.2 WORKING GROUPS This section describes the system engineering working groups that will execute the development of the system engineering products.

3.2.1 System Engineering Working Group The System Engineering Working Group (SEWG) is responsible for executing the system engineering process (Section 2.2) and the development of the system engineering products (Section 2.1). The SEWG is led by the NPP System Manager. The System Manager assigns responsibility for the development of products to specific team members who have the responsibility for planning, organizing and developing those products. Documentation assignments are as follows: The System Manager is responsible for facilitating the resolution of issues between segments as well as coordinating issues/progress with program management. The System Manager is the primary interface for technical issues related to science integration or operations. The SEWG provides oversight for the IDPS Working Group, Interface Control Working Group, Test and Verification Working Group, Science Data Processing Working Group and the Archive and Distribution Working Group. The SEWG coordinates science related issues with the Interim Science Panel.

Figure 3-2. Working Groups

3.2.2 IDPS Working Group The IDPS WG is responsible for the development of IDPS requirements, operations concepts and interfaces.

3.2.3 Interface Control Working Group The Interface Control Working Group (ICWG) is responsible for the development and configuration control support for the Interface Requirements Documents and Interface Control Documents for all internal and external NPP interfaces. The ICWG identifies

SystemEngineering

Working GroupScience Support

Archive andDistribution

Working Group

Science DataProcessing

Working Group

Test andVerification

Working Group

Interface ControlWorking Group

IDPSWorking Group

Downloaded from http://www.everyspec.com

Page 34: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original 3-4 March 22, 2000

interfaces between segments and has the responsibility to negotiate the technical details of each interface. Membership on the ICWG includes all segments and parties that have interfaces internally or externally to the NPP.

3.2.4 Test and Verification Working Group The Test and Verification Working Group (T&VWG) is responsible for development of the integration and testing activities between segments. The T&VWG works with each segment developer to understand each segment’s verification process and schedule in order to develop an integrated test and verification plan and schedule that spans the NPP Mission from development, through integration and testing, to on-orbit operations. Membership includes representatives from each segment, test facilities, launch processing facilities and operations.

3.2.5 Science Data Processing Working Group The Science Data Processing Working Group is comprised of NASA and science climate research representatives. The purpose of this work is to develop and identify requirements, products and the architecture for the Science Data Processing Segment.

3.2.6 Archive and Distribution Working Group The Archive and Distribution Working Group is comprised of NASA, IPO, and NOAA representatives. The purpose of this working group is to develop and identify requirements, products and the architecture for the Archive and Distribution Segment.

Downloaded from http://www.everyspec.com

Page 35: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original A-1 March 22, 2000

Appendix A

Acronym List ADS Archive and Distribution Segment ATMS Advanced Technology Microwave Sounder C3S Command, Control and Communications Segment CDA Command and Data Acquisition CONOPS System and Operations Concept CONUS Continental United States CrIS Cross-Track Infrared Sounder DFD Data Flow Diagrams DMSP Defense Meteorological Satellite Project EDR Environmental Data Recorder EOS Earth Observing System ESE Earth Science Enterprise ICD Interface Control Document IDPS Interface Data Processing Segment IIA Interim Interagency Agreement IPO Integrated Program Office IRD Interface Requirements Document ISP Interim Science Panel MCR Mission Confirmation Review MDR Mission Design Review MMIC Monolithic Microwave Integrated Circuits MRB Mission Review Board MRD Mission Requirements Document MRR Mission Requirements Review NOAA National Oceanic and Atmospheric Administration NPOESS National Polar-orbiting Operational Environmental Satellite System NPP NPOESS Preparatory Project NRB NPP Review Board PVP Performance Verification Plan RDR Raw Data Record SERB System Engineering Review Board SEMP System Engineering Management Plan SEWG System Engineering Working Board SDS Science Data Segment SI&T System Integration and Testing SMD Sensor Monitor Data SS Space System

Downloaded from http://www.everyspec.com

Page 36: NATIONAL POLAR-ORBITING OPERATIONAL ENVIRONMENTAL ...everyspec.com/NASA/NASA-GSFC/GSFC-General/download.php?spe… · GSFC 429 -99 02 01 Original i March 22, 2000 NPP System Engineering

GSFC 429-99-02-01

Original A-2 March 22, 2000

TDRSS Tracking and Data Relay Satellite System T&VWG Test and Verification Working Group VIIRS Visible-Infrared Imager Radiometer Suite

Downloaded from http://www.everyspec.com