Liquid Penetrant Quality Control and Inspection Report Form 1OK
1
Project: Client: Report No.: LIQUID PENETRANT TEST Contractor: Date: Ref. Standard: Page 1 of 1 Doc. No.: Item No.: Total tested length: Removal: Type of joint: Thickness: Acceptance Criteria: Quality Control TPI Inspection Client Name: Sign: Date Name: Sign: Date Name: Sign: Date: Final Result Evaluation Defect Percent Tested L (cm) Weld Identification Date No. Accept After Repair Reject Accept Incomplete Fusion Slag Inclusion Excessive Poro. Piping Porosity Crack Star Crack Crater Crack Transverse Longitudinal
-
Upload
samer-bayati -
Category
Documents
-
view
26 -
download
11
description
Liquid Penetrant Quality Control and Inspection Report Form 1OK
Transcript of Liquid Penetrant Quality Control and Inspection Report Form 1OK
-
Project:
Client: Report No.:
LIQUID PENETRANT TESTContractor: Date:Ref. Standard: Page 1 of 1 Doc. No.:
Item No.: Total tested length: Removal: Type of joint: Thickness: Acceptance Criteria:
Quality Control TPI Inspection ClientName: Sign: Date
Name: Sign: Date
Name: Sign: Date:
Final Result
Evaluation Defect
Perc
ent
Tested L (cm)
Weld Identification Date No.
Acc
ept A
fter R
epai
r
Rej
ect
Acc
ept
Inco
mpl
ete
Fusi
on
Slag
Incl
usio
n
Exce
ssiv
e Po
ro.
Pipi
ng P
oros
ity
Crack
Star
Cra
ck
Cra
ter C
rac k
Tran
sver
se
Long
itudi
nal