RBCA - LUST CASE GAS STATION, WASHINGTON DC ASTSWMO LUST Workshop September 2019 Deepak Singh

Transcript of LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak...

Page 1: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

RBCA - LUST CASEGAS STATION, WASHINGTON DC

ASTSWMO LUST WorkshopSeptember 2019Deepak Singh

Page 2: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

Location: Washington DC, NW quadrantFacility: Gas Station since 1943 but zoned for mixed use

BackgroundUSTs: 4 tanks currently in use (gasoline and diesel)Release: Phase II indicated gasoline leak from UST pipe lines in 2008

(Benzene at 1730 ug/L)Impacted media: Soil and groundwater

Sensitive receptors:School located 500 feet up-gradient and east of site, across a the road.Single family homes located west and southwest of site, (across road).Washington Aqueduct Reservoir located 500 ft. southeast of Site.Potomac River located 1,500 ft. southwest of site.Utility line: storm sewer located along south property line.

FACT SHEET

Page 3: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

SITE STRATIGRAPHY

Depth (ft) USC Type of Soil and Description

0-8 SC Clayey fine to medium grained SAND8-19 ML Fine SANDY SILT19-25 SM Silty fine SAND

(25-* Groundwater)

Page 4: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

GROUNDWATER DIRECTION

Page 5: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

CONCEPTUAL SITE MODEL

C C

C C

C

C

CC C CC

C

C

C

C

C

Page 6: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

IMPACT AND REMEDIATIONIMPACT: Light NAPL: None noted at the site. Adsorbed Phase: impact on-site near MW-C at depths from 10-25 ft.

Impacted soil concentration were low: Benzene concentrations in soil rangedfrom 0.009 to 7.5 mg/kg, and TPH-GRO ranged from 4.2 to 2680 mg/kg.

Dissolved Phase: On site, maximum benzene concentration rangedfrom 1730 ug/L to 5500 ug/L in MW-3. Impact has migrated off-site to thesouth where highest groundwater concentrations for benzene ranged from3600 ug/L to 1600 ug/L at off-site well MW-6.

REMEDIATION: Soil Vapor Extraction /Air-Sparge System – SVE chosen based on soil

type found at the site. System ran from October 2014 till December 2015. Per sulfate injection was suggested initially in CAP. However, per sulfate

injection was not approved. BOS-200 injection was suggested as the other option to address dissolved

phase impact in October, 2016.

Page 7: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

ACTIVATED CARBON AND NUTRIENTS INJECTION

BOS-200 Activated carbon trap and treat completed in October, 2018

Activated Carbon Application:Carbon: 15,000 poundsBacteria concentration: 35 gallonCalcium Sulfate (Gypsum): small amounts (terminal electron acceptors)Depth ranging from 10 to 25 feet below ground surface.Locations (off site) 95 boring points spaced five feet apart.

Monitoring schedule: Measure VOCs, Sulfates, and other natural attenuation parameters in soil - after 7, 30, 60 days of post injection.

Page 8: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

REMEDIATION LOCATION

Page 9: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

INJECTION POINTS (OFF-SITE)

Page 10: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

SITE PHOTOS

Page 11: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

SITE PHOTOS

Page 12: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

SITE PHOTOS

Page 13: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

RESULTS

PRE-INJECTION:BOS200 carbon injection was conducted in October, 2018.Impact migrated offsite past the south property line.

POST INJECTION BENZENE:

GROUNDWATER DATA Off site On-siteMW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 MW-8 MW-9 MW-10 MW-11 MW-12 MW-13 MW-A MW-B MW-C

2011 0.6 ND 1200 730 2200 3600 ND ND ND ND 39 1100 ND 812 ND 1730MID 2018 ND ND 520 540 57 4700 ND ND ND ND 65 230 ND 140 ND 710

2019 ND ND 1100 200 650 1600 ND ND ND ND 370 ND ND 210 ND 5500

RAN GE:51-

1200015-

5500

Page 14: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

ADDITIONAL WORK

• Permits from DCRA for per sulfate injection • Storm Sewer approval from DC Waters – access for CCTV survey.• CCTV – contract and report • Repeat Permits from DCRA – Borings for 95 points• Permits from DDOT - construction and occupancy• Stakeholder’s approval for reservoir located 500 ft. of Site.• Public Participation letters, communication, and comments

All approvals needed for injection was received in June, 2018. BOS200 carbon injection was conducted in October, 2018.

Page 15: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

PUBLIC PARTICIPATION

Public participation Pre-Injection:As required by DC regulation 20 DCMR 6212, nine single family homeowners were contacted by mail notifying them before injection wasstarted in October 2018 as impact had migrated off-site.

Requests during injection:Complain about carbon injection overflow of carbon product from wells on the ground surface looking unsightly, but was explained to be harmless.

Public Contacts made Post Injection:Received a few inquiries that were addressed to via emails or site visits. Encouraged parties to contact consultants and DOEE and ask questions. Made the CAP work as transparent as possible.

Page 16: LUST Project Gas Station, NW Washington DCastswmo.org/.../9-17-0130pm-Deepak-Singh-DC.pdf · Deepak Singh. Location: Washington DC, NW quadrant. Facility: Gas Station since 1943 but

KEY CONCEPTS

Creative FundingHRSC, Treatment TrainsRisk-Based Corrective Action (RBCA)Low-Threat ClosuresLegacy SitesOrphan LUST SitesMNA & NSZDWorking with ConsultantsOffsite Contamination ChallengesQuestion & Answer Session