MONIPULO OIL & GAS ROUNDTABLE
VIRTUAL GAS PIPELINES – A REALITY :
CASE-STUDY OF TOTALSUPPORT’S CNG INFRASTRUCTURE PROJECT IN
PORTHARCOURT
BY
UBANI NKAGINIEME – Ph.D
TOTALSUPPORT ENERGY GROUP
.
HISTORICAL BACKGROUND
• Nigeria has abundant natural gas resources. However the pipeline infrastructure to evacuate produced(associated & non-associated) gases is very limited to small clusters in Lagos, Portharcourt, Aba, Ota, Agbara, Ajaokuta, Ikot-Abasi, Benin. A few other clusters like Calabar is in the works.
HISTORICAL BACKGROUND
• Natural gas fuels are inherently cheaper and much cleaner than other existing fossil-fuel sources like diesel, gasoline, fuel-oil.
• In view of the above, a national and holistic shift to cheaper and cleaner natural gas fuels makes economic and environmental sense.
HISTORICAL BACKGROUND
• Forward thinking companies like Dufil Prima Foods Plc(Indomie), IMI, and Schlumberger are already switching to natural gas fuels
HISTORICAL BACKGROUND
• Being a Clean Energy Company, we are pioneering this Private Industry effort in Nigeria, especially in the Niger-Delta
• We have just delivered the First Truly Nigerian CNG Infrastructure in spite of unimaginable challenges.
PROJECT DESCRIPTION
Gas Receiving• This project receives pipeline gas
from the Shell gas node at Eleme Junction Portharcourt. The received gas is passed through a Customer Station(CS) to be filtered and prepared for compression.
PROJECT DESCRIPTION
Gas Compression• The pipeline gas received at a
pressure of up to 70bars is further compressed to 250bars and loaded into gas transport modules(GTM).
CUSTOM ATLAS-COPCO COMPRESSORS AT MOTHER STATION
PROJECT DESCRIPTION
Gas Transport• The gas transport modules then
moves the compressed gas to DUFIL premises at Choba – Pht(~30 Klm) … where there is no pipeline infrastructure.
GTM TRUCKS AT DUFIL DAUGHTER STATION
INSIDE A GTM TANK
PROJECT DESCRIPTION
Gas Consumption• At DUFIL-Choba, the compressed gas
in the GTM is consumed after reducing the pressure to the required consumption pressure(3Bar) --- hence the need to have PRMS(Pressure reducing & metering station) at DUFIL.
• The gas is then fed to Dufil gas generators and Steam Boilers
DAUTHER STATION AT DUFIL CHOBA
JENBACHER GAS GENS
DUFIL-CHOBA BOILERS
PROJECT DESCRIPTION
PROMOTER : • TOTALSUPPORT LTD PRIMARY GAS SUPPLIER : • SHELL NIGERIA GAS
PRIMARY OFF-TAKER : • DUFIL PRIMA FOODS PLC --- INDOMIE –
SECONDARY OFFTAKERS : • SCHLUMBERGER; NDDC; UNIVERSITY OF
PORTHARCOURT; IMI-LTD; GREATER-PH;
PROJECT DESCRIPTION
Operational Experience in Niger Delta• Totalsupport Group is essentially a
child of the Niger-Delta. We are headquartered in Portharcourt.
• Since starting operations with
Schlumberger in 1990, Niger-Delta has remained our primary area of operation and focus.
THANK YOU
• QUESTIONS PLS
APPROACH ZERO-FLARE
•BELOW 5 SLIDES ARE PICTURES OF WHAT
WE MUST NOT ENCOURAGE BY DOING NOTHING
APPROACH ZERO-FLARE
•Nigeria currently ranks #2 in the global
list of “Worst-Emissions-Footprint”
…. Only Siberia-Russia is worse.
NIGERIA EMISSIONS PROFILE : 2009-2012
RUSSIAN EMISSIONS PROFILE : 2009-2012
CDM = CLEAN DEVELOPMENT MECHANISMCNG = COMPRESSED NATURAL GASLNG = LIQUIFIED NATURAL GASGTM = GAS TRANSPORT MODULEAGG = ASSOCIATED GAS
GATHERING
3 of 4
F162007 = Red F141998 = Green F101992 = BlueVectors drawn on gas flares.
AHIA FLOWSTATION(UMUDIOGA) - NPDC
EBOCHA FLOWSTATION - AGIP
WHAT WE WASTE !!• Nigeria flares about 2.1Billion
scf of gas daily. This is equivalent to wasting over 6,500MW of electricity or fueling over 1,000,000 commercial vehicles daily.
• At Flow-Station pricing … this represents an annual wastage of over $1.5Billion.
Some Nox Emissions Effects In Niger-Delta
• Acid rain leading to degraded & disappearing farm/fishery/livestock yields
• Polluted & noxious air leading to dramatic increase in cases of asthma, cancer, skin & respiratory diseases
A BETTER OUTCOME IS POSSIBLE
It Must Be CleanThe Capstone MicroTurbine approaches the
performance of zero-emissions technologies, but at a fraction of the cost...
The Capstone MicroTurbine approaches the performance of zero-emissions technologies, but at
a fraction of the cost...
0
2
4
6
8
10
12
14
16
18
20
g/k
Wh
Natural GasRecip Genset
USA Fossil FuelGeneration
Gas Turbine CapstoneMicroTurbine
Fuel Cell Photovoltaic Wind Turbine
Nitrogen Oxides (NOx)
Source: EPA Report AP-42: Compilation of Air Pollutant Emission Factors Source: EPA Report AP-42: Compilation of Air Pollutant Emission Factors
KYOTO COMPLIANCE
BRAND NEW DIESEL ENGINE
UTILITY TURBINE & SELECT GAS ENGINES
LOW-NOX TURBINE
CAPSTONE TURBINE
FUEL CELLS
PHOTO-VOLTAIC
WIND TURBINE
A BETTER OUTCOME IS POSSIBLE
18-25MW MOBILE POWER
33
SMALL LNG PLANT
ON-SHORE FIELD : IMPLEMENTATION ARCHITECTURE
CRUDE STREAM
PRODUCTS STREAM : PMS/KERO/DIESEL/FUEL-OIL
EXPORT CRUDE STREAM
FUEL-OIL STREAM FOR RE-INJECTION TO EXPORT CRUDE LINE
WET GAS STREAM
FLOW STATION
GAS PROCESS PLANT
LPG/PROPANE STREAM
LEAN GASCNG & LNG
POWER TO COMMUNITY & GRID
MODULAR REFINERY