W ARCHITECTS AND INTERIOR DESIGNERS N.M.ROAD,FORT, … DRAWINGS.pdf · 12 swg gi wire 12 swg gi...

7
TOILET ELECTRICAL ROOM GENTS TOILET LADIES TOILET PANTRY AND CANTEEN RECORD ROOM CONFERENCE ROOM FOR 30 PEOPLE STORAGE D.G.M. SERVER UPS P.A. 1.2M WIDE PASSAGE STORAGE STORAGE STORAGE STORAGE 1.4M WIDE PASSAGE 1.0M WIDE PASSAGE D.G.M. A.G.M. C.M. Office Staff Personal Assistant STORAGE STORAGE ENTRANCE STORAGE STORAGE STORAGE STORAGE C.M. A.G.M. A.G.M. A.G.M. STORAGE STORAGE CREDENZA CREDENZA CREDENZA CREDENZA CREDENZA CREDENZA CREDENZA CREDENZA STORAGE RECEPTION STORAGE STORAGE CREDENZA STORAGE INTERIOR LAYOUT PLAN PARELKAR OVALEKAR PARPIA ARCHITECTS AND INTERIOR DESIGNERS N.M.ROAD,FORT, MUMBAI TEL: 22673725/22675840 Email: [email protected] SCALE : 1:100 REVISION DWG NO. DATE : PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH AT TULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OF INDIA. S W E 1 3 01.02.2019 TOTAL AREA = 291.10 sq.m. = 3133.4 sq.ft. REMARK: 1)Area has been redesigned as per discussion. 2)Officer table size has been reduced to 1.35m x 0.65m. 3)D.G.M. cabin located in south west corner without attached washroom. 4)A.G.M. will have low height partition instead of cabin. 5)Office staff's desktop should not be directly visible from the corridor. 6)Server room, UPS and Store room has been relocated. MEETING ROOM MEETING ROOM A.G.M. A.G.M. C.M. C.M. STORAGE STORAGE D2 D1 D4 D5 D5 D4 D4 D4 D6 D6 D6 D6 D6 D6 D4 D4

Transcript of W ARCHITECTS AND INTERIOR DESIGNERS N.M.ROAD,FORT, … DRAWINGS.pdf · 12 swg gi wire 12 swg gi...

TOILET

ELECTRICAL

ROOM

GENTS

TOILET

LADIES

TOILET

PANTRY AND CANTEEN

RECORD

ROOM

CONFERENCE ROOM

FOR 30 PEOPLE

STO

RAG

E

D.G

.M

.

SERVER

UPS

P.A.

1.2M WIDE PASSAGE

STORAGE

STO

RAG

E

STO

RAG

E

STORAGE

1.4M WIDE PASSAGE

1.0M WIDE PASSAGE

D.G.M.

A.G.M.

C.M.

Office Staff

Personal Assistant

STO

RAG

E

STO

RAG

E

ENTRANCE

STO

RAG

E

STO

RAG

E

STO

RAG

E

STORAGE

C.M.

A.G.M. A.G.M.

A.G.M.

STO

RAG

E

STO

RAG

E

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CREDENZA

CREDENZA

CREDENZA

STO

RAG

E

RECEPTION

STO

RAG

E

STO

RAG

E

CREDENZASTORAGE

INTERIOR LAYOUT PLAN

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE : 1:100 REVISION DWG NO.DATE :PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH ATTULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OFINDIA. S

W

E13

01.02.2019

TOTAL AREA

= 291.10 sq.m.

= 3133.4 sq.ft.

REMARK:

1)Area has been redesigned as

per discussion.

2)Officer table size has been

reduced to 1.35m x 0.65m.

3)D.G.M. cabin located in south

west corner without attached

washroom.

4)A.G.M. will have low height

partition instead of cabin.

5)Office staff's desktop should

not be directly visible from the

corridor.

6)Server room, UPS and Store

room has been relocated.

MEETING

ROOM

MEETING

ROOM

A.G.M. A.G.M.

C.M.

C.M.

STORAGE STORAGE

D2

D1

D4

D5

D5

D4

D4

D4

D6

D6

D6

D6

D6

D6

D4

D4

TOILET

ELECTRICAL

ROOM

GENTS

TOILET

LADIES

TOILET

PANTRY AND CANTEEN

RECORD

ROOM

CONFERENCE ROOM

FOR 30 PEOPLE

STO

RAG

E

D.G

.M

.

SERVER

UPS

P.A.

1.2M WIDE PASSAGE

STORAGE

STO

RAG

E

STO

RAG

E

STORAGE

1.4M WIDE PASSAGE

1.0M WIDE PASSAGE

STO

RAG

E

STO

RAG

E

ENTRANCE

STO

RAG

E

STO

RAG

E

STO

RAG

E

STORAGE

C.M.

A.G.M. A.G.M.

A.G.M.

STO

RAG

E

STO

RAG

E

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CR

EDEN

ZA

CREDENZA

CREDENZA

CREDENZA

STO

RAG

E

RECEPTION

STO

RAG

E

STO

RAG

E

CREDENZASTORAGE

MEETING

ROOM

MEETING

ROOM

A.G.M. A.G.M.

C.M.

C.M.

STORAGE STORAGE

D2

D1

D4

D5

D5

D4

D4

D4

D6

D6

D6

D6

D6

D6

D4

D4

1200 MM DIA

1.5TR

2TR

4TR

2TR

4TR

4TR

2.5TR

2.5TR

1TR

1TR

D.G.M.

A.G.M.

C.M.

Office Staff

Personal Assistant

FALSE CEILING LAYOUT

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE : 1:100 REVISION DWG NO.DATE :proposed interiors for stressed asset resolution branch at tulsianichambers, nariman point, mumbai for state bank of india.

S

W

E12

01.02.2019

TOTAL CARPET AREA

= 9.3m X 29.6m

= 275.28 sq.m.

= 2963.10 sq.ft.

REMARK:

1)Area has been redesigned as

per discussion.

2)Officer table size has been

reduced to 1.35m x 0.65m.

3)D.G.M. cabin located in south

west corner without attached

washroom.

4)A.G.M. will have low height

partition instead of cabin.

5)Office staff's desktop should

not be directly visible from the

corridor.

1200 MM TUBE LIGHT

(10/12W) LED SPOT LIGHT

600 TUBE LIGHT LED

(36W) LED (600X600)

1200 MM DIA

CEILING FAN (1200MM DIA)

LED STRIP LIGHTING

(15W) LED SPOT LIGHT

SPOTLIGHT

NOTE : LEVELS ARE MENTIONED

FROM FINISHED FLOOR LEVEL

B KEYBOARD DRAWER

500 X 250 X 75 FINISHED WITH 4MM THKVENEER

CREDENZA WITH ALUMINIUMFRAME SLIDING SHUTTERS

FINISHED WITH 4MM THK VENEER

100 MM DEEP DRAWER WITH 18 mm THK PLYON THREE SIDES AND 6MM PLY ON REAR SIDE

FINISHED WITH 4MM THK VENEER

TABLE TOP-18 MM THK MR COMMERCIAL PLY,TO BE FINISHED WITH

T.W. VENEER AND12 MM THK GLASS ON TOP

SECTION AT BB'

0.7

5

FOOTREST

0.13

0.11

0.3

3

0.3

00

.30

0.10

FOOTREST

0.7

5

0.200.15

0.5

9

KEYBOARDTRAY

SECTION AT AA'

eqeq

0.10

CREDENZA WITH SLIDINGSHUTTERS

FINISHED WITH 4MM THK VENEER

TABLE TOP-18 MM THK MR COMMERCIALGRADE PLY, TO BE FINISHED

WITH 4MM THK VENEER AND12 MM THKGLASS

ON TOP WITH BEVELLED EDGES

KEYBOARD DRAWER 500 X 250 X75

FINISHED WITH 4MM THK VENEER

A' A

B'

CABLE MANAGER

TABLE TOP 18 MMTHK MRCOMMERCIALPLY, TO BEFINISHED WITH4MM THK VENEER& 12 MM THKGLASS ON TOPWITH BEVELLEDEDGES

CREDENZA TOP 18 MM PLY, TO BEFINISHED WITH 4MM THK VENEERKEYBOARD

DRAWER

CPUTROLLEY

0.35

FOOTREST

0.4

0

0.5

00.25

0.90

1.80

DR

AW

ER0.4

0

0.90

0.4

5

eq eq

0.66

PLAN

FRONT ELEVATION

0.7

5

TABLE TOP-18 MM THK MRCOMMERCIAL GRADE PLY, TO BE

FINISHED WITH4MM VENEER AND12 MM THK GLASS

ON TOPWITH BEVELLED EDGES

EXPOSED EDGE FINISHED WITH 50 X 18MM COMMERCIAL GRADE PLY

FINISHED WITH 4MM THK VEENEER

FINISHED WITH 4MM THK VENEER.

4MM THK VENEER

1 MM GROOVE

0.10

0.0

1

0.15

0.15

0.15

0.15

PLAN

SIDE ELEVATION

FRONT ELEVATION

0.15 0

.08

0.4

0

0.050.35

0.15

FOOTRESTDETAIL

ITEM NO. 1

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE - 1 : 20 REVISION DWG NO.DATE : 01-02-2019PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH ATTULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OFINDIA. S

W

EDGM TABLE DETAIL 1

0.10

0.10

0.66

0.7

5

0.20 DRAWER WITH 18 mm THK MRCOMMERCIAL GRADE PLY

ON THREE SIDES AND 6MM PLY ONREAR SIDE

FINISHED WITH 4MM VENEER

TABLE TOP-18 MM PLY, TO BEFINISHED WITH

4MM VENEER AND12 MM THK GLASSON TOP

WITH BEVELLED EDGES

0.3

5

0.12

0.12

C C'

ITEM NO. 3

0.7

5

TABLE TOP - 18 MM THK MRCOMMERCIAL GRADE PLYFINISHED WITH LAMINATE

SECTION A A'

KEYBOARDTRAY

0.6

50

.41

1.16

0.19

1 MM GROOVE

TABLE FRONT (TOP)FINISHED WITHLAMINATE

FOOTREST

18 mm THK MR COMMERCIALGRADE PLY FINISHED WITHLAMINATE

TABLE FRONT (BOTTOM)FINISHED WITH LAMINATE

1.35

0.10

SWITCHBOARD

100mm WIDE BANDOF LAMINATE

10 mm THK GLASS EITCHEDAS PER DESIGN

1mm GROOVE

LAMINATE

CREDENZA WITH OPENABLESHUTTERS FINISHEDEXTERNALLY WITH 1.00mm THKLAMINATE & INTERNALLY WITH0.8mm THK LAMINATE

0.10

0.7

5

READYMADE KEYBOARD TRAY - 500 X 250

SECTION B B'

1.16

0.10

FOOTREST

TABLE TOP FINISHED WITH1 MM THK. LAMINATE

0.4

1

12 mm THKGLASS EITCHEDAS PER DESIGN

100 MM DEEP DRAWERWITH 19MM THK PLY ONTHREE SIDES AND 6MM PLYON REAR SIDE FINISHEDWITH LAMINATE FROMOUTSIDE.

eqeq 0.10 0.3

6eq

eq

SIDE PARTITION

TABLE SIDE FINISHED WITHLAMINATE

0.19

CREDENZA WITH OPENABLESHUTTERS FINISHEDEXTERNALLY WITH 1.00mm THKLAMINATE & INTERNALLY WITH0.8mm THK LAMINATE

FRONT ELEVATION

0.7

51.3

5

1 MM GROOVE

TABLE FRONT FINISHEDWITH LAMINATE

TABLE TOP-18 mm THKMR COMMERCIAL GRADEPLY, FINISHED WITHLAMINATE

TABLE FRONT FINISHEDWITH LAMINATE

10 mm THKGLASS EITCHEDAS PER DESIGN

100mm THK BAND OFLAMINATE

0.15

0.15

0.15

0.15

0.10

PLAN

SIDE ELEVATION FRONT ELEVATION

0.15 0

.08

0.4

0

0.050.30

0.15

FOOTRESTDETAIL

0.9

0

0.45

A

B'B

DRAWERFOOTREST

KEYBOARDTRAY

0.7

5

0.6

00

.15

0.5

6

0.400.2

40.50

0.3

0 0.40

eqeq

1.50

CPUTROLLEY

PLAN

A'

TABLE TOP-18 mm THK MRCOMMERCIAL GRADE PLYFINISHED WITH 1 MM THK.

LAMINATE.

CREDENZA WITH SHUTTERS

SIDE PARTITION

50 X 50 ALUMINUM FRAMEFINISHED WITH 8 mm PLY, 1 mm

THK LAMINATE

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE - 1 : 20 REVISION DWG NO.DATE : 01-02-2019PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH ATTULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OFINDIA. S

W

EAGM TABLE DETAIL 3

PLAN @ 800MM

65MM X 50MM WOODEN POST

EXPOSED EDGE FINISHED WITH 50X18 MMCOMMERCIAL GRADE PLY FINISHED WITH4MM THK VEENEER

18 MM THK MR COMMERCIALGRADE PLY FINISHED WITHLAMINATE.

PLAN @ 450MM1.96

50MM DIA. CABLE MANAGER2.00

0.8

0

65MM X 50MM WOODEN POST

EXPOSED EDGE FINISHED WITH 50X18 MMCOMMERCIAL GRADE PLY FINISHED WITH4MM THK VEENEER

18 MM THK MR COMMERCIAL GRADEPLY FINISHED WITH LAMINATE.

2.00

0.8

0

2.60

1.96

50MM DIA. CABLE MANAGER

SECTION AA'

18 MM THK MR COMMERCIAL GRADEPLY FINISHED WITH LAMINATE

65MM X 50MM WOODEN POST

50MM X 35MM WOODEN FRAME

EXPOSED EDGE FINISHED WITH 50X18 MMCOMMERCIAL GRADE PLY FINISHED WITH4MM THK VEENEER

18 MM THK MR COMMERCIALGRADE PLY FINISHED WITH LAMINATE

0.7

5

0.6

8

18 MM THK COMMERCIAL GRADE PLYFINISHED WITH 4MM THK VEENEER

18 MM THK COMMERCIAL GRADE PLY TABLEFRONT FINISHED WITH 4MM THK VEENEER

EXPOSED EDGE FINISHED WITH 50X18 MMCOMMERCIAL GRADE PLY FINISHED WITH4MM THK VEENEER

0.7

5

50MM X 35MM WOODEN FRAME

50MM X 35MM WOODEN FRAME

ELEVATION

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE - 1 : 25 REVISION DWG NO.DATE : 01-02-2019PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH ATTULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OFINDIA. S

W

E

CONFERENCE TABLE DETAIL 4

ITEM NO. 4

1.97

1.97

50X50 ALUMINUM FRAMEPARTITION - VERTICALFINISHED WITH 12MM THK MDF

50X50 ALUMINUM FRAMEPARTITION - HORIZONTALFINISHED WITH 12MM THK MDF

FALSE CEILING

0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.41 0.41 0.41 0.41

SECTION A A'ELEVATION

PLAN

0.0

71.3

5

3.0

0

3.0

0

5.29

A'

A

PARELKAR OVALEKAR PARPIAARCHITECTS AND INTERIOR DESIGNERS

N.M.ROAD,FORT, MUMBAI

TEL: 22673725/22675840

Email: [email protected]

SCALE - 1 : 20 REVISION DWG NO.DATE : 01-02-2019PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH ATTULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OFINDIA. S

W

EPARTITION WALL DETAIL 2

ITEM NO. 2

0.6

5

0.6

5

8 MM PLY, 1 MMTHK LAMINATE

76543

12 S

WG

G

I W

IR

E

12 S

WG

G

I W

IR

E

12 S

WG

G

I W

IR

E

12 S

WG

G

I W

IR

E

12 S

WG

G

I W

IR

E

2

12 S

WG

G

I W

IR

E

1

12 S

WG

G

I W

IR

E

----

----

----

125 A FP MCCB

THERMAL MAGNETIC BASED

WITH O/L, S/C & E/F RELEASES

SUITABLE FOR 415V, 50Hz &

FAULT LEVEL OF 36 KA

CT#1

125/5A

15VA CLASS-1.0

FOR METERING

MF / LM

LOAD MANAGER

TP

N M

CB

63/40 A

S.N.

UPTO

CABLE

SIZE &

TYPE

30 KVAR

INBUILT

APFC PANEL

1Rx4Cx6

Sq.mm Cu.

Arm. Cable

SPARE

02

1C

10 S

q.m

m C

U.

D.E.

01

1 PH. O/P,U.P.S.

3 PH I/P,

UPS

BATTERY

BACK UP

3 N

OS

.1C

16 S

q.m

m .

CU

.(N

EU

TR

AL-2 N

OS

)

63

A,T

PN

MC

B W

IT

H

EN

CL

OU

SE

R

NE

AR

U

PS

CU

63

A,D

P

MC

B W

IT

H

EN

CL

OU

SE

R

NE

AR

U

PS

UPS

63

A D

P

10

KA

MC

B

10

KA

MC

B

10

KA

40

A,D

P

63

A,D

P

MC

B

MAIN UPS

OUTPUT DB

8-WAY SPN DB

2C X 16 SQMM. Cu.YFY CABLE

1Rx4Cx10

Sq.mm Cu.

Arm. Cable

1Rx4Cx6

Sq.mm Cu.

Arm. Cable

LIGHTING

DB

RAW

POWER DB

2C X 10 SQMM. Cu.YFY CABLE

8 9

TP

N M

CB

63/40 A

TP

N M

CB

63/40 A

TP

N M

CB

63/40 A

TP

N M

CB

63/40 A

TP

N M

CB

63/40 A

TP

N M

CB

63/40 A

UPS

IN-PUT HVAC ODU -1

SPARE - 1

1Rx4Cx10

Sq.mm Cu.

Arm. Cable

1Rx4Cx10

Sq.mm Cu.

Arm. Cable

ON

OFF

3.5C X 95 Sq.mm .AL.YFY

LOCATION :- METER ROOM

DP

M

CB

DP

M

CB

25/32/40 A

25/32/40 A

HVAC

ODU - 2

SPARE

01

----

----

----

----

----

----

2C X 10 SQMM. Cu.YFY CABLE

PARELKAR OVALEKAR PARPIA

AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
R1
AutoCAD SHX Text
16/20 A
AutoCAD SHX Text
SPMCB
AutoCAD SHX Text
R2
AutoCAD SHX Text
R3
AutoCAD SHX Text
R4
AutoCAD SHX Text
R5
AutoCAD SHX Text
UPS. DB-2
AutoCAD SHX Text
12-WAY SPNDB
AutoCAD SHX Text
'D'
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
R6
AutoCAD SHX Text
R7
AutoCAD SHX Text
R8
AutoCAD SHX Text
R9
AutoCAD SHX Text
R10
AutoCAD SHX Text
63 AMP, DP,
AutoCAD SHX Text
10 KA, MCB 'D' CURVE
AutoCAD SHX Text
FOR UPS CIRCUITS
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
FOR RAW POWER CIRCUITS
AutoCAD SHX Text
R1
AutoCAD SHX Text
R2
AutoCAD SHX Text
R3
AutoCAD SHX Text
R4
AutoCAD SHX Text
63 AMP, FP
AutoCAD SHX Text
MCB, 'C'-CURVE
AutoCAD SHX Text
R5
AutoCAD SHX Text
R6
AutoCAD SHX Text
B1
AutoCAD SHX Text
B2
AutoCAD SHX Text
B3
AutoCAD SHX Text
B4
AutoCAD SHX Text
B5
AutoCAD SHX Text
B6
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
Y1
AutoCAD SHX Text
Y2
AutoCAD SHX Text
Y3
AutoCAD SHX Text
Y4
AutoCAD SHX Text
Y5
AutoCAD SHX Text
Y6
AutoCAD SHX Text
16/20A
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
R
AutoCAD SHX Text
Y
AutoCAD SHX Text
B
AutoCAD SHX Text
16/20A
AutoCAD SHX Text
16/20A
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
FOR LIGHTING CIRCUITS
AutoCAD SHX Text
R1
AutoCAD SHX Text
R2
AutoCAD SHX Text
R3
AutoCAD SHX Text
R4
AutoCAD SHX Text
63 AMP, FP MCB + ELCB
AutoCAD SHX Text
MCB, 'C'-CURVE
AutoCAD SHX Text
R5
AutoCAD SHX Text
R6
AutoCAD SHX Text
B1
AutoCAD SHX Text
B2
AutoCAD SHX Text
B3
AutoCAD SHX Text
B4
AutoCAD SHX Text
B5
AutoCAD SHX Text
B6
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
Y1
AutoCAD SHX Text
Y2
AutoCAD SHX Text
Y3
AutoCAD SHX Text
Y4
AutoCAD SHX Text
Y5
AutoCAD SHX Text
Y6
AutoCAD SHX Text
10A
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
SP
AutoCAD SHX Text
MCB
AutoCAD SHX Text
'C'
AutoCAD SHX Text
R
AutoCAD SHX Text
Y
AutoCAD SHX Text
B
AutoCAD SHX Text
10A
AutoCAD SHX Text
10A
AutoCAD SHX Text
LIGHTING DB 6W TPN
AutoCAD SHX Text
RAW POWER DB 6W TPN
AutoCAD SHX Text
r
AutoCAD SHX Text
R
AutoCAD SHX Text
Y
AutoCAD SHX Text
B
AutoCAD SHX Text
6A
AutoCAD SHX Text
R
AutoCAD SHX Text
G
AutoCAD SHX Text
%%ULOCATION - AS APPROVED
AutoCAD SHX Text
%%UMAIN ELECTRICAL LT PANEL
AutoCAD SHX Text
FROM ENERGY METER IN THE METER ROOM
AutoCAD SHX Text
125A, TPN, SFU WITH ENCLOSURE
AutoCAD SHX Text
%%U200A TPN CU. B/B
AutoCAD SHX Text
R
AutoCAD SHX Text
Y
AutoCAD SHX Text
B
AutoCAD SHX Text
N
AutoCAD SHX Text
16/20 A
AutoCAD SHX Text
SPMCB
AutoCAD SHX Text
40 AMP, DP,
AutoCAD SHX Text
10 KA, MCB,
AutoCAD SHX Text
SERV. RM. UPS DB-1
AutoCAD SHX Text
8-WAY SPNDB
AutoCAD SHX Text
'D'
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
E.B.B
AutoCAD SHX Text
12 SWG
AutoCAD SHX Text
GI WIRE
AutoCAD SHX Text
R1
AutoCAD SHX Text
R2
AutoCAD SHX Text
R3
AutoCAD SHX Text
R4
AutoCAD SHX Text
R5
AutoCAD SHX Text
R6
AutoCAD SHX Text
'D' CURVE
AutoCAD SHX Text
PROPOSED INTERIORS FOR STRESSED ASSET RESOLUTION BRANCH AT TULSIANI CHAMBERS, NARIMAN POINT, MUMBAI FOR STATE BANK OF INDIA.