  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    1/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 1 de 36

    ISSUE: 30/04/08

    REVISION: 5

    INDEX1. GENERALITIES

    1.1 Scope.

    1.2 Objectives.

    2. LEGAL REQUIREMENTS

    3. POLICY OF THE INTEGRATED SYSTEM OF MANAGEMENT

    3.1 Mission.

    3.2 Vision.

    3.3 Policy of the Integrated System of Management.

    4. POLICIES OF WORK

    4.1 Policy of Meetings and Training.

    4.2 Policy of Use of Personal Protective Equipment (PPE).

    4.3 Policy of Order and Cleaning (Housekeeping).

    4.4 Policy of Health and Other Services.

    4.5 Policy on Control of the Alcohol and Drugs.

    4.6 Policy of Incentives and Disciplinary Measures.

    5. RESPONSIBILITIES5.1 Project Chief.

    5.2 Project EH&S Manager.

    5.3 Erection Supervisor.

    5.4 Quality Supervisor.

    5.5 Human Resources Administrator.

    5.6 Planning.

    5.7 Responsible for Warehouse.

    5.8 Responsible for Maintenance.5.9 Supervisors of Field.

    5.10 Workers in general.

    5.11 Subcontractors and third sides.

    6. HAZARDS IDENTIFICATION AND RISKS ANALYSIS (HIRA)

    7. INSPECTIONS

    8. JOB SAFETY ANALYSIS

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    2/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 2 de 36

    ISSUE: 30/04/08

    REVISION: 5

    9. TRAINING

    10. ACCIDENT/INCIDENTS

    11. BEHAVIOR BASED SAFETY

    12. SAFETY STANDARDS

    12.1 Housekeeping.

    12.2 Personal Protective Equipment.

    12.3 Tools in General.

    12.4 Electrical Aspects.

    12.5 Scaffolds.

    12.6 Ladders.

    12.7 Material Handling and Storage.

    12.8 Hazardous Materials.

    12.9 Fire Prevention and Protection.

    12.10 Welding and Cutting.

    12.11 Unfired Pressure Vessels.

    12.12 Steel Erection.

    12.13 Fall Protection12.14 Rigging & Lifting Operations and Equipment.

    12.15 Motor Vehicles.

    12.16 Confined Space.

    12.17 Construction Nondestructive Testing.

    12.18 Abrasive Blasting and Painting.

    . 12.19 Signs, signals and barricades.

    12.20 Excavations, trenching and shoring.

    12.21 Sanitation.12.22 First aid.

    13. PROCEDURES OF CRITICAL WORKS

    14. MEDICAL CARE FACILITIES

    15. ENVIRONMENTAL ASPECTS

    16. MANAGEMENT REVIEW AND CONTINUAL IMPROVEMENT

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    3/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 3 de 36

    ISSUE: 30/04/08

    REVISION: 5

    1. GENERALITIES

    1.1 Scope

    The Manual present contains elements and standards of strict fulfilment for the employees and workers of

    our company. HOWEVER AGREE TO COMPLY WITH THE PROGRAMME, PROCEDURES AND

    PRACTICES OF SAFETY, HEALTH AND ENVIRONMENT OF OUR CUSTOMER.

    1.2 Objectives

    The objectives of the present manual are:

    Inform and norm the aspects Environmental, Health and Safety in the work for its respective execution.

    Include an internal technical/normative instrument to carry out every task according to the practices and

    disciplines of Safety and employment Health established by the laws, regulations and standards of our

    client.

    2. LEGAL REQUIREMENTS

    This Plan is based on the following documents:

    Occupational Safety & Health Administration (OSHA) 29 CFR 1926 of the United Status of

    NorthAmerica.

    Mine Safety and Health Administration (MSHA)

    National Fire Protection Association (NFPA)

    Enviromental Protection Agency (EPA)

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    4/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 4 de 36

    ISSUE: 30/04/08

    REVISION: 5

    3. POLICY OF THE INTEGRATED SYSTEM OF MANAGEMENT

    3.1 Mission

    "To provide Engineering, Construction and Installation services in the steel construction field with the

    highest levels of safety, quality, compliance, profitability and social responsibility, while focusing on

    achieving the complete satisfaction of our customers and the professional development of our personnel.

    3.2 Vision

    To be a highly reliable and competent company of the sector that guarantees their clients an

    excellent service.

    To reach the 100 years of services maintaining the leadership among the companies of the sector

    and particularly in the speciality of Tanks.

    3.3 Policy of the Integrated System of Management

    HAUG S.A., as a dedicated company to serve of Engineering, Construction and Assembly in the steel

    construction field, and having the commitment of the top direction and active participation of all the

    personnel is committed:

    a) To obtain the satisfaction of its clients offering them products and services of the highest quality,

    considering Safety, protection and care of Health and of Environment as top priorities elements in the

    execution of itself.

    b) To seek the constant professional development of its workers.

    c) To reach the most yield of the company.

    d) To protect the environment of any adverse effect of its operations, diminishing the environmental impact

    caused by the consumption of resources, generation of remainders and gas discharge.

    e) To guard by the safety and health of all the employees in the site through the prevention and control of

    risks in its activities.

    f) To fulfill the applicable legal requirements and the internal requirements that the company considers

    necessary to assure the quality the services that offers and safety and protection of environment on the

    activities that make.

    g) Continuous improvement of the quality, safety and the protection of environment on its processes and

    services that offer in order to reach the excellence in itself.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    5/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 5 de 36

    ISSUE: 30/04/08

    REVISION: 5

    4. POLICIES OF WORK

    4.1 Policy of Meetings and Training

    Meetings of five minutes: before the works begin, the Supervisor will give a chat from 5 minutes to their

    personnel, orienting them on the sure work that will perform. Any worker that have some doubt should

    ask his Supervisor and this should resolve the problem. Every chat and meeting of safety that give

    should be communicated in writing in the corresponding formats, causing signing to each one of the

    workers as sign of conformity.

    Meetings weekly: Every week a meeting of Safety will be performed, Hygiene and control of the

    Environment that will have a most minimum duration of thirty minutes, in which they will intervene the

    Project Chief, Project EH&S Manager, Supervisors and workers in general. This meeting should be

    documented in a format of weekly meeting.

    Training HAUG S.A. will qualify and will coach its personnel in the different related areas from EH&S.

    Instruction to third parties every visit or supplier of HAUG S.A. that have that to enter to Project,

    previously will be instructed on the existing risks and the administrative norms and of EH&S that should

    comply.

    4.2 Policy of Use of Personal Protective Equipment (PPE)Safety glasses, hardhats, hi viz vest and steel toed work boots of safety will used by the personnel during

    the workday compulsory, and according to the degree of risk of the work be considered, will be offered

    special implements. The administrative workers that be found labouring inside the offices are excepted of

    this disposition.

    Safety of the head: The head is the most important part of the human body, that is why the use of the

    hardhat for its protection is permanent and strict in project during the workdays. It prohibited in work having

    loose hair only if it is long , it should be maintained collected in such a way that not cause danger since it

    could be trapped by machines or equipment in operations.Safety of the eyes: Safety glasses during the continuance in the work will used, except for works in offices.

    For the special works of welding, brazing, cutting and other will be provided of the adequate implements.

    Protection of the feet:For the safety of the feet is obligatory the use of steel toed work boots to avoid

    accidents. Its prohibited the use of slippers, sandals or similar. The boots of rubber with steel toed are

    permitted in humid places or contact with the water. The electricians will use dielectric boots of Safety.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    6/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 6 de 36

    ISSUE: 30/04/08

    REVISION: 5

    Uniform: All personnel will use a hi viz vest during the permanence in the project. According to the

    requests of the project or work the company will provide the personnel work uniforms. This should be

    comfortable and tight of such form that cannot be stalled neither to be hooked in machines and equipments

    of construction, structures, mobile parts, etc. Moreover, workers should not use shirts, pants or very wide

    overalls or deform. Clothing of synthetic fibber will not be used.

    Ear safety: All personnel will use protectors of ear in places where the noise surpass the 85 decibels dB,

    such as: compressor, pneumatic hammers, blows of constant bulge, etc.; and in those places that apply

    hand grinds , workshops where there are noises of machines and vehicle.

    Safety of arms and hands: according to as correspond should be used protection for the hands and arms.

    Previously an evaluation of risks will be made in order of determining the type of gloves to use.

    Safety of the face will be used the adequate mask in works of chemical materials, welding, cutting,

    brazzing or in those machines that throw shaving, dust or abrasive.

    Respiratory protection: it will be provided to each worker respirators adequate for each work that imply

    risk or excessive concentration of dust, smoke, gases, fog, vapors, toxic emanations or by deficiency of

    oxygen in places confined. Before using the respirator, be assured that he has been trained about it.

    Protection in works of height: Is obligatory the use of the safety harness in works of height, equal or

    more than 1.20 mts. The infringement of this norm is motive of drastic sanction.Inspection of the equipments: All the personal protective equipment will be inspected, codified and

    repaired or placed out of service.

    4.3 Policy of Order and Cleaning (Housekeeping)

    The order and cleaning is a very necessary and fundamental activity of individual responsibility of each

    person.

    The places of work, walkways, stairs and all the other areas should be maintained free of filth.

    All the wastes should be placed in cylinders placed in different places.

    The ways, halls and other places where the personnel circulates should be maintained cleared of

    obstructions and other materials that can cause any accident.

    The stores and deposits should be maintained clean and orderly.

    Every building material, cords, wires, electric cables they should be far away of the surface of circulation

    of the personnel, these should be placed in high places over the surface in order not to cause damage

    to personnel or equipment (or protected).

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    7/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 7 de 36

    ISSUE: 30/04/08

    REVISION: 5

    It is compulsory to keep each work area in order and clean.

    The sanitary services and dining rooms after being cleaned should be disinfected daily to avoid

    infections.

    4.4 Policy of Health and Other Services

    Every worker that enter to project should be submitted to medical exam.

    In every installation or work, the personnel should include adequate dining rooms and enclosures,

    which they should be maintained always clean, free of wastes.

    The personnel should maintain the good judgment and discipline in the dining rooms, sanitary services

    and internal areas of Site project.

    The portable chemical baths should be maintained clean, disinfected and in good conditions

    4.5 Policy on Control of the Alcohol and Drugs

    HAUG S.A. is conscious that the use of alcohol and drugs in the workplace affects the normal health of the

    workers to carry out their tasks safely for themselves and others. That is why it is prohibited to consume or

    to possess alcoholic beverages and drugs during the work day or while working in the site projects.

    Measures to take:

    Carry out tests of alcohol tests to the people found involved in a serious accident.

    The Supervisor will control the behaviour of his workers in alcohol consumption signs search and

    drugs. Or in his defect he will be utilized instruments like the ALCOTEST for this purpose.

    In case it has been proved that the worker has consumed alcohol or drugs, the coordinations for

    respective analyses will be done.

    The worker that is consuming drugs by medical prescription, will report this fact to Human Resources

    Administrator. All the workers of site projects, without exception, will comply with their responsibilities that are

    indicated in our politics on the use of alcohol and drugs.

    Personal will be sanctioned, any be its hierarchy yes infringes these norms, in agreement al item 4.6 of

    the present document and legal devices in force.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    8/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 8 de 36

    ISSUE: 30/04/08

    REVISION: 5

    4.6 Policy of Incentives and Disciplinary Measures

    Incentives

    HAUG, will establish safety incentives programs for the workers consisting on the following points:

    Monthly prize to the workers that there are outstanding in safety.

    Celebration of the ACCIDENTS ZERO goal.

    Disciplinary Rules

    All the rules, norms and procedures, contents in the present plan are of strict fulfillment by part the workers,

    without restriction of charge or category.

    In agreement with Internal Regulation of Personnel of HAUG and legal devices in force, that break the

    dispositions given will apply the following sanctions:

    Verbal Admonition.

    Admonition written

    Suspension

    Dismissal

    If the misdemeanour is serious, the worker will be fired not including the sanctions before described.

    Serious misdemeanour in Safety is considered : Cause serious wound or death, which makes the worker be under the disposal of the competent

    authorities.

    Cause damage to the installations, equipments or any properties of the company or third sides.

    Appropriated of any property or value of the company or of third sides, or that anything under its

    custody.

    Destroy the natural resources.

    The resistance to comply the regulations, norms, manual and dispositions of Safety and Environment of

    the employer. The Supervisor is responsible for the control of his personnel and he is in obligation to instruct them so

    that they do not incur in the demeanours mentioned before.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    9/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 9 de 36

    ISSUE: 30/04/08

    REVISION: 5

    5. RESPONSIBILITIES

    5.1 Project Chief

    Is the direct head of all the operations in Project and therefore of the Safety, Health and Environment in

    the place. Consequently, he must provide the resources and facilities needed to avoid any occurrence

    of incidents, damage or waste of the resources of the business.

    Will set a personal example and assist in the proactive promotion of EHS as a personal objective

    Implement, comply and to make fulfill the EH&S policy, plan, objectives and designated goals in the

    project.

    It reviewed all the methods and procedures of work, verifying the compatibility with in EH&S Plan.

    To participate actively in the EH&S initiatives.

    Conduct inspects all the areas of the Project.

    To make weekly EH&S meetings with all the workers of the Project.

    Participate in accidents investigations.

    Review and improve permanently the EH&S programs of project, in agreement with the updates of the

    laws, standards and technologies in the matter.

    5.2 Project EH&S Manager

    Administer the EH&S Plan of project

    To advise to the different areas form the project in EH&S aspects

    To offer the EH&S induction training to all the new workers in the project

    To train all the personnel in EH&S.

    Inspect weekly all the areas of the project, review the results to identify EH&S issues and deficiencies

    and to advise supervisors of findings.

    Lead Job Safety Analysis reviews.

    To participate in accidents investigations.

    To provide weekly reports of EH&S project a our client e internally to HAUG S.A.

    To participate in the EH&S meetings organized by our client.

    To offer first aid to rough personnel.

    Be fully conversant with our client EH&S Rules for Construction, standards and the project EH&S

    requirements.

    Evaluate the EH&S performance of all the areas e inform a Project Chief.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    10/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 10 de 36

    ISSUE: 30/04/08

    REVISION: 5

    5.3 Erection Supervisor

    It planned and it implemented appropriate methods of agreed work with the safety standards.

    Comply and to make fulfill the EH&S plan.

    Conduct EH&S inspections weekly in all areas of project with the goal to verify the fulfillment of the

    standards and EH&S plan and to take the corrective measures in case that some norm is being

    infringed. These inspections should be taken down in their respective formats.

    To participate in the elaboration of Job Safety Analysis

    To participate in accidents investigations.

    To participate in the audits of Safety to order of the Project Chief or of the Client.

    Arrange continuously the improvement of the working conditions to prevent accidents and employment

    illnesses.

    Verify that the Area of Maintenance comply with the preventive program of maintenance, in order to

    assuring the operability of equipments and tools.

    5.4 Quality Supervisor

    It planned and it implemented appropriate methods of agreed work with the safety standards,

    specifically in the works that it corresponds to him. To participate EH&S inspections weekly in all areas of project

    To participate in the elaboration of Job Safety Analysis that it corresponds to him.

    5.5 Human Resources Administrator

    Verify that every new worker enters to the business with the certification of pre medical exams

    employment.

    To offer each worker the services of social insurance ESSALUD and complementary insurance. In

    every case these services should be maintained brought up to date. To offer the facilities like feeding and others with he purpose of maintaining an atmosphere of healthy

    and healthful work.

    To transact the necessary documentation for the entrance of the workers to the project.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    11/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 11 de 36

    ISSUE: 30/04/08

    REVISION: 5

    5.6 Planning

    To make the planning of all the activities of the project contemplating the aspects of security, health and

    environment during all the work.

    5.7 Responsible for warehouse

    Maintain the stock of personal protective equipment such as hardhats, protectors for ears, steel toed

    work boots, gloves in their diverse uses, high-viz outer garment, facial protectors and safety glasses.

    This stock should be compatible with the quantity of the scheduled personnel, in such a way that all

    they include these requests.

    Order that the warehouse includes enough fire extinguishers and to inspect them.

    Maintain order and cleaning in the warehouse.

    Order that every material or flammable product, chemical or hazardous materials be stored in other

    different areas al warehouse of materials. To maintain a file with MSDS (Material Safety Data Sheet) of

    existing dangerous products in the project

    Every acquisition of equipment, implement or material of safety should include the review and approval

    of the Project EH&S Manager. Similarly, it will be done with the dangerous materials and products.

    Order that the warehouse carry a KARDEX everyday on the safety equipments delivery to the workers.

    To inspect equipments, tools and other objects of warehouse, placing to the elements in good state the

    tape of the color code corresponding to the trimester in course (yellow).

    To retire of use and to signalize the elements in badly been

    5.8 Responsib le for Maintenance

    Comply the programs of preventive maintenance of machines, equipments, installations and electric

    tools.

    Comply with the requests of corrective maintenance that indicate the Supervisors of Safety or the users

    of equipments and tools.

    To inspect machines, equipments, installations and electric tools. to put the tape of color code to the

    elements that are in good state

    To give to the warehouse, to retire of use and to signalize the elements that are in badly been

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    12/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 12 de 36

    ISSUE: 30/04/08

    REVISION: 5

    5.9 Supervisors of Field

    Know the dispositions and the EH&S Plan of project.

    Order the works of the personnel to its charge in sure form, according to the dispositions of Safety.

    Not to allow the new workers carry out works unless they have received EH&S induction training as

    much of HAUG S.A. of as our client.

    Conducting weekly EH&S tool box meetings.

    Conducting daily EH&S meetings given to all the workers.

    To participate in the elaboration of Job Safety Analysis.

    Ensure that the work under their control has been planned and undertaken in such a way that

    recognized hazards and residual risks are managed and controlled making use of all available tools

    Ensure that EHS concerns are identified, communicated and understood by the workers under their

    supervision.

    Monitor and evaluate site personnel to identify workforce EHS performance issues for improvement,

    To verify that each worker has a uniform and basic equipments of Safety, like hardhats, protective

    lenses, protectors of ear, gloves, hi viz vest and steel toed boots.

    Control strictly the new workers under his charge.

    To make sure that all the equipment, tools and other elements to be used in the work are in good state

    To make inspection weekly in the work area.

    To investigate all near miss and accidents.

    To fulfill and to make fulfill the established thing in EH&S Plan

    Communicate the Project Chief or Project EH&S Manager in order to solve problems of Safety that do

    not have an apparent solution

    Keep the work area clean and maintain the conditions of Safety in the zone of work. As well as the

    control of his workers under its charge.

    Direct that be complied with the delivery of uniforms and equipments of personal protection to the

    workers according to the tasks that carry out or those equipments of personal protection that indicates

    the plan present.

    Request special permission to the Project Chief on works of high risk, as: Raise critic with crane, works

    in confined places, works in height, works in heat and others.

    Request sanctions for the workers who infringe the norms of Safety in agreement to the procedure that

    is established in this Plan.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    13/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 13 de 36

    ISSUE: 30/04/08

    REVISION: 5

    5.10 Workers in General

    Work in a safe manner at all times, which is indispensable requirement to maintain the employment,

    obeying the dispositions of EH&S Plan.

    Communicate any act or substandard condition to their immediate supervisor.

    Attend the courses, talks and EH&S meetings..

    Obey the dispositions, norms, rules and instructions that give the company and Supervisors.

    Use the equipment of Safety that the company handed out by the company according to the task.

    Do not carry out unsafe works. If it is obliged it to communicate al Chief Project.

    Employees are responsible for their personal safety and the safety of their co/workers, through both

    their acts or their omissions

    Maintain the area in order and clean.

    Stopping their immediate or impinging work where they consider the work being performed is at risk

    or unsafe.

    5.11 Sub contrators and third sides

    The sub contractors are in the obligation to obey the norms of Safety, Health and Environment of

    HAUG and of our client.

    HAUG is in the obligation to instruct them and to reach them the pertinent documentation on these

    aspects.

    Likewise the suppliers will comply with the norms of Safety, Health and Environment of HAUG and our

    client.

    6. HAZARDS IDENTIFICATION AND RISK ANALYSIS (HIRA)

    Previously a begin a works will elaborate hazards identification and risk analysis of all work, step by stepconsidering the hazards, risks and safety measures to apply. One will consider any change in the

    process, activities, materials, equipment and new substances to make one re- evaluation of risks with

    respect to the initial.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    14/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 14 de 36

    ISSUE: 30/04/08

    REVISION: 5

    7. INSPECTIONS

    Introduction

    The inspection constitutes one of the main techniques used for the identification of substandard

    conditions in the place of work and verification of the fulfilment of the appropriate standards of work.

    Objectives

    Identification of occupational risks in order to eliminate them or to treat them in the smaller possible

    time and of the suitable way more.

    Identification of defects or faults in the facilities, vehicles, equipment, machineries and tools.

    Verification of the implementation of the remedial actions derived from them inspection.General Procedure of the Inspection

    Preparation

    To make a list of the equipment, tools and materials to inspect.

    To review the previous reports of inspection in search of critical aspects for the pursuit.

    To prepare a route to have sufficient cover in all the area of inspection.

    To compile the control lists to use during the inspection.

    Inspection

    To follow the route predetermined and to use a list of control previously prepared. To describe in clear form, makes specific and concise the detected problem, contemplating its specific

    location.

    Analysis of the inspection

    To analyze the causes that originated the presence of the detected substandard conditions.

    Remedialactions

    To give the recommendations that are necessary to correct the found deficiencies.

    To adopt the measures necessary to prevent the loss.

    Actions of pursuit To verify that the remedial actions are implemented and that these give the considered results.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    15/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 15 de 36

    ISSUE: 30/04/08

    REVISION: 5

    8. JOB SAFETY ANALYSIS

    Objectives

    To count on a practical methodology of identification of the hazards and evaluation of the occupational

    risks that involve the diverse labour activities of our organization.

    To promote the use of simple tools of evaluation of risks between the workers.

    To know the occupational hazards and risks each one of the tasks to apply the suitable preventive

    measures.

    Procedure

    Selection of the work

    To analyze Initially the work will be chosen that is desired to evaluate.

    Data collection

    One will rise information about the equipment, tools, materials and other elements to use, the

    conditions of the work surroundings, the technical characteristics of the workings to make, among

    others.

    Hazard identification

    The selected work will be divided in its main stages and it will identify the present hazards in each one

    of these steps. The registry of this activity will be made in the respective format.Measurement of the risk

    In the matrix of risks, in function to the probability of occurrence and the potential of damage the level

    of risks of each one of the present dangers in the different activities from the project was determined

    Proposal and implementation of preventive recommendations

    For each one of the identified risks the corresponding preventive recommendations will settle down

    and implement in the work fronts

    The Job Safety Analysis will be registered in the respective and located format in the work place.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    16/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 16 de 36

    ISSUE: 30/04/08

    REVISION: 5

    9. TRAINING

    Introduction

    Based on the hazards, risks, occupations, equipment, machines, tools, conditions of work and other

    elements, that is to say, previous to an analysis of qualification necessities, a Plan of Qualification will be

    developed. The training is agreed to exposed in the Policy of Meetings and Training.

    Objectives

    To generate a high level of safety conscience in all our workers and employees.

    To offer to our personnel an optimal level of knowledge in the aspect of Enviroment, Safety and

    Health, facilitating this way the putting in practice of these

    Training Plan

    Induction to the New Personnel

    All worker of HAUG S.A. will obligatorily receive a Course of Induction to the New Personnel, before

    entering to toil in the Project. This course will be distributed by Project EH&S Manager on an appropriate

    atmosphere.

    Also all worker will obligatorily receive the Course of Induction offered by our client, before the beginning

    of the workings in the project.

    Daily Meetings of 5 minutesThey are offered to all the personnel of the project, being distributed by the Supervisor of area. In these

    char them will touch to agreed subjects to the hazards and existing risks in the work area.

    Weekly Meetings

    It will be realized weekly during 30 minutes by the Project Chief altogether with the Project EH&S

    Manager.

    EH&S Courses

    Workers will be received specify training in different subjects from safety, health and environment

    Training to visitors, suppliers and thirdEverything third, previous one to its entrance to the project, will receive EH&S training.

    Training Procedure

    In function to the occupational hazards and risks that they appear in the development of the workings

    will choose the subject to char it it of 5 minutes, orienting to them on the safe work that they will carry

    out.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    17/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 17 de 36

    ISSUE: 30/04/08

    REVISION: 5

    It is necessary that the exhibitor previously reviews information related to the subject of selected it

    char, being able to mention norms, histories and anecdotes, among others.

    Later it will prepare the content of its exhibition and the form of teaching, in addition to some resources

    to use (if outside the case) like audio-visual means, among others.

    The exhibition of the subject will be made in an suitable atmosphere, initiating with a brief introduction

    and specifying what it is going away to treat.

    Later the subject will appear counting on the active participation of the workers by means of its

    commentaries. Finally the message of the qualification will be indicated and what it looks for of the

    workers.

    Once finished the exhibition the participation of the workers by means of the formulation of questions

    and the exhibition of problems, restlessness and suggestions will be asked for. In case some problem

    appears that cannot be solved will be transferred this one to the Project Chief.

    Registry of training

    All training will have to be registered in the respective format, which will be given to the EH&S Area for its

    final register and its registry in the training statistics.

    Evaluation

    One will verify that the objectives of the training are obtained by means of written, oral tests, appropriateobservation and other means.

    10. ACCIDENTS/INCIDENTS

    Objectives

    Identification of the basic causes of the accidents and incidents of work.

    Verification of the remedial actions derived from the respective investigation.

    To avoid the repetition of the accidents and happened incidents.

    Report of Accidents and Incidents

    All accident and incident that happens will be communicated to the Project Chief and the client. Later one

    will fill to a format of report of investigation of accident and incident, which will appear to the client before

    passed the 24 hours subsequent to the fact.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    18/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 18 de 36

    ISSUE: 30/04/08

    REVISION: 5

    Procedure of Investigation of Accidents

    Initials actions

    Report immediate to the supervisor and the Project EH&S Manager.

    Isolation of the affected area, avoiding the entrance of people and alteration of the conditions of the

    place.

    Report of the accident or incident to the Project Chief and the client.

    Harvesting of pertinent information

    Identification of the sources of evidences

    (1) What it seems to have happened?

    (2) Who must be interviewed?

    (3) What equipment, materials, tools or people would have to be present?

    (4) What things failed or did not work well?

    (5) What is needed to know on training, maintenance or other data that are registered?

    To avoid that the evidence is altered or removed.

    Interview to the witnesses.

    Take a photographys from the place of the facts.

    Drawing of the sketch of the accident or incident. Annotation of all the data and raised information.

    Analysis of the collected information

    Use of the model of causality of losses

    Analysis of all the significant causes

    Identification of the injuries and the damages

    Identification of the immediate causes (asking itself so that the damages happened).

    Identification of the basic causes (asking itself so that the immediate causes existed).

    Determination of the faults of the administrative control.

    Evaluation of the potential of losses

    Estimation of the probability of occurrence and the potential gravity of the losses

    Meeting between Project Chief, Project EH&S Manager, Erection Supervisor and Supervisor of field

    Review, analysis and discussion of the report of investigation of incident/ accidents.

    Definition of the problem.

    Adoption and verification of the remedial actions

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    19/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 19 de 36

    ISSUE: 30/04/08

    REVISION: 5

    Definition of the corrective measures, establishing concrete actions, responsible people to implement

    them and dates of term.

    Elaboration and diffusion of the learned lesson of the incident/accident.

    Verification of the adopted remedial actions with the purpose of verifying its effectiveness. In case

    some problem is stated will meet the Project Chief, Project EH&S Manager, Erection Supervisor and

    Supervisor of field to position to evaluate the situation and to define the respective measures to adopt.

    11. BEHAVIOR BASED SAFETY

    To maintain the interest of the workers by the Security, Health and Environment and to recognize activate

    participation of the workers in the profit of the fixed objectives

    With the purpose of causing safe actions in our workers intrinsic and extrinsic recognitions will be offered

    to the people who emphasize in the accomplishment of the safe workings, as well as the promotion and

    active participation in the improvement of the Safety, Health and Environment. Between the reasons for

    premiacin to consider they are:

    Record of zero accidents during an amount of worked hours man.

    More outstanding workers in safety.

    The awarded workers will be chosen on the basis of the evaluation that makes the Project Chief, ProjectEH&S Manager, Erection Supervisor and Supervisor of field, considering their participation in safety,

    innovations, contributed opinions of improvement, among others.

    Intrinsic recognitions: Congratulations.

    Extrinsic recognitions: Certificates or Diplomas and diverse prizes.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    20/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 20 de 36

    ISSUE: 30/04/08

    REVISION: 5

    12. SAFETY STANDARDS

    HAUG S.A. comply strictly standards of our client during a activities in the present project.

    12.1 Housekeeping

    The order and the cleaning constitute fundamental activities that they must be executed by all the workers

    who toil in the project.

    Good housekeeping is an important element of accident prevention.

    Good housekeeping will be planned at the beginning of the job and be of a primary concern of all

    supervisors and workers throughout the entire project. This will be a part of the daily routine and clean up

    will be a continuous process.

    Some basic rules to consider are:

    The areas of work, passages, stairs and all the other areas will stay free of obstacles, equipment, and

    materials.

    In diverse sites appropriate containers for sweepings will be placed, which will be used for the

    positioning of remainders.

    The liquids (such as paintings, reliable, dissolvent, oils, and fats) and any other material or containers

    that have contained chemical, will be rejected in agreement with the procedures and regulations

    established for toxic wastes. The storage areas will stay cleanings and the materials properly stored.

    The electrical cords, wires, cables, hoses, and other temporary systems, will stay outside the surfaces

    to walk and in a high position.

    All the pieces of wood, rejected material and sweepings will have to be removed immediately of the

    work area.

    All the remainders of reliable, oily rags, and incendiary fuels, will stay in containers closed resistant to

    the fire until they are retired of the work site.

    12.2 Personal Protective Equipment

    Previous at the beginning of the workings, it will be made an identification of hazards and evaluation of

    risks, with the purpose of determining the personal protective equipment to use.

    All workers will be trained in the storage, use, cleaning and spare part of personal protective equipment.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    21/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 21 de 36

    ISSUE: 30/04/08

    REVISION: 5

    It is obligatory the use of safety glasses, hardhats, hi viz vest, steel toed work boots of safety and uniform

    of work at any moment in the work fronts and where risk against the security and health of the people

    exists. In case of appearing additional risks the suitable implements will be used to control these.

    All personal protective equipment to use in the project will fulfil the stipulations of the pertinent norms and

    will count on the certification of respective quality.

    Double eye protection is required for certain operations such as welding, cutting and brazing.

    All the personnel will use auditory protective equipment in the designated areas that exceed 85 dB.

    Fall protection is required for employees working above/below ground when not protected by an approved

    scaffold or staging.

    All respiratory protective equipment will count on the approval of the National Institute Occupational

    Safety and Health of EE.UU.

    The respiratory equipment will be used, stored and maintained in accordance with the requirements of themanufacturer.

    The respiratory equipment will be selected with base in the risks to which the worker will be exposed.

    The use of steel toed work boots of safety is required during all the works in the project.

    The equipment that has undergone any type of alteration and/or that is in inoperativo state will be retired

    of use in immediate form.

    12.3 Tools in general

    Every tool should be used only for the purpose that was designed.

    The tools should be maintained in optimum conditions of operation and use and they can just be used by

    qualified personnel.

    Tools mechanic portable

    The portable tools should be operated for qualified and authorized personnel.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    22/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 22 de 36

    ISSUE: 30/04/08

    REVISION: 5

    These tools should have guards and adequate protections.

    Read the instructions of warning installed in each machine of the manual of operation and to comply with

    their content.

    It is indispensable that the Supervisor give the instructions before the use of the tool.

    Tools electrics

    The welders of electric arch, turbines, drills, are electric tools that HAUG S.A. will utilize in the project.

    Utilize both hands, to have good base, to utilize the tool according to the instructions that the Supervisor

    has given.

    Any failure of the tool should be communicated to the Supervisor or electrician.

    Use always facial protector or lenses of Safety when you are operating machines or electric equipments.

    All the machines and electric tools should be operated just for what they were designed; do not withdraw

    the protector, guard or another element of Safety.

    Do not used tools that have cables wore out or in bad conditions

    The tools and electric machines should be connected to land.

    The tools damaged or faulty should be retreats of the use and will be put them a placard that says DO

    NOT USERemains prohibited repairing electric tools, this work concerns to the technical electrician

    Tools of hand

    The faulty tools should be returned to warehouse

    They should be marked or to be identified of way such that the user or owner can recognize it.

    Never use a hand tool to do lever. Neither forces its capacity.

    12.4 Electrical AspectsAll electrical wiring will be carried out by qualified personnel.

    All temporary electrical wiring will comply with the National Electric Code.

    All portable electrical equipment will be grounded.

    All single-phase low-voltage extension cords will be three-wire conductor type.

    All low-voltage hand held portable electrical equipment will be used in conjunction with GFCI's (Ground

    Fault Circuit Interrupters).

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    23/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 23 de 36

    ISSUE: 30/04/08

    REVISION: 5

    12.5 Scaffolds

    Will be established norms that guarantee that the scaffolds and work platforms systems be installed, they

    inspect, use and be disarmed according to safe practices and the pertinent rules. Nobody, will modify,

    alter or damage any scaffold. The modifications which are required will be performed only under

    authorization. Scaffolds will only be erected, modified or dismantled by qualified scaffolders.

    All scaffolds comply with standards of our client.

    Every scaffold must be reinspected and certified for use every 7 days and will use a scafftag system.

    The use of harness is obligatory when it works in scaffolds, which will have to be hooked to a safe point

    outside the scaffold. Also the use of elastic chin straps of plastic is obligatory.

    12.6 Ladders

    All ladders comply with standards of our client.

    The ladders will be reviewed before each use and periodically a authorized person will carry out

    inspection, registering the results in the respective format.

    The ladders that present deficiencies you would not used, being retired of use.

    Tools will never be put, materials or objects upon the steps.

    In same ladders it will not be able to work more than a person.

    12.7 Material Handling and Storage

    The manual manipulation refers to the task that the force of the worker is carried out by its means. It

    should be taken into account the following norms:

    Use adequate gloves to avoid cuts or sharp pains in hands.

    If the load is heavy request help to raise it; but it is preferably recommended the use of mechanical

    carts.

    To raise a load do not use the lumbar musculature. Employ the effort with the leg musculature ofmaintaining the back straight.

    Reinforcing steel is to be stored in separate piles according to size, length, and placement sequence.

    No Smoking and Warning signs as required for the stored products will be posted and maintained.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    24/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 24 de 36

    ISSUE: 30/04/08

    REVISION: 5

    12.8 Hazardous Materials

    EH&S area will support responsible of warehouse about the degree of hazard of the material or

    substance, consequently the adequate material for the different processes of the production will be

    acquired.

    The responsible of warehouse will be performed weekly inventory of the hazardous materials of project.

    The management and utilization of the hazardous materials will be according to the indications of the

    manufacturer or supplier. It will serve to instruct the workers by means of the sheets of instruction of the

    manufacturer or Material Safety Data Sheets (MSDS).

    For the storage of these materials previously should be coordinated with the Project Chief to adopt the

    measures of the case.

    Every container that has contained hazardous materials should be signalized.

    A Hazardous Communication Program will be implement and spread a personnel of project.

    Material Safety Data Sheets (MSDS) in both English and Spanish will be maintained at the job site and

    will be available for examination from the EHS Supervisor.

    12.9 Fire Prevention and Protection

    It is prohibited final to smoke in the zones of work. Warnings of prohibition will be placed to smoke and itwill instruct the personnel previously.

    A procedure written of storage, use and disposition of inflammable materials will be elaborated.

    The work area will stay clean, ordered and free of combustible materials and incendiary fuels.

    Fully charged and operative fire extinguishers will be supplied according to the standards of our client.

    Personnel are required to be familiar with fire extinguisher locations and operation.

    Personnel will be trained in the correct use of each type of extinguisher on the site.

    Extinguisher will be inspected monthly by the Supervision.

    12.10 Welding and Cutting

    All the electrical machines must operate as they are designed; it does not have to retire the protector,

    keeps or another element from safety.

    Machine weld that have spent cables or in bad conditions do not have to be used.

    The electrical tools and machines must be connected to earth.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    25/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 25 de 36

    ISSUE: 30/04/08

    REVISION: 5

    The damaged or defective machine must be retired of the use and a poster will be put to them that it

    indicates NOT TO USE.

    It is prohibited to repair electrical tools; this one work is incumbent on to him to the responsible for

    maintenance.

    The positioning of screens is necessary to protect to the rest of workers of the radiations caused by the

    electrical arc.

    Fully charged and operative fire extinguishers will be supplied in the work area.

    Frames of electric welding machines operated from power circuits will be effectively grounded.

    Electrode and ground cables will be supported to prevent interference with workers.

    Defective cable shall be repaired or replaced.

    An electrode holder shall be properly rated and insulated.

    Electrodes shall be removed from the electrode holder when unattended.

    The welders will use a necessary Personal Protective Equipment for the welding and cutting.

    12.11 Unfired Pressure Vessels

    The cylinders of oxygen or fuel should not be rolled thrown horizontally (they should not be used as

    rollers). For the transportation, to utilize appropriate cars or to roll them vertical. They should neither beraised with crane or truck crane, freight elevator. The raise of the cylinders should be manual or with

    appropriate cages.

    The cylinders should be stored of the following form:

    Hitched in vertical position with chain of average inch with the cap placed.

    The environment of storage should be remote, aired, with ceiling and enclosure with netting wire of

    preference.

    Fire extinguishers should be placed in the quantity required. Place signs of warning, as: NOT TO SMOKE, HAZARD, MATERIAL INFLAMABLE.

    They should be stored separated, full and empty cylinders of oxygen and as of fuel, grouped at a

    minimum distance of 8 meters.

    The bottles of oxygen and acetylene or other gas will be placed on vertical form, moored with chain upon

    a cart in such a way that they do not fall to the floor.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    26/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 26 de 36

    ISSUE: 30/04/08

    REVISION: 5

    Previous to the positioning of the regulators, you carefully open the valve of the cylinder to blow any

    strange particle. After finishing installing the regulator, you get off to side of the measurer while it opens

    the valve of the cylinder.

    In the regulators (to the height of the exit) a valve backfire must settle, as much in the oxygen cylinder like

    in acetylene or any inflammable one.

    Before initiating the work and during the operation, the oxygener must verify that there is no lose of gas

    by any union of hoses or pressure gauges.

    It is obligatory the use of glasses type wins for the personnel who is due to use the weld.

    In the environs of the equipment of oxicorte it must not be greasy, oil, gasoline or other fuels. These with

    the combination or flight of oxygen can intensify the fire in chain and cause an explosion

    This completely prohibited cleaning machines, motors of combustion, equipment and clothes with oxygen

    of the cylinders. This action is considered serious offense.

    In order to initiate the work, open slowly the valve of the cylinder, making sure that the second cover of

    the regulator is closed before opening the valve of the cylinder

    Also, to open to the valve of the inflammable gas cylinder (acetylene, propane gas, etc.) only a quarter of

    return. Later to open totally the valves of the cylinders of oxygen.

    When igniting the blowpipe or cane, opening the first valve of the combustible gas in the blowpipe, laterthe one of oxygen. To use an approved spark gap to ignite the blowpipe.

    When the day finishes, all the accessories and elements of the equipment must be disarmed. The

    cylinders were left only with the respective hoods the blowpipe.

    Before initiating the works of oxygen or weld is due to place to the flank, an fire extinguisher

    Never cut o weld containers, cylinder or tank that has contained some inflammable previously material

    without being washed and freedom of gas.

    12.12 Steel ErectionSteel workers shall be trained about the appropriate use of personal protective equipment, safe work

    practices, and potential hazards in steel erection operations. Workers will be appropriately supervised.

    Before initiating the structures erection works, it is necessary to plan with procedures of Safety and step

    work profiles by step (JSA) With the support of the erection supervisor, Project EH&S Manager,

    supervisor of area and the user of the truck-crane.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    27/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 27 de 36

    ISSUE: 30/04/08

    REVISION: 5

    All the workers will be a distance similar to the indicated one by the turning radius of the heavy equipment

    The equipment located will be protected further down against dross and metal melted and electrodes in

    operation.

    Put protective blankets against fires under the operations to where said discovered flame operations be

    carried out.

    To build and to raise with cranes, the load will not free themselves of the hook of the feather until the

    members be make sure that with at least two bolts, or their equivalent on one, in each connection and

    tense themselves with adequate tools.

    In area in construction will be placed notices of warning, signal and evacuation.

    In heights of 1.20 meters or but, the works will be performed with harness according to the standards of

    our client.

    12.13 Fall Protect ion

    HAUG S.A. will establish a Falls Prevention Program that define the requirements of the protection

    equipment use against falls and the methods / procedures of prevention. All the equipment of personnel

    protection and other material associates with this program should be supplied for HAUG.S.A.

    The use of the harness is obligatory, when working in equal heights or more than 1.20 meters, provided

    that do not include protections, as fixed railings, retaining walls, etc. The Supervisors will evaluate all thearea of work by exposition to falls and they will plan for anticipated and will install the systems of

    protection against necessary falls before assigning the workers.

    Employ safety harnesses of entire body approved with absorption of blows to protect the workers against

    falls where the primary systems of protection against falls be not adequate and the workers be exposed

    to falls to different level.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    28/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 28 de 36

    ISSUE: 30/04/08

    REVISION: 5

    The workers that displace or work in high areas at more than 1.20 meters on the level of the land or in an

    adjacent surface and be exposed to falls, they will utilize secondary protection against falls to hitch in

    every moment their safety harness to a structure, piola life preserver, or to a capable approved falls

    detention device of bear 5000 pounds.

    Employ equipment of protection against falls while the scaffolds are installed and the platforms of

    provisional work, the structures they be built and the buildings, and other equal works be carried out.

    Every element of protection against falls just as the lines of life, the safety harnesses, etc. they will be

    inspected regularly by damages or deterioration. The faulty equipment will be put out of service and will

    be destroyed

    Every element of protection against falls that suffer loads of shake during the detention of falls they will be

    rejected.

    Any element and systems of protection against falls will be utilized with no another purpose that that ofsafeguards the workers.

    The workers will utilize only systems of harnesses supplied by HAUG.

    All the piolas should be of type SHOCK ABSORBER when they are used like protection against falls

    The lines of life and the points of obsession of the piolas of protection against falls they should be capable

    of bearing at least 5000 pounds. The lines of life will be able to be installed or well vertical or horizontallyand in general will try that they provide mobility al personnel working in high areas:

    The lines of horizontal life should consist of metallic cable of average inch (1/2), properly borne to resist

    at least 5000 pounds in any direction.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    29/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 29 de 36

    ISSUE: 30/04/08

    REVISION: 5

    The lines of horizontal life will be summoned to court give form that points of connection to the height of

    the shoulder be provided or more higher than the personnel that utilize them. The lines of life will be

    utilized with no another purpose but protection against falls. The lines of horizontal life will be installed

    and maintained by personnel qualified.

    The lines of vertical life will be utilized to protect al personnel against falls when require vertical mobility

    and they will consist of lines of static life manufactured of cord of synthetic fibber or cables equipped with

    connection of cord approved or will also be able to consist of drum type life lines auto folding connected

    directly to a safety harness.

    12.14 Rigging & L ifting Operations and Equipments

    HAUG S.A. comply with standards of our client with respect to this subject

    All rigging, hoisting, or power equipment will be inspected daily prior to use to assure the safety of the

    equipment and the employees. Too inspections written monthly and annual reports are made on

    each piece of lifting equipment. These records are to be maintained at the jobsite with a copy on the

    applicable lifting equipment as required.

    All rigging equipment is to be properly inspected color coded on a quarterly basis (yellow in our case). Arigging register will be maintained by each contractor for all rigging equipment used on the project.

    The Project Chief in coordination with Erection Supervisor and Project EH&S Manager will evaluate the

    situation and will decide he type of lifting.

    Equipment operators will be instructed in our policies and rules for operation and in equipment

    maintenance. They will be trained, certified, and qualified for each class of lifting equipment.

    The signal person (rigger) will be specifically designated and instructed in the use of proper hand signals.

    A chart containing the proper hand signals will be maintained in a prominent location

    on the job site.Equipment will be repaired in designated, safe locations.

    The condition of all cables, slings, hooks, and clamps will be inspected in accordance with the safety

    requirements.

    Personnel are not permitted to walk or work underneath suspended loads.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    30/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 30 de 36

    ISSUE: 30/04/08

    REVISION: 5

    12.15 Motor VehiclesAll driver will instructed in defensive handling and will have a certification respective.

    The conductors of vehicles should possess an internal license to conduct inside the project offered by the

    client if thus is required.

    The conductor before operating the vehicle or heavy equipment will inspect the system of brakes,

    mechanical and electric system, state of the tires and other elements.

    Every vehicle of the company will leave in commission of services with authorization of the Project Chief.

    In the project, the maximum velocity of circulation it will be the one that set the client

    The conductor of the vehicle is responsible for any damage or wound that cause as a result of an

    accident or incident in the public way or project.

    Every conductor or passenger should use the seat belt that carries in the cabin.

    He is prohibited to travel in the platform or hopper of the trucks, small trucks. Thus he is prohibited to

    travel in the stirrups and bumper of the vehicles and heavy equipment.

    The vehicles and heavy equipment should have their sonorous alarm of backward movement that be

    audible besides the environmental noise. It is prohibited to use the alarm musical or another

    unconventional sound.

    In the Project the vehicles should stationed in the places and form that indicate the client

    In the huts is obligatory the revision of the vehicle on the part of the Agents of Caution. Every material,equipment or active that enter or leave should be revised in the huts with the corresponding guide of

    remission. The conductor is the only head of any infringement to this norm.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    31/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 31 de 36

    ISSUE: 30/04/08

    REVISION: 5

    12.16 Confined SpaceBefore entering a confined space should will tramit to PERMIT REQUIRED CONFINED SPACE.

    Confined Space training will be provided to all employees who will be entering any permit or non-permit

    required confined space areas.

    The Confined Space Entry procedure will be used to control the work being conducted within the space.

    Adequate ventilation will be provided to those work areas, as needed, to provide and maintain a safe

    atmosphere. Ventilation units will be both portable and fixed, so as to provide the necessary flexibility as

    work areas are changed.

    On job sites where conditions warrant, oxygen deficiency meters, combustible gas meters, and other

    monitoring devices are provided. No person will be allowed to enter or work in an explosive or toxic

    atmosphere.

    In the entrance of the place the permission of work in confined spaces will be published the relation of

    personnel who has entered to the confined space, the hour of entrance and the time that will last their

    workings Periodically gas measurements will be made in the carried out place of work by personnel

    properly trained and authorized

    12.17 Construction Non DestructiveThe Quality Supervisor elaborated procedures of radiographic tests before the accomplishment of these

    types of work

    Only trained and qualified personnel are to perform radiography work.

    Each radiographer is required to wear a film badge, which records radiation exposure.

    A dosimeter is to be worn by each individual in radiation work. The dosimeter reading is to be recorded

    daily in the Quarterly Dosimeter Report.

    During this works will comply with Peru Regulation D.S. 009-97 EM Radiologic Safety.

    12.18 Abrasive Blasting and Painting

    All personnel will use Personal Protective Equipment respective during the accomplishment of abrasive

    blasting and painting

    Painting equipment and procedures are to be carefully examined frequently to assure potential hazards

    are eliminated. Items examined are rigging, scaffolding, staging, ladders, ropes, and cables. Of particular

    importance are vapour concentrations, fire and explosion hazards, toxic materials, and corrosive liquids.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    32/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 32 de 36

    ISSUE: 30/04/08

    REVISION: 5

    In enclosed spaces, the atmosphere will be checked for oxygen deficiency and combustible gas before

    starting work.

    Signs will be posted specifying no smoking, fires, or open lights within 20 meters of solvent handling

    areas.

    Extinguishers against fires in the zone of work will place.

    The Paint Superintendent will inspect the job site no less that weekly.

    12.19 Signs, signals and barricades

    The posters, signboards and posters of Safety must be made in agreement with the regulations of Safety

    The posters must be allusive to the Safety and must be placed in places where the personnel has easy

    access to its reading

    The signboards according to are their message must be put when hazard is noticed, warning, not to

    smoke, indication of transit routes, prohibitions, etc. Is obligation of all, to obey the instructions, that that

    disobeys will be reason for sanction

    The red tapes indicate danger and the yellows mean warning or attention. The tapes single indicate

    warning of the hazard but physical nonprotection

    12.20 Excavation, trenching and shoring

    Prior to opening an excavation, provisions are to be made to accommodate underground installations.

    The walls and faces of all excavations, in which employees are exposed to danger from moving ground,

    will be guarded by a shoring system, sloping of the ground, or some other equivalent means.

    Excavations are to be inspected by a competent person after every rainstorm or other hazard increasing

    occurrence, and the protection against slides and cave-ins will be increased if necessary.

    The determination of the angle of repose and design of the supporting systems are based on careful

    evaluation of weather conditions, soil consistency, and other operations.Piling, cribbing, shoring, etc., are to be designed by a qualified person and will meet all accepted

    engineering requirements.

    In excavations which employees may be required to enter, excavated or other material will be effectively

    stored and retained at least 1/2 meter or more from the edge of the excavation unless other effective

    retaining devices are used.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    33/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 33 de 36

    ISSUE: 30/04/08

    REVISION: 5

    Support systems are to be planned and designed by a qualified person when excavation is in excess of 5

    meters in depth, adjacent to structures or improvements, or subject to vibration or ground water.

    Materials used for sheeting, sheet piling, cribbing, bracing, shoring, and underpinning will be in good

    serviceable condition.

    Except in hard rock, excavations below the level of the base of footing of any foundation or retaining wall

    is not permitted unless the wall is underpinned and all other precautions are taken to assure the stability

    of the adjacent walls for the protection of employees involved in excavation work.

    Precautions are to be taken to assure sidewalls are supported if heavy equipment is to be located near

    the edge.

    Where oxygen deficiency or gaseous conditions are possible, the atmosphere in an excavation is to be

    tested. Where adverse atmospheric conditions may be present, emergency rescue equipment will be

    provided.

    Shoring and/or bracing will be placed in every trench over 1 meter in depth regardless of soil type, except

    solid rock, unless banks are sloped to the angle of repose in accordance to soil types as based on

    recognized tables, e.g., OSHA regulations.

    Shoring and bracing are carried down the trench.

    All excavated material will be placed a minimum of 1/2 meter back from the trench edge.Adequate means of exit will be provided for every 5 meters of lateral travel in trenches more than 1 meter

    in depth.

    Where bracing of shoring trenches is not practical or economical due to unstable ground, moveable steel

    trench shields may be used.

    12.21 Sanitation

    Proper sanitation on the jobsite and adequate facilities are required to prevent unsafe drinking water and

    inadequate or disease prone sanitary facilities.

    12.22 First Aid

    In the different fronts from work it will be counted on medicine kits of first aid, like brigades of first aid and

    two personnel qualified in this.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    34/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 34 de 36

    ISSUE: 30/04/08

    REVISION: 5

    13. PROCEDURES OF CRITICAL WORKS

    Previously a begin a works will elaborate procedures of critical works, which would be reviewed and

    approved by our client.

    .

    14. MEDICAL CARE FACILITIES

    Immediate and adequate medical care to the injured will be of utmost importance.

    All workers of HAUG S.A. will be trained in First Aid and CPR.

    In the different fronts from work it will be counted on medicine kits of first aid, like brigades of first aid and

    two personnel qualified in this.

    15. ENVIRONMENTAL ASPECTS

    HAUG S.A. will comply with General Environmental Law, applicable regulations including WORLD BANK

    INTERNATIONAL and standards /procedures of our client.

    IDENTIFICATION AND EVALUATION OF ENVIRONMENTAL ASPECTS

    Before the beginning of the labors there will be realized an evaluation of environmental risks detailed inthe place of work, identifying the possible impacts and determining the measures of control to adopt. For

    it there will elaborate a counterfoil of identification of environmental risks Any risk evaluation will be sent

    to the client for his review and approval, being later registered and filed.

    MONITORING AND CONTROL OF THE ENVIRONMENTAL MANAGEMENT

    The check of the fulfillment of the Plan of Environmental Managing will be realized by means of the

    monitoring and respective control, using for it the inspections and environmental audits, executed by the

    Project Chief.

    ENVIRONMENTAL AUDITS

    The Project EH&S Manager will realize environmental audits monthly, in which the fulfillment will happen

    of exposed in the Plan of Environmental Managing. Later a report will be sent to the Project Chief of

    HAUG S.A. by copy to the client, indicating not conformities (if they had) and the necessary corrective

    policies (including persons in charge and period) for the respective raising.

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    35/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 35 de 36

    ISSUE: 30/04/08

    REVISION: 5

    MEASURES OF MANAGING, CONTROL AND MINIMIZATION OF ENVIRONMENTAL IMPACTS

    Storage of Materials in Stores Our materials will be located in strategic, due surrounded and put up

    signs places. Additional fire-extinguishers will be located against fires and first aid kit of the first aids

    in the place.

    Managing of Dangerous Materials The employment of dangerous materials in the labors of the

    Project does that one presents a risk for the environment, the safety and labour health. Every

    chemical product will possess(rely on) a safety leaf called leaf(sheet) MSDS (Material Safety Data

    Sheet), which details the characteristics, risks and measures of contingency in case of emergencies.

    One will take an inventory of the dangerous materials, as well as of the consumption.

    His managing will be realized expiring with the dispositions of the manufacturer; in case of his

    storage they will install systems of containment if it was the case. As for his final disposition it will

    separate of the remaining types of residues.

    The files and files of the safety leaves of dangerous materials they will be located in the Office and

    store of Work, as well as in the work camp.

    Managing and disposal of Solid residues: The labours of the project will generate solid residues, for

    ende one will possess(rely on) a Plan of Managing of Solid Residues, which will meditate that thegenerated residues are withdrawn and arranged in due covered cylinders and / or bags(stock

    exchanges) of colors for his movement and final disposition.

    Are considered to be systems of containment to containers, trays, puddles of plastic, etc. That are

    impermeable, in sizes and dimensions adapted to prevent them the content of the engines, tanks

    and cylinders being from spilt on the soil and for ende to prevent the possible spillages or

    escapes(fugues) from managing to strike to the environment and the health.

    One will possess(rely on) a kit of emergency consisting of spades, beaks(peaks), absorbent rags

    and black markets to face to any contingency.

    16. MANAGEMENT REVIEW AND CONTINUAL IMPROVEMENT

    To half and finalizing the project the high direction of HAUG S.A., to reviewed the EH&S management

    and will propose improvements (if there were them) fulfilling the cycle of continuous improvement of the

    company

  • 7/21/2019 Manual HSE Empresa Metal Mecanica

    36/36

    Ingeniera

    ENVIRONMENTAL, HEALTH AND SAFETYMANUAL

    HAUG - SP

    SHEET: 36 de 36

    ISSUE: 30/04/08

    REVISION: 5