MINISTRY OF ELECTRICITY IRAQ HIGH TENSION PROJECTS 132/33/11/6.6 KV AIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007

Transcript of MINISTRY OF ELECTRICITY - Camera di Commercio...

Page 1: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

MINISTRY OF ELECTRICITY

IRAQ HIGH TENSION PROJECTS 132/33/11/6.6 KV AIS SUBSTATIONS VOLUME 3 TECHNICAL SCHEDULES JANUARY 2007

Page 2: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

LIST OF REVISIONS

Current Rev.

Date Page affected

Prepared by

Checked by (technical)

Checked by (quality

assurance)

Approved by

1 2 3 4 5

22.12.04 18.03.05 Aug 05 Oct 05 Jan 07

ALL ALL ALL ALL

JK/MH JK/MH JK/MH MH/JK MH/JK

JK/MH JK/MH JK/MH

JW JW

JW JW JW JW JW

JW JW JW JW JW

REVISION HISTORY

3 Aug 05 ALL Updated with MOE comments and general alignment across volumes.

4 Oct 05 ALL Specification split into GIS and AIS versions. Capacitor specification rationalised. Impulse withstand and Power frequency withstand values reviewed in accordance with IEC 60694. Details for 11kV (Tertiary) shunt reactors added.

5 Jan 07 ALL General review

Page 3: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

CONTENT SHEET

VOLUME 1 TECHNICAL SPECIFICATION – PLANT VOLUME 2 TECHNICAL SPECIFICATION & SCHEDULES – CIVIL WORKS VOLUME 3 TECHNICAL SCHEDULES – PLANT

Page 4: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

CONTENTS

Page No.

SCHEDULE A - MILESTONES FOR THE PURPOSE OF PAYMENT AND HANDOVER TO THE CLIENT ............................................................ A.1

SCHEDULE B - TIME PERIODS FOR PROCUREMENT, DESIGN, MANUFACTURE, INSPECTION, TESTING, DELIVERY, INSTALLATION, COMMISSIONING AND HANDOVER................................................. B.1

SCHEDULE C - MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION ..............................................................................C.1

SCHEDULE C1 – 132KV AIS OUTDOOR SWITCHGEAR ..............................................C.1

SCHEDULE C2 – 33 KV METALCLAD SWITCHGEAR...................................................C.2

SCHEDULE C3 – 11 KV OR 6.6 KV METALCLAD SWITCHGEAR.................................C.2

SCHEDULE C4 - TRANSFORMERS AND AUXILIARY PLANT......................................C.3

SCHEDULE C5 – LV SERVICES EQUIPMENT...............................................................C.3

SCHEDULE C6 - CABLES ..............................................................................................C.4

SCHEDULE C7 - SUBSTATION CONTROL AND PROTECTION SYSTEMS................C.4

SCHEDULE D – TECHNICAL PARTICULARS ............................................................D1.1

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR .......................................D1.1

SCHEDULE D2 – METALCLAD SWITCHGEAR............................................................D2.1

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS..........D3.1

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS .....................................D4.1

SCHEDULE D5 – POWER FACTOR CORRECTION CAPACITORS............................D5.1

SCHEDULE D6 – LVAC SWITCHGEAR........................................................................D6.1

SCHEDULE D7– DC SYSTEM......................................................................................D7.1

SCHEDULE D8- 220 V AC UNINTERRUPTIBLE POWER SUPPLY...........................D.81

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES .................................................D9.1

SCHEDULE D10 - LV CABLES .....................................................................................D10.1

SCHEDULE D11 - PROTECTION SYSTEM .................................................................D11.1

Page 5: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM ...............................................D12.1

SCEHDULE D13 - CONTROL, OPERATION, INDICATION AND ALARM CIRCUITS .D13.1

SCHEDULE D14 – CAPACITORS .................................................................................D14.1

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS.............................................. E.1

SCHEDULE E1 – DRAWINGS ISSUED WITH THE TENDER ........................................ E.1

SCHEDULE E2 - DRAWINGS REQUIRED WITH TENDER........................................... E.3

SCHEDULE E3 - REQUIREMENTS FOR CONTRACT DRAWINGS ............................. E.3

SCHEDULE E4 - CONTRACTOR’S SUBMITTALS - DRAWING AND DESIGN DATA.. E.6

SCHEDULE E5 - INSTALLATION AND MAINTENANCE INSTRUCTIONS ................... E.8

SCHEDULE E6 - FINAL RECORDS ............................................................................... E.8

SCHEDULE F - DEVIATIONS FROM THE TECHNICAL SPECIFICATION ................. F.1

SCHEDULE G – QUANTITIES AND PRICES ................................................................G.1

SCHEDULE J1 - RECOMMENDED SPARES ...............................................................J1.1

SCHEDULE J2 - SPECIAL TOOLS, TEST EQUIPMENT..............................................J2.1

SCHEDULE J3 - TRANSFORMERS AND REACTORS QUANTITIES AND PRICES FOR SPARE PARTS..........................................................................J3.1

SCHEDULE K - BUILDING SERVICES ........................................................................ K.1

SCHEDULE L - HEATING, VENTILATION AND AIR CONDITIONING.........................L.1

Page 6: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE A

MILESTONES FOR THE PURPOSE OF PAYMENT AND HANDOVER TO THE CLIENT

Page 7: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

A.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE A - MILESTONES FOR THE PURPOSE OF PAYMENT AND HANDOVER TO THE CLIENT

(Information to be provided with Tender) The Tenderer is to indicate all milestones identified within the programme for the works as defined in this Project Specification. The milestones should align with those included in the priced (fixed sum) activity schedule.

Item No

Description Section

Page 8: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE B

TIME PERIODS FOR PROCUREMENT, DESIGN, MANUFACTURE, INSPECTION, TESTING, DELIVERY, INSTALLATION, COMMISSIONING AND HANDOVER

Page 9: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

B.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE B - TIME PERIODS FOR PROCUREMENT, DESIGN, MANUFACTURE, INSPECTION, TESTING, DELIVERY, INSTALLATION, COMMISSIONING AND

HANDOVER

(Information to be provided with Tender. All time periods are weeks from date of Notice to Proceed)

Description

Time within which: 1 All arrangement and equipment drawings shall be

submitted for approval

2 All schemes and functional drawings shall be submitted for approval

3 All wiring and cable diagrams / schedules shall be submitted

4 Plant shall be available for final inspection / test in manufacturer’s works

5 Plant shall be delivered to site

6 Plant shall be installed

7 Overall works are commissioned

8 Overall works are handed over to client

Page 10: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE C

MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION

Page 11: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

C.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE C - MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION

(Information to be supplied with Tender)

SCHEDULE C1 – 132KV AIS OUTDOOR SWITCHGEAR

Item

Manufacturer

Place of manufacture

Place of testingand inspection

132kV AIS Circuit breakers

132kV AIS Current transformers

132kV AIS Voltage transformers

132kV AIS Surge arresters

132kV AIS Disconnector/earth switches

Steel Structures

Conductor

Support insulators

Connectors

Page 12: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

C.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE C - MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION – CONT

SCHEDULE C2 – 33 KV METALCLAD SWITCHGEAR

Item

Manufacturer

Place of manufacture

Place of testingand inspection

Metalclad enclosures

Circuit breakers

Circuit breaker operating mechanisms

Interrupters

Current transformers

Voltage transformers

Earthing switches

Low voltage equipment

Any deviation from this Schedule shall be notified as soon as possible for the Engineer's approval.

SCHEDULE C3 – 11 KV OR 6.6 KV METALCLAD SWITCHGEAR

Item

Manufacturer

Place of manufacture

Place of testingand inspection

Metalclad enclosures

Circuit breakers

Circuit breaker operating mechanisms

Interrupters

Current transformers

Voltage transformers

Earthing switches

Low voltage equipment

Any deviation from this Schedule shall be notified as soon as possible for the Engineer's approval.

Page 13: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

C.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE C - MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION – CONT

SCHEDULE C4 - TRANSFORMERS AND AUXILIARY PLANT

Item No

Description

Manufacturer

Place of manufacture

Place of testing and inspection

1 132/33/11/6.6 kV Transformer

2 Transformer Tap Changer

3 Earthing/Auxiliary Transformer

4 Neutral Earth Resistor

5 Power factor compensating Capacitors

SCHEDULE C5 – LV SERVICES EQUIPMENT

Item

Manufacturer

Place of manufacture

Place of testingand inspection

LVAC Equipment

Batteries

Charging equipment

UPS Equipment

Any deviation from this Schedule shall be notified as soon as possible for the Engineer's approval.

Page 14: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

C.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE C - MANUFACTURERS AND PLACES OF MANUFACTURE, TESTING AND INSPECTION – CONT

SCHEDULE C6 - CABLES

Item

Manufacturer

Place of manufacture

Place of testingand inspection

132kV power cable

33kV power cable

11 or 6.6 kV power cable

LV multicore / multipair cable

Cable glands

Cable trays

Cable ladder racks

Any deviation from this Schedule shall be notified as soon as possible for the Engineer's approval.

SCHEDULE C7 - SUBSTATION CONTROL AND PROTECTION SYSTEMS

Item

Manufacturer

Place of manufacture

Place of testingand inspection

SCS Substation Computer

SCS Operator Workstations / HMI

Operator Desk and Chair

SCS Colour Visual Display Units

SCS Substation LAN

SCS Printers

SCS Bay Control Unit BCU

SCS I/O Cards for BCU

SCS Software Engineering

SCS Database Engineering

Protection Relays

Any deviation from this Schedule shall be notified as soon as possible for the Engineer's approval.

Page 15: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D

TECHNICAL PARTICULARS

Page 16: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR

Unit Data Required Offered 1 GENERAL

1.1 Standards

IEC IEC 62271-100, 62271-102, 60694,

60233, 60044, 60186, 60383,

60815

1.2 Rated voltage

kV 145

1.3 System Voltage

kV 132

1.4 Rated frequency

Hz 50

1.5 Rated lightning impulse withstand voltage

Phase to earth KVp 650 Across the isolating distance kVp 750 1.6 Rated power frequency withstand voltage Phase to earth kV 275 Across the isolating distance kV 315 1.7 Rated short-time withstand current (1 s)

kA 40

1.8 Rated peak withstand current

kA 100

1.9 Rated Current at 50 oC – (Contractor to confirm by calculation)

- Busbars - Circuits

A A

2000 1250

1.10 Material of HV conductor

Aluminium

1.11 Material of contacts

Bi-metallic

1.12 Minimum factors of safety for switchgear

Busbars or other connections based on elastic limit

2.5

Complete insulators based on electro-mechanical test

2.5

Insulator metal fittings based on elastic limit 2.5

Steel structures based on elastic limit of tension members and on crippling loads of compression members

2.5

Foundations for structures against overturning or uprooting under maximum simultaneous working loadings

2.5

Page 17: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 1.13 Creepage distance (based on Um)

mm/kV 31

1.14 Seismic factor

N/A

2 CIRCUIT BREAKER

2.1 Type designation

2.2 Type

SF6

2.3 Standards

IEC 62271-100, 61233, 60694, 60427, 60376,

60480

2.4 Rated operating sequence

O -0.3 sec- CO -3 min – CO

2. 5 Auto reclosing

O -0.3 sec- CO -3 min – CO

2.6 Rated making current

KAp 62.5

2.7 Rated breaking current kA 40 Rated breaking current (asymmetrical)

KA To IEC 62271-100

%dc

%dc

2..8 Rated breaking current under out-of-phase conditions

kA 10

2.9 First phase to clear factor

1.3

2.10 Transient Recovery Voltages

TRVs To IEC 62271-100

2.11 Rated capacitive breaking current To IEC 62271-100 Rated line charging breaking current A 125 Rated cable charging breaking current A 250 Rated Single/Back to Back Capacitor bank

breaking current A 400

2.12 Rated small inductive/reactor breaking

currents of:

To IEC 62771-110

small inductive A 10, 20, 50 and 100 reactor A 306 2.13 Maximum overvoltage factor on any switching

duty pu 2.5

Page 18: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 2.14 Maximum overvoltage factor when

interrupting rated line/cable/capacitor bank charging currents

pu 2.5

2.15 Maximum overvoltage factor when switching small inductive/reactor currents

pu 2.5

2.16 Maximum total break time (trip initiation to final arc extinction)

ms 60

2.17 Opening time (trip initiation to contact separation)

Without current ms With 100% rated breaking current ms 2.18 Maximum time interval between opening of

first and last phase of three phase circuit breakers

ms 3

2.19 Maximum time interval between opening of interrupters of one phase

- - -

2.20 Closing time from energisation of close coil to latching of circuit breaker in fully closed position

ms

2.21 Making time (energisation of close coil to contact touch)

Without current ms 100% making current ms 2.22 Maximum time interval between closure of

first and last phase of three phase circuit breaker

ms 3

2.23 Maximum time interval between closure of interrupters of one phase

- - -

2.24 Minimum time from extinction of main arc to contact make during auto-reclosing duty

ms N/A.

2.25 Mechanical life of circuit breaker and mechanism in No. of operations

10,000

2.26 Electrical contact life in number of operations at:

Page 19: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered Rated current –1250 A/2000 A Fault current - 40 kA 15 to 20 Cumulative ampere rating

2.27 Number of current interrupting break units in series per phase

One

2.28 Type of operating mechanism

Motor charged spring operated

2.29 Type of power device (motor charged)

For closing Spring or hydraulic For opening

Spring or hydraulic

2.30 Hand operating facility

Yes

2.31 Manual spring release

Yes

2.32 Mechanical on/off indicator

Yes

2.33 Mechanical spring charge / discharge indication

Yes

2.34 Charging time

s

2.35 Number of trip coils

2

2.36 Number of close coils

1

2.37 Nominal control and operating voltage

V 110 DC

2.38 Nominal heater voltage

V 220 AC

2.39 Rated power of trip coil

W

2.40 Rated power of close coil

W

2.41 Rated motor power

W

2.42 Total load of heaters for circuit breaker

W

2.43 Mass of circuit breaker complete (three pole)

kg

2.44 Mass of single phase circuit breaker

- - -

2.45 Emergency Trip Facility Yes

Page 20: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS – CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT Unit Data Required Offered 3 DISCONNECTORS

3.1 Type designation

3.2 Type of operating mechanism

Motor

3.3 Standards

IEC 62271-102, IEC 60694, 61128,

60265

3.4 Maximum capacitive current that can be interrupted by the isolator

A

3.5 Total time from initiation of opening operation to isolator in fully open position

s

3.6 Time from contact separation to extinct of capacitive arc

s

3.7 Total time from initiation of opening operation to time when isolator gap can withstand phase voltage

s

3.8 Hand operating facility

Yes

3.9 Locking arrangement in on/off position

Yes

3.10 Nominal control and operating voltage

V 110 DC

3.11 Automatic isolation of control supplies when lock off

Yes

3.12 Accessibility to operating mechanism from ground level

Yes

3.13 Nominal heater voltage

V 220 AC

3.14 Rated power of operation coil

W

3.15 Rated motor power

W

3.16 Total load of heaters for isolator

W

3.17 Total mass of three phase isolator complete

kg

3.18 Mass of single phase isolator

kg

3.19 Contact type

3.20 Type of interlocking

Page 21: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS – CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT Unit Data Required Offered 4 EARTHING SWITCH

4.1 Type designation

4.2 Type of operating mechanism

Hand

4.3 Standards

IEC 62271-102, 60694

4.4 Hand operating facility

Yes

4.5 Locking arrangement in on/off position

Yes

4.6 Nominal control and operating voltage

V 110 DC

4.7 Automatic isolation of control supplies when lock off

Yes

4.8 Accessibility to operating mechanism from ground level

Yes

4.9 Nominal heater voltage

V 220 AC

4.10 Total load of heaters for earthing switch

W

4.11 Total mass of earthing switch complete

kg

5 CURRENT TRANSFORMER

5.1 Type

Post

5.2 Standards

IEC 60694, 60044-1

5.3 Rated continuous thermal current at 50oC

Rated extended primary current

Note: All Cl PX CTs shall be ISN 1.2 A 5.4 Cable feeder bays current transformer

To suit specific

requirements

Number of cores Rated extended primary current Ratio (TR – turns ratio) I core A II core A III core A IV core A

Page 22: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS – CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT Unit Data Required Offered Class I core II core III core IV core

Knee point voltage (Ek) I core V II core V III core V IV core

V

Exciting current (IE) at Ek I core mA II core mA III core mA IV core

mA

Rated output (burden to be 25-100% rated burden)

I core VA II core VA III core VA IV core

VA

Total mass of single phase current transformer complete

kg

5.5 Bus coupler and bus section bays current transformer

To suit specific arrangement

Number of cores 120% 6 CAPACITIVE VOLTAGE TRANSFORMERS

6.1 Type

Capacitive

6.2 Standards

IEC 60186, IEC/PAS 60044-

5:2002

6.3 Maximum permissible partial discharge level Um

pC 10

6.4 Maximum permissible partial discharge level 1.2Um /√3

pC 5

6.5 Method of suppressing ferroresonance phenomena

Page 23: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 6.6 Line voltage transformer

6.7 Number of secondaries

2

Rated transformation ratio kV 132/√3 / 0.11/√3 /0.11/√3

Rated accuracy class I secondary 3P/1.0 II secondary

3P

Rated output (burden to be 25-100% rated burden)

I secondary VA II secondary

VA

Mass of single phase voltage transformer kg 7 SURGE ARRESTERS

7.1 Type

7.2 Standard IEC 60099-4, 60099-1 60099-5,

60694

7.3 Rated/system voltage

kV

7.4 - Maximum overvoltage factor on the system due to any switching duty

pu 2.5

7.5 Rated system frequency

Hz 50

7.6 Condition of system neutral

Solid

7.7 Nominal Discharge current

KA crest

7.8 Energy capability as per IEC 60099-4 KJ/kV

7.9 Rated voltage - MOA

kV

7.10 Long duration discharge class as per IEC 60099-4

Class

7.11 Maximum Continuous Operating Voltage (COV)

kV

Page 24: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS – CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT Unit Data Required Offered 7.12 TOV capability for

1 sec kV 10 sec kV 7.13 - Maximum residual voltage with current

wave

7.14 Switching Surges - 1kA / 2kA kV 8/20 μs - 5kA kV 8/20 μs - 10kA kV 7.15 Discharge current withstand strength KAp High current (4/10 μs) Ap Low current 2000A

7.16 Pressure relief capability kA High current (0.2 s) Low current

KA/sec As per IEC

7.17 Rating of earth connections

40/1

7.18 Surge counter provided

Yes

8 BUSBARS AND CONNECTIONS

8.1 Type (flexible or tubular)

8.2 Material

8.3 Short-circuit current rating / duration

KA/s

8.4 Rated current at 50oC (Contractor to confirm by calculation) - Busbar - Circuit

A A

2000 1250

8.5 Maximum continuous current rating

A

8.6 Flexible conductors stranding nominal cross-sectional area outer diameter no. of conductors per bundle spacing between conductors

mm2

mm

mm

8.7 Tubular conductors nominal cross-sectional area outer diameter inner diameter

mm2

mm

mm

Page 25: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 8.8 Maximum stress at surface of flexible

conductor

kV/mm

8.9 Radio influence voltage level measured at 1.1 times Us/√3 at 1 MHz

µV

9 POST TYPE INSULATORS

9.1 Type designation

9.2 Insulator material

9.3 Number of units in complete post insulator

9.4 Length of each unit

mm

9.5 Mass of complete post insulator

kg

9.6 Maximum cantilever working load (complete post insulator)

N

9.7 Minimum cantilever breaking load, upright (complete post insulator)

N

9.8 Power frequency withstand voltage dry: wet

kV

9.9 Basic insulation level

kVp

910 Minimum dry/wet switching surge withstand level

kVp

911 Radio influence voltage level measured at 1.1 times Us/√3 at 1 MHz

µv

10 TENSION AND SUSPENSION INSULATORS

10.1 Type designation

10.2 Insulator material

10.3 Number of units in string

mm

10.4 Greatest diameter of units

mm

10.5 Distance between centres of units

mm

Page 26: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 10.6 Length of string, overall

mm

10.7 Mass of string complete with all fittings

kg

10.8 Maximum working load

N

10.9 Power frequency withstand voltage of complete string

kV

10.10 Basic insulation level of complete string

kVp

10.11 Minimum wet switching surge withstand level of complete string

kVp

10.12 Radio influence voltage measured at 1.1 times Us/√3 at 1 MHz

µv

11 132KV LINE TRAPS

11.1 Maker's type and designation

11.2 Main coil insulation - class

11.3 Rated continuous current

A

11.4 Rated short time current (1 second/3 seconds) kA

11.5 Inductance at 50 Hz

mH

11.6 Insulating level across line traps at:

11.6.1 Power frequency

11.6.2 Impulse

11.7 Rated voltage level of protective device

kV

11.8 Centre frequency

kHz

11.9 Bank width of blocking range

kHz

11.10 Self resonant frequency

kHz

11.11 Tapping loss

db

Page 27: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D1.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D1 – 132 KV OPEN TERMINAL SWITCHGEAR - CONT

Unit Data Required Offered 11.12 Blocking impedance

Ω

11.13 Total mass

kg

Page 28: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 1 GENERAL

6.6kV data shown in

(brackets) 1.1 Manufacturer & Place of

Manufacturing

1.2 Type designation

1.3 Type of Switchgear

Metal clad –indoor

switchgear with fixed Vacuum Circuit Breaker

Metal clad - air insulated, indoor switchgear with Vacuum Circuit

Breaker

1.4 Standards

IEC 62271-200, 62271-100,

61233, 60694, 60529

IEC 62271-200, 62271-100,

61233, 60694, 60529

1.5 Number of years equipment of identical design has been in service

Years 3 3

1.6 Rated voltage

kV 36 12 (7.2)

1.7 Rated current at 50oC (Contractor to confirm by calculation) - Busbar and Bus Section - Transformer - Feeder

A A A

33kV

1600 1600 800

11kV

2000 2000 800

1.8 Rated frequency

Hz 50 50

1.9 Rated lightning impulse withstand voltage

Phase to earth kV 170 75 (60)

Across the isolating distance kV 195 85 (70)

1.10 Rated power frequency withstand voltage

Phase to earth kV 70 28 (20)

Page 29: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered Across the isolating distance kV 80 32

(23)

1.11 Partial discharge test voltage

IEC 60270 IEC 60270

1.12 Rated short-time withstand current (1 s)

kA 31.5 40 (50)

1.13 Rated peak withstand current

kA To IEC 62271-100

To IEC 62271-100

1.14 Type of busbars

Single Single

1.15 Method of earthing Busbars side Line side 1.16 Minimum subdivision of

cubicles at compartments

Busbar/ Circuit Breaker/ Cable/ CTs/VTs/Relay compartment.

Busbar/ CTs/ Circuit Breaker/

Cable/ VTs/Relay

compartment.

1.17 Are busbars segregated Between phases Yes Yes Between cubicles Yes Yes 1.18 Material of cover

Metallic Metallic

1.19 Material of partitions

Metallic Metallic

1.20 Material of shutters

Metallic/Earthed Metallic/Earthed

1.21 Busbars and joints fully encapsulated / shielded

Yes

1.22 Busbar and feeder shutters lockable with individual manual and automatic features

NA Yes

1.23 Protection class

General IP41 IP41 Busbars, cable compartment,

internal partitions IP3XD IP3XD

Circuit breaker compartment Door closed Door open

IP41 IPXX

IP41 IPXX

Page 30: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered LV compartment IP41 IP41 Shutters and spouts

Pressure relief device/flaps

IP4X IP5X

IP4X IP 5X

1.24 The way of securing (opening/closing of doors)

Hinged doors Hinged doors

1.25 Material of HV conductor

Copper Copper

1.26 Material of contacts

Silver-plated copper

Silver-plated copper

1.27 Type of pressure relief device

1.28 Method of personnel protection in case of operation of pressure relief device

1.29 Total mass of switchgear (average per bay)

kg

1.30 Minimum factors of safety for switchgear (minimum 2.5)

Busbars or other connection based on elastic limit

2.5 2.5

Complete insulators based on electro-mechanical test

2.5 2.5

Insulator metal fittings based on elastic limit

2.5 2.5

Steel structures based on elastic limit of tension members and on crippling loads of compression members

2.5 2.5

Foundations for structures against overturning or uprooting under maximum simultaneous working loading

2.5 2.5

Page 31: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 1.31 Manufacturer quality

assurance according to ISO 9000, 9001, 9002, 9003 and 9004

Yes Yes

1.32.

Type test certificate to be issued by Independent laboratory or independently witnessed type test certificate available

Yes Yes

1.33 Emergency manual trip facility (during failure of DC supply)

Yes Yes

2.

CIRCUIT BREAKER

2.1 Manufacturer & Place of manufacturing

2.2 Type designation

2.3 Type

Vacuum, Fixed mounted,

withdrawable

Vacuum, Truck mounted,

withdrawable

2.4 Fully encapsulated

NA Yes

2.5 Standards

IEC 62271-200, 62271-100,

61233, 60694

IEC 62271-200, 62271-100,

61233, 60694

2.6 Rated voltage

kV 36 12 (7.2)

2.7 Rated current at 50oC (Contractor to confirm by calculation) - Busbar and Bus Section - Transformer - Feeder

A A A

1600 1600 800

2000 2000 800

2.8 Rated frequency

Hz 50 50

2.9 Rated lightning impulse withstand voltage

Phase to earth KVp 170 75 (60)

Across the isolating distance

kVp 195 85 (70)

Page 32: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2– METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 2.10 Rated power frequency

withstand voltage

Phase to earth

kV 70 28 (20)

Across the isolating distance kV 80 32 (23)

2.11 Rated short-time withstand current (1 s)

kA 31.5 40 (50)

2.12 Rated peak withstand current

kAp To IEC 62271-100

To IEC 62271-100

2.13 Rated operating sequence

O-0.3 sec - - CO - 3 min -

CO

O-0.3 sec - - CO - 3 min -

CO

2.14 Rated making current

kA To IEC 62271-100

To IEC 62271-100

2.15 Rated breaking current (symmetrical)

kA 31.5 40 (50)

2.16 Rated breaking current (asymmetrical)

kA To IEC 62271-100

To IEC 62271-100

2.17 Rated breaking current under out of phase conditions

kA To IEC 62271-100

To IEC 62271-100

2.18 First pole to clear factor

1.5 1.5

2.19 Transient Recovery Voltages

To IEC 62271-100

To IEC 62271-100

2.20 Rated capacitive breaking current Rated line charging breaking current Rated cable charging breaking current Rated single / Back to back capacitor bank breaking current

A A A

To IEC 62271-100 10 50

400

To IEC 62271-100 10 25 NA

2.21 Rated small inductive breaking current of unloaded transformer

A

To IEC 62771-110 NA

To IEC 62771-110 NA

Page 33: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 2.22 Maximum overvoltage factor

on any switching duty

pu <2.5 <2.5

2.23 If the Overvoltage factor above, is in excess of 2.5 pu, then detail steps taken to protect the system from overstressing, by the use of suitable Metal-Oxide surge arresters

MOAs MOAs

2.24 Maximum peak value of switching overvoltage when interrupting capacitive currents

kV

2.25 Maximum peak value of switching over-voltage when interrupting low inductive and reactor currents

kV

2.26 Maximum total break time (trip initiation to final arc extinction)

ms 60 60

2.27 Opening time (trip initiation to contact separation)

Without current

ms

With 100% rated breaking current

ms

2.28 Maximum time interval

between opening of first and last phase of three phase circuit breakers

ms

3

3

2.29 Closing time from energisation of close coil to latching of circuit breaker in fully closed position

ms

2.30 Making time (energisation of close coil to contact touch)

Without current

ms

With 100% rated current ms

Page 34: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 2.31 Maximum time interval

between closure of first and last phase of three phase circuit breaker

ms 3 3

2.32 Mechanical life of CB and Mechanism in number of operations

min 10000 10000

2.33 Electrical contact life at rated current in No. of operations

2.34 Electrical contact life at 100% fault current in No. of operations

10 10

2.35 Internal arcing tests in the switchgear enclosure to IEC 60298 – Annex AA

Adjacent compartments

are not affected

Adjacent compartments

are not affected

2.36 Mechanical means for withdrawal

NA Yes

2.37 Type of operating mechanism

3 pole 3 pole

2.38 Manual spring discharge facility

Yes Yes

2.39 Interlock facilities complying with requirements of specification

Yes Yes

2.40 Type of power device

For closing Motor-Spring Motor-Spring For opening Spring Spring 2.41 Hand charging facility

Yes Yes

2.42 Charging time

s

2.43 Number of trip coils

1 1

2.44 Number of close coils

1 1

2.45 Nominal control and operating voltage

V 110 DC 110 DC

Page 35: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 2.46 Nominal heater voltage

V 220 220

2.47 Rated power of trip coil

W

2.48 Rated power of close coil

W

2.49 Rated motor power

W

2.50 Does earthing of truck remain effective until fully withdrawn

NA Yes

2.51 Total load of heaters for circuit breaker

W

2.52 Mass of circuit breaker complete (three pole set)

kg

2.53 Partial discharge test voltage

kV IEC 60270 IEC 60270

2.54 Manufacturer quality assurance according to ISO 9000, 9001, 9002, 9003 and 9004

Yes Yes

2.55 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

Yes Yes

3 BUSBARS

3.1 Rated current at 50oC (Contractor to confirm by calculation) - Busbar and Bus Section - Transformer - Feeder

A A A

1600 1600 800

2000 2000 800

3.2 Maximum temperature rise

oC

3.3 Cross Section

mm2

3.4 Material of barriers between units

3.5 Insulation of Busbars:

Material Maximum working

temperature oC

Page 36: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2– METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 3.6 Type test certificate to be

issued by independent laboratory or independently witnessed type test certificate available

Yes

Yes

4 EARTHING SWITCH

4.1 Manufacturer & Place of Manufacturing

at busbar side at line side 4.2 Type designation

at busbar side at line side 4.3 Type of operating mechanism

Manual Manual

4.4 Standards

IEC 62271-102

IEC 62271-102

4.5 Rated voltage

kV 36 12 (7.2)

4.6 Rated frequency

Hz 50 50

4.7 Rated lightning impulse withstand voltage phase to earth

kV 170 75 (60)

4.8 Rated power frequency withstand voltage phase to earth

kV 70 28 (20)

4.9 Rated short time (1 s) current

kA 31.5 40 (50)

4.10 Peak Current

kAp IEC 62271-102

IEC 62271-102

4.11 Total mass of three phase complete earthing switch

at busbar side kg at line side

kg

Page 37: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 4.12 Type of contacts

Moving Copper Copper Fixed Copper Copper 4.13 Moving contacts are directly

connected to earthing system via copper connectors

Yes

Yes

4.14 Continuous running earth bar has been provided

Yes Yes

5 CURRENT TRANSFORMER

5.1 Manufacturer & Place of manufacturing

5.2 Type

Cast-resin multi-core, multi-ratio

indoor

Cast-resin multi-core, multi-ratio

indoor

5.3 Type of primary winding (e.g. bar, wound, etc.)

5.4 Standards

IEC 60044-1 IEC 60044-1

5.5 Rated voltage

kV 36 12 (7.2)

5.6 Rated lightning impulse withstand voltage phase to earth

kV 170 75 (60)

5.7 Rated power frequency withstand voltage phase to earth

kV 70 28 (20)

5.8 Partial discharge test voltage

kV IEC 60270 IEC 60270

5.9 Rated frequency

Hz 50 50

5.10 Rated continuous thermal current

Rated extended primary current

Rated extended primary current

Page 38: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 5.11 Rated short-time withstand

current (1s) kA 31.5 40

(50)

5.12 Rated dynamic current

kA IEC 62271-102 IEC 62271-102

5.13 Are earthed metal screens fitted between primary and secondary windings

5.14 Transformer incomer bays current transformer

Type designation

NA

Number of cores

3 NA

Rated extended primary current in percentage of rated primary current

NA

Ratio I core A II core A III core A Class I core II core III core Rated burden

I core VA II core VA III core

VA

Total mass of three phase current transformer complete

kg

5.15 Auxiliary Transformer feeder

bays current transformer

Location of current transformer (33, 11 or 6.6 kV ) depends on main transformer type

- Type designation - Number of cores - Rated extended primary

current in percentage of rated primary current

Page 39: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered - Ratio I core A II core

A

- Class

I core II core - Rated burden I core VA II core VA Total mass of three phase

current transformer complete

kg

5.16 Bus section bay current transformer

To suit

Type designation Number of cores

Rated extended primary current in percentage of rated primary current

Ratio I core

A

II core A Class

I core

II core Rated burden

I core

VA

II core VA Total mass of three phase

current transformer complete kg NA

5.17 Feeder bay current transformer (630A)

Type designation Number of cores

Page 40: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.13 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered Type designation Number of cores Rated extended primary

current in percentage of rated primary current

Ratio I core A II core A Class I core II core - Rated burden I core VA II core VA Type designation Number of cores Rated extended primary

current in percentage of rated primary current

Ratio I core A II core A Class I core II core - Rated burden I core VA II core VA - Total mass of three phase

current transformer complete

kg

5.19 Auxiliary Earthing Transformer

neutral point current transformer (800A)

Location of current transformer (33, 11 or 6.6 kV) depends on main transformer type

- Type designation - Number of cores

Page 41: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.14 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered - Rated extended primary

current in percentage of rated primary current

- Ratio I core A II core A - Class I core II core - Rated burden I core VA II core VA - Total mass of three phase

current transformer complete

kg

6 VOLTAGE TRANSFORMERS

(3-Phase sets to be provided)

6.1 Manufacturer & Place of manufacturing

6.2 Type designation for Line transformer Busbar transformer Power transformer bay 6.3 Type

Inductive

cast - resin single pole insulated

Inductive cast - resin single pole insulated

6.4 Standards

IEC 60044-2

IEC 60044-2

6.5 Rated voltage

kV 36 12 (7.2)

6.6 Rated frequency

Hz 50 50

6.7 Rated lightning impulse phase to earth

kV 170 75 (60)

Page 42: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D2.15 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D2 – METALCLAD SWITCHGEAR - cont

UNIT 33kV switchgear 11 or 6.6 kV switchgear Required Offered Required Offered 6.8 Rated power frequency

withstand voltage phase to earth

kV 70 28 (20)

6.9 Partial discharge test voltage

kV IEC 60270 IEC 60270

6.10 Type of primary isolation

Disconnector

Drawout

6.11 Line voltage transformer & Busbar Voltage Transformer

Number of secondaries

1 1

Rated transformation ratio kV 33/√3 / 0.11/√3

11/√3 / 0.11/√3 / 0.11/3

(6.6/√3 / 0.11/√3 / 0.11/3)

Rated accuracy class

3P/1.0 3P/1.0

Rated output

VA

Total mass of three phase voltage transformer complete

kg

7 Manufacturer quality system in

accordance with ISO 9000, 9001, 9002, 9003 and 9004

Yes Yes

8 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available.

Yes

Yes

Page 43: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS

MOE have standardised on a 63/50/25 MVA, 132/33/11.5 kV (3 winding) transformer and also use a range of 132/6.6 kV (2 winding) double wound transformers and other types may be specified:

Unit Data Required Offered

Power Transformer

6.6kV data shown in (brackets)

1 Rated power with ONAF cooling at site conditions

MVA 63/50/25 (6.6kV to suit)

2 Rated power with ONAN cooling at site conditions

MVA 44.1/35/17.5 (6.6ktV to suit)

3 Type designation

Double wound

4 Three-winding three phase, oil immersed, core type

Yes

5 Standards

IEC 60076-1, -2, -3, -5,-8 -10, 60214

NEMA TR1

6 Mounting

Outdoor,

7 Rated voltage ratio

kV 132/33/11.5 (132/6.6)

8 Rated frequency

Hz 50

9 Alternative 1: - Vector group

Ynd1yno

10 Alternative 2: - Vector group

Ynyod11

11 Cooling

ONAF

12 Method of earthing

12.1 HV winding

Effectively earthed

12.2 33kV winding Alternative 1

Transformer

12.3 33kV winding Alternative 2

Reactance

12.4

- 11(6.6)kV winding Alternative 1

Resistance

12.5 - 11(6.6)kV winding Alternative 2 Transformer

13 Type (graded/non-graded) of windings

13.1 HV winding

graded

13.2 33kV winding

Non-graded

Page 44: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3- 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 13.3 11 (6.6)kV winding

Non-graded

14 Rated voltage of windings

14.1 HV winding

kV 132

14.2 - 33kV winding

kV 33

14.3 - 11(6.6)kV winding

kV 11.5 (6.6)

14.4 Highest voltage for equipment

14.5 HV winding

kV 145

14.6 - 33kV winding

kV 36

14.7 - 11(6.6)kV winding kV 12 (7.2)

15. Rated lightning impulse withstand voltage at:

15.1 HV terminal

kV PK 550

15.2 HV neutral terminal

kV PK 350

15.3 33kV terminal

kV PK 170

15.4. 11(6.6)kV terminal kV PK 75 (60)

16 Rated power frequency withstand voltage at

16.1 HV terminal

kV 220

16.2 33kV terminal

kV 70

16.3 11(6.6)kV terminal kV 28 (20)

16.4 HV neutral terminal kV 140 17 Maximum temperature rise at rated power at:

Windings

K 55

17.1 Hot spot of windings

K 68

Page 45: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 17.2 Top oil

K 50

17.3 Oil at inlet of cooler

K - -

17.4 Oil at outlet of cooler

K - -

17.5 Core K - - 18 Temperature rise of winding due to short circuit

duration of 2 s and:

18.1 HV side short circuit current of 40kA

K

18.2 33kV side short circuit current of 31kA

K

18.3 11(6.6)kV side short circuit current of 40kA

K

19 No load losses at rated voltage and rated frequency

kW

20 Input to cooling plant at rated power

kW

21 Load losses at 75°C, and rated ONAF power

i) On principal (normal) tapping

21.1 Tap number

21.2 HV/MV (guaranteed value) at full MV rating

kW

21.3 HV/LV (guaranteed value) at full LV rating kW ii) On Tapping for maximum loss

21.4 Tap number

21.5

HV/MV at full MV rating

kW

21.6

HV/LV at full MV rating

kW

22 Total losses at 75and normal voltage at 22.1 At full HV/MV rating

kW

22.2

At full HV/LV rating

kW

Page 46: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 23.2 33kV winding

A/mm2

23.3 Tapping

A/mm2

24 Symmetrical short circuit withstand current (duration 1 s) at:

24.1 HV terminals

kA 40

24.2 33kV terminals

kA 31.5

24.3 11(6.6)kV terminals kA 40 (50)

25 Magnetising current (HV winding)

25.1 At 90% rated voltage

A

25.2 At 100% rated voltage

A

25.3 At 110% rated voltage

A

26 Maximum flux density in iron at rated voltage, power frequency and principal tapping at:

26.1 Wound limbs

T

26.2 Unwound limbs

T

26.3 Yokes

T

26.4 Shields

T

27 Maximum flux density in iron at power frequency, principal tapping and 105% rated voltage at:

27.1 Wound limbs

T

27.2 Unwound limbs

T

27.3 Yokes

T

27.4 Shields

T

28 Type of tap changing HV winding

On-load

Page 47: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3- 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 29 Manufacturer of on-load tap changer

MR

30 Type designation of on-load tap changer

31 Tapped winding

HV

32 Type of flux voltage variation

C.F.V.V

33 Tapping range (132/11.5 kV)

+10% -10%

34 Tapping step (132/11.5 kV)

1.25%

35 Number of steps (132/11.5 kV)

17

36 Arrangement of tappings (Linear, Coarse/Fine, Reversing)

37 Automatic voltage control (132/11.5 kV)

Yes

38 Type of tap changing 33kV winding

Off-load

39 Tapping range (33kV winding)

+5% -5%

40 Tapping step (33kV winding)

2.5%

41 Impedance voltage range at 75°C, rated frequency and ONAF cooling:

41.1 HV –33kV at principal tapping

12.5%

41.2 HV –33kV at maximum voltage ratio

12.5%

41.3 HV –33kV at minimum voltage ratio

12.5%

41.4 - HV – 11(6.6)kV 19-20% (19-20%)

41.5 - 33kV-11kV 9-10% (n/a)

42 Resistance of winding at 75°C and principal tapping:

42.1 HV side

Ω/phase

42.2 33kV side

Ω/phase

42.3 11(6.6)kV side Ω/phase

Page 48: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 43 Terminal connection

43.1 HV terminal Separable connector to

busduct (GIS) Or

Bushing stalk ( AIS)

43.2 HV neutral terminal

Bushing stalk

43.3 33 and 11kV terminals Air-filled cable box

44. Cable box insulation

44.1 33kV terminal

44.2 11(6.6)kV terminal

44.3 HV neutral terminal 45 Isolating links for test purposes

45.1 HV terminal No 46 Current transformers

47 Number of coolers per transformer

min 4

48 Number of stand-by coolers

49 Number of stand-by fans

50 Rating of each cooler

kW

51 Oil

51.1 Manufacturer

51.2 Type designation

51.3 Standards

IEC 60296

51.4 Minimum flash point

°C

Page 49: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 51.5 Viscosity

51.6 at 20°C

mm2/s

51.7 at 50°C

mm2/s

51.8 at 80°C

mm2/s

51.9 Maximum dielectric strength for 1 min.

kV

51.10 Dielectric factor

51.11 Acidity (neutralization value) mgKOH/g

52 Type of dehydrating breather

Silica gel –

automatic recharge

53 Types and arrangement of winding:

53.1 HV winding

53.2 MV/LV winding

53.3 Tapping

53.4 Windings arrangement (i.e. core/Ty/LV/HV/Taps)

54 Conductor Material (e.g., copper, work hardened copper, etc.)

54.1 HV windings

54.2 MV/LV windings

54.3 Tapping windings

55 Conductor insulation:

55.1 HV windings

55.2 MV/LV windings

55.3 Tapping windings

55.4 Connecting leads from winding to tap changer

Page 50: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 56 Calculated thermal time constant

56.1 ONAF cooling min

56.2 ONAN cooling

57 Oil circulation (i.e., natural/partially directed/directed)

a To the windings

57.1 HV windings

57.2 MV/LV windings

57.3 Tapping windings

58 Through the windings:

58.1 HV windings

58.2 MV/LV windings

58.3 Tapping windings

59 Core construction:

59.1 Taped/banded/bolted limbs

59.2 Taped/banded/bolted yokes

59.3 Taping/banding material

59.4 Number of limbs

59.5 Number of limbs wound

59.6 Type of joint in magnetic core (90% butt, overlap, mitre, etc.)

59.7 Type of core steel

60 Specific loss of core steel at 1.5 tesla W/kg

61 Thickness of transformer tank

61.1 Sides mm

Page 51: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 61.2 Bottom mm

61.3 Top mm

62 Material of transformer tank

63 Thickness of radiator plates

mm

64 Total volume of conservator

l

65 Minimum volume of conservator between highest and lowest levels as percentage of total cold oil at 15°C volume of transformer

7.5%

66 Volumetric expansion of oil from 0° to 90°C

m3

67 Pressure increase inside tank due to expansion of oil

68 Masses of transformer

69 Core and coils kg < 80,000

70 Total mass excluded oil kg

71 Oil mass • in tank kg

72 • in radiators kg N/A

73 • total kg

74 Total mass kg

75 Mass of transformer as arranged for transport (heaviest part)

kg

76 Dimensions of transformer arranged for transport

Height m Width m Length m 77 Filling medium of transformer tank for shipment

78 Maximum noise level (To NEMA TR1)

dB 79

79 Vibration test (Y/N) N

Page 52: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D3.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D3 - 132/33/11.5 KV AND 132/6.6KV POWER TRANSFORMERS - Cont

Unit Data Required Offered 80 Conservator vessel, radiators, fan grilles, control

boxes or cubicles and pipework anticorrosion protection

Hot dip galvanized and

painted

81 Tank anticorrosion protection

82 Supply voltage for transformer auxiliaries

V 380/220 AC

83 Control/Protection voltage

V 110 DC

84 Manufacturer quality assurance

Yes

According to ISO 9000, 9001, 9002, 9003 and 9004

Validity

85 Type test certificate to be issued by:

Independent laboratory or independently witnessed type test certificate

Yes

Special Tests to be performed:

N/A

Dielectric test – Chopped wave lightning impulse Dielectric test – Long duration AC (ACLD) Dielectric test – Short duration AC (ACSD) Measurement of zero-sequence impedance Determination of sound levels Measurement of harmonics of no-load current Measurement of power of fan motors & oil pumps Determination of capacitance, windings to earth and between windings Measurement of insulation resistance to earth and loss angle of insulation system capacitances

Yes

No No Yes Yes Yes Yes

Yes

Yes

Page 53: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS

Unit Data Required Offered 1 EARTHING/AUXILIARY TRANSFORMER 33, 11 or

6.6/0.380KV; WITH AUXILIARY WINDING

1.1 Manufacturer & Place of manufacturing

1.2 Type designation

1.3 Type

Three phase, oil immersed,

core type

1.4 Standards

IEC 60076-1, -2, -3, -5, -10,

60296 NEMA TR1

1.5 Mounting Outdoor, wheel

1.6 Rated voltage ratio 33kV 11kV 6.6kV

KV KV kV

33/0.380 11 /0.380 6.6/0.380

1.7 Rated frequency

Hz 50

1.8 Vector group

ZNyn11

1.9 Cooling

ONAN

1.10 Method of earthing

1.10.1 HV winding

Solid

1.10.2 LV winding Solid 1.11 Type (graded/non-graded) of windings

1.11.1 HV winding

Non-graded

1.11.2 LV auxiliary winding Non-graded

Page 54: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered 1.12 Rated voltage of windings

1.12.1 HV winding 33kV 11kV 6.6kV

KV KV kV

33 11 6.6

1.12.2 LV auxiliary winding kV 0.380 1.13 Highest voltage for equipment

1.13.1 HV winding 33kV 11kV 6.6kV

KV KV kV

36 12 7.2

1.13.2 LV auxiliary winding

kV 0.420

1.14 Rated lightning impulse withstand voltage at HV Terminal 33kV 11kV 6.6kV

KV KV kV

170 75 60

1.15 Rated power frequency withstand voltage at

1.15.1 HV terminal 33kV 11kV 6.6kV

KV KV kV

70 28 20

1.15.2 LV terminal

kV 3

Page 55: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered 1.16 HV neutral terminal

33kV 11kV 6.6kV

KV KV KV

70 28 20

1.17 Rated power at site conditions

kVA to suit

1.18 Maximum temperature rise at rated power at:

1.18.1 Windings K 55

1.18.2 Hot spot of windings K 68

1.18.3 Top oil K 50

1.18.4 Oil at inlet of cooler K

1.18.5 Oil at outlet of cooler K

1.18.6 Core K 1.19 Temperature rise of winding due to short circuit

duration of 2 s and HV side short circuit current of 25 kA

1.20 No load losses at rated voltage and rated frequency

kW

1.21 Load losses at 75°C, and rated frequency, rated power and principal tapping:

1.22 Maximum current density at rated power:

1.22.1 HV winding

A/mm2

1.22.2 LV auxiliary winding

A/mm2

1.23 Symmetrical short circuit withstand current (duration 2 s) at:

Page 56: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered 1.23.1 HV terminal

33kV 11kV 6.6kV

KA KA kA

31.5 40 50

1.23.2 LV auxiliary terminal kA 1.24 Magnetising current (HV winding)

1.24.1 At 90% rated voltage

A

1.24.2 At 100% rated voltage

A

1.24.3 At 110% rated voltage A 1.25 Maximum flux density in core at rated voltage, power

frequency and principal tapping

T

1.26 Type of tap changing

Off-load

1.27 Type designation of off-load tap changer

1.28 Tapped winding

HV

1.29 Tapping range

+5% -5%

1.30 Tapping step

2.5%

1.31 Number of steps (positions)

5

1.32 Limitation and withstanding of fault current in neutral for 10s

A 1000

1.33 Impedance voltage range at 75°C and principal tapping:

1.34 At principal tapping

> 4%

1.34.1 At maximum voltage ratio

>4%

Page 57: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered 1.34.2 At minimum voltage ratio >4% 1.35 Resistance of winding at 75°C and principal tapping:

1.35.1 HV side

Ω/phase

1.35.2 LV auxiliary side Ω/phase 1.36 Zero phase sequence impedance of inter-star windings

at 75°C (LV windings open-circuit)

Ω/phase

1.37 Zero phase sequence impedance of LV windings at 75°C (inter-star windings open-circuit)

Ω/phase

1.38 Terminal connection

1.38.1 HV terminal Air-filled cable box

1.38.2 LV terminal Air-filled cable box

1.38.3 HV neutral terminal Air-filled cable box

1.38.4 LV neutral terminal Air-filled cable box

1.39 Isolating link for test purposes (not required if separable connector allows testing)

1.39.1 HV terminal

Yes

1.39.2 LV terminal No 1.30 Mounting of current transformer at

1.30.1 HV terminal

In tank

1.30.2 Neutral terminals

In tank or box

Page 58: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4– EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered 1.31 Current transformers

To suit

HV Line Number of cores Rated extended primary current Ratio (TR = turns ratio) I core A Class I core Knee point voltage (Ek) I core V Exciting current (IE ) at Ek I core mA Rated output (Burden to be 25-100% rated burden) I core VA HV Neutral Number of cores Rated extended primary current Ratio (TR = turns ratio) I core A II core A Class I core II core Knee point voltage (Ek) I core V II core V Exciting current (IE ) at Ek I core mA II core mA Rated output (Burden to be 25-100% rated burden) I core VA II core VA LV Line (Only AIS connections)

Number of cores

Page 59: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered

Rated extended primary current Ratio (TR = turns ratio) I core A Class I core Knee point voltage (Ek) I core V Exciting current (IE ) at Ek I core mA Rated output (Burden to be 25-100% rated burden) I core VA LV Neutral Number of cores Rated extended primary current Ratio (TR = turns ratio) I core A Class I core Knee point voltage (Ek) I core V Exciting current (IE ) at Ek I core mA Rated output (Burden to be 25-100% rated burden) I core VA All class PX CTs shall have a rated secondary current,

ISN

A

1.32 Oil:

1.32.1 Manufacturer

1.32.2 Type designation

1.32.3 Standards IEC 60296

1.32.4 Minimum flash point oC

1.32.5 Viscosity

At 20oC mm2/s At 50oC mm2/s

Page 60: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D4.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D4 – EARTHING AUXILIARY TRANSFORMERS - Cont

Unit Data Required Offered At 80oC

mm2/s

1.32.6 Maximum dielectric strength for 1 min

kV

1.32.7 Dielectric factor

1.32.8 Acidity (neutralization value) mgKOH/g

1.48 Maximum noise level (to NEMA TR1)

dB

1.49 Vibration test (Y/N)

N

1.50 Conservator vessel, radiators, fan grilles, control boxes or cubicles and pipework anticorrosion protection

Hot dip galvanized and painted

1.51 Tank anticorrosion protection

1.52 Control/Protection voltage

V 110 DC

1.53 Manufacturer quality assurance

Yes

According to ISO 9000, 9001, 9002, 9003 and 9004

1.54 Type test certificates to be issued by:

Independent Laboratory or independently witnessed type test certificate

Yes

Page 61: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D5.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D5 – POWER FACTOR CORRECTION CAPACITORS

Item No Description Units Required

Offered

1.1 Assigned rated current

A

1.2 Assigned rated voltage

kV

1.3 Assigned rated output

MVAr

1.4 Whether complete 3-phase bank is star or delta connected

1.5 Rated frequency

Hz

1.6 Temperature category to IEC 60871

1.7 Nominal capacitance:

1.7.1 For each element

µF

1.7.2 For each capacitor unit

µF

1.7.3 Capacitance of single phase bank

µF

1.8 Dielectric embodied in elements:

1.8.1 Whether paper and/or plastic film

1.8.2 Thickness of each: a. Paper b. Film

µm µm

1.8.3 Number per layer: Of paper Of film

1.9 Element foils thickness

µm

1.10 Method of making connections to element foils

1.11 Details of impregnating medium:

1.11.1 Trade name

1.11.2 Chemical compound

1.12 Nominal rated voltage of elements

V

Page 62: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D5.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D5 – POWER FACTOR CORRECTION CAPACITORS - Cont

Item No Description Units Required

Offered

1.13 Design maximum dielectric stresses: a. Paper b. Film

V/µm V/µm

1.14 Minimum rms breakdown voltage of individual elements

V

1.15 Connection of elements per capacitor unit:

1.15.1 Number in parallel

1.15.2 Number in series

1.16 Rated voltage UN of capacitor unit

kV

1.17 Rated current of unit

A

1.18 Rated output of unit

MVAr

1.19 Connection of capacitors:

1.19.1 Number of units in parallel per phase

1.19.2 Number of unit groups in series per phase

1.20 Details of fusing arrangement and whether internal or external

1.21 Losses in capacitor unit determined as described in IEC 60871 at dielectric temperatures of: 20 °C 75 °C

W/kWAr W/kVAr

1.22 Variation of losses due to temperature variation over the ambient temperature range for the temperature category stated in Item 1.6 W/kVAr at °C W/kVAr at °C

1.23 Variation of capacitance due to temperature variation over the ambient temperature range for the temperature category stated in Item 1.6

%

Page 63: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D5.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D5 – POWER FACTOR CORRECTION CAPACITORS - Cont

Item No Description Units Required

Offered

1.24 Maximum operating surface temperature rise of container - above an ambient temperature of –

°C °C

1.25 Maximum internal hot spot temperature rise (above ambient stated in Item 1.24) °C

1.26 Weight of complete unit capacitor including all fittings and impregnating medium

kg

1.27 Total weight of complete 3-phase capacitor bank arranged for transport

kg

1.28 Thickness of container: mm

1.28.1 Top

mm

1.28.2 Sides

mm

1.28.3 Bottom mm

1.29 Type of connector provided at HV terminals of capacitor bank

1.30 Type of connector provided at neutral ends of capacitor bank

1.31 Minimum ambient temperature at which a capacitor bank at this temperature may be energised at rated voltage and frequency without damage to, or loss of life of, unit capacitors or deterioration of associated fuses

°C

1.32 Details of discharge device:

1.32.1 Type

1.32.2 Connection

1.32.3 Number of devices (per element, of group of elements)

1.32.5 Voltage rating/device

V

1.32.6 Current rating/device

mA

1.32.7 Total loss per device at rated current W

Page 64: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D5.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D5 – POWER FACTOR CORRECTION CAPACITORS - Cont

Item No Description Units Required

Offered

1.32.8 Total loss per unit capacitor at rated current

W

1.32.9 Estimated times for discharge down to the voltage limit specified in IEC 60871:

a. For a unit capacitor

Minutes

b. For the complete single phase bank

Minutes

Page 65: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR

Data Unit Required Offered

A LVAC SWITCHGEAR (380/220 V, 50 Hz)

1 GENERAL 1.1 Rated voltage V 380 1.2 Rated frequency Hz 50 2 LVAC SWITCHBOARD

2.1 Manufacturer 2.2 Type designation 2.3 Type of switchboard Metal-clad

withdrawable type, multi-tier

2.4 Standards IEC 60439 2.5 Number of years equipment of identical

design has been in service

2.6 Rated current of busbars at 50°C ambient

temperature A

2.7 Busbar cross section mm2 2.8 Busbar insulation material 2.9 Busbar insulation maximum working

temperature °C

2.10 Temperature rise on continuous operation at

rated current at 50°C

2.11 Rated short-time withstand current (1 s) kA 2.12 Rated peak withstand current kA 2.13 Test voltage (1 min) V 2500 2.14 Impulse Withstand Voltage kVp 2.15 Type of internal barriers, shutters, etc.

Metallic

2.16 Degree of protection IP51

Page 66: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6– LVAC SWITCHGEAR - Cont

Data Unit Required Offered

2.17 Overall dimensions per cubicle

− Width mm − Depth mm − Height mm − Weight

kg

2.18 Method of circuit breaker withdrawal manual 3 CIRCUIT BREAKER 3.1 Manufacturer 3.2 Type designation 3.3 Type Air, withdrawable 3.4 Number of poles 3 3.5 Standard IEC 60947-2 3.6 Rated current at 50°C A 3.7 Rated short-time withstand current (1 s) kA 50 3.8 Rated peak withstand current kA 3.9 Rated symmetrical breaking current kA 3.10 Rated making current kA 3.11 Breaking time s 3.12 Material of:

− moving contacts − fixed contacts 3.13 Design of:

− moving contacts − fixed contacts 3.14 Operating mechanism

− Motor rated power W − Motor operating voltage V

Page 67: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR - Cont

Data Unit Required Offered

3.15 Weight of draw-out unit

kg

3.16

Type tests

3.16.1 Temperature Rise Test

Have heating tests at continuous rated normal current been carried out?

− report number − date

3.16.2 Basic Impulse Voltage Type Test:

Has B.I.V test been completed?

− circuit breaker − report number

− date 3.16.3 Life Test:

Has 2000 operating life test at no load (de-energised) been carried out?

− report number − date 4 MOULDED CASE CIRCUIT BREAKERS

(MCCBs)

4.1 Manufacturer 4.2 Type designation 4.3 Withdrawable MCCBs type yes 4.4 Number of poles 3 4.5 Standards IEC 60947-2 4.6 Rated current at 50°C A 4.7 Rated short-time withstand current (1 s) kA 4.8 Rated peak withstand current kA 4.9 Rated breaking current kA

Page 68: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR - Cont

Data Unit Required Offered

4.10 Remote signalling yes 4.11 Operating mechanism

4.12 Mass

5 CURRENT TRANSFORMERS 5.1 Manufacturer

5.2 Type 5.3 Type of primary winding (e.g. bar, wound,

etc.)

5.4 Standards IEC 60044-1 5.5 Rated voltage

kV

5.6 Rated lightning impulse withstand voltage phase to earth

kV

5.7 Rated power frequency withstand voltage phase to earth

kV

5.8 Partial discharge test voltage kV

5.9 Rated frequency

Hz 50

5.10 Rated continuous thermal current at 50oC

5.11. Rated short-time withstand current (1 s)

kA

5.12. Rated dynamic current

kA

5.13 Line current transformer

5.13.1 Type designation

5.13.2 Number of cores

5.13.3 Rated extended primary current

%

5.13.4 Ratio (TR = turns ratio) • I core • II core

A A

Page 69: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR - Cont

Data Unit Required Offered

5.13.5 Class • I core • II core

5.13.6 Knee point voltage (EK) • I core • II core

V V

5.13.7 Exciting current (IE) at EK • I core • II core

A A

5.13.8 Rated output (burden to be 25-100% rated burden) • I core • II core

VA VA

6 INSTRUMENTS

6.1 Manufacturer

6.2 Standards

IEC 60051

6.3 Type designation − Ammeter

− Voltmeter

6.4 Total scale range − Ammeter − Voltmeter

6.5 Dimensions

mm

6.6 Accuracy

7 PROTECTION RELAYS

7.1 Earth Fault Protection

7.1.1 Manufacturer

7.1.2 Type reference

Page 70: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR - Cont

Data Unit Required Offered

7.1.3 Relay design (electromechanical, static, microprocessor-based, numerical)

7.1.4 Range of current settings, percent of current rating

%

7.1.5 Range of time multiplier setting

7.1.6 Current at which relay resets, percent of current setting

%

7.1.7 Current at which relay picks-up, percent of current setting

%

7.1.8 Self-checking facility

7.1.9 CT’s requirements

7.1.10 Tripping contacts ratings

7.2 Restricted Earth Fault Protection

7.2.1 Manufacturer

7.2.2 Type reference

7.2.3 Relay design (electromechanical, static, microprocessor-based, numerical)

7.2.4 Estimated minimum faults setting (% of CT rating)

%

7.2.5 Operating time at 5 x setting

ms

7.2.6 Maximum primary out-of-zone fault current at which protection is stable

A

7.2.7 State principle of operation, i.e. H - high impedance L - low impedance

H

7.2.8 Current transformer requirements: − Required knee point voltage, Vk − CT maximum winding resistance − Magnetising current at Vk

V Ω A

7.2.9 Self monitoring

yes

Page 71: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D6.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D6 – LVAC SWITCHGEAR - Cont

Data Unit Required Offered

7.2.10 Self checking

yes

7.2.11 Tripping contacts rating

7.3 Undervoltage / Overvoltage Relay

7.3.1 Manufacturer

7.3.2 Type reference

7.3.3 Relay design (electromechanical, static)

7.3.4 Total scale range

V

7.3.5 Operate time at instantaneous voltage change for undervoltage / overvoltage relay

ms

7.3.6 Reset ratio overvoltage / undervoltage

%

7.3.7 Self monitoring

7.3.8 Self checking

8 Manufacturer quality system in accordance with ISO 9000, 9001, 9002, 9003 and 9004

yes

9 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

yes

Page 72: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7– DC SYSTEM

Data 110 V D.C SYSTEM Unit Required Offered

1 110 V D.C SYSTEM - SUBSTATION SERVICES SUPPLY

1.1 110 V Battery Units

1.1.1 Manufacturer

1.1.2 Type designation

1.1.3 Number of battery units

2

1.1.4 Type of cell

Nickel-Cadmium

1.1.5 Operating voltage per cell

V

1.1.6 Number of cells

1.1.7 Standard * IEEE 1115 for calculation

* IEC 60623, 60478, 60439 for

equipment

1.1.8 Discharge capacity:

− 10 hour rate Ah min. 250 (to be confirmed by calculation)

− 5 hour rate Ah − 3 hour rate Ah − 1 hour rate Ah − 30 minute rate

Ah

1.1.9 Final cell voltage after discharge:

− 10 hour rate V − 5 hour rate V − 3 hour rate V − 1 hour rate V − 30 minute rate

V

1.1.10 Ampere hour efficiency:

− 10 hour rate % − 5 hour rate % − 3 hour rate % − 1 hour rate %

Page 73: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

1.1.11 Watt hour efficiency:

− 10 hour rate % − 5 hour rate % − 3 hour rate % − 1 hour rate % − 30 minute rate % 1.1.12 Maximum charging voltage per cell

V

1.1.13 Normal charging rate range

A

1.1.14 Maximum charging rate range

A

1.1.15 Float charging rate

A

1.1.16 Boost charging rate

A

1.1.17 Normal voltage across battery on float charge

V

1.1.18 Voltage per cell on float charge

V

1.1.19 Normal voltage across battery on boost charge

V

1.1.20 Voltage per cell on boost charge

V

1.1.21 Overall dimensions of one cell

mm

1.1.22 Quantity of electrolyte per cell

Litres

1.1.23 Overall dimensions of each stand

mm

1.1.24 Number of stands

1.1.25 Number of tiers

1.1.26 Material and cross section of connections: − between cells − between tiers − between stands − to battery fuse box

mm2 mm2

mm2 mm2

1.1.27 Method of treating copper connection against corrosion

1.1.28 Method of protecting copper connections against accidental short circuiting

Page 74: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

1.1.29 Estimated short circuit current from fully charged battery

A

1.1.30 Anticipated life of electrolyte under actual operating conditions

Years

1.1.31 Anticipated life of electrolyte under actual operating conditions

Years

1.1.32 Operating temperatures: − Normal operation maximum minimum

°C °C

− Emergency discharge maximum minimum

°C °C

1.2 110 V D.C Battery Chargers

1.2.1 Manufacturer

1.2.2 Type designation

1.2.3 Degree of protection

IP 51

1.2.4 Number of chargers

2 x 100% for each battery

1.2.5 Type

1.2.6 Charging characteristic

1.2.7 Input voltage

V 3 Phase, 380 volt

1.2.8 Input frequency and range

Hz 50

1.2.9 Input power

kVA

1.2.10 Minimum working power factor

Page 75: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

1.2.11 Rated output power

kW

1.2.12 Output voltage range:

− float charge V − boost charge

V

1.2.13 Continuous output current range:

− float charge A − boost charge

A

Accuracy of output voltage

%

1.2.14 Overload range

%

1.2.15 Voltage ripple

%

1.2.16 Ripple frequency

Hz

1.2.17 Means of adjusting output

1.2.18 Details of any forced cooling equipment for chargers

1.2.19 Ambient temperature range

°C

1.2.20 Ambient relative humidity range

%

1.2.21 Mean time between failure (MTBF)

Years

1.2.22 Overall dimensions (shall be a separate free-standing panel/cubicle)

mm

1.2.23 Weight

kg

1.2.24 Boost charge maximum permitted constant potential per cell

V

1.2.25 Boost charge maximum permitted current as percentage of 5 hour capacity

%

1.2.26 Time to be re-charge to 90% capacity at maximum permitted voltage and current

hrs

1.3 Battery Fuse Boxes

1.3.1 Manufacturer

Page 76: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

1.3.2 Type designation

1.3.3 Degree of protection

IP 51

1.3.4 Fuse rated current at 50oC

1.3.5 Remote signalling

yes

1.4 110 V D.C. Switchboards

1.4.1 Manufacturer

1.4.2 Type designation

1.4.3 Degree of protection

IP 51

1.4.4 Standards

IEC 60439

1.4.5 Rating voltage

V 110

1.4.6 Rated current of busbars at 50oC ambient temperature

A

1.4.7 Busbar cross section

mm2

1.4.8 Busbar insulation material

1.4.9 Number of circuits

1.4.10 Main isolator rating

A

1.4.11 Main fuse rating

A

1.4.12 Single line diagram number

Arrangement drawing number

1.4.13 Details of Contactors:

− Manufacturer

− Type designation

− Type

− Site current rating (at 50°C)

A

− Rated breaking capacity

kA

Page 77: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7– DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

− Short time current (1 s)

kA

− Maximum operating time

• Opening

msec

• Closing

msec

− Voltage / power coil rating

V/W

− Typical circuit diagram number

1.4.15 Details of Earth Fault Protection:

− Manufacturer

− Type Designation

− Brochure number

1.4.16 Details of Undervoltage / Overvoltage Protection:

− Manufacturer

− Type Designation

− Brochure number

1.4.17 Instruments

− Manufacturer

− Voltmeter (type)

− Ammeter (type)

− Instruments

Details of Moulded Case Circuit Breakers (MCCBs)

− Manufacturer

− Type designation

− Number of poles

Page 78: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 110 V D.C SYSTEM Unit Required Offered

− Standards − Rated current at 50°C − Rated short-time withstand current

(1 s) − Rated breaking capacity − Remote signalling

A

kA

kA

Yes

1.4.18 Details of Miniature Circuit Breakers (MCBs)

− Manufacturer

− Type designation

− Number of poles

− Standards

A Yes

− Rated current at 50°C

kA

− Rated short-time withstand current (1s)

kA

− Breaking capacity at

− Remote signalling

Manufacturer quality system in accordance with ISO 9000, 9001, 9002, 9003 and 9004

Yes

Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

Yes

Page 79: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1 48 V D.C SYSTEM - SUBSTATION SERVICES SUPPLY

1.1 48 V Battery Units

1.1.1 Manufacturer

1.1.2 Type designation

1.1.3 Number of battery units

2

1.1.4 Type of cell

Nickel-Cadmium

1.1.5 Operating voltage per cell

V

1.1.6 Number of cells

1.1.7 Standard * IEEE 1115 for calculation

* IEC 60623, 60478, 60439 for

equipment

1.1.8 Discharge capacity:

− 10 hour rate Ah min. 250 (to be confirmed by calculation)

− 5 hour rate Ah − 3 hour rate Ah − 1 hour rate Ah − 30 minute rate

Ah

1.1.9 Final cell voltage after discharge:

− 10 hour rate V − 5 hour rate V − 3 hour rate V − 1 hour rate V

− 30 minute rate

V

1.1.10 Ampere hour efficiency:

− 10 hour rate % − 5 hour rate % − 3 hour rate % − 1 hour rate %

Page 80: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1.1.11 Watt hour efficiency:

− 10 hour rate % − 5 hour rate % − 3 hour rate % − 1 hour rate % − 30 minute rate

%

1.1.12 Maximum charging voltage per cell

V

1.1.13 Normal charging rate range

A

1.1.14 Maximum charging rate range

A

1.1.15 Float charging rate

A

1.1.16 Boost charging rate

A

1.1.17 Normal voltage across battery on float charge

V

1.1.18 Voltage per cell on float charge

V

1.1.19 Normal voltage across battery on boost charge

V

1.1.20 Voltage per cell on boost charge

V

1.1.21 Overall dimensions of one cell

mm

1.1.22 Quantity of electrolyte per cell

Litres

1.1.23 Overall dimensions of each stand

mm

1.1.24 Number of stands

1.1.25 Number of tiers

1.1.26 Material and cross section of connections: − between cells − between tiers − between stands − to battery fuse box

mm2 mm2

mm2 mm2

1.1.27 Method of treating copper connection against corrosion

Page 81: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1.1.28 Method of protecting copper connections against accidental short circuiting

1.1.29 Estimated short circuit current from fully charged battery

A

1.1.30 Anticipated life of electrolyte under actual operating conditions

Years

1.1.31 Anticipated life of electrolyte under actual operating conditions

Years

1.1.32 Operating temperatures: − Normal operation

maximum minimum

°C °C

− Emergency discharge

maximum minimum

°C °C

1.2 48 V D.C Battery Chargers

1.2.1 Manufacturer

1.2.2 Type designation

1.2.3 Degree of protection

IP 51

1.2.4 Number of chargers

2 x 100% for each battery

1.2.5 Type

Thyristor Controlled

1.2.6 Charging characteristic

1.2.7 Input voltage

V 3 Phase, 380

1.2.8 Input frequency and range

Hz 50

1.2.9 Input power

kVA

1.2.10 Minimum working power factor

1.2.11 Rated output power

kW

1.2.12 Output voltage range:

float charge V boost charge V

Page 82: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1.2.13 Continuous output current range:

float charge A boost charge

A

Accuracy of output voltage

%

1.2.14 Overload range

%

1.2.15 Voltage ripple

%

1.2.16 Ripple frequency

Hz

1.2.17 Means of adjusting output

1.2.18 Details of any forced cooling equipment for chargers

1.2.19 Ambient temperature range

°C

1.2.20 Ambient relative humidity range

%

1.2.21 Mean time between failure (MTBF)

Years

1.2.22 Overall dimensions (shall be a separate free-standing panel/cubicle)

mm

1.2.23 Weight

kg

1.2.24 Boost charge maximum permitted constant potential per cell

V

1.2.25 Boost charge maximum permitted current as percentage of 5 hour capacity

%

1.2.26 Time to be re-charge to 90% capacity at maximum permitted voltage and current

hrs

1.3 Battery Fuse Boxes

1.3.1 Manufacturer

1.3.2 Type designation

1.3.3 Degree of protection

IP 51

1.3.4 Fuse rated current at 50oC

1.3.5 Remote signalling yes

Page 83: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1.4 48 V D.C. Switchboards

1.4.1

Manufacturer

1.4.2 Type designation

1.4.3 Degree of protection

IP 51

1.4.4 Standards

IEC 60439

1.4.5 Rating voltage

V 48

1.4.6 Rated current of busbars at 50oC ambient temperature

A

1.4.7 Busbar cross section

mm2

1.4.8 Busbar insulation material

1.4.9 Number of circuits

1.4.10 Main isolator rating

A

1.4.11 Main fuse rating

A

1.4.12 Single line diagram number

1.4.13 Arrangement drawing number

1.4.14 Details of Contactors:

− Manufacturer

− Type designation

− Type

− Site current rating (at 50°C)

A

− Rated breaking capacity

kA

− Short time current (1 s)

kA

− Maximum operating time

• opening msec • closing

msec

− Voltage / power coil rating V/W

Page 84: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.13 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

− Typical circuit diagram number

1.4.15 Details of Earth Fault Protection:

− Manufacturer

− Type Designation

− Brochure number

1.4.16 Details of Undervoltage / Overvoltage Protection:

− Manufacturer

− Type Designation

− Brochure number

1.4.17 Instruments

− Manufacturer

− Voltmeter (type)

− Ammeter (type)

− Instruments

Details of Moulded Case Circuit Breakers (MCCBs) − Manufacturer − Type designation − Number of poles − Standards − Rated current at 50°C − Rated short-time withstand current

(1 s) − Rated breaking capacity − Remote signalling

A

kA

kA

Yes

Page 85: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D7.14 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D7 – DC SYSTEM - Cont

Data 48 V D.C SYSTEM Unit Required Offered

1.4.18 Details of Miniature Circuit Breakers (MCBs)

− Manufacturer

− Type designation

− Number of poles

− Standards

A Yes

− Rated current at 50°C

kA

− Rated short-time withstand current (1s)

kA

− Breaking capacity at

− Remote signalling

Manufacturer quality system in accordance with ISO 9000, 9001, 9002, 9003 and 9004

Yes

Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

Yes

Page 86: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D8.1

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D8- 220 V AC UNINTERRUPTIBLE POWER SUPPLY

Data

Unit Required Offered

1 GENERAL

The uninterruptible power supply (UPS) shall consist but not be limited to the following items:

− 48 V DC / 220 V AC inverters

yes

− static interrupters and transfer switches

yes

− 220/220 V single phase isolating by-pass transformer

yes

− manual by-pass switch

yes

− UPS distribution board yes

2 INVERTER

2.1 Manufacturer

2.2 Type designation

2.3 Degree of protection

IP51

2.4 Rated output power VA min 1200 (to be confirmed by calculation)

2.5 Rated input voltage and range

V±%

2.6 Rated input current

A

2.7 Rated output voltage

V

2.8 Steady state voltage variation

%

2.9 Rated output current

A

2.10 Rated output frequency

Hz

2.11 Steady state frequency variation

%

2.12 Total harmonic distortion

%

2.13 Rated output power factor

2.14 Maximum harmonic distortion:

− at any single frequency % − at all frequencies %

Page 87: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D8.2

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D8 - 220 V AC UNINTERRUPTIBLE POWER SUPPLY - Cont

Data

Unit Required Offered

2.15 Radio frequency interference (RFI) classification

2.16 Output voltage rise time on turn-on

ms

2.17 Output voltage decay time on turn-off

ms

Maximum transient voltage variation after full load acceptance or rejection for:

− 1 cycle % − 0.1 s % − 1 s

%

2.18 Method of cooling

2.19 Ambient temperature range

°C

2.20 Maximum temperature rise (inside)

°C

2.21 Ambient relative humidity

%

2.22 Method of protecting inverters against high intensity D.C voltage surges

2.23 Mean time between failure (MTBF)

Years

2.24 Dimensions

mm

2.25 Weight

kg

3 STATIC SWITCH

A detailed description of offered static switch with data and diagram to be provided

4 ISOLATION BY-PASS TRANSFORMER

4.1 Manufacturer

4.2 Standard applied

4.3 Type designation

4.4 Maximum continuous capacity

VA

4.5 Number of phase

1

Page 88: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D8.3

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D8 - 220 V AC UNINTERRUPTIBLE POWER SUPPLY - Cont

Data

Unit Required Offered

4.6 Rated voltage under full load

V

4.7 Protection class

IP

Dimensions overall

mm

Total weight kg 5 MANUAL BY-PASS SWITCH

5.1 Manufacturer

5.2 Type of designation

5.3 Rated current at 50°C

A

6 DISTRIBUTION BOARD

6.1 Manufacturer

6.2 Type designation

6.3 Degree of protection

IP 51

6.4 Busbar insulation material

6.5 Number of circuits

6.6 Details of Miniature Circuit Breakers (MCBs)

− Manufacturer − Type designation − Number of poles − Standards

− Rated current at 50oC A − Rated breaking capacity kA − Remote signalling

Manufacturer quality system in accordance with ISO 9000, 9001, 9002, 9003 and 9004

yes

Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

yes

Page 89: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES

132 KV POWER CABLES Unit Data Required Offered 1 GENERAL

1.1 Name of manufacturer

1.2 Place of manufacture

1.3 Manufacturers type or drawing reference number

1.4 Circuit rating required

MVA To suit

1.5 Constructional and Testing standards Standard(s) to which cable complies

1.6 General description of cable

Voltage designation Uo/U(Um) kV Number of cores one Conductor size mm2 Conductor material aluminium Type of insulation XLPE Type of metal screen/sheath lead Type of armour - Type of oversheath

MDPE

1.7 Year of first commercial operation of cable type 2 CONSTRUCTIONAL FEATURES

2.1 Conductor

Material aluminium Nominal cross-section mm2 Type of conductor Overall diameter mm Waterblocking method Semiconducting binder tape yes/no 2.2 Conductor screen Type of material Extruded semi

conductive, cross-linkable, fully bonded

Nominal thickness mm 2.3 Insulation Material XLPE Thickness: Minimum average mm Thickness: Minimum at a point mm Nominal overall diameter mm

Page 90: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

132 KV POWER CABLES Unit Data Required Offered 2.4 Insulation screen

Type of material Extruded semi conductive,

cross-linkable

Nominal thickness mm 2.5 XLPE Manufacturing Methods

- Extrusion line type e.g. CCV - Single pass, triple extrusion yes/no - Curing method - Cooling method 2.6 Bedding (if applicable)

Type and material 2.7 Metallic screen on each core

Type and material copper wire or tape

Nominal thickness mm Nominal diameter over the screen mm 2.8 Bedding layer

Type and material Nominal thickness mm Minimum thickness mm 2.9 Armour

Nominal diameter under the armour mm - Type and material - Armour wire diameter or dimensions of strip mm - 2.10 Protective anti-corrosion external sheath covering

Type and material MDPE Colour Nominal thickness mm Minimum thickness mm Termite resistant yes/no yes Type of anti-termite protection 2.11 Nominal overall cable diameter mm

Page 91: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

132 KV POWER CABLES Unit Data Required Offered 2.12 Weight of completed cable kg/m 3 CURRENT RATINGS

3.1 Maximum continuous rating, direct-buried, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.2 Maximum continuous rating, in single way ducts, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat touching formation (single point bonded) A Calculation Method

IEC 60287

3.3 Maximum continuous rating, in-air, assuming:

Air temperature (in shade) of 50 oC Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.4 Maximum permissible conductor temperature for continuous operation

oC

3.5 Conductor short circuit capacity

Short circuit current kA 40 Duration s 3 Permissible maximum temperature

oC 250

3.6 Screen / armour short circuit capacity

Short circuit current kA Duration s 3 Permissible maximum temperature oC 200

Page 92: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

132 KV POWER CABLES Unit Data Required Offered 4 ELECTRICAL CHARACTERISTICS

4.1 DC resistance of conductor at 20˚C

Ω/m

4.2 AC resistance of conductor at 50 Hz and maximum conductor temperature

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.3 Positive Sequence Resistance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.4 Positive Sequence Reactance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.5 Zero Sequence Resistance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.6 Zero Sequence Reactance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.7 Capacitance per core pF/m 5 LOSSES

5.1 Total losses per three phase circuit when operating at nominal voltage and 50Hz and at the current ratings stated in Item 2 :

W/m

laid direct in trefoil touching (solid bonded) W/m laid direct in flat formation (single point bonded)

W/m

in ducts in trefoil touching (solid bonded) W/m in ducts in flat touching formation

(single point bonded) W/m

in air in trefoil touching (solid bonded) W/m in air in flat formation (single point bonded)

W/m

6 INSTALLATION DATA

6.1 Minimum cable bending radius when laid:

During installation mm

Page 93: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

132 KV POWER CABLES Unit Data Required Offered Adjacent to joints and terminations mm 6.2 Minimum internal diameter of pipes or ducts

mm

6.2 Maximum permissible pulling force of total cable

kN

7 COMMISSIONING TESTS

7.4 Recommended tests after all terminating and jointing has been completed but before connection to the system.

Page 94: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

33 KV POWER CABLES Unit Data Required Offered 1 GENERAL

1.1 Name of manufacturer

1.2 Place of manufacture

1.3 Manufacturers type or drawing reference number

1.4 Circuit rating required

MVA To suit

1.5 Constructional and Testing standards

Standard(s) to which cable complies

1.6 General description of cable

Voltage designation Uo/U(Um) kV Number of cores one Conductor size mm2 Conductor material copper Type of insulation XLPE Type of metal screen/sheath Type of armour Type of oversheath

1.7 Year of first commercial operation of cable type 2 CONSTRUCTIONAL FEATURES

2.1 Conductor

Material Copper Nominal cross-section mm2 Type of conductor Overall diameter mm Waterblocking method Semiconducting binder tape yes/no 2.2 Conductor screen

Type of material Extruded semi conductive,

cross-linkable, fully bonded

Nominal thickness mm

Page 95: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

33 KV POWER CABLES Unit Data Required Offered 2.3 Insulation

Material XLPE Thickness: Minimum average mm Thickness: Minimum at a point mm Nominal overall diameter mm 2.4 Insulation screen

Type of material Extruded semi conductive,

cross-linkable

Nominal thickness mm 2.5 XLPE Manufacturing Methods

- Extrusion line type e.g. CCV - Single pass, triple extrusion yes/no - Curing method - Cooling method 2.6 Bedding (if applicable)

Type and material 2.7 Metallic screen on each core

Type and material copper wire or tape

Nominal thickness mm Nominal diameter over the screen mm 2.8 Bedding layer

Type and material Nominal thickness mm Minimum thickness mm 2.9 Armour

Nominal diameter under the armour mm Type and material Armour wire diameter or dimensions of strip mm 2.10 Protective anti-corrosion external sheath covering

Type and material Colour

Page 96: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

33 KV POWER CABLES Unit Data Required Offered Nominal thickness mm Minimum thickness mm Termite resistant yes/no yes Type of anti-termite protection 2.11 Nominal overall cable diameter

mm

2.12 Weight of completed cable

kg/m

3 CURRENT RATINGS

3.1 Maximum continuous rating, direct-buried, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.2 Maximum continuous rating, in single way ducts, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat touching formation (single point bonded) A Calculation Method

IEC 60287

3.3 Maximum continuous rating, in-air, assuming:

Air temperature (in shade) of 50 oC Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.4 Maximum permissible conductor temperature for continuous operation

oC

3.5 Conductor short circuit capacity

Short circuit current kA 31

Page 97: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

33 KV POWER CABLES Unit Data Required Offered Duration s 3 Permissible maximum temperature

oC 250

3.6 Screen / armour short circuit capacity

Short circuit current kA Duration s 3 Permissible maximum temperature

oC 200

4 ELECTRICAL CHARACTERISTICS

4.1 DC resistance of conductor at 20˚C

Ω/m

4.2 AC resistance of conductor at 50 Hz and maximum conductor temperature

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.3 Positive Sequence Resistance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.4 Positive Sequence Reactance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.5 Zero Sequence Resistance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.6 Zero Sequence Reactance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.7 Capacitance per core pF/m 5 LOSSES

5.1 Total losses per three phase circuit when operating at nominal voltage and 50Hz and at the current ratings stated in Item 2 :

W/m

laid direct in trefoil touching (solid bonded) W/m laid direct in flat formation (single point bonded)

W/m

in ducts in trefoil touching (solid bonded) W/m

Page 98: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

33 KV POWER CABLES Unit Data Required Offered in ducts in flat touching formation

(single point bonded) W/m

in air in trefoil touching (solid bonded) W/m in air in flat formation (single point bonded)

W/m

6 INSTALLATION DATA

6.1 Minimum cable bending radius when laid:

During installation mm Adjacent to joints and terminations mm 6.2 Minimum internal diameter of pipes or ducts

mm

6.2 Maximum permissible pulling force of total cable

kN

7 COMMISSIONING TESTS

7.4 Recommended tests after all terminating and jointing has been completed but before connection to the system.

Page 99: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

11 KV POWER CABLES Unit Data Required Offered 1 GENERAL

1.1 Name of manufacturer

1.2 Place of manufacture

1.3 Manufacturers type or drawing reference number

1.4 Circuit rating required

MVA To suit

1.5 Constructional and Testing standards

Standard(s) to which cable complies

1.6 General description of cable

Voltage designation Uo/U(Um) kV Number of cores one Conductor size mm2 Conductor material copper Type of insulation XLPE Type of metal screen/sheath Type of armour Type of oversheath

1.7 Year of first commercial operation of cable type 2 CONSTRUCTIONAL FEATURES

2.1 Conductor

Material Copper Nominal cross-section mm2 Type of conductor Overall diameter mm Waterblocking method Semiconducting binder tape yes/no 2.2 Conductor screen

Type of material Extruded semi conductive,

cross-linkable, fully bonded

Nominal thickness mm

Page 100: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

11 KV POWER CABLES Unit Data Required Offered 2.3 Insulation

Material XLPE Thickness: Minimum average mm Thickness: Minimum at a point mm Nominal overall diameter mm 2.4 Insulation screen

Type of material Extruded semi conductive,

cross-linkable

Nominal thickness mm 2.5 XLPE Manufacturing Methods

- Extrusion line type e.g. CCV - Single pass, triple extrusion yes/no - Curing method - Cooling method 2.6 Bedding (if applicable)

Type and material 2.7 Metallic screen on each core

Type and material copper wire or tape

Nominal thickness mm Nominal diameter over the screen mm 2.8 Bedding layer

Type and material Nominal thickness mm Minimum thickness mm 2.9 Armour

Nominal diameter under the armour mm - Type and material - Armour wire diameter or dimensions of strip mm - 2.10 Protective anti-corrosion external sheath covering

Type and material Colour

Page 101: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.13 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

11 KV POWER CABLES Unit Data Required Offered Nominal thickness mm Minimum thickness mm Termite resistant yes/no yes Type of anti-termite protection 2.11 Nominal overall cable diameter

mm

2.12 Weight of completed cable

kg/m

3 CURRENT RATINGS

3.1 Maximum continuous rating, direct-buried, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.2 Maximum continuous rating, in single way ducts, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat touching formation (single point bonded) A Calculation Method

IEC 60287

3.3 Maximum continuous rating, in-air, assuming:

Air temperature (in shade) of 50 oC Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.4 Maximum permissible conductor temperature for continuous operation

oC

3.5 Conductor short circuit capacity

Short circuit current kA 40 Duration s 3

Page 102: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.14 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

11 KV POWER CABLES Unit Data Required Offered Permissible maximum temperature

oC 250

3.6 Screen / armour short circuit capacity

Short circuit current kA Duration s 3 Permissible maximum temperature oC 200 4 ELECTRICAL CHARACTERISTICS

4.1 DC resistance of conductor at 20˚C

Ω/m

4.2 AC resistance of conductor at 50 Hz and maximum conductor temperature

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.3 Positive Sequence Resistance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.4 Positive Sequence Reactance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.5 Zero Sequence Resistance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.6 Zero Sequence Reactance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.7 Capacitance per core pF/m 5 LOSSES

5.1 Total losses per three phase circuit when operating at nominal voltage and 50Hz and at the current ratings stated in Item 2 :

W/m

laid direct in trefoil touching (solid bonded) W/m laid direct in flat formation (single point bonded) W/m in ducts in trefoil touching (solid bonded) W/m in ducts in flat touching formation

(single point bonded) W/m

Page 103: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.15 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

11 KV POWER CABLES Unit Data Required Offered in air in trefoil touching (solid bonded) W/m in air in flat formation (single point bonded) W/m 6 INSTALLATION DATA

6.1 Minimum cable bending radius when laid:

During installation mm Adjacent to joints and terminations mm 6.2 Minimum internal diameter of pipes or ducts

mm

6.2 Maximum permissible pulling force of total cable

kN

7 COMMISSIONING TESTS

7.4 Recommended tests after all terminating and jointing has been completed but before connection to the system.

Page 104: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.16 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

6.6 KV POWER CABLES Unit Data Required Offered 1 GENERAL

1.1 Name of manufacturer

1.2 Place of manufacture

1.3 Manufacturers type or drawing reference number

1.4 Circuit rating required

MVA To suit

1.5 Constructional and Testing standards

Standard(s) to which cable complies

1.6 General description of cable

Voltage designation Uo/U(Um) kV Number of cores one Conductor size mm2 Conductor material copper Type of insulation XLPE Type of metal screen/sheath Type of armour Type of oversheath

1.7 Year of first commercial operation of cable type 2 CONSTRUCTIONAL FEATURES

2.1 Conductor

Material Copper Nominal cross-section mm2 Type of conductor Overall diameter mm Waterblocking method Semiconducting binder tape yes/no 2.2 Conductor screen

Type of material Extruded semi conductive,

cross-linkable, fully bonded

Nominal thickness mm

Page 105: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.17 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

6.6 KV POWER CABLES Unit Data Required Offered 2.3 Insulation

Material XLPE Thickness: Minimum average mm Thickness: Minimum at a point mm Nominal overall diameter mm 2.4 Insulation screen

Type of material Extruded semi conductive,

cross-linkable

Nominal thickness mm 2.5 XLPE Manufacturing Methods

- Extrusion line type e.g. CCV - Single pass, triple extrusion yes/no - Curing method - Cooling method 2.6 Bedding (if applicable)

Type and material 2.7 Metallic screen on each core

Type and material copper wire or tape

Nominal thickness mm Nominal diameter over the screen mm 2.8 Bedding layer

Type and material Nominal thickness mm Minimum thickness mm 2.9 Armour

Nominal diameter under the armour mm - Type and material - Armour wire diameter or dimensions of strip mm - 2.10 Protective anti-corrosion external sheath covering

Type and material Colour

Page 106: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.18 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE 9 – 132/33/11/6.6 KV POWER CABLES - Cont

6.6 KV POWER CABLES Unit Data Required Offered Nominal thickness mm Minimum thickness mm Termite resistant yes/no yes Type of anti-termite protection 2.11 Nominal overall cable diameter

mm

2.12 Weight of completed cable

kg/m

3 CURRENT RATINGS

3.1 Maximum continuous rating, direct-buried, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.2 Maximum continuous rating, in single way ducts, assuming:

Ground temperature at burial depth of 35oC Soil thermal resistivity of 2.5K.m/W Depth of laying 0.8m Thermally independent of other cable circuits trefoil touching (solid bonded) A flat touching formation (single point bonded) A Calculation Method

IEC 60287

3.3 Maximum continuous rating, in-air, assuming:

Air temperature (in shade) of 50 oC Thermally independent of other cable circuits trefoil touching (solid bonded) A flat formation spaced at one cable diameter (single

point bonded) A

Calculation Method

IEC 60287

3.4 Maximum permissible conductor temperature for continuous operation

oC

3.5 Conductor short circuit capacity

Short circuit current

kA 50

Page 107: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.19 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

6.6 KV POWER CABLES Unit Data Required Offered Duration s 3 Permissible maximum temperature

oC 250

3.6 Screen / armour short circuit capacity

Short circuit current kA Duration s 3 Permissible maximum temperature oC 200 4 ELECTRICAL CHARACTERISTICS

4.1 DC resistance of conductor at 20˚C

Ω/m

4.2 AC resistance of conductor at 50 Hz and maximum conductor temperature

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.3 Positive Sequence Resistance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.4 Positive Sequence Reactance of cable at 50 Hz

Ω/m

trefoil touching (solid bonded) Ω/m flat formation (single point bonded)

Ω/m

4.5 Zero Sequence Resistance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.6 Zero Sequence Reactance of cable at 50 Hz in trefoil touching formation (solid bonded)

Ω/m

4.7 Capacitance per core pF/m 5 LOSSES

5.1 Total losses per three phase circuit when operating at nominal voltage and 50Hz and at the current ratings stated in Item 2 :

W/m

laid direct in trefoil touching (solid bonded) W/m laid direct in flat formation (single point bonded)

W/m

in ducts in trefoil touching (solid bonded) W/m

Page 108: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D9.20 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D9 – 132/33/11/6.6 KV POWER CABLES - Cont

6.6 KV POWER CABLES Unit Data Required Offered in ducts in flat touching formation

(single point bonded) W/m

in air in trefoil touching (solid bonded) W/m in air in flat formation (single point bonded)

W/m

6 INSTALLATION DATA

6.1 Minimum cable bending radius when laid:

During installation mm Adjacent to joints and terminations mm 6.2 Minimum internal diameter of pipes or ducts

mm

6.2 Maximum permissible pulling force of total cable

kN

7 COMMISSIONING TESTS

7.4 Recommended tests after all terminating and jointing has been completed but before connection to the system.

Page 109: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 – LV CABLES

Data

Unit Required Offered

1 L.V. POWER CABLES

1.1 Manufacturer

1.2 Cable type

Cu/XLPE/ SWA/LSOH

1.3 Standards

IEC 60189, 60227, 60228, 60287, 60724, 60811,

60885. BS 6724, BS EN 50265

1.4 Rated voltage

V 600/1000

1.5 Test voltage (1 min)

VAC/min

4000

1.6 Conductor − Cross sectional area − Material: copper − Design (stranded, sectoral, etc.) − Overall dimensions − No. of Cores

mm2

mm

min 2.5

Cu Stranded

1.7 Insulation

1.8 Fillers − Material: polypropylene

1.9 Armour bedding − Type − Nominal thickness

mm

1.10 Armour − Type of wire − Number of wire − Diameter of wire

No. mm

1.11 Outer covering − Material − Minimum average thickness

mm

LSOH

Page 110: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 – LV CABLES - Cont

Data

Unit Required Offered

1.12 Completed cable − Overall diameter − Weight per metre − Maximum drum length

mm kg m

*

1.13 Cable drums − Overall diameter − Width − Weight loaded

m m kg

*

1.14 Continuous current carrying capacity based on the conditions specified: Laid in the ground − One Circuit − Two Circuits − Three Circuits Drawn into ducts − One Circuit − Two Circuits − Three Circuits In air − One Circuit at 50°C

A A A

A A A A

*

1.15 Maximum conductor temperature

oC

90

1.16 Conductor short circuit current

Carrying capacity for one second, cable loaded as above prior to short circuit and final conductor

Temperature of

KA

oC

1.17 Minimum radius of bend around which cable can be laid − Laid direct − In ducts − In air

m m m

1.18 Ducts − Nominal internal diameter of pipes or

ducts through which cable may be pulled

mm

Page 111: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 – LV CABLES - Cont

Data

Unit Required Offered

1.19 Maximum DC resistance − Per km of cable at 20oC of conductor

ohm

*

1.20 Maximum AC resistance − Of conductor per km of cable at

maximum conductor temperature

ohm

*

1.21 Insulation resistance − per km of cable per core

Megaoh

m

1.22 Manufacturer quality assurance according to ISO 9000, 9001, 9002, 9003 and 9004

1.23 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

* The tenderer may provide a table of data for each of the cables offered.

Page 112: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10- LV CABLES - Cont

Data Unit Required Offered

2 MULTICORE CONTROL CABLES

2.1 Manufacturer

2.2 Cable type

2.3 Standards

IEC 60189, 60227, 60228, 60287, 60724, 60811,

60885. BS 6724, BS EN 50265

2.4 Rated Voltage

V 600/1000

2.5 Test voltage (1 min)

V AC/min 4000

2.6 Cores − Number of cores

No

2, 3, 4,7, 12, 19,

27, 37

2.7 Conductor − Cross sectional area: annealed copper− Material

mm2

2.8 Insulation − Thickness nominal − Minimum

mm mm

XLPE

2.9 Armour bedding − Type: − Nominal thickness

mm

LSOH

2.10 Armour − Number of wire: − Diameter of wire

No. mm

2.11 Outer covering − Material: − Minimum average thickness

mm

LSOH

Page 113: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 - LV CABLES - CONT

Data Unit Required Offered

2.12 Completed cable − Overall diameter − Weight per metre − Maximum drum length

mm kg m

* * *

2.13 Mean electrostatic capacity − of each conductor to earth per km − of each core at 20°C

pF

*

2.14 Maximum DC resistance − per km of each core at 20°C max.

− 1.5mm2 − 2.5mm2

ohm

2.15 Minimum radius of bend round which cable can be laid

mm

2.16 Manufacturer quality assurance according to ISO 9000, 9001, 9002, 9003 and 9004

2.17 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

* The tenderer may provide a table of data for each of the cables offered.

3 MULTIPAIR CONTROL CABLES (Individually screened)

3.1 Manufacturer

3.2 Cable type

3.3 Standards

IEC 60189, 60227, 60228, 60287, 60724, 60811,

60885. BS 6724, BS EN 50265

34 Rated Voltage

V 100v ac/150v dc

3.5 Test voltage (1 min)

V AC/min

Page 114: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 - LV CABLES - CONT

Data Unit Required Offered

3.6 Cores Number of pairs

No

3.7 Conductor Diameter: annealed copper Material

mm2

0.8

3.8 Insulation Thickness nominal minimum

mm mm

XLPE

3.9 Individual wire screen - Material - Thickness - Drainwire diameter

mm mm

3.10 Overall wire screen - Material - Thickness - Drainwire diameter

mm mm

3.11 Armour bedding Type: Nominal thickness

mm

LSOH

3.12 Armour Number of wire: Diameter of wire

No. mm

3.13 Outer covering Material: Minimum average thickness

mm

LSOH

3.14 Completed cable Overall diameter Weight per metre Maximum drum length

mm kg m

* * *

Page 115: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D10.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D10 - LV CABLES - CONT

Data Unit Required Offered

3.15 Mean electrostatic capacity of each conductor to earth per km of each core at 20°C

pF

*

3.16 Maximum DC resistance per km of each core at 20°C max.

1.5mm2 2.5mm2

ohm

3.17 Minimum radius of bend round which cable can be laid

mm

3.18 Manufacturer quality assurance according to ISO 9000, 9001, 9002, 9003 and 9004

3.19 Type test certificate to be issued by independent laboratory or independently witnessed type test certificate available

* The tenderer may provide a table of data for each of the cables offered.

Page 116: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM

GENERAL PROTECTION REQUIREMENTS Unit Data

Required Offered 1 OPERATING PERAMETERS

1.1 Auxiliary voltage range (Vn = 110Vdc) Vdc 77→150

1.2 Input frequency range (50Hz nominal) Hz 47.5→52.5

2 TYPE TESTS

2.1 Atmospheric Environment

Operation -25C and 55C for 96hrs, IEC 60068-2-1 Yes

Transport/storage -25C and 70C for 96hrs, IEC 60068-2-2 Yes

2.2 Relative Humidity

Operation at 93% Yes

Tested to IEC 60068-2-78 with severity class 56 days Yes

2.3 Enclosure

IEC 60529 IP50 Yes

2.4 Mechanical Environment

Vibration IEC 60255-21-1 Yes

Shock and bump IEC 60255-21-2 Yes

Seismic IEC 60255-21-3 Yes

2.5 Insulation

Rated insulation

1000 V high impedance protection CT inputs

250 V for other circuits Yes

1000 V open contact withstand Yes

Dielectric Tests

IEC 60255-5 – Series C of table 1 Yes

Page 117: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

GENERAL PROTECTION REQUIREMENTS Unit Data

Required Offered Impulse voltage

IEC 60255-5 test voltage 5kV Yes

2.6 Electromagnetic Compatibility

1 MHz Burst disturbance test

IEC 60255-22-1 severity class III

Yes

Electrostatic Discharge IEC 60255-22-2 severity class III

Yes

Radiated Electromagnetic Field Disturbance

IEC 60255-22-3 severity class III

Test method A, 27MHz through 500MHz

Yes

Electromagnetic Emissions

IEC 60255-25

Yes

Fast Transient Disturbance

IEC 60255-22-4 severity level IV

As appropriate

Page 118: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

DISTANCE PROTECTION Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR BASED, NUMERICAL)

Numerical

4 DISTANCE PROTECTION REQUIREMENTS

4.1 3 zone ph-ph & ph-E Yes

4.2 Phase fault & Earth fault characteristic shapes (Mho, Quad)

4.3 Operating time <30ms

4.4 Switch On To Fault Yes

4.5 Power swing blocking (depending on relaying point in the power system)

Yes

4.6 Voltage transformer supervision Yes

4.7 Time delays for all zones Yes

4.8 Zone enable/disable for all zone Yes

4.9 Teleprotection modes PUR/POR/Block Yes

4.10 DEF plain & Blocking modes Blk

4.11 Z1 min and max operating time (mid zone) ms <30

5 OTHER REQUIREMENTS

5.1 Thermal overload, (49) Yes

5.2 Circuit breaker failure. 50BF- (dependent on application) Yes

1.1 5.3 Event recording function Yes

5.4 Disturbance recording function Yes

5.5 Fault locator function Yes

Page 119: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

DISTANCE PROTECTION Unit Data

Required Offered 5.6 Integral operator interface for local interrogation

Yes

5.7 Programmable scheme logic Yes

5.8 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

5.9 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive(L/R40ms)

Yes

5.10 Self checking facility

Yes

5.11 Integral intertrip send and receive, with external input interface Intertrip send and receive operate time

Yes

6 COMMUNICATIONS

6.1 Protection

Direct optical fibre 1300nm single mode Others (please list)

Yes

6.2 Control

Communication ports (Front/rear etc) Physical links (RS485/Fibre optic) Protocols supported IEC 60870-5-103 Yes others

6.3 Type test certificate provided

Yes

Page 120: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11- PROTECTION SYSTEM - Cont

FEEDER DIFFERENTIAL PROTECTION Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR BASED, NUMERICAL)

Numerical

4 FEEDER DIFFERENTIAL PROTECTION REQUIREMENTS

4.1 Fault settings (% of relay rating)

4.2 Minimum current at one feeder end for relay operation at that end:

1. Phase faults 2. Earth faults

4.3 Minimum current at one feeder end for relay operation at both feeder ends:

1. Phase faults 2. Earth faults

4.4 Effect of load current on settings given in 3.5, 3.6 above

8 Operating time at 5 x setting

45ms

4.5 Maximum primary out-of-zone fault current at which protection is stable

4.6 Insulation level between pilot wires and relay equipment 15 kV

5 PILOT WIRE REQUIREMENTS:

5.1 Number of cores

5.2 Insulation level between cores

5.3 Insulation level between cores and cable sheath

5.4 Any other requirements

Page 121: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

FEEDER DIFFERENTIAL PROTECTION Unit Data

Required Offered 6 PILOT WIRE SUPERVISION

Check Relay (Setting ranges - Ph F 0.4In – 2.0In, EF 0.2In –0.8In)

Yes

Yes

7 TWO WAY INTERTRIP FUNCTION

Yes

8 TRIPPING CONTACTS RATING Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

9 SELF-MONITORING

10 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 122: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MAIN TRANSFORMER BIASED DIFFERENTIAL PROTECTION Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR BASED, NUMERICAL)

numerical

4 BIASED DIFFERENTIAL FUNCTION

4.1 Operation time at 5 times setting

ms <25

4.2 Adjustable bias characteristics

Yes

4.3 Differential current stage Id >>

Yes

4.4 Magnetisation inrush restraint

Yes

4.5 “5th” Harmonic inrush restraint

Yes

4.6 Maximum through fault current for which relay remains stable (multiple of rating)

4.7 CT ratio and vector group compensation

5 RESTRICTED EARTH FAULT FUNCTION

5.1 HV REF

Yes

5.2 LV REF

Yes

5.3 Principle of operation High impedance/Low impedance

High

5.4 Metrosil requirements

5.5 Operation time at 5 times settings

ms <30

6 OTHER REQUIREMENTS

6.1 Phase overcurrent function 50/51 (requirement depending on application)

6.2 Earth fault protection 51N (requirement depending on application)

Page 123: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MAIN TRANSFORMER BIASED DIFFERENTIAL PROTECTION Unit Data

Required Offered 6.3 Integral operator interface for local interrogation

Yes

6.4 Programmable scheme logic

Yes

6.5 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

6.6 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

6.7 Event recording function

Yes

6.8 Disturbance recording function

Yes

6.9 Fault recording function

Yes

6.10 Self monitoring and alarm facility

6.11 Integral intertrip send and receive

7 COMMUNICATIONS

7.1 Control

7.2 Communication ports (Front/rear etc)

7.3 Physical links (RS485/Fibre optic)

7.4 Protocols supported

• IEC 60870-5-103 Yes • others

8 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 124: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

LOW IMPEDANCE BUSBAR PROTECTION INCLUDING BREAKER FAILURE PROTECTION

Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR-BASED, NUMERICAL)

Numerical

State principle of operation, i.e. low impedance

Low Z

4 LOW IMPEDANCE BUSBAR PROTECTION INCLUDING BREAKER FAILURE PROTECTION FUNCTIONS

4.1 Integral check zone feature (state principle of operation)

Yes

4.2 Distributed Bay Modules and Central Unit (Y/N)

Yes

4.3 Maximum number of Bays

4.4 Isolator replica

4.5 CT saturation detector and stabilisation

4.5 Integral CT supervision

4.6 CT matching functions

4.7 Phase segregated protection

4.8 Sensitivity

1. Phase faults

A sec’y

2. Earth faults

A sec’y

4.9 Operating time at 5 x fault setting

ms 30

4.10 Two stage Circuit Breaker Failure Adjustable current setting Adjustable time delays per stage

Yes

5 OTHER REQUIREMENTS

5.1 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

Page 125: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

LOW IMPEDANCE BUSBAR PROTECTION INCLUDING BREAKER FAILURE PROTECTION

Unit Data

Required Offered 5.2 Tripping contacts rating

Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

5.3 Event recording function

Yes

5.4 Disturbance recording function

Yes

5.5 Self monitoring and alarm facility

6 COMMUNICATIONS

6.1 Bay to central Module communication

Fibre optic.

6.2 Integral operator interface for local interrogation

Yes

7 CONTROL

7.1 Communication ports (Front/rear etc)

7.2 Physical links (RS485/Fibre optic)

7.3 Protocols supported

• IEC 60870-5-103 Yes • others

8 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 126: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MULTI-FUNCTIONAL OVERCURRENT & EARTH FAULT PROTECTION

Unit DataATA

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR-BASED, NUMERICAL)

Numerical

4 MULTI-FUNCTIONAL OVERCURRENT & EARTH FAULT PROTECTION FUNCTIONS

4.1 Number of phase CT inputs

4.2 Number of earth fault CT inputs

4.3 Standard, Very and Extreme Inverse and definite time characteristics curves conforming to IEC 60255

Yes

4.4 Number of inverse overcurrent functions (per phase)

4.5 Number of high set overcurrent functions (per phase)

4.6 Number of low set overcurrent functions (per phase)

4.7 Number of inverse earth fault functions

4.8 Number of high set earth fault functions

4.9 Number of low set earth fault functions

4.10 Number of group settings

4.11 Earth fault element suitable of high impedance REF (with external resistor)

Yes

4.12 Operating time at 5 x setting when configured for REF

ms 30

4.13 Suitable for Blocked Overcurrent busbar protection scheme

Yes

5 OTHER FUNCTIONS PROVIDED • Thermal overload 49 Y/N • Directional OC&EF Y/N

5.1 Number of output relays • Rated for tripping • Rated for control and alarm

Page 127: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MULTI-FUNCTIONAL OVERCURRENT & EARTH FAULT PROTECTION

Unit Data

Required Offered 5.2 Integral metering functions

Yes

5.3 Opto-isolator inputs

Yes

5.4 Programmable scheme logic

Yes

5.5 Event and Fault recording functions

5.6 Self-monitoring facility

5.7 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

5.8 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

6 COMMUNICATIONS

6.1 Integral operator interface for local interrogation

Yes

7 CONTROL

7.1 Communication ports (Front/rear etc)

7.2 Physical links (RS485/Fibre optic)

7.3 Protocols supported

• IEC 60870-5-103 Yes • others

8 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 128: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.13 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MULTI-FUNCTIONAL DIRECTIONAL OVERCURRENT & EARTH FAULT PROTECTION

Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR-BASED, NUMERICAL)

Numerical

4 MULTI-FUNCTIONAL DIRECTIONAL OVERCURRENT & EARTH FAULT PROTECTION FUNCTIONS

4.1 Number of phase CT inputs

4.2 Number of earth fault CT inputs

4.3 Three phase VT input

Yes

4.4 Method of determining zero sequence voltage • Broken delta VT input (Y/N) • Derived mathematically (Y/N)

4.5 Standard, Very and Extreme Inverse and definite time characteristics curves conforming to IEC 60255

Yes

4.6 Number of inverse DOC overcurrent functions (per phase)

4.7 Number of high set DOC functions (per phase)

4.8 Number of low set DOC functions (per phase)

4.9 Number of inverse DEF functions

4.10 Number of high set DEF functions

4.11 Number of low set DEF functions

4.12 Number of group settings

5 OTHER FUNCTIONS PROVIDED

5.1 • Non-directional overcurrent 50/51 (Y/N)

5.2 • Non-directional earth fault 50 N/51 N (Y/N)

5.3 • Thermal overload 49 (Y/N)

Page 129: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.14 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11- PROTECTION SYSTEM - Cont

MULTI-FUNCTIONAL DIRECTIONAL OVERCURRENT & EARTH FAULT PROTECTION

Unit Data

Required Offered 5.4 • Suitable for Blocked Overcurrent busbar protection

scheme

5.5 • Earth fault element suitable of high impedance REF (with external resistor)

5.6 Number of output relays • Rated for tripping • Rated for control and alarm

5.7 Integral metering functions

Yes

5.8 Opto-isolator inputs

Yes

5.9 Programmable scheme logic

Yes

5.10 Event and Fault recording functions

5.11 Self-monitoring facility

5.12 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

5.13 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

6 COMMUNICATIONS

6.1 Integral operator interface for local interrogation

Yes

7 CONTROL

7.1 Communication ports (Front/rear etc)

7.2 Physical links (RS485/Fibre optic)

7.3 Protocols supported

• IEC 60870-5-103 Yes • Others

Page 130: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.15 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MULTI-FUNCTIONAL DIRECTIONAL OVERCURRENT & EARTH FAULT PROTECTION

Unit Data

Required Offered 8 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 131: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.16 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

RESTRICTED EARTH FAULT PROTECTION Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR-BASED, NUMERICAL, E-M)

Numerical

4 RESTRICTED EARTH FAULT PROTECTION FUNCTIONS

4.1 Estimated minimum fault setting (% of CT rating)

%

4.2 Operating time at 5 x setting

ms

4.3 State principle of operation,

• H = high impedance • L = low impedance

4.4 Metrosils provided

Yes

4.5 Self monitoring (excluding EM)

4.6 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

4.7 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

4.8 Communications (numerical relays)

Yes

4.9 Integral operator interface for local interrogation

5 CONTROL

5.1 Communication ports (Front/rear etc)

5.2 Physical links (RS485/Fibre optic)

5.3 Protocols supported

Yes

• IEC 60870-5-103 • others

Yes

Page 132: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.17 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

RESTRICTED EARTH FAULT PROTECTION Unit Data

Required Offered 6 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 133: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.18 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11- PROTECTION SYSTEM - Cont

TRIP CIRCUIT SUPERVISION Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR, BASED NUMERICAL)

Numerical

4 TRIP CIRCUIT SUPERVISION FUNCTIONS

4.1 Operating time

ms

4.2 Supervision of the whole trip circuit with CB open and closed.

Yes

4.3 Relay operated indicator

Yes

5 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 134: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.19 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

MULTI-CONTACT TRIPPING RELAYS Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 MULTI-CONTACT TRIPPING RELAYS FUNCTIONS

3.1 Operating time

ms <12

3.2 Is relay mechanically latched or self resetting

3.3 Method used to reset latched relay (hand or electrical)

3.4 Burden at rated voltage

3.5 Minimum voltage at which reliable operation occurs

3.6 Tripping contacts rating Carry continuous 5A Make 30A maximum for 0.2s Break dc 50W resistive 25W inductive (L/R40ms)

3.7 Relay operated indicator type

4 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 135: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.20 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

11 / 6.6 KV LOAD SHEDDING FREQUENCY RELAY Unit Data

Required Offered 1 MANUFACTURER

2 TYPE REFERENCE

3 RELAY DESIGN (MICROPROCESSOR-BASED, NUMERICAL)

Numerical

4 LOAD SHEDDING FREQUENCY RELAY FUNCTIONS

4.1 Number of under frequency stages

5

4.2 Independent time delay setting for each stage

Yes

4.3 Frequency measurement accuracy

4.4 Number of setting groups

4.5 Voltage supervision/blocking

4.6 Busbar VT changeover facility

4.7 Integral metering functions

Yes

4.8 Opto-isolator inputs Yes

4.9 Programmable scheme logic

Yes

4.10 Event and Fault recording functions

4.11 Self-monitoring facility

5 OTHER FUNCTIONS PROVIDED

5.1 • df/dt (Y/N) • over frequency (Y/N) • under/over voltage (Y/N)

5.2 Remote operation of each under frequency stage

Yes

5.3 User-friendly HMI, Windows based software for relay setting, relay configuration and event, disturbance and fault record management.

Yes

5.4 Tripping contacts rating

Page 136: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D11.21 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D11 - PROTECTION SYSTEM - Cont

11 / 6.6 KV LOAD SHEDDING FREQUENCY RELAY Unit Data

Required Offered Carry continuous 5A

Make 30 A maximum for 0.2s Break dc 50 W 25 W inductive (L/R 40 ms)

6 TYPE TEST CERTIFICATE PROVIDED

Yes

Page 137: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 1 SUBSTATION CONTROL SYSTEM Yes

2 MASTER CONTROL UNIT

2.1 Substation Computer

2.1.1 Manufacturer Yes

2.1.2 Model Yes

2.1.3 Processor

2.1.4 Type

2.1.5 Word length Bits

2.1.6 Clock speed (minimum) MHz

2.1.7 Memory size

2.1.8 Supplied (minimum) Mb

2.1.9 Supportable/expandable Gb

2.1.10 Hard disk size

2.1.11 Supplied (minimum) Gb

2.1.12 Supportable/expandable Gb

2.1.13 Optical Storage Yes

2.1.14 Operating system

2.1.15 Software supplied

2.1.16 Operating temperature range °C

2.1.17 Maximum relative humidity %

2.1.18 Nominal voltage V ac

2.1.19 Operating frequency Hz

2.1.20 Starting current A

2.1.21 Power requirement W

2.1.22 Mean time between failure h

2.1.23 Mean time to repair h

Page 138: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.2 Gateway

2.2.1 Manufacturer Yes

2.2.2 Model Yes

2.2.3 Processor

2.2.4 Type

2.2.5 Word length Bits

2.2.6 Clock speed (minimum) MHz

2.2.7 Memory size

2.2.8 Supplied (minimum) Mb

2.2.9 Supportable/expandable Gb

2.2.10 Hard disk size

2.2.11 Supplied (minimum) Gb

2.2.12 Supportable/expandable Gb

2.2.13 Communication Protocols To Control Centre(s)

2.2.14 NCC Main IEC 60870-5-101 Yes

2.2.15 NCC Alt IEC 60870-5-101 Yes

2.2.16 NCC TCP/IP Intranet Yes

2.2.17 DCC Main IEC 60870-5-101 Yes

2.2.18 DCC Alt IEC 60870-5-101 Yes

2.2.19 NCC IEC 60870-5-104 Yes

2.2.20 DCC IEC 60870-5-104 Yes

2.2.21 Communication Protocols in Substation

2.2.22 NCC IEC 60870-5-103 Yes

2.2.23 DCC IEC 60870-5-103 Yes

2.2.24 NCC IEC 60870-5-101 Yes

Page 139: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.2.25 DCC IEC 60870-5-101 Yes

2.2.26 List other operating Protocols

2.2.27 Data Communications Interface

2.2.28 V.35 interface at 64Kb/s Yes

2.2.29 X.21 / V.11 interface at 64Kb/s Yes

2.2.30 Operating system

2.2.31 Operating temperature range °C

2.2.32 Maximum relative humidity %

2.2.33 Nominal voltage V dc

2.2.34 Operating frequency Hz

2.2.35 Starting current A

2.2.36 Power requirement W

2.2.37 Mean time between failure h

2.2.38 Mean time to repair h

2.3 Operator Workstations / HMI

2.3.1 Manufacturer Yes

2.3.2 Model Yes

2.3.3 Literature reference for principle of operation Yes

2.3.4 Processor

2.3.5 Type

2.3.6 Word length Bits

2.3.7 Clock speed (minimum) MHz

2.3.8 Memory size

2.3.9 Supplied (minimum) Mb

2.3.10 Supportable/expandable Gb

Page 140: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.3.11 Hard disk size

2.3.12 Supplied (minimum) Gb

2.3.13 Supportable/expandable Gb

2.3.14 Optical Storage Yes

2.3.15 Pointer Device

2.3.16 Operating system

2.3.17 Operator interface screens

2.3.18 Operating temperature range °C

2.3.19 Maximum relative humidity %

2.3.20 Nominal voltage V ac

2.3.21 Operating frequency Hz

2.3.22 Starting current A

2.3.23 Power requirement W

2.3.24 Mean time between failure h

2.3.25 Mean time to repair h

2.3.26 Operator Desk Yes

2.3.27 Manufacturer Yes

2.3.28 Type of construction

2.3.29 Finish and material of working surfaces

2.3.30 Method of mounting VDUs

2.3.31 Number

2.3.32 Operator Chairs

2.3.33 Manufacturer

2.3.34 Type of construction

2.3.35 Type of upholstery

2.3.36 Number

Page 141: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.4 Colour Visual Display Units (VDUs)

2.4.1 Manufacturer Yes

2.4.2 Model Yes

2.4.3 Literature reference for principle of operation Yes

2.4.4 Screen size across diagonal mm

2.4.5 Usable display area mm

2.4.6 Resolution (minimum) pixels

2.4.7 Dot pitch mm

2.4.8 Operating temperature range °C

2.4.9 Operating relative humidity range %

2.4.10 Nominal voltage V ac

2.4.11 Operating frequency Hz

2.4.12 Starting current A

2.4.13 Power requirement W

2.4.14 Approximate lifetime of monitor under continuous use h

2.4.15 Mean time between failure h

2.4.16 Mean time to repair h

2.5 Substation Local Area Network (LAN)

2.5.1 Architecture and Technology Yes

2.5.2 Literature reference for principle of operation Yes

2.5.3 Transmission medium (e.g. optical fibre) and physical specification

2.5.4 Protocols

2.5.5 IEC 60870-5-101

2.5.6 IEC 60870-5-104

2.5.7 IEC 61850

2.5.8 List all other protocols

Page 142: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.5.9 Data transmission rate(s) Mbps

2.5.10

Physical arrangement - Identify all main elements in the supply including hubs, concentrators, bridges, routers, gateways switches etc. and the number of each

Yes

2.5.11 For each element of the LAN indicate the

2.5.12 No and type of ports

2.5.13 % of spare for each type of port

2.5.14 Management software package, functions and facilities, and hardware platform

2.5.15 % Loading under various system activity scenarios including

2.5.16 normal loading for performance testing %

2.5.17 high loading for performance testing %

2.5.18 system power up %

2.5.19 main server fail-over and database resynchronisation

2.5.20 Overall availability %

2.6 Individual Elements

2.6.1 For each element of the LAN equipment provide the following information

2.6.2 Manufacturer

2.6.3 Type

2.6.4 Nominal voltage

2.6.5 Power requirements V ac

2.6.6 Range of ambient temp. and max relative humidity for continuous reliable operation W

2.6.7 Mean time between failures oC

2.6.8 Mean time to repair %RH

2.7 Printers

2.7.1 Logging Printer Yes

2.7.2 Manufacturer

Page 143: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

SUBSTATION CONTROL SYSTEM Unit Data

Required Offered 2.7.3 Model

2.7.4 Literature reference for principle of operation

2.7.5 Number

2.7.6 Mounting arrangement

2.7.7 Method of printing (e.g. ink jet)

2.7.8 Print speed ppm

2.7.9 Paper feed mechanism

2.7.10 Number of columns (minimum)

2.7.11 Operating temperature range °C

2.7.12 Maximum relative humidity %

2.7.13 Nominal voltage V ac

2.7.14 Operating frequency Hz

2.7.15 Power requirement W

2.7.16 Max noise level at 1 m dB(A)

2.7.17 Mean time between failure h

2.7.18 Mean time to repair h

2.7.19 Colour Printers

2.7.20 Manufacturer Yes

2.7.21 Model Yes

2.7.22 Literature reference for principle of operation Yes

2.7.23 Number

2.7.24 Mounting arrangement

2.7.25 Print speed (minimum) ppm

2.7.26 Technology

2.7.27 Resolution dpi

2.7.28 Paper size

Page 144: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE UNIT DATA

Required Offered

2.7.29 Sheet feed paper tray capacity Sheets

2.7.30 Internal memory (minimum) Mb

2.7.31 Operating temperature range °C

2.7.32 Maximum relative humidity %

2.7.33 Nominal voltage V ac

2.7.34 Operating frequency Hz

2.7.35 Power requirement W

2.7.36 Max noise level at 1 m dB(A)

2.7.37 Mean time between failure h

2.7.38 Mean time to repair h

3 BAY CONTROL UNIT HARDWARE

3.1 General Yes

3.1.1 Manufacturer Yes

3.1.2 Module designation Yes

3.1.3 Literature reference for principle of operation Yes

3.1.4 Power supply V dc 110

3.1.5 Power requirements W

3.1.6 Maximum Number of expansion modules

3.1.7 Mean-time to repair for each type of RTU H

3.1.8 Mean-time between failure for each type of RTU H

3.1.9 Local LCD Display

3.1.10 Operating temperature range °C 0 – 50

3.1.11 Operating relative humidity range

3.2 BCU Enclosure

3.2.1 Manufacturer

3.2.2 Module designation

Page 145: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Offered 3.2.3 Literature reference for enclosure

3.2.4 Weight

3.2.5 Dimensions

3.2.6.0 Degree of protection

3.2.6.1 Flush Mounted housing

3.2.6.2 Surface mounted housing

3.3 IEC Standards ( Or Equivalent )

3.3.1 EMC Type tests (Provide Class/Level or Severity rating)

3.3.2 EMC Compliance IEC 60255-22-3

3.3.3 Dielectric withstand test IEC 60255--5

3.3.4 High Voltage impulse test IEC 60255-5

3.3.5 Fast transient disturbance test IEC 61000-4-4 and 60255-22-4

3.3.6 Oscillatory transient IEC 61000-4-12

3.3.7 Radiated immunity test IEC 61000-4-6 and 60255-22-3

3.3.8 Electrostatic discharge test IEC 61000-4-2 and 60255-22-2

3.3.9 1 MHz Burst disturbance test to IEC 60255-22-1

3.3.10 Electromagnetic emissions to IEC 60255-25

3.3.11 Emitted interference test IEC 61000-4-3

3.3.12 Mechanical test Compliance

3.3.13 Vibration test IEC 60255-21-1

3.3.14 Shock test IEC 60255-21-2

3.3.15 Seismic test IEC 60255-21-3

3.3.16 Temperature rise test IEC 60068-2-1 and 2-2

3.3.15 Relative humidity test 60068-2-78

3.3.16 Enclosure test to IEC 60529 IP50

Page 146: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.10 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Offered 3.4 BCU Functions

3.4.1 The monitoring functions include:

3.4.2 Switching status monitoring (breakers)

3.4.3 Indication & alarm status monitoring

3.4.4 Analogue measurements (currents, voltages, etc.)

3.4.5 Resolution of time tagging ms 1

3.4.6.0 The control functions include:

3.4.6.1 Close / open of circuit breakers

3.4.6.2 Close / Open of isolators / disconnectors

3.4.6.3 Transformer Automatic tap change control

3.4.6.4 Breaker Voltage Synchronisation Check Control

3.4.6.5 Bay interlocking facilities

3.4.7 The reporting functions include: 3.4.7.1 Sequence of Events recording

3.4.7.2 Post – Mortem Review / Fault waveform capture

3.4.7.3 Tenderers to state memory capacity and functionality of Sequence of events and fault waveform capture

3.5.0 BCU Configuration

3.5.1 Number of processors

3.5.2 Main processor

3.5.3 Secondary processors

3.5.4 Communication processor (module)

3.5.5 Type of communication between processors

3.5.6.0 LCD Display and selector Buttons on front of BCU Yes

3.5.6.1 Functionality to include

3.5.6.2 Full control of circuit bay

3.5.6.3 Status of bay plant

Page 147: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.11 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required

3.5.6.4 Circuit active line diagram

3.5.6.5 Power system Measurements

3.5.6.6 Display alarms and events

3.6 Processing Units

3.6.1 Main CPU

3.6.2 Manufacturer

3.6.3 Module designation

3.6.4 Literature reference for principle of operation

3.6.5 Mean - time between failure h

3.6.6 Power requirements W

3.6.7 Type of processor

3.6.8 Word length bit

3.6.9 Clock speed MHz

3.6.10 Kinds of memory used:

3.6.10.1 Type, size and extension capabilities KByte

3.6.10.2 Type, size and extension capabilities Kbytes

3.6.10.3 Type, size and extension capabilities Kbytes

3.7 Secondary CPU

3.7.1 Manufacturer

3.7.2 Module designation

3.7.3 Literature reference for principle of operation

3.7.4 Mean - time between failure h

3.7.5 Power requirements W

3.7.6 Type of processor

3.7.7 Word length bit

3.7.8 Clock speed MHz

Page 148: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.12 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12- SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required

3.7.9 Kinds of memory used:

3.7.9.1 Type, size and extension capabilities Kbytes

3.7.9.2 Type, size and extension capabilities Kbytes

3.7.9.3 Type, size and extension capabilities Kbytes

3.8 Communications

3.8.1 Manufacturer Yes

3.8.2 Module designation

3.8.3 Literature reference for principle of operation

3.8.4 Number of communications channels

3.8.5 Type of processor

3.8.6 Word length

3.8.7 Clock speed bit

3.8.8 Type and size of memory MHz

3.8.9 Line interface to communication channel

3.8.10 Kinds of memory used: B/s

3.8.11 Number and type of communication ports

3.8.12 Meantime between failure h

3.8.13 Power requirement W

3.8.14.0 Communication Interfaces

3.8.14.1 IEC60870-5-101 direct to Control Centre(s)

3.8.14.2 IEC60870-5-103 interface to protection IED

3.8.14.3 IEC61850 interface to substation LAN

3.8.14.4 IEC60870-5-101 for remote downloading of BCU data

3.8.14.5 List all Protocols available at BCU

3.8.15 Local interface for Laptop Computer

Page 149: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.13 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.8.16 IED interface

3.8.16.1 List of manufactures the BCU has interfaced Yes

3.8.16.2 Standard communication protocols available Yes

3.8.16.3 Optional communication protocols available Yes

3.9 Power Supply Module

3.9.1 Module designation

3.9.2 Literature reference for principle of operation

3.9.3 Maximum number of modules per processor

3.9.4 Nominal Input voltage VDC

3.9.5 Operating voltage range

3.9.6 Power requirement W

3.9.7 Isolation

3.9.8 Meantime between failure h

3.9.9 Power requirement W

3.10 Digital Input Module

3.10.1 Module designation

3.10.2 Literature reference for principle of operation

3.10.3 Maximum number of modules per processor

3.10.4 Input voltage V dc

3.10.5 Is contact input type configurable as

3.10.5.1 Status and alarms

3.10.5.2 Sequence of events

3.10.5.3 BCD or parallel inputs

3.10.5.4 Pulse accumulator

3.10.5.5 Or any combination of these

Page 150: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.14 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.10.6 Standard number of inputs per module:

3.10.6.1 double position

3.10.6.2 single position

3.10.7 Type of input circuit isolation

3.10.8 Input galvanic separation

3.10.9 Impulse voltage withstand kV

3.10.10 Scan time ms

3.10.11 Minimal pulse duration ms

3.10.12 Input impedance ohm

3.10.13 Filter time constant ms

3.10.14 Meantime between failure h

3.10.15 Power requirement W

3.11 Pulse Counting Module

3.11.1 Is this facility incorporated into the digital input module?

3.11.2 Module designation

3.11.3 Literature reference for principle of operation

3.11.4 Maximum number of modules per processor

3.11.5 Type of counter

3.11.6 Maximum count

3.11.7 Storage and resetting under control of external clock?

3.11.8 Number of inputs per module

3.11.9 Input current mA

3.11.10 Impulse voltage withstand kV

3.11.11 Signal range : pulse widths ms

3.11.12 Meantime between failure h

3.11.13 Power requirement W

Page 151: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.15 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.12 Command Output Module

3.12.1 Module designation

3.12.2 Literature reference for principle of operation

3.12.3 Maximum number of modules per processor

3.12.4.0 Contact ratings

3.12.4.1 Switched voltage V

3.12.4.2 Switched power VA max

3.12.4.3 Switched current A

3.12.4.4 Range of duration of command output S

3.12.5 Number of two position output channel per module

3.12.6 Are outputs activated by select-check-actuate procedure?

3.12.7 Are welded contacts checked prior to command output?

3.12.8 Are the outputs fused and fuse status monitored?

3.12.9 Impulse voltage withstand kV

3.12.10 Meantime between failure h

3.12.11 Power requirement W

3.13 Digital Output Module

3.13.1 Module designation

3.13.2 Literature reference for principle of operation

3.13.3 Number of outputs per module

3.13.4 Maximum number of modules per processor

3.13.5 Maximum output current mA

3.13.6 Maximum switched output voltage V

3.13.7 Impulse voltage withstand kV

3.13.8 Type of protection against back EMF kV

3.13.9 Command duration adjustable in the range s

Page 152: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.16 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.13.10 Meantime between failure h

3.13.11 Power requirement W

3.14 Analogue to digital conversion module

3.14.1 Module designation

3.14.2 Literature reference for principle of operation

3.14.3 Number of inputs per module

3.14.4 Maximum number of modules per processor

3.14.5 Resolution bits

3.14.6 Accuracy %

3.14.7 Common mode noise rejection dB

3.14.8 Normal mode noise rejection dB

3.14.9 Conversion time ms

3.14.10 Scanning time (per channel) ms

3.14.11 Meantime between failures h

3.14.12 Power requirement W

3.15 Analogue Input Module

3.15.1 Module designation

3.15.2 Literature reference for principle of operation

3.15.3 Maximum number of modules per processor

3.15.4 Scanning resolution bits

3.15.5 Accuracy %

3.15.6 How are overflow and conversion failures dealt with?

3.15.7 Conversion time

3.15.8 Input filter attenuation at 50 Hz dB

3.15.9 Input signal types (e.g. 4-20 mA)

3.15.10 Method of isolation

Page 153: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.17 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.15.11 Impulse voltage withstand kV

3.15.12 Input impedance ohm

3.15.13 Type of ADC switching

3.15.14 Standard number of inputs per module

3.15.15 Meantime between failure h

3.15.16 Power requirement W

3.16 Analogue Output Module

3.16.1 Module designation

3.16.2 Literature reference for principle of operation

3.16.3 Number of outputs per module

3.16.4 Maximum number of modules per processor

3.16.5 Output voltage range V

3.16.6 Output current range mA

3.16.7 Type of isolation

3.16.8 Load resistance range ohms

3.16.9 Maximum error over-current ranges %

3.16.10 Impulse voltage withstand kV

3.17 Direct AC Connection Voltage

3.17.1 Module designation

3.17.2 Literature reference for principle of operation

3.17.3 Maximum number of modules processor

3.17.4 Number of inputs per module

3.17.5 Input voltage ranges V ac

3.17.6 Input filter attenuation at 50 Hz dB

3.17.7 Burden on instrument transformer circuit VA

3.17.8 Conversion time ms

Page 154: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.18 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BAY CONTROL UNIT HARDWARE Unit Data

Required Required 3.17.9 Scanning resolution bits

3.17.10 Accuracy %

3.17.11 What calculations are supported?

3.17.12 How are overflow and conversion failures dealt with?

3.17.13 Method of isolation

3.17.14 Impulse voltage withstand kV kV

3.18 Direct AC Connection Current

3.18.1 Module designation

3.18.2 Literature reference for principle of operation

3.18.3 Maximum number of modules processor

3.18.4 Number of inputs per module

3.18.5 Input current ranges A

3.18.6 Input filter attenuation at 50 Hz dB

3.18.7 Burden on instrument transformer circuit VA

3.18.8 Conversion time ms

3.18.9 Scanning resolution bits

3.18.10 Accuracy %

3.18.11 What calculations are supported?

3.18.12 How are overflow and conversion failures dealt with?

3.18.13 Method of isolation

3.18.14 Impulse voltage withstand kV kV

Page 155: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.19 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BCU SOFTWARE Unit Data

Required Offered 4 BCU SOFTWARE

4.1 General Requirements

4.1.1 Program structure

4.1.2 System software

4.1.3 Standard functions programs

4.1.4 User functions programs

4.2 Capability of:

4.2.1 BCU program downloading from Control Centre

4.2.2 Application configuration from Control Centre

4.2.3 Remote selection of processing parameters

4.2.4 Selection of communication protocols

4.2.5 Selection of operation modes (cyclic, polled, etc.)

4.2.6 Appropriate protection of software against power failure

4.2.7 Automatic BCU re-start without software down-loading

4.3 SYSTEM SOFTWARE

4.3.1 Operating System (Monitor) Functions and capabilities

4.3.2 Calendar Program Type, Functions and capabilities

4.3.3 Time Synchronization Program Functions and capabilities

4.3.4 Database Updating Program Functions and capabilities

4.3.5 Testing and Diagnostics Programs Functions and capabilities

4.4 Standard Functions Programs

4.4.1 Data Communication Programs: Functions and capabilities

4.4.2 Capability of communication protocol selection

4.4.3 Capability of operating modes selection

Page 156: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.20 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BCU SOFTWARE Unit Data

Required Offered

4.5 Analogue Measurements, Scanning and Transmission Programs

4.5.1 Capabilities of adjustments

4.5.2 Transducers constants

4.5.3 Periodic transmission/transmission by exception

4.5.4 Automatic checking of A/D-conversion accuracy

4.5.5 Smoothing

4.5.6 Threshold values

4.5.7 Limits

4.5.8 Scan duration (range)

4.5.9 Cycle duration (range) s

4.5.10 Priority of transmission s

4.5.11 Digital Input Data Scanning and Transmission Program

4.6 Functions and capabilities

4.6.1 Capability of adjustments

4.6.2 Scan duration (range) ms

4.6.3 Transient time of status information (range)

4.6.4 Cycle duration (range) ms

4.6.5 Debouncing filter s

4.6.6 Suppression of intermediate status information

4.6.7 Time tagging

4.6.8 Transmission mode

4.6.9 Priority of transmission

4.7 Alarm and Event handling

4.7.1 Grouping of alarms and events

4.7.2 Maximum number of groups

Page 157: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.21 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

BCU SOFTWARE Unit Data

Required Offered

4.8 Supervisory Control Programs: Functions and capabilities

4.8.1 Select before execute

4.8.2 Target check

4.8.3 Cancelling control after adjustable time delay

4.8.4 Capability of adjustments:

4.8.5 Duration of output (range) s

4.8.6 Allowed duration of execution (range) s

4.8.7 Sequence of Events programs

4.8.8 Minimal sequence of events time resolution ms

4.8.9 Sequence of events memory capacity

4.8.10 Events time resolution (adjustable range)

4.8.11 Priority of transmission

4.8.12 Post - Mortem Review / Program

4.8.13 Selection of analogues for post-mortem review

4.8.14 Short interval time resolution (adjustable range) s

4.8.15 Long interval time resolution (adjustable range) s

4.9 Data processing programs: Functions and capabilities

4.9.1 Required minimum data processing:

4.9.2 Logic functions

4.9.3 Arithmetical functions (MW , Mvar etc )

4.9.4 Limiting functions s

4.9.5 Comparative functions

4.9.6 Time functions

Page 158: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.22 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

GATEWAY SOFTWARE Unit Data

Required Offered 5 GATEWAY SOFTWARE

5.1 General Requirements

5.1.1 Database management application

5.1.2 Alarm and Event Grouping

5.1.3 Alarm and Event Separation for NCC and DCC

5.1.4 Alarm and Event storage and remote / local access

5.2 Capability of:

5.2.1 Gateway program downloading from Control Centre

5.2.2 Application configuration from Control Centre

5.2.3 Remote selection of processing parameters

5.2.4 Selection of communication protocols

5.2.5 Selection of operation modes (cyclic, polled, etc.)

5.2.6 Appropriate protection of software against power failure

5.2.7 Automatic re-start without software down-loading

5.3 System Software

5.3.1 Operating System (Monitor) Functions and capabilities

5.3.2 Calendar program Type, functions and capabilities

5.3.3 Time Synchronization Program Functions and capabilities

5.3.4 Data Base Updating program Functions and capabilities

5.3.5 Testing and Diagnostics Programs Functions and capabilities

Page 159: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.23 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data

Required Offered

6 TRANSDUCERS

6.1 Current transducer.

6.1.1 Manufacturer

6.1.2 Type reference

6.1.3 Number

6.1.4 Principle (e.g. 3 phase, 3 wire, unbalanced)

6.1.5 Output range mA

6.1.6 Input ranges available A

6.1.7 Burden on instrument transformer circuit VA

6.1.8 Insulation level kV

6.1.9 Impulse withstand level kV peak

6.1.10 Minimum accuracy over working range %

6.1.11 Response time (0 to 90%) ms

6.1.12 Mounting details

6.1.13 Operating temperature range °C

6.1.14 Operating humidity range %

6.1.15 Auxiliary supply if required

6.1.16 Voltage range V

6.1.17 Power requirements VA

6.1.18 Frequency Hz

6.1.19 Type of overload protection

6.1.20 Permissible continuous input overload %A

6.2 Voltage transducer

6.2.1 Manufacturer

6.2.2 Type

6.2.3 Number

Page 160: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.24 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data

Required Offered 6.2.4 Output range mA

6.2.5 Input ranges available V

6.2.6 Burden on instrument transformer circuit VA

6.2.7 Insulation level kV

6.2.8 Impulse withstand level kV peak

6.2.9 Minimum accuracy over working range %

6.2.10 Response time (0 to 90%) ms

6.2.11 Mounting details

6.2.12 Operating temperature range °C

6.2.13 Operating humidity range %

6.2.14 Auxiliary supply

6.2.15 V range V

6.2.16 Power requirements VA

6.2.17 Frequency Hz

6.2.18 Type of overload protection

6.2.19 Permissible continuous input overload %V

6.3 Active Power MW

6.3.1 Manufacturer

6.3.2 Type reference

6.3.3 Number

6.3.4 Principle (e.g. 3 phase, 3 wire, unbalanced)

6.3.5 Output range mA

6.3.6 Input ranges available

6.3.7 Voltage V

6.3.8 Current A

6.3.9 Burden on instrument transformer circuit

Page 161: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.25 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data

Required Offered 6.3.10 Current Transformer (CT) VA

6.3.11 Voltage Transformer (VT) VA

6.3.12 Insulation level kV

6.3.13 Impulse withstand level kV peak

6.3.14 Minimum accuracy over working range %

6.3.15 Response time (0 to 90%) ms

6.3.16 Mounting details

6.3.17 Operating temperature range °C

6.3.18 Operating humidity range %

6.3.19 Auxiliary supply if required

6.3.20 Voltage range V

6.3.21 Power requirements VA

6.3.22 Frequency Hz

6.3.23 Type of overload protection

6.3.24 Permissible continuous input overload

• Voltage %V

• Current %A

6.4 Reactive Power MVArs

6.4.1 Manufacturer

6.4.2 Type reference

6.4.3 Number

6.4.4 Principle (e.g. 3 phase, 3 wire, unbalanced)

6.4.5 Output range mA

6.4.6 Input ranges available

6.4.7 Voltage V

6.4.8 Current A

Page 162: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.26 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data

Required Offered 6.4.9 Burden on instrument transformer circuit

6.4.10 Current Transformer (CT) VA

6.4.11 Voltage Transformer (VT) VA

6.4.12 Insulation level kV

6.4.13 Impulse withstand level kV peak

6.4.14 Minimum accuracy over working range %

6.4.15 Response time (0 to 90%) ms

6.4.16 Mounting details

6.4.17 Operating temperature range °C

6.4.18 Operating humidity range %

6.4.19 Auxiliary supply

6.4.20 Voltage range V

6.4.21 Power requirements VA

6.4.22 Frequency Hz

6.4.23 Type of overload protection

6.4.24 Permissible continuous input overload

• Voltage %V

• Current %A

6.5 Frequency

6.5.1 Manufacturer

6.5.2 Type

6.5.3 Number

6.5.4 Measurement range Hz

6.5.5 Output range mA

6.5.6 Input ranges available V ac

6.5.7 Burden on instrument VT circuit VA

Page 163: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.27 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data Required Offered 6.5.8 Insulation level kV

6.5.9 Impulse withstand level kV peak

6.5.10 Minimum accuracy over working range %

6.5.11 Response time (0 to 90%) ms

6.5.12 Mounting details

6.5.13 Operating temperature range °C

6.5.14 Auxiliary supply

6.5.15 Voltage range V

6.5.16 Power requirements VA

6.5.17 Frequency Hz

6.5.18 Type of overload protection

6.5.19 Permissible continuous input overload %V %

6.6 Power Factor

6.6.1 Manufacturer

6.6.2 Type

6.6.3 Number

6.6.4 Measurement range

6.6.5 Output range mA

6.6.6 Input ranges available V ac

6.6.7 Burden on instrument VT circuit VA

6.6.8 Insulation level kV

6.6.9 Impulse withstand level kV peak

6.6.10 Minimum accuracy over working range %

6.6.11 Response time (0 to 90%) ms

6.6.12 Mounting details

6.6.13 Operating temperature range °C

6.6.14 Auxiliary supply

Page 164: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.28 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data Required Offered 6.6.15 Voltage range V

6.6.16 Power requirements VA

6.6.17 Frequency Hz

6.6.18 Type of overload protection

6.6.19 Permissible continuous input overload %

• Voltage %V

• Current %A

6.7 Combined active and reactive power

6.7.1 Manufacturer

6.7.2 Type

6.7.3 Number

6.7.4 Measurement range

6.7.5 Input ranges available

6.7.6 Voltage V ac

6.7.7 Current A

6.7.8 Burden on instrument transformer circuit

6.7.9 Current Transformer (CT) VA

6.7.10 Voltage Transformer (VT) VA

6.7.11 Insulation level kV

6.7.12 Impulse withstand level kV peak

6.7.13 Minimum accuracy over working range %

6.7.14 Response time (0 to 90%) ms

6.7.15 Number of analogue outputs

6.7.16 Analogue output range mA

6.7.17 Calculations available

6.7.18 Serial output protocol

6.7.19 Mounting details

Page 165: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D12.29 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D12 - SUBSTATION CONTROL SYSTEM - Cont

TRANSDUCERS Unit Data Required Offered 6.7.20 Operating temperature range °C

6.7.21 Auxiliary supply

6.7.22 Voltage range V

6.7.23 Power requirements VA

6.7.24 Frequency Hz

6.7.25 Type of overload protection

6.7.26 Permissible continuous input overload

• Voltage %V

• Current %A

Page 166: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D13.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCEHDULE D13 - CONTROL, OPERATION, INDICATION AND ALARM CIRCUITS

Item No.

Device Function Operating supply voltage

Required Provided

1 Gas And/Or Oil Actuated Relay

a. Alarm b. Trip

48 V dc 110 V dc

Yes Yes

2 Winding temperature indicator

Alarm Trip Cooler Control

48 V dc 110 V dc 220/380 V ac

HV Yes LV Yes Tertiary N/A

3 Winding temperature indicator remote repeater

Indication HV No LV No Tertiary N/A

4 Oil temperature indicator

Alarm Trip

48 V dc 110 V dc

Yes Yes

5 Tap-changing equipment

Control Indication

220/380 V ac 48 V dc

Yes Yes

6 Fan failure Alarm 48 V dc Yes

7 Oil flow failure

Alarm 48 V dc N/A

8 Remote electrical indicator to show if units of a group of transformers are in parallel on different tappings

Indication Alarm

48 V dc -

Yes No

9 Transformer “tap change in progress” remote electrical indication

Indication Alarm

48 V dc -

Yes No

10 Transformer “voltage ratio” remote electrical indication

Indication

48 V dc

Yes

Page 167: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D14.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D14 – CAPACITORS

Unit Data Item No Description Required Offered 1.1 Assigned rated current

A

1.2 Assigned rated voltage

kV

1.3 Assigned rated output MVAr

1.4 Whether complete 3-phase bank is star or delta connected

1.5 Rated frequency

Hz

1.6 Temperature category to IEC 60871

1.7 Nominal capacitance:

1.7.1 For each element

µF

1.7.2 For each capacitor unit

µF

1.7.3 Capacitance of single phase bank

µF

1.8 Dielectric embodied in elements:

1.8.1 Whether paper and/or plastic film

1.8.2 Thickness of each: a. Paper B. FILM

µm µm

1.8.3 Number per layer: Of paper Of film

1.9 Element foils thickness

µm

1.10 Method of making connections to element foils

1.11 Details of impregnating medium:

1.11.1 Trade name

1.11.2 Chemical compound

1.12 Nominal rated voltage of elements

V

Page 168: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D14.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D14 – CAPACITORS – Cont

Unit Data Item No Description Required Offered 1.13 Design maximum dielectric stresses:

a. Paper b. Film

V/µm V/µm

1.14 Minimum rms breakdown voltage of individual elements

V

1.15 Connection of elements per capacitor unit:

1.15.1 Number in parallel

1.15.2 Number in series

1.16 Rated voltage UN of capacitor unit

kV

1.17 Rated current of unit

A

1.18 Rated output of unit

MVAr

1.19 Connection of capacitors:

1.19.1 Number of units in parallel per phase

1.19.2 Number of unit groups in series per phase

1.20 Details of fusing arrangement and whether internal or external

1.21 Losses in capacitor unit determined as described in IEC 60871 at dielectric temperatures of: 20 °C 75 °C

W/kWAr W/kVAr

1.22 Variation of losses due to temperature variation over the ambient temperature range for the temperature category stated in Item 1.6 W/kVAr at °C W/kVAr at °C

W/kVAr W/kVAr

1.23 Variation of capacitance due to temperature variation over the ambient temperature range for the temperature category stated in Item 1.6

%

Page 169: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D14.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D14 – CAPACITORS – Cont

Unit Data Item No Description Required Offered 1.24 Maximum operating surface temperature

rise of container - (above an ambient temperature of 50°C)

°C

1.25 Maximum internal hot spot temperature rise (above ambient stated in Item 1.24)

°C

1.26 Weight of complete unit capacitor including all fittings and impregnating medium

kg

1.27 Total weight of complete 3-phase capacitor bank arranged for transport

kg

1.28 Thickness of container:

mm

1.28.1 Top

mm

1.28.2 Sides

mm

1.28.3 Bottom

mm

1.29 Type of connector provided at HV terminals of capacitor bank

1.30 Type of connector provided at neutral ends of capacitor bank

1.31 Minimum ambient temperature at which a capacitor bank at this temperature may be energised at rated voltage and frequency without damage to, or loss of life of, unit capacitors or deterioration of associated fuses

°C

1.32 Details of discharge device:

1.32.1 Type

1.32.2 Connection

1.32.3 Number of devices (per element, of group of elements)

1.32.5 Voltage rating/device

V

1.32.6 Current rating/device

mA

1.32.7 Total loss per device at rated current

W

Page 170: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

D14.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE D – TECHNICAL PARTICULARS - CONT

SCHEDULE D14 – CAPACITORS – Cont

Unit Data Item No Description Required Offered 1.32.8 Total loss per unit capacitor at rated current W 1.32.9 Estimated times for discharge down to the voltage

limit specified in IEC 60871:

a. For a unit capacitor

Minutes

b. For the complete single phase bank

Minutes

Page 171: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E

TECHINCAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS

Page 172: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS

This Schedule details the requirements for drawings, documents, operating and maintenance instructions, samples and models as may be required to describe the Works. SCHEDULE E1 – DRAWINGS ISSUED WITH THE TENDER

The drawings listed below form an integral part of this specification and are to provide a guide regarding the system electrical connection, location and arrangement.

Drawing Title

1 IQ 18321 D Typical 132/33/11(6.6)kV AIS Substation - Overall Single Line Diagram

1 IQ 18523 C Typical 132/33/11(6.6)kV AIS Substation - Single Line Diagram of 132kV Substation Protection

1 IQ 18329 E Typical 132/33/11(6.6)kV Substation - Single Line Diagram of 33kV Substation Protection

1 IQ 18330 D Typical 132/33/11(6.6)kV Substation - Single Line Diagram of 11(6.6)kV Substation Protection

3 IQ 18331 B Typical 132/33/11(6.6)kV Substation - Single Line Diagram of MW Max Demand Indication and Recording

2 IQ 18332 D Typical 132/33/11(6.6)kV Substation - Single Line Diagram of LVAC Supplies

3 IQ 18333 C Typical 132/33/11(6.6)kV Substation - Single Line Diagram of 110V DC Supplies

3 IQ 18334 C Typical 132/33/11kV Substation - Single Line Diagram of 48V DC Supplies

3 IQ 18291 D Typical Substation Diagrams - Symbols List

1 IQ 18338 B Typical 132/33/11(6.6)kV AIS Substation - General Arrangement

1 IQ 18339 B Typical 132/33/11(6.6)kV AIS Substation - Sections of 132kV Switchgear

1 IQ 18531 A Typical 132/33/11(6.6)kV AIS Substation - Layout of Combined 33/11kV Switchgear and Auxiliary Plant Building

1 IQ 18532 A Typical 132/33/11(6.6)kV AIS Substation - Sections of Combined 33/11kV Switchgear and Auxiliary Building

2 IQ 18297 C Typical 400/132kV and 132/33/11(6.6)kV Substation – Layout of Guard House

1 IQ 18300 B Typical 400/132kV and 132/33/11(6.6)kV Substation – Fence Details

2 IQ 18303 B Typical 400/132kV and 132/33/11(6.6)kV Substation - Arrangement of Control Desk

1 IQ 18304 E Typical 400/132kV and 132/33/11(6.6)kV Substation - Outdoor Open Terminal Electrical Safety Clearances

1 IQ 18305 B Typical 400/132kV and 132/33/11(6.6)kV Substation - Road Cross Sections and Drainage Details

Page 173: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS - CONT

SCHEDULE E1 – DRAWINGS ISSUED WITH THE TENDER – CONT

Drawing Title

1 IQ 18306 B Typical 400/132kV and 132/33/11(6.6)kV Substation - Details of Sanitary Drainage System

Page 174: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E2 - DRAWINGS REQUIRED WITH TENDER

The Contractor shall submit with this Tender full details to describe the proposal and as a minimum shall include the following information:

(a) General arrangement of the switchyard showing general equipment layout, overall dimensions of equipment bays, and phase-phase and phase-earth clearances where applicable.

(b) Outline drawings of switchgear bays, circuit breakers, disconnect switches, earthing switches and other main plant showing overall dimensions and weights, including details for shipping.

(c) Typical drawings of protection equipment, relay panels, and associated equipment enclosures

(d) General arrangement for transformers and reactors.

(e) Bushings or cable termination details for transformers

(f) Descriptive information and drawings dealing with tank, core and winding arrangements including type of coils, insulation, use of grading, on-load tap-changing equipment and location of all ancillary devices.

(g) Evidence of Type testing on similar switchgear and transformer units.

The contractor shall include any other drawings, catalogues, descriptions and photographs necessary to present a clear picture of the type and class of equipment being submitted.

SCHEDULE E3 - REQUIREMENTS FOR CONTRACT DRAWINGS

Following award of Contract the Contractor shall submit for approval drawings, which shall be in sufficient detail to show:

1 Substation General Arrangement and Single Line Diagrams

(a) General arrangement at each substation. (These drawings shall give the principal dimensions and positions of the circuit breakers, disconnecting switches, etc.)

(b) Single line diagram of the main high-voltage connections, showing protection and metering circuits.

2 Switchgear and Associated Control and Protection

(a) Section drawings of circuit breakers showing general details of construction.

(b) General arrangement of control and indicating panels.

(c) General arrangement of relay panels.

Page 175: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E3 - REQUIREMENTS FOR CONTRACT DRAWINGS - CONT

(d) Typical diagrams of unit protective equipment and busbar zone protection.

(e) General arrangement of battery charging equipment.

(f) General arrangement of auxiliary switchgear.

(g) General arrangement, details and schematic diagram of oil filtering and storage equipment (if any are required).

(h) General arrangement and details of isolating switches and earthing blades.

(j) General arrangement, details and schematic diagram of compressed air system, if required.

(k) Details of bushing, post and suspension insulators.

(m) General arrangement and details of surge arresters and associated surge counters.

(n) Sectional elevation drawings of each type of circuit breaker bay showing positions of current transformers and other apparatus forming an integral part of each unit.

(p) Details and schematic diagram of interlocking.

(q) Complete schematic diagrams of:

(i) Direct current tripping connections;

(ii) Direct current control and indication connections;

(iii) Current transformer connections;

(iv) AC voltage connections for protective equipment, indication and synchronizing;

(v) Connections of electrical interlocking equipment;

(vi) Connections of busbar zone protective equipment.

(r) Complete wiring diagrams.

(s) Details of protective relays, accessories and current transformers including particulars of wiring and drilling dimensions.

(t) Details and arrangements of auxiliary plant and kiosks.

Page 176: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-5 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E3 - REQUIREMENTS FOR CONTRACT DRAWINGS - Cont

(u) Details of circuit breakers handling equipments.

(v) Details of instrument scales.

(w) Material lists.

(y) Layout and schedule of multi-conductor cables.

(z) Details of transformer fire protection equipment (if any are required).

3 Transformers

(a) The general arrangement and dimensions of the equipment to be supplied under the Contract.

(b) Detail drawings showing core clamping, winding arrangements, tank and wheel detail dimensions, cooler details and control cubicle details.

(c) The weight of each part on all detail drawings.

(d) The nature of the material from which the various parts are to be made and their surface finishes.

(e) The weld details and machining and assembly tolerance of all assemblies.

(f) The manner in which such parts are designed to function.

(g) Name plate details.

(h) Wiring diagrams and catalogue numbers of all electrical equipment.

(j) Complete electrical wiring diagrams.

(k) Complete electrical wiring diagrams.

(m) Material lists of all ancillary equipment - starters, fans, relays, bushings etc.

(n) The location of checks, anchors, grout pockets and the like in structures constructed by others. Such drawings shall be provided not less than six months prior to the scheduled start of construction of the structure effected.

Page 177: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-6 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E3 - REQUIREMENTS FOR CONTRACT DRAWINGS - Cont

(p) Final issues of all applicable drawings

(q) Drawings, submitted by the Contractor shall be in sufficient detail to show:

(i) The general arrangement and dimensions of the parts and the size of each major part of the equipment to be supplied under the contract.

(ii) The weight of each major part on all detail drawings. The shipping weight and dimensions shall also be given.

(iii) The nature of the material and surface finish from which the various parts are to be made.

(iv) The weld details and machining and assembly tolerance of all assemblies.

(v) The manner in which such parts are designed to function.

(vi) Wiring diagrams and catalogue numbers of all electrical equipment

4 Civil, architectural and building services

Submittals required for are required to fully detail all substation buildings, roads, drainage equipment foundations building serves and air conditioning equipment as specified.

SCHEDULE E4 - CONTRACTOR’S SUBMITTALS - DRAWING AND DESIGN DATA

The Contractor shall submit all drawings, samples and models for approval in sufficient time to permit modifications to be made if such are deemed necessary, and the drawings and samples and models to be re-submitted without delaying the initial deliveries or completion of the Contract Works. The time allowed for the Employer to review and comment on drawings, samples and models shall be agreed.

If the Contractor requires early review of any drawing in order to avoid delay in the completion of the Contract Works, he shall advise the Engineer to such effect when submitting the drawing.

The drawing format and the indexing system, will be agreed at the first Contract meeting between the Contractor and the Engineer. The number of copies of each drawing or of any subsequent revision to be submitted to the Engineer for review shall be advised to the Contractor by the Engineer.

Drawings, samples and models submitted by the Contractor and approved by the Engineer shall not be departed from without the instruction in writing of the Engineer.

The Engineer reserves the right to request any further additional information that may be considered necessary in order fully to review the Contractor’s drawings.

Page 178: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-7 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E 4 - CONTRACTOR’S SUBMITTALS - DRAWING AND DESIGN DATA - Cont

Any drawing modified from a previously submitted drawing shall bear a new version number. Revised drawings reissued for review shall have at least one copy clearly marked indicating the amendments to the drawing. Revision boxes must be provided giving the date, revision letter and brief description of each drawing.

Any drawing or document submitted for information only shall be indicated as such by the Contractor. Drawings submitted for information only will not be returned to the Contractor unless the Engineer considers that such drawings do need to be reviewed, in which case they will be returned suitably stamped with comments.

Following final review, further copies of the reviewed drawing shall be marked “Issued for Construction” and shall be supplied to the Engineer for distribution and to Site.

All drawings shall be drawn to one of the preferred scales quoted in Table 7 of BS Publication PD6031 and on paper of the appropriate size from the International Series of A sizes.

Except as otherwise specifically approved, all drawings shall be of size not greater than A0 (normally 841 mm x 1189 mm) nor smaller than A4 (normally 210 mm x 297 mm).

All drawings shall be accurately drawn to scale on sheets of specified size and shall be legible. Wording on drawings shall be in English. All units and dimensions shall be in the metric (S.I) system. Symbols shall be in accordance with approved standards. Drawings submitted for approval shall be to scale not less than 1:20. All important dimensions shall be given and the material of which each part is to be constructed shall be indicated.

The Contractor shall be responsible for any discrepancies or errors in or omissions from the drawings, whether such drawings have been approved or not by the Engineer. Approval given by the Engineer to any drawing or sample shall neither relieve the Contractor from his liability to complete the Contract Works in accordance with this Specification and the Conditions of Contract nor exonerate him from any of his guarantees, or relieve the Contractor of responsibility for correctness, nor for results arising from errors or omissions nor for failure in the matter of guarantee, which may become evident during erection or subsequent operation.

If revisions are required after a drawing has been submitted, the Contractor shall resubmit the specified number of reproductions to the Engineer.

All drawings, samples and models shall be submitted in accordance with the provisions of this Specification and shall become the property of the Employer.

Page 179: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-8 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E 4 - CONTRACTOR’S SUBMITTALS - DRAWING AND DESIGN DATA - Cont

All drawings submitted by the Contractor shall have the following particulars in the lower right hand corner in addition to the Contractor’s name, date, scale, number and title of the drawing, contract number, substation title and equipment description.

Ministry of Electricity

Baghdad, Iraq

SCHEDULE E5 - INSTALLATION AND MAINTENANCE INSTRUCTIONS

The Contract Price shall be deemed to include illustrated installation and maintenance instructions written in English.

The instructions are to be as simple and clear as possible, fully illustrated with drawings and diagrams as necessary and detailed with part numbers for ordering of replacements. Two copies are required for use of the Engineer during erection work.

A further 6 copies are to be reproduced as a book or books of approximately A4 size and bound into strong black durable imitation leather covers inscribed upon the front generally in the form of the title page to this document except that the references to Specification, Conditions of Contract, drawings, etc, will be replaced by “Installation and Maintenance Instructions”.

The name of the main Contractor, but not that of any subcontractor, may also be inscribed upon the cover after the description of the plant. The name of the Ministry of Electricity shall be inscribed upon the spine.

SCHEDULE E6 - FINAL RECORDS

After completion of work on Site all Contract drawings shall be revised where necessary to show the equipment as installed and two copies of revised drawings shall be submitted for review. A complete set of reviewed records shall be provided comprising, one full size reproducible copy and one full size print. Record drawings shall be endorsed “As Constructed” and shall be correctly titled and carry the Engineer’s review number, Contractor’s drawing number and where appropriate the Ministry of Electricity’s number allocated to the item.

After final review of the “As Constructed” record drawings the Contractor shall submit two complete sets of records on compact discs, one of which is for the Ministry of Electricity. Electronic copies of the drawings shall be in CAD 2002 format suitable for reproduction on paper using the Engineer’s preferred software packages. Each disc shall provide a comprehensive drawing list containing the drawing number, sheet, revision and title of every drawing. Each single file drawing record shall be

Page 180: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

E-9 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE E - TECHNICAL DOCUMENTATION/DRAWINGS AND OPERATING AND MAINTENANCE INSTRUCTIONS – CONT

SCHEDULE E6 - FINAL RECORDS - Cont

self-supporting, complete with unique title and drawing number, without referencing other files. Non-standard items such as fonts, line types, etc should not be used. If compression techniques are applied to files then any software necessary to decompress the files shall be included on the discs. The Contractor shall ensure that all information contained on the discs has been checked for virus contamination. Each compact disc shall be supplied suitably encased and accompanied with printed documentation describing the contents of the compact discs, the formats and software used to compile the discs and the print hardware required to reproduce the record drawings.

Final record copies shall be handed over before the issue of the Taking Over Certificate.

Page 181: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 182: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 183: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 184: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 185: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 186: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 187: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 188: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 189: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 190: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 191: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 192: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 193: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 194: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 195: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 196: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 197: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 198: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 199: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging
Page 200: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE F

DEVIATIONS FROM THE TECHNICAL SPECIFICATION

Page 201: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

F.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE F - DEVIATIONS FROM THE TECHNICAL SPECIFICATION

(Information to be provided with Tender) The Tenderer shall set out below a tabulated statement showing clearly section by section compliance and departures from the Specification and details of alternative proposals. The Tenderer will be deemed to have complied with the Specification in all respects and as written unless qualified in this Schedule.

Section Departure from the requirements of the Project Specification

with details of alternative proposals

Page 202: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE G

QUANTITIES AND PRICES

Page 203: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

G.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE G – QUANTITIES AND PRICES

PREAMBLE

The prices inserted in Schedule G shall include all the requirements in the Invitation to Tender. The quantities, rates and prices in Schedule G shall include all design, testing, inspection, plant, labour, supervision, materials, erection, maintenance, transportation, handling, storage, supply and use of Contractor’s equipment, temporary works, insurance, profit; together with all general risks, liabilities and obligations set out or implied in the Contract. The cost of items against which the Tenderer has failed to enter a price shall be deemed to be covered in the Tender price. The whole cost of complying with the provisions of the Invitation to Tender shall be included in the items provided in Schedule G and where no items are provided, shall be deemed to be distributed among the rates and prices for related items of work.

Page 204: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

G.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE G: QUANTITIES AND PRICING - CONT

(Information to be provided with Tender)

This Schedule shall be completed for the Proposal as per the Specifications

Item no.

Description

Qty

Supply, delivery and insurance to

site

Installation, commissioning

and insurance at site

Total Price

Page 205: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J1

RECOMMENDED SPARES

Page 206: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J1.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J1 - RECOMMENDED SPARES

(Information to be provided with Tender) The Tenderer is required to provide a list of recommended spares for a 5-year period from the end of the Defect Liability Period for the Work. All unit prices quoted shall be valid for any spare parts ordered by the Client in this period.

Main equipment type Part no/description Quantity Unit price

Page 207: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J2

SPECIAL TOOLS, TEST EQUIPMENT

Page 208: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J2.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J2 - SPECIAL TOOLS, TEST EQUIPMENT

(Information to be provided with Tender) Details of all special tools and test equipment required should also be provided. All unit prices quoted shall be valid for tools and test equipment ordered by the Client during the Contract Period. The work to be done under this section consists of the supply, delivery to site and guarantee of all tools and equipment for operation and maintenance of the substations. All tools shall be of the best quality and of the class most suitable for working under the conditions specified. All material used in the tools and equipment shall be new. These shall include, but not necessarily be limited to, the items listed in the following sections. A lump sum shall be quoted in the Schedule of Prices for all Tools and Equipment, except where separate prices are specifically requested.

Main equipment type

Part no/description Quantity Unit price

Heavy Equipment

(a) Supply two mobile cranes with jib length and lifting capacity suitable for maintenance of all switchgear equipment; in the substation. Provide an optional separate price for this equipment.

(b) Supply two mobile aerial buckets, suitable for inspection and washing of 132 kV substation insulators. Provide an optional separate price for this equipment.

(c) Supply one mobile oil filter plant, suitable for filtration of the main system 132 transformer oil. Provide an optional separate price for this equipment.

(d) At each substation, supply one set of jacking devices suitable for use in installation or removal of the main system transformers as applicable

Page 209: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J2.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J2 - SPECIAL TOOLS, TEST EQUIPMENT - CONT

Main equipment type

Part no/description Quantity Unit price

Workshop Equipment

(a) Steel work benches, approximately 10 square metres of working surface.

(b) Distilled water plant.

(c) Drill Press complete with 2 sets of assorted drills.

(d) Bench Grinder, fine and coarse wheels, complete with spare wheels.

(e) Electric Welder, complete with assorted rods.

(f) Moisture absorbing material drying oven

Industrial vacuum cleaner.

(g) Tool racks and boxes as required.

(h) Assorted slings and lifting tackle.

(j) Vices.

Hand Tools

(a) Two sets of flat spanners, in sixes suitable for the equipment supplied.

(b) Two sets of socket spanners, in sizes suitable for the equipment supplied.

(c) Inspection lamps.

(d) Assorted screwdrivers.

(e) Electricians knives.

(f) Hammers

(g) Hacksaws.

(h) Pliers.

(j) Files

Page 210: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J2.3 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J2 - SPECIAL TOOLS, TEST EQUIPMENT - CONT

Main equipment type

Part no/description Quantity Unit price

(k) Blow torch

(l) Soldering Iron.

(m) One set of taps and dies, in sizes suitable for the equipment supplied.

Special Tools

(a) Earthing and Safety Equipment

(b) 2 sets - 132 kV insulated earthing rods,

(c) 2 sets - 11 kV or 6.6kV insulated earthing rods, as applicable

(d) Earthing connections with suitable clamps

(e) One - 132 kV neon indicator,

(f) One - 11 kV or 6.6kV neon indicator, as applicable

(g) One - 33 kV neon indicator.

(h) 2 pairs - Rubber gloves.

(j) 6 -. Safety hats,

(k) 6- pairs -. Safety glasses

(l) 2 - Lineman's safety belts

(m) 50 - Warning plates.

(n) 2 - First aid kits.

(p) Sufficient length of white rope to rope off two maintenance areas in the substation.

Page 211: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J2.4 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J2 - SPECIAL TOOLS, TEST EQUIPMENT - CONT

Main equipment type

Part no/description Quantity Unit price

Test Equipment

(a) One set of Oil Testing Equipment, suitable for sample testing of transformer, reactor and circuit breaker oils.

(b) One AV Primary injection test set

(c) One 5000 Volt, motor-driven Megger insulation tester.

(d) One set of Meters to cover all tanks of substation maintenance (V meter, Ammeter, W meter, AC and DC).

(e) One AC Secondary injection test set.

(f) One Double Beam oscilloscope, complete with trolley.

(g) Two AVO multimeters, in ever-ready cases.

(h) One 50 C Volt hand driven Megger insulation tester.

(j) One 1000 Volt hand-driven Megger insulation tester.

(k) Test equipment for protection with necessary transformers, wires, tools, etc.

Page 212: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J3

TRANSFORMERS AND REACTORS QUANTITIES AND PRICES FOR SPARE PARTS

Page 213: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J3.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J3 - TRANSFORMERS AND REACTORS QUANTITIES AND PRICES FOR SPARE PARTS

This Schedule shall be completed by the Tenderer. Each Tenderer shall in addition to the specified spares, provide details of additional items recommended by him. These items are optional and shall only be included in the definite work on written instructions from the Engineer.

Description Recommended Number for 10 year maintenance period

Price

Autotransformers

132 kV bushings

33 kV bushings

11(6.6) kV bushings

Neutral Air/oil bushings

Set of autotransformer gaskets, complete

Fans with motors, complete

Gas/oil relay (main unit) if similar type otherwise one of each type.

Gas/oil relay (tap changer) if similar type otherwise one of each type.

Oil level gauges if similar type otherwise one of each type.

Oil temperature indicator if similar type otherwise one of each type.

Winding temperature indicators if similar type otherwise one of each type.

Dehydrating breathers

Set of tap changer spares: details of spares offered including diverter switch, motor drive etc to be specified.

Tap position indicators

AVC relay

Page 214: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

J3.2 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE J3 - TRANSFORMERS AND REACTORS QUANTITIES AND PRICES FOR SPARE PARTS - CONT

Description Recommended Number for 10 year maintenance period

Price

Fan motor protection relays

Pressure relief device

Contactors of each type

MCBs complete with bases and holders of each rating

Cubicle heaters

Thermostats

Page 215: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE K

BUILDING SERVICES

Page 216: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

K.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE K - BUILDING SERVICES

The Tenderer is to provide the name of the Manufacturer on this sheet against the item of Plant/Equipment to be provided; and provide full details of the Plant/Equipment appended to the Tender.

DATA BUILDING SERVICES

Required Manufacturer Offered

1 LIGHTING AND SMALL POWER

1.1 Distribution Boards:

1.2 Main Switches:

1.3 Luminaires Type / Weather proof outside

1.4 Luminaires Type / For emergency lighting

1.5 Luminaires Type / Explosion proof for battery room

1.6 Columns:

1.7 Earthing and Bonding Materials:

2 FIRE DETECTION SYSTEM

3 FIRE FIGHTING SYSTEM

3.1 Portable Extinguisher CO2 type

3.2 Portable Extinguisher, Dry powder type

3.3 Mobile Extinguisher, Foam Type (Outdoor)

Page 217: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE L

HEATING, VENTILATION AND AIR CONDITIONING

Page 218: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

L.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE L - HEATING, VENTILATION AND AIR CONDITIONING

The Tenderer is to provide the name of the Manufacturer on this sheet against the item of Plant/Equipment to be provided; and provide full details of the Plant/Equipment appended to the Tender.

DATA HEATING, VENTILATION AND AIR CONDITIONING

Required Manufacturer Offered

1 Split Unit air conditioning

2 Battery room axial flow fans

3 Twin fan toilet extract units

4 Switchgear room supply and extract ventilation for high ambient temperature control

5 Switchgear room fresh air supply over pressurization unit

6 Extraction fans

7 Low velocity supply, return, exhaust and fresh air duct of required thickness including all hangers, supports and required accessories

8 Insulation to sheet metal ductwork thickness and type of materials

9 Grilles and diffusers supply, return, all as described in the specification

10 Weather louvres

11 Exhaust louvres

12 Sand filters louvers factory assembled

13 Fire dampers, size, material and type

14 Volume control dampers type and material

15 Filters for fresh air intakes and air handling units

16 Automatic control system complete for a/c and ventilating system including control panel

Page 219: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

132kV AIS SUBSTATION – VOLUME 3

SCHEDULE M

GUARANTEED TRANSFORMER LOSSES AND PENALTIES

Page 220: MINISTRY OF ELECTRICITY - Camera di Commercio Udineimages.vc.camcom.it/f/promozioneinternazionalizz/57/5724_CCIAA… · Rated line charging breaking current A 125 Rated cable charging

M.1 132kV AIS SUBSTATION – VOLUME 3

SCHEDULE M

GUARANTEED TRANSFORMER LOSSES AND PENALTIES

The Tenderer shall complete the following guarantees based on highest declared rated power at Site conditions.

132/33/11.5kV 63/50/25 MVA three winding transformer as specified. Item Description

Unit

1 No load losses (NNL) at rated voltage ratio at IEC rating

kW

2 Load losses (LL) at 75°C and rated ONAF power and principal tapping: HV/LV winding at IEC rating

kW

3 Total losses (TL=NNL+LL) kW

1. Loss Evaluation

For the purposes of tender evaluation the 132/33/11.5kV transformer losses will be capitalized, in the following manner: Transformers No-load loss (NLL) 3052 US$/kW at rated voltage Load loss (LL) 730 US$/kW at rated MVA and voltage 2. Penalties A maximum variation of +10% of the total declared losses (TL) is permitted. Any transformer (or reactor) with losses more than +10% of the Total Loss (TL) declared will be rejected, unless otherwise agreed by the Engineer. For transformers (or reactors) with total losses within +5% of the declared losses no variation of the contract price will be made. For transformers (or reactors) where the total losses are between +5% to +10% of the total declared losses the contract price will be reduced by the total capitalised cost of losses in excess of the capitalised cost of the declared guaranteed losses. For any transformer (or reactor) with total losses less than 100% of the guaranteed losses, no variation of the Contract price will be made.