NBC NBC  (Rev ised) IRR (Revi sed) IRR National Building Code (PD 1096)  Ad ministration a n d Enf orceme nt Engr. Agustin S. Torres, mpm Member: NBC – (Re v i s ed) IRR Oversight Committee  NBCRC / DP WH Head: Structural Section Processing Division OBO Quezon City eMai l: obodpwh&yahoo.com Web: buil di ngcode. 200u.com

Transcript of National Building Code PD 1096 - 148 pages.pdf

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 1/148

NBCNBC – – (Revised) IRR(Revised) IRRNational Building Code (PD 1096)

 Administration and Enforcement

Engr. Agustin S. Torres, mpmMember: NBC – (Revised) IRR 

Oversight Committee NBCRC / DPWH

Head: Structural SectionProcessing DivisionOBO – Quezon City

eMail: obodpwh&yahoo.com Web: buildingcode.200u.com

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 2/148

IntroductionIntroduction

• Administration and Enforcement

Sect 201 – Responsibility for Adm & Enf. Sect 202 – Technical Staff 

Sect 203 – General Power & Function Sect 204 – Profession & Tech. Assistance

Sect 205 – Building Official Sect 206 – Qualification of Bldg Official

Sect 207 – Duties of the Bldg Official

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 3/148

IntroductionIntroduction

• Administration and Enforcement

Sect 208 – Fees Sect 209 – Exemption

Sect 210 – Use of Income from Fees Sect 211 – Implementing Rules and Regulation

Sect 212 – Administrative Fines Sect 213 – Penal Provisions

Sect 214 – Dangerous and Ruinous Bldgs.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 4/148

IntroductionIntroduction

• Administration and Enforcement

Sect 215 – Abatement of Dangerous Bldgs. Sect 216 – Other Remedies

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 5/148

IntroductionIntroduction

• Expectation in this lecture

Application Building Permit

Processing of Application for Bldg Permit Fees

Administrative Sanction

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 6/148

IntroductionIntroduction

• Lessons learned from the implementation

BP 344

Tragedies Decision of the Secretary

Opinions from DOJ

Relevant cases on implementation

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 7/148

 Agenda / Overview Agenda / Overview• Application for Building Permit Building Permit and the Form

 Ancillary Permits and the Forms

 Accessory Permits and the Forms Processing of Application for Bldg Permit

Concept of Evaluation

Tools of processing

Steps in processing

Fees Imposition

Building Fees

Fines, Surcharges and Penalty

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 8/148

 Application for Building Permit Application for Building Permit

• Building Permit – Section 301 / PD 1096 (NewIRR)

Section 301 – No person, firm or corporation, including anyagency or instrumentality of the government shall construct,

alter, repair, convert, use, occupy, move, demolish and add

any building/structure or any portion thereof or cause the

same to be done, without first obtaining a building permit

therefore from the Building Official assigned in the place

where the subject building/structure is located or to be done.

The prescribed application form (NBC Form B-01) shall beused by all application.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 9/148

 Application for Building Permit Application for Building Permit• Building Permit – Section 301 / PD 1096 (New IRR)

Feature of the Revised BP Form No. B – 01

Distinction of two side (Frontal & Dorsal Side)

Front Side – indicated entries from the applicant to be filled up by appropriate concerns.

Box 1 for detail, scope of application

Box 2 for full-time inspector of the construct’nBox 3 for applicant

Box 4 for lot owner 

Box 5 for the Notary

Dorsal side – indicated entries from the OBO

Box 6 for processing & evaluation division

Box 7 for the Building Official which is the

Building Permit itself.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 10/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 11/148

A li ti f B ildi P itA li ti f B ildi P it

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 12/148

 Application for Building Permit Application for Building Permit• Building Permit – Section 301 / PD 1096 (New

IRR)Revised BP vs Old BPBox 1 for detail, Box 1- detail, scope of

scope, of application application

Cost/sty/date Box 3A – Cost/sty/dateBox 2 for full-time Box 7 – In-Charge of

 project inspector Construction

Box 3 & 4 for applicant/owner Box 8 & 9

Box 6 for eval. Assest w/ ncso Box 4

 New Revised / Removed

Box 5 for the notary (not in old BP form)

(not in revised BP form Box 2 – Bldg doc recd

Box 7 Building Permit itself . Box 3 – action of BO(not in revised BP form) Box 5 – time/flow

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 13/148

 Application for Building Permit Application for Building Permit

• Box 6 (Old Bldg Permit) –Designing Architect / Engineer

1. Not included in the Building Permit Form for the fact

that he/she already responsible for the functional

design of the building/structure along with other

designers (civil, electrical, mechanical, etc).

2. The same way Civil/Structural, Mechanical, Electrical,

Plumbing, Sanitary and Electronic are not also

signatories of the Building Permit .

NBCNBC (N ) IRR(N ) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 14/148

NBCNBC – – (New) IRR(New) IRR

Box 1 – To be filled-up by the applicant;

 OTHERS (specify) ________________ 

 OCCUPANCY CLASSIFIED__________________________ TOTAL ESTIMATED COST P___________________________ 

 NUMBER OF UNITS _______________________________ PROPOSED DATE OF CONSTRUCTION __________________ 

 TOTAL FLOOR AREA __________________SQUARE METERS EXPECTED DATE OF COMPLETION _____________________ 

 GROUP A: RESIDENTIAL DWELLINGS

 APPLICATION NO.

 OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN

 FOR CONSTRUCTION OWNED BY AN ENTERPRSE FORM OF OWNERSHIP

 ADDRESS NO STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.

 LOCATION OF CONSTRUCTION LOT NO._________ BLK NO ________ TCT NO ________ TAX DEC NO ________

STREET _______________ BARANGAY _______________ CITY /MUNICIPALITY OF _______________________ 

 SCOPE OF WORK

 GROUP C: EDUCATIONAL, RECREATIONAL

 GROUP B: RESIDENTIAL HOTEL APARTMENT

 NEW CONSTRUCTION

 ERECTION ______________ 

 ADDITION ______________ 

 ALTERATION ___________ 

 GROUP D: INSTITUTIONAL

 GROUP G: INDUSTRIAL STORAGE AND HAZA RDOUS

GROUP H: RECREATIONAL ASSEMBLY OCCUPANT LOAD LESS THAN 10

GROUP I: RECREATIONAL ASSEMBLY OCCUPANT LOAD 1000 OR MORE

 GROUP F: INDUSTRIAL

 USE OF CHARACTER OF OCCUPANCY

 GROUP E: BUSINESS AND MERCANTILE GROUP J: AGRICULTURAL ACCESSORY

 MOVING _____________________ 

 RAISING _____________________________ 

 ACCESORY BUILDING STRUCTURE _______ 

 OTHERS (specify) _____________________ 

 ____________________________________ 

 RENOVATION ________________ 

 CONVERSION ________________ 

 REPAIR _____________________ 

(see page 13/NCSO manual

1

22 3

4

5 Demolition

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 15/148

 Application for Building Permit Application for Building Permit

• Treatment of Data/Information Entries

Box 1 – Detail of Application

 Note: a) Relevant only for the use of the BuildingOfficial and LGU,

 b) Not among the data to be encoded by

 NCSO.

LAST NAME FIRST NAME MI TINOwner/Applicant

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 16/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of Application

FOR OWNERSHIP OWNEDBY AN ENTERPRISE

FORM OFOWNERSHIP

Form of Ownership

 Note: 1. Blank is not acceptable

2. Entry Instruction when name is an enterprise:

“Corp” or “Inc” - - Corporation“Proprietor”, “Prop” or “Owner” - Single Prop.

“Partners”, “Limited”, “Associates” -Partnership

“Cooperative” or “Coop” - - Cooperative“If name of a person” - - Private Individuals

fA li ti f B ildi P it

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 17/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of Application

FOR OWNERSHIP OWNEDBY AN ENTERPRISE

FORM OFOWNERSHIP

Form of Ownership

 Note: Form of Ownership

1. Private Individuals & Households 2. Single Proprietor 

3. Partnership 4. Government Corporation

5. Private Corporation 6. Cooperative

7. Association 8. Local Government9. National Government 10. Others (Specify)

A li ti f B ildi P itA li ti f B ildi P it

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 18/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of Application

NO. STREET BARANGAY CITY/MUN. ZIP CODE TEL. NO.

Address of Owner/Applicant

 Note: 1. For the use of the Building Official & LGU

2. ZIP Code shall be indicated per 1993 PSTANDARD

GEOGRAPHIC CODE (see Appendix 7, NCSO

Manual for reference)

A li ti f B ildi P itA li ti f B ildi P it

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 19/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of Application

LOT NO. BLK NO. TCT NO. TAX DEC. NO.

STREET ___________ BARANGAY ________ CITY/MUN. OF

 ________ ZC_________________

Location of Construction

 Note: 1. For the use of the Building Official & LGU

2. ZIP Code shall be indicated per 1993 PSTANDARDGEOGRAPHIC CODE (see Appendix 7, NCSO

Manual for reference) corresponding to the

City/Municipality where the construction is located3. Example: Tagum, Davao 23192

A li ti f B ildi P itA li ti f B ildi P it

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 20/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of ApplicationScope of Work 

 Note: 1. There should be check mark corresponding to one of thenumbers from 1 to 5. “Other” should be specified.

2. For “SoW” = 1 (New Construction), total cost, total

floor area and number of storey should be non-zero.

3. For “SoW = 2(Additions), total cost and total area

should be non-zero. Then, verify the number of storey.

Accept number of storey = 0, if total floor area is 1 to 15

square meters.

4. For “SoW” = 3 (Repair), 4 (Renov.), 5 (Demolition),there should be non-zero entries in total cost while total

floor area and number of storey should be zero.

NBCNBC –– (New) IRR(New) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 21/148

NBCNBC   (New) IRR(New) IRR

Box 1 – To be filled-up by the applicant;

 OTHERS (specify) ________________ 

 OCCUPANCY CLASSIFIED__________________________ TOTAL ESTIMATED COST P___________________________ 

 NUMBER OF UNITS _______________________________ PROPOSED DATE OF CONSTRUCTION __________________ 

 TOTAL FLOOR AREA __________________SQUARE METERS EXPECTED DATE OF COMPLETION _____________________ 

 GROUP A: RESIDENTIAL DWELLINGS

 APPLICATION NO.

 OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN

 FOR CONSTRUCTION OWNED BY AN ENTERPRSE FORM OF OWNERSHIP

 ADDRESS NO STREET BARANGAY CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.

 LOCATION OF CONSTRUCTION LOT NO._________ BLK NO ________ TCT NO ________ TAX DEC NO ________

STREET _______________ BARANGAY _______________ CITY /MUNICIPALITY OF _______________________ 

 SCOPE OF WORK

 GROUP C: EDUCATIONAL, RECREATIONAL

 GROUP B: RESIDENTIAL HOTEL APARTMENT

 NEW CONSTRUCTION

 ERECTION ______________  ADDITION ______________ 

 ALTERATION ___________ 

 GROUP D: INSTITUTIONAL

 GROUP G: INDUSTRIAL STORAGE AND HAZA RDOUS

GROUP H: RECREATIONAL ASSEMBLY OCCUPANT LOAD LESS THAN 10

GROUP I: RECREATIONAL ASSEMBLY OCCUPANT LOAD 1000 OR MORE

 GROUP F: INDUSTRIAL

 USE OF CHARACTER OF OCCUPANCY

 GROUP E: BUSINESS AND MERCANTILE GROUP J: AGRICULTURAL ACCESSORY

 MOVING _____________________ 

 RAISING _____________________________ 

 ACCESORY BUILDING STRUCTURE _______  OTHERS (specify) _____________________ 

 ____________________________________ 

 RENOVATION ________________ 

 CONVERSION ________________  REPAIR _____________________ 

(see page 13/NCSO manual

1

22 3

4

5 Demolition

A li ti f B ildi P itApplication for B ilding Permit

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 22/148

 Application for Building Permit Application for Building Permit• Treatment of Data/Information Entries

Box 1 – Detail of Application Number of Units

 Note: 1. The number of buildings covered by the building permitshould be indicated.

2. If the building permit is only for one building, then the

entry is 1.

3. If the building permit is for 5 separate buildings, then

the entry is 5.

4. If the building is an apartment/row house/accessoria

consisting of many doors, then the number of units

is still 1.

Application for Building PermitApplication for Building Permit

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 23/148

 Application for Building Permit Application for Building Permit

• Treatment of Data/Information Entries Box 1 – Detail of Application: Type of

Use/Occupancy

Use or Type of Occupancy (of the NSO Manual)

 Note: 1. There should be a check mark in one of the code

numbers from 10 to 74.

2. “Others” should be properly specified. If the type of

occupancy indicated in “others” is one listed on the

 NCSO Manual use the corresponding codenumber.

NBCNBC Classification of all building by use/occupancyClassification of all building by use/occupancy

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 24/148

NBCNBC – – Classification of all building by use/occupancyClassification of all building by use/occupancy

ADMINISTRATION AND ENFORCEMENT

IRR VII – Classification and Gen. Requirements of

all Building by Use or Occupancy / PD 1096

• Ten (10) GroupsA B C D E F G H I J

   R

  e  s   i   d  e  n   t   i  a   l

   R  e  s . ,

   H  o   t  e   l ,   A  p   t

 .I  n s  t  i   t   u t  i   o

n a l  

H

 a z a r  d  o u s  /   S  t   or  a  g e 

A

 s  s  e m b l   y , OL < 1  0  0  0 

A

 s  s  e m b l   y , OL > 1  0  0  0 

A c  c  e  s  s  or  y S  t  r  u c  t   .

I  n d  u s  t  r i   a l  

 d  u c  . &R e  c 

r  e  a  t  i   on

B

 u s i  n e  s  s  /  M e r  c  a n t  i  l   e 

GR 

O

UP

DIV.(25) 2 1 2 3 3 1 3145

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 25/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 26/148

NBCNBC –– Example NCSO Type of OccupanciesExample NCSO Type of Occupancies

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 27/148

NBCNBC   Example NCSO Type of OccupanciesExample NCSO Type of Occupancies

ADMINISTRATION AND ENFORCEMENT

Use or Type of Occupancy

• Residential: 11 – Single, 12 – Duplex13 – Row house/Accessoria , 14 – Quadruplex

15 – Residential Condo. 10 – Staff Houses

• Commercial:

22 - Store

 Bakery, Department Store, Grocery, Shopping Center, Supermarket, Sari- Sari

 Store, Video Rental, Other Business Store.

23 – Hotel/Motel

 Inns, Pension houses

NBCNBC –– Example NCSO Type of OccupanciesExample NCSO Type of Occupancies

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 28/148

NBCNBC   Example NCSO Type of OccupanciesExample NCSO Type of Occupancies

ADMINISTRATION AND ENFORCEMENT

Use or Type of Occupancy• Commercial:

24 – Office Condominium/Business/Office

Transportation Office, Radio & TV

 Broadcasting & Transmitting Studios

25 – Restaurants, Etc.Cabarets, Day & Night Clubs, Disco

 pads/houses, Bar & Cocktail Lounges, Beer

Gardens, Music Lounges, Night Club

26 – Shop

 Beauty Parlor, Photo Developing Shop, Engraving Shop, Laundry Shop, Painter

 Sho

NBCNBC –– Other USE/Other USE/OccuppanciesOccuppancies

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 29/148

NBCNBC   Other USE/Other USE/OccuppanciesOccuppancies

ADMINISTRATION AND ENFORCEMENT

IRR VII: Other Grouping not mentioned in this Section

• The Secretary (DPWH) will issue farther groupclassification if the Code allows (after

amendment, ex. BP 220)

• Occupancy not expressly indicated shall adoptthe nearest it most nearly resembles.

• Ancillary building/structures as fences over

1.80m height, water tanks, etc., shall be

treated as separate structures.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 30/148

Fence: 5.80 m. boundary structure. M. Balara, Quezon City

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 31/148

Validity

Date issued

TIN

 FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)

 ______________________

 ARCHITECT OR CIVIL ENGINEER

(Signed and Sealed over printed name)

Date ____________________ 

 Address

PRC No.

PTR No.

issued at

Full Time Inspector

 NBCDO MEMORANDUM NO. 1 s 2006

FullFull--Time Inspector Time Inspector 

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 32/148

Place Issued Date Issued Place Issued

 

 __________________________________ Date___________

(Signature over printed name)

CTC No. Date Issued CTC No.

 APPLICANT WITH MY CONSENT: LOT OWNER

 _______________________________ Date___________

(Signature over printed name)

 Address Address

BOX 3 – ApplicantBOX 4 – Lot Owner

Box 3 & 4Box 3 & 4 – – Applicant/Owner Applicant/Owner

NBCNBC – – Other Definition / ItemsOther Definition / Items

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 33/148

ADMINISTRATION AND ENFORCEMENT

Total Estimated Cost – 

Use: Table II.G.1 – Fixed Construction Cost

Proposed Date of Construction – Should be in numeric figures; Ex. June 19,

2006, should written as 061906.

Expected Date of Completion – Should be laterthan the proposed date of construction and

should also be written in numeric figures.

Total Floor Area – Should be reported in square

meter, and there should always be non-

zero entry for all types of new building

construction and additions to existing buildings.

ASSESSED FEES ASSESSED BY AMOUNT DUE DATE PAID OR NUMBER NSO

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 34/148

ASSESSED FEES ASSESSED BY AMOUNT DUE DATE PAID O.R. NUMBER NSO

  FILING FEE

  PROCESSING FEE

  LOCATIONAL /ZONING OF LAND USE

  LINE AND GRADE (Geodetic)

  FENCING  ARCHITECTURAL

  CIVIL/STRUCTURAL

  ELECTRICAL

  MECHANICAL

  SANITARY

  PLUMBING

  ELECTRONICS  INTERIOR

  ONE HALF (1/2) OF FIRE SERVICE FUND (FSF)

TOTAL

Date Issued ----------------------- 9

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 35/148

tat/matrix Data Generation

Permit Number ------------------

Blank

Blank 

Blank 

Blank 

Blank 

Form of Ownership & Eco Activity

Blank 

Location of Construction

Scope of Work -------------------

 Number of Units -----------------

Type of Occupancy -------------

Data Generation for Reporting Consolidation 10

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 36/148

Statistic Com liance/ ur oseStatistic Com liance/ ur ose Data Generation

p g

Statistic Requirements for NCSO data generation

1. Permit Number

• Blank is not acceptable

• approve building permits are numberedcontinuously from 1 every year as

follows;

Y Y M M N N N N N• First two cells for the year 

•Next two cells for the month of issuance

• Next five cells for chronological numbering of

 permits issued every year.

 Note: Alpha entry will not be included in encoding.

Data Generation for Reporting Consolidation 11

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 37/148

tatistic om liance/ ur ose Data Generation

p g

Statistic Requirements for NCSO data generation

2. Date Issued

• Date of issued of building permit should be

written numeric figures.

• For Example: if the date of issuance is February

14, 2005, this should be -

0 2 1 4 0 5

M M D D Y Y

NBCNBC – – IRR/2005 Evaluation adviseIRR/2005 Evaluation advise

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 38/148

ADMINISTRATION AND ENFORCEMENT

The Building Permit – What’s new in its Terms & Cond.

The New (Old IRR II, Sect 1.8/ not on BP form)

Article 1723 of the civil CodeAccompanied by ancillary & accessory permits

Relocation Survey, Geodetic Engineer,

 Notify adjacent property owner before excav.

 No sidewalk Occupancy unless permitted

Protection of pedestrian

Keep logbook, subject for scrutiny of BO Notice of Construction to be submitted to BO

NBCNBC – – IRR/2005 Evaluation adviseIRR/2005 Evaluation advise

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 39/148

ADMINISTRATION AND ENFORCEMENT

The Building Permit – 

What is a Building Permit / evaluation advises

check authenticity of the professional signatories both of the designer and in charge of work;

 provide the NCSO one (1) copy of the issued

Building Permit to serve as indicator of progress

and development of the construction industry.

 provide also a copy of notice of construction tocontractor industry association of the

Philippines, CIAP (if or whenever it is already

submitted by the applicant, indicating starts ofconstruction.

 – –  RequireRequire

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 40/148

ADMINISTRATION AND ENFORCEMENT

The Building Permit – 

Requirement for the issuance of BP.

complete the required clearances;• Locational Clearance from local planning dept.

• Clearances from various authorities exercising

and enforcing regulatory function affecting

the project.

• Example: proposed hospital from DOH

 proposed hotel from Dept of Tourism

 proposed ind’l bldg from DENR 

NBCNBC – – IRR/2005 Ancillary PermitIRR/2005 Ancillary PermitADMINISTRATION AND ENFORCEMENT

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 41/148

ADMINISTRATION AND ENFORCEMENT

List of various authorities exercising and enforcingregulatory functions affecting buildings/structures

DPWH/widening

ATO/height

HLURB/condo

LGU/zoningDOT/hotel

DENR/pollution

DOTC/ bus/train sta.DILG/Fire/asst.

PPA/ harbor works

DepEd/ school

DOH/sanitation

PHIVOCS/faults

LLDA/discharge

MWSS/source NWRB/ug source

DAR/ conversions

DA/ dairy agri hseDOLE/ safety

 NHA/ housing

 NCWDP/ social

NBCNBC – – IRR/2005 Ancillary PermitIRR/2005 Ancillary Permit

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 42/148

ADMINISTRATION AND ENFORCEMENT

The Ancillary Permits – 

What is an Ancillary Permit

 permits forms duly signed and sealed by the

corresponding professionals who prepared the

documents required for Building Permit

document involves; plans/drawings, specifications,

design analysis, etc. and the Ancillary PermitForm itself.

Ancillary Permit Forms (next slides)

NBCNBC – – (New) IRR(New) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 43/148

Building Permit and Ancillary Permits

Inter-disciplinary undertaking

to attain a goal or objective/stowards nation’s development.

C L I E N T

Discipline/Professionals& Stakeholders

1. Building Technical

2. Building Official

3. Owner/Applicant

4. LGU

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 44/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 45/148

NBCNBC – – (New) IRR, similar entries on Ancillaries(New) IRR, similar entries on Ancillaries

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 46/148

STAIRS WASH ROOMS AND TOILETS SWITCHES, CONTROLS, BUZZERS DRINKING FOUNTAINS

  WALKWAYS LIFTS AND ELEVATORS HANDRAILS PUBLIC TELEPHONES  CORRIDOORS RAMPS THRESHOLDS SEATING ACCOMODATIONS

  DOORS, ENTRANCES & THRESHOLD PARKING AREAS FLOOR FINISHES OTHERS (Specify)_________  

  NUMBER AND WIDTH OF EXIT DOORS FIRE EXITS OTHERS (Spec ify)_____ 

  WIDTH OF CORRIDOORS FIRE FIGTHING & SAFETY FACILITIES  DISTA NCE TO FIRE EXIT SMOKE DETECTTORS

  ACCESS TO PUBLIC STREET EMERGENCY LIGHTS

 PERCENTAGE OF IMPERVIOUS SURFACE AREA _________________%PERCENTAGE OF UNPAVE SURFACE AREA ______ _____________%

OTHERS (Specify) __________________________________________ 

1. ARCHIT ECTURAL FACILIT IES AND OTHER FEATURES PURSUANT TO BATAS PAMBANSA BILA NG 334, REGARDING CERTAIN BUILDING,

INSTITUTIONS, ESTABLISHMENTS AND PUBLIC UTILITIES TO INSTALL FACILITIES AND OTHER DEVICES.

2. PERCENTAGE OF SITE OCCUPANCY 3. CONFORMANCE TO FIRE CODE OF THE PHILIPPINES ( PD 1185)

 PERCENTAGE OF BUILDING FOOTPRINT _______________________%

Box 1 – Architectural Permit : (Ancillary Permit)

Similarly, Ancillaries contained basic information pertaining to technical as well as data necessary for the

BO to assess compliance with the National Building

Code and its IRR as reflected in the Plans & Spec.

NBCNBC – – IRR/2005 Accessory PermitIRR/2005 Accessory Permit

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 47/148

ADMINISTRATION AND ENFORCEMENT

The Accessory Permits – 

What is an Accessory Permit

 permits issued by BO for activities usually before

or during the processing of the application for

Building Permit;some of these permits has expiry period .

accessory permit forms (next slides)

NBCNBC – – Ancillary/ Accessory Diagram Ancillary/ Accessory Diagram

JURISDICTION TO VARIOUS

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 48/148

JURISDICTION TO VARIOUS

 ANCILLARY ON ACCESSORYPERMITS

Ancillaries

Accessories

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 49/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 50/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 51/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 52/148

NBCNBC – – IRR/2005 Phases of ConstructionIRR/2005 Phases of Construction

ADMINISTRATION AND ENFORCEMENT

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 53/148

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

Pre – Construction Phase

Construction Phase

Post Construction Phase

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 54/148

NBCNBC – – IRR/2005 Pre Const/ Step 1IRR/2005 Pre Const/ Step 1

ADMINISTRATION AND ENFORCEMENT

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 55/148

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

Pre – Construction Phase/ Steps & Procedures in

Processing application for Building PermitStep 1 –  Receiving

• documents check for completeness including

clearances,

• if found incomplete or deficient, advise

applicant to complete/correct or rectify,• requirements compliance, advise applicant to

 pay the non-refundable application fee.

• proceed/forward to Line & Grade Section.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 56/148

NBCNBC – – IRR/2005 Pre ConstructionIRR/2005 Pre Construction

Phases of Building Permit/Construction – 

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 57/148

g

Verify compliance with the requirements ofapplication for Building Permit.

Conduct site inspection for verification of

submitted documents & site conditions

If construction/activities had already been started,

imposed per procedure fines & surchargesRecommend rectification if misrepresentation is

committed per observation. Ex. Actual lot/site

different from submitted documents.

Pre – Evaluation of Application for Bldg Permit

 Adm Adm && Enf Enf  – – Evaluation/ Processing definedEvaluation/ Processing defined

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 58/148

Evaluation – 

 – the process of assessing compliance of a

 proposed project (construction) withexisting regulation or law/s promulgated

for the purpose of protecting the public

against excessive or lacking of

requirements of what is necessary.

 – since it is a process, it is usually

termed: Processing

 Adm Adm && Enf Enf  – – Tools for Evaluation ProcessTools for Evaluation Process

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 59/148

Evaluation – Tools for use in Evaluation;

- Forms, documents & clearances

submitted by the applicant,

- Referral Codes, literature & standards so

authorized by the Secretary,

- Review of related literature/s

- Computer/s (records, existing structures)

- Localized evaluation forms

 Adm Adm && Enf Enf  – – Evaluation Sheet (Sample), Arch.Evaluation Sheet (Sample), Arch.

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 60/148

 Adm Adm && Enf Enf  – – Evaluation Sheet (Sample),Evaluation Sheet (Sample), StructStruct..

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 61/148

NBCNBC – – IRR/Pre Const. Step 1, Line & GradeIRR/Pre Const. Step 1, Line & Grade

ADMINISTRATION AND ENFORCEMENT

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 62/148

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

Pre – Construction Phase/ Steps & Procedures in

Processing application for BP (cont’d)Line and Grade verification;

• established line and grade on all sides of the lot

 based on the technical description of TCT.

• Indicate physical & environmental constraints,

Ex. Road & widening, River/creek, etc.• access to the site or property.

• foundation encroaching public property.

NBCNBC – – IRR/ Pre Const. Step 2, Arch.IRR/ Pre Const. Step 2, Arch.

ADMINISTRATION AND ENFORCEMENT

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 63/148

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

Pre – Construction Phase/ Steps & Procedures in

Processing application for BP (cont’d)Step 2 – Architectural Section

• compliance to type/s of occupancy/use

• Compliance to setback/easement, parking and

accessibility, light and ventilation;

• if found deficient, return with statement oferror/corrections for compliance,

• resubmitted corrected docs found complied

substantially, proceed to other sections

FEB. 25, 1983 OCT. 3, 1984IRR /EFFECT

PRES MARCOS

 NEW PROPOSED

BP 344BP 344 – – HistogramHistogram

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 64/148

PRES MARCOS

SIGNED THIS ACT

BP 344SCOPE

ALL BLDG &

STRUCTPERMIT

-IRR 1: SCOPE & APP

-IRR 2: MIN REQ’MENTS

-IRR 3: SPECIFIC REQ.

-IRR 4: TRANSPORT REQ

-IRR 5: ADM & ENF

   A   P   P   L   I   C   A

   T   I   O   N -CONSTRUCTN

-REPAIR 

-RENOVATION

-CHANGE OCCUP

INCORPORATED

IN DESIGN &FACILITIES

INSTALLATION

EXISTING

a) PRIMARY

FUNCTION

 b) 10% OF TOTAL

 NUMBER 

c) INGRESS/EGRESS

d) PARKING AREAS

a) WORK TO BE

DONE AT

PRIMARY

FUNCTION

 b) USE OF

ELEVATOR/LEVEL

c) 10% LIMIT ONFUNCTION ROOM

d) NOT EFFECT

STRUCTURAL

e) COST NOT MORE

THAN 20% /BLDG

f) NO LEGAL EFFECT

   B   O   T   H

PRIVATE PUBLIC

 NON-

ISSUANCE

WHEN NOT

TO ISSUE

VIOLATION BY

CONSTITUTE

-OWNER 

-CONTRACTOR 

-ARCHITECT

-ENGINEER 

-BLDG OFF’L

 NON-COMPLIANCE-STAIRS

-WALKWAYS-CORRIDORS-DOORS/ENTR -WASH/REST RM-LIFTS/ELEV-RAMP-PARKING-SWITCHES/-HANDRAILS

-THRESHOLDS-FLOOR FINISHES-DRINKING FOUN-PUB TELEPHONE-SEATING CAPACITY

EDUC INST

AIRPORTS

SHOPS/EST

SPORT CX

RECREA CX

PAKINGPUB TRANS

STREETS

HIGHWAY

PED XING

BP 344BP 344 -- Determination of Violation / MagnaDetermination of Violation / Magna CartaCarta

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 65/148

PERMIT

   A

   P   P   L   I   C   A   T   I   O   N

INCORPORATED

IN DESIGN &

FACILITIES

INSTALLATION

 NON-ISSUANCE

WHEN

 NOT

TO ISSUE

VIOLATION BY

CONSTITUTE

-OWNER 

-CONTRACTOR 

-ARCHITECT

-ENGINEER 

-BLDG OFF’L

 NON-COMPLIANCE

-STAIRS

-WALKWAYS

-CORRIDORS

-DOORS/ENTR 

-WASH/REST RM

-LIFTS/ELEV

-RAMPS, ETC.

Determination of violations

a) IRR 5, Section 2 : Adm & Enf.

MAGNA CARTA /Disabled Per.

Penalty:

1st violation: P50T to 100 T or/w 6 Moin prison up to 2 yrs or both.

2nd violation: P100 to 200T or/w 2 Yrs

in prison up to 6 yrs or both.

Abused: not less than 6 Mo in prison &

imposed P5T to P50T or both.

BP 344BP 344 – – Determination of violation/ BP 344 provisionDetermination of violation/ BP 344 provision

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 66/148

PERMIT

   A

   P   P   L   I   C   A   T   I   O   N

INCORPORATED

IN DESIGN &

FACILITIES

INSTALLATION

 NON-ISSUANCE

WHEN

 NOT

TO ISSUE

VIOLATION BY

CONSTITUTE

-OWNER 

-CONTRACTOR 

-ARCHITECT

-ENGINEER 

-BLDG OFF’L

 NON-COMPLIANCE

-STAIRS

-WALKWAYS

-CORRIDORS

-DOORS/ENTR 

-WASH/REST RM

-LIFTS/ELEV

-RAMPS, ETC.

Determination of violations

 b) IRR Section 4.

BP 344 /Disabled Per.

Penalty:

6 Mo. In prison and fine of P2Tto P5T or both.

BP 344BP 344 – – Jurisdiction of PenaltyJurisdiction of Penalty

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 67/148

PERMIT

   A

   P   P   L   I   C   A   T   I   O   N

INCORPORATED

IN DESIGN &

FACILITIES

INSTALLATION

 NON-ISSUANCE

WHEN

 NOT

TO ISSUE

VIOLATION BY

CONSTITUTE

-OWNER 

-CONTRACTOR 

-ARCHITECT

-ENGINEER 

-BLDG OFF’L

 NON-COMPLIANCE

-STAIRS

-WALKWAYS

-CORRIDORS

-DOORS/ENTR 

-WASH/REST RM

-LIFTS/ELEV

-RAMPS, ETC.

Jurisdiction of Penalty

a) Based on the New IRR. – the BO can

deny the application for BuildingPermit. The applicant can make appeal.

 b) In both cases, non-compliance can be

filed in civil court for imposition of

 penalty.

 Note: BO cannot imposeimprisonment term to violator of 

BP 344

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 68/148

PROCESSING APPLICATION FOR BLDG PERMITS

USING THE CODE PROCEDURES

LAND USE AND

ZONING

ISSUANCE OF BUILDING PERMIT

PAYMENT OF

FEES

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 69/148

NBC - IRR/ Administration & Enforcement 69

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

MUNICIPAL

TREASURER 

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

FINAL EVALUATION

AND

RECOMMENDATION

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

PLUMBING

SANITARY

ELECTRICAL

ELECTRONICS &

COMMUNICATION

MECHANICAL

OTHERS

(SPECIFY, REPAIR)

CIVIL/

STRUCTURAL

ZONING

BUILDING

OFFICIAL

APPLICATION

REALEASE

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

5

6

7

8

9

11 12

10

13

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 70/148

NBC - IRR/ Administration & Enforcement 70

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

Receiving:

-Completeness of documents per Section 302/ App for BP

- Incomplete/deficient return to applicant for compliance

- Complied w/ req., pay filing fee

Line & Grade:

- Set L&G per TCT

- Easements & Access

- Determine pay items

 Archi tectural:

-Types of Occupancy/Use

- Setback/Easements/parking/ Accessibility & L& Vent’n

- Fire Protection requirements, Exi ts, Occupancy Loads

- Floor & Premises Areas, Projections, Heights

- Determine pay items

- Sect 804/ Courts & Yards, min horizontal distance not less than 2m for

Architectural Processing Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 71/148

NBC - IRR/ Administration & Enforcement 71

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow 

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

1 & 2 sty bldg., 1.5m on cluster bldg.

1.5m 1.5m

Courts

B  ui  l   d i  n g

 pr  o p er 

Building proper 

BO Evaluation of Compliance

Architectural Processing Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 72/148

NBC - IRR/ Administration & Enforcement 72

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

- Sect 806/ Room Minimum Size and Dimension

a) Human habitation shall be 6 sq m., 2m least dimensionb) Kitchen shall be 3 sq m., 1.5m least dimension

c) Toilet shall be 1.2 sq m., 0.9m least dimension

BO Evaluation of Compliance

1. Sect 804/ Courts & Yards

BO Evaluation of Compliance

Architectural Processing Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 73/148

NBC - IRR/ Administration & Enforcement 73

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

- Sect 805/ Ceiling Heights

a) Artificial Ventilation, ceiling height not less than:

2.7m – 1st floor

2.4m – 2nd floor2.1m – 3rd floor and up

b) Natural Ventilation; 2.7m – any floor 

c) Mezzanine Height; 1.8m – above & below floor

BO Evaluation of Compliance

1. Sect 804/ Courts & Yards

2. Sect 806/ Room Minimum Size and Dimension

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 74/148

 NBC - IRR/ Administration & Enforcement 74

BUILDING

SECTION

 Artificial Ventilation Room

Ceiling Ht. not less than

2.70 m – 1st floor 

2.40 m – 2

nd

storey2.10 m – 3rd and up

Natural Ventilation Room

2.70 m – Any Floor 

Mezzanine Ht.1.80 m – Above / Below

Int. Beam

DefinitionsDefinitions –  – Floor Level / 15Floor Level / 15

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 75/148

 NBC - IRR/ Administration & Enforcement 75

Storey Ht.Ceiling Ht.

Storey – Portion of a building/structure includedbetween the uppermost surface (or finished

level) of any floor and the uppermost surface

(or finished level) of the next floor above(or ceiling or roof above) or below it (Glossary).

First Storey – storey the floor of which is at/or abovethe level of the sidewalk, the remaining storeys

being numbered in regular succession upward.

The Code (PD 1096) Compliance / 20The Code (PD 1096) Compliance / 20

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 76/148

 NBC - IRR/ Administration & Enforcement 76

PD 1096 Sect 807:

Air Space Requirement in Determining Size of Rooms:

Air Space shall be as follows;

 – School rooms :• Volume- - - - - - - 3.00 cu. m.

• Floor area/person - - 1.00 sq. m

 – Workshops, Factories, and Offices:

• Volume - - - - - - - 12.00 cu. m.

• Floor area/person - - - 1.00 sq. m.

 – Habitable rooms:

• Volume - - - - - - - 14.00 cu. m.

• Floor area/person - - - 1.00 sq. m.

- Sect 808/ Window Openings for any room without artificial ventilation sy

stem shall be

Architectural Processing Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 77/148

NBC - IRR/ Administration & Enforcement 77

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

3

stem shall be

a) 10% (least) of floor area, no less than 1.0 sq m.

b) 1/20 of toilet, bath or laundry room areac) Shall open di rectl y to;

- court w/in property

- yard with regular setback

- public street or alley, not FW

- open water courses, not FW

1. Sect 804/ Courts & Yards

2. Sect 806/ Room Minimum Size and Dimension

3.Sect 805/ Ceiling Heights

- Sect 1207/ Design Requirements;

Architectural Processing Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 78/148

NBC - IRR/ Administration & Enforcement 78

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

ARCHITECTURAL

INTERIOR/ACCESSIBILITY

3

a) Occupants Loads and Exits Req.

b) Width & Arrangement of Exi ts;

c) Exit Door swing shall be in the direction of exit travel when serving

hazardous areas or with occupant load of 50 or more.

d) Exit shall be openable inside without the use of a key. . .

1. Sect 804/ Courts & Yards

2. Sect 806/ Room Minimum Size

and Dimension

3.Sect 805/ Ceiling Heights

4. Sect 808/ Window Openings

 Architectural Figures Architectural Figures

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 79/148

Refer to Table VII.G.3/p301-IRR for Residential and Commercial

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 80/148

 Architectural Figures Architectural Figures

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 81/148

The Ozone DiscoThe Ozone Disco

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 82/148

 NBC - IRR/ Administration & Enforcement 82

THE OZONE DISCO

a) Architectural Failure

b) Electrical Failure

c) Structural Failure

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 83/148

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 84/148

NBC - IRR/ Administration & Enforcement 84

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

Sect 708/ Min Requirements; (pd 1096)

a) Foundation: Footings shall be of sufficient size and strength to supp

ort the load of the dwelling and shall be at least;

- 250mm thick

- 600mm below ground level

b) Post of wooden construction shall be per Table 708-A, each post sh

all be anchored to such footing by straps and bolt of adequate size.

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 85/148

NBC - IRR/ Administration & Enforcement 85

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

Sect 708 PD 1096/ Minimum Requirements;

c) Floor Live Load shall be;

- 200 Kg/sq m for 1st floor,

- 150 Kg/sq m for 2nd floor 

d) Roofs wind load shall be at least -120 Kg/Sq m of vertical

projection

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 86/148

NBC - IRR/ Administration & Enforcement 86

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

- Written reports of Geotechnical Engineer shall be

submitted w/ the application for BP.

1. Sect 708/ Min Requirements;

Boring and Load Test (in accordance with NSCP) for the following;

- Building/structures of three (3) sty and higher,

- Lower bui lding/structures shall also be required on areas w/

potential geological/ geotechnical hazards, areas

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 87/148

NBC - IRR/ Administration & Enforcement 87

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

NSCP 2001, Sect 303.(1-4)

c) Provide data;

- soi l bearing capacity

- compressibili ty,- l iquefaction (PI) and - expansiv

eness/ASTM4546

or 4829, index 20 require

special design)

1. Sect 708/ Min Requirements;

Foundation Investigation:

a) shall be conducted at each site

b) CE shall make evaluation, evaluate, interpret results

2. Sect 302.5/ PD 1096 – Boring Test Requirement

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 88/148

NBC - IRR/ Administration & Enforcement 88

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

NSCP 2001, Sect 104.5

Foundation Investigation required

a) bldg falling under Categories ;

Cat I - Essential Facilities (Hospital, etc.)

Cat II -Hazardous Facilities (Struct w/ Toxic, or

Hazards contents)

Cat III – Special Occupancy (struct of publi c

assembly with more than 300 OL)

1. Sect 708/ Min Requirements;

2. Sect 302.5/ PD 1096 – Boring Test Requirement

3.Sect 302 PD 1096 - Jurisdiction

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 89/148

NBC - IRR/ Administration & Enforcement 89

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

Sect 302 PD 1096- Foundation Investigation

NSCP 2001, Sect 304

Foundation Investigation required when using Table 304-1;

a) Assumption limitation

- Continuous Footing w/ load > 30 kN/m

- Isolated Footing with load > 250 kN.

b) Higher values set by Tab 304-1 on soil bearing capacity

in reference to min depth prescribed by

PD 1096

1. Sect 708/ Min Requirements;

2. Sect 302.5/ PD 1096 – Boring Test Requirement

3.Sect 302 PD 1096 - Jurisdiction

Compliance to NSCP / 7Compliance to NSCP / 7

2001 Edition (1972, 1981, 1986, 1992) NSCP

Ch 1 G

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 90/148

 NBC - IRR/ Administration & Enforcement90

Chap 1 – Gen Req.

Table 304 – 1 Allowable Found. & Lateral Pressure

Class of Materials² Allowable Foundation

(ASTM Classification) Pressure³ ( kPa )

1. Massive Crystalline Bedrock 200

2. Sedimentary & Foliated Rock 100

3. Sandy Gravel /Gravel (GW & GP) 1004. Well Graded Sand . . (SW, SP, SM, etc) 75

5. Clay, Sandy Clay . . (CL, ML, MH & CH) 50

(See footnotes for application)

0 Df=300mm Qa=100kPa

Civil/Structural Section

2001 Edition (72, 81, 86, 92) NSCP

Chap 1 Gen Req

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 91/148

 NBC - IRR/ Administration & Enforcement91

Dp Df 

t

N

G

0. Df=300mm, Qa=100kPa

1.

2.

3.

t(min) = 250mm

Dp(min) = 600mm

Chap 1 – Gen Req.

Table 304 – 1 Allowable Found.

& Lateral Pressure

Footnotes of Table 304 – 1

All values of allowable foundation

 pressure are for footings having a

minimum width of 300 mm and aminimum depth of 300 mm into

natural grade. Except as in footnote

7 below, increase of 20% is allowed

for each additional 300 mm ofwidth and/or depth to a maximum

value of three times the designated

value.

(+20%), Df=600mm, Qa=120kPa

(+20%), Df=900mm, Qa=140kPa

(+20%), Df=900mm, Qa=140kPa

Structural Evaluation SheetStructural Evaluation Sheet

2 R l i D ( i )

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 92/148

• 2. Regulation Data (min):

• Qa(assumed) = 140 (to 145) kPa

• SBC/Test = (if submitted as required)

• Pn (Designed) = Pn<250 kN /Isolated Footing

Pn<30 kN/m/Wall Footing

• Depth Footing = Dp = 600mm or

• Depth Foundation= Df = equal/least dimensionof footing base

• Thickness slab tf(min) = 250 mm.

3. What is the least assumed SBC allowed by the Code/NSCP

2001 Edition (1972 1981 1986 1992) NSCP

Civil/Structural Section

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 93/148

 NBC - IRR/ Administration & Enforcement93

2001 Edition (1972, 1981, 1986, 1992) NSCP

Chap 1 – Gen Req. Foundation investigation (Sect. 104.5)Sect. 303. (1 to 4) –  Report for Soil Investigation

a) plot showing location of all test boring b) description & classification of soil

encountered

c) Elevation of the water table, if encounteredd) Recommendations for;

foundation type & design criteria

 bearing capacity, provision to mitigateexpansive soil, provision to mitigate liquefactionand soil strength, effects of adjacent loads

e) Expected total and differential settlement

Pre Fabricated Construction

Civil/Structural Sect

ion

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 94/148

 NBC - IRR/ Administration & Enforcement 94

Pre – Fabricated Construction2001 Edition (1972, 1981, 1986, 1992) NSCP

Chap 1 – Gen Req. Sect. 107 – Structural Inspection,

Test and Structural ObservationSect. 107.7 Prefabricated Construction / 1 107.7.1 : Purpose is to

regulate materials and establish method of safe construction

where any structure or portion thereof is wholly or partially prefabricated.

Definitions ;

a) Prefab. Assy. – done prior to incorporation in the bldg.

 b) Test of Materials – test to be made during prefabrication

c) Test of Assy. – test for durability & weather resistance

d) Connections – device used to connect prefab assy/Code req.

2001 Edition (1972 1981 1986 1992)

Civil/Structural Section

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 95/148

 NBC - IRR/ Administration & Enforcement95

2001 Edition (1972, 1981, 1986, 1992) National Structural Code of the Phil.

Chap 1 – Gen Req. Sect. 107 – Structural Inspection, Test and Structural

Observation

Sect. 107.7 Prefabricated Construction / 2

107.7.6.(1-2) : Cert. and Inspection – as to inspection done and declare

compliance with the requirements of the Code.

107.7.6.3: Certifying Agency – to be acceptable under this Code, everycertificate of approval shall be made by an approved agency.

(Note: Reference is also made to Section 416 – Precast Concrete where test and

acceptance is also required by the Code)

Certification Issued, Prefab Structural, NSCP/13Certification Issued, Prefab Structural, NSCP/13

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 96/148

 NBC - IRR/ Administration & Enforcement 96

DPWH / Office of the Secretary, Manila; Feb 14, 2007

Vasquez Building System Corp./ 1269 EDSA, QC.

This refers to your letter reply dated February

02, 2007 to our 16 January 2007 letter regarding our

evaluation and recommendation on the VAZBUILT

Prefab Columns and Panel Systems, which as cited inYour letter is good only for a one-storey building system.

Based on the Technical Brochure you submitted,

That contains among other information . . .

 Acting Exec Dir., NBCDO

The Code (PD 1096) Compliance / 24The Code (PD 1096) Compliance / 24

PD 1096 Sect 1210 (e): Tower and Spires (Roof

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 97/148

 NBC - IRR/ Administration & Enforcement 97

PD 1096 Sect 1210 (e): Tower and Spires (RoofStructures): Least x-sectional area exceed 10 sq m;

 – Supporting frames shall extend directly to the ground

 – Shall be constructed entirely of incombustible materials

 – Shall withstand wind load in any direction in addition to any

other loads.

 Note: application of the above installations can be useful in

communication tower, cell site, and roof sign structures

Sign(2) Structures CollapsesSign(2) Structures Collapses

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 98/148

 NBC - IRR/ Administration & Enforcement 98

The Millenyo Challenges the Billb

oards

LAND USE AND

ZONING

Civil/Structural Section

BO Evaluation of Compliance

1. Sect 708/ Min Requirements;

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 99/148

NBC - IRR/ Administration & Enforcement 99

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

NSCP /Excerpt for PD 1096

Minimum size for Column constituting the principal support of a floor or roof shall

have a dimensions of at least

a) 25cm diameter for spiral column

w/ 6- 16mmØ RSB

b) 20cm least x-dimension for anytied column (600sq cm w/ 4- 16mmØ RSB

c) RSB shall be between (0.01- 0,08) of gross secti onal area.4. Sect 302 PD 1096- Foundation Investigation

2. Sect 302.5/ PD 1096 – Boring Test Requirement

3.Sect 302 PD 1096 - Jurisdiction

Civil/Structural Section

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 100/148

 NBC - IRR/ Administration & Enforcement 100

Area = 60000 sq mm

300 mm

200 mm

250 mmSpiral Colum

n

 NSCP on Concrete:

Limiting Dimension of Column:

Civil/Structural Section

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 101/148

 NBC - IRR/ Administration & Enforcement 101

Limiting Dimension of Column:

Equivalent circular column – As an exception to the general

 procedure of utilizing the full gross area of the column section, it shall

 be permissible to design a circular column and to build it with a square,octagonal, or other shaped section of the least lateral dimension, in

such case, the allowable load, the gross area considered, and the

required percentage of reinforcement shall be taken as those of the

circular column.

16 mm Ф RSB

(minimum size)

 Abandoned Construction Abandoned Construction

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 102/148

 NBC - IRR/ Administration & Enforcement 102

MRT-Ayala Project, North Ave/Edsa, Quezon City

Compliance by NSCP / 2Compliance by NSCP / 2

2001 Edition (1972, 1981, 1986, 1992) NSCPChap 1 Gen Req on Analysis (Sect 104 4)

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 103/148

 NBC - IRR/ Administration & Enforcement103

( , , , )Chap 1 – Gen Req. on Analysis (Sect. 104.4)

Consideration of Analysis focus of rationality of equilibrium,stability, geometric compatibility, materials properties;

Distribution of Horizontal Shear (lateral force)

Stability Against Overturning

Sec 206.6 for Retaining Wall

Sec 207 for Wind Loading

Sec 208 for Seismic Loading

Self Straining Forces (caused by settlements, temp., etc)

Anchorage (roof to wall/column, column to foundation)

MUNICIPAL CIVIL/

LAND USE AND

ZONING

4

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 104/148

NBC - IRR/ Administration & Enforcement 104

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow Administrative & Enforcement

REQUIRED

CLEARANCES

MUNICIPAL

TREASURER 

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

PLUMBING

SANITARY

ELECTRICAL

ELECTRONICS &

COMMUNICATION

MECHANICAL

OTHERS

(SPECIFY, REPAIR)

CIVIL/

STRUCTURAL

APPLICATION

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS

& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

1 2 3

4

5

6

7

8

9

Could be less processing time for simpleor more complicated for large structures.

CIVIL/

LAND USE AND

ZONING

4

Fi l E l i b h Chi f P i U i

FINAL EVALUATION AND RECOMMENDATION

Chief Processing Section

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 105/148

NBC - IRR/ Administration & Enforcement 105

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow 

FINAL EVALUATION

AND

RECOMMENDATION

PLUMBING

SANITARY

ELECTRICAL

ELECTRONICS &

COMMUNICATION

MECHANICAL

OTHERS

(SPECIFY, REPAIR)

STRUCTURAL4

5

6

7

8

9

10

• Final Evaluation by the Chief Processing Unit

• Recommendations to the Building Official

• Prepare Order of Payment including Fire

Service Fund Fee

CIVIL/

LAND USE AND

ZONING

ISSUANCE OF BUILDINGPERMIT

PAYMENT

OF FEES

4

2. Review O/P including

FS Fund per T- II.G.1

All in Order, forward

f l l

After recording, releasesto the applicant,

By Owner/Applicant

Properly informed

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 106/148

NBC - IRR/ Administration &

Enforcement

106

NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow BP Processing Flow  Administrative & Enforcement

REQUIRED

CLEARANCES

MUNICIPAL

TREASURER 

RECEIVINGV

ERIFICATION OF

CLEARNCES

FINAL EVALUATION

AND

RECOMMENDATION

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

PLUMBING

SANITARY

ELECTRICAL

ELECTRONICS &

COMMUNICATION

MECHANICAL

OTHERS

(SPECIFY, REPAIR)

STRUCTURAL

BUILDING

OFFICIAL

APPLICATI

ON

REALEASE

TRUE COPY TCTTAXDEC & RCPT(LEASE CNTRCT)

SETS OF PLANS

& SPECIFICATN

(A/S, S/P, E & M)GOV’T & EXEMP

1 2 3

4

5

6

7

8

9

11 12

10

13

1. refer one set of plans/

specs to the BFP c/o

City/Mun. Fire Marshall,to act in 5 days.

for payment to local

treasurer’s office

• Signs/issues BuildingPermitand accompanying

Ancillary/Accessory Permits

upon presentation of 

Official Receipts and Fire

Safety Check issued byThe BFP & Forward all

 processed/signed documents

for Recording and

Releasing Section.

pp

MUNICIPAL

TREASURER 

CHIEF, PROCESSING

DIVISION

(Recommendation)

CHIEF, PROCESSING

DIVISION

(Recommendation)

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 107/148

 NBC - IRR/ Administration & Enforcement

107NBCNBC –  – (NR)IRR(NR)IRR BP Processing Flow (SOME1)BP Processing Flow (SOME1)

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

ASSESSMENT

OF FEES

LINE AND GRADE

(GEODETIC)

PLUMBING

SANITARY

ELECTRICAL

MECHANICAL

CIVIL/

STRUCTURAL

ARCHITECTURAL

BUILDING

OFFICIAL

APPLICATION

65

REALEASE

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS

& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

DEPUTY

DEPUTY

DEPUTY

DEPUTY

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 108/148

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 109/148

NBCNBC – – IRR/2005 Pre Const/ Summon ApplicantIRR/2005 Pre Const/ Summon ApplicantADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – Pre – Construction Phase/ Steps & Procedures in

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 110/148

Pre Construction Phase/ Steps & Procedures in

Processing application for BP (cont’d)

The Building Official actions on BP application;• can invite/summon , in writing, the applicant

or his designer to amplify ambiguous

items on plans/specifications/

• in the exercise of Sect. 306 of PD, Re: non-

issuance, suspension or revocation ofBuilding Permit, applicant can make an

Appeal to the Secretary of DPWH within

15 days upon receipt of such action.

MUNICIPAL

TREASURER

CIVIL/

STRUCTURAL

LAND USE AND

ZONING

ISSUANCE OF BUILDING PERMIT

PAYMENT OF

FEES

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 111/148

NBCNBC – – (NR)IRR BP Processing Flow, NBC1(NR)IRR BP Processing Flow, NBC1 Administrative & Enforcement

REQUIRED

CLEARANCES

TREASURER 

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

FINAL EVALUATION

AND

RECOMMENDATION

LINE AND GRADE

(GEODETIC)

ARCHITECTURAL

INTERIOR/

ACCESSIBILITY

PLUMBING

SANITARY

ELECTRICAL

ELECTRONICS &

COMMUNICATION

MECHANICAL

OTHERS

(SPECIFY, REPAIR)

STRUCTURAL

BUILDING

OFFICIAL

APPLICATIO

 N

64

REALEASE

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS

& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

ENDORSEMENT T O PROPER AUTHORITIES

MUNICIPAL

TREASURER 

CHIEF, PROCESSING

DIVISION

(Recommendation)

CHIEF, PROCESSING

DIVISION

(Recommendation)

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 112/148

NBCNBC – – (NR)IRR BP Processing Flow (Districts)2(NR)IRR BP Processing Flow (Districts)2 Administrative & Enforcement

REQUIRED

CLEARANCES

VERIFICATION OF

ZONING & OTHER 

CLEARNCES

ASSESSMENT

OF FEES

LINE AND GRADE

(GEODETIC)

PLUMBING

SANITARY

ELECTRICAL

MECHANICAL

CIVIL/

STRUCTURAL

ARCHITECTURAL

BUILDING

OFFICIAL

APPLICATIO

 N

65

REALEASE

TRUE COPY TCT

TAXDEC & RCPT

(LEASE CNTRCT)

SETS OF PLANS

& SPECIFICATN

(A/S, S/P, E & M)

GOV’T & EXEMP

DEPUTY

DEPUTY

DEPUTY

DEPUTY

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 113/148

Flow more3Flow more3

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 114/148

Flow more4Flow more4

inspection

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 115/148

Flow more5Flow more5

11

2

34

5

6

71

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 116/148

Flow more7Flow more7

NBCNBC – – (New) IRR Process Concept, Diagram(New) IRR Process Concept, Diagram

Diagram representation of the evaluation process,

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 117/148

INPUT

SUPPORT

EVALUATIONPROCESS

OUTPUT

-Conforming / Code

-- Deficient / correct

-- Re-design use IRR

-- Shift to non-conforming / BP 220

Knowledge and

Expertise of thedesigner/profes.

Institute Strategic

measure to meet Code

requirement by both

designer & evaluator.

FEEDBACK

NBCNBC

 – –

IRR/2005 Pre ConstructionIRR/2005 Pre Construction

Phase, DefinitionsPhase, DefinitionsADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

D fi iti R l t t E l ti / i

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 118/148

Definitions Relevant to Evaluation/processing

Storey – bet. succ. floor surfaces or floor/roof Level, (or Split) – (refer to elevations)

Roof Deck – (required to have parapet vs flr. levelPenthouse – simply a floor level/area > 6 sqm.

Mezz & Loft (with open floor), Flat (multi living)

Soil Bearing Cap. or Pressure (w/c is up or down)

Existing building – (covered by legal permit)

Height of Building – (references: sidewalk or lot

NBCNBC

 – –

IRR/2005 ConstructionIRR/2005 Construction

PhasePhaseADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

C t ti Ph

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 119/148

Construction Phase

conduct periodic inspection on the on-goingconstruction;

Can examine & sign in logbook as prescribed in

terms and conditions of permit issued;

evaluate installations of safety devises for

 protection of pedestrianevaluate installations of safety devises for

 protection of pedestrian as well as workers

no changes on issued plans unless BO authorized.

NBCNBC

 – –

IRR/2005 PostIRR/2005 Post

ConstructionConstructionADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – 

P t C t ti Ph A li t b it t OBO

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 120/148

Post Construction Phase: Applicant submit to OBO

Certificate of Completion;

Construction Logbook, signed and certified

completed according to the permit issued,as-built plans and specification, including the

reflected on plans amendatory permit/s issued,

test and samples of specimen (if so required by the

OBO).

NBCNBC – – IRR/2005 Post Const/ OBO actionIRR/2005 Post Const/ OBO action

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – Post Construction Phase: OBO action on submitted

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 121/148

Post Construction Phase: OBO action on submitted

documents for application for Cert of Occupancy

endorse one copy of as-built plan submitted with

request to conduct final inspection pursuant to

PD 1185; to act within five (5) daysundertakes Final Inspection, verification or review

 based on Certificate of Completion, etc.

 pursuant to Sect 303 of PD 1096.assess fees for payment.

all in order, BO issue the Certificate of Occupancy

NBCNBC – – IRR/2005 Post Const/OBO further IRR/2005 Post Const/OBO further 

ADMINISTRATION AND ENFORCEMENT

Phases of Building Permit/Construction – Post Construction Phase: OBO further action

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 122/148

Post Construction Phase: OBO further action

A partial Certificate of Occupancy maybe issued, provided the remaining construction will not

 posed hazards to the occupant/s

Building with already issued Certificate ofOccupancy may be further issued Certificate of

Occupancy due to changes in use, whether

 partly or wholly.

Inspection of Mech. Installation with Mechanical

Engineer commission by the applicant,

NBCNBC – – IRR/2005 AnnualIRR/2005 Annual

InspectionInspectionADMINISTRATION AND ENFORCEMENT

Annual Building Inspection – 

Insp. & Enf. Division Team effort composed of

h i l i f diff di i li

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 123/148

technical inspectors of different disciplines

 Notification to building owner required before theactual inspection,

Consolidated report backed by picture/s if possible

 prepared by the team after inspection, withassessment of fees submit to Chief, E & I D in

turns forward to BO for disposition,

BO approves recommendation and assess fees

issued the Certificate of Annual Inspection.

 Non payment of inspection fee on time adds 25%surcharge.

NBCNBC – – IRR/2005 Annual Insp. PortfolioIRR/2005 Annual Insp. PortfolioADMINISTRATION AND ENFORCEMENT

Annual Building Inspection – Portfolio of Findings

Findings can indicate;

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 124/148

• Unauthorized substantial changes made to the

 building/structure (no building permit)

BO shall issue the necessary Order/s

corresponding to the violation/s for compliance

 by the owner/occupant.

• Change of Occupancy without Certificate of

Change of Occupancy/Use,

• Demolition/removal without appropriate

demolition or removal permit

VIOLATIONS -

SECTION 211 -

Implementing Rules and Regulation:

In the implementation of the provisions of the Code,

the Secretary shall formulate necessary rules and regulations

and adopt design and construction standards and criteria for

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 125/148

NBCNBC – – (NR)IRR(NR)IRR ViolationsViolations-- illustration 2 illustration 2  Administration & Enforcement

SECTION 212

-

Administrative Fines:

and adopt design and construction standards and criteria for

 buildings and other structures. Such standards, rules and

regulation shall take effect after their publication once a weekfor three consecutive weeks in a newspaper of general

circulation

For the violation of any of the provisions of this Code

or any of the rules or regulations issued there under, theSecretary is hereby empowered to prescribed and impose

fines not exceeding ten thousand pesos.

VIOLATIONS -

A. Initiation of action usually arises from a complaint and/or findings of

violation involving the following;

Activities/

ViolationsCompliance

Type

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 126/148

126 126

Administration & Enforcement

1. Erecting, constructing,

altering, repairing, moving,

converting, installing or

demolishing a private or

 private building/structurewithout building and/or

demolition permit.

Sect. 301 Grave

ViolationP 10,000.00

 Note: Defiance to undergo administrative proceeding for compliance, the

case can be filed in Civil Court under other remedies.

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

Violations ComplianceType

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 127/148

127 127

2. Making any alteration, addition,

conversion or repair in any

 building/ structure

appurtenances thereto

constructed or installed before

the adoption of the Code

whether public or private

without permit.

Sect.

2101

Grave

ViolationP 10,000.00

 Note: Decision is subject for Appeal.

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

ViolationsCompliance

Type

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 128/148

128 128

3. Unauthorized change,

modification or alteration

during construction in the

duly submitted plans and

specifications on which the

 building permit is based.

Sect. 304Grave

ViolationP 10,000.00

 Note: Decision is subject for Appeal.

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

Violations ComplianceType

Violation

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 129/148

129 129

4. Non-compliance with the

work stoppage order or

notice and/or orders to effect

necessary correction in plans

and specifications founddefective.

Sect. 207Grave

ViolationP 10,000.00

 Note: Decision is subject for Appeal.

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

Violations ComplianceType

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 130/148

130 130

5. Non-compliance with order todemolish building/structure

declared to be nuisance,

ruinous or dangerous.Sect. 215

Grave

ViolationP 10,000.00

 Note: (sometimes political & economic (squatters?)

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;Activities/

Violations Compliance

Type

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 131/148

131 131Administration & Enforcement

6. Use or occupancy of a

 building/structure without

Certificate of

Occupancy/Use even if

constructed under a valid building permit.

Compliance

Sect. 309

Violation

Less Grave

Violation

P 8,000.00

 Note: (Mandatory/ often on residential)

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

ViolationsCompliance

Type

Violation

Fine, upon

determination

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 132/148

132 132

7. Change in the existing use or

occupancy classification of a

 building/structure or portion

thereof without thecorresponding Certificate of

Change of Use.

Sect. 309 Less Grave

Violation

P 8,000.00

 Note: (Mandatory and subject of TUP/ medgen, St Agnes, Pandacan Oil

Depot)

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;Activities/

ViolationsCompliance

Type

Violation

Fine, upon

determination

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 133/148

133 133

Administration & Enforcement

8. Failure to post or display the

Certificate of Occupancy/

Use/ Operation in a

conspicuous place on the

 premises of the building/structure/ appurtenances.

Violations

Sect. 309

Violation determination

Less Grave

ViolationP 8,000.00

 Note: Mandatory

VIOLATIONS -

A. Initiation of action usually arises from a complaint involving the

following;

Activities/

Violations Compliance Type Violation

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 134/148

134 134

9. Change in the type of

construction of any building/

structure without an

amendatory permit.

Sect. 402

with Sect.

304

Grave

Violation

 Note: Mandatory compliance to issued permit.

VIOLATIONS -

A. Initiation of action usually arises from a complaint and or findings (on

time the issuance of Building permit is still pending) involving thefollowing activities/violations

NBCNBC – – (Rev) IRR(Rev) IRR

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 135/148

135 135Administration & Enforcement

10. Non-compliance to pay thenecessary fees imposed as

fines and/or penalty, there

shall be;

a) Excav for foundation only.

 b) foundations reinf. laid

c) const’n of superstructure

within 2m above ground

d) const’n of super structure

above 2m.

Compliance

Surcharge

Fine, upondetermination (prima

facie) to be added to

the Building Permit

Fees10%

For multiple building

construction in one lot,

 building with most

development shall beused.

Surcharge

Surcharge

25%

50%

Surcharge 100%

NBCNBC – – IRR/2005 Assessment of Fees & otherIRR/2005 Assessment of Fees & other

ChargesCharges

ADMINISTRATION AND ENFORCEMENT

ASSESSMENT OF FEES & OTHER CHARGES

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 136/148

1. Basis of Assessment

• Type of Occupancy or Use of the Building

• Cost of Construction

• Floor Area, and

• Height.

NBCNBC – – IRR/2005 Assessment of Fees & otherIRR/2005 Assessment of Fees & other

ChargesChargesADMINISTRATION AND ENFORCEMENT

ASSESSMENT OF FEES & OTHER CHARGES

2. Cost of Construction uniform application

regardless of the following;

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 137/148

regardless of the following;

• Type of construction, and

Table II.G.1- Fixed Cost of Construction / sq m.

• Cost of construction

Location Group

All Cities/Mun. A,B,C,D,E,G,H,I F J

(Cost x 1000) P10 P 8 P 6

NBCNBC – – IRR/2005 Assessment of Fees & otherIRR/2005 Assessment of Fees & other

ChargesChargesADMINISTRATION AND ENFORCEMENT

Advantages of specified basic assessment reference,

Table II.G.1, Height and Use/Occupancy.

• Does not depend of submitted material of

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 138/148

• Does not depend of submitted material of

construction/ bill of materials submitted by designer, which in former days;

- Rich field of graft and corruption

- Source of “cashunduan” of what should be

adopted, usually favoring the applicant,

causing disadvantage to the governmentfor allowing collecting reduced fees.

- Repair, Cert of Occupancy & Fire Fund uses

cost of construction

ORGANIZATION AND ENFORCEMENT: Reports Generation

REPORTS;

1.

2.

REQUIREMENTS DUE DATE / AGENCY

QUARTERLYCIAP/ISSUED BP

Status BP issuedCopy start notice

1st

week/apr/jul/oct/janUpon issuance@ week 

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 139/148

NBCNBC – – (NR)IRR(NR)IRR Organization & Enforcement Organization & Enforcement  – – report generationreport generation Administration & Enforcement

3.

4.

5.

6.

7.

8.

 NSO/ISSUED BPCOLLECTIONS

ANNUAL INSP.

OTHER 1(BP 344

OTHER 2

OTHER 3

Copy BP issuedFees, Fines & Char 

Status Existg bldgs.

Compliance/ CO

End of @ monthEnd of @ month

15th day jan year follow

End of @ month

etc

etc

etc

etc

37

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other Charges

ADMINISTRATION AND ENFORCEMENT

Computation of Building Permit Fees (Hypothetical)

Use of Sidewalks and Erection of Scaffoldings:

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 140/148

Use of Sidewalks and Erection of Scaffoldings:

Ref. Sect. f and g, Schedule of Fees.

Features:

• Payment shall be per calendar month,

• Compliance with the safety and protective

requirement of IRR XI.

 Adm Adm && Enf Enf (Safety Net)(Safety Net)

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 141/148

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other ChargesADMINISTRATION AND ENFORCEMENT

Computation of Building Permit Fees (Hypothetical)

Ground Preparation and Excavation Permit

F t

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 142/148

Features:

Excavations > 50.00 cu m and 2m in depthRequired: GP/EP

Solution: (Ref. Sect 304(4) – Processing BP

Sect 9(b)(i)(a to f) – Sched. of Fees

Form: NBC Form No. 8- 02 w/ cond.

Elements of Permit: With Cash BondFirst 50 cu m. - - - - - Php 50,000.00

+ in excess of 1st 50 cu m - - Php 300.00/cu m

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other ChargesADMINISTRATION AND ENFORCEMENT

Computation of Building Permit Fees (Hypothetical)

Ground Preparation and Excavation Permit

Features:

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 143/148

Features:

Excavations > 50.00 cu m and 2m in depthRequired: GP/EP

Limit of Permit:

Max Volume – 100.00 cu m.

& Depth – 3.00 m.

Duration – 30 days (or superseded bythe issuance of the

 principal Building Permit)

ADMINISTRATION AND ENFORCEMENT

Computation of Building Permit Fees (Hypothetical)

Repairs Differentiated from Renovation/Alteration

Definitions:

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other Charges

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 144/148

Definitions:

Repair  – dismantling/replacing dilapidated/deteriorated part/s of existing building

with same or equivalent material/s.

Fee – Ref. Sect 9(i), Schedule of Fees.

Renovation – Use of material/s different from

the original even if the original face ofthe structure is not changed.

Fee – Refer to original construction.

ADMINISTRATION AND ENFORCEMENT

Computation of Building Permit Fees (Hypothetical)

Accessories of Buildings/structures

S f W k (f ll i )

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other Charges

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 145/148

Scope of Works: (for all occupancies)

swimming pools , firewalls, concrete water

tanks, paved areas and the like;

Fee – Ref. Sect 8(d), Schedule of Fees.

Ex. Swimming pools (improvised from indigenous

materials such as rocks, cement flooring – Fee (50% of regular type/occupancy)

ADMINISTRATION AND ENFORCEMENTOther Provisions (On Fees computation)

Raising Permit: Ref. Sect 9(j) – Accessory Fee based on new usable area generated

D liti /M i P it

NBCNBC – – IRR/2005 Assessment of Fees & other ChargesIRR/2005 Assessment of Fees & other Charges

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 146/148

Demolition/Moving Permit:

Ref. Sect 9(k) – Accessory Fee

 based on FA or dimension to be demolished.

* Related to Rule V, Fire Zone and Rule XI,

 precautions/safety, traffic & utility clearances

Cemeteries, Mausoleum, columbarium, tombs, etc

construction – Ref. Sect 8(p).Certificate of Use: Group J, Div. 3 & Ancillaries – 

 bank/record vaults, swimming pools, towers, silos,

smoke stacks/chimney/ovens/kilns/furnaces/tanks, etc

Fees Silos, IRR II, Sect 8gFees Silos, IRR II, Sect 8g

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 147/148

Fees: Note/ for permanent or temporary (require removal)• Up to 10m in ht = P 2,400.00 + 150/m excess

• platform floor area @ /Section 3e (50% principal

bldg it serve)

NBCNBC – – IRR/2005 Thank YouIRR/2005 Thank You

8/15/2019 National Building Code PD 1096 - 148 pages.pdf

http://slidepdf.com/reader/full/national-building-code-pd-1096-148-pagespdf 148/148

Thank You