Mid Rise Sigma Ascensores

28
MID RISE Distributed Inverter Elevator Di enhancing the value of the buildingDi ensuring perfect safety & reliability Di providing ride comfort Di maximizing energy & space saving Di furnishing modern & universal design

Transcript of Mid Rise Sigma Ascensores

Page 1: Mid Rise Sigma Ascensores

MID RISE

Distributed Inverter Elevator

Di enhancing the value of the building…

Di ensuring perfect safety & reliability

Di providing ride comfort

Di maximizing energy & space saving

Di furnishing modern & universal design

Page 2: Mid Rise Sigma Ascensores

Truly your elevator partner

The Changwon Factory in Korea which isreferred as the single largest elevatorplant provides one-stop manufacturingof high quality

∙Annual production Capacity(as of 2005)

- Elevator : 15,000 units

- Escalator : 700 units

The Changwon Factory

Page 3: Mid Rise Sigma Ascensores

∙Established in 1995

∙10 aesthetic designers(as of 2005)

∙Accumulated Sales(as of 2005)

- over 150,000 units

The Design Center in Korea providesperfect customer satisfaction by meetingany customer needs

SIGMA has been serving you in morethan 70 countries around the world forover 35 years

The Design Center SIGMA in the world

Page 4: Mid Rise Sigma Ascensores

04 SIGMA Elevator

SIGMA Elevator company’s number one priority is safety. Our basic spirit to ensure safetyis through control technology such as ‘back-up solution, safety drive operation’ andmore than 10 other safety devices.

We execute more than 30 kinds of reliability tests. These intense quality assuranceprograms make fool-proof products from design stage.

Through SIGMA Net which monitors elevator, escalator and movingwalks by internet-based software, our elevator not only provides a comprehensive and easy-to-use interfacebut also brings perfect quality to reality.

Safety & Reliability

EMI Test(Electro Magnetic Interference)

Vibration and Dropping Test

ESD Test(Electro Static Discharge)

Burst Test

Page 5: Mid Rise Sigma Ascensores

05MID RISE

Distributed Inverter(Di) control drastically improves reliabilityand performance of elevators. By adopting Di control, thecontrol panel size has been reduced by 46% not to mentionwiring and installation time. The formation of high efficiencyand compactness allows the traction machine to save energy by50% and provide installation space.

SIGMA’s sophisticated, state-of-the-art ‘fuzzy logic’ reduceswaiting time and enhances performance efficiency at aparticular moment, depending on its location, direction, loadand the overall passenger calls currently on the system. SIGMA’smodern microprocessor technology can be used to optimizegroup performance to satisfy high customer standards.

SIGMA provides best-in-class ride quality on every lift we install.High switching speed of power device in the drive(IGBT) reducesmotor noise. Moreover, door operator with VVVF controlensures silent door movement. The result of moderntechnology allows SIGMA to reduce vibration and noise to aminimum level.

Customers define luxury as a swift, smooth and silent ride. Ourseamless interface between tenant requirements and elevatorperformance meets the exact standards and higher expectationof customers.

Ride Comfort

Energy & Space Saving

Page 6: Mid Rise Sigma Ascensores

06 SIGMA Elevator

Page 7: Mid Rise Sigma Ascensores

SIGMA Elevator company has a ‘Design Center’ forcreative and innovative product development to meetthe various needs of customers.

Our newly released ceiling and fixture fully containsbrightness and luxury which represent the latest trend.

SIGMA believes there is no boundary in usage of theelevator. This kind of belief not only enhances theexternal finish of elevator but also enriches the essenceof human life. We proudly recommend everyone toexperience our innovative design and wide assortmentswith all your senses.

Universal Design

07MID RISE

Newly designed round buttons

offer attractive shape and distinctive feelings

Thickness of handrail

provides comfortable rest and stability

OPB with tactile buttons

enables the handicapped to easily recognize

Fixture installed at proper height

allows children to free access

Page 8: Mid Rise Sigma Ascensores

08 SIGMA Elevator

Natural Modern

more than 1000kg

less than 900kg

Ceiling C-NS1

OPB CBM-22C

Wall STS Hairline Etching(EW2-071)

Door STS Hairline Etching(EH1-071)

Handrail HR-04

Floor Deco Tile

※The images listed on this catalog may be different from actual products.

Page 9: Mid Rise Sigma Ascensores

09MID RISE

Ceiling C-NS2

OPB CBM-22C

Wall STS Hairline Etching (EW2-067)

Door STS Hairline Etching (EH1-067)

Handrail HR-04

Floor Deco Tile

Royal Modern

more than 1000kg

less than 900kg

Page 10: Mid Rise Sigma Ascensores

10 SIGMA Elevator

Techno Modern

more than 1000kg

less than 900kg

Ceiling C-NS3

OPB CBM-22C

Wall STS Hairline Etching (EW2-060)

Door STS Hairline Etching (EH1-060)

Handrail HR-04

Floor Deco Tile

Page 11: Mid Rise Sigma Ascensores

11MID RISE

Contemporary Modern

Ceiling C-NL1

OPB CBM-22

CPI CID-11

Wall STS Hairline Etching (EW2-064) + STS Hairline

Door STS Hairline Etching (EH1-064)

Handrail HR-04

Floor Deco Tile

more than 1000kg

less than 900kg

Page 12: Mid Rise Sigma Ascensores

Entrance

12 SIGMA Elevator

�Jamb : Narrow Jamb in Painted Steel Sheet (No. LGM-922)

�Door : Painted Steel Sheet (No. LGM-922)

�Sill : Extruded Hard Aluminum

�Hall Indicator & Hall Button : VID-M652

�Jamb : Wide Taper Jamb in STS Hairline

�Door : STS Hairline Etching (No. EH1-064)

�Sill : Extruded Hard Aluminum

�Hall Indicator & Hall Button : VID-M652

�Jamb : Wide Taper Jamb with Transom Panel in STS Hairline

�Door : STS Hairline Etching (No. EH1-067)

�Sill : Extruded Hard Aluminum

�Hall Indicator : HID-A122

�Hall Button : HBM-R45

Page 13: Mid Rise Sigma Ascensores

Ceiling

Mixture of classic and modern design with sensuous

illumination enjoying comforts of natural lights inside

the elevators

13MID RISE

Standard

C-NS2(Painted steel sheet color No.LGM-924+LGM-920)

C-NS1(Painted steel sheet color No.LGM-924+LGM-920)

C-HX3(Painted steel sheet color No.LGM-922)

C-HX2(Painted steel sheet color No.LGM-922)

Option

C-NL1(Painted steel sheet color No.LGM-924+Stainless Mirror)

C-NS3(Painted steel sheet color No.LGM-924+LGM-920)

Page 14: Mid Rise Sigma Ascensores

14 SIGMA Elevator

Fixture & Colors

VID-M652VID-M652T

OPB Hall Button

Handicapped OPB

HBM-R45

VID-M632HBM-S43

CBM-22C

OPB Hall Button

Handicapped OPB

CBM-13C CBM-42SH

VID-M632T

CBM-44SH

Page 15: Mid Rise Sigma Ascensores

15MID RISE

Handrails

HID-A122

Car Position Indicators

CID-10 CID-12

HID-C132

HID-A132

HR-02

HR-04

HR-08

Hall Position Indicators (Horizontal Type)

Painted Steel Sheet Color

�Actual colors may be different from these prints.

LGM-921 LGM-922 White Pearl LGM-920 LGM-930 LGP-928 LGP-004

LGP-944 LGP-924 LGP-923 LGP-015 LGP-925 LGP-943 LGP-934

LGP-927

Page 16: Mid Rise Sigma Ascensores

Etching Patterns

16 SIGMA Elevator

EW2-060EH1-060

Etching Patterns

EW2-043EH1-043

EW2-062EH1-062

EW2-063EH1-063

EW2-064EH1-064

EW2-067EH1-067

EW2-069EH1-069

EW2-070EH1-070

EW2-071EH1-071

EW2-072EH1-072

EW2-074EH1-074

EW2-075(BR)EH1-075(BR)

EW2-076EH1-076

EW2-077EH1-077

EW3-001EH2-001

EW3-003EH4-003

EW3-031EH2-031

EW4-005EH3-005

EW4-034EH3-034

EW6-028EH3-028

Page 17: Mid Rise Sigma Ascensores

17MID RISE

Passenger Elevator Layouts

Technical Data

Hoistway & Machine Room Plan(Simplex)

Note1. ※(Separating Beams) : By Others

2. Unit : mm

Hoistway & Machine Room Plan(Duplex)

Hoistway Section

Technical Data

Page 18: Mid Rise Sigma Ascensores

Technical Data

18 SIGMA Elevator

Items

Overhead

PitDepth

Machine roomHeight

60L≤1020

L > 1020

L≤1020

L > 1020

L≤1020

L > 1020

L≤1020

L > 1020

L≤1020

L > 1020

L≤1020

L > 1020

L≤1020

L > 1020

4550

4600

4750

4800

4950

5000

1500

1600

1800

1800

2100

2100

2200

2400

4400

4400

4450

4600

4600

4750

1450

1550

1500

1600

1700

1950

2200

2400

4200

4250

4400

4450

4600

4650

1450

1600

1550

1700

1800

1950

2500

2850

4200

4250

4400

4450

4600

4650

1450

1550

1600

1700

1700

1850

2200

2400

90

105

60

90

105

60,90,105

Speed(m/min)

Load(kg)

Code / Country

Standard SingaporeMalaysiaEN Code

Overhead, Pit Depth & Machine Room Height

(Unit : mm)

(Unit : mm)

Items

Overhead

PitDepth

Machine roomHeight

120

150

5500

5700

2100

2400

2400

2400

5200

5400

2000

2400

2400

2400

5200

5400

2100

2500

2850

2850

120

150

120

150

Speed(m/min)

Code / Country

Standard SingaporeMalaysia

5200

5400

2100

2500

2400

2400

EN Code

Page 19: Mid Rise Sigma Ascensores

19MID RISE

Planning Guide For Dimensions | Di1 (60 m/min)

Malaysia, Singapore

Standard

EN Code

(Unit : mm)

60

450

550

600

680

750

900

1000

1150

1350

1600

800

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×850

1400×1030

1400×1100

1400×1250

1400×1350

1600×1350

1600×1500

1800×1500

2000×1350

1800×1700

2000×1500

2000×1750

2150×1600

1450×1015

1450×1195

1450×1265

1450×1415

1450×1515

1650×1515

1650×1665

1890×1685

2090×1535

1890×1885

2090×1685

2090×1935

2240×1785

1800

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1450

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

3750

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1450

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

2100

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3200

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3200

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

3600

4050

4100

4200

4550

5100

5450

8000

8000

8900

8900

10200

10200

2000

2500

2500

2800

2900

3800

4300

5200

5200

6000

6000

7000

7000

3800

4550

4700

5000

5200

6300

6600

9550

10150

10900

3150

3350

3450

3600

3750

4500

4700

7150

7500

8700

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

6

8

9

10

11

13

15

17

20

24

(Unit : mm)

60

450

550

610

680

750

900

1020

1155

1360

1565

800

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×820

1400×1030

1400×1150

1400×1250

1400×1350

1600×1350

1600×1550

1800×1500

2000×1350

1800×1750

2000×1550

2000×1750

2150×1600

1450×985

1450×1195

1450×1315

1450×1415

1450×1515

1650×1515

1650×1715

1890×1685

2090×1535

1890×1935

2090×1735

2090×1935

2240×1785

1800

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1420

1630

1750

1850

1950

1950

2150

2200

2050

2450

2250

2450

2300

3750

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1420

1630

1750

1850

1950

1950

2150

2200

2050

2450

2250

2450

2300

2100

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3170

3400

3550

3650

3750

3750

3950

4000

3850

4250

4050

4250

4100

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3170

3400

3550

3650

3750

3750

3950

4000

3850

4250

4050

4250

4100

3600

4050

4100

4200

4550

5100

5450

8000

8000

8900

8900

10200

10200

2000

2500

2500

2800

2900

3800

4300

5200

5200

6000

6000

7000

7000

3800

4550

4700

5000

5200

6300

6600

9550

10150

10900

3150

3350

3450

3600

3750

4500

4700

7150

7500

8700

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

6

8

9

10

11

13

15

17

20

23

(Unit : mm)

60

450

525

600

675

800

900

1000

1200

1350

1600

800

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×850

1400×1030

1400×1100

1400×1250

1400×1350

1600×1350

1600×1500

1800×1500

2000×1350

1800×1700

2000×1500

2000×1750

2150×1600

1450×1015

1450×1195

1450×1265

1450×1415

1450×1515

1650×1515

1650×1665

1890×1685

2090×1535

1890×1885

2090×1685

2090×1935

2240×1785

1800

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1450

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

3750

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1450

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

2100

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3200

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3200

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

3600

4050

4100

4200

4550

5100

5450

8000

8000

8900

8900

10200

10200

2000

2500

2500

2810

2900

3800

4300

5200

5200

6000

6000

7000

7000

3800

4550

4700

5000

5200

6300

6600

9550

10150

10900

3150

3350

3450

3600

3750

4500

4700

7150

7500

8700

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

6

7

8

9

10

12

13

16

18

21

Page 20: Mid Rise Sigma Ascensores

20 SIGMA Elevator

Technical Data

Planning Guide For Dimensions | Di1 (90,105 m/min)

Standard(Unit : mm)

90

105

550

600

680

750

900

1000

1150

1350

1600

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×1030

1400×1100

1400×1250

1400×1350

1600×1350

1600×1500

1800×1500

2000×1350

1800×1700

2000×1500

2000×1750

2150×1600

1450×1195

1450×1265

1450×1415

1450×1515

1650×1515

1650×1665

1890×1685

2090×1535

1890×1885

2090×1685

2090×1935

2240×1785

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4200

4500

4900

5250

5750

6150

9400

9400

10000

10000

11550

11550

2800

3100

3400

3700

4100

4600

7750

7750

8250

8250

8700

8700

6550

6850

7450

7850

9000

9650

14100

15400

16950

4800

5000

5350

5550

6250

6650

10400

11150

12000

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

8

9

10

11

13

15

17

20

24

Malaysia, Singapore(Unit : mm)

90

105

550

610

680

750

900

1020

1155

1360

1565

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×1030

1400×1150

1400×1250

1400×1350

1600×1350

1600×1550

1800×1500

2000×1350

1800×1750

2000×1550

2000×1750

2150×1600

1450×1195

1450×1315

1450×1415

1450×1515

1650×1515

1650×1715

1890×1685

2090×1535

1890×1935

2090×1735

2090×1935

2240×1785

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1630

1750

1850

1950

1950

2150

2200

2050

2450

2250

2450

2300

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1630

1750

1850

1950

1950

2150

2200

2050

2450

2250

2450

2300

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3400

3550

3650

3750

3750

3950

4000

3850

4250

4050

4250

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3400

3550

3650

3750

3750

3950

4000

3850

4250

4050

4250

4100

4050

4100

4200

4550

5100

5450

8000

8000

8900

8900

10200

10200

2500

2500

2800

2900

3800

4300

5200

5200

6000

6000

7000

7000

6550

6850

7450

7850

9000

9650

14100

15400

16950

4800

5000

5350

5550

6250

6650

10400

11150

12000

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

8

9

10

11

13

15

17

20

23

EN Code(Unit : mm)

90

105

525

600

675

800

900

1000

1200

1350

1600

800

800

800

800

900

900

1000

1100

1000

1100

1100

1400×1030

1400×1100

1400×1250

1400×1350

1600×1350

1600×1500

1800×1500

2000×1350

1800×1700

2000×1500

2000×1750

2150×1600

1450×1195

1450×1265

1450×1415

1450×1515

1650×1515

1650×1665

1890×1685

2090×1535

1890×1885

2090×1685

2090×1935

2240×1785

1800

1800

1800

1800

2000

2000

2400

2600

2400

2600

2600

2750

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

3750

3750

3750

3750

4150

4150

4950

5350

4950

5350

5350

5650

1630

1700

1850

1950

1950

2100

2200

2050

2400

2200

2450

2300

2100

2100

2100

2100

2300

2300

2700

2900

2700

2900

2900

3050

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4100

4100

4100

4100

4500

4500

5300

5700

5300

5700

5700

6000

3400

3500

3650

3750

3750

3900

4000

3850

4200

4000

4250

4100

4050

4100

4200

4550

5100

5450

8000

8000

8900

8900

10200

10200

2500

2500

2800

2900

3800

4300

5200

5200

6000

6000

7000

7000

6550

6850

7450

7850

9000

9650

14100

15400

16950

4800

5000

5350

5550

6250

6650

10400

11150

12000

Speed(m/min) Person Load(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH R1 R2 R3 R4

Car Size Hoistway Size Machine Room Reaction Load(kg)Simplex Duplex

Capacity Pit ReactionLoad(kg)

AM BM AM BM

Machine Room Size

Simplex Duplex

7

8

9

10

12

13

16

18

21

Page 21: Mid Rise Sigma Ascensores

21MID RISE

Planning Guide For Dimensions | Di2 (Speed : 120&150 m/min), Geared

Standard

Speed(m/min)

120

150

13

15

17

20

24

900

1000

1150

1350

1600

900

900

1000

1000

1100

1600×1350

1600×1500

1800×1500

1800×1700

2000×1750

1690×1535

1690×1685

1890×1685

1890×1885

2090×1935

2200

2200

2400

2400

2600

2150

2300

2300

2500

2550

4550

4550

4950

4950

5350

2150

2300

2300

2500

2550

6900

6900

7500

7500

8100

2150

2300

2300

2500

2550

2800

2800

3000

3000

3200

4100

4200

4200

4400

4500

5200

5200

5600

5600

6000

4100

4200

4200

4400

4500

7500

7500

8100

8100

8700

4700

4800

4800

5100

5200

11100

11650

12300

13100

13900

7550

7850

8250

8850

9350

13250

13950

16600

18050

19550

10100

10550

12650

13550

14350

PersonLoad(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH AH BH AM BM AM BM AM BM R1 R2 R3 R4

Car Size Hoistway Size Machine Room Size Machine Room Reaction Load(kg)Simplex Duplex Triplex Simplex Duplex Triplex

Capacity Pit ReactionLoad(kg)

(Unit:mm)

Malaysia, Singapore

120

150

13

15

17

20

23

900

1020

1155

1360

1565

900

900

1000

1000

1100

1600×1350

1600×1550

1800×1500

1800×1750

2000×1750

1690×1535

1690×1735

1890×1685

1890×1935

2090×1935

2200

2200

2400

2400

2600

2150

2350

2300

2550

2550

4550

4550

4950

4950

5350

2150

2350

2300

2550

2550

6900

6900

7500

7500

8100

2150

2350

2300

2550

2550

2800

2800

3000

3000

3200

4100

4250

4200

4450

4500

5200

5200

5600

5600

6000

4100

4250

4200

4450

4500

7500

7500

8100

8100

8700

4700

4850

4800

5150

5200

11100

11650

12300

13100

13900

7550

7850

8250

8850

9350

13250

13950

16600

18050

19550

10100

10550

12650

13550

14350

PersonLoad(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH AH BH AM BM AM BM AM BM R1 R2 R3 R4

Car Size Hoistway Size Machine Room Size Machine Room Reaction Load(kg)Simplex Duplex Triplex Simplex Duplex Triplex

Capacity Pit ReactionLoad(kg)

EN Code

Speed(m/min)

120

150

12

13

16

18

21

900

1000

1200

1350

1600

900

900

1000

1000

1100

1600×1350

1600×1500

1800×1500

1800×1700

2000×1750

1690×1535

1690×1685

1890×1685

1890×1885

2090×1935

2200

2200

2400

2400

2600

2150

2300

2300

2500

2550

4550

4550

4950

4950

5350

2150

2300

2300

2500

2550

6900

6900

7500

7500

8100

2150

2300

2300

2500

2550

2800

2800

3000

3000

3200

4100

4200

4200

4400

4500

5200

5200

5600

5600

6000

4100

4200

4200

4400

4500

7500

7500

8100

8100

8700

4700

4800

4800

5100

5200

11100

11650

12300

13100

13900

7550

7850

8250

8850

9350

13250

13950

17550

18050

19550

10100

10550

13300

13550

14350

PersonLoad(kg)

EntranceOpening

(mm)Inside

AN×BN

Outside

AS×BS AH BH AH BH AH BH AM BM AM BM AM BM R1 R2 R3 R4

Car Size Hoistway Size Machine Room Size Machine Room Reaction Load(kg)Simplex Duplex Triplex Simplex Duplex Triplex

Capacity Pit ReactionLoad(kg)

Speed(m/min)

Page 22: Mid Rise Sigma Ascensores

22 SIGMA Elevator

Technical Data

Electrical Design Guide

Di1 (Speed : 60,90 & 105 m/min)

Note. Please contact us if the distance of lead - in wire exceeds 50m.

Heat Output of Machine Room

kcal / H = F×L×S (H : Hour / F : Factor = 1/40 / L : Rated Load(kg) / S : Rated Speed (m/min) / *cal = 4.2 Joule)

220V 400V

Speed(m/min) Person

Load(kg)

MotorCapa.(kW)

Simplex Duplex Simplex Duplex Simplex Duplex

MCCB Capacity of Building (A)Power SupplyCapacity(kVA)

Lead - in Wire Size(mm2) Earth Wire Size(mm2)

Heat Output (kcal / H)

Starting Power(kVA / set)

Capacity

60

90

105

6

8

9

10

11

13

15

17

20

24

8

9

10

11

13

15

17

20

24

8

9

10

11

13

15

17

20

24

450

550

600

680

750

900

1000

1150

1350

1600

550

600

680

750

900

1000

1150

1350

1600

550

600

680

750

900

1000

1150

1350

1600

5.5

5.5

7.5

7.5

11

11

11

11

11

11

9.5

9.5

9.5

9.5

13

13

13

15

15

11

11

11

11

15

15

15

18

18

50

50

50

75

75

75

75

75

100

100

75

75

75

75

75

75

100

100

125

75

75

75

75

100

100

125

125

150

100

100

100

150

150

150

150

150

125

200

100

100

100

150

150

150

200

200

250

100

100

100

150

150

150

250

250

300

60

60

60

100

100

100

100

100

100

100

60

60

60

100

100

100

100

100

125

60

60

60

100

100

100

125

125

125

4.2

5.1

5.5

6.3

6.9

8.3

9.2

10

8.9

10.5

6.6

7.1

8.1

8.9

10.7

11.9

11.3

12.8

15.2

7.6

8.3

9.4

10.4

12.5

13.8

13.2

15

17.7

8.4

10.2

11

12.6

13.8

16.6

18.4

20

17.8

21

13.2

14.2

16.2

17.8

21.4

23.8

22.6

25.6

30.4

15.2

16.6

18.8

20.8

25

27.6

26.4

30

35.4

30

30

30

50

50

50

50

50

50

50

50

50

50

50

50

50

60

50

75

50

50

50

50

50

50

60

75

75

8

8

8

14

14

22

22

22

22

22

14

14

14

14

22

22

22

38

38

14

14

14

14

22

22

38

38

60

14

14

14

22

22

38

38

38

38

60

22

22

38

38

38

38

60

60

60

38

38

38

38

60

60

60

60

100

5.5

5.5

5.5

8

8

14

14

14

14

22

8

8

14

14

14

14

22

22

22

14

14

14

14

22

22

22

22

38

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

8

5.5

5.5

5.5

5.5

5.5

5.5

8

14

14

5.5

5.5

5.5

5.5

8

8

14

14

22

5.5

5.5

8

8

8

8

8

14

14

14

14

14

14

14

14

14

14

3.5

3.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

675

825

900

1020

1125

1350

1500

1725

2025

2400

1238

1350

1530

1688

2025

2250

2588

3040

3600

1445

1575

1785

1970

2365

2625

3019

3544

4200

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

5.5

13.1

16

17.5

19.9

21.8

26.2

29.1

23

28.1

33.3

20.7

22.6

25.6

28.2

33.8

37.6

35.9

40.7

48.2

24.1

26.3

29.8

32.8

39.4

43.8

41.8

47.4

56.2

Speed(m/min) Person

Load(kg) Simplex Duplex Triplex Fourplex Simplex Duplex Triplex Fourplex

MCCB Capacity of Building(A)Power SupplyCapacity(kVA)

EarthWire

Size(㎟)

HeatOutput(kcal/H)

StartingPower

(kVA/set)

CapacityMotorCapa.(kW)

15

17

20

24

15

17

20

24

120

150

1000

1150

1350

1600

1000

1150

1350

1600

3000

3450

4050

4800

3750

4313

5063

6000

14

14

14

14

14

14

22

22

35

39

43

48

46

51

57

64

18

20

22

24

22

24

27

30

90 50105 60125 75150 85120 70130 80155 90185 110

Simplex Duplex Triplex Fourplex

Lead-in WireSize(㎟)

38 1450 1450 1460 2250 1460 1460 2280 22

100 22100 30125 38150 38125 30150 38200 38200 50

150 30200 38200 60250 60200 50250 60325 60325 80

200 38200 50250 80325 80250 60325 80400 80500 100

180 100205 115250 140295 165235 130260 145305 170365 205

240 135280 160340 195400 230315 185355 205415 240495 290

275 155320 185390 225455 265360 210405 235475 275570 330

41

46

53

62

50

57

65

77

15

17

20

23

18

21

24

28

30

34

40

46

37

42

48

57

46

51

59

69

55

63

73

85

200V 400VDi2 (Speed : 120, 150 m/min), Geared

Page 23: Mid Rise Sigma Ascensores

Entrance Details

Narrow Jamb without Transom PanelDoor Machine : SAV1

Note1. “H”dimension in building structure plan depends upon the type of hall indicator selected.

2. “J”dimension depends upon governing code requirement for height(above floor) of hall buttons.

3. Unit : mm

Section B-B Section A-A

Front View of Entrance

Building Structure Plan

23MID RISE

Page 24: Mid Rise Sigma Ascensores

24 SIGMA Elevator

Technical Data

S-Type Wide Jamb with Transom Panel(with accentric line)Door Machine : SAV1

Building Structure Plan

Section B-B

Front View of Entrance

Section A-A

Note1. “H”dimension in building structure plan depends upon the type of hall indicator selected.

2. “J”dimension depends upon governing code requirement for height(above floor) of hall buttons.

3. Unit : mm

Page 25: Mid Rise Sigma Ascensores

Entrance Details

T-Type Wide Jamb with Transom Panel(With accentric line)Door Machine : SAV1

Note1. “H”dimension in building structure plan depends upon the type of hall indicator selected.

2. “J”dimension depends upon governing code requirement for height(above floor) of hall buttons.

3. Unit : mm

Section A-A

25MID RISE

Section B-B

Front View of Entrance

Building Structure Plan

Page 26: Mid Rise Sigma Ascensores

26 SIGMA Elevator

Technical Features

Feature RemarkDescription

Anti-nuisance operation ●

In case of substantial difference between the number of calls registered on the car operatingpanel and actual load in the elevator, the elevator prevents unnecessary operation bycancelling all registered calls when it arrives at the nearest floor.

Car call cancellation ●Allows cancellation of an incorrectly registered car call. If you push a wrong floor button inthe car, you can cancel it by pressing the same button one more time.

Automatic turn off of carlight and fan

●Car illumination and fan are turned off automatically in case there is no hall call or car call tosave energy.

By pass operation (80%) ●If the actual load comes to more than 80% of the allowable maximum load, the elevatorwill not react to the calling signals from other passing floors.

Over load (110% of ratedload) holding stop

Anti hall button jamming

Door reopen control

Car door safety edge

Automatic adjustment ofdoor time

Micro Leveling

Back-up operation

Safety Drive operation

Voice synthesizer

Door photo sensor

When the load of passengers exceeds the maximum capacity, a buzzer sounds and theelevator remains stopped at that floor. When the passengers get off, the buzzer will stop.Consequently elevator doors will close and operation continues.

If landing door would not closed by a hall button’s jamming and it is caused car can’t startthen, the floor will close in force by the command from controller so that the car servicenext calls.

While the car door is closing, if a door reopen signal is occured the door will be reopenedimmediately and after specified time expired the door will again close.

This device enables the doors to return to the fully open position, should the door encountera person or obstacle while closing.

Door closing time can be adjusted in order to improve the efficiency.

An automatic two-way leveling device is provided to maintain the elevator car level with thelanding, regardless of elevator load or direction travel

In normal operation, if the serial communication between the controller and it’s terminalboard have something malfunction, the car mode is changed to a “back-Up” modeautomatically, then the car checks itself by servicing every even floors and every odd floorsuntil the car returns normal condition. By this operation, even though the car has somethingmalfunction, passergers can be offered a limited service without shoutdown.

During normal operation, a malfunction is occurred suddenly but it’s not serious, in thiscase, if the car is not in a door zone, then the car starts to run to the nearest floor in slowspeed. After stop at the nearest floor, the care remains stop with door fully open and “Outof Service” lamp. If the car condition is possible to return a normal condition itself then, thecar can service normal operation again.

This system provides passengers with audio information about car operation such asdirection of travel, landing floor, etc.

The doors will return to fully open position if the light ray unit detects an obstacle when thedoors are closing.

● Standard ○ Option

Multi-Photo ○When passengers are entering or getting out of the elevator, the multi-photo device willprevent the door from closing.

Forced floor stop ○After service on specific floor stop by car call, the car is operated normally.

Supervisory panel ○

This panel monitors elevator operations and conditions of emergency operations from thebuilding’s control room

Parking Operation

In order for park the elevator, if the parking key is on position the car stop at the specifiedfloor after finish servicing of all of registered calls. After the car stops at the specified floor,the car light and fan are off automatically and every buttons both on the car operatingpanel and hall button box are no more available.

Fire return operation

Fireman Operation

In case of fire every cars should be returned to the specified floor in order to evacuatepassengers safety.

In case of fire, a firemen can use the elevator which is stopped at the specified floor in orderto support firemen for fire-fighting.

Technical Data

Page 27: Mid Rise Sigma Ascensores

27MID RISE

Work By Others

Hoistway

∙A properly framed and enclosed hoistway, including any ventilation as required by the governing code or authority.

∙A dry pit constructed to the elevator manufacturer's specifications to reinforce or sustain any vertical forces

on the guide rails and impacted loads from the car and counterweight buffers.

∙A metal sill angle or concrete haunch across the full width of the hoistway at each elevator landing.

∙Provision of steel bars to fix jamb around the entrance of each floor.

∙All cutting, including cutouts to accommodate hall singal fixtures, patching, painting of walls, floors, or

partitions, together with finish painting of entrance doors and frames, if required.

∙Provision of entrance or ladder for pit access

∙Supply and installation of fascia plate.

∙Installation of emergency exits and electric wiring in blind sections of hoistway where required.

∙The tolerance of perpendicular line over the whole hoistway height must not exceed ±30mm.

∙A waterproof outlet and light fixture in the elevator pit area with the light switch being located adjacent to the

access door or ladder.

∙Suitable light fixture and convenience outlet in the pit with a light switch adjacent to the access door or ladder.

The receptacles shall have protection for ground fault circuit interrupter.

The works below are not included in the elevator installation work and should be carried out by building

contractors in accordance with our drawings, relevant international or local codes and regulations.

Machine Room

∙Provision of wiring between controller and building management system.

∙A construction hoisting beam or hook, if required, with the correct location and size as determined

by the elevator contractor for each hoistway.

∙Noise insulation should be installed between machine room and adjacent residential area.

∙A suitable machine room with legal access, ventilation and concrete floor.

The temperature in the machine room should be maintained between 5℃ and 40℃.

Relative humidity should not exceed 90%(monthly) and 95%(daily) non-condensing.

Ventilation fan or air conditioner should be provided as per heat dissipation by the elevator contractor.

∙The size of entrance shall be Min.1000mm(W) x 2000mm(H).

∙Installation of lead-in wire and earth wire between building main power board and machine room incoming

distribution board. However, machine room lighting source supply shall be installed separately.

∙Provision of suitable light fixture and convenience outlets in the machine room

Miscellaneous

∙Wiring and piping between monitoring system.

∙Machine room and hoistway shall be free of dust or harmful gas.

∙All electric power for lighting, tools, welding, etc during installation.

∙All single phase receptacles installed in machine room, pit, and machinery spaces shall have ground

fault circuit interrupter protection.

∙Fire detector for fire emergency operation.

∙A secured area for storage of elevator equipment and materials during installtion.

Page 28: Mid Rise Sigma Ascensores

SIGMA constantly endeavors to improve products so that information in this catalog is subject to change without notice.

2006. 8 Printed in Korea