Transcript of Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Oragvis-Gele RC Tank Construction
(1,900m3)
A part of Lanchkhuti City Water Supply System
MULTIPLE LEAKAGES RECORDED, PREVIOUS REPAIR ATTEMPTS BY PLASTERING OF SURFACE NOT SUCCESSFUL.
ORIGINALLY PLANNED REPAIRS OF EXISTING RC TANK BY CLEANING OF PLASTER AND IRONING OF WALLS & ROOF SLAB - NOT IMPLEMENTED DUE TO DETERIORATED CONDITION OF THE TANK.
Existing RC Tank Status
During the original construction of existing Tank – concrete cover has not been provided for roof slab re-bars, instead – plaster was applied, which has falling off repeatedly. High moisture environment caused severe corrosion of steel reinforcement.
Planned Construction Method
Existing Tank shell to be used for construction of new RC Tank; -Horizontal PVC Water Stop between wall kickers in base slab & wall segments; -- Vertical PVC Water Stop between 4nr Wall segments
SOIL COVER (30CM) & REMAINING HYDRO-INSULATION REMOVAL
TO ENABLE ENTRY FOR CONSTRUCTION OF NEW RC TANK
EXISTING TANK BASE SLAB PREPARED FOR REINFORCEMENT
NEW RC TANK – BASE SLAB REINFORCING WORKS
SURVEY CONTROL COLUMN PLINTHS FORMWORK, PVC WATER-STOP INSTALLATION
HORIZONTAL PVC WATER STOP IN BASE SLAB’S WALL KICKER
HORIZONTAL / VERTICAL WATER STOP FOR CONSTRUCTION JOINTS
VISIBLE VERTICAL PVC WATER STOPS FOR WALL’S SEGMENTS JOINTS
VISIBLE VERTICAL PVC WATER STOPS FOR WALL’S SEGMENTS JOINTS
VERTICAL PVC WATER STOP ON CONSTRUCTION JOINT
ROOF SLAB’S REINFORCEMENT CONCRETE INSTALLATION
CONCRETE POURING CONCRETE CURING
CONCRETE CURING (7 DAYS) SEALING BETWEEN EXISTING RESERVOIR WALL AND NEW
RESERVOIR BASE SLAB BY SILICONE FOAM
RESERVOIR’S INTERIOR’S REPAIRS, CLEANING RESERVOIR BACKFILLING AFTER APPLIED HYDRO-
INSULATION
RC Tank’s Final Status