Multi-Sync Repair Training DPM Diversified Products Mfg Inc. Click the Mouse or use the Down Arrow...
-
Upload
arabella-fisher -
Category
Documents
-
view
216 -
download
2
Transcript of Multi-Sync Repair Training DPM Diversified Products Mfg Inc. Click the Mouse or use the Down Arrow...
Multi-Sync RepairTraining
DPMDiversified Products Mfg Inc.
Click the Mouse or use the Down Arrow to advance to the next point.
DPM Multi- Sync Training
Part 1: Support Chemicals Part 2: Prepare the SumpPart 3: Weld Multi-Sync in PlacePart 4: Fill the Multi-Sync Boot
Multi-Sync RepairDPM
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Loosen clamp at pipe.
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Loosen clamp at pipe. • Remove plugs at tube & set
aside.
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Loosen clamp at pipe. • Remove plugs at tube & set
aside. • Insert mixing nozzle and secure
with nut.
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Loosen clamp at pipe. • Remove plugs at tube & set
aside. • Insert mixing nozzle and secure
with nut. • Fill mixing tube and pump about
2 oz. into a container and set aside.
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port
(Cont’d)
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port• Fill with constant pressure
(Cont’d)
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,
tighten clamp
(Cont’d)
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,
tighten clamp • Fill until DBF II comes out of vent
(Cont’d)
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,
tighten clamp • Fill until DBF II comes out of vent• Insert plug into fill port
(Cont’d)
Multi-Sync RepairDPMFill Multi-Sync with DBF II
• Insert nozzle into Sleeve fill port• Fill with constant pressure• When DBF II oozes out at pipe,
tighten clamp • Fill until DBF II comes out of vent• Insert plug into fill port• Recommended - coat outer
surface with DBF II
(Cont’d)
Multi-Sync RepairDPM
Watch the Filling the Multi-Sync Entry video in Part 4A
Contact Diversified Products Mfg5523 Baggett Marysville Road
Oroville, CA 95965(530)-534-3966
Multi-Sync RepairDPM