US Army Corps of Engineers BUILDING STRONG ® Nashville District October 2011 Update Tom Cayce Chief of Programs and Project Management October 18, 2011

Transcript of Nashville District October 2011 Update - · PDF fileNashville District October 2011 Update...

Page 1: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

US Army Corps of Engineers

BUILDING STRONG®

Nashville DistrictOctober 2011 Update

Tom Cayce

Chief of Programs and Project Management

October 18, 2011

Page 2: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

LRN

Nashville District Value to the Nation

• 12% of inland navigable waterways (1,175 navigable river miles)

• 2.5% of ton miles on inland navigable waterways

Page 3: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Great Lakes and Ohio River DivisionCivil Works Boundaries

• Southern most District in the Great Lakes and Ohio River Division

• 56,000 square miles (parts of 7 states)

• Tennessee and Cumberland River basin systems

• Largest storage reservoir East of the Mississippi River (Lake Cumberland)

• Critical support and access to major TVA power production and DOE Facilities

• 34 Million Visitors a year on six district lakes (Destination)

Nashville DistrictValue to the Region

Page 4: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Twin River Systems

LaurelLaurelMartins ForkMartins Fork

Dale HollowDale Hollow

J.PercyPriestJ.PercyPriest

NashvilleNashville

Cordell HullCordell Hull

Old HickoryOld Hickory

CheathamCheatham

BarkleyBarkley

KentuckyKentucky

PaducahPaducah

ChattanoogaChattanooga

TennesseeTennessee

KentuckyKentucky

MississippiMississippi

AlabamaAlabama

GeorgiaGeorgia

SouthCarolina

SouthCarolina

North CarolinaNorth Carolina

VirginiaVirginia

Melton HillMelton Hill

Ft. LoudounFt. Loudoun

Watts BarWatts Bar

NickajackNickajack

KnoxvilleKnoxville

PickwickPickwick

WilsonWilson

WheelerWheeler

GuntersvilleGuntersville

Lock & Dam

Dam

Lock & Dam

Dam

Mississippi R.Mississippi R. Ohio R.Ohio R.

Cumberland R.Cumberland R.

Tennessee R.Tennessee R.

Cumberland River BasinCumberland River Basin

Tennessee River BasinTennessee River Basin

Wolf Creek Major Rehab

Center Hill Major Rehab

Chickamauga Lock

Kentucky Lock

Cumberland River System - Operate and Maintain 10 Multi-Purpose Projects (4 Locks and 6 Dams)

Tennessee River System - Operate and Maintain 10 Locks (Partner with for Dams and Hydro)

Page 5: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Concern: Deteriorating Infrastructure

• 10 Dams preventing $750M annually in damages

• 2 largest reservoirs DSAC 1 (8 million acre-feet of storage)

• 18 Lock chambers at 14 sites

• 11 Locks in operation for over 50 years

• Average age of locks: 59 years

• Minimal advanced maintenance on projects (ARRA Helped)

• Currently “Fix projects as they Fail”

• Now moving towards “Fail to Fix” projects

Can we afford the infrastructure in our inventory?

RISK

Page 6: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Budget Comparisons - FY 2007 - FY 2012 ($Millions)FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

CORPS LRN CORPS LRN CORPS LRN CORPS LRN CORPS LRN CORPS LRN

Invest 94.0 0.2 90.0 0.3 91.0 0.1 100.0 0.1 104.0 0.1 104.0 0.0

Construction 1,555.0 58.0 1,523.0 167.1 1,402.0 177.3 1,718.0 181.0 1,690.0 215.2 1,480.0 210.7

O&M 2,258.0 68.5 2,471.0 83.3 2,475.0 83.4 2,504.0 84.8 2,361.0 78.1 2,314.0 83.0

FCCE 81.0 40.0 40.0 41.0 30.0 27.0

GRF 164.0 177.0 180.0 190.0 193.0 196.0

TOTAL 4,733.0 126.6 4,871.0 250.6 4,741.0 260.8 5,125.0 265.8 4,939.0 293.3 4,631.0 293.7

% PB 2.7% 5.1% 5.5% 5.2% 5.9% 6.3%

E&W Approp 5,340 5,592 5,402 5,445 5,055 4,631??

Page 7: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Cumberland River Profile

1 32 4Dam Safety Action Classification(DSAC) Level

Page 8: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Barkley

Cheatham

J. Percy

Priest

■Clarksville

■NashvilleCarthage■

■Celina

Center

Hill

Old

Hickory

Cordell

Hull Dale

Hollow

Martins

Fork

Laurel

Wolf Creek

Run-of-River

Flood Damage

Reduction

Cumberland River Basin Reservoir System

Page 9: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Operation Watershed4/26/2011 – 5/4/2011

Rainfall & Project OperationsCumberland River Basin

Dale Hollow Dam

Cordell Hull Lock & Dam

Old Hickory Lock & Dam

Cheatham Lock & Dam

Barkley Lock & Dam

Wolf Creek Dam

J. Percy Priest Dam

Center Hill Dam

Storage conserved inBarkley and Kentucky

4.65 feet

Dale Hollow – 0.51’

Center Hill – 0.95’

Wolf Creek – 2.54’

J. Percy Priest – 0.65’

Top of Hydropower Pool

Top of Hydropower Pool

Top of Flood Control Pool

Top of Flood Control Pool

Top of Hydropower Pool

Storage at Peak Elevation

Available

Pie area scaled to storage capacity

Peak

695

700

705

710

715

720

725

730

4/12 4/22 5/2 5/12 5/22 6/1

Ele

vation (ft

)

Operation Watershed - Wolf Creek Dam

Observed

Without Reductions

650

652

654

656

658

660

662

664

4/12 4/22 5/2 5/12 5/22 6/1

Ele

vation (ft

)

Operation Watershed - Dale Hollow Dam

Observed

Without Reductions

625

630

635

640

645

650

655

660

4/12 4/22 5/2 5/12 5/22 6/1

Ele

vation (ft

)

Operation Watershed - Center Hill Dam

Observed

Without Reductions

488

490

492

494

496

498

500

502

504

506

4/12 4/22 5/2 5/12 5/22 6/1

Ele

vation (ft

)

Operation Watershed - J. Percy Priest Dam

Observed

Without Reductions

Page 10: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Technique Area 1Complete

Technique Area 2Complete

Critical Area 1

Drilling and Grouting; Access Road; Platform Raising

Non-Critical Areas

Barrier Wall Installation (30% complete)

Wolf Creek Dam Project

Gallery Grouting

Mobilizing

DSAC I Classification - Karst foundation seepage

$584M Total Cost, $371M Obligated, 55% CompleteBarrier Wall Completion Estimated Dec 2013

Rock Foundation Beneath CA 1

10Current as of Sep 2011

Halcomb’s LandingComplete

Page 11: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Wolf Creek DamFoundation Remediation

ICOS Wall

Work Platform

Sheet Pile Wall

Lake CumberlandElev 750

Clay Embankment

Limestone Bedrock

Elev 475

Elev 425

Elev 525

New Wall

Page 12: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Treviicos Soletanche JV Proposal

Dam

Foundation Soil

Bedrock

Wall

Protective Concrete Embankment Wall (PCEW)

Page 13: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Grout & Cutoff Walls

Legend

Grout Curtain

Barrier Wall

Cave Feature

Sinkholes

Main Embankment & Left Rim

(1) Grouting- complete(2) Barrier Wall

Timeframe Major Construction Contracts2008-10 (1) Grouting at Embankment and Left Rim – Complete2011-14 (2) Barrier Wall at Embankment – Award Sep 20112012-14 (3) Saddle Dam Foundation Work – Award 2012

Center Hill Dam

13

DSAC I Classification- Karst foundation seepage

$295M Total Cost, $117M ObligatedBarrier Wall Completion – Jul 2014Project Completion – Dec 2014

(3) Saddle Dam EmbankmentAppropriate Treatment TBD

Page 14: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®Slide 14

419

260

421

Center Hill Grouting Program

Page 15: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Center Hill Barrier Wall(Looking Upstream)

Encasement Wall

Page 16: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®Slide 16

Downstream of the Saddle DamEmbankment

Roller Compacted Concrete (RCC) Stability Berm

Page 17: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Transportation Comparison Statistics

Category Barge Rail Truck

Fuel Efficiency (miles/gal/ton)

576 413 155

Fatalities (ratio per ton-mile)

1 23 155

Injuries (ratio per ton-mile)

1 125 2,171

Spills (gallons per Mton-mile)

3.6 3.9 6.1

Emissions HC (ratio per ton-mile)

1 1.4 1.2

Source: Texas Transportation Institute, Dec 2007

Page 18: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

• Currently longer tows must

perform double lockages

(increased time and money)

• New lock double the size

• New rail and road bridges

• Cofferdam complete

• Monolith walls under construction

Kentucky Lock

• $713.4M Project

• FY 11: $2.9M + $55M (ARRA)

• FY 12 Budget: $0M

• IWTF Funding Challenges

Page 19: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Overall Project – July 2011

Slide 19

Page 20: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Page 21: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

� Excavation and construction of 9 of 61 monoliths for new lock. Entire critical path of project for 2 years.

� Awarded Base contract (Jan 2010) and 5 of 10 options –

► $48.0M out of $57M total contract► 33 Month long contract (including 5 Opt’s)

� Remaining 5 options – Each option completes a monolith to full height

► $8.9M required to exercise all 5► Would increase contract length to 36 months or more

Upstream Monolith Contract

Page 22: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Lock Excavation - 6 Oct 2011

Slide 22

Page 23: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Kentucky Lock Funding Status

� Project funding - 50% Federal & 50% Inland Waterways Trust Fund

(IWTF). IWTF - revenues from a special $0.20 per gallon Federal

tax on marine diesel fuel.

� American Recovery and Reinvestment Act (ARRA) - short term relief

for KY Lock & other navigation projects – not require IWTF match.

� KY Lock - $79.6M in ARRA funds - allowed new lock construction to

resume after its halt in 2006.

Page 24: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

KY Lock Future Funding

� Existing ARRA - Maintain construction activities thru 1st Quarter FY 13 (Upstream Lock Monoliths). To meet 2016 project completion date requires additional funds in FY 12

� Status of IWTF – Unlikely project receives significant additional funding until at least FY 13 - Depends on the “fix” to the IWTF by Congress

� No additional funding in FY 13 – Mothball project

Page 25: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

O&M Project Review

LaurelLaurelMartins ForkMartins Fork

Wolf CreekWolf Creek

Dale HollowDale Hollow

CenterHillCenterHill

J.PercyPriestJ.PercyPriest

NashvilleNashville

Cordell HullCordell Hull

Old HickoryOld Hickory

CheathamCheatham

BarkleyBarkley

KentuckyKentucky

PaducahPaducah

ChattanoogaChattanooga

TennesseeTennessee

KentuckyKentucky

MississippiMississippi

AlabamaAlabama

GeorgiaGeorgia

SouthCarolina

SouthCarolina

North CarolinaNorth Carolina

VirginiaVirginia

Melton HillMelton Hill

Ft. LoudounFt. Loudoun

Watts BarWatts Bar

ChickamaugaChickamauga

NickajackNickajack

KnoxvilleKnoxville

PickwickPickwick

WilsonWilson

WheelerWheeler

GuntersvilleGuntersvilleLock & Dam

Dam

Lock & Dam

Dam

Mississippi R.Mississippi R. Ohio R.Ohio R.

Cumberland R.Cumberland R.

Tennessee R.Tennessee R.

Cumberland River BasinCumberland River Basin

Tennessee River BasinTennessee River Basin

Page 26: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

O&M Funding($ Millions)

FY 08 FY 09 FY 10 FY 11 ARRA FY 12

TN River

Budget23.4 21.4 20.6 20.1 - 21.8

TN River

Approp21.9 17.1 19.6 19.6 25.2

CU River

Budget59.9 62.0 64.0 57.9 57.8

CU River

Approp58.8 57.9 71.2 93.1 37.1

Page 27: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Hydropower O&M Major Rehabs & Uprates

• 9 Projects in operation with 28 units

• Installed Capacity of 914 Megawatts

• 3.4 B Kilowatt-Hours produced annually

• $44M/year returned to the U.S. Treasury

Customer-Funded Activities

• FY 08 & 09 - $25.0M

• FY11 to FY30 – MOA $30M to $50M/Year

(Recently approved)

Typical Work Items:• Rehab Powerhouse Crane

• Rewind Generator (Barkley award in FY11)

• Replace Generator Air Coolers, Thrust Bearing

• Replace Turbines

Page 28: Nashville District October 2011 Update -  · PDF fileNashville District October 2011 Update ... Top of Hydropower Pool Top of Hydropower Pool ... •Cofferdam complete

BUILDING STRONG®

Recreation

#1 Federal Provider of Outdoor Recreation

34 Million Visitors per Year (More than Disney World)

4,835 Miles of Shoreline

3,379 Campsites

254 Miles of Trails

288 Boat Launch Ramps

$750 Million spent by visitors at Corps projects