Managing Construction MNP1163 (Software Construction)

Transcript of MNP1163 (Software Construction). SDLC and Construction Models Construction Planning Construction...

Page 1: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Managing ConstructionMNP1163 (Software Construction)

Page 2: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

This Module

SDLC and Construction Models Construction Planning Construction Measurement

Page 3: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

SDLC and Construction Models

Page 4: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Waterfall

Page 5: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

V-ModelNeed, wish,

policy, law

User Requirements

Systems Requirements

Global Design

Detail Design

Implementation

Component Test Execution

Integration Test Execution

System Test Execution

Acceptance Test Execution

Operational systems

PreparationAcceptance Test

PreparationSystems Test

PreparationIntegration Test

Page 6: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Iterative Life Cycle

Phase 1

Def

ine

Dev

elop

Bui

ld

Test

Impl

emen

tPhase 2

Def

ine

Dev

elop

Bui

ld

Test

Impl

emen

t

Phase 3

Def

ine

Dev

elop

Bui

ld

Test

Impl

emen

t

Page 7: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

What is Construction Planning? Laying out the work plan (i.e.

schedule) to design, implement, debug, and unit test the software

Page 8: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction planning

Construction planning major concerns: Coders are typically not planners Schedules will be difficult to maintain unless a good

architecture design is in place Many organizations to not collect project data on

which to plan future projects Many managers consider planning to be a waste of

time and therefore don’t encourage it Project plans may be limited to the construction

plans Many organizations and projects do not use

systematic cost estimating methods such as models

Page 9: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Consider reducing development costs by planning to: Reduce the size and/or complexity Improve the development process Use more highly skilled people and build

better teams Use better tools Reduce quality thresholds

Page 10: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Some actions include Use an object-oriented approach Use COTS components Use an iterative approach Provide training to development team Automate tedious tasks with tools

Page 11: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

As with building construction, much of the success or failure of the project already determined before construction begins

Upstream activities such as project planning, requirements, architecture, and design are crucial to success

Typical high-risk areas Project planning Requirements Architecture

Preparation is a way to reduce these risks

Page 12: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

The problem being solved via the application must be well defined

Common names for the document containing the problem statement: Product Vision Vision Statement Product Definition

Defines the problem without reference to potential solutions

Helps avoid solving the wrong problem!

Page 13: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Requirements describe in detail what a system is supposed to do, therefore are invaluable for construction

Explicit requirements: Help ensure the user drives system functionality▪ Rather than the programmer

Reduce the number of construction debates Help minimize changes after development begins

Specifying requirements adequately is a key to project success

Page 14: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Quality of the architecture determines the conceptual integrity of the system

A proper architecture: Gives structure to maintain conceptual integrity Provides guidance to programmers Partitions work

Architecture-level problems are much more costly to fix than are coding errors

Good architecture can make construction easy Bad architecture makes construction difficult

Page 15: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Time budgeted for requirements and architecture work 10 to 20 percent of manpower 20 to 30 percent of schedule

If requirements are unstable Do not ignore, spend time to fix The analyst should fix if a formal project Can be fixed by the programmer for informal

projects Use same heuristics for problems with the

architecture

Page 16: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Many software development approaches have been tried over the years

Some examples: Functional Object-Oriented Iterative Waterfall Agile Data-centric

The construction team must follow some approach Chosen approach must be appropriate for the task

at hand

Page 17: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Programming language choices affect Productivity Code quality

Programmers more productive using a familiar language

High-level languages provided higher quality and better productivity

Some languages better at expressing programming concepts than others

The ways in which a programmers express themselves are affected by the chosen language

Page 18: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Questions to answer regarding practices: How detailed will the design be? What are the coding conventions for names,

comments, layout, etc.? How will the architecture be enforced? Is the project’s use of technology ahead of or behind

the power curve, and is this appropriate given the circumstances?

What is the integration procedure, how often is it done, and who participates?

Will developers program individually, in pairs, or some combination of this?

Where and when will builds occur?

Page 19: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

Modern programming tools Are essential to maintain programmer productivity Reduce tedious and redundant tasks Must be appropriate for the task at hand

Tools preparation checklist: Are all product licenses current? Are all products at current, supported revision level? Have all programmers received proper training on the

tools? Does the project have a configuration management tool? Does the project have a tool to track change requests? Do project team members have sufficient workstations? Does the project have sufficient test environments? Does the project have sufficient build environments?

Page 20: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

Construction Planning

For small development efforts Self managed Everyone is a peer

For mid-size development efforts Single team

For large development efforts Multiple teams

Page 21: MNP1163 (Software Construction).  SDLC and Construction Models  Construction Planning  Construction Measurement.

References

[IE04] IEEE Computer Society, Guide to the Software Engineering Body of Knowledge (SWEBOK), IEEE Computer Society Press, Los Alamitos, CA 20001, June 2004

[RS04] IBM Rational Software, The Rational Unified Process v2003.06.13, 2004

[RT03] [SM04] S. McConnell, Code Complete: A Practical

Handbook of Software Construction, Second Edition, Microsoft Press, 2004.

[WR01] Walker Royce, Software Project Management, A Unified Framework, Addison-Wesley, Boston, MA, 2001