Memories Rubric and Poject Matrix
-
Upload
jorgeherga -
Category
Documents
-
view
222 -
download
0
Transcript of Memories Rubric and Poject Matrix
-
7/29/2019 Memories Rubric and Poject Matrix
1/2
IES MARA ZAMBRANO. EL ESPINAR. TECHNOLOGY DEPARTMENT
THE MEMORY DOCUMENT ABOUT THE PROJECT. 1st ESO TECHNOLOGY
The document has to include:
Front cover: Project title, group, names of the components. List of materials: Everything you have employed
Project Diary: Everyday we have to note that we have made, the tasks of each person, what werethe difficulties identified, etc...
Technical Drawings: There must be a front view drawing of the project, with its measurements andannotations.
How to evaluate the memory?. With this rubric:
0 2(negative)
4(incorrect)
5(correct)
7(quite good)
9(excelent)
Presentation(10%)
Not done Poor handwriting,
almost
incomprehensible
Poor handwriting
and does not respect
margins, spacing,
line spacing, without
stapling, improper
file name
Presentation
adequate
minimum
standards
respecting most
explained style
(header, footer,
numbering,
styles, etc..)
Respect all rules
of style, has a
good presence
Is perfectly
finished and
includes the
original
typography, good
layout, invited to
be read.
Writtenexpression(10%)
Not done Not understand
the phrases, bad
syntax,
disconnected data,
many misspellings.
It is expressed
incorrectly and as
summarized that
doesnt express
criticism or reviews,
no misspellings.
It is well
articulated and
clearly expressed
its ideas, and
there is no faults
In addition to a
correct
expression and
absence of
faults, it
manifests
reviews and
opinions.
It contributes with
reviews that
improve future
teaching and
learning
processes.
Contents(50%)
Not done Missing many
sections to fill.
Missing required
minimum contents
or project sections
are not properly
completed.
Minimum
content required.
All sections
properly
completed.
Appropriate
content for the
project. Prove
you have made
significative
learning.
In addition to
above, include
valuable
additional data.
TechnicalDrawings(30%)
Not done Numerous
drawings are
missing, and those
included are
poorly presented,
no rulers, no
dimensions, no
scale.
Missing minimum
required drawings,
dimensioning
without respecting
the rules, non-
parallel lines, does
not respect the
scales.
Drawings
required
minimum
Appropriate
planes, made to
ruler, according
to standard
dimension
without errors.
In addition to
above, at the
further
description to
improve
understanding.
Bilingual Section. Projects
-
7/29/2019 Memories Rubric and Poject Matrix
2/2
IES MARA ZAMBRANO. EL ESPINAR. TECHNOLOGY DEPARTMENT
To evaluate the project itself, we will use this rubric
PROJECT EVALUATION MATRIX
0 2(Negative)
4(Incorrect)
5(Correct)
7(Quite good)
9(Excelent)
Good finishing(20%)
Not done It is poorly
constructed, has
wasted material
(termofusible..),Unions appear
hollow, is
dangerous to use
for chips, etc..
The poor finish
prevents proper
operation, has
wasted material.
Finishing
minimum
required, some
joints do not fitwell.
Is well finished,
most of the
surfaces are
smooth, the jointsfit well.
Perfectly finished,
all surfaces are
smooth, all joints
fit well, has notwasted any
material
Difficulty(10%)
Not done It does not
incorporate
anything studied,
has no difficulty,
no significative
learning can be
extracted.
It doesnt
correspond with
the level of
education of the
students.
Conforms to the
minimum
required.
The level is
appropriate to the
student's
educational level
and reports value.
It is of a higher
level than the
students,
demonstrating
mastery of the
material,
combines several
content blocks.
Operating(40%)
Not done It is not finished. Does not work,
not meet the
requirements.
Operation
required
minimum.
It works well. Works great and
includes some
additional
improvement.
Team working(10%)
Not done Very poor
organization and
coordination of the
team: nobody does
anything
productive.
Missing minimal
coordination and
organization: one
does something,
the others look.
Coordination and
organization
required
minimum to take
the project
forward.
Good coordination
and organization
of the team.
Very good
coordination and
team
organization.
Individualwork andSafetyCompliance(20%)
Not done He has worked
very little and
wasted material.
Play and endangers
the safety of
others.
It has not worked
the required
minimum. Does
not meet strict
safety standards.
He has worked
and meets the
minimum
required safety
standards all the
time
Perfect job, made
all your tasks with
responsibility and
independence. He
has watched and
helped his
teammates to
meet standards.
Excellent work,
with additional
contributions
have benefited
the group.
Bilingual Section. Projects