System Gas turbine package Exhaust gas boiler Gas compressor

2
Keywords S4 FEMS Energy system with a total efficiency exceeding 80% achieved by natural gas or other fuels fired power generation system with heat recovery from exhaust gas Power can be supplied from the cogeneration system even in the grid power black-out situation (emergency power generating facilities) Environmental-friendly system by reducing CO2 emissions Energy saving system by recovering waste heat from exhaust gas with generating power Peak-cut operation can contributes to load leveling Cost saving by avoiding the use of special high-voltage power supply systems from the grid System Flow System Arrangement Electrical room Gas turbine package Exhaust gas boiler Gas compressor Air intake filter Dynamo room Turbine room Turbine Compressor Generator Ventilation Nozzle vapor Exhaust gas Boiler feed pump Waste heat boiler Reheating equipment Reheating equipment Electrical Power Remote monitoring system Electric room This indicates an option. Continuous flow device Pure water storage tank Exhaust sound absorber Simplified deaerating device Process vapor Case vapor Z2/3 oil/natural gas E-09 E25 general-purpose machinery Source:JASE-W Japanese Smart Energy Products & Technologies https://www.jase-w.eccj.or.jp/technologies/index.html

Transcript of System Gas turbine package Exhaust gas boiler Gas compressor

Page 1: System Gas turbine package Exhaust gas boiler Gas compressor

25,000

20,000

15,000

10,000

5,000

00 1,000 2,000 3,000 4,000 5,000 6,000 7,000

2

13

46

5

70x106kJ/h

60x106kJ/h 100x106kJ/h

90x106kJ/h

80x106kJ/h

50x106kJ/h

40x106kJ/h

30x106kJ/h

System installation can achieve energy savings of 5~10%, although the actual level depends on theuser’s operating conditions.

(Person in charge: Aiba)

(Steam injection + additional burning)Area surrounded by (1), (4), (5) and (2) is for a (Steam injection + Additional burning)The increase of power generation in the right side of (2) and (5) area is by Steam injection to Gas turbine.The increase of steam generation in the above (1) and (2) area is by additional burning to Heat recovery boiler

(Steam injection)The area surrounded by (1), (2) and (3) is for a (Steam injection), which is subject to partial load of and steam injection to Gas turbine.

(Additional burning)The area surrounded by (2), (5), (6) and (3) is for a (Additional burning), which is subject to partial load of Gas turbine and additional burning to Heat recovery boiler.

E-09

Tel : +81-3-6404-0842 & Fax +81-3-6404-0849E-mail: [email protected]

URL: http://www.hitachizosen.co.jp

KeywordsS4 FEMS

Energy system with a total efficiency exceeding 80% achieved by natural gas or other fuels fired powergeneration system with heat recovery from exhaust gasPower can be supplied from the cogeneration system even in the grid power black-out situation(emergency power generating facilities)Environmental-friendly system by reducing CO2 emissionsEnergy saving system by recovering waste heat from exhaust gas with generating powerPeak-cut operation can contributes to load levelingCost saving by avoiding the use of special high-voltage power supply systems from the grid

System Flow

SystemArrangement

Electrical room

Gas turbine package

Exhaust gas boiler

Gas compressor

Air intake filter

Dynamo room Turbine room

TurbineCompressorGenerator

Ventilation

Nozzle vapor

Exhaust gas

Boiler feed pumpWaste heat boiler

Reheating equipment

Reheating equipment

Electrical Power

Remote monitoring system

Electric room

This indicates an option.Continuous flow device

Pure water storage tank

Exhaust sound absorber

Simplified deaerating device

Process vapor

Case vapor

Z2/3 oil/natural gasE-09 E25 general-purpose machinery

196

Source:JASE-W Japanese Smart Energy Products & Technologieshttps://www.jase-w.eccj.or.jp/technologies/index.html

Page 2: System Gas turbine package Exhaust gas boiler Gas compressor

25,000

20,000

15,000

10,000

5,000

00 1,000 2,000 3,000 4,000 5,000 6,000 7,000

2

13

46

5

70x106kJ/h

60x106kJ/h 100x106kJ/h

90x106kJ/h

80x106kJ/h

50x106kJ/h

40x106kJ/h

30x106kJ/h

System installation can achieve energy savings of 5~10%, although the actual level depends on theuser’s operating conditions.

(Person in charge: Aiba)

(Steam injection + additional burning)Area surrounded by (1), (4), (5) and (2) is for a (Steam injection + Additional burning)The increase of power generation in the right side of (2) and (5) area is by Steam injection to Gas turbine.The increase of steam generation in the above (1) and (2) area is by additional burning to Heat recovery boiler

(Steam injection)The area surrounded by (1), (2) and (3) is for a (Steam injection), which is subject to partial load of and steam injection to Gas turbine.

(Additional burning)The area surrounded by (2), (5), (6) and (3) is for a (Additional burning), which is subject to partial load of Gas turbine and additional burning to Heat recovery boiler.

E-09

Tel : +81-3-6404-0842 & Fax +81-3-6404-0849E-mail: [email protected]

URL: http://www.hitachizosen.co.jp

KeywordsS4 FEMS

Energy system with a total efficiency exceeding 80% achieved by natural gas or other fuels fired powergeneration system with heat recovery from exhaust gasPower can be supplied from the cogeneration system even in the grid power black-out situation(emergency power generating facilities)Environmental-friendly system by reducing CO2 emissionsEnergy saving system by recovering waste heat from exhaust gas with generating powerPeak-cut operation can contributes to load levelingCost saving by avoiding the use of special high-voltage power supply systems from the grid

System Flow

SystemArrangement

Electrical room

Gas turbine package

Exhaust gas boiler

Gas compressor

Air intake filter

Dynamo room Turbine room

TurbineCompressorGenerator

Ventilation

Nozzle vapor

Exhaust gas

Boiler feed pumpWaste heat boiler

Reheating equipment

Reheating equipment

Electrical Power

Remote monitoring system

Electric room

This indicates an option.Continuous flow device

Pure water storage tank

Exhaust sound absorber

Simplified deaerating device

Process vapor

Case vapor

Z2/3 oil/natural gasE-09 E25 general-purpose machinery

197

Source:JASE-W Japanese Smart Energy Products & Technologieshttps://www.jase-w.eccj.or.jp/technologies/index.html