© VERBUND AG, www.verbund.com © VERBUND AG, www.verbund.com Workshop Hydropower and Fish Existing hydropower facilities: Strategic planning for ecological restoration Verbund Hydro Power Gmbh, Gerd Frik, Brussels, 30.05.2017

Transcript of Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop...

Page 1: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com© VERBUND AG, www.verbund.com

Workshop Hydropower and FishExisting hydropower facilities:Strategic planning for ecological restoration

Verbund Hydro Power Gmbh, Gerd Frik, Brussels, 30.05.2017

Page 2: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Energy production and environmental protection

VERBUND target is on sustainable energy production (water:127 HPP, wind)

30% of the HPP sites have been nominated nature conservation areas following construction of the power plant.

Main focus is on the improvement of the (fish-) ecological conditions at the Hydro Power Plants (Donau, Inn, Salzach, Enns, Mur, Drau) Structure of the rivers: MQ 100m³/s (Mur) – 2000m³/s (Donau)

width between 35 and 300 m

Goal: good ecological potential at all run of river HPP’s

A detailed timeframe has been established between the Ministry, the regional governments, the electricity companies and other stakeholders along rivers

Work is ongoing since 2005 (years before begin of 1. national water management plan).

Existing hydropower facilities:Strategic planning for ecological restoration

page 2

Page 3: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Approach

It became clear that for many water bodies fish passage “per se” is insufficient to achieve the ultimate goal of the “good ecological status” or “good ecological potential” required by the Water Framework Directive (WFD).

One possibility to combine the goals of connectivity and habitat improvement are large nature-like fish passes. Such measures may be narrowed by space limitation or dam height.

In order to achieve the objectives the improvement of aquatic habitat conditions is required to increase the fish biomass and diversity considerably.

One of the key habitat types are permanently connected side arms providing spawning grounds and shelter from ship-induced waves along the river Danube.

It is also important to co-ordinate all actions with the different types of usage of the Danube (energy, navigation, flood protection...) and the responsible stake holders. This successful approach will also be taken in the future.

The strategy of VERBUND regarding the requirements of the EU-WFD and the NGP is a systematic approach which prioritizes the creation and connection of habitats before the implementation of pure fish passage.

Existing hydropower facilities:Strategic planning for ecological restoration

page 3

Page 4: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

implemented (48)under construction (6)in planning stage (19)pending (14)

Existing hydropower facilities:Strategic planning for ecological restoration

page 4

Page 5: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Wherever possible nature like fish passes have been implemented Limitations: space, dam height

Existing hydropower facilities:Strategic planning for ecological restoration

page 5

Page 6: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Example nature like fishway – Ottensheim-WilheringDanube

Heavily modified stretch at the power plant „Ottensheim-Wilhering“

Danube

15 km

Powerplant

page 6

Page 7: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Powerplant

Pesenbach

Große Rodl

Aschach

Innbach

DanubeInnbach-mouth

15 km

Moderate ecological status

Bad ecological status

Example nature like fishway – Ottensheim-WilheringDanube

page 7

Page 8: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

• app. 14 km nature-like fish way• Usage of natural water bodies• Restauration measures in the water body• Habitat improvement & creation• Increased connectivity (lateral & longitudinal)

Example nature like fishway – Ottensheim-WilheringDanube

page 8

Page 9: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

FMF Ottensheim-Wilhering

page 9

Page 10: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Detail of the mouth of the fishway to ensure fish migration – expected development

Innbach-mouth

Example nature like fishway – Ottensheim-WilheringDanube

page 10

Page 11: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

FMF Ottensheim-Wilhering

page 11

Page 12: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

mm50 100 150 200 250 300

Anz

ahl

0

5

10

15

20

mm50 100 150 200 250

Anz

ahl

0

50

100

150

200

250

300

A large number of juvenile autochthonous Danube percids (Zingel, Striped Ruffe)entered the Danube in autumn 2016

Zingel Schrätzer

FMF Ottensheim-Wilhering – first results

page 12

Page 13: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Example Traisen River

Challenge• Chanellized river• MQ 25 m³s-1

• Poor ecological status• Eight impassable obstacles• Hindering access to spawing grounds

page 13

Page 14: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Solution:• Generous restauration measures

(>>Nature like fish pass)• 10 km new river bed

Solution:• Generous restauration measures

(>>Nature like fish pass)• 10 km new river bed

• Hindering access to spawing grounds

Example Traisen River

page 14

Page 15: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Example Traisen River

Solution:• Generous restauration measures

(>>Nature like fish pass)• 10 km new river bed• re-contouring the accompanying

wetlands

page 15

Page 16: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Expected results:• Longitudinal connectivity• Improved lateral connectivity• Habitat for rheophilic species• Pioneer stages• Softwood forest-> New Habitats of the EU habitat directive

Danube River

Example Traisen River

page 16

Page 17: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com© Gerhard Pock

Example Traisen River

Page 18: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com© Gerhard Pock

Example Traisen River

Page 19: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

• Warfare agent - EIA 2011: bomb craters known

• Unexected findings of warfare agents due to heavy ground combat

• Additional costs of 1,65 Mio €

Example Traisen River

page 19

Page 20: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Example Traisen - Monitoring results

"Old" Traisen upstream

"Old" Traisen downstream

"New" Traisen

Biom

ass

(kg.

ha-1

)

0

50

100

150

200

250nasebarbelother rheophilicchubother eurytopic (bream, carp)stagnophilic

• Quick reaction of the fishcommunity

• Increased biomass

• Habitat for rheophilicspecies

• Promote a “Leitbild”-like community

page 20

Page 21: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Example Traisen - Monitoring results

White willow (Salix alba) Black poplar (Populus nigra)

Natural rejuvenation in re-contoured wetlandsNew Habitats of the EU habitat directive - Softwood forest

page 21

Page 22: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Partners

Existing hydropower facilities:Strategic planning for ecological restoration

page 22

Page 23: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Experiences and Challenges

• In most water bodies Fish Passage alone is insufficient to achieve the good ecological status or potential

• Where possible, the design of fish passage facilities should include other elements such as large scale connectivity measures and habitat improvements/creation

• First results are promising: even small scale “nature like” fish ways are used as spawning habitat. Monitoring results enhance knowledge of river ecology.

• integrative planning should including all stake holders (local authorities, fisheries science, fishery, navigation authorities, innovative planners) –> this is not a match simply between Hydro Power and NGO’s

• Land availibility to realize habitat creation or large scale connectivity measures

• Going public• Further financial funding is necessary

• Good solutions need time • Especially “difficult sites”• Learning from implemented measures (monitoring)• Development of new solutions

Existing hydropower facilities:Strategic planning for ecological restoration

page 23

Page 24: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

• Extensive approval process under the EIA Act • Increased and expensive efforts during project preparation

• Example Traisen: Time required for EIA preparations and EIA procedures > 2 years, additional costs app. 1,2 Mio € for environmental measures

• Natura 2000: Degree of significance assessment obligatory

• Also for measures which are proposed in the Natura 2000 management plans

• The legal requirement to minimize impact may lead to sub-optimal restoration projects

• Forestry laws

• Minimizing impacts on forestry often contradicts optimal ecological solutions

• Best practical environmental option instead of overregulation -> listen to the Stake Holders

• Dialogue with ministry and federal government; Establishing a basis of confidence leads to a climate of highly constructive dialogue with optimated ecological solutions without neglecting economic limits

page 24

Existing hydropower facilities:Strategic planning for ecological restoration

Experiences and Challenges, EIA, Natura2000, Forestry law

Page 25: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Status of current mitigation measures in Austria

Number of Measures 133

Continuity 68%

Morphology 19%

Residual Water 13%

Total Investment 189.469.497 €

Total Subsidies 37.801.790 €

Costs of Monitoring 10.104.621 €

Annual OperatingCosts 1.059.160 € per anno

Annual Energy Losses 160.209 MWh/aAdditional CO² (CCTG) 16.021 to CO²/a

Existing hydropower facilities:Strategic planning for ecological restoration

page 25

www,oesterreichsenergie.at

Page 26: Workshop Hydropower and Fish.pptx [Schreibgeschützt] - Workshop Hydropower and Fish... · Workshop Hydropower and Fish Existing hydropower facilities: ... spawning grounds and shelter

© VERBUND AG, www.verbund.com

Thank You for your attention

Existing hydropower facilities:Strategic planning for ecological restoration