Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

12
Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013

Transcript of Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

Page 1: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

Longitudinal Coordination of Care

LTPAC SWGMonday, April 29, 2013

Page 2: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

• ONC S&I Update• Announcements• Transition of Care Implementation Guide Kick-off (Lantana)

2

Agenda

Page 3: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

• Lantana C-CDA Revision Project Kick-off

• LCC WG presentation to the HITPC MU WG SWG #3 Improve Care Coordination

– Date: April 30 2013

– Time: 10:30 to 12:00 EST

• Call for Pilots!

– We are seeking vendors and healthcare delivery organizations to pilot evolving standards

3

ONC S&I Update

Page 4: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

• LCC HL7 Tiger Team SWG: Collaborate on LCC-related projects from HL7. Please join our meetings on Wednesdays at 11am ET

– Information about the Tiger Team can be found on the wiki at: http://wiki.siframework.org/LCC+HL7+Tiger+Team+SWG

• Check out the LCC Use Case 2.0 Wiki Page (http://wiki.siframework.org/LCC+WG+Use+Case+2.0)

– We have a comment form to provide feedback on UC sections (http://wiki.siframework.org/LCC+Use+Case+2.0+Comments)

• Meeting Reminders (this week)– LTPAC SWG meeting – Monday at 11am ET– LCC HL7 Tiger Team SWG meeting – Wednesday at 11am ET– LCP SWG meeting – Thursday at 11am ET

4

Announcements

Page 5: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com5

eLCC - CDA IG Development

Project Overview

April 29, 2013

Page 6: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com6

Objective

Develop national data standards for information exchange of a Longitudinal Coordination of Care Dataset.

Expand on the document types and templates to include HL7 Implementation Guides (IGs) for new and enhanced document types:

•New: Transfer Summary

•New: Referral Note

•Enhanced: Consult Note

Page 7: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com7

Background

• Improving Massachusetts Post Acute Care Transfer (IMPACT) project

• Resulted in a Transfer of Care Dataset: 500 data elements that are necessary during a patient transfer of care

• Data set is organized into 5 groups: 1. Transfer of Care

2. Consultation Request

3. Shared Care Encounter Summary

4. Care Plan

5. Home Health Plan of Care

Page 8: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com8

Stakeholders and Participants

• NYeC: New York eHealth Collaborative

• CCITI NY: Continuum of Care Improvement Through Information New York

• Healthix, Inc

• ONC S&I Framework

• IMPACT Project team

• HL7 International Structured Documents Work Group

Page 9: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com9

Deliverables

• Functional Specification

• Templates: create up to 30 new CDA templates

• Sample Files: sample files to accompany each document type

• Schematron: validation rules

• HL7 CDA IG(s): final implementation guide(s) for DSTU*

• HL7 Ballot Package

• HL7 Ballot Reconciliation

• Published HL7 CDA IG

*Draft Standard for Trial Use

Page 10: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com10

Project Timeline

AprTask 1: Background

Analysis• S&I stakeholder meetings• Identify relevant precedentTask 2: Functional

Specifications/Setting Specific Rules

• S&I stakeholder meetings• Develop mapping sheet• Define setting specific

rules

May Jun Jul Aug Oct Nov DecSep

Task 4: Templates• Develop templates

Meetings

Deliverables

LEGEND:

Task 6: Ballot Material• Produce schematron

validation rules• Develop IG• Review IG with Tiger Team• Deliver IG to S&I• Update and submit IG and

materials for ballotTask 7:

Reconciliation/Publication

• Develop ballot comment tracking table

• Lead reconciliation meetings

• Publish IG

HL7 Reconciliation meeting frequency and dates TBD

DraftDraft

Task 5: Sample Files• Develop sample files

Task 3: Project Scope Stmt• Draft Project Scope

Statement

Page 11: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com11

Next Steps:

1. Schedule Open Stakeholder Weekly Meetings

S&I LCC Long-Term Post-Acute Care (LTPAC) Transition SWG meeting (need approval from S&I group)

http://wiki.siframework.org/LCC+Long-Term+Post-Acute+Care+%28LTPAC%29+Transition+SWG

Mondays, 11:00 am to 12:00 noon EST

Webinar: siframework1.webex.com

Call in number: Pending

Page 12: Longitudinal Coordination of Care LTPAC SWG Monday, April 29, 2013.

© 2011 Lantana Consulting Group, www.lantanagroup.com12

Next Steps continued:

2.Review draft of HL7 Project Scope Statement

3.Determine content and structure requirements for each Document-Type

4.Define ambiguous data elements and data sets that are in scope

5.Utilize MASS HIE IMPACT dataset as a source for the project

6.Begin template design