Logical Frame Work Analysis of a Project

download Logical Frame Work Analysis of a Project

of 7

Transcript of Logical Frame Work Analysis of a Project

  • 7/29/2019 Logical Frame Work Analysis of a Project

    1/7

    LOGICAL FRAMEWORK

    APPROACH: Establishment of

    J unior High Schools in SumbaRegency, Indonesia.

    Hankuk University of Foreign Studies

    Seoul, October 2012

    Hankuk University of Foreign Studies

    Seoul, October 2012

    Melesse Zenebework - ID-201248041

    Sandri Ghifari - ID-201250018

  • 7/29/2019 Logical Frame Work Analysis of a Project

    2/7

    General Information

    Project title : Establishment of Junior High Schools in Sumba

    Regency

    Country : Indonesia

    Sector : EducationTarget Area : 10 villages in of remote area in Sumba regency

    Target Group : Primary education completed students

    Project Duration : 2 Years

    Date : July, 2013 July, 2015

  • 7/29/2019 Logical Frame Work Analysis of a Project

    3/7

    STAKEHOLDER ANALYSISStakeholders and

    Basic Characteristics

    Interests and how

    affected by the

    problems

    Capacity and motivation

    to bring about change

    Possible actions to address

    stakeholders interests

    Families : - Free education

    -Distance from

    home to school

    -Shortage of

    transportation

    -Lack ofinfrastructure

    -Insecurity for girls

    High motivation to

    educate their children

    Sending their children to school

    Giving much time to their children

    for education

    Local Government: -Financial

    incapability

    -Shortage of man

    power

    - Minimizing crime

    High motivation to assist

    the project

    High interest to minimize

    crime

    Providing the school with security

    Monitoring the integration of

    education with the countrys

    educational policy

    Central Government: Finance, man

    power, quality of

    education

    High interest to increase

    the number of high

    schools

    Providing the national education

    policy to the region for integration

    Private sector: Providinginfrastructure, High motivation to Providing the material assistancefor free

  • 7/29/2019 Logical Frame Work Analysis of a Project

    4/7

    Problem Tree

    Overcapacityof classroom

    Number of Secondary School isInsufficient

    Low enrollment insecondary education

    Family expenditure

    for education is still

    high

    High

    transportation

    cost

    Children safetyand security

    Children cannot

    attend school

    freely

    Lack of road

    infrastructure

    Children most likely as

    victims of crime/violence

    Distance of existing

    schools from home is

    far

    Human resourcesnot competitive

    Children cannot

    attend school in

    bad weathers

  • 7/29/2019 Logical Frame Work Analysis of a Project

    5/7

    Objective Tree

    Enoughclassroom

    Number of Secondary School issufficient

    High enrollment insecondary education

    Family expenditure

    for education is still

    low

    No transportation

    costChildren are safe

    and secured

    Children can

    attend school

    freely

    Improved road

    infrastructure

    crime/violence on

    children is minimized

    Distance of existing

    schools from home is

    near

    Human resources iscompetitive

    Children can attend

    school even in bad

    weathers

  • 7/29/2019 Logical Frame Work Analysis of a Project

    6/7

    Project Design Matrix

    Intervention Logic Objectively VerifiableIndicators (OVIs)

    Sources of Verification(SOVs)

    Assumptions

    Overall objectives:

    Improving enrollment in

    secondary education

    Indicator: Enrollment of student

    in secondary schools increased

    Quantity: Is increased to 98%

    Time: In 3 years

    Regional educational office

    Project purpose:

    Increase the number of junior

    high school

    Indicator: number schools to

    villages ratio increased

    Quantity: Is increased from 1:10

    to 1:3

    Time: 2 years

    Regional educational office Building schools closer to the villages is

    important. The closer the schools are the

    more the number of attending students.

    Results:

    New schools

    Indicator: New number of

    schools increased

    Quantity: 2 new schools

    Time: 2 years

    Regional educational office Building two more schools can improve

    enrollment in the secondary schools

    Activities:

    1.1 Analyze possible locations

    1.2 Design the buildings

    1.3 Cost and benefit analysis

    1.4 Registering the legal status

    of the schools

    1.5 Providing stationary and

    books

    Means:

    a) Technical expertise

    b) Investment

    c) Surveys

    Cost (000 US$):

    WB Govt Private/CSR Total

    50 10 10 70

    500 10 30 540

    20 20

    570 20 40 630

    The regional education office can provide

    education with overload for 10 villages.

  • 7/29/2019 Logical Frame Work Analysis of a Project