Merge Activity
AA
B
C D
Burst Activity
A B
C
D
Merge & BurstActivity
A
B
C
D
E
ES
LS
EF
LFd
Activity Name
ES : Early Start EF : Early FinishLS : Latest Start LF : Latest Finishd : Duration
1. Pola hubungan antar aktivitas (Sequencing)
Linier Activity
A B C D
Predecessor Successor
Hubungan Ketergantungan antar Aktivitas
2. Bentuk Hubungan Antar Aktivitas
Gunakan Lag time untuk overlap atau delay.
dalam "Finish-to-Start" relationship, successor tidak bisa mulai sampai predecessor selesai dilaksanakan
Dalam hubungan "Start-to-Start" relationship, successor tidak boleh mulai sampai predecessor mulai
dalam ketergantungan "Finish-to-Finish" , successor tidak boleh selesai sampai aktivitas predecessor selesai.
Gunakan Lead time untuk menjadualkan kegiatan lebih awal
S F
FS
1
S F
S F
2
S F
S F
3
4 S F
S F
S F
Lag
Lead
Predecessor
Successor
Construction Method
Land Clearing (Cut & Fill)
Original Land Contour
Piling Installation
Set Pilecap
Set Sloof
Set 1st Level Column & Beam
Set 2nd Level Column & Roof
3. Contoh Real Hubungan ketergantungan antar Aktivitas
4. Pemodelan LINEAR & CPM (Critical Path Method
MS Project menggabungkanPemodelan Linear & CPM dalam satu model
C10
F5
E6
D4
G6
FINISHSTARTA5
005 5 15
15 19
00
5 5 15
B10
27 31
15 25
15 25
15 21
25 31
25 30
26 31
25 31
25 31
31
31
Total Slack : LF - EF
Task
ES EF
LS LF
Critical Task : ES = LS dan EF = LF
Total Slack : The amount of time that a task can be delayed without delaying successors task
5. Perhitungan Durasi Proyek (Forward & Backward Pass Calculation)
A 3
0 3
1 4
C 4
0 4
0 4
B 5
4 9
4 9
A 3
0 3
1 4
C 4
5 9
5 9
B 5
4 9
4 9
FS+1
C 4
1 5
1 5
B 5
5 10
5 10
SS+1
A 3
0 3
2 5
Calculation of project duration usingForward & Backward Pass
6. Perhitungan durasi proyek yang menggunakan SS, FS, FF dan Lead/Lag
Aplikasi MS Project utk Input Hub. Antar Aktivitas
To order tasks, first, second, third, etc., double-click on a task.
You can manually input task predecessors
Lead & Lag
To link a whole range of tasks and order them, select the range of tasks.
Go to Edit > Link Tasks.
1. Prosedur utk memasukkan hubungan antar aktivitas
1
2
3
4
2. Check hubungan antar aktivitas melalui Relationship Diagram
Relationship diagram is a special version of Network Diagram
While working on a large project, this graphic view helps you to focus on one task and the tasks to which it is linked.
This view displays the current task in the center of the pane
PredecessorsSuccessors
1
2
3
If a conflict exists, caused by multiple dependencies or a combination of dependencies and constraints , Project will give you this warning.
3. Peringatan bila terjadi Conflict akibat pola hubungan antar aktivitas
Change the conditions that make the successor task dates fixed
Remove the relationship definition so that a successor relationship to the task in the message no longer exist
Change the conditions governing the finish date for the predecessor (the task named in the late date message) so that you can schedule the task to finish by the late date.
1
3
2
4. Tips bila terjadi Activity Dependency Conflict
Identifying the Critical Path.
Crashing the Schedule :
•Review with an intent to reduce task duration that are unnecessary long
•Examine the predecessor and successor relationships and try to identify the relationship that can change from Finish to Start to one of the overlapping relationship (SS,FF, Lead-Lag schedule)
•Increase Resource Assignment for task that are not fix-duration tasks.
1
a
b
c
2
d•Schedule Overtime to reduce the number of regular work hours that a task may take
5. Tips bila Total Durasi Proyek lebih panjang dari yang direncanakan
6. Melihat Schedule dalam bentuk Calender & Precedence Diagram
Calendar view is useful when entering a simple project and reviewing what needs to be done on a specific day
The Network Diagram view displays the general flow of work and the relationships between the tasks of your project
Specify how large or small you would like to view the diagram.
Precedence diagram Method (PDM)