LNG as a fuel - IENE

38
DNV GL © 2016 Ungraded 20 April 2016 SAFER, SMARTER, GREENER DNV GL © 2016 Alexandros Chiotopoulos 20 April 2016 Ungraded MARITIME LNG as a fuel 1 The past, the present and the future developments

Transcript of LNG as a fuel - IENE

Page 1: LNG as a fuel - IENE

DNV GL © 2016

Ungraded

20 April 2016 SAFER, SMARTER, GREENERDNV GL © 2016

Alexandros Chiotopoulos

20 April 2016

Ungraded

MARITIME

LNG as a fuel

1

The past, the present and the future developments

Page 2: LNG as a fuel - IENE

The drivers for alternative fuels in shipping are interlinked

Fluctuating – highly volatile - fuel prices

More stringent environmental regulations

DNV GL © 2016

Ungraded

20 April 20162

Availability of new energy sources

Stakeholder pressure to manage

environmental and climate risks

Page 3: LNG as a fuel - IENE

Fuel prices – who dares now to estimate future price paths?

LNGMDOHFO

Henry Hub (US)230$*

Japan LNG Import650$

July 2014 – 860 USD/tonne

Dec 2014 – 570 USD/tonneJuly 2014 – 610 USD/tonne

Dec 2014 – 360 USD/tonne

DNV GL © 2016

Ungraded

20 April 20163

� Fuel price has been according to all three predicted scenarios….

� … showing the complexity of prediction

� The LNG price has not dropped as much as HFO/MDO…

� … and is varying according to geographical areas more than following the HFO price

� …except for Japan – where it follows HFO development

� Moving in parallel with HFO, but has dropped less than HFO relatively

� Uncertainty about hybrid fuel alternative – will it be a saviour for int’l shipping?

Page 4: LNG as a fuel - IENE

A number of environmental regulations are on the horizon

ADOPTED REGULATIONS

0.1% ECA sulphur limit

EEDI phase 1

EEDI phase 3EEDI phase 2

0.5% global sulphur cap (2020/2025)*

Date TBD pending review, by end-2018 latest

NOx tier III for new builds

0.5% EU sulphur cap

All EU waters; EEZ (200NM)

DNV GL © 2016

Ungraded

20 April 20164

FUTURE REGULATIONS

EU CO2 MRVBC and VOC regulation

Additional ECAs established

Operational requirements on

CO2

201820162015 20252020

Global CO2 MRV

MRV: Monitoring, Reporting, Verification

BC: Black Carbon

VOC: Volatile Organic Compound

Page 5: LNG as a fuel - IENE

Sulphur legislation

2015

SECA

0.1%S

EU0.5%S

IMO0.5%S

CHINA

0.5%S

DNV GL © 2016

Ungraded

20 April 20165

Illustrative purpose only

Page 6: LNG as a fuel - IENE

Sulphur legislation

2015

SECA

0.1%S

2020

EU0.5%S

IMO0.5%S

CHINA

0.5%S

DNV GL © 2016

Ungraded

20 April 20166

EU Sulphur directive

Illustrative purpose only

Page 7: LNG as a fuel - IENE

Sulphur legislation

2015

SECA

0.1%S

2020

EU0.5%S

IMO0.5%S

CHINA

0.5%S

2017/2019

DNV GL © 2016

Ungraded

20 April 20167

EU Sulphur directive

Illustrative purpose only

China “ECA”

Page 8: LNG as a fuel - IENE

Sulphur legislation

2015 2020 or 2025?2015

SECA

0.1%S

2020

EU0.5%S

IMO0.5%S

CHINA

0.5%S

2017/2019

DNV GL © 2016

Ungraded

20 April 20168

EU Sulphur directive

Illustrative purpose onlyIMO 0.5%S

China “ECA”

Page 9: LNG as a fuel - IENE

LNG Fuelled Fleet Development

DNV GL © 2016

Ungraded

20 April 20169

Page 10: LNG as a fuel - IENE

The development trend is moving from LOCAL …

2000 – 2013

DNV GL © 2016

Ungraded

20 April 201610

Norway

Page 11: LNG as a fuel - IENE

… to GLOBAL …

DNV GL © 2016

Ungraded

20 April 201611

Page 12: LNG as a fuel - IENE

… and from SMALLER to LARGER vessels

2000 2005 2010 2015 2020

Offshore

Ferry/RORO

In Operation

On Order

DNV GL © 2016

Ungraded

20 April 201612

Bulk

Container

Gas Carriers

Page 13: LNG as a fuel - IENE

76 LNG fuelled ships in operation worldwide (1/2)

Year Type of vessel Owner Class

2000 Car/passenger ferry Fjord1 DNV GL2003 PSV Simon Møkster DNV GL2003 PSV Eidesvik DNV GL

2006 Car/passenger ferry Fjord1 DNV GL2007 Car/passenger ferry Fjord1 DNV GL2007 Car/passenger ferry Fjord1 DNV GL2007 Car/passenger ferry Fjord1 DNV GL

2007 Car/passenger ferry Fjord1 DNV GL2008 PSV Eidesvik Shipping DNV GL2009 PSV Eidesvik Shipping DNV GL2009 Car/passenger ferry Tide Sjø DNV GL

Year Type of vessel Owner Class

2012 PSV Eidesvik DNV GL2012 PSV Olympic Shipping DNV GL2012 PSV Island Offshore DNV GL

2012 General Cargo Nordnorsk Shipping DNV GL2012 PSV Eidesvik Shipping DNV GL2012 PSV Island Offshore DNV GL2012 Car/passenger ferry Torghatten Nord DNV GL

2012 Car/passenger ferry Torghatten Nord DNV GL2012 Car/passenger ferry Torghatten Nord DNV GL2013 PSV REM DNV GL2013 RoPax Viking Line LR

2013 Car/passenger ferry Torghatten Nord DNV GL

Ships in operation

DNV GL © 2016

Ungraded

20 April 201613

2009 Car/passenger ferry Tide Sjø DNV GL2009 Car/passenger ferry Tide Sjø DNV GL2009 Patrol vessel Remøy Management DNV GL2009 Car/passenger ferry Fjord1 DNV GL

2010 Patrol vessel Remøy Management DNV GL2010 Car/passenger ferry Fjord1 DNV GL2010 Patrol vessel Remøy Management DNV GL2010 Car/passenger ferry Fjord1 DNV GL

2010 Car/passenger ferry Fjord1 DNV GL2010 Car/passenger ferry Fosen Namsos Sjø DNV GL2011 PSV DOF DNV GL2011* Oil/chemical tanker Tarbit Shipping DNV GL

2011 Car/passenger ferry Fjord1 DNV GL2011 PSV Solstad Rederi DNV GL2012* Car/passenger ferry Fjord1 DNV GL

2013 Car/passenger ferry Torghatten Nord DNV GL2013 Tug Incheon Port Authority KR2013 General Cargo Eidsvaag DNV GL2013 RoPax Fjordline DNV GL

2013 High speed RoPax Buquebus DNV GL2013 Tug CNOOC CCS2013 Tug CNOOC CCS2013 Car/passenger ferry Norled DNV GL2014 Car/passenger ferry Norled DNV GL2014 Tug Buksér & Berging DNV GL2014 RoPax Fjordline DNV GL2014 Patrol vessel Finish Border Guard DNV GL2014 Tug Buksér & Berging DNV GL2014 Gas carrier Anthony Veder BV2014 Gas carrier Anthony Veder BV

* Conversion project

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels

Page 14: LNG as a fuel - IENE

76 LNG fuelled ships in operation worldwide (2/2)

Year Type of vessel Owner Class

2014 PSV Remøy Shipping DNV GL2014 General Cargo Egil Ulvan Rederi DNV GL2014 General Cargo Egil Ulvan Rederi DNV GL

2014 PSV Siem Offshore DNV GL2015 PSV Harvey Gulf Int. ABS2015 Ro-Ro Norlines DNV GL2015 Car/passenger ferry Samsoe municipality DNV GL

2015 PSV Simon Møkster Shipping DNV GL2015 PSV Siem Offshore DNV GL2015 Ro-Ro Norlines DNV GL2015* Oil/chemical tanker Bergen Tankers LR2015 Car/passenger ferry Society of Quebec ferries LR

Ships in operation

DNV GL © 2016

Ungraded

20 April 201614

2015 Car/passenger ferry Society of Quebec ferries LR

2015 Gas carrier Evergas BV2015 Gas carrier Evergas BV2015 Tug CNOOC CCS2015* Car/passenger ferry AG Ems DNV GL2015 Tug NYK NK

2015 Gas carrier Chemgas Shipping BV2015 Gas carrier Evergas BV2015 PSV Harvey Gulf Int. ABS2015 Container ship TOTE Shipholdings ABS

2015 Car/passenger ferry AG EMS DNV GL2015 Bulk ship Erik Thun LR2016 Container ship TOTE Shipholdings ABS

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels* Conversion project

Page 15: LNG as a fuel - IENE

86 confirmed LNG fuelled newbuilds –DNV GL also first choice for future projects (1/2)

Year Type of vessel Owner Class

2016 Car/passenger ferry Society of Quebec ferries LR2016 Car/passenger ferry Society of Quebec ferries LR2016 PSV Harvey Gulf Int. ABS2016 Tug CNOOC CCS2016 Tug Drydocks World2016 PSV Harvey Gulf Int. ABS2016 PSV Harvey Gulf Int. ABS2016 PSV Siem Offshore DNV GL2016 PSV Siem Offshore DNV GL2016* Oil/chemical tanker Furetank Rederi BV2016 Gas carrier Evergas BV

Year Type of vessel Owner Class

2016 Oil/chemical tanker Terntank BV2016* Ro-Ro TOTE Shipholdings ABS2016 Car carrier UECC LR2016 Car carrier UECC LR2016 Car/passenger ferry Boreal DNV GL2016 Car/passenger ferry Boreal DNV GL2016 Container ship GNS Shipping ABS2016 Container ship GNS Shipping ABS2016 Ro-Ro Searoad Holdings DNV GL2016 Car/passenger ferry BC Ferries LR2016 Car/passenger ferry BC Ferries LR

Confirmed orderbook

DNV GL © 2016

Ungraded

20 April 201615

2016 Gas carrier Evergas BV2016 Gas carrier Evergas BV2016 Gas carrier Evergas BV2016 PSV Harvey Gulf Int. ABS2016 Icebreaker Finnish Transport Agency LR2016 PSV Siem Offshore DNV GL2016 PSV Siem Offshore DNV GL2016 Gas carrier Chemgas Shipping2016 Oil/chemical tanker Terntank BV2016 Oil/chemical tanker Terntank BV

2016 Gas carrier Ocean Yield DNV GL2016 Gas carrier Ocean Yield DNV GL2016 Gas carrier Ocean Yield DNV GL2016 Car/passenger ferry Seaspan Ferries Corp. BV2016 Car/passenger ferry Seaspan Ferries Corp. BV2016 Gas carrier Navigator Gas ABS2016 Gas carrier Navigator Gas ABS2016 Gas carrier Navigator Gas ABS2016 Gas carrier Navigator Gas ABS2016* RoPax Baleària BV2016 Dredger DEME BV2016 Dredger DEME BV2016* Container ship Wessels Reederei BV

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels* Conversion project

Page 16: LNG as a fuel - IENE

86 confirmed LNG fuelled newbuilds –DNV GL also first choice for future projects (2/2)

Confirmed orderbook

Year Type of vessel Owner Class

2018 Car/passenger ferry CHFS LR2018 Car/passenger ferry CHFS LR2018* Ro-Ro TOTE Shipholdings ABS2018 RoPax Rederi AB Gotland DNV GL2018 General cargo ship Nordnorsk Shipping2018 Container ship Containerships ABS2018 Container ship Containerships ABS2018 Heavy lift vessel Heerema Offshore LR2018 Oil/chemical tanker Furetank Rederi2018 Oil/chemical tanker Furetank Rederi2018 DEME Dredger

Year Type of vessel Owner Class

2016 Hopper Barge Bremenports DNV GL2017 Cable layer DEME Tideway DNV GL2017 Gas carrier Evergas BV2017 Gas carrier Evergas BV2017 Tug Østensjø Rederi2017 Tug Østensjø Rederi2017 Tug Østensjø Rederi2017 RoPax Rederi AB Gotland DNV GL2017 Car/passenger ferry Caronte & Tourist RINA 2017 Oil/chemical tanker Groupe Desgagnés BV2017 Oil/chemical tanker Groupe Desgagnés BV

DNV GL © 2016

Ungraded

20 April 201616

2018 Cruise ship Carnival Corporation RINA 2019 Cruise ship Carnival Corporation RINA 2019 Oil/chemical tanker Älvtank2019 Oil/chemical tanker Thun Tankers2019 RoPax Baleària BV2020 Cruise ship Carnival Corporation RINA 2022 Cruise ship Carnival Corporation RINA

2017 Oil/chemical tanker Groupe Desgagnés BV2017 Container ship GNS Shipping ABS2017 Container ship GNS Shipping ABS2017 Car/passenger ferry BC Ferries LR2017 Oil/chemical tanker Terntank BV2017 Container ship Crowley Maritime Corp. DNV GL2017 Container ship Crowley Maritime Corp. DNV GL2017 RoPax Tallink BV2017 Container ship Brodosplit DNV GL2018 Container ship Brodosplit DNV GL2018 Bulk ship ESL Shipping DNV GL2018 Bulk ship ESL Shipping DNV GL2018 Container ship Brodosplit DNV GL2018 Container ship Brodosplit DNV GL

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels* Conversion project

Page 17: LNG as a fuel - IENE

Area of operation of LNG fuelled vessels

8 %

6 %

Operating areaships in operation

Norway

Europe

14 %

25 %

2 % 1 %

Operating area confirmed orderbook

Norway

Europe

DNV GL © 2016

Ungraded

20 April 201617

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels

69 %

17 %Europe

America

Asia & Pacific

58 %

25 %Europe

America

Asia & Pacific

Middle East

Page 18: LNG as a fuel - IENE

LNG uptake by vessel segment

26

18

12

13

12

8

5

10

15

20

25

30

35

40

In operation On order

DNV GL © 2016

Ungraded

20 April 201618

Updated 21 March 2016Excluding LNG carriers and inland waterway vessels

0

74

1 24

18

3 2

6

1

2

2

13

4

11

5

3

5

7

0

5

Bu

lk s

hip

Ca

r ca

rrie

r

Ca

r/p

ass

en

ge

r fe

rry

Co

nta

ine

r sh

ip

Cru

ise

sh

ip

Ga

s ca

rrie

r

Ge

ne

ral

Ca

rgo

HS

LC

Oil

/ch

em

ica

l ta

nke

r

Pa

tro

l ve

sse

l

PS

V

Ro

Pa

x

Ro

-Ro

Tu

g

Sp

eci

ali

zed

ve

sse

l

Page 19: LNG as a fuel - IENE

LNG supply development

DNV GL © 2016

Ungraded

20 April 201619

Page 20: LNG as a fuel - IENE

LNG supply for ships – some reflections

� The chicken and egg debate is finally almost over

� Bunker ships become available in 2016/2017

� Import terminals can supply bunker ships (size will be between

1,000 to 8,000 m3 LNG)

� For sustainable business, a bunker supplier has to sell LNG with a

DNV GL © 2016

Ungraded

20 April 2016

� For sustainable business, a bunker supplier has to sell LNG with a

competitive supply surcharge

– 2 $/mmBTU and below seem to be possible (6,000 to 8,000 m3 bunker

sold per week)

� A bunker ship may operate 200 to 250 nm around a supply

terminal offering the required supply flexibility

20

Page 21: LNG as a fuel - IENE

LNG supply for ships is possible from LNG import terminals

DNV GL © 2016

Ungraded

20 April 201621

Enough supply possibilities?

DNV GL LNG Intelligence web portal

can offer the required insight

Page 22: LNG as a fuel - IENE

LNGi – Your LNG intelligence portal

For more information please visit: https://lngi.dnvgl.com/sitepages/Homepage.aspx

DNV GL © 2016

Ungraded

20 April 201622

Page 23: LNG as a fuel - IENE

LNG Intelligence provides all needed information to keep you on top of LNG bunkering for ships

�Map of LNG bunkering infrastructure

with detailed project data

� Heat map and vessel positions of LNG

fuelled fleet operating area using AIS

LNG INTELLIGENCE

Heat map Vessel positions

DNV GL © 2016

Ungraded

20 April 201623

� Detailed statistics of LNG fuelled

fleet development

� Scrubber + alternative fuels overview

� LNG related studies and publications

The heat map and vessel positions are based on AIS data from

01.01.2016-11.01.2016

Page 24: LNG as a fuel - IENE

Shapshots of LNG Intelligence

LNG Interactive map: World map

DNV GL © 2016

Ungraded

20 April 201624

Page 25: LNG as a fuel - IENE

Shapshots of LNG Intelligence

LNG Interactive map: AIS data shows vessel positions of LNG fuelled vessels

DNV GL © 2016

Ungraded

20 April 201625

* The heat map and vessel positions are based on AIS data from 01.01.2016-11.01.2016

Page 26: LNG as a fuel - IENE

Shapshots of LNG Intelligence

LNG Interactive map: Only proposed projects are shown by use of filter

DNV GL © 2016

Ungraded

20 April 201626

Page 27: LNG as a fuel - IENE

Shapshots of LNG Intelligence

LNG Interactive map: By clicking the port icons, the name of the port is shown

DNV GL © 2016

Ungraded

20 April 201627

Page 28: LNG as a fuel - IENE

Shapshots of LNG Intelligence

LNG Interactive map: Port details in pop-up

DNV GL © 2016

Ungraded

20 April 201628

Page 29: LNG as a fuel - IENE

LNG fuelled vessels VS scrubber installations – development

DNV GL © 2016

Ungraded

20 April 201629

Page 30: LNG as a fuel - IENE

� The low oil price is delaying the

market development� Increase in LNG production within next

5 years by approx. 40% (US and

Australia coming online)

� This will keep the LNG price

under pressure and most likely result

in world wide price levelling.

Key takeaways - The perspective for LNG as a fuel still stays positive

� Bunker ships and first

cargo vessels in Europe and

US become available in

2016/2017. This will

motivate followers

DNV GL © 2016

Ungraded

20 April 201630

IMO IGF Code is in place

reducing significantly any

potential risk

The complete technology chain

including 2-stroke engines from

both large makers are now

available come into operation.

This will also motivate followers

All projects for US and European

market have to consider Sulphur

reduction:

This creates interest in the

Mediterranean and additional

interest for round Europe trade

Page 31: LNG as a fuel - IENE

Thank you very much for your attention!

DNV GL © 2016

Ungraded

20 April 2016

SAFER, SMARTER, GREENER

www.dnvgl.com

31

Alexandros Chiotopoulos

[email protected]

+30 6970 985 821

Page 32: LNG as a fuel - IENE

Interesting new vessel:Nor Lines 2 x Combined cargo vessels, mono fuel LNG

� First ship «Kvitbjørn» underway from Tsuji Yard in China to Norway (North

Sea trade). Second ship launced in June

� Rolls Royce LNG engines and design, DNVGL Class

� Specially designed for coastal/short sea traffic, competing with trucks

«Green Corridors»

� Refuelled in India on her way to Europe (Kochi LNG terminal)

DNV GL © 2016

Ungraded

20 April 201632

Page 33: LNG as a fuel - IENE

The world’s first LNG Handysize bulk carriers

The two B.Delta26LNG vessels will be constructed for the Finnish shipowner ESL

Shipping Ltd by the Chinese Qingshan Shipyard of Sinotrans & CSC SBICO.

DNV GL © 2016

Ungraded

20 April 201633

Page 34: LNG as a fuel - IENE

First LNG Powered Cruise Ships

DNV GL © 2016

Ungraded

20 April 201634

Page 35: LNG as a fuel - IENE

LNG Fuelled Kamsarmax Bulk Carrier (Oshima & DNV GL)

Ready for order !

DNV GL © 2016

Ungraded

20 April 201635

Page 36: LNG as a fuel - IENE

The innovative Oshima solution – vessel design

Key challenges:

� Keep the same cargo capacity

� Limited space on deck

� Accommodate up to 3,000m3 of LNG

Solution:

� Unique U-shaped superstructure

� LNG tank protected by a steel cover

forming a box which is part of the hull

structure and provides additional safety

DNV GL © 2016

Ungraded

20 April 201636

Page 37: LNG as a fuel - IENE

LNG system installation on board

� Both LNG tank type C and

type B can be installed in the

same dedicated space

� Can accommodate any LNG

volume requirement up to

about 3,000 m3 by type-B

tank installation

DNV GL © 2016

Ungraded

20 April 2016

tank installation

� Also the arrangement is

suitable design for retro-fit

after the delivery.

� Requesting patent application

37

Page 38: LNG as a fuel - IENE

Brodosplit builds four LNG-fuelled container ships with DNV GL class

DNV GL © 2016

Ungraded

20 April 201638