LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

293
LAND LAW AND SURVEY REGULATION (SGHU 3313) WEEK 8 & 10 - STRATA TITLES MANAGEMENT (PENINSULAR & SARAWAK) SR DR. TAN LIAT CHOON 07-5543157 016-4975551 1 FINAL SR DR TAN LIAT CHOON

Transcript of LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Page 1: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

LAND LAW AND SURVEY REGULATION (SGHU 3313)

WEEK 8 & 10 - STRATA TITLES MANAGEMENT

(PENINSULAR & SARAWAK)

SR DR. TAN LIAT CHOON07-5543157

016-4975551

1

FINAL

SR DR TAN LIAT CHOON

Page 2: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

OUTLINE

• Latest Legislations and its Effect

• Highlights of Improvements Over Building and Common Property (Maintenance and management) Act 2007 [Act 663]

• Overview of Strata Management Act 2013(Act 757)

• Strata Titles Ordinance 1995 VS Strata Management Act 2013

• Schedule of Parcels (S6)

• Allocated Share Units (S8 & First Schedule)

• Limited Common Property and Subsidiary Management Corporation2

FINAL

SR DR TAN LIAT CHOON

Page 3: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

LATEST LEGISLATIONS AND ITS EFFECT

3

FINAL

SR DR TAN LIAT CHOON

Page 4: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Latest Legislations And Its Effect

• The Strata Titles (Amendment) Act 2013 was published inthe Gazette on 7th February 2013 as Act A1450 and withthe approval of the National Land Council, appoints 1st

June 2015 as the date on which the Act comes intooperation in the States of Johore, Kedah, Kelantan,Malacca, Negeri Sembilan, Pahang, Penang, Perak, Perlis,Selangor, Terengganu, Federal Territory of Kuala Lumpur,Putrajaya and Labuan.

4

FINAL

SR DR TAN LIAT CHOON

Page 5: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Latest Legislations And Its Effect

• The Strata Management Act 2013 was published in theGazette on 8th February 2013 as Act 757 and afterconsultation with the State Authority, appoints 1st June2015 as the date on which the Act comes into operationin the States of Johore, Kedah, Kelantan, Malacca, NegeriSembilan, Pahang, Penang (12th June 2015), Perak, Perlis,Selangor, Terengganu, Federal Territory of Kuala Lumpur,Putrajaya and Labuan.

5

FINAL

SR DR TAN LIAT CHOON

Page 6: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Latest Legislations And Its Effect

• Will make very significant changes to the laws relating tostrata development and common property managementand will affect many people who live in, or do businessin, strata-titled properties.

• 14,998 strata development areas occupied byapproximately 5.9 million citizens.

• Strata legislations affect > 25 % of the population inPeninsular Malaysia. (the population of PeninsularMalaysia is about 22.53 million).

6

FINAL

SR DR TAN LIAT CHOON

Page 7: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

HIGHLIGHTS OF IMPROVEMENTS OVER BUILDING AND COMMON PROPERTY (MAINTENANCE AND

MANAGEMENT) ACT 2007 [ACT 663]

7

FINAL

SR DR TAN LIAT CHOON

Page 8: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Current Legislations On Maintenance And Management Of

Strata Schemes

8

Building and Common Property (Maintenance and Management) Act

2007 [Act 663]

Building or land intended for subdivision

Before strata title (JMB)

Strata Titles Act 1985

[Act 318]

Subdivided building or land

After strata title (MC)

FINAL

SR DR TAN LIAT CHOON

Page 9: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Latest Legislations On Maintenance And Management Of Strata

Schemes

9

COMBINED INTO A SINGLE LEGISLATION AS ACT 757

PART VII & IXA OF ACT 318 ON

MANAGEMENT OF SUBDIVIDED

BUILDING CARVED OUT

ACT 663 REPEALED AND SOME

PROVISIONS RE-ENACTED WITH AMENDMENTSFIN

AL

SR DR TAN LIAT CHOON

Page 10: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Highlights Of Improvements Over Act 663

10

ELEMENTACT

REMARKS663 (2007)

757 (2013)

Strata management

2 Acts✓ Act 663✓ Act 318

1 Act▪ Refer to one act only▪ Comprehensive

Legislation that is more comprehensive

✓ 8 parts

✓ 46 sections

✓ 25 interpretations

✓ 9 penalty offences

✓ 11 part

✓ 153 sections

✓ 52 interpretations

✓ 34 penalty offences

Additional: ✓3 parts ✓107 sections.✓27 interpretations✓25 penalty offences ✓Specific parts

• Managing agent• Strata tribunal• Enforcement• Insurance

FINAL

SR DR TAN LIAT CHOON

Page 11: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Highlights Of Improvements Over Act 663

11

ELEMENTACT

REMARKS663

(2007)757

(2013)

Schedule of Parcels filed to COB before sale of any parcel

▪ Transparent transaction▪ Building is capable of subdivision ▪ Identify Parcels, Accessory Parcels

& Common Property ▪ Allocation of Share Units▪ Identify Provisional Blocks &

Provisional Share Units

Appointment of Deputy COB and other officers

✓▪ Administering and carrying out the

provisions of Act 757

Penalty to commensurate with offence

RM500,10,000/

20,000/100,000

3 months imprisonment

RM5000,10,000/

100,000/250,000/500,000

3/5 years imprisonment

▪ Increased in maximum fine to reflect the seriousness of offence and longer imprisonment term to act as deterrent.

FINAL

SR DR TAN LIAT CHOON

Page 12: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Highlights Of Improvements Over Act 663

12

ELEMENTACT

REMARKS663

(2007)757

(2013)

Uniformity of provisions

2 provisions / 2 Acts

Schedule 2

• Uniform provisions for Management Committee, Joint Management Committee and Subsidiary Management Committee

Penalty to commensurate with offence

RM500,10,000/

20,000/100,000

3 months imprisonment

RM5000,10,000/

100,000/250,000/500,000

3/5 years imprisonment

▪ Increased in maximum fine to reflect the seriousness of offence and longer imprisonment term to act as deterrent.

Developer => JMB => MC

2 provisions/2Acts ✓

▪ Handing over by developer to the Joint Management Body and JMB to MC clearly

FINAL

SR DR TAN LIAT CHOON

Page 13: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Highlights Of Improvements Over Act 663

13

ELEMENTACT

REMARKS663

(2007)757

(2013)

Allocated share units

Schedule 1▪ Existing Occupied Development Areas

without Allocated Share Units

Provision for tenant, subtenant, or occupier to pay for any sum due

▪ In order to avoid the attachment or sale of the movable property for non-payment of any sum due

▪ Deduct the amount so paid by him from the rent due

Comprehensive enforcement ✓

▪ Empower the Commissioner to investigate▪ Provide for the compounding of offences▪ provide for the continuing offences

Limited commonproperty & Sub-MC

✓ ▪ For the purpose of representing the different interests of parcel proprietors

FINAL

SR DR TAN LIAT CHOON

Page 14: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Highlights Of Improvements Over Act 663

14

ELEMENTACT

REMARKS663

(2007)757

(2013)

Power to exempt by Minister & State Authority

✓▪ By order published in the Gazette,

exempt from all or any of the provisions of this Act

Disputes2

provisions/ 2 Acts

STRATA MANAGEMENT

TRIBUNAL

▪ Allows an easy, cheap and speedy alternative to seek legal recourse on strata matters

Comprehensive enforcement ✓

▪ Empower the Commissioner to investigate

▪ Provide for the compounding of offences

▪ Provide for the continuing offences

FINAL

SR DR TAN LIAT CHOON

Page 15: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

OVERVIEW OF STRATA MANAGEMENT ACT 2013 (ACT 757)

15

FINAL

SR DR TAN LIAT CHOON

Page 16: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

16

STRATA MANAGEMENT ACT

11 PARTS 153 SECTIONS 4 SCHEDULES

REGULATIONS: expedient or necessary for thebetter carrying out of theprovisions of this Act.

FINAL

SR DR TAN LIAT CHOON

Page 17: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

17

REGULATIONS

TRIBUNAL

COMPUNDING OFFENCES

AS NECCESSARY

FINAL

SR DR TAN LIAT CHOON

Page 18: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview

1) Amendment of Strata Title Act (Strata Title (Amendment) Act 2013(Act A1450) - gazette on 7th Feb 2013(Implemented 1st June 2015 in Johore, Kedah, Kelantan, Malacca, NegeriSembilan, Pahang, Penang, Perak, Perlis, Selangor, Terengganu, FederalTerritory of Kuala Lumpur, Putrajaya and Labuan)

2) Formation of new Act 757–Strata Management Act 2013 (Act 757) -gazette on 8th Feb 2013(Implemented 1st June 2015 in Johore, Kedah, Kelantan, Malacca, NegeriSembilan, Pahang, Penang (12th June 2015), Perak, Perlis, Selangor,Terengganu, Federal Territory of Kuala Lumpur, Putrajaya and Labuan)

3) Amendment on HDA-New Schedule H and etc,(Was implemented on 1st July 2015 - National Level)

18

FINAL

SR DR TAN LIAT CHOON

Page 19: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Compulsory Period For Submission

a) To apply for building / land subdivision 3 months upon the completion of superstructures (Form G12)

b) All BP must approved prior to pre-strata title application.

c) Future phase development will submitted as provisional blocks

d) The land must be final title and free of any encumbrances

19

FINAL

SR DR TAN LIAT CHOON

Page 20: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

STA – New Section 8

Section 8, requires land owner / developer to apply forbuilding subdivision within 3 months upon the completion ofsuper structure and expecting the registration of strata titlebefore vacant possession (VP).

20

FINAL

SR DR TAN LIAT CHOON

Page 21: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

8. Circumstances In Which It Is Compulsory To Apply For Subdivision Of A Building Or Land

(Current)

(1) The original proprietor of any alienated land on whichthere is a building capable of being issued with strata titlesshall, within the period apply in accordance for Certificateof Proposed Strata Plan [S(8A)] and subdivision of thebuilding or land [9(1)] if at any time he has sold or agreed tosell any parcel in such building or land to any person.

21

FINAL

SR DR TAN LIAT CHOON

Page 22: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8(2) - (New)

22

S8(2)(a)

S8(2)(b)

S8(2)(c)

S8(2)(d)

S8(2)(e)

SPA

Super structure

SPABuilding is completed

Building is completed

SPA

SPABuilding is completed

Building is completed SPA

3 MONTHS FROM THE DATE OFISSUANCE OF THE DOCUMENT THATCERTIFIES THE SUPER STRUCTURESTAGE

3 MONTHS FROM THE DATE THEBUILDING IS COMPLETED

3 MONTHS FROM THE DATE THEBUILDING IS COMPLETED OR SPA –WHICHEVER IS THE LATER

3 MONTHS FROM THE DATE OF THECOMMENCEMENT OF THIS ACT

3 MONTHS FROM THE DATE OF SPA

FINAL

SR DR TAN LIAT CHOON

Page 23: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8(3) & 8(4) & 8(5)-(Current)

(3) The original proprietor of land had been issued with thecertificate of proposed strata plan under subsection 8A(8)shall apply for subdivision in accordance with subsection9(1) within one (1) month from the date issuance of thecertificate of proposed strata plan.

(4) The period may, on an application made before itsexpiry, be extended once by the Director of Survey for anyfurther period not exceeding one (1) month.

(5) The period may, on an application made before itsexpiry, be extended once by the Director for any furtherperiod not exceeding one (1) month.

23

FINAL

SR DR TAN LIAT CHOON

Page 24: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section S8(7) & S8(8)-(New)

S8(7) - Where an application is not made within the period, and,within the period of such extension granted, the original proprietorshall be guilty of an offence.

S8(8)(a)✓ fine of not less than RM10,000 but not exceeding

RM100,000; or✓ imprisonment for a term not exceeding 3 years or both; and✓ to a further fine of not less than RM100 but not exceeding

RM1,000 for continuing offence

S8(8)(b) - The court may order the original proprietor to apply forsubdivision of building or land within a period specified in the order.

24

FINAL

SR DR TAN LIAT CHOON

Page 25: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8(9) – New

❑ S8(9) - Mentioned about the date which the building isor was completed shall be the date on which thecertificate of completion and compliance is issued,certificate by any local authority to be fit for occupation oruse, or certified in accordance with the provisions of anywritten law for the time being in operation.

25

FINAL

SR DR TAN LIAT CHOON

Page 26: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

8A. Application for Certificate of Proposed Strata Plan (Current)

Section 8A to provide for the application for certificate ofproposed strata plan. The certificate of proposed strataplan is required to be submitted in the application forsubdivision of building.

26

FINAL

SR DR TAN LIAT CHOON

Page 27: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8A(1)-(Current)

❑ Proprietor shall apply for a certificate of proposed strataplan (CPSP) to Director of Survey (Form 10) together with:

• Survey fees

• Approved original copy of building plans (or plan certifiedby Professional Architect or by Land Surveyor)

• CPSP comprising a location plan, storey plan and adelineation plan that has make a comparison to theapproved building plan prepared by ProfessionalArchitect or engineer and certified by the ProfessionalArchitect or by the Land Surveyor. 27

FINAL

SR DR TAN LIAT CHOON

Page 28: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8A(1)-(Current)

• Certified copy of Final Title of the lot.

• Certified copy of the document that certifies the SuperStructure Stage.

• Certified copy of Certificate of Completion andCompliance (CCC) or Certificate of Fitness for Occupancy(CFO).

• Certified copy of the Schedule of Parcels or amendedSchedule of Parcels.

28

FINAL

SR DR TAN LIAT CHOON

Page 29: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8A(1A) – New

❑ New section 8A(1A) to provide for the Director ofSurvey, in approving the application for the certificate ofproposed strata plan – (a) of a special building, (b) in anyother circumstances where he deem fit, may giveexemption to the documents such as certification byarchitect or engineer and certificate of completion andcompliance or certificate of fitness for occupancy.

29

FINAL

SR DR TAN LIAT CHOON

Page 30: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8A - The Period - (New)

30

S.8(2)(a)

S.8(2)(b)

S.8(2)(c)

S.8(2)(d)

S.8(2)(e)

SPA

Super structure

SPAThe Building is completed

The Building is completed

SPA

SPA

The Building is completed

The Building is completed SPA

3 MONTHS FROM THE DATE OFISSUANCE OF THE DOCUMENT THATCERTIFIES THE SUPER STRUCTURESTAGE

3 MONTHS FROM THE DATE THEBUILDING IS COMPLETED

3 MONTHS FROM THE DATE OF THEBUILDING IS COMPLETED OR SPA –WHICHEVER IS THE LATER

3 MONTHS FROM THE DATE OF THECOMMENCEMENT OF THIS ACT

3 MONTHS FROM THE DATE OF SPA

1 MONTH FROM

ISSUANCE OF CPSP

FINAL

SR DR TAN LIAT CHOON

Page 31: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

FAIL

PLA

N

AM

END

MEN

T

Application for Development Order

(DO)

DO Approved + Conditions

Applyication for Building Plan (BP)

Approval

BP Approved

A

Sale & Purchase

PASS

PASS

DEVELOPER

Imposed such conditions into DO:

i. Schedule of Parcels

ii. Sijil Formula Unit Syer (SiFUS)

▪ LS prepare Schedule of Parcels based on approved building plans.

▪ Schedule of Parcels filed with COB.▪ Advertisement and sale permit.

1

2

31

Ref

er

A1

FINAL

SR DR TAN LIAT CHOON

Page 32: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

32

BP Approved

Deposit Survey Fee to JLT

Application for No. Schedule of Parcel, No. Scheme & No.

Fieldbook

Approved

Approval condition1. LS appointed2. Copy of receipt LJT3. Copy of DO

Ya

YesNo

Preparation of Schedule of Parcel

Application for Sijil Formula Unit Syer (SiFUS)

Sale & Purchase

SiFUS Approval condition1. Land matters sattled2. LS appointed3. Copy of receipt LJT4. Unit syare calculation formula (excel)5. Proposed Schedule of Parcel6. Format purchaser register7. Building plan approved

Yes

Yes

No

NoApproved

Filed Schedule of Parcel to COB

In order?

Verification of filing of Schedule of Parcel

Condition to file1. Schedule of Parcel2. SiFUS3. Approved building plan4. Form 1 (if amendment,

use Form 1A)

A1

2

FINAL

SR DR TAN LIAT CHOON

Page 33: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

FAIL

PLA

N

AM

END

MEN

T

Application for Development Order

(DO)

DO Approved + Conditions

Applyication for Building Plan (BP)

Approval

BP Approved

A

Sale & Purchase

PASS

PASS

DEVELOPER

Condition in Schedule H (SPA) - Strata titles uponvacant possession must consist of SiFUS andschedule of parcels.3

33

FINAL

SR DR TAN LIAT CHOON

Page 34: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

34

FINAL

SR DR TAN LIAT CHOON

Page 35: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Superstructure Stage

Application for CPSP

Approval of CPSP

FAIL

B

A

PASS

Submit to State PTG by proprietor within 2 weeks.

4

▪within 3 months after superstructure stage.▪ 1 month extension.

5

State CS within 1 month.

6

35

FINAL

SR DR TAN LIAT CHOON

Page 36: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

36

Sale & Purchase

Building AchieveSuper Structure Stage

In Order

Yes

Notification of Super Structure Stage to PTG

Application for CPSP(Section 8A Act 318)

No

CPSP Application condition1. Form 102. Payment for survey fee

(checking) [P.U.(A) 99]3. Original Building Plan4. Proposed Strata Plan5. Air Space permit6. Certification of

Architech/Engineer7. Title search Final Title8. Certification copy of Super

Structure Stage9. Copy of SiFUS

Approval of CPSP

3

4

5

FINAL

SR DR TAN LIAT CHOON

Page 37: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application for subdivision

Approval from PTG

B

FAIL

Preparation of Strata Titles Plan

[PA(B)]

Approval of PA(B)

Registration of Strata Titles

C

▪ Application for Strata Title within 1 month.▪ 1 month extension.

7

Strata Titles application and registrationprocess within 90 days.

8

FAIL

37

FINAL

SR DR TAN LIAT CHOON

Page 38: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

38

Approval of CPSP

DokumentIn order?

Application for strata title(Section 9, Act 318)

Approval by Director of PTG (Section 12, Act 318)

Approval of Strata Certified Plan by Director of Survey

Preparation of Title Plan (B4) by State JUPEM

Notice 5F

Handing Strata Certified Plan to State JUPEM for chekcing

No

Yes

In order

Consideration and approval by Director of PTG

(Section 10, Act 318)

Checking

No

Registration of Strata Titles by PTG(Part III, Act 318)

Vacant Possession

Condition for strata title application1. Application form (Form 1)2. Payment for application

and preparation of title3. CPSP4. Certificate of verification

low-cost building [S9B(3), Act 318]

5. Written concern from interested parties

6. Propose MC name7. Original Final Title8. Copy of Schedule of Parcel

8

7

FINAL

SR DR TAN LIAT CHOON

Page 39: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

C

PASS

END

CCC

Strata Titles with Vacant Possession

FAILApplication for

exemption from Controller of

Housing

PASS

FAIL

VP without Strata Titles

9

Exemption: Prove Strata Titles delay not caused by applicant

Schedule H, Clause 28 (Strata title not yet issued and transfer of title), Housing

Development (Control and Licensing) Act 1966 Act 118

▪ Notification of Superstructure Stage within 2 weeks.

▪ Certificate Proposed Strata Plan (CPSP) issued.

▪ Application for submission ≥ 30 days.

▪Application to PTG ≥ 90 days.

▪ Application to Controller of Housing before date of 1st Vacant Possession (VP).39

Schedule H, Clause 27,Act 118

FINAL

SR DR TAN LIAT CHOON

Page 40: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

i. Development Order Approval (DO)

ii.Approval / Endorsement of Building Plan

Pre-approval requirements:i. Land matters resolvedii. Appointment of Licensed Land

Surveyor iii. Deposit of Strata Fee to Lembaga

Juruukur Tanahiii. Application and issuance of Sijil Formula Unit Syer (SiFUS)

iv. Filing of Schedule of Parcel to COB / Application of APDL / Sales & Build

v. Completion of Super Structure (Form G12)

viii. Strata application to PTG

ix. Strata approval by PTG

11. Issuance of Strata Title by PTG

12. Vacant Possession

10. Preparation & approval of Strata CP by JUPEM

3+1 (appeals) months

1 month

1+1 (appeals) months

3 months

vi. Application for Certificate Proposed Strata Plan (CPSP) to JUPEM

vii. Issuance of CPSP by JUPEM

40

2 weeks

1

2

3

4

5

6

7

8

FINAL

SR DR TAN LIAT CHOON

Page 41: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Clause 27, Schedule HManner Of Delivery Of Vacant Possession

Housing Development (Control And Licensing) Act 1966 Act 118

27 (1) The developer shall let the purchaser into possession of the saidparcel upon the following:

(a) The issuance of a certificate of completion and compliance.(b) The separate strata title relating to the said parcel has been issued

by the appropriate authority.(c) Water and electricity supply are ready for connection to the said

parcel.(d) The purchaser having paid all monies in accordance with the Third

Schedule (10% immediately upon signing of contract, 90% within30 days after the receipt by purchaser of the developer’s writtennotice of delivery of vacant possession supported by the certificateof completion and compliance) and all monies due underagreement and the purchaser having performed and observed allthe terms and covenants on his part.

(e) The completion of any alteration or additional work on building.41

FINAL

SR DR TAN LIAT CHOON

Page 42: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Clause 27, Schedule HManner Of Delivery Of Vacant Possession

Housing Development (Control And Licensing) Act 1966 Act 118

(2) The delivery of vacant possession by the developer shallbe supported by a certificate of completion and complianceand includes the handing over of the keys of the parcel tothe purchase.

(3) Upon the expiry of 30 days from the date of service of anotice from the developer requesting the purchaser to takepossession of the said paid, whether of not the purchaserhas actually entered into possession or occupation of thesaid parcel, the purchaser shall be deemed to have takendelivery of vacant possession.

42

FINAL

SR DR TAN LIAT CHOON

Page 43: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Clause 28, Schedule HStrata Title Not Yet Issued And Transfer Of Title

Housing Development (Control And Licensing) Act 1966 Act 118

28 (1) If the separate strata title to the said parcel is not issued for anyreason not attributable to the developer, then the developer mayapply to the controller for a certification in writing to deliver thevacant possession of the said parcel within the time stipulated for thehanding over of vacant possession. The delivery of vacant possessionof the said parcel to the purchaser shall be accompanied with a copyof the written certification issued by the controller.

(2) Upon the issued of the separate strata title to the said parcel, thedeveloper shall, at no additional cost and expense to the purchaser,execute or cause the proprietor to execute and deliver a valid andregistrable instrument of transfer of the said parcel to the purchaser orthe purchaser’s solicitor together with a separate strata title to bepresented for registration in favour of the purchaser.

43

FINAL

SR DR TAN LIAT CHOON

Page 44: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Clause 28, Schedule HStrata Title Not Yet Issued And Transfer Of Title

Housing Development (Control And Licensing) Act 1966 Act 118

(3) When the document of separate strata title to the saidparcel has been registered in the name of the purchaser,the developer shall hand over to the purchaser the originalissue document of separate strata title registered in thename of the purchaser within 30 days from the date ofregistration.

(4) If the developer fails to comply, the developer shall beliable to pay to the purchaser liquidated damagescalculated at the same sate as for delay in rendering vacantpossession of the said parcel to the purchaser.

44

FINAL

SR DR TAN LIAT CHOON

Page 45: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

8. Hal Keadaan Yang Adalah Wajib Memohon Bagi Pecah Bahagi Bangunan

Atau Tanah (Semasa)

(1) Pemilik asal mana-mana tanah beri hakmilik yang diatasnya terdapat bangunan yang boleh dikeluarkan hakmilikstrata hendaklah dalam tempoh yang dinyatakan memohonmengikut subseksyen 8A(1) dan 9(1) untuk pecah bahagibangunan atau tanah itu jika pada bila-bila masa dia telahmenjual atau bersetuju untuk menjual mana-mana petakdalam bangunan atau tanah itu kepada mana-mana orang.

45

FINAL

SR DR TAN LIAT CHOON

Page 46: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

S.8(2)(a)

S.8(2)(b)

S.8(2)(c)

S.8(2)(d)

S.8(2)(e)

S&P

Struktur Utama

S&P

SIAP BANGUNAN/CFO

SIAP BANGUNAN/CFO

S&P

S&P

SIAP BANGUNAN/CFO

SIAP BANGUNAN/CFO

S&P

3 BULAN DARI TARIKH PENGELUARANDOKUMEN STRUKTUR UTAMA

3 BULAN DARI TARIKH SIAPBANGUNAN

3 BULAN DARI TARIKH SIAPBANGUNAN @ S&P – MANA-MANAYANG TERKEMUDIAN

3 BULAN DARI TARIKH KUATKUASAAKTA

3 BULAN DARI TARIKH S&P

46

Seksyen 8(2)-(Baharu)

FINAL

SR DR TAN LIAT CHOON

Page 47: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 8(3) & 8(4) & 8(5)-(Semasa)

(3) Pemilik asal tanah beri hakmilik yang di atasnya bangunanatau tanah telah dikeluarkan sijil cadangan pelan strata di bawahsubseksyen 8A(8), hendaklah memohon untuk pecah bahagimengikut subseksyen 9(1) dalam ytempoh satu(1) bulan daritarikh pengeluaran sijil cadangan pelan strata.

(4) Tempoh yang dinyatakan boleh atas permohonan yang dibuatsebelum tamatnya tempoh itu, dilanjutkan sekali oleh PengarahUkur selama apa-apa tempoh lanjut yang tidak melebihi satu (1)bulan.

(5) Tempoh yang dinyatakan boleh atas permohonan yang dibuatsebelum habis tempoh itu, dilanjutkan sekali oleh Pengarahselama apa-apa tempoh lanjut tidak melebihi satu (1) bulan.

47

FINAL

SR DR TAN LIAT CHOON

Page 48: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen S8(7) & S8(8)-(Baharu)

S8(7) - Jika permohonan tidak dibuat dalam tempoh yang dinyatakan, dandalam tempoh pelanjutan yang diberikan berkenaan dengan sesuatubangunan atau tanah, pemilik asal adalah melakukan suatu kesalahan.

S8(8)(a)✓ Denda tidak kurang daripada RM10,000 tetapi tidak lebih daripada

RM100,000; atau✓ Dipenjarakan untuk satu tempoh yang tidak melebihi 3 tahun

atau; dan✓ Dalam hal kesalahan yang berterusan, didenda selanjutnya tidak

kurang daripada RM100 tetapi tidak melebihi RM1,000 bagi setiaphari keslahan itu terus dilakukan.

S8(8)(b) – Mahkamah boleh memberi perintah kepada pemilik asal memohonpecah bahagi bangunan atau tanah dalam masa yang ditetapkan dalamperintah.

48

FINAL

SR DR TAN LIAT CHOON

Page 49: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8(9) – Baharu

❑ S8(9) - Memberitahu berkenaan tarikh di manabangunan telah siap dibina di mana sijil siap pembinaantelah diisu dan diakui oleh Pihak Berkuasa Tempatan.

49

FINAL

SR DR TAN LIAT CHOON

Page 50: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

8A. Permohonan Bagi Sijil Cadangan Pelan Strata (Semasa)

Seksyen 8A memperuntukkan permohonan bagi sijilcadangan pelan strata. Pemilik asal mana-mana tanah berimilik yang di atasnya terdapat bangunan atau tanah yangboleh dikeluarkan hakmilik strata hendaklah memohon sijilcadangan pelan strata. Sijil cadangan pelan strata adalahdiperlukan untuk memohon pecah bahagi.

50

FINAL

SR DR TAN LIAT CHOON

Page 51: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 8A(1)-(Semasa)

❑ Pemilik hendaklah memohon Sijil Cadangan Pelan Strata(CPSP) daripadan Pengarah Ukur dengan menggunakan Borang10 beserta dengan:

• Fi ukur

• Salinan asal pelan bangunan (atau pelan yang disahkan olehJuruukur tanah Berlesen atau Arkitek Profesional)

• CPSP mengandungi pelan lokasi, pelan tingkat, dan pelantandaan yang mengandungi apa-apa butir sebagaimana yangdinyatakan bahawa Juruukur tanah Berlesen atau ArkitekProfesional telah membuat perbandingan dengan pelan yangtelah diluluskan. 51

FINAL

SR DR TAN LIAT CHOON

Page 52: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 8A(1)-(Semasa)

• Salinan diperakui sah hak milik tetap bagi lot tanah.

• Salinan yang diperakui sah dokumen yangmemperakukan peringkat struktur utama.

• Salinan yang diperakui sah perakuan siap dan pematuhan(CCC) atau sijil layak menduduki (CFO).

• Salinan diperakui sah jadual petak atau jadual petakterpinda yang difailkan dengan Pesuruhjaya di bawakAkta Pengurusan Strata 2013.

52

FINAL

SR DR TAN LIAT CHOON

Page 53: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 8A(1A) – Baharu

❑ Seksyen baharu 8A(1A) memperuntukkan PengarahUkur, dalam meluluskan sijil cadangan pelan strata – (a)bangunan khas, (b) dalam keadaan mana sesuai, bolehmemberi pengecualian dokumen seperti perakuan arkitekatau jurutera dalam sijil siap pembinaan.

53

FINAL

SR DR TAN LIAT CHOON

Page 54: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 8A - (Baharu)

5454

S8(2)(a)

S8(2)(b)

S8(2)(c)

S8(2)(d)

S8(2)(e)

SPA

Stuktur Utama

SPA

SIAP BANGUNAN/CFO

SIAP BANGUNAN/CFO

SPA

SPA

SIAP BANGUNAN/CFO

SIAP BANGUNAN/

CFO

SPA

3 BULAN DARI TARIKH PENGELUARAN DOKUMEN STRUKTUR UTAMA

3 BULAN DARI TARIKH SIAPBANGUNAN

3 BULAN DARI TARIKH SIAP BANGUNAN @ S&P –MANA-MANA YANG TERKEMUDIAN

3 BULAN DARI TARIKH KUATKUASA AKTA

3 BULAN DARI TARIKH S&P

1 BULAN DARI CPSP

FINAL

SR DR TAN LIAT CHOON

Page 55: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

GA

GA

LP

IND

A P

ELA

NPermohonan Kebenaran

Merancang (KM)

KM Lulus Bersyarat

Permohonan Kelulusan Pelan bangunan (PB)

Kelulusan PB

A

Jual-Beli

LULUS

LULUS

PEMAJU

1

Memasukkan syarat berikut di dalam KM :

i. “…Semua pemajuan yang akan dipecah bahagi untuk

pengeluaran hakmilik strata bagi tujuan jualan, wajib

memohon Sijil Formula Unit Syer (SiFUS) kepada PTG Negeri

dan memfailkan Jadual Petak kepada Pesuruhjaya

Bangunan (COB) sebelum penjualan mana-mana petak…”

ii. “…Semua pemajuan yang akan dipecah bahagi untuk

pengeluaran hakmilik wajib memohon Sijil Formula Unit

Syer (SiFUS) kepada PTG Negeri dan memfailkan Jadual Petak

kepada Pesuruhjaya Bangunan (COB) sebelum Permohonan

Sijil Cadangan Pelan Strata, Certified Proposed Strata Plan

(CPSP) kepada Pengarah Ukur dan Pemetaan Negeri…”

iii. “…Semua pemajuan yang tidak dipecah bahagi untuk

pengeluaran hakmilik strata tidak wajib memohon Sijil

Formula Unit Syer (SiFUS) kepada PTG Negeri dan

memfailkan Jadual Petak kepada Pesuruhjaya Bangunan

(COB)…“

iv. “…komposit lesen dan permit jualan hanya akan dikeluarkan

oleh Bahagian Pelesenan Pemajuan Perumahan Jabatan

Perumahan Negara (JPN) selepas syarat-syarat SiFUS dan

Jadual Petak dipenuhi...”

v. “…pemaju hendaklah mengemukakan sesalinan perakuan

bahawa bangunan telah mencapai peringkat super structure

ke pejabat tanah dalam tempoh 2 minggu selepas mencapai

peringkat tersebut. ”55

FINAL

SR DR TAN LIAT CHOON

Page 56: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

GA

GA

LP

IND

A P

ELA

NPermohonan Kebenaran

Merancang (KM)

KM Lulus Bersyarat

Permohonan Kelulusan Pelan bangunan (PB)

Kelulusan PB

A

Jual-Beli

LULUS

LULUS

PEMAJU

Syarat-syarat kelulusan SiFUSi. Urusan Tanah selesaiii. Lantik JUBLiii. Resit deposit bayaran ukuriv. Formula Kiraan Unit Syerv. Jadual Petak yang diperakui oleh JUBL dan

arkitek/Juruteravi. Pelan Bangunan telah lulus

Permohonan SiFUS ke PTG oleh pemaju

2

Failkan Jadual Petak kepada COB

56

Ru

juk

A1

FINAL

SR DR TAN LIAT CHOON

Page 57: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

57

PB Lulus

Deposit Bayaran UpahUkur kepada LJT

Permohonan No. Jadual Petak,No. Skim & No. Buku Kerja Luar

Lulus

Syarat Kelulusan1. Lantik JTB2. Salinan resit LJT3. Salinan KM

Ya

YaTidak

Penyediaan Jadual Petak

Permohonan Sijil PenentuanFormula Unit Syer (SiFUS)

Penjualan Petak

Syarat Kelulusan SiFUS1. Urusan tanah selesai2. Lantikan JTB3. Salinan resit LJT4. Formula kiraan unit syer5. Cadangan jadual petak6. Format Daftar Pembeli7. Pelan bangunan lulusYa

Ya

Tidak

TidakLulus

Pemfailan Jadual PetakKepada COB

Teratur?

Pengesahan PemfailanJadual Petak

Syarat Pemfailan1. Jadual petak2. SiFUS3. Pelan bangunan

yang diluluskan4. Borang 1 (Jika

pindaan, guna Borang 1A)

A12

FINAL

SR DR TAN LIAT CHOON

Page 58: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

GA

GA

LP

IND

A P

ELA

NPermohonan Kebenaran

Merancang (KM)

KM Lulus Bersyarat

Permohonan Kelulusan Pelan bangunan (PB)

Kelulusan PB

A

Jual-Beli

LULUS

LULUS

PEMAJU

Syarat pengeluaran komposit lesen danpermit jualan adalah mesti ada SiFUS danJadual Petak.

3

58

FINAL

SR DR TAN LIAT CHOON

Page 59: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

59

FINAL

SR DR TAN LIAT CHOON

Page 60: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Peringkat Struktur Utama

Permohonan CPSP

Kelulusan CPSP

GA

GA

L

B

A

LULUS

Pemaju memajukan salinan perakuan bahawa bangunan telah mencapai peringkat super structure dimaju ke pejabat tanah dalam tempoh 2 minggu selepas mencapai peringkat

4

Permohonan kepada JUPEM dalam tempoh 3bulan dari tarikh pengeluaran dokumenperingkat struktur utama (1 bulan lanjutan)

5

Ulasan JUPEM (teratur/tidak teratur) dalamtempoh 1 bulan

6

Peringkat Struktur Utama (Super StructureStage-SSS) dalam AHS (Pindaan) 2013 (AktaA1450) adalah pembinaan bangunan telahmencapai peringkat G12 dalam Jadual Kedua,Undang-Undang Kecil Bangunan Seragam1984.

60

FINAL

SR DR TAN LIAT CHOON

Page 61: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

61

Penjualan Petak

Pembinaan mencapaiPeringkat Struktur Utama

TeraturYa

Permakluman Peringkat Struktur Utama kepada PTG

Permohonan CPSP(Seksyen 8A Akta 318)

Tidak

Syarat Permohonan CPSP1. Borang 102. Bayaran semakan ukur

[P.U.(A) 99]3. Pelan bangunan asal4. Cadangan pelan strata5. Permit ruang udara6. Perakuan Arkitek/Jurutera7. Carian rasmi hakmilik

tetap8. Salinan sah perakuan

struktur utama9. Salinan SiFUS

Kelulusan CPSP

3

4

5

FINAL

SR DR TAN LIAT CHOON

Page 62: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Hakmilik Strata

Kelulusan PTG

B

GA

GA

L

Penyediaan Pelan Akui Strata [PA (B)]

Kelulusan PA(B)

Pendaftaran Hakmilik Strata

C

Permohonan kepada PTG dalam tempoh 1bulan dari tarikh CPSP (1 bulan lanjutan)

7

Proses Permohonan hingga PendaftaranHakmilik Strata dalam tempoh 90 hari

8

GA

GA

L

62

FINAL

SR DR TAN LIAT CHOON

Page 63: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

63

Kelulusan CPSP

DokumenLengkap?

Permohonan Khakmilik Strata(Seksyen 9, Akta 318)

Kelulusan oleh Pengarah PTG(Seksyen 12, Akta 318)

Kelulusan Pelan Akui Strata olehPengarah Ukur

Penyediaan Pelan Hakmilik (B4)Oleh JUPEM Negeri

Notis 5F

Penghantaran Pelan Akui StrataUntuk semakan JUPEM Negeri

Tidak

Ya

Teratur

Pertimbangan dan Kelulusan oleh Pengarah PTG

(Seksyen 10, Akta 318)

Semakan

Tidak

Pendaftaran Hakmilik Strata oleh PTG(Bahagian III, Akta 318)

Pengeluaran Pemilikan Kosong

Syarat Permohonan Hakmilik Strata1. Borang permohonan

(Borang 1)2. Bayaran permohonan dan

penyediaan hakmilik3. CPSP4. Sijil akuan kos rendah

(S9B(3), Akta 318)5. Kebenaran bertulis pihak

berkepentingan6. Cadangan nama MC7. Hakmilik tetap asal8. Salinan jadual petak

8

7

FINAL

SR DR TAN LIAT CHOON

Page 64: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

C

BERJAYA

Selesai(Pindahmilik

Hakmilik Strata)

CCC

9

Pengecualian: Buktikan kelewatan hakmilik strata bukan disebabkan oleh pemohon.

Jadual H, Fasal 28 (Hakmilik strata belum dikeluarkan dan pemindahan hakmilik)

Akta Pemajuan Perumahan (Kawalan dan Pelesenan) 1966 Akta 118

i. Garis panduan kepada Pengawal untuk menimbangkan beri pengecualian untuk serah pemilikan

kosong tanpa hakmilik strata. Perkara perlu dipertimbangkan oleh Pengawal:

✓ CPSP telah dikeluarkan

✓ Permohonan hakmilik strata tidak kurang daripada 30 hari bekerja

✓ Permohonan hakmilik strata telah dikemukakan ke PTG tidak kurang daripada 90 hari bekerja

sebelum permilikan kosong untuk petak pertama.

✓ Makluman peringkat struktur utama telah diberi dalam tempoh 2 minggu.

✓ Permohonan mesti dibuat sebelum tarikh serah pemilikan kosong petak pertama.

Hakmilik Strata dengan

Pemilikan Kosong

GAGALMohon

Pengecualian dpd Pengawal

Bangunan

BERJAYA

GAGAL

Pemilikan Kosong tanpa

Hakmilik Strata

64

Jadual H, Fasal 27,Akta 118

FINAL

SR DR TAN LIAT CHOON

Page 65: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual H, Fasal 27Cara Penyerahan Pemilikan Kosong

Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

27 (1) Pemaju hendaklah membenarkan pembeli mengambil pemilikanpetak tersebut atas sebab yang berikut:(a) Pengeluaran perakuan siap dan pematuhan.(b) Hakmilik strata berasingan yang berhubung dengan petak tersebut

telah dikeluarkan oleh Pihak Berkuasa Yang Berkenaan.(c) Bekalan air dan elektrik sedia untuk penyambungan ke petak tersebut.(d) Pembeli telah membayar segala wang yang kena dibayar mengikut

Jadual Ketiga (10% sebaik selepas apabila tandatangani perjanjian, 90%dalam 30 hari selepas pembeli menerima notis pemaju bagipenyerahan pemilikan kosong dengan disokong dengan perakuan siappematuhan) dan segala wang lain yang kena dibayar di bawahperjanjian dan pembeli telah melaksanakan dan mematuhi segalaterma dan waad.

(e) Penyiapan apa-apa perubahan atau kerja tambahan kepada bangunan.

65

FINAL

SR DR TAN LIAT CHOON

Page 66: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual H, Fasal 27Cara Penyerahan Pemilikan Kosong

Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

(2) Penyerahan pemilikan kosong oleh pemaju hendaklahdisokong oleh suatu perakuan siap dan pematuhan dantermasuk penyerahan kunci petak kepada pembeli.

(3) Apabila selepas 30 hari dari tarikh penyampaian notisdaripada pemaju yang meminta pembeli untuk mengambilpemilikan kosong, sama ada pembeli telah mengambil ataumenduduki, dia disifatkan telah mengambil pemilikankosong.

66

FINAL

SR DR TAN LIAT CHOON

Page 67: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual H, Perenggan 28Hakmilik Strata Belum Dikeluarkan Dan Pemindahan Hakmilik

Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

28 (1) Sekiranya hakmilik strata berasingan petak tidak dikeluarkan atasapa jua sebab yang bukan disebabkan oleh pemaju, maka pemajuboleh memohon kepada pengawal suatu perakuan bertulis untukmenyerahkan pemilikan kosong petak dalam tempoh masa yangdinyatakan bagi menyerahan pemilikan kosong. Penyerahan pemilikankosong tersebut kepada pembeli hendaklah disertakan dengansesalinan perakuan bertulis yang dikeluarkan oleh pengawal.

(2) Apabila hakmilik strata berasingan petak tersebut dikeluarkan,pemaju hendaklah tanpa kos dan perbelanjaan tambahan kepadapembeli, menyempurnakan atau menyebabkan tuan punyamenyepurnakan dan menyerahkan surat cara pindah milik yang sahdan boleh didaftar bagi petak tersebut kepada pembeli atau peguamcara pembeli bersama dengan hakmilik strata berasingan untukdikemukakan bagi pendaftaran atas nama pembeli. 67

FINAL

SR DR TAN LIAT CHOON

Page 68: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual H, Perenggan 28Hakmilik Strata Belum Dikeluarkan Dan Pemindahan Hakmilik

Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

(3) Apabila dokumen hakmilik strata berasingan petaktersebut telah didaftarkan atas nama pembeli, pemajuhendaklah menyerahkan kepada pembeli dokumen hakmilikstrata berasingan keluaran yang asal yang didaftarkan atasnama pembeli dalam masa 30 hari dari tarikh pendaftaran.

(4) Sekiranya pemaju tidak mematuhi, pemaju hendaklahbertanggungan untuk membayar kepada pembeli ganti rugijumlah tertentu yang dikira pada kadar yang sama bagikelewatan dalam menyerahkan pemilikan kosong petakkepada pembeli.

68

FINAL

SR DR TAN LIAT CHOON

Page 69: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

SMA - Submission Of Schedule Of Parcels

a) Submission of schedule of parcels to PTG for approvalupon BP approval

b) Approved Schedule of parcels to be file to COB prior toany sales of any parcels

c) The approved Schedule shall be exhibited at developeroffice / sale office

69

FINAL

SR DR TAN LIAT CHOON

Page 70: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

SPA-Schedule H; (OLD vs CURRENT)

70

FINAL

SR DR TAN LIAT CHOON

Page 71: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Existing Clause

New Amendment

71

FINAL

SR DR TAN LIAT CHOON

Page 72: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Bayaran Permohonan CPSP

Perintah Kanun Tanah Negara (Bayaran Ukur) (Pindaan) 2015berkuatkuasa pada 1 Jun 2015. [P.U.(A) 99]

Permohonan Bagi Sijil Cadangan Pelan Strata

Ia meliputi pengukuran bagi permohonan pecah bahagi bangunan,bangunan dan tanah atau tanah bagi pengeluaran sijil cadangan pelanstrata. Fi yang dikenakan adalah seperti berikut:

(a) Skim strata kos rendah Fi = 5P + 2.5A + RM300.00(b) Skim strata bukan kos rendah Fi = 10P + 5A + RM600.00

Di mana: P = jumlah petakA = jumlah petak aksesori

72

FINAL

SR DR TAN LIAT CHOON

Page 73: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Bayaran Permohonan CPSP

Low-cost strata scheme

Total number of parcels = 500Total number of accessory prcels = 750Fee = 5P + 2.5A + RM300

= 5*500 + 2.5*750 + RM300= 2,500 + 1,875 + RM300= RM4,675-00

73

FINAL

SR DR TAN LIAT CHOON

Page 74: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Bayaran Permohonan CPSP

Non low-cost strata scheme

Total number of parcels = 500Total number of accessory prcels = 750Fee = 10P + 5A + RM600

= 10*500 + 5*750 + RM600= 5,000 + 3,775 + RM600= RM9,350-00

74

FINAL

SR DR TAN LIAT CHOON

Page 75: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application To Obtain CPSP

The National Land Code (Survey Fees) (Amendment) Order 2015is effective 1st June 2015. [P.U.(A) 99]

Application for Certificate of Proposed Strata Plan

It covers the measurement of the application of subdivision ofbuildings, building and land or land for the issuance of thecertificate of proposed strata plan. The fees charged are asfollows:

(a) Low cost strata scheme Fi = 5P + 2.5A + RM300.00(b) Not low cost strata scheme Fi = 10P + 5A + RM600.00

Where: P = number of parcelA = number of accessory parcels

75

FINAL

SR DR TAN LIAT CHOON

Page 76: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application To Obtain CPSP

Low-cost strata scheme

Total number of parcels = 500Total number of accessory prcels = 750Fee = 5P + 2.5A + RM300

= 5*500 + 2.5*750 + RM300= 2,500 + 1,875 + RM300= RM4,675-00

76

FINAL

SR DR TAN LIAT CHOON

Page 77: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application To Obtain CPSP

Non low-cost strata scheme

Total number of parcels = 500Total number of accessory prcels = 750Fee = 10P + 5A + RM600

= 10*500 + 5*750 + RM600= 5,000 + 3,775 + RM600= RM9,350-00

77

FINAL

SR DR TAN LIAT CHOON

Page 78: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Time-Line SMA 2013 (Act 757)Before existence of MC After existence of MC

VPJMB 1st

AGM Hand Over

Mgmt. Period by Developer

MC 1st

AGMHandOver

JMB

Within 12 mths. Within 1 mth. Within 1 mth.

Initial PeriodEnds (25% Share

transferred)

Within 1 mth.

MC

New Projects approved after implementation of Act 757 & Act 318 (as amended) without strata titles upon vacant possession

JMBdissolves

StrataRegister

VP

MC 1st

AGM Hand Over

Preliminary Mgmt. Period by Developer

Within 1 mth.

Initial PeriodEnds (25% Share

transferred)

Within 1 mth.

MC

New Projects approved after implementation of Act 757 & Act 318 (as amended) with strata titles upon vacant possession

78

FINAL

SR DR TAN LIAT CHOON

Page 79: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Time-Line SMA 2013 (Act 757)Before existence of MC After existence of MC

VPJMB 1st

AGM Hand Over

Mgmt. Period by Developer

MC 1st

AGMHandOver

JMB

Within 12 mths. Within 1 mth. Within 1 mth.

Initial PeriodEnds (25% Share

transferred)

Within 1 mth.

MC

Existing Completed Projects & Ongoing Approved Projectsbefore implementation of Act 757 & Act 318 (as amended)

New Projects approved after implementation of Act 757 & Act 318 (as amended)

JMBdissolves

StrataRegister

79

Exemption:Prove Strata Title delay not caused by applicant✓Notification of Super Structure Stage within 2 weeks✓CPSP issued✓Application to PTG ≥ 90 days✓Application to Controller of Housing before date of 1st VP

FINAL

SR DR TAN LIAT CHOON

Page 80: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Formation Of The Management Body

80

Delivery of Vacant Possession (VP)

With Strata Title Without Strata Title

PRELIMINARY MANAGEMENT

PERIOD

DEVELOPER MANAGEMENT

PERIOD

Strata Title is issued during 1st year from

VP date

No Strata Title is issued during 1st year from VP date

Strata Title is issued and 25% aggregate share units transferred

during 1st year from VP date

25% of aggregate share units transferred

MANAGEMENT CORPORATION

SUBSIDIARY MANAGEMENT CORPORATION

(Optional)

JOINT MANAGEMENT BODY

Strata Title Issued

25% of aggregate share units transferred

FINAL

SR DR TAN LIAT CHOON

Page 81: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

81

PART I: PRELIMINARY(SECTION 1-3)

1) Short title of the proposed Act and provisions on the commencement of theproposed Act. The proposed Act applies to Peninsular Malaysia and theFederal Territory of Labuan

2) The definitions of certain words and expressions used in the proposed Act3) Construction of the act

✓ Read and construed with the Strata Titles Act 1985 and subsidiary legislation made under the Strata Titles Act 1985

PART II: ADMINISTRATION OF THE ACT (SECTION 4)

4) Appointment of commissioner of buildings, deputies and other officers by the State Authority

✓ Administering and carrying out the provisions of Act 757

FINAL

SR DR TAN LIAT CHOON

Page 82: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 2 – Interpretation

Maintenance accountSinking fund account

Means an account required to be opened and maintained by adeveloper, joint management body, management corporation orsubsidiary management corporation under related section inSMA 2013.

82

FINAL

SR DR TAN LIAT CHOON

Page 83: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 2 – Tafsiran

Akaun penyenggaraanAkaun kumpulan wang penjelas

Suatu akaun yang dikehendaki untuk dibuka dan disenggarakanoleh pemaju, badan pengurusan bersama (joint managementbody), perbadanan pengurusan (management corporation) atauperbadanan pengurusan subsidiary (subsidiary managementcorporation) mengikut seksyen yang berkenaan dalam APS 2013.

83

FINAL

SR DR TAN LIAT CHOON

Page 84: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 2-Interpretation

Joint management body

A joint management body should be established upon firstannual general meeting for joint management body-

(a) If vacant possession has been issued before the commerce ofSMA 2013, not later than 12 months from commerce of SMA2013; or

(b) If vacant possession has been issued after the commerce ofSMA 2013, not later than 12 months from the date of vacantpossession parcel to purchaser.

84

FINAL

SR DR TAN LIAT CHOON

Page 85: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 2 – Tafsiran

Joint management body/badan pengurusan bersama

Suatu badan pengurusan bersama hendaklah ditubuhkan apabilamesyuarat agung tahunan pertama bagi badan pengurusanbersama itu diadakan-

(a) Jika milikan kosong telah diserahkan sebelum permulaankuat kuasa APS 2013, tidak lewat daripada 12 bulan daripermulaan kuat kuasa APS 2013; atau

(b) Jika milikan kosong diserahkan selepas permulaan kuat kuasaAPS 2013, tidak lewat daripada 12 bulan dari tarikhpenyerahan milikan kosong sesuatu petak kepada pembeli.

85

FINAL

SR DR TAN LIAT CHOON

Page 86: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 2 – Interpretation

Management Corporation responsible for:

Any subdivision of building or land that shown in strata planapproved can be registered in strata register book, containall parcel owners including phase development, owner ofblock/provisional block.

86

FINAL

SR DR TAN LIAT CHOON

Page 87: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 2 – Tafsiran

Perbadanan pengurusan bertanggungjawab untuk:

Mana-mana bangunan atau tanah yang dipecah bahagiyang ditunjukkan dalam pelan strata yang diluluskan bolehdidaftarkan dalam buka daftar strata, terdiri dari semuapemilik petak termasuk dalam hal pembangunanberperingkat-peringkat, pemilik blok atau blok-bloksementara.

87

FINAL

SR DR TAN LIAT CHOON

Page 88: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

88

PART III: DEALINGS IN BUILDING OR LAND INTENDED FOR SUBDIVISION INTO PARCELS (SECTION 5-6)

5) Provisions relating to dealings in buildings or lands intended for subdivision intoparcels and the common property.

▪ Shall apply to any sale of a parcel by a developer on or after the commencement ofthe proposed Act.

6) Require the developer of a development area to file a schedule of parcels with theCommissioner showing the proposed share units of each parcel and the total shareunits of all the parcels before it can sell any parcel (for new strata development ordevelopment that still having sale after 1 June 2015)

▪ Schedule of parcels showing proposed share units or proposed quantum ofprovisional share units.

▪ Developer who fail to comply, be liable to a fine ≤ 500K or to imprisonment ≤ 5 yearsor to both.

FINAL

SR DR TAN LIAT CHOON

Page 89: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

89

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 1 (Section 7-8)7) Apply to a development area where before or after SMA 2013 where

Vacant Possession as been delivered by developer to a purchaser or themanagement corporation has not come into existence (meaning nostrata title yet).

8) Allocated share units in accordance with the formula set out in the FirstSchedule (For building completed, no more sale, but no share unitsand no strata title yet).

FINAL

SR DR TAN LIAT CHOON

Page 90: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

90

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

CHAPTER 2 (Section 9-16)✓ Management by developer before joint management body is established

9) Duties and powers of developer during developer’s managementperiod (responsible to maintain and manage properly building orland intended for subdivision into parcels and common property)

10)Developer to establish maintenance account11)Developer to establish sinking fund account12)Purchaser and developer to pay charges, and contribution to sinking

fund13)Prohibition on collection of moneys before accounts are opened14)Duties of developer in relation to accounts15)Handing over by developer to the Joint Management Body (JMB)16)Balances not transferred shall vest in JMB

FINAL

SR DR TAN LIAT CHOON

Page 91: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

91

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 3 (Section 17-28)

✓ Management by JMB17) Establishment of a JMB (established upon the convening of the first annual general

meeting)18) Duty of developer to convene first annual general meeting of JMB19) First annual general meeting of JMB20) Duty of JMB to inform its name to commissioner21) Duties and powers of JMB22) Joint management committee23) JMB to establish maintenance account24) JMB to establish sinking fund account25) Parcel owners to pay charges, and contribution to the sinking fund, to the JMB26) Duties of JMB in relation to accounts27) Dissolution of JMB (shall be dissolve 3 months from the date of first general meeting of

the management corporation)28) Balances not transferred shall vest in management corporation

FINAL

SR DR TAN LIAT CHOON

Page 92: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 21

Duties and power of joint management body

(a) Properly maintain and manage the building or land intended forsubdivision.

(b) Determine and impose the charges to be deposited intomaintenance account (maintenance fee).

(c) Determine and impose the contribution to the sinking fund to bedeposited into the sinking fund account.

(d) To insure the building (common property).(e) Comply with notice or order given or made by local authority.(f) Prepare and maintain a register of all parcel owners of the

buildings or lands.(g) Ensure that the accounts required are audited.(h) Enforce the by-laws.(i) To do such other things as may be expedient or necessary for the

proper maintenance and management of the buildings and lands.92

FINAL

SR DR TAN LIAT CHOON

Page 93: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Section 21

Power of the joint management body

(a) Collect the charges from the parcel owners in proportion tothe allocated share units.

(b) Collect the contribution to the sinking fund from parcelowners.

(c) Authorize expenditure for the carrying out of themaintenance and management of the parcels.

(d) Recover from the parcel owner any sum expended by JMB.(e) Purchase, hire or acquire movable property for use by the

parcel owners.(f) Employ or arrange and secure the services of any person or

agent.(g) Make additional by-laws.(h) To do all things reasonably necessary

93

FINAL

SR DR TAN LIAT CHOON

Page 94: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 21

Kewajipan badan pengurusan bersama

(a) Menyenggarakan dan menguruskan bangunan atau tanah yangdicadangkan untuk dipecah bahagi.

(b) Menentukan dan mengenakan Caj yang kena didepositkan kedalam akaun penyenggaraan (maintenance fee).

(c) Menentukan dan mengenakan caruman kepada kumpulan wangpenjelas (sinking fund).

(d) Menginsuranskan bangunan (harta bersama).(e) Mematuhi notis atau perintah PBT.(f) Menyediakan dan menyenggarakan suatu daftar bagi kesemua

pemunya bangunan atau tanah.(g) Memastikan akaun diaudit.(h) Menguatkuasakan undang-undang kecil (by-laws).(i) Melakukan banda-benda lain yang difikirkan sesuai dalam

menyelengarakan bangunan atau tanah.94

FINAL

SR DR TAN LIAT CHOON

Page 95: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Seksyen 21

Kuasa badan pengurusan bersama

(a) Memungut Caj daripada pemunya petak mengikut kadar unit syer.(b) Memungut caruman kepada kumpulan wang penjelas (sinking

fund).(c) Membenarkan perbelanjaan bagi menjalankan penyenggaraan dan

pengurusan petak.(d) Mendapatkan daripada mana-mana pemunya petak jumlah wang

yang dibelanjakan oleh JMB.(e) Membeli, menyewa atau memperolehi harta alih bagi kegunaan

pemunya petak.(f) Mengambil atau mengatur dan mendapatkan perkhidmatan ejen

pengurusan.(g) Membuat undang-undang kecil tambahan (by-laws).(h) Melakukan perkara yang semunasabahnya perlu. 95

FINAL

SR DR TAN LIAT CHOON

Page 96: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

96

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 4 (Section 29-31)

✓ Miscellaneous provisions applicable to this Part29)Duty of developer in respect of charges for building or land intended

for subdivision into parcels completed before commencement of thisAct (Development area completed before the Act, no MC, six monthsafter the establishment of JMB, submit to COB an audited account)

30)Register of parcel owners (Prepare and maintain the register whichcontain the allocated share units, floor area, owner name andaddress etc.)

31)Right of parcel owner or prospective purchaser (Owner can pay fee≤RM50 to get certified information such as maintenance fee orsinking fund)

FINAL

SR DR TAN LIAT CHOON

Page 97: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

97

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 4 (Section 32-34)

✓ Miscellaneous provisions applicable to this Part32)By-laws for building or land intended for subdivision into parcels

(Developer, JMB, MC can make by-laws within their management periodwithin 14 days to COB, matters regarding safety and security, commonproperty, keeping of pets, parking, floor coverings, refuse control,behaviour, architectural and landscaping, imposition fine ≤RM200)

33)Recovery of sum as a debt due to joint management body (JMB power tocollect fee, owner responsible to pay fee, JMB can bring to court orTribunal as any debt)

34)Procedure on recovery of sums due (Serve a written notice, if remainsunpaid, after 14 days of notice, may file a summons or claim in court)

FINAL

SR DR TAN LIAT CHOON

Page 98: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

98

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFORE EXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 4 (Section 35-36)

35)Recovery of sums by attachment of movable property (Issue awarrant in Form A-Third Schedule, COB request assistance of police,make an inventory of property in Form B-Third Schedule, owner after14 days may apply to court, after 14 days, property attached shall besold by action)

36)Moneys not required for immediate use (more than RM5000, put inFD)

FINAL

SR DR TAN LIAT CHOON

Page 99: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

99

PART IV (CHAPTER 1 -5): STRATA MANAGEMENT BEFOREEXISTENCE OF MANAGEMENT CORPORATION(SECTION 7-45)

▪ CHAPTER 5 (Section 37-45)

✓ Transitional and saving provisions due to the repeal of the Building andCommon Property (Maintenance and Management) Act 2007 [Act 663]

37) References to repealed Act and savings provision38) Existing body and committee (Establishment of JMB under Act 663 shall be

deemed to have been established under Act 757)39) Existing managing agent (Shall continue)40) Existing accounts or funds (Shall continue)41) Incumbent commissioner of Buildings and other officers (Shall continue to

hold such office)42) Existing notices, orders, etc. (Shall continue)43) Pending applications, etc. (Shall consider as filed document)44) Pending appeals (Shall continue)45) Existing regulations (Shall continue in force)

FINAL

SR DR TAN LIAT CHOON

Page 100: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

100

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 1 (Section 46)

✓General • Shall apply to a development area, where before or after the

commencement of the proposed Act, vacant possession of aparcel in a building or land intended for subdivision into parcelsor in a subdivided building or land has been delivered by thedeveloper to a purchaser and the Management Corporation(MC) has come into existence.

FINAL

SR DR TAN LIAT CHOON

Page 101: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

101

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 2 (Section 47-49)✓General Management by developer before first annual

general meeting of MC47)Application

o Shall apply to a development area specified where no jointmanagement body is established for the development area

48)Duties and powers of developer to maintain and manage Maintainand manage properly the subdivided building or land and commonproperty)

49)Restrictions during preliminary management period (shall notborrow moneys or give securities, enter any contract extendingbeyond the management period)

FINAL

SR DR TAN LIAT CHOON

Page 102: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

102

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 2 (Section 50-52)✓General Management by developer before first annual

general meeting of MC50)Developer to establish maintenance account in the name of MC (On

the date of the Act if VP of a parcel was delivered before the Act,; Atany time before the delivery of VP, if VP of a parcel is delivered afterthe Act and after the MC came into existence; within 14 days fromthe date the MC comes into existence, if VP of a parcel is deliveredafter the Act and before the MC come into existence and if no JMB isestablished)

51)Developer to establish sinking fund account in the name of MC (astogether with maintenance account)

52)Proprietors to pay charges, and contribution to the sinking fund(Proprietor shall be the maintenance fee and sinking fund)

FINAL

SR DR TAN LIAT CHOON

Page 103: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

103

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 2 (Section 53-55)✓General Management by developer before first annual

general meeting of MC53)Prohibition on collection of moneys for maintenance from

proprietors (Cannot collect maintenance fee and sinking fundwithout opening an account, and VP of the parcel has beendelivered to the proprietor)

54)Duties of developer in relation to accounts55)Handing over of control to MC (Developer not later than the

date of expiry of the management period transfer the moneysinto maintenance and sinking fund account to MC and etc.)

FINAL

SR DR TAN LIAT CHOON

Page 104: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

104

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 3 (Section 56-58)

✓ Management after first annual general meeting of the MC56) Management committee (Perform the MC duties)57) Duty of developer to convene first annual general meeting

(Developer to convene 1st AGM of MC within 1 month afterthe expiration of the initial period)

58) First annual general meeting of MC (To determine committeemembers, budget, charge, contribution, interest rate, auditedaccounts, insurance, make by-laws etc.)

FINAL

SR DR TAN LIAT CHOON

Page 105: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

105

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 3 (Section 59-62)

59) Duties and powers of MC (Duties-Maintain building andcommon property, charges, contributions, insurance, noticeauthority, strata roll, audited statements, by-laws etc. Powers-charge, contribution, expenditure, interest, movable property,agent, by-laws, borrow moneys, repayment moneys, etc.

60) Maintenance account of the MC61) Sinking fund account of the MC62) Duties of MC in relation to accounts (Audit, reports, COB)

FINAL

SR DR TAN LIAT CHOON

Page 106: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

106

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 4 (Section 63-65)

✓ Subsidiary management corporation and limited commonproperty63)Administration of the subsidiary management corporation

(Subsidiary management committee, proprietor of exclusive benefitthe limited common property, same as MC, 1 member in MC)

64)Duties and powers of subsidiary management corporation (Same asMC but only for limited common property, cannot make by-lawsagainst the MC)

65)Expenses of subsidiary management corporation (Contributioncalculated as share unit of a parcel / aggregate share units of allparcels X total contribution determine)

FINAL

SR DR TAN LIAT CHOON

Page 107: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

107

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 4 (Section 66-69)

✓ Subsidiary management corporation and limited common property66)Maintenance account of subsidiary management corporation67)Sinking fund account of subsidiary management corporation68)Proprietors to pay charges, and contribution to the sinking fund, to

subsidiary management corporation69)Judgments against management corporation relating to limited

common property

FINAL

SR DR TAN LIAT CHOON

Page 108: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

108

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 5 (Section 70-75)

✓ Miscellaneous provision applicable to this Part70)By-laws for regulation of subdivided building or land (Safety and security,

keeping of pets, parking, floor coverings, refuse control, behaviour,architectural and landscaping)

71)By-laws for limited common property (By-laws MC shall apply to SMC)72)Strata roll (Prepare strata rolls containing share units, floor area, name

and address of proprietor)73)Right of proprietor or prospective proprietor (Can obtain the MC/SMC

info)74)Acquisition of additional land, grant and acceptance of easements, etc.

(Can buy property outside the lot)75)Rating (by authority)

FINAL

SR DR TAN LIAT CHOON

Page 109: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

109

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 5 (Section 76-80)

✓ Miscellaneous provision applicable to this Part76) Appointment of administrator for management corporation (If instruct by

court)77) Recovery of sum as a debt due to management corporation or subsidiary

management corporation (MC/SMC power to collect fee, owner responsibleto pay fee, MC/SMC can bring to court or Tribunal as any debt)

78) Procedure for recovery of sums due (Serve a written notice, if remainsunpaid, after 14 days of notice, may file a summons or claim in court)

79) Recovery of sums by attachment of movable property (Issue a warrant inForm A-Third Schedule, COB request assistance of police, make an inventoryof property in Form B-Third Schedule, owner after 14 days may apply tocourt, after 14 days, property attached shall be sold by action)

80) Moneys not required for immediate use (more than RM5000, put in FD)

FINAL

SR DR TAN LIAT CHOON

Page 110: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

110

PART V (CHAPTER 1 -6): STRATA MANAGEMENT AFTER EXISTENCE OF MANAGEMENT CORPORATION(SECTION 46-85)

▪ CHAPTER 6 (Section 81-85)

✓ Transitional and saving provisions due to consequentialamendments to the Strata Titles Act 198581) Existing managing agent (Before Act shall continue to be

agent)82) Existing maintenance fund or special account (Before Act

shall continue and be deemed to have been established)83) Existing notices, orders, etc. (Shall continue)84) Pending applications, etc. (Shall consider as filed document)85) Existing rules (Shall continue inforce)

FINAL

SR DR TAN LIAT CHOON

Page 111: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

111

PART VI : MANAGING AGENT (SECTION 86-91)

▪ The provisions relating to the managing agent

86) Appointment of managing agent by commissioner (If MC fail to appoint)87) Independence of managing agent (Shall not be appointed as agent if has

professional or pecuniary interest)88) Managing agent to lodge bond 89) Powers and duties of managing agent (Duties as required by MC/SMC)90) Developer not to be relieved of his obligations to carry out repairs, etc.91) Termination of management agreement (Shall submit unaudited

accounts to COB within 1 month and audited accounts to COB within 3 months)

FINAL

SR DR TAN LIAT CHOON

Page 112: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

112

PART VII : DEPOSIT TO RECTIFY DEFECTS(SECTION 92)

92) Developer to pay deposit to rectify defects on common property

✓ Seeks to require the developer to pay deposit to rectify defects in the common property of the development area after the completion of the common property

FINAL

SR DR TAN LIAT CHOON

Page 113: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

113

PART VIII : INSURANCES(SECTION 93-100)

▪ Provisions on insurances

93) Duty to insure buildings94) Amount to be insured95) Insurance where area cannot be separated from main premises of

building (MC shall responsible instead of SMC)96) Insurance where area can be separated from main premises of building

(SMC shall responsible)97) Land parcels (Shall responsible by proprietor)98) Other insurances99) Insurable interest100)Obligation to rebuild (Moneys payments by inserer shall me

immediately applied in rebuilding, replacing, repairing or restoring the building)

FINAL

SR DR TAN LIAT CHOON

Page 114: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

114

PART IX (CHAPTER 1-6): DISPUTES AND STRATAMANAGEMENT TRIBUNAL(SECTION 101-124)

▪ CHAPTER 1 (Section 101)✓General

• Contains the definitions of certain words and expressions used in this Part

▪ CHAPTER 2 (Section 102-104)✓ Establishment and organization

• Establishment of Tribunal• Members, terms of office and allowances• Secretary, officers and staff

FINAL

SR DR TAN LIAT CHOON

Page 115: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

115

PART IX (CHAPTER 1-6): DISPUTES AND STRATA MANAGEMENT TRIBUNAL(SECTION 101-124)

▪ CHAPTER 3 (Section 105-107)• Jurisdiction of Tribunal• Exclusion of jurisdiction of court• Persons entitled to file a claim

▪ CHAPTER 4 (Section 108-116)✓ Conduct of proceedings

• Claim to be in prescribed form• Sittings of tribunal• Right to appear at hearings• Proceedings to be public• Negotiation for settlement• Equal treatment of parties• Determination of rules and procedure• Hearings• Appointment of expert by tribunal

FINAL

SR DR TAN LIAT CHOON

Page 116: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

116

PART X : ENFORCEMENT(SECTION 125-141)

▪ Contains the enforcement provision

✓ Power of investigation✓ Search and seizure with warrant✓ Search and seizure without warrant✓ Access to computerized data✓ List of things seized✓ Released of things seized✓ Power to require attendance of person acquainted with case✓ Examination of person acquainted with case✓ Obstruction

FINAL

SR DR TAN LIAT CHOON

Page 117: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

117

PART X (CHAPTER 1-6): ENFORCEMENT(SECTION 125-141)

▪ Contains the enforcement provisions✓ Power of investigation✓ Search and seizure with warrant✓ Search and seizure without warrant✓ Access to computerized data✓ List of things seized✓ Released of things seized✓ Power to require attendance of person acquainted with case✓ Examination of person acquainted with case✓ Obstruction✓ Requirement to provide translation✓ compounding of offences✓ Prosecution✓ Jurisdiction of the Magistrate’s court✓ Joinder of offences✓ Protection of informers✓ Offences by body corporate✓ continuing offences

FINAL

SR DR TAN LIAT CHOON

Page 118: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

118

PART XI : MISCELLANEOUS(SECTION 142-153)

▪ Contains the miscellaneous provisions

✓ Evidential provisions✓ Representation in proceedings✓ service of notice or order✓ Protection against suits and legal proceedings✓ Public Authorities Protection Act 1948✓ Public servant✓ Non-application of other written laws, contracts and deeds✓ contracting out prohibited✓ Regulations✓ Power to exempt✓ Amendment of schedules✓ Repeal

FINAL

SR DR TAN LIAT CHOON

Page 119: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

119

FIRST SCHEDULE Formula for the computation of the allocated share units of parcels in relation to building or land intended for subdivision into parcels(Section 8)

SECOND SCHEDULE Provisions for JMB, MC & SUB-MC[Subsection 22(2), 56(2) or 63(5)]

THIRD SCHEDULE

FORM AWARRANT OF ATTACHMENT[Subsection 35(1) and 79(1)]

FORM BNOTICE AND INVENTORY[Paragraph 35(4)(b) and 79(4)(b)]

FOURTH SCHEDULE

PART1JURISDICTION OF THE TRIBUNAL[Subsection 105(1)]PART 2ORDERS OF THE TRIBUNAL[Subsection 117(3)]

FINAL

SR DR TAN LIAT CHOON

Page 120: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Overview Of Strata Management Act 2013 (Act 757)

Miscellaneous:

• Evidential provisions• Representation in proceedings• service of notice or order• Protection against suits and legal proceedings• Public Authorities Protection Act 1948• Public servant• Non-application of other written laws, contracts and deeds• contracting out prohibited• Regulations• Power to exempt• Amendment of schedules• Repeal

120

FINAL

SR DR TAN LIAT CHOON

Page 121: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Strata Titles Ordinance 1995 (Law Of Sarawak) VS Strata Management Act 2013• Similarity between Strata Titles Ordinance 1995 and Strata

Management Act 2013 or Strata Titles Act 1985

121

Details Strata Titles Ordinance 1995 Strata Titles Act 1985/ Strata

Management Act 2013Establishment of

corporation

Original proprietor duty to convene the

first annual general meeting of the

management corporation within ninety

days from the date the management

corporation is constituted (Subsection 23

(4))

Developer to convene the first annual

general meeting of the management

corporation within one month after

the expiration of the initial period.

(Subsection 57 (1))

Ownership of

common property

and custody of

issue document of

title

The management corporation upon its

establishment shall become the proprietor

of the common property and the

custodian of the issue document of title.

(Subsection 24 (1))

The management corporation shall

become the proprietor of the common

property and the custodian of the issue

document of the lot. (Subsection 17B

(1) Strata Titles Act 1985)

FINAL

SR DR TAN LIAT CHOON

Page 122: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

122

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Duties of

corporation

To control, manage and administer the

common property; to keep the common

property in good repair. (Section 26)

To properly maintain and manage the

subdivided building or land and the

common property and keep it in a

state of good and serviceable repair.

(Section 59)

Power of

corporation

-To recover from any subsidiary

proprietor any sum expended by the

management corporation.

- To purchase, hire or otherwise acquire

movable property for use by the

subsidiary proprietors in connection with

their enjoyment of the common

property. (Section 26)

-To recover from any proprietor any

sum expended by the management

corporation.

-To purchase, hire or otherwise

acquire movable property for use by

the proprietors in connection with

their use and enjoyment of the

common property. (Section 59)

FINAL

SR DR TAN LIAT CHOON

Page 123: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

By-laws Management corporation may by

special resolution make bylaws (not

being inconsistent with the bylaws

contained in the Third Schedule) for

regulating the control, management,

administration, use and enjoyment of

the building.

(Section 29)

Management corporation may by

special resolution make additional

by-laws or make amendments to

such additional by-laws for regulating

the control, management,

administration, use and enjoyment

of the subdivided building or land

and the common property (Section

70)The management

fund

Management corporation shall establish

a fund for administrative for the

purposes of controlling, managing and

administering the common property,

paying rent, rates and premiums of

insurance and discharging any other

obligation of the corporation. (Section

31)

The management corporation shall

open and maintain a maintenance

account in the name of management

corporation, with the purposes of

maintain the common property,

paying for the expenses, paying any

premiums for the insurance and

others. (Section 60)

123

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 124: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Acquisition of

additional land

and grant and

acceptance of

easements

The management corporation if

authorized by unanimous resolution

may acquire land outside the lot to be

used for purposes connected with the

building; grant or accept the burden of

an easement imposed on the lot for the

benefit of some other land; accept the

benefit of an easement imposed in

favour of the lot on some other land.

(Section 31)

The management corporation if

authorized by unanimous resolution

may acquire land outside the lot to

be used for purposes connected with

the subdivided building or land;

grant or accept the burden of an

easement imposed on the lot for the

benefit of some other land; accept

the benefit of an easement imposed

in favour of the lot on some other

land. (Section 74)

124

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 125: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Rating The management corporation shall

within one month after its

establishment, or within such further

period as the rating authority may allow,

supply the rating authority with two

copies of the certified plan of the

building and with the names and

addresses of the council of the

corporation.

(Section 33)

The management corporation shall

within one month after its

establishment, or within such further

period as the rating authority may

allow, supply the rating authority

with two copies of the certified

strata plan in respect of the

subdivided building or land and with

names and address of the members

of the management committee.

(Section 75)

125

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 126: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

126

Details Strata Titles Ordinance 1995 Strata Titles Act 1985

Termination of

subdivision

The management corporation, where the

building is totally destroyed; or the

subsidiary proprietors seek to demolish

the building or, in the case of a building

which has been partially destroyed, the

remaining parts of the building; or there is

only one subsidiary proprietor, may be

directed by unanimous resolution to take

action to terminate the subdivision of

building if so directed shall lodge with the

Registrar a notification in Form 6 in the

First Schedule, together with the issue

documents of title of the lot and the

parcels. (Section 36)

The management corporation, where

the building is totally destroyed; or the

subsidiary proprietors seek to demolish

the building or, in the case of a building

which has been partially destroyed, the

remaining parts of the building; or

there is only one subsidiary proprietor,

after make sure that no land revenue is

outstanding may be directed by

unanimous resolution to take action to

terminate the subdivision of building if

so directed shall lodge with the

Registrar a notification in Form 6 in the

First Schedule, together with the issue

documents of title of the lot and the

parcels. (Section 57 Strata Titles Act

1985)

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 127: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Titles Act 1985

Rights of subsidiary

proprietor in his

parcel and in

common property

In relation to his parcel, the powers

conferred by the Land Code on a

proprietor in relation to his land.

In relation to the common property, the

right of user which he would have had if

he and the other subsidiary proprietors

were co-proprietors thereof. (Section 37)

In relation to his parcel (parcel

proprietor), the powers conferred by

the National Land Code on a

proprietor in relation to his land.

In relation to the common property,

the right of user which he would have

if he and the other proprietors were

co-proprietors thereof. (Section 34

Strata Titles Act 1985)Rights of support,

service and shelter

Each subsidiary proprietor shall be

entitled to have his parcel sheltered by all

such parts of the subdivided building as

are capable of affording shelter and may,

for the purpose of replacing, renewing or

restoring any such shelter, enter upon the

common property or any other parcel.

(Section 38)

Each parcel proprietor shall be entitled

to have his parcel sheltered by all such

parts of the subdivided building or land

as are capable of affording shelter and

may, for the purpose of replacing,

renewing or restoring any such shelter,

enter upon the common property or

any other parcel. (Section 35 Strata

Titles Act 1985) 127

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 128: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Titles Act 1985Restriction on

voting rights

Where a subsidiary proprietor is for any

reason unable to control his property,

the powers of voting conferred on him

by the Second Schedule shall be

exercisable by the person who is for the

time being authorized by law to control

that property. (Section 39)

Where a subsidiary proprietor is for

any reason unable to control his

property, the powers of voting

conferred on him by the Strata

Management Act 2013 shall be

exercisable by the person who is for

the time being authorized by law to

control that property. (Section 37

Strata Titles Act 1985)

128

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 129: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

129

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

Details Strata Titles Ordinance 1995 Strata Titles Act 1985

Power of Court

where no person

able to vote in

respect of a parcel

Where the Court, on the application of

the management corporation or a

subsidiary proprietor, is satisfied that

there is no person or body able to vote

in respect of a parcel, the Court shall, in

cases where a unanimous resolution is

required by this Part; and may, in any

other case, appoint the Amanah Raya

Berhad, a corporation incorporated

under the Public Trust Corporation Act

1995 or some other fit and proper

person or body to exercise such of the

powers of voting attached to the parcel

by the Second Schedule. (Section 40)

Where the court of competent

jurisdiction on the application of the

management corporation or a

proprietor, is satisfied that there is

no person who is able to vote in

respect of a parcel, the court shall in

cases where a unanimous resolution

is required; may. In any other case

appoint a Public Trustee or some

other fit and proper person to

exercise such of the powers attached

to the parcel by the Strata

Management Act 2013. (Section 38,

Strata Titles Act 1985)

FINAL

SR DR TAN LIAT CHOON

Page 130: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

130

Similarity between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Second Schedule Second Schedule of this Act is about

Rules of the Management Corporation.

(related to Section 23, 39, 40 and 43)

Second Schedule in the Strata

Management Act 2013 is about

Provisions for Management

Corporation. (related to subsection

22(2), 56(2) and 63(5))

Third Schedule Third Schedule in this Act is By-laws For

The Regulation Of Subdivided Buildings.

(related to Section 29 and 43)

Third Schedule of Strata

Management (Maintenance and

Management) Regulation 2015 is By-

Laws

(related to Regulation 5 and 28)

(related to Section 32, 70 and 71 in

Strata Management Act)

FINAL

SR DR TAN LIAT CHOON

Page 131: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Establishment of

corporation

If the original proprietor fails to

comply first annual general meeting,

he shall be guilty of an offence and

liable on conviction to a fine not

exceeding five thousand ringgit.

(Subsection 23 (5))

Any developer fails to comply to

convene first annual general

meeting, shall commits an offence

to a fine not exceeding two hundred

and fifty thousand ringgit or to

imprisonment for a term not

exceeding three years or to both.

(Subsection 57 (2))Pre-existing

contracts

The rights and liabilities of the

original proprietor in a contract

touching a subdivided building

devolve upon the management

corporation on its establishment.

(Section 25)

All the records will be handing over

of control to management

corporation. (Section 55)

All right, power or remedy or any

liability imposed on joint

management body shall vest in the

management corporation on the

date of the expiry. (Section 28)

131

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 132: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Duties of the corporation -to pay the rent of the lot

(Section 26).

-To insure the building to its

replacement value against fire

and keep it so insured directed

by unanimous resolution.

(Section 26)

-imposed parcel rent and

management corporation only

pay any relevant rent and rates.

(Section 50 (3))

-To effect insurance according

to this Act to insure against

other risks by special resolution

direct. (Section 50 (3))

Powers of the corporation - No power in collect charges

and contribution to the sinking

fund.

-To collect charges and

contribution to the sinking

fund from the proprietors in

proportion to the share units

or provisional share units.

(Section 59 (2))

132

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 133: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Appointment of administrator

for the corporation

Application of the

management corporation, a

subsidiary proprietor or any

other person or body having an

interest in a parcel may appoint

an administrator for the

corporation (Section 27).

Discharge a local authority

appointed for the exercise of

the duties, powers and

functions imposed on a

management corporation if the

Minister is satisfied (Section

27A)

Management corporation

administer by management

committee which shall perform

the management corporation’s

duties and conduct the

management corporation’s

business on behalf and may

exercise any of the

management corporation’s

powers. (Section 56)

133

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 134: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Titles Act 1985

Service of documents Management corporation shall

cause to be conveniently

available at or near the front of

the building a receptacle

suitable for the purposes of

postal delivery, with the name

of the management

corporation clearly designated

thereon. (Section 34)

The management corporation

established shall be known by

the name appearing in the

book of the strata register

relating to a subdivided

building or land, and shall be a

body corporate. (Strata Titles

Act 1985, Section 17).

134

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 135: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

135

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Power of Court

where building

damaged

Where a subdivided building is damaged

but is not totally destroyed, the Court on

the application of the management

corporation, a subsidiary proprietor or the

registered chargee of any parcel may by

order settle a scheme for the reinstatement

or continued use of the building in whole or

in part; and any such scheme may include

provision for the transfer of the interests of

subsidiary proprietors of parcels which

have been wholly or partially destroyed to

the other subsidiary proprietors in

proportion to their share units.

(Section 36)

The amount of expenditure of

any money expended by the

management corporation in

performing the repairs, work or

act shall be recoverable by it

from that person as a debt in

an action in any court of

competent jurisdiction or

before the Tribunal. (Section

59)

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 136: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Titles Act 1985/ Strata

Management Act 2013Legal Proceeding Applications to the Court under

this Part shall be by originating

summons, and the Rules of

High Court 1980 relating to

proceedings begun by

originating summons shall

apply to such application.

(Section 41)

Every application to the court

under the Act shall be

summons in Chambers.

(Section 75 Strata Titles Act)

Penalties Person who shall be guilty of

an offence: Penalty,

imprisonment for one year and

a fine of two thousand ringgit.

(Section 42)

Maximum fine in Strata

Management Act is less than

RM250,000; less than 3 years

imprisonment; or both

136

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 137: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Subsidiary

legislation

The Yang di-Pertua Negeri may make rules generally

for carrying out the provisions of this Ordinance

and, in particular, such rules may provide for

amending the Forms in the First Schedule and

prescribing new Forms in respect of any matter to

be done under this Ordinance; or amending the

Second and Fourth Schedules and prescribing all

matters relating to the establishment of

management corporations and regulating the

division and amalgamation of parcels. (Section 43)

The Minister may from time to

time, after consultation with

the National Council for Local

Government, by order

published in the Gazette,

amend any of the Schedules.

The Minister may make such

incidental, consequential or

supplementary provision as

may be necessary or

expedient. (Section 152)Repeal and

Saving

The Strata Titles Ordinance, 1974 [Ord. No. 3/74], is

repealed. (Section 44)

The Building and Common

Property (Maintenance and

Management) Act 2007 (Act

663) is repealed. (Section 153)

137

Difference between Strata Titles Ordinance 1995 and Strata Management Act 2013 or Strata Titles Act 1985

FINAL

SR DR TAN LIAT CHOON

Page 138: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

Details Strata Titles Ordinance Strata Management Act 2013

Composition

of council,

election of

members and

tenure of

office

The council shall consist of not less

than three (3) nor more than

seven (7) proprietors, who shall be

elected at each annual general

meeting and shall cease to hold

office at the next annual general

meeting.

Every management corporation shall have a

management committee which shall consist

of such number of persons not less than

three (3) and not more than fourteen (14)

natural persons (include the any member of

Subsidiary Management Committee) as the

management corporation may determine in

a general meeting.Re-election Members of the Council shall be

eligible for re-election or

reappointment.

All members of the management committee

shall retire from office at the conclusion of

the next annual general meeting. A retiring

member of the management committee

shall be eligible for re-election but no

member of management committee shall

hold office for more than three consecutive

terms.

138

FINAL

SR DR TAN LIAT CHOON

Page 139: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance Strata Management Act 2013

Meetings of

council

The council shall meet at such

times and places and at such

intervals as it thinks fit

The council shall meet at such times and

places and at such intervals as the chairman

may decide, but shall not allow more than

two months to lapse between the meetings.

Procedure at

meetings of

council

-Questions arising at meetings

shall be decided by simple

majority vote.

-Every meeting of the council shall

be presided over by a chairman,

who shall be elected from among

themselves by the members of the

council present at the meeting and

who shall have a casting as well as

an original vote.

-Questions arising at meetings shall be

decided by simple majority vote, if on any

question to be determined by the

management committee there is equality of

votes the chairman shall casting a vote.

-Every meeting shall be presided over by the

chairman of the management committee,

and in the absence of the chairman, the

members of the management committee

who are present may elect one of them to

chair such meeting.

139

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

FINAL

SR DR TAN LIAT CHOON

Page 140: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

140

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

Details Strata Titles Ordinance Strata Management Act 2013

Delegation of

council’s

powers and

duties

Subject to any restriction imposed or

direction given by the corporation at a

general meeting, the council may

delegate to any one or more of its

members the exercise of any of its powers

or the performance of any of its duties;

and revoke the delegation at any time.

No delegation powers are allowed for

management corporation.

Minutes and

accounts

The council shall

(1) cause proper books of account to be

kept in respect of all sums of money

received and expended by it specifying

the matters in relation to which the

receipts and expenditure take place;

(2) on the application of a proprietor or

chargee of a parcel (or any person

authorized in writing by him) make the

books of account available for inspection

at all reasonable times.

The management committee shall

(1) cause to be prepared account and records of

accounts and enable true and fair balance

sheet, income and expenditure statement

profit and loss statement to be prepared;

(2) on the application of a proprietor or chargee

of a parcel or a proprietor of a provisional block

(or any person authorized in writing by him)

make the books of accounts available for

inspection during office hours of the

management corporation with a fee not

exceeding fifty ringgit for each inspection.

FINAL

SR DR TAN LIAT CHOON

Page 141: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

141

Details Strata Titles Ordinance Strata Management Act 2013

Annual general

meetings

The first annual general meeting shall

be held within three months after the

establishment of the corporation and

subsequent annual general meetings

shall be held once in each year,

provided that not more than fifteen

months shall elapse between the date

of one annual general meeting and the

next.

The first annual general meeting shall be held

within one month after the after the expiry

of the initial period and subsequent annual

general meetings shall be held once in each

year, provided that not more than fifteen

months shall elapse between the date of one

annual general meeting and the next.

Notice of

general

meeting

Seven days’ notice of any general

meeting, specifying the place, date and

hour of the meeting and the general

nature of the business to be transacted,

shall be given to every proprietor and

every first chargee of a parcel in the

building.

At least fourteen days’ notice of any general

meeting shall be given to every proprietor

shall include the place, date and time for the

meeting; each proposed resolution to be

considered at the meeting and a notification

to each proprietor of his voting rights and

that he may vote in person or by proxy at the

meeting.

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

FINAL

SR DR TAN LIAT CHOON

Page 142: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

142

Details Strata Titles Ordinance Strata Management Act 2013Quorum at

general

meeting

One-half of the persons entitled to vote

shall constitute a quorum at a general

meeting. If within half an hour after the

time appointed for a general meeting a

quorum is not present, the meeting shall

stand adjourned to the same day in the

next week at the same place and time;

and, if at the adjourned meeting a quorum

is not present within half an hour after the

time appointed for the meeting, those

persons entitled to vote who are present

shall constitute a quorum.

One half of the proprietors entitled to

vote present either in person or by proxy,

shall constitute quorum at general

meeting. If within half an hour the time

appointed for a general meeting, a

quorum is not present, those proprietors

entitled to vote who are present shall

constitute a quorum.

Chairman of

general

meeting

Every general meeting shall be presided

over a chairman, who shall be elected from

among themselves by those persons

present who are entitled to vote.

Every general meeting shall be presided

over by a chairman, who shall be elected

by those proprietors present who are

entitled to vote among proprietors and

the chairman shall preside over such

meeting until its conclusion.

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

FINAL

SR DR TAN LIAT CHOON

Page 143: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

143

Details Strata Titles Ordinance Strata Management Act 2013

Proxies An instrument appointing a proxy (who

need not be a proprietor) shall be in

writing under the hand of the person

making the appointment or his attorney,

and may be either general or for a

particular meeting.

An instrument appointing a proxy who

need not be a proprietor shall be in

writing under the hand of the proprietor

making the appointment or his attorney,

and may be either general for a particular

meeting; if the proprietor appointing the

proxy is a company, society, statutory

body or any other body, under seal or

under the hand of an office or its

attorney duly authorized.

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

FINAL

SR DR TAN LIAT CHOON

Page 144: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Voting rights of

proprietors

Each proprietor who is not a co-proprietor

shall have one vote on a show of hands

and on a poll shall have such number of

votes as corresponds with the number of

the share units attaching to his parcel.

Except where a unanimous resolution is

required, no proprietor shall be entitled to

vote at a general meeting unless all

contributions to the management fund of

the corporation in respect of his parcel

have been duly paid

Each proprietor who is not a co-

proprietor shall have one vote in respect

of each parcel in a show of hands and on

a poll, shall have such number of votes as

that corresponding with the number of

share unit or provisional share units

attached to his parcel or provisional

block.

A proprietor not entitled to vote if on the

seventh day before the date of the

meeting, all or any part of the Charges, or

contribution to the sinking fund are in

arrears.

144

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

FINAL

SR DR TAN LIAT CHOON

Page 145: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

145

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Differences)

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Special

resolution

A special resolution of the corporation is a

resolution passed at a general meeting of

which at least fourteen days’ notice

specifying the proposed special resolution

has been given by proprietors who are

together entitled to not less than three-

quarters of the share units and who

together constitute not less than three

quarters of the membership.

A special resolution means a resolution

which passed at a duly convened general

meeting of which at least twenty-one

days’ notice specifying the proposed

resolution has been given, and carried by

a majority consisting of not less than

three-quarters of the valid votes cast at

the general meeting by a show of hands,

or if a poll is demanded and taken, by a

majority consisting of not less than three-

quarters in number of the valid votes cast

on such poll.

FINAL

SR DR TAN LIAT CHOON

Page 146: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Meeting of council Provided that any member of the

council may convene a meeting by

appointing a date for the meeting

and giving the other members not

less than seven days’ notice of the

date appointed.

Notice of every meeting shall be

given to all members of the

management committee not less

than seven days before the date

appointed for the meeting.

Procedure at

meetings of

council

Except where there is only one

proprietor, a quorum at meetings of

the council shall be.

Except where there is only one

proprietor, a quorum at meetings of

the council shall be.Council’s power to

employ agents and

servants

The council may employ for and on

behalf of the corporation such agents

and servants as it thinks fit in

connection with the exercise of the

powers and the performance of the

duties of the corporation.

The management committee may

employ on behalf of the

management corporation such

agents and servants as it thinks fit in

connection with the exercise of the

powers and the performance of the

duties of the management

corporation in a yearly basis.

146

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Similarities)

FINAL

SR DR TAN LIAT CHOON

Page 147: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Minutes and

accounts

The council shall keep minutes of its

proceedings and shall cause minutes

to be kept of general meetings.

The management committee shall

keep minutes of its proceedings and

minutes of general meetings.Annual general

meetings

The corporation shall hold an annual

general meeting for the

consideration of accounts, the

election of the council and the

transaction of such other business as

may arise.

The management corporation shall

hold an annual general meeting for

the consideration of accounts,

election of the management

committee and the transaction of

such other business as may arise.

147

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Similarities)

FINAL

SR DR TAN LIAT CHOON

Page 148: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

148

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Extraordinary

general meetings

A general meeting other than the

annual general meeting shall be

known as an extraordinary general

meeting. The council shall convene

an extraordinary general meeting

upon a requisition in writing made by

proprietors who are together entitled

to at least twenty-five per cent of the

share units.

A general meeting of the

management corporation other than

annual general meeting known as the

extraordinary general meeting. The

management committee shall

convene an extraordinary general

meeting upon a requisition in writing

made by proprietors who are

together entitled to at least one

quarter of the aggregate share units.Manner of

deciding questions

at general

meetings

A resolution at a general meeting

shall be decided on a show of hands

unless a poll is demanded by a

proprietor or his proxy.

Any matter that requires a decision at

a general meeting shall be decided

on a show of hands unless a poll is

demanded by a proprietor or his

proxy.

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Similarities)

FINAL

SR DR TAN LIAT CHOON

Page 149: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

149

Second Schedule Strata Titles Ordinance 1995 VS Strata Management Act 2013 (Similarities)

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Voting rights of co-

proprietors

Co-proprietors may vote by means of a

jointly appointed proxy.

In the absence of a proxy, co-

proprietors shall not be entitled to vote

on a show of hands except where a

unanimous resolution is required,

provided that any one co-proprietor

may demand a poll.

Co-proprietors may vote by means of a

jointly appointed proxy or by

appointing anyone of them or any other

person.

In the absence of a proxy, co-

proprietors shall not be entitled to vote

on a show of hands except where a

unanimous resolution is required,

provided that any one co-proprietor

may demand a poll.Common seal The common seal of the corporation

shall not be used except on the

authority of the council previously

given and in the presence of at least

two members of the council, who shall

sign the instrument to which the seal is

affixed

The common seal of the management

corporation shall not be used except on

the authority of the management

committee previously given and in the

presence of at least two members of

the council, who shall sign the

instrument to which the seal is affixed.

FINAL

SR DR TAN LIAT CHOON

Page 150: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Access to

parcels

The proprietor shall permit the corporation

and its agents at all reasonable times and on

giving reasonable notice (or, in an emergency,

without notice) to enter his parcel for the

purpose of inspecting the parcel; maintaining,

repairing or renewing pipes, wires, cables and

ducts used or capable of being used in

connection with the enjoyment of any other

parcel or the common property; maintaining,

repairing or renewing the common property;

or executing any work or doing any act

reasonably necessary for or in connection

with the performance of its duties or the

enforcement of these by-laws affecting the

building.

The person or body carry out

the inspection of the effected

parcel or any other parcel,

common property or limited

common property or in carry

out the works to rectify the

inter floor leakage, shall have

access to the affected parcel,

any other parcel, common

property or limited common

property on seven days’

written (Regulation 63).

150

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 151: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

151

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Work ordered by

public or local

authority

Proprietor shall forthwith carry out all work

ordered in respect of his parcel by a competent

public or local authority.

Management corporation to

comply with any notice or order

given or made by the local

authority or any competent

public authority requiring the

abatement of any nuisance on

the common property, or

ordering repairs or other work

to be done in respect of the

common property. (section 59)Repair and

maintenance of

parcel

The proprietor shall repair any damage to his

parcel and maintain it in a state of good repair

The management corporation to

properly maintain and manage

the subdivided building or land

and the common property and

keep it in a state of good and

serviceable repair.

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 152: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

152

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Manner of using

common

property

The proprietor shall use and enjoy the common

property in such a way as not to interfere

unreasonably with the use and enjoyment of

the common property by the other subsidiary

proprietors or their families or visitors.

The proprietor to use and enjoy

the common property in such a

manner so as not to interfere

unreasonably with use and

enjoyment thereof by other

proprietors. (Paragraph 8-

General duties of a proprietor)Manner of using

parcel

The proprietor shall not use his parcel in such a

way as to cause nuisance or danger to any other

subsidiary proprietor or his family.

The proprietor not use or permit

to be used his parcel in such a

manner or for such a purpose as

to cause nuisance or danger to

any other proprietor or the

families of such proprietor. The

proprietor shall not use his

parcel for any purposes, illegal,

or otherwise, which may be

injurious to the reputation of the

development area.

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 153: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

153

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Notification of

intended

change of

ownership and

other dealings

The proprietor shall forthwith

inform the corporation of any

intended change in the

proprietorship of his parcel; and

any other dealing with the parcel

of which he is aware.

The proprietor shall notify the management

corporation forthwith of any change in the

proprietorship of his parcel or any dealings,

charges, leases or creation of any interest for

entry in the strata roll.

Management

of common

property for

common

benefit

The corporation shall control,

manage and administer the

common property for the benefit

of all the subsidiary proprietors:

Provided that the corporation may

by agreement with a particular

subsidiary proprietor grant him

the exclusive use and enjoyment

of part of the common property or

special privileges in respect of the

common property or part of it.

The management corporation shall control,

manage and administer the common property

for the benefit of all the proprietors provided

that the management corporation may by

written agreement with a particular proprietor

grant him for a define period of time, the

exclusive use and enjoyment of part of the

common property or special privileges in

respect of the common property or part of it,

subject to appropriate terms and conditions to

be stipulated by the management corporation.

FINAL

SR DR TAN LIAT CHOON

Page 154: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

154

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Maintenance of

fixtures and

fittings

The corporation shall maintain in

a state of good and serviceable

repair the fixtures and fittings

(including lifts) existing on the lot

and used or capable of being used

in connection with the enjoyment

of more than one parcel or the

common

Any furniture on the common property

including tables, chairs, settees, benches and

deck chairs are provided for the enjoyment

and comfort of all proprietors and shall not be

misused, tampered with, vandalised or

damaged by any person and shall not be

removed or altered by any proprietor without

permission of the management corporation.Lawns and

gardens

Where practicable, the

corporation shall establish and

maintain suitable lawns and

gardens on the common property.

A proprietor shall not damage any lawn,

garden, tree, shrub, plant and flower in the

common property. A proprietor shall not use

any part of the common property for the

purpose of his own garden except prior

written approval of the management

corporation.

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 155: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Maintenance of

pipes, wires, etc.

The corporation shall maintain,

repair and (where necessary)

renew pipes, wires, cables and

ducts existing on the lot and used

or capable of being used in

connection with the enjoyment of

more than one parcel or the

common property.

All fixtures and fittings, devices, equipment

and installation on the common property,

including trolleys, light fittings, timers, door

closers, card readers, CCTV cameras, smoke

detectors, fire extinguishers, hose reels and

nozzles, break glass alarms, safety railings and

refuse bins, are provided safety and

convenience for all proprietors and shall not

be misused, tampered with, vandalised or

damaged by any person.

155

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 156: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

156

Details Strata Titles Ordinance 1995 Strata Management Act 2013

Production of

insurance

policies and

receipts

On the written request of the

proprietor or a registered chargee

of his parcel, the corporation shall

produce to the proprietor or

chargee, as the case may be (or to

a person authorized in writing by

the proprietor or chargee) all

policies of insurance effected by

the corporation, together with the

receipts for the last premiums

paid in respect of the policies.

On the written request of a proprietor of a

parcel and on a payment of a fee which shall

not exceed fifty ringgit furnish to the

proprietor or to a person authorised in writing

by the proprietor the copies of all insurance

policies effected under the Act or effected

against such other risks as directed by the

proprietors by a special resolution, together

with the receipts for the last premiums paid in

respect of the policies. (Paragraph 3- Function

of management corporation)Provisions of

amenities or

services to

particular parcel

The corporation may make an

agreement with a particular

subsidiary proprietor for the

provision of amenities or services

by the corporation to or in respect

of his parcel.

The management corporation may make an

agreement with particular proprietor for the

provision of amenities or services by the

management corporation to or in respect of

his parcel. (paragraph 5)

Third Schedule Strata Titles Ordinance 1995 VS Strata Management (Maintenance and

Management) Regulation 2015

FINAL

SR DR TAN LIAT CHOON

Page 157: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

SCHEDULE OF PARCELS (S6)

157

FINAL

SR DR TAN LIAT CHOON

Page 158: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels [S6(1)]

✓ Shall not sell any parcel unless schedule of parcels has

been filed with the commissioner.

✓ Shows proposed share units of each parcel or proposed

parcel and the total share units of all the parcels.

✓ Shows the proposed quantum of provisional share units

for each provisional block.

158

FINAL

SR DR TAN LIAT CHOON

Page 159: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels [S6(2)]

✓ Shall also not sell any parcel or proposed parcel in anyprovisional block unless the developer has filed with thecommissioner an amended schedule of parcels.

✓ Shows the proposed allocation of the provisional shareunits among the new parcels in the provisional block.

159

FINAL

SR DR TAN LIAT CHOON

Page 160: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels

❑ Shall not sell any parcel unless schedule of parcels has been filedwith the commissioner.

❑ Shows proposed share units of each parcel or proposed parcel andthe total share units of all the parcels.

❑ Shows the proposed quantum of provisional share units for eachprovisional block.

❑ Shall also not sell any parcel or proposed parcel in any provisionalblock unless the developer has filed with the commissioner anamended schedule of parcels.

❑ Shows the proposed allocation of the provisional share unitsamong the new parcels in the provisional block. 160

FINAL

SR DR TAN LIAT CHOON

Page 161: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels

❑ Comprise a location plan, storey plan and delineation plan.

❑ Show a legend of all parcels, all common properties and allaccessory parcels, and in the case of accessory parcels, specify inthe legend the parcels they are made appurtenant to.

❑ Contain a certificate by the developer’s licensed landsurveyor that the buildings or land parcels are capable of beingsubdivided.

❑ Contain a certificate by the developer’s architect or engineerthat the buildings or land parcels to be constructed inaccordance with the approved plans and specifications arecapable of being subdivided. 161

FINAL

SR DR TAN LIAT CHOON

Page 162: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels

❑ Proposed share units shall be deemed to be theallocated share units until approved by the Director.

❑ Exhibited at all times in a conspicuous position inany office and branch office of the developer and atsuch place where sale of a parcel is conducted.

❑ Submitted to the Director in any application forsubdivision of building or land.

162

FINAL

SR DR TAN LIAT CHOON

Page 163: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels [S6(3)]

✓ Comprise a location plan, storey plan and delineationplan.

✓ Show a legend of all parcels, all common properties andall accessory parcels, and in the case of accessoryparcels, specify in the legend the parcels they are madeappurtenant to.

163

FINAL

SR DR TAN LIAT CHOON

Page 164: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels [S6(3)]

✓ Contain a certificate by the developer’s licensedland surveyor that the buildings or land parcels arecapable of being subdivided.

✓ Contain a certificate by the developer’s architect orengineer that the buildings or land parcels to beconstructed in accordance with the approved plansand specifications are capable of being subdivided.

164

FINAL

SR DR TAN LIAT CHOON

Page 165: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels [S6(4) & S6(5)]

✓ Proposed share units shall be deemed to be theallocated share units until approved by the Director.

✓ Exhibited at all times in a conspicuous position inany office and branch office of the developer and atsuch place where sale of a parcel is conducted.

✓ Submitted to the Director in any application forsubdivision of building or land.

165

FINAL

SR DR TAN LIAT CHOON

Page 166: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

166

MULA

Pelantikan JTB

SkimStrata?

Permohonan Kebenaran Merancang (KM)(Seksyen 21, Akta 172)

KelulusanKM

Permohonan KelulusanPelan Bangunan

Lulus

Deposit Bayaran UpahUkur kepada LJT

Permohonan No. Jadual Petak,No. Skim & No. Buku Kerja Luar

Lulus

A

Tidak tertakluk diBawah Akta 318

Syarat Kelulusan1. Lantik JTB2. Salinan resit LJT3. Salinan KM

Tidak

Ya

Ya

Ya

Ya

Tidak

Tidak

Tidak

FINAL

SR DR TAN LIAT CHOON

Page 167: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

167

Penyediaan Jadual Petak

Permohonan Sijil PenentuanFormula Unit Syer (SiFUS)

Penjualan Petak

Pembinaan mencapaiPeringkat Struktur Utama

Teratur

A

Syarat Kelulusan SiFUS1. Urusan tanah selesai2. Lantikan JTB3. Salinan resit LJT4. Formula kiraan unit syer5. Cadangan jadual petak6. Format Daftar Pembeli7. Pelan bangunan lulusYa

Ya

Ya

Tidak

Tidak

A

Lulus

Pemfailan Jadual PetakKepada COB

Teratur?

Pengesahan PemfailanJadual Petak

Permakluman Peringkat Struktur Utama kepada PTG

Permohonan CPSP(Seksyen 8A Akta 318)

Tidak

Syarat Pemfailan1. Jadual petak2. SiFUS3. Pelan bangunan yang

diluluskan

Syarat Permohonan CPSP1. Borang 102. Bayaran semakan ukur3. Pelan bangunan asal4. Cadangan pelan strata5. Permit ruang udara6. Perakuan Arkitek/Jurutera7. Carian rasmi hakmilik

tetap8. Salinan sah perakuan

struktur utama9. Salinan SiFUS

FINAL

SR DR TAN LIAT CHOON

Page 168: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

168

Kelulusan CPSP

DokumenLengkap?

Permohonan Hakmilik Strata(Seksyen 9, Akta 318)

Kelulusan oleh Pengarah PTG(Seksyen 12, Akta 318)

Kelulusan Pelan Akui Strata olehPengarah Ukur

Penyediaan Pelan Hakmilik (B4)Oleh JUPEM Negeri

Notis 5F

Penghantaran Pelan Akui StrataUntuk semakan JUPEM Negeri

Tidak

Ya

Teratur

B

Pertimbangan dan Kelulusan oleh Pengarah PTG

(Seksyen 10, Akta 318)

Semakan

Tidak

Pendaftaran Hakmilik Strata oleh PTG(Bahagian III, Akta 318)

Pengeluaran Pemilikan Kosong

Syarat Permohonan Hakmilik Strata1. Borang permohonan

(Borang 1)2. Bayaran permohonan dan

penyediaan hakmilik3. CPSP4. Sijil akuan kos rendah

(S9B(3), Akta 318)5. Kebenaran bertulis pihak

berkepentingan6. Cadangan nama MC7. Hakmilik tetap asal8. Salinan jadual petak

FINAL

SR DR TAN LIAT CHOON

Page 169: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

169

START

Appoint LS

Strata Scheme ?

Application For Development Order (DO) (Section 21, Act 172)

DO Approved

Application for Building Plan Approval

Approved

Deposit Survey Fee to JLT

Application for No. Schedule of Parcel, No. Scheme & No. Fieldbook

Approved

A

Tidak tertakluk diBawah Akta 318

Approval condition1. LS appointed2. Copy of receipt LJT3. Copy of DO

No

Yes

Ya

Yes

Yes

No

No

No

FINAL

SR DR TAN LIAT CHOON

Page 170: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

170

Preparation of Schedule of Parcel

Application for Sijil Formula Unit Syer (SiFUS)

Sale & Purchase

Building AchieveSuper Structure Stage

In Order?

A

SiFUS Approval condition1. Land matters sattled2. LS appointed3. Copy of receipt LJT4. Unit syare calculation

formula (excel)5. Proposed Schedule of

Parcel6. Format purchaser register7. Building plan approved

Ya

Yes

Yes

No

No

A

Approved

Filed Schedule of Parcel to COB

In Order ?

Verification of filing of Schedule of Parcel

Notification of Super Structure Stage to PTG

Application for CPSP(Section 8A Act 318)

No

Condition to file1. Schedule of Parcel2. SiFUS3. Approved building plan

CPSP Application condition1. Form 102. Payment for survey fee

(checking) [P.U.(A) 99]3. Original Building Plan4. Proposed Strata Plan5. Air Space permit6. Certification of

Architech/Engineer7. Title search Final Title8. Certification copy of Super

Structure Stage9. Copy of SiFUS

FINAL

SR DR TAN LIAT CHOON

Page 171: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

171

Approval of CPSP

DokumentIn order?

Application for strata title(Section 9, Act 318)

Approval by Director of PTG (Section 12, Act 318)

Approval of Strata Certified Plan by Director of Survey

Preparation of Title Plan (B4) by State JUPEM

Notice 5F

Handing Strata Certified Plan to State JUPEM for chekcing

No

Yes

In order

Consideration and approval by Director of PTG

(Section 10, Act 318)

Checking

No

Registration of Strata Titles by PTG(Part III, Act 318)

Vacant Possession

Condition for strata title application1. Application form (Form 1)2. Payment for application

and preparation of title3. CPSP4. Certificate of verification

low-cost building [S9B(3), Act 318]

5. Written concern from interested parties

6. Propose MC name7. Original Final Title8. Copy of Schedule of Parcel

FINAL

SR DR TAN LIAT CHOON

Page 172: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Building & Provisional Block

172

FINAL

SR DR TAN LIAT CHOON

Page 173: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

173

Schedule Of Parcels For Subdivision Of Building & Provisional Block

FINAL

SR DR TAN LIAT CHOON

Page 174: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Licensed Land Surveyor On Schedule Of Parcels For Subdivision Of

Building And Provisional Block

174

Saya ___________________seorang Juruukur Tanah Yang Dilesenkan dibawah Akta Juruukur Tanah Berlesen 1958 [Akta 458], memperakuimenurut seksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawabangunan/bangunan-bangunan yang dicadangkan untuk dipecah bahagikepada petak-petak dan blok/blok-blok sementara yang ditunjukkan iniboleh dipecah bahagi di bawah peruntukan Akta Hakmilik Strata 1985[Akta 318].

Bertarikh _________ haribulan ________ 20 ___

_________________________________________Juruukur Tanah yang dilesenkan di bawah Akta 458

FINAL

SR DR TAN LIAT CHOON

Page 175: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Architect Or Engineer On Schedule Of Parcels For Subdivision Of

Building And Provisional Block

175

Saya ____________________seorang Arkitek Profesional yang didaftarkan dibawah Akta Arkitek 1967 [Akta 117] / Jurutera Profesional yang didaftarkan dibawah Akta Pendaftaran Jurutera 1967 [Akta 138], memperakui menurutseksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawabangunan/bangunan-bangunan yang dicadangkan untuk dipecah bahagi kepadapetak-petak dan blok/blok-blok sementara yang akan dibina mengikut pelandan spesifikasi yang diluluskan dan mana-mana pindaan kepada pelan danspesifikasi di bawah Akta Jalan, Parit dan Bangunan 1974 [Akta 133] dan mana-mana undang-undang kecil yang dibuat di bawah Akta itu, yang disediakanboleh dipecah bahagi di bawah peruntukan Akta Hakmilik Strata 1985 [Akta318].

Bertarikh _________ haribulan _________ 20 ___

______________________________________________Arkitek Profesional yang didaftarkan di bawah Akta 117 /Jurutera Profesional yang didaftarkan di bawah Akta 138

FINAL

SR DR TAN LIAT CHOON

Page 176: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Building & Provisional Block

176

FINAL

SR DR TAN LIAT CHOON

Page 177: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Building & Provisional Block

177

FINAL

SR DR TAN LIAT CHOON

Page 178: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Building & Provisional Block

178

FINAL

SR DR TAN LIAT CHOON

Page 179: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel

179

FINAL

SR DR TAN LIAT CHOON

Page 180: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Licensed Land Surveyor On Schedule Of Parcels For Subdivision Of

Land Parcel

180

Saya ___________________seorang Juruukur Tanah Yang Dilesenkan dibawah Akta Juruukur Tanah Berlesen 1958 [Akta 458], memperakuimenurut seksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawatanah yang dicadangkan untuk dipecah bahagi kepada petak-petak tanahyang ditunjukkan ini boleh dipecah bahagi di bawah peruntukan AktaHakmilik Strata 1985 [Akta 318].

Bertarikh _________ haribulan ________ 20 ___

_________________________________________Juruukur Tanah yang dilesenkan di bawah Akta 458

FINAL

SR DR TAN LIAT CHOON

Page 181: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Architect Or Engineer On Schedule Of Parcels For Subdivision Of

Land Parcel

181

Saya ____________________seorang Arkitek Profesional yang didaftarkan dibawah Akta Arkitek 1967 [Akta 117] / Jurutera Profesional yang didaftarkan dibawah Akta Pendaftaran Jurutera 1967 [Akta 138], memperakui menurutseksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawa tanah yangdicadangkan untuk dipecah bahagi kepada petak-petak tanah yang akan dibinamengikut pelan dan spesifikasi yang diluluskan dan mana-mana pindaan kepadapelan dan spesifikasi di bawah Akta Jalan, Parit dan Bangunan 1974 [Akta 133]dan mana-mana undang-undang kecil yang dibuat di bawah Akta itu, yangdisediakan boleh dipecah bahagi di bawah peruntukan Akta Hakmilik Strata 1985[Akta 318].

Bertarikh _________ haribulan _________ 20 ___

______________________________________________Arkitek Profesional yang didaftarkan di bawah Akta 117 /Jurutera Profesional yang didaftarkan di bawah Akta 138

FINAL

SR DR TAN LIAT CHOON

Page 182: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel

182

FINAL

SR DR TAN LIAT CHOON

Page 183: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel & Provisional Block

183

FINAL

SR DR TAN LIAT CHOON

Page 184: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Licensed Land Surveyor On Schedule Of Parcels For Subdivision Of

Land Parcel & Provisional Block

184

Saya ___________________seorang Juruukur Tanah Yang Dilesenkan dibawah Akta Juruukur Tanah Berlesen 1958 [Akta 458], memperakuimenurut seksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawatanah yang dicadangkan untuk dipecah bahagi kepada petak-petak tanahdan blok-blok sementara yang ditunjukkan ini boleh dipecah bahagi dibawah peruntukan Akta Hakmilik Strata 1985 [Akta 318].

Bertarikh _________ haribulan ________ 20 ___

_________________________________________Juruukur Tanah yang dilesenkan di bawah Akta 458

FINAL

SR DR TAN LIAT CHOON

Page 185: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Architect Or Engineer On Schedule Of Parcels For Subdivision Of

Land Parcel & Provisional Block

185

Saya ____________________seorang Arkitek Profesional yang didaftarkan dibawah Akta Arkitek 1967 [Akta 117] / Jurutera Profesional yang didaftarkan dibawah Akta Pendaftaran Jurutera 1967 [Akta 138], memperakui menurut seksyen6 Akta Pengurusan Strata 2013 [Akta 757], bahawa tanah yang dicadangkan untukdipecah bahagi kepada petak-petak tanah dan blok-blok sementara yang akandibina mengikut pelan dan spesifikasi yang diluluskan dan mana-mana pindaankepada pelan dan spesifikasi di bawah Akta Jalan, Parit dan Bangunan 1974 [Akta133] dan mana-mana undang-undang kecil yang dibuat di bawah Akta itu, yangdisediakan boleh dipecah bahagi di bawah peruntukan Akta Hakmilik Strata 1985[Akta 318].

Bertarikh _________ haribulan _________ 20 ___

______________________________________________Arkitek Profesional yang didaftarkan di bawah Akta 117 /Jurutera Profesional yang didaftarkan di bawah Akta 138

FINAL

SR DR TAN LIAT CHOON

Page 186: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel & Provisional Block

186

FINAL

SR DR TAN LIAT CHOON

Page 187: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel (Shared Basement)

187

FINAL

SR DR TAN LIAT CHOON

Page 188: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel (Shared Basement)

188

FINAL

SR DR TAN LIAT CHOON

Page 189: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Licensed Land Surveyor On Schedule Of Parcels For Subdivision Of

Land Parcel (Shared Basement)

189

Saya ___________________seorang Juruukur Tanah Yang Dilesenkan dibawah Akta Juruukur Tanah Berlesen 1958 [Akta 458], memperakui menurutseksyen 6 Akta Pengurusan Strata 2013 [Akta 757], bahawa tanah yangdicadangkan untuk dipecah bahagi kepada petak-petak tanah yangditunjukkan ini boleh dipecah bahagi di bawah peruntukan Akta HakmilikStrata 1985 [Akta 318].

Bertarikh _________ haribulan ________ 20 ___

_________________________________________Juruukur Tanah yang dilesenkan di bawah Akta 458

FINAL

SR DR TAN LIAT CHOON

Page 190: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certification By Architect Or Engineer On Schedule Of Parcels For Subdivision Of

Land Parcel (Shared Basement)

190

Saya ____________________seorang Arkitek Profesional yang didaftarkan dibawah Akta Arkitek 1967 [Akta 117] / Jurutera Profesional yang didaftarkan dibawah Akta Pendaftaran Jurutera 1967 [Akta 138], memperakui menurut seksyen 6Akta Pengurusan Strata 2013 [Akta 757], bahawa tanah yang dicadangkan untukdipecah bahagi kepada petak-petak tanah yang akan dibina mengikut pelan danspesifikasi yang diluluskan dan mana-mana pindaan kepada pelan dan spesifikasi dibawah Akta Jalan, Parit dan Bangunan 1974 [Akta 133] dan mana-mana undang-undang kecil yang dibuat di bawah Akta itu, yang disediakan boleh dipecah bahagidi bawah peruntukan Akta Hakmilik Strata 1985 [Akta 318].

Bertarikh _________ haribulan _________ 20 ___

______________________________________________Arkitek Profesional yang didaftarkan di bawah Akta 117 /Jurutera Profesional yang didaftarkan di bawah Akta 138

FINAL

SR DR TAN LIAT CHOON

Page 191: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Schedule Of Parcels For Subdivision Of Land Parcel (Shared Basement)

191

FINAL

SR DR TAN LIAT CHOON

Page 192: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Impact On Developers

192

Developers

To Be Filed with COB:

No sale before filing

Exhibit:

Details of all parcels,

accessory parcels and

common property

Allocated Share Units:

Restriction to amendments

Failure to Comply:

RM500K

5 years imprisonme

nt

FINAL

SR DR TAN LIAT CHOON

Page 193: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Impact On Professionals

193

Professionals

Filed with COB:

Licensed Land Surveyor +

Architect/Engineer

Offence:

False, Fraudulent, Negligent

On Conviction:

RM250K

3 years imprisonme

nt

FINAL

SR DR TAN LIAT CHOON

Page 194: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Impact On Purchasers

194

Purchasers

Filed with COB:

Compliance with SMA & STA

“WYSIWYG”

Exhibit:

Transparent

Informed decision

Certification & Offence:

Assurance

Strata Title

FINAL

SR DR TAN LIAT CHOON

Page 195: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

ALOCATED SHARE UNITS (S8 & FIRST SCHEDULE)

195

FINAL

SR DR TAN LIAT CHOON

Page 196: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Share Units (Old)

• "share units", in respect of a parcel, means the share units determined for that parcel as shown in the schedule of share units strata register;

• "provisional share units" means the share value allotted to a provisional block shown in an approved strata planthe strata register;

196

FINAL

SR DR TAN LIAT CHOON

Page 197: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Share Units (Current)

❑ Share Unit Entitlements [S36 STA 2013]• The voting rights of the proprietors• The proportion payable by each proprietor of the

contribution levied by the management corporationaccording to the Strata Management Act 2013

❑ Termination of subdivision [S57(4)(e) STA 2013]• Distribution of profits on termination of subdivision

based on open market capital values of parcels(previously based on share units)

197

FINAL

SR DR TAN LIAT CHOON

Page 198: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Allocated Share Units (Old)

Each parcel in a subdivided building and each land parcel isallocated with share units. [Accessory parcels are not allocatedseparate share units as that accessory parcels are related to themain parcel that has been allocated for the share units].

In the strata scheme involving a provisional blocks, theprovisional block is allocated to provisional share units.

The schedule of share units for all parcels and provisional blocks(if any) shall be filed by the land owner to the Commissioner ofBuilding before he submits to Land Office when applying for astrata title in FORM 1 or FORM 1A.

198

FINAL

SR DR TAN LIAT CHOON

Page 199: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Allocated Share Units (Old)

Each parcel is allocated with share units and shown in a strataplan. The sum of the share units are different depending onvarious factors such as the size of the parcel, the location of theparcel, the selling price of the parcel, the market price of theparcel and others. The contribution is based on the unit sharethat means the greater the share the higher the contribution tobe paid.

Type of multi-storey building is divided into 5 types:CondominiumApartmentService ApartmentFlatTown House 199

FINAL

SR DR TAN LIAT CHOON

Page 200: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Allocated Share Units (Old)

The usual way to determine the number of share units forparcels and provisional blocks (if any) are as follows:

❑ According to the market price of parcel, a parcel with a highermarket price will be allocated more share units compared to aparcel that has a lower market price.

❑ According to the selling price of the parcel, which has ahigher selling price, will be allocated more share units.

❑ According to the value of the parcel determined by the LocalAuthority, the value as assessed for the purpose of payment ofthe assessment tax.

200

FINAL

SR DR TAN LIAT CHOON

Page 201: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Allocated Share Units (Old)

❑ According to the size of the parcel, the larger area of the floorwill be allocated more share units.

❑ According to the usage type of parcel, the parcel used forbusiness purposes will be allocated more share units than theparcel used for residential purpose.

❑ According to the location of the parcel, where if theapartment is of a luxury type, a parcel located on a higher floorwill be allocated more share units compared to a parcel locatedon the lower floor; or if in the case the low-cost flats, maybe aparcel located on the lower floor will be allocated more sharethan the parcel located on the higher floor. Why??

201

FINAL

SR DR TAN LIAT CHOON

Page 202: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Allocated Share Units (Current)

Formula for calculation of allocated share units:

• Based on area of parcel (Keluasan)

• Weightage factors (Pemberat)

• Accessory parcels contribute to allocated share units

202

FINAL

SR DR TAN LIAT CHOON

Page 203: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certificate Of Share Units Formula (SiFUS)

❑ SiFUS is a certificate and is required before the sale ofthe parcels or the CPSP application is submitted to JUPEM.

❑ SiFUS application is required for all subdivision ofbuilding (S6, STA 1985):

a) any building having two (2) or more floors on aalienated land held as one (1) lot under final titlemay be subdivided into parcels; and any land on thesame lot can be subdivided into land parcel heldnder the strata title or an accessory parcel.

203

FINAL

SR DR TAN LIAT CHOON

Page 204: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certificate Of Share Units Formula (SiFUS)

b) any alienated land having two (2) or morebuildings held as one (1) lot under final title may besubdivided into land parcels each held under a stratatitle or as an accessory parcel .

❑ SiFUS is required by DO by the Local Authority. DOrequires developers to obtain SiFUS from PTG before sale ofparcels or CPSP application.

204

FINAL

SR DR TAN LIAT CHOON

Page 205: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certificate Of Share Units Formula (SiFUS)

❑ Owner is requires to submit a new SiFUS to PTG if theamendment of the building plan is approved by PBT orthere is a change in the share units.

❑ PTG needs to issue a new SiFUS if there is amendment tobuilding plan approved by the PBT although no changes onto the share units.

205

FINAL

SR DR TAN LIAT CHOON

Page 206: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Certificate Of Share Units Formula (SiFUS)

❑ A copy of SiFUS and a certified building plan certified byPTG (each folio) shall be submitted to JUPEM for thepurpose of preparing the CPSP to ensure there is no changeto the building plan based on SiFUS issued. Example ofcertificate:

“Ini adalah salinan Pelan Bangunan yang diterima oleh PTGbagi tujuan pengeluaran SiFUS No.: .....................

Meterai:Tarikh:Tandatangan: PTG”

206

FINAL

SR DR TAN LIAT CHOON

Page 207: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Documents Needed For SiFUSApplication

• Copy of DO/KM approved;• Copy of approved Building Plan;• Appointment letter of Licensed Land Surveyor (JTB);• The receipt of strata survey fee which has been deposited at the

Land Surveyors Board (LJT);• The official search of land title;• Unit Share formula;• Document of Share Units calculation (in Excel);• Schedule of Parcel certified by JTB and Architect/Engineer (If

applicable);• Premium payment receipt (If applicable);• Quit rent Receipt for the current year;• Application form for classification as low cost building (If

applicable);• Other documents required by PTG (If necessary). 207

FINAL

SR DR TAN LIAT CHOON

Page 208: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Sample Of Share Units Formula (Excel)

208

FINAL

SR DR TAN LIAT CHOON

Page 209: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Syarat-Syarat Kelulusan SiFUS

• Syarat-syarat berkaitan tanah telah diselesaikan• Juruukur Tanah Berlesen telah dilantik• Bayaran upah ukur strata telah didepositkan kepada

Lembaga Juruukur Tanah (LJT)• Formula dan kiraan unit syer telah disediakan• Jadual Petak yang telah diperakui oleh JTB dan

Arkitek/Jurutera• Pelan bangunan yang telah diluluskan.

209

FINAL

SR DR TAN LIAT CHOON

Page 210: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Terms For SiFUS Approval

• Terms and conditions related tom land have beenresolved;

• Licensed Land Surveyors have been appointed;• The strata survey fee was deposited to the Land

Surveyors Board (LJT);• The formula and the calculation of share units have been

provided;• Schedule of Parcel have been certified by LLS and

Architect/Engineer;

210

FINAL

SR DR TAN LIAT CHOON

Page 211: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual Petak

Jadual Petak yang disediakan perlu mengandungi;

a) Pelan lokasi, pelan tingkat, pelan tandaan sebagaimanayang ditetapkan dalam AHS;b) Petunjuk bagi semua petak, harta bersama dan petakaksesori;c) Petak aksesori berhubung dengan petak yang berkaitan;d) Perakuan daripada JTB dan Arkitek/Jurutera bahawabangunan atau tanah yang ditunjukkan dalam Jadual Petakboleh dipecah bahagi; dane) Apa-apa butiran lain sebagaimana yang ditentukan olehCOB.

211

FINAL

SR DR TAN LIAT CHOON

Page 212: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Formula for Calculation of Allocated Share Units (New)

SHARE UNIT OF

A PARCEL

SHARE UNIT OF

A LAND PARCEL

WHERE:

• A = AREA OF PARCEL

• B = AREA OF ACCESSORY PARCEL

• F1 = FACTOR FOR THE TYPE OF PARCEL AS SPECIFIED IN TABLE 1

• F2 = FACTOR FOR THE TYPE OF PARCEL AS SPECIFIED IN TABLE 2

• F3 = FACTOR FOR THE TYPE OF PARCEL AS SPECIFIED IN TABLE 3 212

= (A X F1 X F2) + σ𝟏𝑵(𝑩 𝑿 𝑭3)

= (A X 0.8) + σ𝟏𝑵(𝑩 𝑿 𝑭3)

FINAL

SR DR TAN LIAT CHOON

Page 213: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

No. Type of parcel

Without air-conditioning to common areas of corridors,

lobbies and foyers

With air-conditioning to common areas of corridors,

lobbies and foyersF1

having benefit

of common lift/escalator

facility

F1

having no benefit of common

lift/escalator facility

F1

having benefit

of common lift/escalator

facility

F1

having no benefit of common

lift/escalator facility

1. Apartment/Small Office Home Office (SOHO)

1.00 0.85 1.30 1.15

2. Office/Institution (College) complex

1.00 0.85 1.30 1.15

3. Retail complex 2.00 1.70 3.20 2.904. Hotel/Medical centre

complex2.20 1.90 2.80 2.45

5. Industrial complex 1.00 0.85 1.45 1.306. Car park

(whole floor parcel)0.75 0.65 0.85 0.75

7.

8

Shop-houses, shop apartments & shop offices—(a) Upper floor parcel(b) Ground floor parcel

Land Parcel

1.000.85

Not Applicable

0.850.85

Not Applicable

1.301.15

Not Applicable

1.151.15

Not Applicable

Table 1: Factors (F1) for Type of Parcels, Reflecting the Frequency of Usage and General Maintenance (New)

213

FINAL

SR DR TAN LIAT CHOON

Page 214: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

No. Parcel F2 Basis

1

Whole floor parcel excluding area of vertical transportation core (lifts or escalators)

Also include parcel with an area of 1,000 sq.m. to 3,000 sq.m.

0.85

(a) To reflect an equivalent net lettablearea after taking into account its largecirculation area only.

(b) In a retail complex, its circulationarea is much larger but is offset by theletting of such parts to retail kiosks.

2

Whole floor parcel including area of vertical transportation core (lifts or escalators)

Also include parcel with an area greater than 3,000 sq.m.

0.80

(a) To reflect an equivalent net lettablearea after taking into account its largecirculation area and vertical transportationcore (lifts or escalators).

(b) In a retail complex, its circulationarea is much larger but is offset by theletting of such parts to retail kiosks.

3 Not whole floor parcel 1 Not Applicable

Table 2: Factors (F2) for the Whole Floor Parcel & Area ≥ 1000 M2 (New)

214

FINAL

SR DR TAN LIAT CHOON

Page 215: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Table 3: Factors (F3) for an Accessory Parcel (New)

215

No. Accessory parcel F3 Basis

1 Outside building 0.25To reflect a non-habitable open orenclosed area outside the building.

2 Within building 0.50To reflect a non-habitable open orenclosed area within the building.FINAL

SR DR TAN LIAT CHOON

Page 216: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual 1: Faktor Pemberat Bagi Jenis Petak (F1)

216

FINAL

SR DR TAN LIAT CHOON

Page 217: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual 2: Faktor Pemberat Bagi Petak Lantai Keseluruhan (F2)

217

FINAL

SR DR TAN LIAT CHOON

Page 218: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Jadual 3: Faktor Pemberat Bagi Petak Aksesori (F3)

218

FINAL

SR DR TAN LIAT CHOON

Page 219: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Contoh Penggunaan Faktor Pemberat

219

FINAL

SR DR TAN LIAT CHOON

Page 220: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

220

FINAL

SR DR TAN LIAT CHOON

Page 221: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Share Units

❑ Area is in square meters (m²).

❑ Table A is distinguished by a lift or escalator facility for use inconjunction with central air conditioning facilities which arecommon property.

❑ Table B does not apply to the types of shop-house, apartment,office-shop and duplex (each comprising two floors).

❑ The share units shall be in number and any fractions ordecimals shall be rounded to the nearest number (e.g. 109.4 =109, 146.8 = 147, 82.5 = 83).

221

FINAL

SR DR TAN LIAT CHOON

Page 222: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Example Of New Allocated Share Units Calculation (Current)

Parcel : M3/3/12Accessory Parcel : A23 and A45Parcel Type : ApartmentUsage & : with lift, Without air-conditioningGeneral Maintenance (F₁ = 1.0, F₂ = 1.0)Area of Parcel : 105 m2

Area of Accessory Parcel : 13 m2 (within building) (F₃ = 0.5)13 m2 (outside building) (F₃ = 0.25)

Share Units Calculation : (105x1.0x1.0) + (13x0.50) + (13x0.25)105 + 6.5 + 3.25114.75

Share Unit : 115 (rounded to nearest whole number)

222

FINAL

SR DR TAN LIAT CHOON

Page 223: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Example Of New Allocated Share Units Calculation (Current)

Parcel : M1/6/6

Accessory Parcel : A6 and A7

Parcel Type : Office

Usage & : with lift and air-conditioning

General maintenance (F₁ = 1.3, F₂ = 0.85)

Area of Parcel : 1,000 m2 (whole floor)

Area of Accessory Parcel: 2 x 12 m2 (outside building) (F₃ = 0.25)

Share Units Calculation : (1,000 x 1.3 x 0.85) + 2(12 x 0.25)

1,105 + 6

Share Unit : 1,111

223

FINAL

SR DR TAN LIAT CHOON

Page 224: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Example Of New Allocated Share Units Calculation (Current)

Parcel : M1/1/6

Accessory Parcel : A6 and A7

Parcel Type : Office

Usage & : with lift and air-conditioning

General maintenance (F₁ = 1.3, F₂ = 0.85)

Area of Parcel : 2,000 m2 (Whole floor)

Area of Accessory Parcel : 20 m2 (inside building) (F₃ = 0.5)

Area of Accessory Parcel : 13 m2 (outside building) (F₃ = 0.25)

Share Units Calculation : (2,000x1.3x0.85)+(20x0.5)+(13x0.25)

2,210 + 10 + 3.25

2,223.25

Share Unit : 2,223 (rounded to nearest whole number)224

FINAL

SR DR TAN LIAT CHOON

Page 225: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Example Of New Allocated Share Units Calculation (Current)

Parcel : M2/7/82

Accessory Parcel : A100 (Store)

Parcel Type : Retail complex

Usage & : with lift and air-conditioning

General maintenance (F₁ = 3.2, F₂ = 1.0)

Area of Parcel : 800 m2

Area of Accessory Parcel : 150 m2 (dalam bangunan) (F₃ = 0.5)

Share Units Calculation : (800 x 3.2 x 1.0) + (150 x 0.50)

2,560 + 75

Share Unit : 2,635

225

FINAL

SR DR TAN LIAT CHOON

Page 226: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

FINAL

SR DR TAN LIAT CHOON

Page 227: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

FINAL

SR DR TAN LIAT CHOON

Page 228: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

LIMITED COMMON PROPERTY AND SUBSIDIARY MANAGEMENT

CORPORATION

228

FINAL

SR DR TAN LIAT CHOON

Page 229: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Limited Common Property And Subsidiary Management Corporation Allowed

[S17A ST(A)A 2013]

(1) The management corporation may designate limitedcommon property and create one or more subsidiarymanagement corporations only for the purpose ofrepresenting the different interests of parcel proprietors byway of comprehensive resolution conducted under theStrata Management Act 2013.

229

FINAL

SR DR TAN LIAT CHOON

Page 230: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Limited Common Property And Subsidiary Management Corporation Allowed

[S17A ST(A)A 2013]

(2) Limited common property designated by acomprehensive resolution passed by the managementcorporation shall:

(a) describe, identify or define the boundaries orarea of the limited common property in the specialplan prepared by a land surveyor;(b) specifies each parcel comprised in that specialplan whose proprietors are entitled to the exclusivebenefit of the limited common property; and(c) conform with any other details as may bedetermined by the Director of Survey.

230

FINAL

SR DR TAN LIAT CHOON

Page 231: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Limited Common Property And Subsidiary Management Corporation Allowed

[S17A ST(A)A 2013]

(3) The management corporation shall make an application inForm 9 for the approval of the Director for the issue of certificateof subsidiary management corporation for the designatedlimited common property and shall be accompanied:

(a) such fee as may prescribed;(b) a copy of the comprehensive resolution together witha certificate signed by the Commissioner certifying thereceipt of the same filed with him by the managementcorporation; and(c) a special plan prepared as approved bycomprehensive resolution.

231

FINAL

SR DR TAN LIAT CHOON

Page 232: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Limited Common Property And Subsidiary Management Corporation Allowed

[S17A ST(A)A 2013]

(4) Upon receipt of the application, the Director shall then referthe application to the Director of Survey and the Director ofSurvey shall thereupon check the special plan and shall:

(a) advise the Director as to whether the plans are in order;and(b) notify the Director of the amount of fees to be collectedin respect of such work been done.

232

FINAL

SR DR TAN LIAT CHOON

Page 233: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Limited Common Property And Subsidiary Management Corporation Allowed

[S17A ST(A)A 2013]

(5) The Director shall thereupon if he is satisfied that theapplication and the other documents presented therewith are inorder, accept and issue a certificate that the subsidiarymanagement corporation is a body corporate constituted underthis Act on the day specified in the certificate.

(6) The subsidiary management corporation may sue and besued.

233

FINAL

SR DR TAN LIAT CHOON

Page 234: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

The rapid strata type development, whether multi-storeybuilding or land parcel, has led to mixed development in a singlelot. This situation has created problems in terms of limits on theuse of common property and the amount of contribution to MC.

This mixed development is managed by the same MC but due tothe different construction structures and facilities or facilities ofcommon property, the owner has to pay contributions for theunpleasant facilities. Since the owner will enjoy differentproperty facilities, it is desirable that the management andmaintenance of these facilities are managed by differentmanagement so that different contributions can be imposed.

234

FINAL

SR DR TAN LIAT CHOON

Page 235: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

To assist in resolving the problem, the A1450 Act introducedthe new section 17A to STA 1985 which provides for theprovision of limited common property "LCP" which allowsMC to establish a subsidiary management corporation (sub–MC).

Through such amendments, MC may assign the LCP andcreate one or more sub-MCs only for the purpose ofrepresenting different interests for owners.

235

FINAL

SR DR TAN LIAT CHOON

Page 236: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

Comprehensive resolution means a resolution which-

(a) Is considered at a duly convened general meeting of themanagement corporation of which at least thirty days’ noticespecifying the resolution has been given; and

(b) At the end of the period of sixty days after the generalmeeting, on a poll, the total of the share units of the parcelsfor which valid votes are counted for the resolution is at least2/3 of the aggregate share units of the parcels of all theproprietors who constitute the management corporation atthe end of such period.

236

FINAL

SR DR TAN LIAT CHOON

Page 237: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

MC may apply to set up sub-MCs for the purpose ofrepresenting different interests for owners regardless of MCestablishment date.

Under Act 757, sub-MCs shall consist of all owners entitledto enjoy exclusive benefits within the designated LCP area.They shall elect a subsidiary management committeeresponsible for performing sub-MC's responsibilities anddealing to carry out any sub-MC powers. Sub-MC may sueand be sued for it.

237

FINAL

SR DR TAN LIAT CHOON

Page 238: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

Prior to the establishment of a sub-MC, LCP must beestablished through a comprehensive resolution by MC.

MC will apply in Form 9 for PTG approval for the issuance ofsub-MC certificates for a designated LCP.

238

FINAL

SR DR TAN LIAT CHOON

Page 239: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

Upon receipt the application, PTG shall refer the application tothe Director of Survey. The Director of Survey shall check thespecial plan and shall-

(a) advise PTG whether the plans are in order; and(b) notify PTG of the amount of fee to be collected inrespect of the work done.

PTG if satisfied that the application and other documentssubmitted are in order, accept and issue a certificate to certifythat the sub-MC is a body corporate established under the STA1985 on the day specified in the certificate.

239

FINAL

SR DR TAN LIAT CHOON

Page 240: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

Perkembangan pesat pembangunan jenis strata, sama adabangunan bertingkat atau petak tanah, telah menyebabkanwujudnya pembangunan bercampur dalam satu lot yang sama.Keadaan ini telah menimbulkan masalah dari segi had kawasanpenggunaan harta bersama dan jumlah caruman kepada MC.

Pembangunan bercampur ini diuruskan oleh satu MC yang samanamun disebabkan struktur pembinaan serta kemudahan ataufasiliti harta bersama yang berbeza, pemilik terpaksa membayarcaruman bagi kemudahan yang tidak dinikmatinya.Memandangkan pemilik akan menikmati kemudahan hartabersama yang berbeza, adalah wajar sekiranya pengurusan danpenyenggaraan kemudahan tersebut diurus oleh pengurusanyang berbeza agar caruman yang berbeza dapat dikenakan. 240

FINAL

SR DR TAN LIAT CHOON

Page 241: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

Bagi membantu menyelesaikan masalah tersebut, AktaA1450 telah memperkenalkan seksyen baru 17A kepadaAHS 1985 yang menyediakan peruntukan berkenaanpenetapan harta bersama terhad (limited common property(LCP)) yang membolehkan sesuatu MC memohon untukmenubuhkan perbadanan pengurusan subsidiari (subsidiarymanagement corporation (sub-MC)).

Melalui pindaan tersebut, MC boleh menetapkan LCP danmewujudkan satu atau lebih sub-MC hanya bagi maksudmewakili kepentingan yang berbeza-beza bagi pemilik-pemilik.

241

FINAL

SR DR TAN LIAT CHOON

Page 242: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

LCP ditetapkan oleh MC melalui suatu resolusikomprehensif seperti mana yang diperuntukkan di bawahAkta Pengurusan Strata 2013 [Akta 757]. Sempadan-sempadan atau kawasan LCP ditetapkan dalam suatu pelankhas.

Berdasarkan LCP yang telah ditentukan oleh MC,permohonan bagi penubuhan sub-MC bagi menguruskanLCP tersebut hendaklah dikemukakan kepada PengarahTanah dan Galian (PTG) Negeri untuk kelulusan.

242

FINAL

SR DR TAN LIAT CHOON

Page 243: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

The LCP is designated by the MC through a comprehensiveresolution as provided under the Strata Management Act2013 [Act 757]. The boundaries or LCP area are set in aspecial plan.

Based on the LCP determined by MC, an application for sub-MC establishment to manage the LCP shall be submitted tothe State Director of Lands and Mines Office (PTG) forapproval.

243

FINAL

SR DR TAN LIAT CHOON

Page 244: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

Each application must be accompanied by the followingdocuments:

(a) such fees as may be prescribed;(b) a copy of a comprehensive resolution together with acertificate signed by the Commissioner confirming thereceipt of a copy of the comprehensive resolution filed; and(c) a special plan approved by the MC through acomprehensive resolution and any approved amendment.(d) Current quit rent receipt of the lot; and(e) Certificate of management corporation.

244

FINAL

SR DR TAN LIAT CHOON

Page 245: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

ketetapan komprehensif ertinya suatu ketetapan yang–

(a) dipertimbangkan dalam suatu mesyuarat agung perbadananpengurusan yang diadakan dengan sewajarnya yangmengenainya notis sekurang-kurangnya tiga puluh hari yangmenyatakan ketetapan itu telah diberikan; dan

(b) pada akhir tempoh enam puluh hari selepas mesyuarat agungdalam perenggan (a) itu diadakan, pada suatu pengundian,jumlah unit syer bagi petak yang baginya undi yang sah dikirauntuk ketetapan itu adalah sekurang-kurangnya dua pertigadaripada unit syer agregat petak-petak semua pemilik yangmembentuk perbadanan pengurusan itu pada akhir tempoh itu.245

FINAL

SR DR TAN LIAT CHOON

Page 246: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

MC boleh memohon menubuhkan sub-MC bagi maksudmewakili kepentingan yang berbeza bagi pemilik tanpamengambil kira tarikh penubuhan MC.

Di bawah Akta 757, sub-MC hendaklah terdiri daripada semuapemilik yang berhak menikmati manfaat eksklusif dalamkawasan LCP yang dikhaskan. Mereka hendaklah memilih suatujawatankuasa pengurusan subsidiari yang bertanggungjawabmelaksanakan kewajipan dan urusan sub-MC bagi menjalankanapa-apa kuasa sub-MC. Sub-MC boleh membawa guaman dandibawa guaman terhadapnya.

246

FINAL

SR DR TAN LIAT CHOON

Page 247: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

Sebelum sesuatu sub-MC ditubuhkan, LCP perlulahditetapkan melalui suatu resolusi komprehensif oleh MC.

MC akan membuat permohonan dalam Borang 9 bagikelulusan PTG untuk pengeluaran perakuan sub-MC bagisesuatu LCP yang ditetapkan.

247

FINAL

SR DR TAN LIAT CHOON

Page 248: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

Setiap permohonan hendaklah disertai dengan dokumen-dokumen berikut:

(a) apa-apa fi sebagaimana yang ditetapkan;(b) satu salinan resolusi komprehensif bersama denganperakuan yang ditandatangani oleh Pesuruhjaya yangmengesahkan penerimaan salinan resolusi komprehensifitu yang difailkan kepadanya; dan(c) suatu pelan khas yang diluluskan oleh MC melaluiresolusi komprehensif dan apa-apa pindaan yangdiluluskan.(d) Resit cukai tanah semasa bagi lot tersebut; dan(e) Perakuan perbadanan pengurusan.

248

FINAL

SR DR TAN LIAT CHOON

Page 249: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Perbadanan Pengurusan Subsidiari

Setelah menerima permohonan, PTG hendaklah merujuk permohonanitu kepada Pengarah Ukur. Pengarah Ukur hendaklah menyemak pelankhas dan hendaklah–

(a) menasihati PTG sama ada pelan-pelan itu teratur; dan(b) memberitahu PTG tentang amaun fi-fi yang hendakdipungut berkenaan dengan kerja-kerja yang telahdilakukan.

PTG sekiranya berpuas hati bahawa permohonan itu dan dokumen-dokumen lain yang dikemukakan adalah teratur, menerima danmengeluarkan satu perakuan bagi memperakui bahawa sub-MC ituadalah suatu pertubuhan perbadanan yang ditubuhkan di bawah AHS1985 pada hari yang dinyatakan dalam perakuan itu.

249

FINAL

SR DR TAN LIAT CHOON

Page 250: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

250

Limited common property means such part of the common property in a lot-

(a) That is designed in a comprehensive resolution referred to in section 17A of the Strata Titles Act 1985 for the exclusive benefit of the proprietors of two or more, but not all, parcels; and

(b) For which a certificate has been issued by the Director certifying that the subsidiary management corporation has been constituted under the Strata Titles Act 1985.

FINAL

SR DR TAN LIAT CHOON

Page 251: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

251

“Exclusive benefit” in relation to a limited commonproperty, includes but is not to be exclusive use orenjoyment of, and right to contributions andearnings in respect of, the limited commonproperty but exclusive any proprietary interest.

FINAL

SR DR TAN LIAT CHOON

Page 252: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

252

(1) The management corporation may designate limited commonproperty and create one or more subsidiary management corporationsonly for the purpose of representing the different interests of parcelproprietors by way of comprehensive resolution conducted under theStrata Management Act 2013.

FINAL

SR DR TAN LIAT CHOON

Page 253: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

253

(2) Limited common property designated by a comprehensive resolution passed by themanagement corporation shall:(a) describe, identify or define the boundaries or area of the limited common property inthe special plan prepared by a land surveyor;(b) specifies each parcel comprised in that special plan whose proprietors are entitled tothe exclusive benefit of the limited common property; and(c) conform with any other details as may be determined by the Director of Survey.

FINAL

SR DR TAN LIAT CHOON

Page 254: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Subsidiary Management Corporation

254

(3) The management corporation shall make an application in Form 9 for theapproval of the Director for the issue of certificate of subsidiary managementcorporation for the designated limited common property and shall be accompanied:

(a) such fee as may prescribed;(b) a copy of the comprehensive resolution together with a certificatesigned by the Commissioner certifying the receipt of the same filed withhim by the management corporation; and(c) a special plan prepared as approved by comprehensive resolution.

FINAL

SR DR TAN LIAT CHOON

Page 255: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

255

1) MC to get a sum of money to form Sub-MC2) Scheme strata to be 100% completed, scheme with provisional

block not allow to form Sub-MC.3) ≥ 2/3 of total share units strata titles transferred to proprietors4) Total proprietors eligible to vote hold ≥ 2/3 of the total share units.5) Each Sub-MC contains 2 or more parcel owner.6) Special plan prepared before voting.

ESTABLISHMENT OF SUB-MC ITEMS TO BE CONSIDERED

FINAL

SR DR TAN LIAT CHOON

Page 256: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

256

Raise the amounts so determined by imposing charges on theproprietors in proportion to the share units or provisional shareunits of their respective parcels or provisional blocks, and themanagement corporation may determine different rates ofcharges to be paid in respect of parcels which are used forsignificantly different purposes and in respect of the provisionalblocks;

STRATA MANAGEMENT ACT 2013

FINAL

SR DR TAN LIAT CHOON

Page 257: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

257

• MC obtain agreement to appoint LLS to prepare Special Planwith fee approved.

• Give 30 days notice to all parcel owners.• LCP to be set through comprehensive resolution by MC.• To file the comprehensive resolution to COB within 28 days.

APPLICATION PROCESS

FINAL

SR DR TAN LIAT CHOON

Page 258: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

258

APPLICATION PROCESS

• Application to PTG with Form 9• Fee• Copy of comprehensive resolution• Special Plan• Current quit rent• Certification from MC

FINAL

SR DR TAN LIAT CHOON

Page 259: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

259

APPLICATION PROCESS

• PTG refer the application to Director of Survey

• Comment from Director of Survey• Fee checking

3PTG

• Application and documents in order• Related fee• Issue the certification of Sub-MC

4PTG

FINAL

SR DR TAN LIAT CHOON

Page 260: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

260

FINAL

SR DR TAN LIAT CHOON

Page 261: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

MC is required to make application in accordance withsection 17A STA 1985 using Form 9 after obtaining acomprehensive resolution for the approval of the Directorof Lands and Mines Office (PTG) for the issuance of sub-MCcertificates requested.

Prior to submitting PK(HBT) with application to PTG, it is theresponsibility of LLS to be appointed to ensure that no HBTboundary amendment after the comprehensive resolutionis obtained. A new comprehensive resolution should beobtained if the LCP boundary is modified after acomprehensive resolution is obtained.

261

FINAL

SR DR TAN LIAT CHOON

Page 262: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

ACTION AFTER DIRECTOR OF SURVEY RECEIVING LCP FAILNUMBER APPLICATION, LCP FIELD BOOK NUMBER ANDLCP PLAN NUMBER FROM LLS

Upon receipt of the application from LLS, the Director ofSurvey shall:

• Prepare a sub-file from the existing file number of thestrata application. For example, if the previoussubdivision of building file was PUBLJB1_2010, the sub-file number for PK(HBT) application wasPUBLJB1_2010(HBT);

262

FINAL

SR DR TAN LIAT CHOON

Page 263: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

• Register the number of the field book and the PK(HBT)number and supplied to the LLS. For example, if theexisting field book number is BK 1010, the sub-field booknumber for PK(HBT) is BK 1010(HBT);

• Updates LCP special plan registration book containinginformation of file number, PK(HBT), field book number,scheme number and scheme name, LLS name andapplication status.

263

FINAL

SR DR TAN LIAT CHOON

Page 264: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

APPLICATION PROCEDURE

When submitting an application to PTG, LLS is required to submitthe following documents:

• Form 9;• Fees;• Current quit rent receipt;• A copy of a comprehensive resolution together with a

certificate signed by the Commissioner of Building;• Field book;• Four (4) sets of PK(HBT) on laminated paper; and• One (1) set of PK(HBT) on a polyster paper to be deposited to

JUPEM State if the checking is in order. 264

FINAL

SR DR TAN LIAT CHOON

Page 265: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

ACTION TAKEN BY DIRECTOR OF SURVEY AFTER RECEIVEDPK(HBT) FROM THE STATE DIRECTOR OF LANDS ANDMINES OFFICE

• Upon receipt of PK(HBT) from PTG, the Director of Surveyshall check the PK(HBT) and carry out any checking workin accordance with the checklist.

• The checking fee is based on the rate of job checking atthe office and the field work done by the JUPEM.

265

FINAL

SR DR TAN LIAT CHOON

Page 266: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

APPLICATION CHECKING PROCESS FOR PL(HBT)

The checking process is based on the following principles:

• All survey work done complies with the requirements of STA1985 and JUPEM regulations;

• The PK(HBT) submitted shall be based on the measurementsdone in the field;

• The work carried out was fully checked by the LLS beforebeing sent to the State JUPEM for the checking of the Directorof Survey; and

• Any mistake of the work submitted to be the responsibility ofLLS.

266

FINAL

SR DR TAN LIAT CHOON

Page 267: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

Application Document Checking

• Checking on copy of documents should be made to ensurethat some of the important conditions are met before fieldchecking are carried out. Document checking should bereviewed within 7 days from the date of receipt of thedocument.

• In case of mistake in the presentation of the plan, theapplication documents will be returned to LLS and shall becorrected and remedied within 14 days from the date of theinquiry. Failure to return a query within a prescribed periodmay result the checking as not in order.

267

FINAL

SR DR TAN LIAT CHOON

Page 268: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

Field Checking

• Field Checking should be checked within 21 days fromthe date of receipt of the document.

• For LCP located on the ground level, it shall beascertained that there is a boundary mark of the pipe orspike, walled structure, fence, building and any othermark as it may deem reasonable to separate or show theseparate LCP area.

268

FINAL

SR DR TAN LIAT CHOON

Page 269: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

For LCP area located above or inside the building, thereshall be boundary marks such as nails, spike, metal stripes,walled structure, fence, building, cement/floor surface ofdifferent types or marble or any other marks deemed fit toseparate or show the separate LCP area.

269

FINAL

SR DR TAN LIAT CHOON

Page 270: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

PK(HBT) Application Comment

• The Director of Survey shall notify PTG, applicant, LLS andthe Land Surveyors Board of Malaysia whether theapplication is in order or not. For an in order application,a TERATUR (in order) comment letter will be issued tothe applicant within 30 days from the date of receipt ofthe complete application.

• For an in order application, three (3) copies of thecertified PK(HBT) will be sent to PTG.

270

FINAL

SR DR TAN LIAT CHOON

Page 271: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

• In the case of a TIDAK TERATUR (not in order)application shall be notified to PTG, applicant, LLS andthe Land Surveyors Board of Malaysia.

• In the event the applicant wishes to amend the PK(HBT)after the certificate has been issued, the applicant mustre-acquire a comprehensive resolution in accordancewith the provisions of the STA 1985 and submit to PTGfor the amendment of the relevant PK(HBT). Theapplication must be re-submitted and considered as anew application.

271

FINAL

SR DR TAN LIAT CHOON

Page 272: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Application For Establishment Of Sub-MC

Checking Period• The PK(HBT) application checking period shall be completed

within 30 days from the date of receipt of completeapplication documents.

Comment Submission Method• Three (3) copies of PK(HBT) and a official comment letter from

the Director of Survey shall be submitted to the PTG byregistered post or by hand.

LCP Special Plan Field Book• Updates the information in the PK(HBT) list.

272

FINAL

SR DR TAN LIAT CHOON

Page 273: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Prescribed Fees

No. Subject Matter Form Amount of Fee (RM)

1 Filling schedule of parcels 1 100-00

2 Filling revised schedule of parcels 1A 500-00

3 Filling amended schedule of parcels 2 100-00

4 Filling revised amended schedule of parcels 2A 500-00

5 Filling allocated share units 3 100-00

6 Filling management agreement 20-00

7 Filling of bond 12 or 24 20-00

8 Filling sworn application for warrant of attachment 21 100-00

9 Filling notice of intention by developer to deliver vacant possession

25 100-00

10 Filling claim against Common Property Defects Account 27 50-00

273

FINAL

SR DR TAN LIAT CHOON

Page 274: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

MC dikehendaki membuat permohonan mengikut peruntukan dibawah seksyen 17A AHS 1985 menggunakan Borang 9 selepasmendapat resolusi komprehensif bagi kelulusan Pengarah Tanahdan Galian (PTG) untuk pengeluaran perakuan sub-MC yangdipohon.

Sebelum mengemukakan PK(HBT) bersama permohonan kepadaPTG, adalah menjadi tanggungjawab JTB yang dilantik bagimemastikan tidak berlaku sebarang pindaan sempadan HBTselepas resolusi komprehensif diperolehi. Satu resolusikomprehensif yang baru perlu diperolehi jika sempadan HBTdipinda selepas resolusi komprehensif diperolehi.

274

FINAL

SR DR TAN LIAT CHOON

Page 275: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

275

FLOWCHART OF ESTABLISHMENT OF SUB-MC APPLICATION

FINAL

SR DR TAN LIAT CHOON

Page 276: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

TINDAKAN PENGARAH UKUR SELEPAS MENERIMAPERMOHONAN NOMBOR FAIL HBT, NOMBOR BUKUKERJALUAR HBT DAN NOMBOR PELAN HBT DARIPADA JTB

Sebaik sahaja menerima permohonan daripada JTB,Pengarah Ukur hendaklah:

• Menyebabkan satu sub-fail daripada nombor fail asalpermohonan strata dibuka. Sebagai contoh, sekiranyaFail Permohonan Pecah Bahagi Bangunan sebelum iniadalah PUBLJB1_2010, nombor sub-fail bagi permohonanPK(HBT) adalah PUBLJB1_2010(HBT);

276

FINAL

SR DR TAN LIAT CHOON

Page 277: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari• Menyebabkan nombor buku kerjaluar dan nombor

PK(HBT) didaftar dan dibekalkan kepada JTB berkenaan.Sebagai contoh, sekiranya nombor buku kerjaluarsebelum ini adalah BK 1010, nombor sub-buku kerjaluarbagi permohonan PK(HBT) adalah BK 1010(HBT);

• Mengemaskini buku daftar pelan khas HBT yangmengandungi maklumat-maklumat nombor fail, nomborPK(HBT), nombor buku kerjaluar, nombor skim dan namaskim, nama JTB dan status permohonan.

277

FINAL

SR DR TAN LIAT CHOON

Page 278: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

278

FINAL

SR DR TAN LIAT CHOON

Page 279: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

PROSEDUR PERMOHONAN

Semasa mengemukakan permohonan kepada PTG, JTBdikehendaki mengemukakan dokumen-dokumen berikut:

• Borang 9;• Fi yang ditetapkan;• Resit cukai tanah semasa;• Satu salinan resolusi komprehensif bersama dengan perakuan

yang ditandatangani oleh Pesuruhjaya Bangunan;• Buku kerjaluar;• Empat (4) set PK(HBT) di atas kertas plotan berlamina; dan• Satu (1) set PK(HBT) di atas kertas polyster untuk didepositkan

di bilik kebal JUPEM Negeri sekiranya ulasan teratur. 279

FINAL

SR DR TAN LIAT CHOON

Page 280: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

TINDAKAN PENGARAH UKUR SELEPAS MENERIMA PK(HBT)DARIPADA PENGARAH TANAH DAN GALIAN NEGERI

• Sebaik sahaja menerima PK(HBT) daripada PTG, PengarahUkur hendaklah menyebabkan PK(HBT) disemak sertamenjalankan apa-apa kerja semakan berpandukansenarai semak.

• Bayaran semakan adalah berdasarkan kepada kadarsemakan kerja di pejabat dan kerjaluar yang dikeluarkanoleh pihak JUPEM.

280

FINAL

SR DR TAN LIAT CHOON

Page 281: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

281

FINAL

SR DR TAN LIAT CHOON

Page 282: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

282

FINAL

SR DR TAN LIAT CHOON

Page 283: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

PROSES SEMAKAN PERMOHONAN PK(HBT)

Proses semakan dibuat berdasarkan kepada prinsip-prinsipberikut:

• Semua kerja ukur yang telah dilaksanakan mematuhikehendak AHS 1985 dan peraturan-peraturan JUPEM;

• PK(HBT) yang dikemukakan hendaklah berdasarkan maklumatukuran yang telah dibuat di lapangan;

• Kerja yang dijalankan telah disemak sepenuhnya oleh JTBberkenaan sebelum dihantar ke JUPEM Negeri untuk ulasanPengarah Ukur; dan

• Salah betul kerja yang dikemukakan adalah menjaditanggungjawab JTB berkenaan. 283

FINAL

SR DR TAN LIAT CHOON

Page 284: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

Semakan Dokumen Permohonan

• Semakan ke atas salinan dokumen hendaklah dibuat bagimemastikan beberapa syarat utama dipatuhi sebelum semakanlapangan dijalankan. Semakan Dokumen hendaklah disemakdalam tempoh 7 hari daripada tarikh penerimaan dokumen.

• Sekiranya terdapat kesilapan dari segi persembahan pelan,dokumen permohonan akan dikembalikan kepada JTB danhendaklah diambil tindakan pembetulan serta dikemukakansemula dalam tempoh 14 hari dari tarikh pertanyaan. Kegagalanmengembalikan pertanyaan dalam tempoh yang ditetapkanboleh menyebabkan ulasan tidak teratur dikeluarkan.

284

FINAL

SR DR TAN LIAT CHOON

Page 285: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

Semakan di Lapangan

• Semakan Lapangan hendaklah disemak dalam tempoh 21hari daripada tarikh penerimaan dokumen.

• Bagi HBT yang terletak di atas permukaan tanahhendaklah dipastikan terdapat tanda sempadan paipatau pepaku, binaan berdinding, pagar, bangunan dansebarang tanda lain yang difikirkan munasabah bagimemisahkan atau menunjukkan kawasan HBT yangberasingan tersebut.

285

FINAL

SR DR TAN LIAT CHOON

Page 286: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

Bagi kawasan HBT yang terletak di atas atau di dalambangunan, hendaklah dipastikan terdapat tandaansempadan seperti paku, pepaku, metal strip, binaanberdinding, pagar, bangunan, permukaan simen/lantai yangberlainan jenis atau marmar atau sebarang tanda lain yangdifikirkan munasabah bagi memisahkan atau menunjukkankawasan HBT yang berasingan tersebut.

286

FINAL

SR DR TAN LIAT CHOON

Page 287: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

Ulasan Permohonan PK(HBT)

• Pengarah Ukur hendaklah memaklumkan kepada PTG,pemohon, JTB dan Lembaga Juruukur Tanah Malaysiasama ada permohonan tersebut teratur atau tidak. Bagipermohonan yang teratur, satu surat ulasan TERATURakan dikeluarkan kepada pemohon dalam tempoh 30hari dari tarikh terima permohonan yang lengkap.

• Bagi permohonan yang teratur, tiga (3) salinan PK(HBT)yang telah disahkan teratur akan dihantar kepada PTG.

287

FINAL

SR DR TAN LIAT CHOON

Page 288: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

288

FINAL

SR DR TAN LIAT CHOON

Page 289: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari• Bagi kes permohonan yang TIDAK TERATUR hendaklah

dimaklumkan kepada PTG, pemohon, JTB dan LembagaJuruukur Tanah Malaysia.

• Sekiranya pemohon ingin meminda PK(HBT) selepasperakuan dikeluarkan, pemohon perlu mendapatkansemula resolusi komprehensif mengikut peruntukan dibawah APS 1985 dan mengajukan kepada pihak PTGuntuk melaksanakan pindaan ke atas PK(HBT) berkenaan.Permohonan semula perlu dikemukakan dan dianggapsebagai permohonan baru.

289

FINAL

SR DR TAN LIAT CHOON

Page 290: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

290

FINAL

SR DR TAN LIAT CHOON

Page 291: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

Permohonan Penubuhan Perbadanan Pengurusan Subsidiari

Tempoh Semakan• Tempoh semakan permohonan PK(HBT) hendaklah disiapkan

dalam tempoh 30 hari dari tarikh terima dokumenpermohonan yang lengkap.

Kaedah Penyerahan Ulasan• Tiga (3) salinan PK(HBT) dan surat rasmi ulasan daripada

Pengarah Ukur hendaklah diserahkan kepada PTG secara posberdaftar atau serahan tangan.

Buku Daftar Pelan Khas HBT• Mengemaskinikan maklumat-maklumat yang berkenaan di

dalam buku daftar PK(HBT).291

FINAL

SR DR TAN LIAT CHOON

Page 292: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

292

FINAL

SR DR TAN LIAT CHOON

Page 293: LAND LAW AND SURVEY REGULATION (SGHU 3313) SR DR TAN …

T H A N K YO U

293

FINAL

SR DR TAN LIAT CHOON